Loading...
SR - AGR-6073 - 2013-14 ANNUAL CONCRETE REPLACEMENT VARIOUS LOCATIONSUNTY TO: THRU: FROM: AGENDA ITEM February 11, 2014 Honorable Mayor and Members of the City Council John W. Sibley City Manager Joe DeFrancesco Public Works Di ector ReviewedNerified By: City Manager Finance Direc or To Be Presente Joe DeFr cesco X Cons Calendar City Mgr Rpts Council Reports _ _ Legal Affairs Boards /Cmtes Public Hrgs Admin Reports _ Plan /Environ 1. SUBJECT 7- Award of Contract; Bid No.134 -16; SP -3862; Annual Concrete Replacement at Various Locations, Fiscal Year 2013 -14. 2. SUMMARY This project is part of the annual street maintenance activities for curb and gutter, cross gutter, driveway approach, and sidewalk replacement at various locations City wide. 3. RECOMMENDATION /ACTION Award contract in the amount of $501,200 to C.J. Construction, Inc., Santa Fe Springs, CA and authorize the Mayor and the City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 263.5021.51700.00000 (Measure M — Contractual Services) $ 175,000 262.5011.56330.13120 (Local Street Maintenance) $ 161,872 262.5011.56330.14703 (Arterial Curb, Gutter & Sidewalk Repair) $ 80,127 263.5011.56330.13120 (Local Street Maintenance) $ 84,201 Total $501,200 5. STRATEGIC PLAN GOAL(S) 1 b. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 3 -1 1 02/11/2014 C Printed on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND This project is part of the annual street maintenance activities for curb and gutter, sidewalk, driveway, and cross gutter replacement at various locations City wide. Utilizing the City's Pavement Management Survey ranking of the streets, the City has prepared a list of streets requiring pavement rehabilitation for fiscal year 2013 -14. This project will complete all high maintenance areas and concrete replacement needs within these street locations before future street overlay and slurry seal work is to start. Street rehabilitation overlay and slurry seal will bid as separate projects later this fiscal year. This project is the first of three annual maintenance projects, as such; the remaining funds available in the 13120 project account are still needed. The City Council previously approved advertisement for bids on December 10, 2013. The project was publicly advertised for four (4) weeks. The bids were opened on January 9, 2014. Thirteen (13) bid proposals were sold and seven (7) bidders responded as follow: 1. C.J. Concrete Construction, Inc $501,200 2. Grigolla & Sons Const. Co., Inc. $534,800 3. Super Technical, Inc. $586,704 4. Golden State Constructors $631,530 5. Kalban, Inc. $711,600 6. El Camino Construction & Eng. $740,350 7. Los Angeles Engineering, Inc. $968,615 The estimated total quantities of concrete replacement at various locations, FY 2013 -14 is as follows: 1. 5,000 linear feet of curb and gutter 2. 45,000 square feet of sidewalk 3. 2,000 square feet of driveway apron 4. 10,000 square feet cross gutter and spandrel The estimated project cost is $551,320, which includes the apparent low bid of $501,200, approximately 10% contingency and contract administration costs. Staff will determine the needs at other locations as the budget allows. Construction is scheduled to begin in late February 2014 and be completed by May 2014. 8. ATTACHMENTS Bid Abstract JD:at:lyN:\Public Works\ADMIN \LYoung \Council Items \COUNCIL \Feb - 2014\2- 11 -14 \SP 3862 Award Annual Concrete 13 -14 - DRAFT.docx ITEM 2 02/11/2014 O Printed on Recycled Paper