Loading...
HomeMy WebLinkAboutAGR-7804 - CITIES OF SANTA ANA, BREA, PLACENTIA, ANAHEIM - KRAMER, GLASSELL, GRAND CORRIDOR TRAFFIC SIGNAL PROJECT 1 COOPERATIVE AGREEMENT BY AND BETWEEN THE CITIES OF SANTA ANA, BREA, PLACENTIA, ANAHEIM, AND ORANGE FOR THE KRAEMER BOULEVARD/ GLASSELL STREET/ GRAND AVENUE CORRIDOR TRAFFIC SIGNAL SYNCHRONIZATION PROJECT This Cooperative Agreement (“Agreement”) is made and entered into this day of , 2025, by and between the CITY OF SANTA ANA, a charter city (“SANTA ANA”), the CITY OF BREA, a municipal corporation (“BREA”), the CITY OF PLACENTIA, a municipal corporation (“PLACENTIA”), the CITY OF ANAHEIM, a municipal corporation (“ANAHEIM”), and the CITY OF ORANGE, a municipal corporation (“ORANGE”). RECITALS: A. Santa Ana, with cooperation from Brea, Placentia, Anaheim, and Orange, applied for a grant from the Orange County Transportation Authority (“OCTA”) as part of Renewed Measure M2 Regional Traffic Signal Synchronization Program (“RTSSP”) (Project P), aimed to coordinate traffic signals across multiple jurisdictions to enhance countywide traffic flow and reduce congestion. B. The Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor Traffic Signal Synchronization Project was selected by OCTA as one of the RTSSP Projects to be funded in OCTA Fiscal Year 2024-2025. The project will include timing implementation and improvements at traffic signals along Kraemer Boulevard/ Glassell Street/ Grand Avenue, from Lambert Road in Brea to Dyer Road in Santa Ana, as listed in the Project Application attached hereto as Exhibit B and incorporated herein by this reference. C. The total budget for the project is $5,710,657.50. 80% ($4,568,526) is funded by the OCTA Regional Traffic Signal Synchronization Program and 20% ($1,142,131.50) is local agencies matching funds. The breakdown is shown in Exhibit A attached hereto and incorporated herein by this reference. D. Santa Ana, Brea, Placentia, Anaheim, and Orange agree to provide twenty percent (20%) matching funds for the total project cost. Matching funds can be a combination of cash and in-kind match as defined by the RTSSP grant. E. OCTA and Santa Ana have entered into a Master Funding Agreement “Cooperative Agreement No. C-1-2783” defining the terms and conditions for approved Measure M2 projects that will be implemented by Santa Ana. F. Santa Ana agrees to serve as the lead agency to oversee the design and implementation of the project. G. Santa Ana, Brea, Placentia, Anaheim, and Orange desire to enter into this Cooperative Agreement to demonstrate their commitment to implement the project and improve inter- jurisdiction traffic signal synchronization on Kraemer Boulevard/ Glassell Street/ Grand Avenue. Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 AGR-7804 2 H. This cooperative agreement defines the specific terms, conditions and funding responsibilities between Santa Ana, Brea, Placentia, Anaheim, and Orange for the implementation of the project. NOW, THEREFORE, it is mutually understood and agreed by and between SANTA ANA, BREA, PLACENTIA, ANAHEIM, and ORANGE as follows: I. SCOPE: This Agreement specifies the roles and responsibilities of the cities as they pertain to the subjects and projects addressed herein. The project is specifically detailed in the Project Application attached hereto as Exhibit B and incorporated herein by this reference. All of the cities agree that each will cooperate and coordinate with the other in all activities covered by this Agreement and any other supplemental agreements that may be required to facilitate purposes thereof. II. MUTUAL RESPONSIBILITIES: Santa Ana, Brea, Placentia, Anaheim, and Orange mutually agree to: a. Designate a lead staff to act as the liaison for the project. The liaison and any other project personnel, if necessary, will attend and participate in all related project meetings. b. Participate, cooperate and coordinate with contractors, consultants, vendors and staff in good faith using reasonable efforts to resolve any unforeseen issues and disputes arising out of the project to the extent practicable with respect to the performance of the project. c. Maintain project related traffic signals and telecommunications equipment with high priority during the project, and be responsible for repair of their own signal control systems in each of their respective jurisdictions. d. Provide on-site support for signal control systems, timing plans, detection systems and related equipment during construction, installation and integration, and be available to change or make adjustments to timing plans when necessitated by the project. e. Document in-kind match or dollar match funding as identified in the project application, and provide verification of such expenditures as part of any review or audit process, which may include payroll records, contracts and purchase orders. f. Monitor and operate the project traffic signals and improvements within its jurisdiction for a period of two (2) years following the completion of the Primary Implementation Phase of the project, as required by the program funding. g. Coordinate the inclusion of other improvements and in-kind services, where necessary, that the owning agency requires for the implementation of the project, but are not included in the project application. The owning agency shall be responsible for the inclusion of such elements within reason and at its own costs. h. Unused project funds for improvements from one City can be used by another City (with matching fund responsibility) upon mutual consent of the involved parties. Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 3 III. RESPONSIBILITIES OF SANTA ANA: Santa Ana agrees to the following responsibilities: a. Santa Ana shall serve as lead agency for design, construction and construction management of the project, and shall provide oversight by establishing milestones and overseeing the project development to ensure that all standards and requirements set forth by the agreement is adhered to. b. Santa Ana shall be responsible for completing the project in accordance with the funding guidelines and any and all other OCTA requirements related to these funding programs. Santa Ana shall maintain coordination with all participating agencies throughout the duration of the project. c. Santa Ana shall provide staff, consultants, and contractors deemed necessary and appropriate to manage, administer, coordinate, and oversee timing implementation, engineering design, bid and award, and construction management of the project. d. Santa Ana shall enter into an agreement with a qualified consultant and contractor to assist in the completion and monitoring of the project. e. Santa Ana shall enter into any required Cooperative Agreement with Caltrans regarding Caltrans Improvements in cities; to comply with all the terms and conditions of said Cooperative Agreement; to pay invoices for such Caltrans Improvements as required by Caltrans; and to invoice participating agencies in a timely manner with detailed documentation of said Caltrans Improvements f. Santa Ana shall coordinate the work effort of this Project, provide the day to day management of the consultant and manage all consultant administration and contracting. Santa Ana shall review the consultant’s invoices and pay them accordingly after ensuring that the work has been adequately performed by the consultant. g. Santa Ana shall provide its share of matching fund as shown in Exhibit A attached hereto and incorporated herein by this reference. The final amount may vary and will be based on the 20% of actual cost of implementing all timing, improvements and maintenance, as identified in the project application. h. Upon issuance of a Notice to Proceed to the Consultant, Santa Ana can issue invoices to Brea, Placentia, Anaheim, and Orange for up to 80% of the cash match amount identified in Exhibit A. The remaining cash match amount will be invoiced after completion of the Primary Implementation Phase of the project. i. Santa Ana shall comply with all of the terms and conditions of the Cooperative Agreement with OCTA, including the Project Reporting and Audit Requirements contained therein. IV. RESPONSIBILITIES OF BREA, Brea agrees to the following responsibilities: Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 4 a. Brea shall provide its share of matching funds as shown in Exhibit A. The final amount may vary and will be based on the 20% of actual cost of implementing all timing, improvements and maintenance, as identified in the project application. b. Brea shall provide Construction Inspection on all improvements within its jurisdiction. No additional compensation from the project is provided for providing inspection services. c. Brea shall waive all costs and fees related to any and all permits, if such permits are required to perform any project related work within its jurisdiction. V. RESPONSIBILITIES OF PLACENTIA: Placentia agrees to the following responsibilities: a. Placentia shall provide its share of matching funds as shown in Exhibit A. The final amount may vary and will be based on the 20% of actual cost of implementing all timing, improvements and maintenance, as identified in the project application. b. Placentia shall provide Construction Inspection on all improvements within its jurisdiction. No additional compensation from the project is provided for providing inspection services. c. Placentia shall waive all costs and fees related to any and all permits, if such permits are required to perform any project related work within its jurisdiction. VI. RESPONSIBILITIES OF ANAHEIM: Anaheim agrees to the following responsibilities: a. Anaheim shall provide its share of matching funds as shown in Exhibit A. The final amount may vary and will be based on the 20% of actual cost of implementing all timing, improvements and maintenance, as identified in the project application. b. Anaheim shall provide Construction Inspection on all improvements within its jurisdiction. No additional compensation from the project is provided for providing inspection services. c. Anaheim shall waive all costs and fees related to any and all permits, if such permits are required to perform any project related work within its jurisdiction. VII. RESPONSIBILITIES OF ORANGE: Orange agrees to the following responsibilities: a. Orange shall provide its share of matching funds as shown in Exhibit A. The final amount may vary and will be based on the 20% of actual cost of implementing all timing, improvements and maintenance, as identified in the project application. b. Orange shall provide Construction Inspection on all improvements within its jurisdiction. No additional compensation from the project is provided for providing inspection services. Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 5 c. Orange shall waive all costs and fees related to any and all permits, if such permits are required to perform any project related work within its jurisdiction. VIII. COMPLETE AGREEMENT: a. This Agreement, including any attachments incorporated herein and made applicable by reference, constitutes the complete and exclusive statement of the terms and conditions of this Agreement between SANTA ANA, BREA, PLACENTIA, ANAHEIM, and ORANGE and it supersedes all prior representations, understandings and communications between the parties. The invalidity in whole or in part of any term or condition of this Agreement shall not affect the validity of other term(s) or conditions(s) of this Agreement. The above referenced Recitals are true and correct and are incorporated by reference herein. b. Any modification of this Agreement shall only be by amendment upon written mutual consent of all cities. All modifications, amendments, changes and revisions of this Agreement in whole or in part, and from time to time, shall be binding upon the cities so long as the same shall be in writing and executed by each ag ency. c. A party’s failure to insist on any instance(s) of any other party’s performance of any term(s) or condition(s) of this Agreement shall not be construed as a waiver of the non-enforcing party’s right to such performance or to future performance of such term(s) or condition(s), and the nonperforming party’s obligation in respect thereto shall continue in full force and effect. Changes to any portion of this Agreement shall not be binding upon either party except when specifically confirmed in writing by way of a written amendment to this Agreement between the parties and issued in accordance with the provisions of this Agreement. IX. INSURANCE AND INDEMNIFICATION: a. Each city shall jointly and severally indemnify, defend and hold harmless every other city, it’s officers, directors, employees and agents from and against any and all claims for any loss or damages, bodily injuries, damage to, or loss of property caused by the negligent acts, omissions or willful misconduct by that city, its officers, directors, employees or agents in connection with or arising out of the performance of this Agreement. b. Each city shall maintain adequate levels of insurance, or self -insurance to assure full indemnification of every other city. X. ADDITIONAL PROVISIONS: a. Term of Agreement: This Agreement shall commence on the date first written above and continue in full force and effect until December 31, 2030. This Agreement may be extended at the mutual consent of all parties in writing. b. SANTA ANA, BREA, PLACENTIA, ANAHEIM, and ORANGE hereto affirm that they are authorized to execute this Agreement on behalf of said parties and that, by so executing this agreement, the parties hereto are formally bound to the provisions of this Agreement. c. Severability: If any term, provision, covenant or condition of this Agreement is held to be invalid, void or otherwise unenforceable, to any extent, by any court of competent jurisdiction, the remainder of this Agreement shall not be affected thereby, and each term, Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 6 provision, covenant or condition of this Agreement shall be valid and enforceable to the fullest extent permitted by law. d. Counterparts of Agreement: This Agreement may be executed and delivered in any number of counterparts, each of which, when executed and delivered shall be deemed an original and all of which together shall constitute the same agreement. Facsimile and electronic signatures will be permitted. e. In the event that the project costs exceed the estimates submitted in the Project Application as prepared, all parties agree to meet and determine project revisions to meet the budget, or a revised funding proposal by the cities that shall be documented and submitted in writing as a revision to the Agreement. f. The parties shall comply with all applicable federal, state and local laws, statutes, ordinances and regulations of any governmental agency having jurisdiction over the project. g. Force Majeure: Any party shall be excused from performing its obligations under this Agreement during the time and to the extent that it is prevented from performing by an unforeseeable cause beyond its control, including, but not limited to: any incidence of fire, flood; acts of God; commandeering of material, products, plants or facilities by the federal, state or local government; national fuel shortage; or, a material act or omission by the other party; when satisfactory evidence of such cause is presented to the other parties, and provided further that such nonperformance is unforeseeable, beyond the control and is not due to the fault or negligence of the party not performing. h. Assignment: Neither this Agreement, nor any of the parties’ rights, obligations, or duties hereunder may be assigned in whole or in part by any party without the prior written consent of all the other parties in their sole and absolute discretion. Any such attempt of assignment shall be deemed void and of no force and effect. Consent to one assignment shall not be deemed consent to any subsequent assignment, nor the waiver of any right to consent to such subsequent assignment. i. Obligations To Comply with Law: Nothing herein shall be deemed nor construed to authorize or require any party to issue bonds, notes or other evidences of indebtedness under the terms, in amounts, or for purposes other than as authorized by local, state or federal law. j. Governing Law: The laws of the State of California and applicable local and federal laws, regulations and guidelines shall govern this Agreement. k. Litigation fees: Should litigation arise out of this Agreement for the performance thereof, the court shall award costs and expenses, including attorney’s fees, to the prevailing party. l. Notices: Any notices, requests, or demands made between the parties pursuant to this Agreement are to be directed as follows: City of Santa Ana Public Works Agency 20 Civic Center Plaza, M-43 Santa Ana, CA 92701 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 7 Cesar Rodriguez Sr. Civil Engineer (714) 647-5626 Crodriguez5@santa-ana.org City of Brea Public Works Department 1 Civic Center Circle Brea, CA 92821 Ryan Chapman City Engineer 714-990-7763 ryanch@ci.brea.ca.us City of Placentia Public Works Department 401 E. Chapman Ave. Placentia, CA 92870 Kyra Tao Transportation Manager 714-993-8121 ktao@placentia.org City of Anaheim Public Works Department 200 S. Anaheim Blvd, Suite 276 Anaheim, CA 92805 John Thai Principal Traffic Engineer 714-765-5294 jthai@anaheim.net City of Orange Public Works Department 300 E. Chapman Avenue Orange, CA 92866 Gabrielle Hayes Principal Civil Engineer 714-744-5561 ghayes@cityoforange.org XI. DELAGATED AUTHORITY: The actions required to be taken by the cities in the implementation of this Agreement are delegated to its City Manager or equivalent designee. [SIGNATURES ON SUBSEQUENT PAGES] Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 8 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written: CITY OF SANTA ANA: ALVARO NUNEZ City Manager ATTEST: JENNIFER L. HALL Clerk of the Council APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney By: JONATHAN T. MARTINEZ Assistant City Attorney RECOMMENDED FOR APPROVAL: NABIL SABA Executive Director Public Works Agency Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 9 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written: CITY OF BREA: Kristin Griffith Interim City Manager ATTEST: Lillian Harris-Neal City Clerk APPROVED AS TO FORM: Terence Boga City Attorney Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 10 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written: CITY OF PLACENTIA: Rosanna Ramirez Acting City Administrator ATTEST: Robert S. McKinnell City Clerk APPROVED AS TO FORM: Christian L. Bettenhausen City Attorney Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 11 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written: CITY OF ANAHEIM: Jim Vanderpool City Manager ATTEST: Theresa Bass City Clerk APPROVED AS TO FORM: Bryn Morley Deputy City Attorney Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 12 IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written: CITY OF ORANGE: Thomas C. Kisela City Manager ATTEST: Pamela Coleman City Clerk APPROVED AS TO FORM: Mike Vigliotta City Attorney Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 EXHIBIT A KRAEMER BOULEVARD/ GLASSELL STREET/ GRAND AVENUE CORRIDOR TSSP PROJECT FUNDS BREAKDOWN Agency Project Funds by Agency* M2 Grant (80%) Local Match (20%) Total Match** Match Type Cash In-kind 1 Brea PI $580,600 $464,480 $116,120 $116,120 $0 O&M $16,800 $13,440 $3,360 $3,360 $0 2 Placentia PI $928,950 $743,160 $185,790 $185,790 $0 O&M $30,800 $24,640 $6,160 $6,160 $0 3 Anaheim PI $633,675 $506,940 $126,735 $126,735 $0 O&M $19,600 $15,680 $3,920 $3,920 $0 4 Orange PI $1,543,450 $1,234,760 $308,690 $308,690 $0 O&M $50,400 $40,320 $10,080 $10,080 $0 5 Santa Ana PI $1,844,782.50 $1,475,826 $368,956.50 $338,956.50 $30,000 O&M $61,600 $49,280 $12,320 $12,320 $0 Total $5,710,657.50 $4,568,526 $1,142,131.50 $1,112,131.50 $30,000 *: Unused project funds from one Agency can be transferred to another Agency with mutual consent. **: Total match amount may vary; the final match amount will be based on the actual project implementation costs, to be determined at completion of the Primary Implementation Phase of the project. Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 EXHIBIT B KRAEMER BOULEVARD/ GLASSELL STREET/ GRAND AVENUE CORRIDOR TSSP PROJECT APPLICATION Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 15.1 61 Santa Ana Brea Placentia Anaheim Orange Caltrans Applicant Agency:City of Contact Name: Contact Number: Contact Email: Application Deadline Project Overview Total Match: $5,710,657.50 $4,568,526.00 $1,142,131.50 Length of Corridor (mi): Number of signals: Total Project Cost: M2 funds requested: FY 2024 Call for Projects Regional Traffic Signal Synchronization Program Project P Supplemental Application 10/26/2023 Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor Santa Ana Cesar Rodriguez 714-647-54626 crodirguez5@santa-ana.org Cash Match: In-kind Match: Participating Agencies: $1,112,131.50 $30,000.00 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Project P Supplemental Application Checklist Page RTSSP Online Application – submitted through OCFundTracker a. Transportation Significance b. Economic Effectiveness c. Project Characteristics d. Project Scale e. Number of Jurisdictions f. Current Project Status g. Funding Match h. Cabinet photos, equipment specifications, as-built drawings, cabinet drawings, etc. Online only Section 1: Key Technical Information a. Name of Project Corridor/Grid/Route 1 b. Project Limits 1 c. Project Length 1 d. Number of Signalized Intersections Along Corridor 1 e. Participating Agencies/Traffic Forum Members 1 f. Lead Agency 1 g. Designation of the corridor to synchronize 1 h. Project Start and End Date 1 i. Previous funding 1 j. Contact Information 1 k. Signalized intersections that are part of the project 2 l. Offset signalized intersections that are part of the project 2 m. Project Map Depicting the Project Limits 3 Section 2: Regional Significance 4 Section 3: Acknowledgement of Required Tasks 5-8 Section 4: Funding Needs/Costs for Proposed Project by Task a. Summary of Project Cost 9 b. Summary of Cost by Agency 10-11 c. Summary of Intersection Improvement Costs 12-13 Section 5: Detailed Local Match Commitment 14 Section 6: Project Schedule by Task a. Project Start and End Dates 15 b. Project Schedule by Task 15 Appendices A. Calculations and Estimated Points B. Agency Improvement Calculations C. Vehicle Miles Traveled (VMT) D. Agency Resolutions and Letters of Support E. Cabinet Photos and As-built drawings (Uploaded to OCFundTracker and included in Electronic Submittal Only) Online Project P Regional Traffic Signal Synchronization Program Table of Contents i Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 1: KEY TECHNICAL INFORMATION Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP a. Project b. from to c.Project Length (miles ): d.Number of signalized intersections along the corridor (include all Caltrans intersections): number of signals on project corridor(s) number of offset signals included in this project e.Participating agencies / Traffic Forum Members (including applicant agency ): f. Lead Agency g. Designation of the corridor to synchronize: h. Project End Date: i. j. Contact Information (Include name, title, agency, phone, email, and address) John Thai, Principal Traffic Engineer City of Anaheim, 714-765-5294 jthai@anaheim.net 200 S. Anaheim Blvd, Suite 276 Anaheim, CA 92805 Gabrielle Hayes, Senior Civil Engineer City of Orange, 714-744-5561 ghayes@cityoforange.org 300 E. Chapman Avenue Orange, CA 92866 Pauline Nguyen, Branch Chief, Traffic Signals/Ramp Metering/ Census Caltrans District 12, 949-279-9168 6681 Marine Way Irvine, CA 92618 Kyra Tao, Transportation Manager City of Placentia, 714-993-8121 ktao@placentia.org 401 E. Chapman Ave. Placentia, CA 92870 Cesar Rodriguez, Senior Civil Engineer City of Santa Ana, 714-647-5626 crodriguez5@santa-ana.org 20 Civic Center Plaza Santa Ana, CA 92701 Albert Espinoza, City Engineer City of Brea, 714-990-7657 alberte@ci.brea.ca.us 1 Civic Center Circle Brea, CA 92821 Select any that apply: Corridor Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor 15.14 Project Limits: Santa Ana 361 Lambert Road Dyer Road December 31, 2027January 1, 2025Project Start Date: Signal Synchronization Network Corridor / Priority Corridor Master Plan of Arterial Highways Corridor Anaheim Buena Park Caltrans Costa Mesa Cypress Dana Point Fountain Valley Fullerton Garden Grove Huntington Beach La Habra La Palma Laguna Beach Laguna Hills Mission Viejo Orange Placentia Rancho Santa Margarita San Clemente Santa Ana Seal Beach Stanton Tustin Villa Park Westminster County of Orange Irvine Lake Forest San Juan Capistrano Yorba Linda Aliso Viejo Brea Laguna Niguel Laguna Woods Los Alamitos Re-timing at least 75% of previous project Timing at least 75% of new eligible project Newport Beach None All participating agencies are participating in the Countywide Baseline Project 1 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 1: KEY TECHNICAL INFORMATION Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP k. Signalized intersections that are part of the project: 1 Kraemer Boulevard Lambert Road 40 Glassell Street SR-22 Westbound Ramp * 2 Kraemer Boulevard Birch Street 41 Glassell Street SR-22 Eastbound Ramp * 3 Kraemer Boulevard Orbiter Street 42 Grand Avenue Fairhaven Avenue 4 Kraemer Boulevard Birch Hills Mall 43 Grand Avenue Santa Clara Avenue 5 Kraemer Boulevard Imperial Highway (SR-90) * 44 Grand Avenue 21st Street 6 Kraemer Boulevard Buttonwood Drive/ Saturn Street 45 Grand Avenue 17th Street 7 Kraemer Boulevard Golden Avenue 46 Grand Avenue I-5 Northbound Ramp 8 Kraemer Boulevard Patrician Lane 47 Grand Avenue Santa Ana Blvd/I-5 Southbound Ramp 9 Kraemer Boulevard Bastanchury Road 48 Grand Avenue Fruit Street 10 Kraemer Boulevard Yorba Linda Boulevard 49 Grand Avenue OC Register 11 Kraemer Boulevard Sheffield Street/Morse Avenue 50 Grand Avenue 4th Street 12 Kraemer Boulevard Madison Avenue 51 Grand Avenue 1st Street 13 Kraemer Boulevard Alta Vista Street 52 Grand Avenue Chestnut Avenue 14 Kraemer Boulevard Chapman Avenue (North) 53 Grand Avenue McFadden Avenue 15 Kraemer Boulevard Hawaii Way 54 Grand Avenue Century High School 16 Kraemer Boulevard Crowther Avenue 55 Grand Avenue Edinger Avenue 17 Kraemer Boulevard Orangethorpe Avenue 56 Grand Avenue St Andrew Place 18 Kraemer Boulevard La Jolla Street 57 Grand Avenue St Gertrude Place 19 Kraemer Boulevard Miraloma Avenue 58 Grand Avenue Warner Avenue 20 Kraemer Boulevard Coronado Street 59 Grand Avenue Hotel Terrace Drive/Brookhollow Dr 21 Kraemer Boulevard Fire Signal 60 Grand Avenue SR-55 Southbound Off-Ramp 22 Kraemer Boulevard La Palma Avenue 61 Grand Avenue Dyer Road 23 Kraemer Boulevard SR-91 Westbound Off -Ramp * 24 Kraemer Boulevard Frontera Street 25 Glassell Street Riverdale Avenue 26 Glassell Street Riverbend Parkway/Richland Avenue 27 Glassell Street Lincoln Avenue 28 Glassell Street Fletcher Avenue 29 Glassell Street Meats Avenue 30 Glassell Street Grove Avenue 31 Glassell Street Orange Olive Road 32 Glassell Street Taft Avenue 33 Glassell Street Katella Avenue 34 Glassell Street Wilson Avenue/Adams Avenue Legend 35 Glassell Street Collins Avenue 36 Glassell Street Walnut Avenue 37 Glassell Street Sycamore Avenue/University Drive 38 Glassell Street Palm Avenue 39 Glassell Street La Veta Avenue *Caltrans l. Offset signalized intersections that are part of the project: 1 Taft Avenue 13 2 Fairhaven Avenue 14 3 Santa Ana Boulevard 15 4 16 5 17 6 18 7 19 8 20 9 10 11 12 Main Corridor Main Street Cross Street Main Street Brea Placentia Main Corridor Cross Street I-5 SB On/Off Ramp Anaheim Shaffer Street Cambridge Street Cross Street Santa Ana Orange Cross Street 2 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 1: KEY TECHNICAL INFORMATION Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP m. Project Map Depicting the Project Limits and Offset Signals 3 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 2: REGIONAL SIGNIFICANCE Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP Explain why this project is regionally significant: The Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor is a reinvigorated project originally performed and funded by M2 RTSSP in FY 2013/2014. The Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor extends 15.14 miles from Lambert Road in the City of Brea to Dyer Road in the City of Santa Ana. The corridor encompasses 61 signalized intersections controlled by the Cities of Brea, Placentia, Anaheim, Orange, Santa Ana and the California Department of Transportation (Caltrans). Caltrans is a participating agency in the project and the participating Cities are committed to executing a cooperative agreement with Caltrans for the implementation of optimized signal timing at the Caltrans intersections. Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor is currently classified as a Major Arterial in the Cities of Brea, Placentia, Anaheim and Santa Ana and as a Primary Arterial in the City of Orange. The corridor is also designated as part of a Priority Corridor Network by the Traffic Signal Synchronization Master Plan. The corridor carries traffic volumes ranging from 13,000 to 21,000 in Cities of Brea and Placentia; up to approximately 46,000 in City of Anaheim, down to approximately 8,000 in Old Towne Orange, to over 40,000 vehicles daily in Santa Ana. Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor stretches from the northern County limits to the center of Orange County encompassing a wide range of land uses. At the northern limit in City of Brea, the arterial primarily serves a mix of residential, retail and large commercial including Birch Hills Mall and biomedical manufacturing company Beckman Coulter. This area experiences high morning and evening peak traffic volumes that require a well-synchronized network to meet the peak demand. In City of Placentia, the corridor primarily serves residential, small retail and schools including Tri-City Park and nearby Valencia High School. This area experiences moderately high morning and evening peak traffic volumes and requires a well balanced traffic signal system that serves both daily vehicle commuters and local pedestrian and bike users. In City of Anaheim, the corridor primarily serves large industrial and commercial businesses and cuts through the Anaheim Canyon Business District. This area is being reimagined by the City of Anaheim and looks to create a business environment attractive to a wide variety of industries while encouraging sustainable development. This area sees the highest traffic volume of the corridor and is adjacent to the Caltrans SR-91 Freeway which requires a well sychronized traffic signal system that accounts for high volume of vehicle and large trucks traffic. In the City of Orange, the corridor serves a mix of residential, small business, schools and historic landmarks including Chapman University and Old Towne Orange. This area experiences lower traffic volume but requires special signal timing and active transportation elements to efficiently accommodate the mix of vehicle, pedestrians and bicycles. At the southern limit in City of Santa Ana, the corridor serves a mix of residential, schools, and