HomeMy WebLinkAbout4_18_2000 - Council Minutes - Adjourned Regular MeetingAPPROVED BY THE CITY COUNCIL ON MAY 9, 2000
CITY COUNCIL MINUTES ORANGE, CALIFORNIA
OF AN ADJOURNED REGULAR MEETING April 18, 2000
The City Council of the City of Orange, California, convened on April 18, 2000 at 5:20 p.m. in
an Adjourned Regular Meeting in the Weimer Room, 300 E. Chapman Avenue, Orange,
California.
5:00 P.M. SESSION
1. OPENING
1.2 PLEDGE OF ALLEGIANCE TO THE FLAG
Led by Mayor Coontz
1.3 ROLL CALL
CITY COUNCIL
PRESENT - Murphy, Slater, Mayor Coontz ABSENT -
Murphy, Spurgeon, Alvarez Note: Councilman
Murphy arrived at 5:20 p.m.)PLANNING COMMISSION
PRESENT - Bosch,
Pruett, Romero, Carlton ABSENT - Smith (Note:
Commissioner Smith arrived at 5:40 p.m.)1.4 PRESENTATIONS/ANNOUNCEMENTS/
INTRODUCTIONS - None 2. PUBLICCOMMENTS - None 3.
CONSENT CALENDAR All items on
the Consent Calendar
are considered routine and are enacted by one motion approving the recommended action listed on
the Agenda. Any member of the City Council, staff or the public may
request an item be removed from the Consent Calendar for discussion or separate action. Unless
otherwise specified in the request to remove an item from the Consent Calendar, all
items removed shall be considered immediately following action on the remaining items
on the Consent Calendar.3.1 Declaration of City Clerk,
Cassandra J. Cathcart, declaring posting of City Council agenda of An adjourned regular meeting
of April 18, 2000 at Orange Civic Center,Main Library at 101 N. Center
Street, Police facility at 1107 North Batavia, the Eisenhower Park Bulletin Board, and summarized
on Time-Warner Communications, all of said locations
being in the City of Orange and freely accessible to members of the
public at least 72 hours before commencement of said adjourned regular meeting.Page 1
CITY COUNCIL MINUTES April 18, 2000
3. CONSENT CALENDAR (Continued)
ACTION: Accepted Declaration of Agenda Posting and authorized its retention as
a public record in the Office of the City Clerk.
MOTION - Slater SECOND -
Murphy AYES - Murphy,
Slater, Mayor Coontz ABSENT - Spurgeon, Alvarez
Item 3.1 was
approved as recommended. (Note: The Consent Calendar was approved at 6:25 p.m.
with a quorum.)END OF CONSENT CALENDAR
4. REPORTS FROM MAYOR
COONTZ - None 5. REPORTS FROM COUNCILMEMBERS - None
6. REPORTS FROM BOARDS, COMMITTEES, AND
COMMISSIONS - None NOTE: Mayor Coontz convened the meeting at
5:20 p.m. when Councilman Murphy arrived and a quorum was present.7.
ADMINISTRATIVE REPORTS 7.1 Report on
the Seven Year
Capital Improvement Program. (Report on file in the City Clerk's Office.)The City Manager
reported the CIP identifies
207 projects that are being proposed for the seven year period. For the upcoming fiscal year
38 new projects are being proposed and 135 projects are a continuation of previously approved projects.
With these projects, the City Council is investing over $35 million in capital improvements
in the upcoming fiscal year and more than 159 million over the seven year CIP
planning horizon. Maintenance of effort calculations have been made in order that the City
should remain eligible to receive Measure M funds for street improvement, maintenance and traffic safety projects.The
following department heads gave an overview
of their projects:Public Works In response to Planning Commissioner
Carlton's
questions and concerns, the Director of Public Works commented on the following:City Monument
Entry Sign Project - It was
approved by Council and is out to bid at this time.The new signs are the same design except
they are concrete rather than wood with landscaping surrounding the base.PAGE 2
CITY COUNCIL MINUTES April 18, 2000
7. ADMINISTRATIVE REPORTS (Continued)
Realignment of Hewes - The developer has built their portion and the City's project is to complete
the roadway. The developer has to put up cash which goes into a deposit trust account the
City holds until the project begins. The interest earnings are utilized to offset any inflationary
costs which may occur.Cannon
Street Project - This is an alignment study at this point. No rights-of-way are being
acquired at this time. The study will be completed at the end of this year. The City has acquired
three houses on a voluntary basis. There is one more full parcel to acquire and two partial takes
remaining. However, the City will not pursue those until funding is identified for the project.
