HomeMy WebLinkAboutAGR-7804 - CITIES OF SANTA ANA, BREA, PLACENTIA, ANAHEIM - KRAMER, GLASSELL, GRAND CORRIDOR TRAFFIC SIGNAL PROJECT
1
COOPERATIVE AGREEMENT BY AND BETWEEN THE CITIES
OF SANTA ANA, BREA, PLACENTIA, ANAHEIM, AND ORANGE
FOR THE KRAEMER BOULEVARD/ GLASSELL STREET/
GRAND AVENUE CORRIDOR TRAFFIC SIGNAL
SYNCHRONIZATION PROJECT
This Cooperative Agreement (“Agreement”) is made and entered into this day of
, 2025, by and between the CITY OF SANTA ANA, a charter city (“SANTA ANA”),
the CITY OF BREA, a municipal corporation (“BREA”), the CITY OF PLACENTIA, a municipal
corporation (“PLACENTIA”), the CITY OF ANAHEIM, a municipal corporation (“ANAHEIM”), and
the CITY OF ORANGE, a municipal corporation (“ORANGE”).
RECITALS:
A. Santa Ana, with cooperation from Brea, Placentia, Anaheim, and Orange, applied for a
grant from the Orange County Transportation Authority (“OCTA”) as part of Renewed
Measure M2 Regional Traffic Signal Synchronization Program (“RTSSP”) (Project P),
aimed to coordinate traffic signals across multiple jurisdictions to enhance countywide
traffic flow and reduce congestion.
B. The Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor Traffic Signal
Synchronization Project was selected by OCTA as one of the RTSSP Projects to be
funded in OCTA Fiscal Year 2024-2025. The project will include timing implementation
and improvements at traffic signals along Kraemer Boulevard/ Glassell Street/ Grand
Avenue, from Lambert Road in Brea to Dyer Road in Santa Ana, as listed in the Project
Application attached hereto as Exhibit B and incorporated herein by this reference.
C. The total budget for the project is $5,710,657.50. 80% ($4,568,526) is funded by the OCTA
Regional Traffic Signal Synchronization Program and 20% ($1,142,131.50) is local
agencies matching funds. The breakdown is shown in Exhibit A attached hereto and
incorporated herein by this reference.
D. Santa Ana, Brea, Placentia, Anaheim, and Orange agree to provide twenty percent (20%)
matching funds for the total project cost. Matching funds can be a combination of cash
and in-kind match as defined by the RTSSP grant.
E. OCTA and Santa Ana have entered into a Master Funding Agreement “Cooperative
Agreement No. C-1-2783” defining the terms and conditions for approved Measure M2
projects that will be implemented by Santa Ana.
F. Santa Ana agrees to serve as the lead agency to oversee the design and implementation
of the project.
G. Santa Ana, Brea, Placentia, Anaheim, and Orange desire to enter into this Cooperative
Agreement to demonstrate their commitment to implement the project and improve inter-
jurisdiction traffic signal synchronization on Kraemer Boulevard/ Glassell Street/ Grand
Avenue.
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
AGR-7804
2
H. This cooperative agreement defines the specific terms, conditions and funding
responsibilities between Santa Ana, Brea, Placentia, Anaheim, and Orange for the
implementation of the project.
NOW, THEREFORE, it is mutually understood and agreed by and between SANTA ANA, BREA,
PLACENTIA, ANAHEIM, and ORANGE as follows:
I. SCOPE:
This Agreement specifies the roles and responsibilities of the cities as they pertain to the
subjects and projects addressed herein. The project is specifically detailed in the Project
Application attached hereto as Exhibit B and incorporated herein by this reference. All of the
cities agree that each will cooperate and coordinate with the other in all activities covered by this
Agreement and any other supplemental agreements that may be required to facilitate purposes
thereof.
II. MUTUAL RESPONSIBILITIES:
Santa Ana, Brea, Placentia, Anaheim, and Orange mutually agree to:
a. Designate a lead staff to act as the liaison for the project. The liaison and any other project
personnel, if necessary, will attend and participate in all related project meetings.
b. Participate, cooperate and coordinate with contractors, consultants, vendors and staff in
good faith using reasonable efforts to resolve any unforeseen issues and disputes arising
out of the project to the extent practicable with respect to the performance of the project.
c. Maintain project related traffic signals and telecommunications equipment with high
priority during the project, and be responsible for repair of their own signal control systems
in each of their respective jurisdictions.
d. Provide on-site support for signal control systems, timing plans, detection systems and
related equipment during construction, installation and integration, and be available to
change or make adjustments to timing plans when necessitated by the project.
e. Document in-kind match or dollar match funding as identified in the project application,
and provide verification of such expenditures as part of any review or audit process, which
may include payroll records, contracts and purchase orders.
f. Monitor and operate the project traffic signals and improvements within its jurisdiction for
a period of two (2) years following the completion of the Primary Implementation Phase of
the project, as required by the program funding.
g. Coordinate the inclusion of other improvements and in-kind services, where necessary,
that the owning agency requires for the implementation of the project, but are not included
in the project application. The owning agency shall be responsible for the inclusion of such
elements within reason and at its own costs.
h. Unused project funds for improvements from one City can be used by another City (with
matching fund responsibility) upon mutual consent of the involved parties.