large manufacturing and commercial businesses including Behr Paint Company and several Orange County government facilities. This area sees some of the highest traffic volumes and demands a well-synchronized network to meet the directional and oversaturated traffic demand. The original signal timing and improvements on Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor has decayed and needs to be revisited. Therefore, it is imperative that this very important corridor be considered for the 2024 Call for Projects from OCTA. 4 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP a.PROJECT TASKS Primary Implementation (PI) Phase, lasting approximately one year shall include the following: Task 1: Task 2: By checking this box, the Applicant Agency, on behalf of all the participating agencies, agree to the following tasks: Project Management - PI Phase Data Collection and Field Review This task is ongoing throughout the duration of the PI Phase of the project. It includes day-to-day project management, such as meetings, progress reports, tracking of schedules, tracking of cost by agency, invoicing, and overall administration of the PROJECT. The following list is a minimum of what is required of this task: • A running record of project cost broken down by Participating Agency shall be part of this task. This information will be used by the Lead Agency to bill Participating Agencies for their respective project match. • A running record of all scope changes and/or any deviations from the final approved application. This information will be used by the Lead Agency to request for Scope Changes at the Semi-Annual Review (SAR). All agencies on this application will opt out of the Data Collection portion of Task 2 due to participation in the Countywide Baseline Project. A Before/After study will be completed. However, Data Collection will be be conducted at the four (4) Caltrans intersections and utilized to develop Signal Timing Optimization and Implementation. These efforts will be closely coordinated with the Countywide Baseline Project. Cities of Brea, Anaheim and Orange are committed to excecuting a Cooperative Agreeement with Caltrans for the Data Collection efforts. Funding for Data Collection at the Caltrans intersection is included in the respective Agency Task 2. This task shall include collecting seven-day, 24-hour machine counts, including vehicle and bike classifications, along each 1-mile segment of the corridor(s). The project shall also produce weekday and weekend peak period intersection turning movement (ITM) counts at every signalized intersection, including pedestrian and bicycle counts. ITM counts shall be conducted for two hours of each weekday peak period (AM, mid-day, and PM) and a single four-hour Saturday mid-day peak period. All counts shall be summarized in Microsoft Excel format. All data shall adhere to the CTFP Guidelines for data compatibility. Data collection also includes field review of before and after conditions. The floating car method shall be utilized with software and GPS for the ’Before’ Study to fine-tune the corridor operation and verify integrity of system intersection clocks. Synchronized Video shall be used to compare actual conditions to anticipated conditions dictated by the time-space diagram so that any anomalies may be corrected prior to the ’After’ studies task. Field review conducted as part of this task will document the existing conditions for all signal timing, infrastructure, and system improvements on the project. This includes pre-construction pictures for comparison during the post-construction walkthrough, should there be any questions or discrepancies noted by any parties. Data Collection and Field Review Memos shall be provided to all participating agencies. Check this box to indicate all agencies on this application will opt out of the data collection portion of Task 2 due to participation in the Countywide Baseline Project. A Before/After study is still required. A memorandum shall be submitted to indicate completion of this task. 5 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP Task 3: Task 4: Task 5: System Design and Construction Final PI Report Signal Timing Optimization and Implementation Check this box to indicate all agencies on this application will opt out of the Signal Timing Optimization and Implementation task (Task 4) due to participation in the Countywide Baseline Project. The Final PI Report shall still include a section on timing optimization and implementation from the Baseline Project. The Lead Agency will hire a consultant(s), licensed contractor(s), and/or use city staff, or extension of staff, to design, procure, install, construct, and implement all desired components of the project as described in this application in accordance with the CTFP Guidelines. All work and equipment supplied for the project shall comply and be done in accordance with the latest standards and provisions of each Participating Agency or latest approved California Department of Transportation (Caltrans) Standard Plans and Standard Specifications. As-built plans shall be provided to match the improvements. This task is not complete until all participating agencies approve the improvements implemented in their jurisdiction. All agencies on this application will opt out of the Signal Timing Optimization and Implementation portion of Task 4 due to participation in the Countywide Baseline Project. However, Signal Timing Optimization and Implementation will be be conducted at the four (4) Caltrans intersections and coordinated with the Countywide Baseline Project. Cities of Brea, Anaheim and Orange are committed to excecuting a Cooperative Agreeement with Caltrans for the Signal Timing Optimization and Implementation efforts. Funding for Signal Timing Optimization and Implementation at the Caltrans intersection is included in the respective Agency Task 4. Synchronization will be inter-jurisdictional in nature. All existing traffic patterns, flows, and conditions will be taken into account. At a minimum, synchronized timing plans will be developed for a weekday AM, Mid-day, PM, and a Weekend peak period. Special generators such as schools and businesses along with cross street traffic will be considered as part of the project. Timing plans that will be developed will assist traffic in getting to its destination without regard to physical or jurisdictional boundaries. The following list is a minimum of what is required of this task: • A review of the basic timing parameters • Concept of Operations documenting the recommended coordination strategies (e.g. segments, cycle lengths, etc.) based on existing data collection and simulations • Existing and Optimized simulation networks in Synchro (version 10) that is also shared with OCTA using the OCTA designated ID numbers • Implementation and fine-tuning of proposed timing plans This task will not be complete until all participating agencies approve the new timing plans implemented. A Final PI Report, with an executive summary, shall provide complete documentation of the project, including, but not limited to: • Project scope, objectives, locations, findings, and recommendations • Data collected: counts, travel time studies, and project benefits achieved in terms of fuel savings, travel time, and other measurable parameters • For each intersection: lane configurations, signal phasing, turning movement data, and cycle lengths for existing and proposed timings for all peak periods 6 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP By checking this box, the following additional PI task(s) and/or exceptions will be made: Task 6: Task 7: Task 8: ONGOING OPERATIONS AND MAINTENANCE (O&M) PHASE, lasting approximately two (2) years, shall include the following: Final O&M Report Continuing Support Project Management - O&M Phase During this 24-month period, the signal timing along the corridor/route/grid shall be observed and fine- tuned. This task shall also include the monitoring, maintaining, and repair of detection and communication implemented as part of this project. Monthly drives shall be conducted along the length of the project during all designated corridor synchronization timing plan hours of operation in order to verify that the synchronization timing is working as designed and complete any necessary adjustments. This is followed by a monthly memorandum summarizing the status and trends of the corridor based on the runs conducted. Trip logs for the month shall be provided to the Participating Agencies. The memorandum shall include all additional tasks requested and completed during that month. Performance metrics comparisons from ATSPM, where available, shall also be included in the memorandum. All agencies on this application will opt out of the Data Collection portion of Task 2 and Signal Timing Optimization and Implementation portion of Task 4 due to participation in the Countywide Baseline Project. However, Data Collection and Signal Timing Optimization and Implementation will be conducted at the four (4) Caltrans intersections. These efforts will be closely coordinated with the Countywide Baseline Project. Cities of Brea, Anaheim and Orange are committed to excecuting a Cooperative Agreeement with Caltrans for the Data Collection and Signal Timing Optimization/ Implementation efforts. A Before/After study will be completed for the entire corridor including the Caltrans locations. No system construction is proposed at the Caltrans locations. Funding for Data Collection and Signal Timing Optimization/ Implementation at the Caltrans intersection is included in the respective Agency Task 2 and 4. • All work performed for system construction and signal timing optimization • Implementation schedule and improvements accomplished, including dates • Procedures for continuing maintenance, surveillance, and evaluation of the coordinated signal system The report shall document all planned and programmed improvements on the study corridor as well as recommendations based on PI tasks for further infrastructure improvements that would likely improve the corridor signal coordination project results. The report shall be completed in accordance with the current CTFP Guidelines. Finally, the report shall provide recommendations with cost and benefit estimates for future improvements to traffic signal infrastructure (signal controllers, vehicle detection, communications, etc.), intersection capacity (appropriate signal phasing, lane geometrics, and alleviation of physical bottlenecks that curtail arterial capacity), and traffic management strategies. These proposed improvements should be useful in determining future enhancements to the corridor. A Project Summary Sheet, one sheet front and back, that describes the project and improvements gained shall be provided to OCTA. This sheet will be used by OCTA and Participating Agencies to present to the Board and elected officials. This task includes day-to-day project management, such as meetings, tracking of schedules, invoicing, and overall administration of the project. This task shall continue in full force as specified in the Primary Implementation Phase. 