Loading...
SR - AGR-6069 - INTERIOR RECOATING RESERVOIR NO 5AGENDA ITEM February11,2014 TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley City Manager FROM: Joe DeFrancesco Public Works D' ector ReviewedNerifi City Manager Finance Directo To Be Presented Joe rancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Crates Public Hrgs Admin R is Plan /Environ 1. SUBJECT Award of Consultant Services Agreement to Harper & Associates Engineering, Inc. for professional services for the interior recoating of Reservoir No. 5. 2. SUMMARY This Agreement authorizes the consultant to evaluate Reservoir 5's interior coating and develop technical specifications for the repair work including quality control and inspection throughout the course of the project. 3. RECOMMENDED ACTION Award a Consultant Service Agreement to Harper & Associates Engineering, Inc. of Corona, CA, in an amount not to exceed $55,035.00 and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and are available in the following accounts: 600.8041.56451.18302 Reservoir Recoating $401,072.00 5. STRATEGIC PLAN GOAL(S) lb) Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 2d) Be a fiscally healthy community - Effectively manage and develop City assets. 4b) Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM �3 2/11/14 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND Reservoir No. 5 is a welded steel water storage tank located at 694 N. Cannon Street. It was constructed in 1967 serving zone 2 of the City's water system. Reservoir 5 has a five (5) million gallon capacity and is partially buried in the sub - grade. The tank is currently protected from corrosion by a combination of protective coatings and a cathodic protection system. Periodic repair and replacement of the tank's coating is necessary to prevent corrosion and preserve the tank structure. Reservoir 5's interior coating has been inspected and found to be in significant need of interior recoating to maintain maximum corrosion protection. Proposals were solicited from five (5) qualified engineering firms that specialize in protective coating and corrosion control. Three (3) responded with a written proposal. All proposals were carefully reviewed and assessed independently by the review panel. The proposals were evaluated based on team qualifications, professional experience, detail of proposal, and project schedule. Four raters collectively recommended Harper & Associates Engineering, Inc. as the top ranked consultant. The summary of ranking and associated costs is as follows: CONSULTANT 1 Harper & Associates Engineering, Inc. 2 CSI Services 3 Tank Industry Consultants 4 KTA 5 SGPinney AMOUNT $55,035.00 $56,555.00 $92,825.00 Unable to submit Proposal Unable to submit Proposal Upon reviewing the proposals, Harper & Associates Engineering, Inc. of Corona, CA was determined to be the best qualified consultant to provide the professional services outlined in the Request for Proposal. Therefore, staff is recommending award of the contract to Harper & Associates Engineering, Inc. in the amount of $55,035.00. 8. ATTACHMENTS • Consultant Services Agreement • Rater Summary Sheet ITEM 2/11/14 2