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
3
III. RESPONSIBILITIES OF SANTA ANA:
Santa Ana agrees to the following responsibilities:
a. Santa Ana shall serve as lead agency for design, construction and construction
management of the project, and shall provide oversight by establishing milestones and
overseeing the project development to ensure that all standards and requirements set
forth by the agreement is adhered to.
b. Santa Ana shall be responsible for completing the project in accordance with the funding
guidelines and any and all other OCTA requirements related to these funding programs.
Santa Ana shall maintain coordination with all participating agencies throughout the
duration of the project.
c. Santa Ana shall provide staff, consultants, and contractors deemed necessary and
appropriate to manage, administer, coordinate, and oversee timing implementation,
engineering design, bid and award, and construction management of the project.
d. Santa Ana shall enter into an agreement with a qualified consultant and contractor to
assist in the completion and monitoring of the project.
e. Santa Ana shall enter into any required Cooperative Agreement with Caltrans regarding
Caltrans Improvements in cities; to comply with all the terms and conditions of said
Cooperative Agreement; to pay invoices for such Caltrans Improvements as required by
Caltrans; and to invoice participating agencies in a timely manner with detailed
documentation of said Caltrans Improvements
f. Santa Ana shall coordinate the work effort of this Project, provide the day to day
management of the consultant and manage all consultant administration and contracting.
Santa Ana shall review the consultant’s invoices and pay them accordingly after ensuring
that the work has been adequately performed by the consultant.
g. Santa Ana shall provide its share of matching fund as shown in Exhibit A attached hereto
and incorporated herein by this reference. The final amount may vary and will be based
on the 20% of actual cost of implementing all timing, improvements and maintenance, as
identified in the project application.
h. Upon issuance of a Notice to Proceed to the Consultant, Santa Ana can issue invoices to
Brea, Placentia, Anaheim, and Orange for up to 80% of the cash match amount identified
in Exhibit A. The remaining cash match amount will be invoiced after completion of the
Primary Implementation Phase of the project.
i. Santa Ana shall comply with all of the terms and conditions of the Cooperative Agreement
with OCTA, including the Project Reporting and Audit Requirements contained therein.
IV. RESPONSIBILITIES OF BREA,
Brea agrees to the following responsibilities:
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
4
a. Brea shall provide its share of matching funds as shown in Exhibit A. The final amount
may vary and will be based on the 20% of actual cost of implementing all timing,
improvements and maintenance, as identified in the project application.
b. Brea shall provide Construction Inspection on all improvements within its jurisdiction. No
additional compensation from the project is provided for providing inspection services.
c. Brea shall waive all costs and fees related to any and all permits, if such permits are
required to perform any project related work within its jurisdiction.
V. RESPONSIBILITIES OF PLACENTIA:
Placentia agrees to the following responsibilities:
a. Placentia shall provide its share of matching funds as shown in Exhibit A. The final amount
may vary and will be based on the 20% of actual cost of implementing all timing,
improvements and maintenance, as identified in the project application.
b. Placentia shall provide Construction Inspection on all improvements within its jurisdiction.
No additional compensation from the project is provided for providing inspection services.
c. Placentia shall waive all costs and fees related to any and all permits, if such permits are
required to perform any project related work within its jurisdiction.
VI. RESPONSIBILITIES OF ANAHEIM:
Anaheim agrees to the following responsibilities:
a. Anaheim shall provide its share of matching funds as shown in Exhibit A. The final amount
may vary and will be based on the 20% of actual cost of implementing all timing,
improvements and maintenance, as identified in the project application.
b. Anaheim shall provide Construction Inspection on all improvements within its jurisdiction.
No additional compensation from the project is provided for providing inspection services.
c. Anaheim shall waive all costs and fees related to any and all permits, if such permits are
required to perform any project related work within its jurisdiction.
VII. RESPONSIBILITIES OF ORANGE:
Orange agrees to the following responsibilities:
a. Orange shall provide its share of matching funds as shown in Exhibit A. The final amount
may vary and will be based on the 20% of actual cost of implementing all timing,
improvements and maintenance, as identified in the project application.
b. Orange shall provide Construction Inspection on all improvements within its jurisdiction.
No additional compensation from the project is provided for providing inspection services.
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
5
c. Orange shall waive all costs and fees related to any and all permits, if such permits are
required to perform any project related work within its jurisdiction.
VIII. COMPLETE AGREEMENT:
a. This Agreement, including any attachments incorporated herein and made applicable by
reference, constitutes the complete and exclusive statement of the terms and conditions
of this Agreement between SANTA ANA, BREA, PLACENTIA, ANAHEIM, and ORANGE
and it supersedes all prior representations, understandings and communications between
the parties. The invalidity in whole or in part of any term or condition of this Agreement
shall not affect the validity of other term(s) or conditions(s) of this Agreement. The above
referenced Recitals are true and correct and are incorporated by reference herein.
b. Any modification of this Agreement shall only be by amendment upon written mutual
consent of all cities. All modifications, amendments, changes and revisions of this
Agreement in whole or in part, and from time to time, shall be binding upon the cities so
long as the same shall be in writing and executed by each ag ency.
c. A party’s failure to insist on any instance(s) of any other party’s performance of any term(s)
or condition(s) of this Agreement shall not be construed as a waiver of the non-enforcing
party’s right to such performance or to future performance of such term(s) or condition(s),
and the nonperforming party’s obligation in respect thereto shall continue in full force and
effect. Changes to any portion of this Agreement shall not be binding upon either party
except when specifically confirmed in writing by way of a written amendment to this
Agreement between the parties and issued in accordance with the provisions of this
Agreement.