7 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP By checking this box, the following additional O&M task(s) and/or exceptions will be made: b. c.ACKNOWLEDGMENT OF MEETING CTFP GUIDELINES <Insert Text> By checking this box, the Applicant Agency, on behalf of all the participating agencies, certify that all current CTFP guidelines were met for this project. By checking this box, the Applicant Agency, on behalf of all the participating agencies, agree to obtain environmental clearance and other permits (if needed) for this project ENVIRONMENTAL CLEARANCE AND OTHER PERMITS At the end of the O&M Phase, a Final O&M Report documenting the Ongoing Operations and Maintenance efforts and procedures for continuing maintenance shall be prepared. At the minimum, the memorandum shall include when travel runs were conducted and issues and solutions throughout the phase. The memorandum shall document all planned and programmed improvements on the study corridor as well as recommendations for further infrastructure improvements that would likely improve the corridor signal coordination project results. 8 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP a. Summary of Project Cost Match Commitment: 20%(minimum 20%) Total Project Cost (PI and O&M for a total of 3 years): Total M2 Request: Total Agency Match: Total Project Cost: Total M2 Request for PI Phase: Total Agency Match for PI Phase: Total PI Cost: Total M2 Request for O&M Phase: Total Agency Match for O&M Phase: Total O&M Cost: Task 3: System Design and Construction Task 2: Data Collection Task 1: Project Management - PI Phase Project Tasks Total Cost 5,710,657.50$ 19,200.00$ 134,400.00$ 25,600.00$ 64,000.00$ 20,000.00$ 5,236,457.50$ 70,200.00$ 140,800.00$ Total Project Cost: Task 8: Final Technical Memorandum Task 7: Continuing Support Task 6: Project Management - O&M Phase 35,840.00$ 179,200.00$ Task 5: Project Report 4,568,526.00$ Task 4: Signal Timing Optimization and Implementation PI Total 4,425,166.00$ 1,106,291.50$ Project Total 1,142,131.50$ 5,710,657.50$ 5,531,457.50$ O&M Total 143,360.00$ 8 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP b. Summary of Cost by Agency Agency Caltrans Offset Total 51 6 2,200.00$ 13,200.00$ 1,200.00$ 7,200.00$ - 549,200.00$ 5,000.00$ 5,000.00$ 1,000.00$ 6,000.00$ 400.00$ 2,400.00$ 2,100.00$ 12,600.00$ 300.00$ 1,800.00$ PI O&M Agency Caltrans Offset Total 11 0 11 2,200.00$ 24,200.00$ 1,000.00$ 11,000.00$ - 882,750.00$ -$ -$ 1,000.00$ 11,000.00$ 400.00$ 4,400.00$ 2,100.00$ 23,100.00$ 300.00$ 3,300.00$ PI O&M Agency Caltrans Offset Total 61 7 2,200.00$ 15,400.00$ 1,200.00$ 8,400.00$ - 597,875.00$ 5,000.00$ 5,000.00$ 1,000.00$ 7,000.00$ 400.00$ 2,800.00$ 2,100.00$ 14,700.00$ 300.00$ 2,100.00$ PI O&M 6,160.00$ 30,800.00$ Cost / Int Total Cost M2 Requested Match Total Cost 506,940.00$ 126,735.00$ Total Cost Task 4: Signal Timing Optimization and Implementation Task 5: Project Report Task 6: Project Management - O&M Phase Task 7: Continuing Support Placentia Number of Signals: Task 1: Project Management - PI Phase Cost / Int Brea Number of Signals: Task 5: Project Report Project Tasks (Brea) Task 1: Project Management - PI Phase Task 2: Data Collection Task 3: System Design and Construction Task 4: Signal Timing Optimization and Implementation Task 1: Project Management - PI Phase Task 2: Data Collection Task 3: System Design and Construction Task 7: Continuing Support Task 8: Final Technical Memorandum Task 2: Data Collection Task 3: System Design and Construction Total Cost Task 4: Signal Timing Optimization and Implementation Task 5: Project Report Task 6: Project Management - O&M Phase 24,640.00$ 3,360.00$ 116,120.00$ 13,440.00$ 464,480.00$ 743,160.00$ 580,600.00$ Project Tasks (Placentia) Cost / Int Total Cost Task 8: Final Technical Memorandum 185,790.00$ 928,950.00$ M2 Requested Match Total Cost 633,675.00$ 15,680.00$ 3,920.00$ 19,600.00$ MatchM2 Requested 16,800.00$ Anaheim Task 8: Final Technical Memorandum Number of Signals: Project Tasks (Anaheim) Task 6: Project Management - O&M Phase Task 7: Continuing Support 9 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP Agency Caltrans Offset Total 15 2 1 18 2,200.00$ 39,600.00$ 1,200.00$ 21,600.00$ - 1,454,250.00$ 5,000.00$ 10,000.00$ 1,000.00$ 18,000.00$ 400.00$ 7,200.00$ 2,100.00$ 37,800.00$ 300.00$ 5,400.00$ PI O&M Agency Caltrans Offset Total 20 2 22 2,200.00$ 48,400.00$ 1,000.00$ 22,000.00$ - 1,752,382.50$ -$ -$ 1,000.00$ 22,000.00$ 400.00$ 8,800.00$ 2,100.00$ 46,200.00$ 300.00$ 6,600.00$ PI O&M 10,080.00$ M2 Requested Santa Ana Number of Signals: 12,320.00$ 61,600.00$ Task 1: Project Management - PI Phase Task 2: Data Collection Task 3: System Design and Construction Cost / Int Total Cost Task 4: Signal Timing Optimization and Implementation Task 5: Project Report 368,956.50$ 1,234,760.00$ 308,690.00$ 1,543,450.00$ 40,320.00$ Project Tasks (Orange)Cost / Int Match Total Cost M2 Requested Match Total Cost Task 4: Signal Timing Optimization and Implementation Task 5: Project Report Task 6: Project Management - O&M Phase Task 7: Continuing Support Task 8: Final Technical Memorandum Total Cost Orange Task 1: Project Management - PI Phase Project Tasks (Santa Ana) Task 6: Project Management - O&M Phase Task 7: Continuing Support Task 8: Final Technical Memorandum 1,475,826.00$ 1,844,782.50$ 49,280.00$ 50,400.00$ Task 2: Data Collection Task 3: System Design and Construction Number of Signals: 10 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP c. Summary of Intersection Improvement Costs Design Construction TOTAL Average Score 1 Brea Lambert Road 7,000.00$ 89,250.00$ 96,250.00$ 31.3 2 Brea Birch Street 7,000.00$ 89,250.00$ 96,250.00$ 31.3 3 Brea Orbiter Street 6,000.00$ 76,500.00$ 82,500.00$ 31.7 4 Brea Birch Hills Mall 10,000.00$ 127,500.00$ 137,500.00$ 31.3 5 Brea Imperial Highway (SR-90) * -$ 2,500.00$ 2,500.00$ 50.0 6 Brea Buttonwood Drive/ Saturn Street 7,000.00$ 89,250.00$ 96,250.00$ 31.3 7 Placentia Golden Avenue 6,200.00$ 79,050.00$ 85,250.00$ 27.5 8 Placentia Patrician Lane 7,200.00$ 91,800.00$ 99,000.00$ 31.3 9 Placentia Bastanchury Road 9,400.00$ 119,850.00$ 129,250.00$ 35.0 10 Placentia Yorba Linda Boulevard 2,800.00$ 35,700.00$ 38,500.00$ 32.5 11 Placentia Sheffield Street/Morse Avenue 1,000.00$ 12,750.00$ 13,750.00$ 15.0 12 Placentia Madison Avenue 2,000.00$ 25,500.00$ 27,500.00$ 22.5 13 Placentia Alta Vista Street 11,400.00$ 145,350.00$ 156,750.00$ 32.0 14 Placentia Chapman Avenue (North) 6,800.00$ 86,700.00$ 93,500.00$ 31.3 15 Placentia Hawaii Way 1,000.00$ 12,750.00$ 13,750.00$ 15.0 16 Placentia Crowther Avenue 1,000.00$ 12,750.00$ 13,750.00$ 15.0 17 Placentia Orangethorpe Avenue 6,200.00$ 79,050.00$ 85,250.00$ 26.7 18 Anaheim La Jolla Street 6,850.00$ 87,337.50$ 94,187.50$ 31.0 19 Anaheim Miraloma Avenue 7,850.00$ 100,087.50$ 107,937.50$ 32.5 20 Anaheim Coronado Street 5,850.00$ 74,587.50$ 80,437.50$ 31.3 21 Anaheim Fire Signal 1,550.00$ 19,762.50$ 21,312.50$ 45.0 22 Anaheim La Palma Avenue 6,450.00$ 82,237.50$ 88,687.50$ 33.0 23 Anaheim SR-91 Westbound Off -Ramp * -$ 2,500.00$ 2,500.00$ 50.0 24 Anaheim Frontera Street 7,850.00$ 100,087.50$ 107,937.50$ 32.5 25 Orange Riverdale Avenue 5,300.00$ 67,575.00$ 72,875.00$ 27.0 26 Orange Riverbend Parkway/Richland Avenue 5,300.00$ 67,575.00$ 72,875.00$ 27.0 27 Orange Lincoln Avenue 6,600.00$ 84,150.00$ 90,750.00$ 36.7 28 Orange Fletcher Avenue 6,600.00$ 84,150.00$ 90,750.00$ 36.7 29 Orange Meats Avenue 11,600.00$ 147,900.00$ 159,500.00$ 31.7 30 Orange Grove Avenue 13,500.00$ 172,125.00$ 185,625.00$ 31.7 31 Orange Orange Olive Road -$ -$ -$ 32 Orange Taft Avenue 2,600.00$ 33,150.00$ 35,750.00$ 40.0 33 Orange Katella Avenue 1,900.00$ 24,225.00$ 26,125.00$ 30.0 34 Orange Wilson Avenue/Adams Avenue 2,600.00$ 33,150.00$ 35,750.00$ 40.0 35 Orange Collins Avenue 2,600.00$ 33,150.00$ 35,750.00$ 40.0 36 Orange Walnut Avenue 6,600.00$ 84,150.00$ 90,750.00$ 36.7 37 Orange Sycamore Avenue/University Drive 6,600.00$ 84,150.00$ 90,750.00$ 36.7 38 Orange Palm Avenue 6,600.00$ 84,150.00$ 90,750.00$ 40.0 39 Orange La Veta Avenue 7,700.00$ 98,175.00$ 105,875.00$ 35.0 40 Orange SR-22 Westbound Ramp * -$ 2,500.00$ 2,500.00$ 50.0 41 Orange SR-22 Eastbound Ramp * -$ 2,500.00$ 2,500.00$ 50.0 42 Santa Ana Fairhaven Avenue 16,200.00$ 208,447.50$ 224,647.50$ 32.9 43 Santa Ana Santa Clara Avenue 2,700.00$ 36,322.50$ 39,022.50$ 35.0 44 Santa Ana 21st Street 8,900.00$ 115,372.50$ 124,272.50$ 37.0 45 Santa Ana 17th Street 8,900.00$ 115,372.50$ 124,272.50$ 37.0 46 Santa Ana I-5 Northbound Ramp 2,700.00$ 36,322.50$ 39,022.50$ 35.0 47 Santa Ana Santa Ana Blvd/I -5 Southbound Ram 4,000.00$ 52,897.50$ 56,897.50$ 33.8 48 Santa Ana Fruit Street 8,700.00$ 112,822.50$ 121,522.50$ 30.0 49 Santa Ana OC Register 2,100.00$ 28,672.50$ 30,772.50$ 40.0 50 Santa Ana 4th Street 7,800.00$ 101,347.50$ 109,147.50$ 40.0 TASK 3 IMPROVEMENT TOTALS LOC.AGENCY PROJECT CROSS STREETS 11 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP c. Summary of Intersection Improvement Costs Design Construction TOTAL Average Score TASK 3 IMPROVEMENT TOTALS LOC.AGENCY PROJECT CROSS STREETS 51 Santa Ana 1st Street 8,100.00$ 103,275.00$ 111,375.00$ 31.7 52 Santa Ana Chestnut Avenue 1,900.00$ 26,122.50$ 28,022.50$ 27.5 53 Santa Ana McFadden Avenue 14,900.00$ 191,872.50$ 206,772.50$ 33.3 54 Santa Ana Century High School 3,900.00$ 51,622.50$ 55,522.50$ 38.8 55 Santa Ana Edinger Avenue 2,700.00$ 34,425.00$ 37,125.00$ 22.5 56 Santa Ana St Andrew Place 3,500.00$ 46,522.50$ 50,022.50$ 33.8 57 Santa Ana St Gertrude Place 2,700.00$ 36,322.50$ 39,022.50$ 35.0 58 Santa Ana Warner Avenue 8,700.00$ 110,925.00$ 119,625.00$ 20.0 59 Santa Ana Hotel Terrace Drive/Brookhollow Dr 2,700.00$ 36,322.50$ 39,022.50$ 35.0 60 Santa Ana SR-55 Southbound Off -Ramp 2,700.00$ 36,322.50$ 39,022.50$ 35.0 61 Santa Ana Dyer Road 1,900.00$ 26,122.50$ 28,022.50$ 