Sidewalk - Funds identified in the CIP are targeted for the next fiscal year. This sidewalk program
is to fill in gaps and provide sidewalks where there are none. Commissioner Carlton did not
feel that $50,000 was enough to handle the project. The Public Works Director indicated sidewalk
repair was handled elsewhere in the budget.Taft/
Glassell Left Turn Phasing - This project is under design at the present time.Purchase of
190 S. Olive Street - The City has purchased the property for the future expansion of the Senior Center.
Yorba Street Extension
Project - Commissioner Bosch asked about the project at the Yorba Street extension and what
process will be in place relative to the community impact issues. The Director of Public Works
commented at this time the City is in the process of completing alignment studies. When complete
the City will take the proposed alignments to the community for meetings to receive
input and incorporate community comments to be presented to Council for adoption of the
alignment. Pending private development in the area north of Chapman and also the potential Rock
Creek Park expansion will be affected by the alignment.Signals - La Veta/Palmyra/
Prospect - Commissioner Bosch notedfor the past several years the signal proposals at LaVeta/Prospect and
Palmyra/Prospect have beendiscussed and deferred several times until warrants became strong.
The moneys are now budgeted again and he asked if land acquisition was involved? The Public
Works Director reported there are no right-of-way acquisitions, and both locations
do meet warrants. The Palmyra/Prospect is the stronger of the two, although they both
are marginal in meeting warrants. Because of the McPherson Athletic activities, there is a
lot of pedestrian activity and some high peak times. To get better separation of pedestrian traffic and
vehicular traffic to handle it with a safe fashion, that signal would make sense to approve.Commissioner
Bosch commented he
was glad to see the Mall of Orange Transit Center Study listed in the CIP.
However concern was expressed regarding the continuing problems interfacing with OCT A on
Canal and Heim Streets and the protection of residential neighborhoods. It was asked if there is
a better protocol now to work with them to resolve these issues?PAGE 3
CITY COUNCIL MINUTES April 18, 2000
7. ADMINISTRATIVE REPORTS (Continued)
The Public Works Director reported OCTA ultimately decides where the bus stops are located.
They have been very cooperative with the City and have made adjustments. The Straight Line
Project will reduce the number ofbuses in that area and an evaluation will be forthcoming.
Commissioner Bosch noted the Edwards House access ramp sets a great example for Old Towne
residents on how to conform to the historic nature of their residences as it relates to porches and
stairs.
Councilman Slater commented regarding the LaVeta/Palmyra/Prospect Street signalization issue,
he had expressed major reservations concerning the signalization of these two intersections, and
asked the Public Works Director to compare this site with the Handy/Collins intersection as it
relates to how the process would take place.
The Public Works Director reported Handy and Collins had a number of issues other than the
traffic signals, i.e., parking, speeding, etc. It was proposed the City will conduct a community
meeting to introduce the signalization proposal and find out what other issues are of concern.
Councilman Slater indicated the bottom line before a final approval of the project would be to
have the neighborhood buy into the project. Also, it is difficult to turn left from Fairhaven onto
Prospect which is also in the County. Has there been any study done on that intersection and if
not how could the City begin? The Public Works Director indicated he was not aware of any
study, but could request the County as lead agency begin the process. The City Manager
indicated he would look at the area when the annexation island studies begin. Councilman Slater
also felt the intersection at South Prospect and Fairhaven be included.
Mayor Coontz commented there have been many complaints concerning East Chapman Avenue
and the condition of the pavement which has not been addressed in the CIP. These complaints
have occurred over a period of time and even before the CalTrans work on the 55 Freeway. The
Public Works Director responded most of the rehabilitation jobs are being done with grant
funding. As the higher priority jobs are funded there will be more opportunity to submit
rehabilitation projects for funding with a much better prospect.
Mayor Coontz further commented after sidewalks are marked for repair and there is no follow
through for the repair work, it was recommended the City prioritize sidewalk repairs ideally
through a computerized program. The Public Works Director indicated a consultant has been
hired for the work management program and it will include computerized reporting of outside
calls on sidewalk repair and an internal work order system which will enable a better priority
system and control. Mayor Coontz indicated when the public calls they need to know when the
repair will occur. It is a matter of managing information.
PAGE 4
CITY COUNCIL MINUTES April 18, 2000
7. ADMINISTRATIVE REPORTS (Continued)
Commissioner Smith commented on the Chapman Avenue pavement rehabilitation which is
occurring at this time and informed the Public Work's Director the residents were not informed
of the work being done at night, only the businesses that are located on Chapman A venue were
notified. The Public Works Director responded the mind set was Chapman is a commercial
street but they should have looked at the impacts to the residents also.
Bob Bennyhoff inquired about the widening of Chapman Avenue from Crawford Road to
Orange Park Boulevard. The Public Works Director responded it depends on what comes out of
the environmental and traffic studies for the Santiago Hills II proj ect as well as subsequent
projects. At this time there is no funding projected in this CIP.
Mayor Coontz complimented the Public Works Director and his staff for their continued efforts
to achieve grants and the management of their capital improvement projects.