IX. INSURANCE AND INDEMNIFICATION:
a. Each city shall jointly and severally indemnify, defend and hold harmless every other city,
it’s officers, directors, employees and agents from and against any and all claims for any
loss or damages, bodily injuries, damage to, or loss of property caused by the negligent
acts, omissions or willful misconduct by that city, its officers, directors, employees or
agents in connection with or arising out of the performance of this Agreement.
b. Each city shall maintain adequate levels of insurance, or self -insurance to assure full
indemnification of every other city.
X. ADDITIONAL PROVISIONS:
a. Term of Agreement: This Agreement shall commence on the date first written above and
continue in full force and effect until December 31, 2030. This Agreement may be
extended at the mutual consent of all parties in writing.
b. SANTA ANA, BREA, PLACENTIA, ANAHEIM, and ORANGE hereto affirm that they are
authorized to execute this Agreement on behalf of said parties and that, by so executing
this agreement, the parties hereto are formally bound to the provisions of this Agreement.
c. Severability: If any term, provision, covenant or condition of this Agreement is held to be
invalid, void or otherwise unenforceable, to any extent, by any court of competent
jurisdiction, the remainder of this Agreement shall not be affected thereby, and each term,
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
6
provision, covenant or condition of this Agreement shall be valid and enforceable to the
fullest extent permitted by law.
d. Counterparts of Agreement: This Agreement may be executed and delivered in any
number of counterparts, each of which, when executed and delivered shall be deemed an
original and all of which together shall constitute the same agreement. Facsimile and
electronic signatures will be permitted.
e. In the event that the project costs exceed the estimates submitted in the Project
Application as prepared, all parties agree to meet and determine project revisions to meet
the budget, or a revised funding proposal by the cities that shall be documented and
submitted in writing as a revision to the Agreement.
f. The parties shall comply with all applicable federal, state and local laws, statutes,
ordinances and regulations of any governmental agency having jurisdiction over the
project.
g. Force Majeure: Any party shall be excused from performing its obligations under this
Agreement during the time and to the extent that it is prevented from performing by an
unforeseeable cause beyond its control, including, but not limited to: any incidence of fire,
flood; acts of God; commandeering of material, products, plants or facilities by the federal,
state or local government; national fuel shortage; or, a material act or omission by the
other party; when satisfactory evidence of such cause is presented to the other parties,
and provided further that such nonperformance is unforeseeable, beyond the control and
is not due to the fault or negligence of the party not performing.
h. Assignment: Neither this Agreement, nor any of the parties’ rights, obligations, or duties
hereunder may be assigned in whole or in part by any party without the prior written
consent of all the other parties in their sole and absolute discretion. Any such attempt of
assignment shall be deemed void and of no force and effect. Consent to one assignment
shall not be deemed consent to any subsequent assignment, nor the waiver of any right
to consent to such subsequent assignment.
i. Obligations To Comply with Law: Nothing herein shall be deemed nor construed to
authorize or require any party to issue bonds, notes or other evidences of indebtedness
under the terms, in amounts, or for purposes other than as authorized by local, state or
federal law.
j. Governing Law: The laws of the State of California and applicable local and federal laws,
regulations and guidelines shall govern this Agreement.
k. Litigation fees: Should litigation arise out of this Agreement for the performance thereof,
the court shall award costs and expenses, including attorney’s fees, to the prevailing party.
l. Notices: Any notices, requests, or demands made between the parties pursuant to this
Agreement are to be directed as follows:
City of Santa Ana
Public Works Agency
20 Civic Center Plaza, M-43
Santa Ana, CA 92701
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
7
Cesar Rodriguez
Sr. Civil Engineer
(714) 647-5626
Crodriguez5@santa-ana.org
City of Brea
Public Works Department
1 Civic Center Circle
Brea, CA 92821
Ryan Chapman
City Engineer
714-990-7763
ryanch@ci.brea.ca.us
City of Placentia
Public Works Department
401 E. Chapman Ave.
Placentia, CA 92870
Kyra Tao
Transportation Manager
714-993-8121
ktao@placentia.org
City of Anaheim
Public Works Department
200 S. Anaheim Blvd, Suite 276
Anaheim, CA 92805
John Thai
Principal Traffic Engineer
714-765-5294
jthai@anaheim.net
City of Orange
Public Works Department
300 E. Chapman Avenue
Orange, CA 92866
Gabrielle Hayes
Principal Civil Engineer
714-744-5561
ghayes@cityoforange.org
XI. DELAGATED AUTHORITY:
The actions required to be taken by the cities in the implementation of this Agreement are
delegated to its City Manager or equivalent designee.