27.5 -- - -$ -$ -$ 1 Orange Taft Avenue & Shaffer Street 12,800.00$ 163,200.00$ 176,000.00$ 22.5 2 Santa Ana Fairhaven Avenue & Cambridge Stre 2,100.00$ 26,775.00$ 28,875.00$ 40.0 3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp 2,700.00$ 34,425.00$ 37,125.00$ 32.5 - Santa Ana TMC Improvements -$ 63,250.00$ 63,250.00$ 40.0 - Placentia TMC Improvements -$ 126,500.00$ 126,500.00$ 40.0 - Orange TMC Improvements 1,900.00$ 87,475.00$ 89,375.00$ 35.0 - Anaheim TMC Improvements -$ 94,875.00$ 94,875.00$ 40.0 - Brea TMC Improvements -$ 37,950.00$ 37,950.00$ 40.0 5,236,457.50$ 33.6SIGNAL IMPROVEMENT TOTAL = 12 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 5: DETAILED LOCAL MATCH COMMITMENT Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP PI OMM PI OMM PI OMM $116,120.00 $3,360.00 $0.00 $0.00 $116,120.00 $3,360.00 $185,790.00 $6,160.00 $0.00 $0.00 $185,790.00 $6,160.00 $126,735.00 $3,920.00 $0.00 $0.00 $126,735.00 $3,920.00 $308,690.00 $10,080.00 $0.00 $0.00 $308,690.00 $10,080.00 $338,956.50 $12,320.00 $30,000.00 $0.00 $368,956.50 $12,320.00 $1,076,291.50 $35,840.00 $30,000.00 $0.00 $1,106,291.50 $35,840.00 A. Cash Match Agency Funding Source Amount of Cash Contribution Brea Gas Tax/ M2 Fairshare $119,480.00 Placentia Gas Tax/ AB2766 $191,950.00 Anaheim Gas Tax/ M2 Fairshare $130,655.00 Orange Gas Tax/ M2 Fairshare $318,770.00 Santa Ana M2 Fairshare $351,276.50 $1,112,131.50 B. In-Kind Services i. Specific Improvements (List items and Cost): Agency Expenditure Select a City $0.00 ii. Staffing Commitment: Agency Staff Position No. of Hours Fully Burdened Hourly Rate Total* Sr. Civil Engineer 60 $170.00 $10,200.00 Assistant Signal Operations Engineer 120 $140.00 $16,800.00 Assistant Engineer 30 $100.00 $3,000.00 $0.00 $30,000.00 $30,000.00 $30,000.00 Description $1,142,131.50 $30,000.00 TOTAL CASH MATCH: TOTAL MATCH $1,112,131.50 Type of Service to Project Project Oversight, Construction Engineering Total Specific Improvements (i): *Total amount is the required participation by the identified agency. The number of hours and hourly rate will be based on each agency’s actual fully burdened billing rates, which must collectively equal the same value of the assigned “Total” dollars. Each agency will be responsible for keeping detailed records of hours worked and description of work. An accounting record of personnel, hours at fully burdened rate shall be included with the in-kind report submittals. Records will be subject to auditing. In-kind match can be converted to Cash Match, but Cash Match cannot be converted to in-kind match. Total for City of Santa Ana: TOTAL IN-KIND MATCH* (i + ii): Total Staffing Commitment (ii): Anaheim $130,655.00 Orange $318,770.00 $0.00 $0.00 $318,770.00 Santa Ana $351,276.50 $30,000.00 $381,276.50 PART 1: AGENCY TOTAL MATCH SUMMARY PART 2: MATCH BREAKDOWN (CASH vs IN-KIND SERVICES) Agency Placentia $191,950.00 $0.00 CASH Brea $119,480.00 TOTAL MATCH $119,480.00 $191,950.00 $130,655.00 $0.00 IN‐KIND Equipment configuration, installation and integration/ Construction Engineering Santa Ana Equipment configuration, installation and integration/ Construction Engineering 13 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 SECTION 6: PROJECT SCHEDULE BY TASK Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP a.Projected Start and End Dates: January 1, 2025 December 31, 2027 b.Projected Schedule by Task Starting Date Ending Date January 1, 2025 December 31, 2025 January 1, 2025 April 30, 2025 January 1, 2025 December 31, 2025 January 1, 2025 December 31, 2025 October 1, 2025 December 31, 2025 January 1, 2026 December 31, 2027 January 1, 2026 December 31, 2027 October 1, 2027 December 31, 2027 By checking this box, the Applicant Agency, on behalf of all the participating agencies, agree to implement this project within 12 months. (This means the project will be ineligible for delays and timely use funds extensions. This is not applicable to projects requesting OCTA to lead and Baseline Project participants.) Project start date: Project end date: Task 8: Final Technical Memorandum Task Task 1: Project Management - PI Phase Task 2: Data Collection Task 3: System Design and Construction Task 4: Signal Timing Optimization and Implementation Task 5: Project Report Task 6: Project Management - O&M Phase Task 7: Continuing Support 14 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP CALCULATIONS AND ESTIMATED POINTS Appendix A Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP Estimated Points Yes, 3 / 115 = =10 =15 /= = 61 =10 61 /61 = =10 6 Yes,=5 Not =0 Not Implementing within 12 months = 0 /= 75 APPENDIX A: CALCULATIONS AND ESTIMATED POINTS Total Estimated Points: Calculation for Total Project Cost / VMT = Participating Jurisdiction(s) # of signals along entire length of corridor : # of signals being synched / total # of corridor signals: 5. Number of Jurisdictions: (10 points) 6. Current Project Status (10 points) 4. Project Scale: (20 points) $5,710,658 100.0% $5,710,657.50 0 20.00%$1,142,131.50 7. Funding Match: (5 points) Retiming 75% of previous project 25 10 5 1. Transportation Significance (25 points) Inclusion of offset signals w/in 2,700' Vehicle Miles Traveled (VMT): 367,503 10 5 20 Average project improvement score 33.6 Timing 75% of new eligible project All agencies are participating in the Countywide Baseline Project Criteria (Max Points) # of offset signals on project / total # of offset signals : 100.0% 2. Economic Effectiveness (Cost to Benefit Ratio): (10 points) 3. Project Characteristics: (20 points) 367,503 15.54 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP Appendix B AGENCY IMPROVEMENT CALCULATIONS Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE I: AGENCY IMPROVEMENT PREFERENCES Brea Placentia Anaheim Orange Santa Ana Brea Placentia Anaheim Orange Santa Ana Brea Placentia Anaheim Orange Santa Ana 1 Above ground (e.g. wireless, cellular, etc.)$19,000 $13,000 $1,900 $1,300 Encom Radio, Fiber Switch & power supply, SFPs Encom Wireless Radio and Etherwan Ethernet Swich w/ SFPs 2 Fiber Optic underground $10,000 $10,000 $5,000 $90,000 $19,000 $1,000 $1,000 $500 $9,000 $1,900 Fiber Optic Ethernet Switch w/ SFPs and Power Supply, Layer 3 HUB Switch w/ SFPs and Power Supply Reterminate Fiber Opitc Cable, Fiber Optic Ethernet Switch w/ SFPs and Power Supply, Layer 3 HUB Switch w/ SFPs and Power Supply Ethernet Switch 120 SMFO, conduit, Fiber Drop Cable, Splice enclosure, FPP/FDU, Fiber Switch, SFPs, Fiber Switch & power supply 120 SMFO Fiber Optic Cable In Existing Conduit, Fiber Splicing (FDU and Splice Enclosure), Etherwan Switch w/ SFPs, Drop Cable, No 6E Pullbox 3 All other (e.g. copper, aerial fiber, GPS, etc.)$8,000 $800 Fiber Switch & power supply, SFPs, Fiber Patch Panel 4 ATC signal controller $10,000 $8,000 $5,500 $7,000 $8,000 $1,000 $800 $550 $700 $800 Qubic Commander w/ Scout Software Econolite Cobalt w/ EOS Software Econolite 2070 TS2 Type 1 w/ 1C board w/ EOS software Econolite Cobalt w/ ASC3 Software Econolite Cobalt w/ EOS Software 5 Signal cabinet on existing foundation $40,000 $24,000 $24,000 $38,000 $4,000 $2,400 $2,400 $3,800 Type P44 Cubic Trafficware Cabinet Western Systems Type P+Western Systems Type P+ Modify/extend existing foundation or use exitsing foundation as is, Econolite TS Type II P Cabinet 6 Signal cabinet on new foundation $44,000 $60,000 $4,400 $6,000 Western Systems Type P+ w/ Service and SCE Design Fee Econolite ATCC w/ Service and SCE Design Fee 7 BBS/USP (attached) 8 BBS/UPS on existing foundation $11,000 $1,100 Myers / Clary 9 BBS/UPS on new foundation Myers / Clary 10 CCTV $10,000 $10,000 $10,000 $11,000 $8,000 $1,000 $1,000 $1,000 $1,100 $800 Axis Q6000 + PTZ Camera Bosch / COHU Axis Cohu Rise Axis 11 Vehicle detection (ATSPM inputs + counts) 12 Vehicle detection (ATSPM inputs) 13 Vehicle detection + bicycle detection $40,000 $40,000 $24,000 $50,000 $4,000 $4,000 $2,400 $5,000 Iteris Next Iteris Next Econolite Econolite Vision or Iteris Apex 14 Vehicle detection $40,000 $4,000 Iteris Next Gridsmart w/ mounting brackets 15 Bicycle detection 16 Pedestrian detection (audible) $12,000 $23,000 $12,000 $1,200 $2,300 $1,200 Polara (iN2S APS System) Campbell APS Polara (iN2S APS System) 17 Pedestrian detection 18 Active transportation/pedestrian safety 19 Transit Signal Priority 20 EVP (hybrid or GPS) $15,000 $12,000 $1,500 $1,200 GTT Opticam GPS System GPS EVP 21 EVP (infrared) 22 Speed feedback signs (existing post) 23 Speed feedback signs (new post) 24 Signal Performance Monitoring $10,000 $1,500 $1,000 Software, Licensing and Server Centracs SPM 25 Channelization 26 Signal phasing improvement 27 Central System (server, licenses, workstations) $30,000 $100,000 $75,000 $50,000 $50,000 Synchro Green Central System Licenses, Etherwan Layer 3 Switch w/ SFPs and Power Supply, Dell Workstation Etherwan Layer 3 w/ SFPs and Power Supply, Digital Watchdog VMS Server/ Licensing, Dell Server (Video/ Traff Mgt), Dell Workstations, Synchro License, IP Schematic, Server Rack Econolite Centracs Software and Server Workstations (w/ monitors), Touchpanel, TMC Console; Switches Dell Server, Milestone VMS Licenses, Dell Workstations 28 Display (video wall, VMS, etc.) 29 UPS for TMC $10,000 $1,000 Rack Mount UPS 30 Timing Only 31 Timing + Traffic Responsive (license only) 32 Timing + Peer-to-Peer (configuration only) 33 Timing + Traffic Adaptive (license only) Caltrans 34 Caltrans Cooperative Agreement $2,500 $2,500 $2,500 Cooperative Agreement and Data Collection Cooperative Agreement and Data Collection Cooperative Agreement UNIT PRICE (MATERIAL + LABOR) APPLICABLE DESIGN COST PER UNIT VENDOR/BRAND & ADDITIONAL NOTES ITEM DESCRIPTIONID Signal Timing Only TMC/TOC CATEGORIES Comm Field Elements Minor Signal Op Improve Yes No 18 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE II: DESCRIPTION OF WORK BY INTERSECTION Ab o v e g r o u n d ( e . g . w i r e l e s s , ce l l u l a r , e t c . ) Fi b e r O p t i c u n d e r g r o u n d Al l o t h e r ( e . g . c o p p e r , a e r i a l fi b e r , G P S , e t c . ) AT C s i g n a l c o n t r o l l e r Si g n a l c a b i n e t o n e x i s t i n g fo u n d a t i o n Si g n a l c a b i n e t o n n e w fo u n d a t i o n CC T V Ve h i c l e d e t e c t i o n + b i c y c l e de t e c t i o n Ve h i c l e d e t e c t i o n Pe d e s t r i a n d e t e c t i o n (a u d i b l e ) Pe d e s t r i a n d e t e c t i o n Si g n a l P e r f o r m a n c e Mo n i t o r i n g Ce n t r a l S y s t e m ( s e r v e r , li c e