Management Information Systems - presented by the Senior Assistant to the City Manager Planning
Commissioner Carlton asked if the center microphone in the Council Chambers had been
repaired. The City Manager indicated it is being considered to possibly use the center microphone
for the public and applicant presentations.Fire
Department - Frank Frasz, Division Chief Mayor Coontz
commented for future CIP documents, Fire Station locations need to be shown.Regarding Fire
Station design, Division Chief Frasz reported the design was a schematic design that can
be used for any future fire station.Councilman Murphy
commented it was interesting how Station 8 was put together with a temporary site
first, then the permanent site and with no disruption of service to the area.Mayor Coontz
asked if Fire Station No.3 would be moving to the industrial area? Chief Frasz said their
preference would be to relocate it for better coverage, but it is not proposed at this time.Police Department -
Chief Romero Community Services - Director
Gary Wann Commissioner Smith asked about
a community center. The Director of Community Services commented the funding has
not been proposed. The City Manager indicated funding sources for a community center have
been discussed however other projects have taken precedence. The owner of the Adray'
s Building was contacted for this use, however Mr. Adray has a value for the property that is astronomical.
PAGE 5
CITY COUNCIL MINUTES April 18, 2000
7. ADMINISTRATIVE REPORTS (Continued)
Mayor Coontz commented one of the problems is in the planning of a community center that
everyone has a different concept of what a community center is. Some people believe a
community center is primarily for sports, others believe it should be for meetings and cultural
events. We need to concentrate on what sites are available now for use by the community.
Commissioner Carlton asked what would be the ideal square footage for a community center.
The Community Services Director estimated more than 20,000 square feet which would be the
focal point in the community like the City of Brea and Garden Grove.
Mayor Coontz asked the status and timeline for Belmont Park. The Community Services
Director indicated two bids have been obtained from environmentalist and a third is being
sought. Parking and traffic issues need to be addressed and when completed, it will be presented
to Council.
Councilman Slater asked for the timeline. The Community Services Director commented as
soon as the third bid is obtained, the RFP will go to Council. The construction will take
approximately 90 to 120 days.
Councilman Murphy commented it would be wise to place a community center line item in the
CIP even if it has zeros to keep it as a priority for discussions. Also, the City Manager is to
provide a target of square footage and factor in a number as an estimate.
Plaza Rennovation
Mayor Coontz commented when the plaza work begins, the community needs to be informed of
what will be happening and when. Communication is important and must indicate the progress
and steps that will be taken as the project progresses. The City Manager indicated a professional
consultant service will be hired to assist with this project. The target is to have the project bid
and ready to begin construction after the holidays. Meetings need to be held with the merchants
to confirm there is a consensus to meet the January to March window and if delayed, there will
be a March to May window.
Economic Development
Councilman Slater inquired what amount was considered for the Mobile Home Rental Assistance
Program?
The Housing Manager reported it began at approximately $200,000 and is now down to twelve
people.
PAGE 6
CITY COUNCIL MINUTES April 18, 2000
7. ADMINISTRATIVE REPORTS (Continued)
Councilman Murphy asked if Experian will meet their obligation through 2003 and will it take
them that long to build the building? The City Manager responded their lease will go through
and they indicated they will honor their agreement.
Commissioner Carlton asked if the priority was a parking lot at 190 S. Olive St. The City
Manager responded there are parking problems at the senior center and this will alleviate them.
It may turn into an expansion ofthat facility.
Seismic Retrofit of City Hall - City Manager The
City Manager reported on the costs and logistics of seismic retrofitting City Hall. In response
to Mayor Coontz, the City Manager reported a new City Hall could come before Council
with a financing mechanism, but will be very costly and there are other priorities such as community
centers, libraries, etc.The
Public Works Manager reported they will be preparing the plans for the retrofit work through
the remaining fiscal year. There will be probably six months of down time, maximum of nine
months. Contingencies have been factored in the costs.Commissioner
Carlton asked if the current City Hall buildings would be equipped to hold a second
story? The City Manager answered they would not. Mayor Coontz indicated City Hall buildings
were built in 1961, and at the time it was believed to be strong enough in structure to withstand
earthquakes. The buildings were also designed as a civilian defense center which is why
there is a basement. However, after the Northridge earthquake priorities changed.Bob
Bennyhoff asked how old the City Hall buildings were? Mayor Coontz answered they were 40
years old.Commissioner
Bosch asked about FEMA funds and their time constraints on grants? The City Manager
reported it is nearing the end of the time frame to access the money. If it is not used it will
go back for reallocation. Mayor Coontz asked if the seismic retrofitting will be happening the
same time the plaza will be renovated? The City Manager indicated yes.8.
REPORTS FROM CITY MANAGER - None 9. LEGAL
AFFAIRS - None PAGE 7
CITY COUNCIL MINUTES April 18, 2000
10. ADJOURNMENT
MOTION - Mayor Coontz SECOND -
Slater AYES - Murphy,
Slater, Mayor Coontz ABSENT - Spurgeon, Alvarez
The City Council joint
meeting was adjourned at 6:30 p.m.NOTE: Commissioner Bosch announced
the Planning Commission will adjourn to a Study Session on May 1,
2000 at 5:30 p.m. in the Weimer Room for a presentation on the West Chapman Avenue Project. The
motion was unanimously approved.CltA~-(A'$J1~~d
CASSANDRA J. THCART, CMC CITY
CLERK JOANNE COONT /u
MAYOR PAGE
8