[SIGNATURES ON SUBSEQUENT PAGES]
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
8
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year
first above written:
CITY OF SANTA ANA:
ALVARO NUNEZ
City Manager
ATTEST:
JENNIFER L. HALL
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:
JONATHAN T. MARTINEZ
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
NABIL SABA
Executive Director
Public Works Agency
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
9
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year
first above written:
CITY OF BREA:
Kristin Griffith
Interim City Manager
ATTEST:
Lillian Harris-Neal
City Clerk
APPROVED AS TO FORM:
Terence Boga
City Attorney
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
10
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year
first above written:
CITY OF PLACENTIA:
Rosanna Ramirez
Acting City Administrator
ATTEST:
Robert S. McKinnell
City Clerk
APPROVED AS TO FORM:
Christian L. Bettenhausen
City Attorney
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
11
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year
first above written:
CITY OF ANAHEIM:
Jim Vanderpool
City Manager
ATTEST:
Theresa Bass
City Clerk
APPROVED AS TO FORM:
Bryn Morley
Deputy City Attorney
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
12
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year
first above written:
CITY OF ORANGE:
Thomas C. Kisela
City Manager
ATTEST:
Pamela Coleman
City Clerk
APPROVED AS TO FORM:
Mike Vigliotta
City Attorney
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
EXHIBIT A
KRAEMER BOULEVARD/ GLASSELL STREET/ GRAND AVENUE CORRIDOR TSSP
PROJECT FUNDS BREAKDOWN
Agency Project Funds by
Agency*
M2 Grant
(80%)
Local Match (20%)
Total Match**
Match Type
Cash In-kind
1 Brea
PI $580,600 $464,480 $116,120 $116,120 $0
O&M $16,800 $13,440 $3,360 $3,360 $0
2 Placentia
PI $928,950 $743,160 $185,790 $185,790 $0
O&M $30,800 $24,640 $6,160 $6,160 $0
3 Anaheim
PI $633,675 $506,940 $126,735 $126,735 $0
O&M $19,600 $15,680 $3,920 $3,920 $0
4 Orange
PI $1,543,450 $1,234,760 $308,690 $308,690 $0
O&M $50,400 $40,320 $10,080 $10,080 $0
5 Santa Ana
PI $1,844,782.50 $1,475,826 $368,956.50 $338,956.50 $30,000
O&M $61,600 $49,280 $12,320 $12,320 $0
Total $5,710,657.50 $4,568,526 $1,142,131.50 $1,112,131.50 $30,000
*: Unused project funds from one Agency can be transferred to another Agency with mutual
consent.
**: Total match amount may vary; the final match amount will be based on the actual project
implementation costs, to be determined at completion of the Primary Implementation Phase of
the project.
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
EXHIBIT B
KRAEMER BOULEVARD/ GLASSELL STREET/ GRAND AVENUE CORRIDOR TSSP
PROJECT APPLICATION
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
15.1
61
Santa Ana
Brea
Placentia
Anaheim
Orange
Caltrans
Applicant Agency:City of
Contact Name:
Contact Number:
Contact Email:
Application Deadline
Project Overview
Total Match:
$5,710,657.50
$4,568,526.00
$1,142,131.50
Length of Corridor (mi):
Number of signals:
Total Project Cost:
M2 funds requested:
FY 2024 Call for Projects
Regional Traffic Signal Synchronization Program
Project P
Supplemental Application
10/26/2023
Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor
Santa Ana
Cesar Rodriguez
714-647-54626
crodirguez5@santa-ana.org
Cash Match:
In-kind Match:
Participating Agencies:
$1,112,131.50
$30,000.00
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Project P Supplemental Application Checklist Page
RTSSP Online Application – submitted through OCFundTracker
a. Transportation Significance
b. Economic Effectiveness
c. Project Characteristics
d. Project Scale
e. Number of Jurisdictions
f. Current Project Status
g. Funding Match
h. Cabinet photos, equipment specifications, as-built drawings, cabinet drawings, etc. Online only
Section 1: Key Technical Information
a. Name of Project Corridor/Grid/Route 1
b. Project Limits 1
c. Project Length 1
d. Number of Signalized Intersections Along Corridor 1
e. Participating Agencies/Traffic Forum Members 1
f. Lead Agency 1
g. Designation of the corridor to synchronize 1
h. Project Start and End Date 1
i. Previous funding 1
j. Contact Information 1
k. Signalized intersections that are part of the project 2
l. Offset signalized intersections that are part of the project 2
m. Project Map Depicting the Project Limits 3
Section 2: Regional Significance 4
Section 3: Acknowledgement of Required Tasks 5-8
Section 4: Funding Needs/Costs for Proposed Project by Task
a. Summary of Project Cost 9
b. Summary of Cost by Agency 10-11
c. Summary of Intersection Improvement Costs 12-13
Section 5: Detailed Local Match Commitment 14
Section 6: Project Schedule by Task
a. Project Start and End Dates 15
b. Project Schedule by Task 15
Appendices
A. Calculations and Estimated Points
B. Agency Improvement Calculations
C. Vehicle Miles Traveled (VMT)
D. Agency Resolutions and Letters of Support
E. Cabinet Photos and As-built drawings (Uploaded to OCFundTracker and included in Electronic
Submittal Only)
Online
Project P Regional Traffic Signal Synchronization Program
Table of Contents
i
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 1: KEY TECHNICAL INFORMATION Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
a. Project
b.
from to
c.Project Length (miles ):
d.Number of signalized intersections along the corridor (include all Caltrans intersections):
number of signals on project corridor(s) number of offset signals included in this project
e.Participating agencies / Traffic Forum Members (including applicant agency ):
f. Lead Agency
g. Designation of the corridor to synchronize:
h. Project End Date:
i.