n s e s , w o r k s t a t i o n s ) Ca l t r a n s C o o p e r a t i v e Ag r e e m e n t 1234561013141617242734 1 Brea Lambert Road 11 11 2 Brea Birch Street 11 11 3 Brea Orbiter Street 11 1 4 Brea Birch Hills Mall 111 1 5 Brea Imperial Highway (SR-90) * 1 6 Brea Buttonwood Drive/ Saturn Street 11 11 7 Placentia Golden Avenue 111 1 8 Placentia Patrician Lane 1111 9 Placentia Bastanchury Road 111 11 10 Placentia Yorba Linda Boulevard 21 11 Placentia Sheffield Street/Morse Avenue 1 12 Placentia Madison Avenue 11 13 Placentia Alta Vista Street 11111 14 Placentia Chapman Avenue (North) 21 1 1 15 Placentia Hawaii Way 1 16 Placentia Crowther Avenue 1 17 Placentia Orangethorpe Avenue 111 18 Anaheim La Jolla Street 11111 19 Anaheim Miraloma Avenue 11111 1 20 Anaheim Coronado Street 111 1 21 Anaheim Fire Signal 11 22 Anaheim La Palma Avenue 11 21 1 23 Anaheim SR-91 Westbound Off-Ramp *1 24 Anaheim Frontera Street 11111 1 25 Orange Riverdale Avenue 111 26 Orange Riverbend Parkway/Richland Avenue 111 27 Orange Lincoln Avenue 11 1 28 Orange Fletcher Avenue 11 1 29 Orange Meats Avenue 11 1 30 Orange Grove Avenue 111 31 Orange Orange Olive Road 32 Orange Taft Avenue 11 33 Orange Katella Avenue 1 34 Orange Wilson Avenue/Adams Avenue 11 35 Orange Collins Avenue 11 36 Orange Walnut Avenue 11 1 37 Orange Sycamore Avenue/University Drive 11 1 38 Orange Palm Avenue 11 1 39 Orange La Veta Avenue 1111 40 Orange SR-22 Westbound Ramp *1 41 Orange SR-22 Eastbound Ramp *1 42 Santa Ana Fairhaven Avenue 1111111 LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS DESCRIPTION OF WORK 19 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE II: DESCRIPTION OF WORK BY INTERSECTION Ab o v e g r o u n d ( e . g . w i r e l e s s , ce l l u l a r , e t c . ) Fi b e r O p t i c u n d e r g r o u n d Al l o t h e r ( e . g . c o p p e r , a e r i a l fi b e r , G P S , e t c . ) AT C s i g n a l c o n t r o l l e r Si g n a l c a b i n e t o n e x i s t i n g fo u n d a t i o n Si g n a l c a b i n e t o n n e w fo u n d a t i o n CC T V Ve h i c l e d e t e c t i o n + b i c y c l e de t e c t i o n Ve h i c l e d e t e c t i o n Pe d e s t r i a n d e t e c t i o n (a u d i b l e ) Pe d e s t r i a n d e t e c t i o n Si g n a l P e r f o r m a n c e Mo n i t o r i n g Ce n t r a l S y s t e m ( s e r v e r , li c e n s e s , w o r k s t a t i o n s ) Ca l t r a n s C o o p e r a t i v e Ag r e e m e n t 1234561013141617242734LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS DESCRIPTION OF WORK 43 Santa Ana Santa Clara Avenue 11 1 44 Santa Ana 21st Street 11 111 45 Santa Ana 17th Street 11 111 46 Santa Ana I-5 Northbound Ramp 11 1 47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp 11 1 1 48 Santa Ana Fruit Street 111 1 49 Santa Ana OC Register 11 1 50 Santa Ana 4th Street 1 1111 51 Santa Ana 1st Street 111 52 Santa Ana Chestnut Avenue 11 53 Santa Ana McFadden Avenue 111111 54 Santa Ana Century High School 11 11 55 Santa Ana Edinger Avenue 11 56 Santa Ana St Andrew Place 11 1 1 57 Santa Ana St Gertrude Place 11 1 58 Santa Ana Warner Avenue 111 59 Santa Ana Hotel Terrace Drive/Brookhollow Dr 11 1 60 Santa Ana SR-55 Southbound Off-Ramp 11 1 61 Santa Ana Dyer Road 11 - 1 Orange Taft Avenue & Shaffer Street 11 2 Santa Ana Fairhaven Avenue & Cambridge Street 11 3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp 11 - Santa Ana TMC Improvements 1 - Placentia TMC Improvements 1 - Orange TMC Improvements 1 1 - Anaheim TMC Improvements 1 - Brea TMC Improvements 1 164524710715206102215 4 QUANTITY TOTAL = 20 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE II: DESCRIPTION OF WORK BY INTERSECTION 1 Brea Lambert Road 2 Brea Birch Street 3 Brea Orbiter Street 4 Brea Birch Hills Mall 5 Brea Imperial Highway (SR-90) * 6 Brea Buttonwood Drive/ Saturn Street 7 Placentia Golden Avenue 8 Placentia Patrician Lane 9 Placentia Bastanchury Road 10 Placentia Yorba Linda Boulevard 11 Placentia Sheffield Street/Morse Avenue 12 Placentia Madison Avenue 13 Placentia Alta Vista Street 14 Placentia Chapman Avenue (North) 15 Placentia Hawaii Way 16 Placentia Crowther Avenue 17 Placentia Orangethorpe Avenue 18 Anaheim La Jolla Street 19 Anaheim Miraloma Avenue 20 Anaheim Coronado Street 21 Anaheim Fire Signal 22 Anaheim La Palma Avenue 23 Anaheim SR-91 Westbound Off-Ramp * 24 Anaheim Frontera Street 25 Orange Riverdale Avenue 26 Orange Riverbend Parkway/Richland Avenue 27 Orange Lincoln Avenue 28 Orange Fletcher Avenue 29 Orange Meats Avenue 30 Orange Grove Avenue 31 Orange Orange Olive Road 32 Orange Taft Avenue 33 Orange Katella Avenue 34 Orange Wilson Avenue/Adams Avenue 35 Orange Collins Avenue 36 Orange Walnut Avenue 37 Orange Sycamore Avenue/University Drive 38 Orange Palm Avenue 39 Orange La Veta Avenue 40 Orange SR-22 Westbound Ramp * 41 Orange SR-22 Eastbound Ramp * 42 Santa Ana Fairhaven Avenue LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS Construction Management & Inspection Contingency 15% 10% 7,000.00$ 70,000.00$ 10,500.00$ 8,750.00$ 96,250.00$ 7,000.00$ 70,000.00$ 10,500.00$ 8,750.00$ 96,250.00$ 6,000.00$ 60,000.00$ 9,000.00$ 7,500.00$ 82,500.00$ 10,000.00$ 100,000.00$ 15,000.00$ 12,500.00$ 137,500.00$ -$ 2,500.00$ -$ -$ 2,500.00$ 7,000.00$ 70,000.00$ 10,500.00$ 8,750.00$ 96,250.00$ 6,200.00$ 62,000.00$ 9,300.00$ 7,750.00$ 85,250.00$ 7,200.00$ 72,000.00$ 10,800.00$ 9,000.00$ 99,000.00$ 9,400.00$ 94,000.00$ 14,100.00$ 11,750.00$ 129,250.00$ 2,800.00$ 28,000.00$ 4,200.00$ 3,500.00$ 38,500.00$ 1,000.00$ 10,000.00$ 1,500.00$ 1,250.00$ 13,750.00$ 2,000.00$ 20,000.00$ 3,000.00$ 2,500.00$ 27,500.00$ 11,400.00$ 114,000.00$ 17,100.00$ 14,250.00$ 156,750.00$ 6,800.00$ 68,000.00$ 10,200.00$ 8,500.00$ 93,500.00$ 1,000.00$ 10,000.00$ 1,500.00$ 1,250.00$ 13,750.00$ 1,000.00$ 10,000.00$ 1,500.00$ 1,250.00$ 13,750.00$ 6,200.00$ 62,000.00$ 9,300.00$ 7,750.00$ 85,250.00$ 6,850.00$ 68,500.00$ 10,275.00$ 8,562.50$ 94,187.50$ 7,850.00$ 78,500.00$ 11,775.00$ 9,812.50$ 107,937.50$ 5,850.00$ 58,500.00$ 8,775.00$ 7,312.50$ 80,437.50$ 1,550.00$ 15,500.00$ 2,325.00$ 1,937.50$ 21,312.50$ 6,450.00$ 64,500.00$ 9,675.00$ 8,062.50$ 88,687.50$ -$ 2,500.00$ -$ -$ 2,500.00$ 7,850.00$ 78,500.00$ 11,775.00$ 9,812.50$ 107,937.50$ 5,300.00$ 53,000.00$ 7,950.00$ 6,625.00$ 72,875.00$ 5,300.00$ 53,000.00$ 7,950.00$ 6,625.00$ 72,875.00$ 6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$ 6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$ 11,600.00$ 116,000.00$ 17,400.00$ 14,500.00$ 159,500.00$ 13,500.00$ 135,000.00$ 20,250.00$ 16,875.00$ 185,625.00$ -$ -$ -$ -$ -$ 2,600.00$ 26,000.00$ 3,900.00$ 3,250.00$ 35,750.00$ 1,900.00$ 19,000.00$ 2,850.00$ 2,375.00$ 26,125.00$ 2,600.00$ 26,000.00$ 3,900.00$ 3,250.00$ 35,750.00$ 2,600.00$ 26,000.00$ 3,900.00$ 3,250.00$ 35,750.00$ 6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$ 6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$ 6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$ 7,700.00$ 77,000.00$ 11,550.00$ 9,625.00$ 105,875.00$ -$ 2,500.00$ -$ -$ 2,500.00$ -$ 2,500.00$ -$ -$ 2,500.00$ 16,200.00$ 163,500.00$ 24,525.00$ 20,422.50$ 224,647.50$ NOTESDesign Construction TOTAL SIGNAL IMPROVEMENT COSTS 21 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE II: DESCRIPTION OF WORK BY INTERSECTION LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS 43 Santa Ana Santa Clara Avenue 44 Santa Ana 21st Street 45 Santa Ana 17th Street 46 Santa Ana I-5 Northbound Ramp 47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp 48 Santa Ana Fruit Street 49 Santa Ana OC Register 50 Santa Ana 4th Street 51 Santa Ana 1st Street 52 Santa Ana Chestnut Avenue 53 Santa Ana McFadden Avenue 54 Santa Ana Century High School 55 Santa Ana Edinger Avenue 56 Santa Ana St Andrew Place 57 Santa Ana St Gertrude Place 58 Santa Ana Warner Avenue 59 Santa Ana Hotel Terrace Drive/Brookhollow Dr 60 Santa Ana SR-55 Southbound Off-Ramp 61 Santa Ana Dyer Road - 1 Orange Taft Avenue & Shaffer Street 2 Santa Ana Fairhaven Avenue & Cambridge Street 3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp - Santa Ana TMC Improvements - Placentia TMC Improvements - Orange TMC Improvements - Anaheim TMC Improvements - Brea TMC Improvements QUANTITY TOTAL = Construction Management & Inspection Contingency 15% 10%NOTESDesign Construction TOTAL SIGNAL IMPROVEMENT COSTS 2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$ 8,900.00$ 90,500.00$ 13,575.00$ 11,297.50$ 124,272.50$ 8,900.00$ 90,500.00$ 13,575.00$ 11,297.50$ 124,272.50$ 2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$ 4,000.00$ 41,500.00$ 6,225.00$ 5,172.50$ 56,897.50$ 8,700.00$ 88,500.00$ 13,275.00$ 11,047.50$ 121,522.50$ 2,100.00$ 22,500.00$ 3,375.00$ 2,797.50$ 30,772.50$ 7,800.00$ 79,500.00$ 11,925.00$ 9,922.50$ 109,147.50$ 8,100.00$ 81,000.00$ 12,150.00$ 10,125.00$ 111,375.00$ 1,900.00$ 20,500.00$ 3,075.00$ 2,547.50$ 28,022.50$ 14,900.00$ 150,500.00$ 22,575.00$ 18,797.50$ 206,772.50$ 3,900.00$ 40,500.00$ 6,075.00$ 5,047.50$ 55,522.50$ 2,700.00$ 27,000.00$ 4,050.00$ 3,375.00$ 37,125.00$ 3,500.00$ 36,500.00$ 5,475.00$ 4,547.50$ 50,022.50$ 2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$ 8,700.00$ 87,000.00$ 13,050.00$ 10,875.00$ 119,625.00$ 2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$ 2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$ 1,900.00$ 20,500.00$ 3,075.00$ 2,547.50$ 28,022.50$ -$ -$ -$ -$ -$ 12,800.00$ 128,000.00$ 19,200.00$ 16,000.00$ 176,000.00$ 2,100.00$ 21,000.00$ 3,150.00$ 2,625.00$ 28,875.00$ 2,700.00$ 27,000.00$ 4,050.00$ 3,375.00$ 37,125.00$ -$ 50,000.00$ 7,500.00$ 5,750.00$ 63,250.00$ -$ 100,000.00$ 15,000.00$ 11,500.00$ 126,500.00$ 1,900.00$ 69,000.00$ 10,350.00$ 8,125.00$ 89,375.00$ -$ 75,000.00$ 11,250.00$ 8,625.00$ 94,875.00$ -$ 30,000.00$ 4,500.00$ 3,450.00$ 37,950.00$ 5,236,457.50$ SIGNAL IMPROVEMENT TOTAL = 22 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES Ab o v e g r o u n d ( e . g . w i r e l e s s , ce l l u l a r , e t c . ) Fi b e r O p t i c u n d e r g r o u n d Al l o t h e r ( e . g . co p p e r , a e r i a l fi b e r , G P S , e t c . ) AT C s i g n a l c o n t r o l l e r Si g n a l c a b i n e t o n e x i s t i n g fo u n d a t i o n Si g n a l c a b i n e t o n n e w fo u n d a t i o n BB S / U S P ( a t t a c h e d ) BB S / U P S o n e x i s t i n g fo u n d a t i o n BB S / U P S o n n e w f o u n d a t i o n CC T V Ve h i c l e d e t e c t io n ( A T S P M in p u t s + c o u n t s ) Ve h i c l e d e t e c t io n ( A T S P M in p u t s ) Ve h i c l e d e t e c t i o n + b i c y c l e de t e c t i o n Ve h i c l e d e t e c t i o n Bi