j. Contact Information (Include name, title, agency, phone, email, and address)
John Thai, Principal Traffic Engineer
City of Anaheim, 714-765-5294
jthai@anaheim.net
200 S. Anaheim Blvd, Suite 276
Anaheim, CA 92805
Gabrielle Hayes, Senior Civil Engineer
City of Orange, 714-744-5561
ghayes@cityoforange.org
300 E. Chapman Avenue
Orange, CA 92866
Pauline Nguyen, Branch Chief, Traffic Signals/Ramp
Metering/
Census Caltrans District 12, 949-279-9168
6681 Marine Way
Irvine, CA 92618
Kyra Tao, Transportation Manager
City of Placentia, 714-993-8121
ktao@placentia.org
401 E. Chapman Ave.
Placentia, CA 92870
Cesar Rodriguez, Senior Civil Engineer
City of Santa Ana, 714-647-5626
crodriguez5@santa-ana.org
20 Civic Center Plaza
Santa Ana, CA 92701
Albert Espinoza, City Engineer
City of Brea, 714-990-7657
alberte@ci.brea.ca.us
1 Civic Center Circle
Brea, CA 92821
Select any that apply:
Corridor
Kraemer Boulevard/ Glassell Street/ Grand Avenue Corridor
15.14
Project Limits:
Santa Ana
361
Lambert Road Dyer Road
December 31, 2027January 1, 2025Project Start Date:
Signal Synchronization Network Corridor / Priority Corridor Master Plan of Arterial Highways Corridor
Anaheim
Buena Park
Caltrans
Costa Mesa
Cypress
Dana Point
Fountain Valley
Fullerton
Garden Grove
Huntington Beach
La Habra
La Palma
Laguna Beach
Laguna Hills
Mission Viejo
Orange
Placentia
Rancho Santa Margarita
San Clemente
Santa Ana
Seal Beach
Stanton
Tustin
Villa Park
Westminster
County of Orange Irvine Lake Forest
San Juan Capistrano
Yorba Linda
Aliso Viejo
Brea
Laguna Niguel
Laguna Woods
Los Alamitos
Re-timing at least 75% of previous project Timing at least 75% of new eligible project
Newport Beach
None
All participating agencies are participating in the Countywide Baseline Project
1
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 1: KEY TECHNICAL INFORMATION Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
k. Signalized intersections that are part of the project:
1 Kraemer Boulevard Lambert Road 40 Glassell Street SR-22 Westbound Ramp *
2 Kraemer Boulevard Birch Street 41 Glassell Street SR-22 Eastbound Ramp *
3 Kraemer Boulevard Orbiter Street 42 Grand Avenue Fairhaven Avenue
4 Kraemer Boulevard Birch Hills Mall 43 Grand Avenue Santa Clara Avenue
5 Kraemer Boulevard Imperial Highway (SR-90) * 44 Grand Avenue 21st Street
6 Kraemer Boulevard Buttonwood Drive/ Saturn Street 45 Grand Avenue 17th Street
7 Kraemer Boulevard Golden Avenue 46 Grand Avenue I-5 Northbound Ramp
8 Kraemer Boulevard Patrician Lane 47 Grand Avenue Santa Ana Blvd/I-5 Southbound Ramp
9 Kraemer Boulevard Bastanchury Road 48 Grand Avenue Fruit Street
10 Kraemer Boulevard Yorba Linda Boulevard 49 Grand Avenue OC Register
11 Kraemer Boulevard Sheffield Street/Morse Avenue 50 Grand Avenue 4th Street
12 Kraemer Boulevard Madison Avenue 51 Grand Avenue 1st Street
13 Kraemer Boulevard Alta Vista Street 52 Grand Avenue Chestnut Avenue
14 Kraemer Boulevard Chapman Avenue (North) 53 Grand Avenue McFadden Avenue
15 Kraemer Boulevard Hawaii Way 54 Grand Avenue Century High School
16 Kraemer Boulevard Crowther Avenue 55 Grand Avenue Edinger Avenue
17 Kraemer Boulevard Orangethorpe Avenue 56 Grand Avenue St Andrew Place
18 Kraemer Boulevard La Jolla Street 57 Grand Avenue St Gertrude Place
19 Kraemer Boulevard Miraloma Avenue 58 Grand Avenue Warner Avenue
20 Kraemer Boulevard Coronado Street 59 Grand Avenue Hotel Terrace Drive/Brookhollow Dr
21 Kraemer Boulevard Fire Signal 60 Grand Avenue SR-55 Southbound Off-Ramp
22 Kraemer Boulevard La Palma Avenue 61 Grand Avenue Dyer Road
23 Kraemer Boulevard SR-91 Westbound Off -Ramp *
24 Kraemer Boulevard Frontera Street
25 Glassell Street Riverdale Avenue
26 Glassell Street Riverbend Parkway/Richland Avenue
27 Glassell Street Lincoln Avenue
28 Glassell Street Fletcher Avenue
29 Glassell Street Meats Avenue
30 Glassell Street Grove Avenue
31 Glassell Street Orange Olive Road
32 Glassell Street Taft Avenue
33 Glassell Street Katella Avenue
34 Glassell Street Wilson Avenue/Adams Avenue Legend
35 Glassell Street Collins Avenue
36 Glassell Street Walnut Avenue
37 Glassell Street Sycamore Avenue/University Drive
38 Glassell Street Palm Avenue
39 Glassell Street La Veta Avenue
*Caltrans
l. Offset signalized intersections that are part of the project:
1 Taft Avenue 13
2 Fairhaven Avenue 14
3 Santa Ana Boulevard 15
4 16
5 17
6 18
7 19
8 20
9
10
11
12
Main Corridor
Main Street Cross Street Main Street
Brea
Placentia
Main Corridor Cross Street
I-5 SB On/Off Ramp
Anaheim
Shaffer Street
Cambridge Street
Cross Street
Santa Ana
Orange
Cross Street
2
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 1: KEY TECHNICAL INFORMATION Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
m. Project Map Depicting the Project Limits and Offset Signals
3
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 2: REGIONAL SIGNIFICANCE
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
Explain why this project is regionally significant:
The Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor is a reinvigorated project originally performed
and funded by M2 RTSSP in FY 2013/2014. The Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor
extends 15.14 miles from Lambert Road in the City of Brea to Dyer Road in the City of Santa Ana. The corridor
encompasses 61 signalized intersections controlled by the Cities of Brea, Placentia, Anaheim, Orange, Santa Ana
and the California Department of Transportation (Caltrans). Caltrans is a participating agency in the project and
the participating Cities are committed to executing a cooperative agreement with Caltrans for the implementation
of optimized signal timing at the Caltrans intersections.
Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor is currently classified as a Major Arterial in the Cities
of Brea, Placentia, Anaheim and Santa Ana and as a Primary Arterial in the City of Orange. The corridor is also
designated as part of a Priority Corridor Network by the Traffic Signal Synchronization Master Plan. The corridor
carries traffic volumes ranging from 13,000 to 21,000 in Cities of Brea and Placentia; up to approximately 46,000
in City of Anaheim, down to approximately 8,000 in Old Towne Orange, to over 40,000 vehicles daily in Santa
Ana.
Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor stretches from the northern County limits to the
center of Orange County encompassing a wide range of land uses. At the northern limit in City of Brea, the arterial
primarily serves a mix of residential, retail and large commercial including Birch Hills Mall and biomedical
manufacturing company Beckman Coulter. This area experiences high morning and evening peak traffic volumes
that require a well-synchronized network to meet the peak demand. In City of Placentia, the corridor primarily
serves residential, small retail and schools including Tri-City Park and nearby Valencia High School. This area
experiences moderately high morning and evening peak traffic volumes and requires a well balanced traffic signal
system that serves both daily vehicle commuters and local pedestrian and bike users. In City of Anaheim, the
corridor primarily serves large industrial and commercial businesses and cuts through the Anaheim Canyon
Business District. This area is being reimagined by the City of Anaheim and looks to create a business
environment attractive to a wide variety of industries while encouraging sustainable development. This area sees
the highest traffic volume of the corridor and is adjacent to the Caltrans SR-91 Freeway which requires a well
sychronized traffic signal system that accounts for high volume of vehicle and large trucks traffic. In the City of
Orange, the corridor serves a mix of residential, small business, schools and historic landmarks including
Chapman University and Old Towne Orange. This area experiences lower traffic volume but requires special
signal timing and active transportation elements to efficiently accommodate the mix of vehicle, pedestrians and
bicycles. At the southern limit in City of Santa Ana, the corridor serves a mix of residential, schools, and large
manufacturing and commercial businesses including Behr Paint Company and several Orange County
government facilities. This area sees some of the highest traffic volumes and demands a well-synchronized
network to meet the directional and oversaturated traffic demand.
The original signal timing and improvements on Kraemer Boulevard/ Glassell Street/ Grand Avenue corridor has
decayed and needs to be revisited. Therefore, it is imperative that this very important corridor be considered for
the 2024 Call for Projects from OCTA.
4
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
a.PROJECT TASKS
Primary Implementation (PI) Phase, lasting approximately one year shall include the following:
Task 1:
Task 2:
By checking this box, the Applicant Agency, on behalf of all the participating agencies, agree
to the following tasks:
Project Management - PI Phase
Data Collection and Field Review
This task is ongoing throughout the duration of the PI Phase of the project. It includes day-to-day
project management, such as meetings, progress reports, tracking of schedules, tracking of cost by
agency, invoicing, and overall administration of the PROJECT.
The following list is a minimum of what is required of this task:
• A running record of project cost broken down by Participating Agency shall be part of this task.
This information will be used by the Lead Agency to bill Participating Agencies for their respective
project match.
• A running record of all scope changes and/or any deviations from the final approved application.
This information will be used by the Lead Agency to request for Scope Changes at the Semi-Annual
Review (SAR).
All agencies on this application will opt out of the Data Collection portion of Task 2 due to participation
in the Countywide Baseline Project. A Before/After study will be completed. However, Data Collection
will be be conducted at the four (4) Caltrans intersections and utilized to develop Signal Timing
Optimization and Implementation. These efforts will be closely coordinated with the Countywide
Baseline Project. Cities of Brea, Anaheim and Orange are committed to excecuting a Cooperative
Agreeement with Caltrans for the Data Collection efforts. Funding for Data Collection at the Caltrans
intersection is included in the respective Agency Task 2.
This task shall include collecting seven-day, 24-hour machine counts, including vehicle and bike
classifications, along each 1-mile segment of the corridor(s). The project shall also produce weekday
and weekend peak period intersection turning movement (ITM) counts at every signalized
intersection, including pedestrian and bicycle counts. ITM counts shall be conducted for two hours of
each weekday peak period (AM, mid-day, and PM) and a single four-hour Saturday mid-day peak
period. All counts shall be summarized in Microsoft Excel format. All data shall adhere to the CTFP
Guidelines for data compatibility.
Data collection also includes field review of before and after conditions. The floating car method shall
be utilized with software and GPS for the ’Before’ Study to fine-tune the corridor operation and verify
integrity of system intersection clocks. Synchronized Video shall be used to compare actual conditions
to anticipated conditions dictated by the time-space diagram so that any anomalies may be corrected
prior to the ’After’ studies task.