c y c l e d e t e c t i o n Pe d e s t r i a n d e t e c t i o n (a u d i b l e ) Pe d e s t r i a n d e t e c t i o n Acti ve tr a n s p o r t a t i o n / p e d e s t r i a n sa f e t y Tr a n s i t S i g n a l P r i o r i t y EV P ( h y b r i d o r G P S ) EV P ( i n f r a r e d ) Sp e e d f e e d b a c k s i g n s (e x i s t i n g p o s t ) Sp e e d f e e d b a c k s i g n s ( n e w po s t ) Si g n a l P e r f o r m a n c e Mo n i t o r i n g Ch a n n e l i z a t i o n Si g n a l p h a s i n g i m p r o v e m e n t Ce n t r a l S y s t e m ( s e r v e r , li c e n s e s , w o r k s t a t i o n s ) Di s p l a y ( v i d e o w a l l , V M S , et c . ) UP S f o r T M C 1 Brea Lambert Road 15 50 30 30 2 Brea Birch Street 15 50 30 30 3 Brea Orbiter Street 15 50 30 4 Brea Birch Hills Mall 15 50 30 30 5 Brea Imperial Highway (SR-90) * 6 Brea Buttonwood Drive/ Saturn Street 15 50 30 30 7 Placentia Golden Avenue 15 50 15 30 8 Placentia Patrician Lane 15 30 30 50 9 Placentia Bastanchury Road 15 50 30 30 50 10 Placentia Yorba Linda Boulevard 15 50 11 Placentia Sheffield Street/Morse Avenue 15 12 Placentia Madison Avenue 15 30 13 Placentia Alta Vista Street 15 50 15 30 50 14 Placentia Chapman Avenue (North)15 50 30 30 15 Placentia Hawaii Way 15 16 Placentia Crowther Avenue 15 17 Placentia Orangethorpe Avenue 15 50 15 18 Anaheim La Jolla Street 15 50 30 30 30 19 Anaheim Miraloma Avenue 15 50 30 30 30 40 20 Anaheim Coronado Street 15 50 30 30 21 Anaheim Fire Signal 50 40 22 Anaheim La Palma Avenue 15 50 30 30 40 23 Anaheim SR-91 Westbound Off -Ramp * 24 Anaheim Frontera Street 15 50 30 30 30 40 25 Orange Riverdale Avenue 15030 26 Orange Riverbend Parkway/Richland Avenue 15030 27 Orange Lincoln Avenue 30 50 30 28 Orange Fletcher Avenue 30 50 30 29 Orange Meats Avenue 30 15 50 30 Orange Grove Avenue 15 50 30 31 Orange Orange Olive Road 32 Orange Taft Avenue 30 50 33 Orange Katella Avenue 30 34 Orange Wilson Avenue/Adams Avenue 30 50 35 Orange Collins Avenue 30 50 36 Orange Walnut Avenue 30 50 30 37 Orange Sycamore Avenue/University Drive 30 50 30 38 Orange Palm Avenue 30 50 30 50 39 Orange La Veta Avenue 30 50 30 30 40 Orange SR-22 Westbound Ramp * 41 Orange SR-22 Eastbound Ramp * 42 Santa Ana Fairhaven Avenue 30 15 50 15 30 50 40 LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS DESCRIPTION OF WORK Time Source None/5+ Years or Within 5 Years 0/5+ or <5 0/10+ or < 10 23 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES Ab o v e g r o u n d ( e . g . w i r e l e s s , ce l l u l a r , e t c . ) Fi b e r O p t i c u n d e r g r o u n d Al l o t h e r ( e . g . co p p e r , a e r i a l fi b e r , G P S , e t c . ) AT C s i g n a l c o n t r o l l e r Si g n a l c a b i n e t o n e x i s t i n g fo u n d a t i o n Si g n a l c a b i n e t o n n e w fo u n d a t i o n BB S / U S P ( a t t a c h e d ) BB S / U P S o n e x i s t i n g fo u n d a t i o n BB S / U P S o n n e w f o u n d a t i o n CC T V Ve h i c l e d e t e c t io n ( A T S P M in p u t s + c o u n t s ) Ve h i c l e d e t e c t io n ( A T S P M in p u t s ) Ve h i c l e d e t e c t i o n + b i c y c l e de t e c t i o n Ve h i c l e d e t e c t i o n Bi c y c l e d e t e c t i o n Pe d e s t r i a n d e t e c t i o n (a u d i b l e ) Pe d e s t r i a n d e t e c t i o n Acti ve tr a n s p o r t a t i o n / p e d e s t r i a n sa f e t y Tr a n s i t S i g n a l P r i o r i t y EV P ( h y b r i d o r G P S ) EV P ( i n f r a r e d ) Sp e e d f e e d b a c k s i g n s (e x i s t i n g p o s t ) Sp e e d f e e d b a c k s i g n s ( n e w po s t ) Si g n a l P e r f o r m a n c e Mo n i t o r i n g Ch a n n e l i z a t i o n Si g n a l p h a s i n g i m p r o v e m e n t Ce n t r a l S y s t e m ( s e r v e r , li c e n s e s , w o r k s t a t i o n s ) Di s p l a y ( v i d e o w a l l , V M S , et c . ) UP S f o r T M C LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS DESCRIPTION OF WORK Time Source None/5+ Years or Within 5 Years 0/5+ or <5 0/10+ or < 10 43 Santa Ana Santa Clara Avenue 15 50 40 44 Santa Ana 21st Street 15 50 30 50 40 45 Santa Ana 17th Street 15 50 30 50 40 46 Santa Ana I-5 Northbound Ramp 15 50 40 47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp 30 15 50 40 48 Santa Ana Fruit Street 15 50 15 40 49 Santa Ana OC Register 30 50 40 50 Santa Ana 4th Street 50 30 30 50 40 51 Santa Ana 1st Street 15 30 50 52 Santa Ana Chestnut Avenue 15 40 53 Santa Ana McFadden Avenue 15 50 15 30 50 40 54 Santa Ana Century High School 15 50 50 40 55 Santa Ana Edinger Avenue 15 30 56 Santa Ana St Andrew Place 15 50 30 40 57 Santa Ana St Gertrude Place 15 50 40 58 Santa Ana Warner Avenue 15 15 30 59 Santa Ana Hotel Terrace Drive/Brookhollow Dr 15 50 40 60 Santa Ana SR-55 Southbound Off-Ramp 15 50 40 61 Santa Ana Dyer Road 15 40 00- 1 Orange Taft Avenue & Shaffer Street 15 30 2 Santa Ana Fairhaven Avenue & Cambridge Street 30 50 3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp 15 50 - Santa Ana TMC Improvements 40 - Placentia TMC Improvements 40 - Orange TMC Improvements 30 40 - Anaheim TMC Improvements 40 - Brea TMC Improvements 40 24 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES 1 Brea Lambert Road 2 Brea Birch Street 3 Brea Orbiter Street 4 Brea Birch Hills Mall 5 Brea Imperial Highway (SR-90) * 6 Brea Buttonwood Drive/ Saturn Street 7 Placentia Golden Avenue 8 Placentia Patrician Lane 9 Placentia Bastanchury Road 10 Placentia Yorba Linda Boulevard 11 Placentia Sheffield Street/Morse Avenue 12 Placentia Madison Avenue 13 Placentia Alta Vista Street 14 Placentia Chapman Avenue (North) 15 Placentia Hawaii Way 16 Placentia Crowther Avenue 17 Placentia Orangethorpe Avenue 18 Anaheim La Jolla Street 19 Anaheim Miraloma Avenue 20 Anaheim Coronado Street 21 Anaheim Fire Signal 22 Anaheim La Palma Avenue 23 Anaheim SR-91 Westbound Off -Ramp * 24 Anaheim Frontera Street 25 Orange Riverdale Avenue 26 Orange Riverbend Parkway/Richland Avenue 27 Orange Lincoln Avenue 28 Orange Fletcher Avenue 29 Orange Meats Avenue 30 Orange Grove Avenue 31 Orange Orange Olive Road 32 Orange Taft Avenue 33 Orange Katella Avenue 34 Orange Wilson Avenue/Adams Avenue 35 Orange Collins Avenue 36 Orange Walnut Avenue 37 Orange Sycamore Avenue/University Drive 38 Orange Palm Avenue 39 Orange La Veta Avenue 40 Orange SR-22 Westbound Ramp * 41 Orange SR-22 Eastbound Ramp * 42 Santa Ana Fairhaven Avenue LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS Ti m i n g O n l y Ti m i n g + T r a f f i c R e s p o n s i v e (l i c e n s e o n l y ) Ti m i n g + P e e r - t o - P e e r (c o n f i g u r a t i o n o n l y ) Ti m i n g + T r a f f i c A d a p t i v e (l i c e n s e o n l y ) Ca l t r a n s C o o p e r a t i v e Ag r e e m e n t Y/N 31.3 31.3 31.7 31.3 50 50.0 31.3 27.5 31.3 35.0 32.5 15.0 22.5 32.0 31.3 15.0 15.0 26.7 31.0 32.5 31.3 45.0 33.0 50 50.0 32.5 27.0 27.0 36.7 36.7 31.7 31.7 40.0 30.0 40.0 40.0 36.7 36.7 40.0 35.0 50 50.0 50 50.0 32.9 NOTESAV E R A G E I M P R O V E M E N T SC O R E Online or Offline 25 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES LO C A T I O N IM P L E M E N T I N G A G E N C Y PROJECT CROSS STREETS 43 Santa Ana Santa Clara Avenue 44 Santa Ana 21st Street 45 Santa Ana 17th Street 46 Santa Ana I-5 Northbound Ramp 47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp 48 Santa Ana Fruit Street 49 Santa Ana OC Register 50 Santa Ana 4th Street 51 Santa Ana 1st Street 52 Santa Ana Chestnut Avenue 53 Santa Ana McFadden Avenue 54 Santa Ana Century High School 55 Santa Ana Edinger Avenue 56 Santa Ana St Andrew Place 57 Santa Ana St Gertrude Place 58 Santa Ana Warner Avenue 59 Santa Ana Hotel Terrace Drive/Brookhollow Dr 60 Santa Ana SR-55 Southbound Off-Ramp 61 Santa Ana Dyer Road 00- 1 Orange Taft Avenue & Shaffer Street 2 Santa Ana Fairhaven Avenue & Cambridge Street 3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp - Santa Ana TMC Improvements - Placentia TMC Improvements - Orange TMC Improvements - Anaheim TMC Improvements - Brea TMC Improvements Ti m i n g O n l y Ti m i n g + T r a f f i c R e s p o n s i v e (l i c e n s e o n l y ) Ti m i n g + P e e r - t o - P e e r (c o n f i g u r a t i o n o n l y ) Ti m i n g + T r a f f i c A d a p t i v e (l i c e n s e o n l y ) Ca l t r a n s C o o p e r a t i v e Ag r e e m e n t Y/N NOTESAV E R A G E I M P R O V E M E N T SC O R E Online or Offline 35.0 37.0 37.0 35.0 33.8 30.0 40.0 40.0 31.7 27.5 33.3 38.8 22.5 33.8 35.0 20.0 35.0 35.0 27.5 22.5 40.0 32.5 40.0 40.0 35.0 40.0 40.0 33.6AVERAGE SCORE = 26 Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP Appendix C VEHICLE MILES TRAVELED (VMT) Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP APPENDIX C: VEHICLE MILES TRAVELED (VMT) ADTs Distance VMT 13,036 0.40 5,214 16,463 0.50 8,232 16,397 0.50 8,199 16,052 0.50 8,026 18,362 0.60 11,017 20,952 0.80 16,762 18,905 0.40 7,562 18,932 0.42 7,951 Anaheim 45,665 1.70 77,631 20,900 0.45 9,405 16,200 0.46 7,452 16,500 0.94 15,510 21,900 0.46 10,074 15,500 0.46 7,130 8,900 0.50 4,450 7,900 0.50 3,950 13,200 0.50 6,600 29,100 0.34 9,894 29,300 0.16 4,688 27,641 0.43 11,886 24,397 0.50 12,199 28,732 0.39 11,205 44,763 0.61 27,305 37,067 0.84 31,136 28,319 0.48 13,593 24,644 0.75 18,483 21,727 0.55 11,950 15.14 367,503 Edinger Ave - Warner Ave Warner Ave - Dyer Rd Katella Ave - Collins Ave Chapman Ave (South) - La Veta Ave La Veta Ave - SR-22 Fwy SR-22 Fwy - Fairhaven Ave Collins Ave - Walnut Ave Walnut Ave - Chapman Ave (South) McFadden Ave - Edinger Ave Fairhaven Ave - Santa Clara Ave Santa Clara Ave - 17th St 1st St - McFadden Ave Source: 2023 - Brea, Placentia, Anaheim 2022 - Santa Ana, Orange Total Project VMT: Segment Imperial Hwy (SR-90) - Golden Ave Golden Ave - Bastanchury Rd Yorba Linda Blvd - Alta Vista St Lambert Rd - Birch St Birch St - Imperial Hwy (SR-90) Lincoln Ave - Fletcher Ave Taft Ave - Katella Ave Alta Vista St - Chapman Ave (North) Chapman Ave (North) - Orangethorpe Ave Orangethorpe Ave - Riverdale Ave Pl a c e n t i a Or a n g e Sa n t a A n a Br e a Riverdale Ave - Lincoln Ave Bastanchury Rd - Yorba Linda Blvd Fletcher Ave - Taft Ave 17th St - Santa Ana Blvd/ I-5 Fwy I-5 Fwy - 1st St Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP AGENCY RESOLUTIONS AND LETTERS OF SUPPORT Appendix D Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424 Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP Appendix E Cabinet photos and As-built drawings (Uploaded to OCFundTracker and included in Electronic Submittal Only) Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424