Field review conducted as part of this task will document the existing conditions for all signal timing,
infrastructure, and system improvements on the project. This includes pre-construction pictures for
comparison during the post-construction walkthrough, should there be any questions or discrepancies
noted by any parties. Data Collection and Field Review Memos shall be provided to all participating
agencies.
Check this box to indicate all agencies on this application will opt out of the data collection
portion of Task 2 due to participation in the Countywide Baseline Project. A Before/After study
is still required. A memorandum shall be submitted to indicate completion of this task.
5
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
Task 3:
Task 4:
Task 5:
System Design and Construction
Final PI Report
Signal Timing Optimization and Implementation
Check this box to indicate all agencies on this application will opt out of the Signal Timing
Optimization and Implementation task (Task 4) due to participation in the Countywide Baseline
Project. The Final PI Report shall still include a section on timing optimization and
implementation from the Baseline Project.
The Lead Agency will hire a consultant(s), licensed contractor(s), and/or use city staff, or extension of
staff, to design, procure, install, construct, and implement all desired components of the project as
described in this application in accordance with the CTFP Guidelines.
All work and equipment supplied for the project shall comply and be done in accordance with the
latest standards and provisions of each Participating Agency or latest approved California Department
of Transportation (Caltrans) Standard Plans and Standard Specifications.
As-built plans shall be provided to match the improvements. This task is not complete until all
participating agencies approve the improvements implemented in their jurisdiction.
All agencies on this application will opt out of the Signal Timing Optimization and Implementation
portion of Task 4 due to participation in the Countywide Baseline Project. However, Signal Timing
Optimization and Implementation will be be conducted at the four (4) Caltrans intersections and
coordinated with the Countywide Baseline Project. Cities of Brea, Anaheim and Orange are committed
to excecuting a Cooperative Agreeement with Caltrans for the Signal Timing Optimization and
Implementation efforts. Funding for Signal Timing Optimization and Implementation at the Caltrans
intersection is included in the respective Agency Task 4.
Synchronization will be inter-jurisdictional in nature. All existing traffic patterns, flows, and conditions
will be taken into account. At a minimum, synchronized timing plans will be developed for a weekday
AM, Mid-day, PM, and a Weekend peak period. Special generators such as schools and businesses
along with cross street traffic will be considered as part of the project. Timing plans that will be
developed will assist traffic in getting to its destination without regard to physical or jurisdictional
boundaries.
The following list is a minimum of what is required of this task:
• A review of the basic timing parameters
• Concept of Operations documenting the recommended coordination strategies (e.g. segments,
cycle lengths, etc.) based on existing data collection and simulations
• Existing and Optimized simulation networks in Synchro (version 10) that is also shared with
OCTA using the OCTA designated ID numbers
• Implementation and fine-tuning of proposed timing plans
This task will not be complete until all participating agencies approve the new timing plans
implemented.
A Final PI Report, with an executive summary, shall provide complete documentation of the project,
including, but not limited to:
• Project scope, objectives, locations, findings, and recommendations
• Data collected: counts, travel time studies, and project benefits achieved in terms of fuel
savings, travel time, and other measurable parameters
• For each intersection: lane configurations, signal phasing, turning movement data, and cycle
lengths for existing and proposed timings for all peak periods
6
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
By checking this box, the following additional PI task(s) and/or exceptions will be made:
Task 6:
Task 7:
Task 8:
ONGOING OPERATIONS AND MAINTENANCE (O&M) PHASE, lasting approximately two (2) years, shall
include the following:
Final O&M Report
Continuing Support
Project Management - O&M Phase
During this 24-month period, the signal timing along the corridor/route/grid shall be observed and fine-
tuned. This task shall also include the monitoring, maintaining, and repair of detection and
communication implemented as part of this project. Monthly drives shall be conducted along the
length of the project during all designated corridor synchronization timing plan hours of operation in
order to verify that the synchronization timing is working as designed and complete any necessary
adjustments. This is followed by a monthly memorandum summarizing the status and trends of the
corridor based on the runs conducted. Trip logs for the month shall be provided to the Participating
Agencies. The memorandum shall include all additional tasks requested and completed during that
month. Performance metrics comparisons from ATSPM, where available, shall also be included in the
memorandum.
All agencies on this application will opt out of the Data Collection portion of Task 2 and Signal Timing
Optimization and Implementation portion of Task 4 due to participation in the Countywide Baseline
Project. However, Data Collection and Signal Timing Optimization and Implementation will be
conducted at the four (4) Caltrans intersections. These efforts will be closely coordinated with the
Countywide Baseline Project. Cities of Brea, Anaheim and Orange are committed to excecuting a
Cooperative Agreeement with Caltrans for the Data Collection and Signal Timing Optimization/
Implementation efforts. A Before/After study will be completed for the entire corridor including the
Caltrans locations. No system construction is proposed at the Caltrans locations. Funding for Data
Collection and Signal Timing Optimization/ Implementation at the Caltrans intersection is included in
the respective Agency Task 2 and 4.
• All work performed for system construction and signal timing optimization
• Implementation schedule and improvements accomplished, including dates
• Procedures for continuing maintenance, surveillance, and evaluation of the coordinated signal
system
The report shall document all planned and programmed improvements on the study corridor as well
as recommendations based on PI tasks for further infrastructure improvements that would likely
improve the corridor signal coordination project results. The report shall be completed in accordance
with the current CTFP Guidelines.
Finally, the report shall provide recommendations with cost and benefit estimates for future
improvements to traffic signal infrastructure (signal controllers, vehicle detection, communications,
etc.), intersection capacity (appropriate signal phasing, lane geometrics, and alleviation of physical
bottlenecks that curtail arterial capacity), and traffic management strategies. These proposed
improvements should be useful in determining future enhancements to the corridor.
A Project Summary Sheet, one sheet front and back, that describes the project and improvements
gained shall be provided to OCTA. This sheet will be used by OCTA and Participating Agencies to
present to the Board and elected officials.
This task includes day-to-day project management, such as meetings, tracking of schedules,
invoicing, and overall administration of the project. This task shall continue in full force as specified in
the Primary Implementation Phase.
7
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 3: ACKNOWLEDGEMENT OF REQUIRED TASKS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
By checking this box, the following additional O&M task(s) and/or exceptions will be made:
b.
c.ACKNOWLEDGMENT OF MEETING CTFP GUIDELINES
<Insert Text>
By checking this box, the Applicant Agency, on behalf of all the participating agencies, certify that all
current CTFP guidelines were met for this project.
By checking this box, the Applicant Agency, on behalf of all the participating agencies, agree to obtain
environmental clearance and other permits (if needed) for this project
ENVIRONMENTAL CLEARANCE AND OTHER PERMITS
At the end of the O&M Phase, a Final O&M Report documenting the Ongoing Operations and
Maintenance efforts and procedures for continuing maintenance shall be prepared. At the minimum,
the memorandum shall include when travel runs were conducted and issues and solutions throughout
the phase. The memorandum shall document all planned and programmed improvements on the
study corridor as well as recommendations for further infrastructure improvements that would likely
improve the corridor signal coordination project results.
8
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
a. Summary of Project Cost
Match Commitment: 20%(minimum 20%)
Total Project Cost (PI and O&M for a total of 3 years):
Total M2 Request:
Total Agency Match:
Total Project Cost:
Total M2 Request for PI Phase:
Total Agency Match for PI Phase:
Total PI Cost:
Total M2 Request for O&M Phase:
Total Agency Match for O&M Phase:
Total O&M Cost:
Task 3: System Design and Construction
Task 2: Data Collection
Task 1: Project Management - PI Phase
Project Tasks Total Cost
5,710,657.50$
19,200.00$
134,400.00$
25,600.00$
64,000.00$
20,000.00$
5,236,457.50$
70,200.00$
140,800.00$
Total Project Cost:
Task 8: Final Technical Memorandum
Task 7: Continuing Support
Task 6: Project Management - O&M Phase
35,840.00$
179,200.00$
Task 5: Project Report
4,568,526.00$
Task 4: Signal Timing Optimization and Implementation
PI Total
4,425,166.00$
1,106,291.50$
Project Total
1,142,131.50$
5,710,657.50$
5,531,457.50$
O&M Total
143,360.00$
8
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
b. Summary of Cost by Agency
Agency Caltrans Offset Total
51 6
2,200.00$ 13,200.00$
1,200.00$ 7,200.00$
- 549,200.00$
5,000.00$ 5,000.00$
1,000.00$ 6,000.00$
400.00$ 2,400.00$
2,100.00$ 12,600.00$
300.00$ 1,800.00$
PI
O&M
Agency Caltrans Offset Total
11 0 11
2,200.00$ 24,200.00$
1,000.00$ 11,000.00$
- 882,750.00$
-$ -$
1,000.00$ 11,000.00$
400.00$ 4,400.00$
2,100.00$ 23,100.00$
300.00$ 3,300.00$
PI
O&M
Agency Caltrans Offset Total
61 7
2,200.00$ 15,400.00$
1,200.00$ 8,400.00$
- 597,875.00$
5,000.00$ 5,000.00$
1,000.00$ 7,000.00$
400.00$ 2,800.00$
2,100.00$ 14,700.00$
300.00$ 2,100.00$
PI
O&M
6,160.00$ 30,800.00$
Cost / Int Total Cost
M2 Requested Match Total Cost
506,940.00$ 126,735.00$
Total Cost
Task 4: Signal Timing Optimization and Implementation
Task 5: Project Report
Task 6: Project Management - O&M Phase
Task 7: Continuing Support
Placentia
Number of Signals:
Task 1: Project Management - PI Phase
Cost / Int
Brea
Number of Signals:
Task 5: Project Report
Project Tasks (Brea)
Task 1: Project Management - PI Phase
Task 2: Data Collection
Task 3: System Design and Construction
Task 4: Signal Timing Optimization and Implementation
Task 1: Project Management - PI Phase
Task 2: Data Collection
Task 3: System Design and Construction
Task 7: Continuing Support
Task 8: Final Technical Memorandum
Task 2: Data Collection
Task 3: System Design and Construction
Total Cost
Task 4: Signal Timing Optimization and Implementation
Task 5: Project Report
Task 6: Project Management - O&M Phase
24,640.00$
3,360.00$
116,120.00$
13,440.00$
464,480.00$
743,160.00$
580,600.00$
Project Tasks (Placentia)
Cost / Int Total Cost
Task 8: Final Technical Memorandum
185,790.00$ 928,950.00$
M2 Requested Match Total Cost
633,675.00$
15,680.00$ 3,920.00$ 19,600.00$
MatchM2 Requested
16,800.00$
Anaheim
Task 8: Final Technical Memorandum
Number of Signals:
Project Tasks (Anaheim)
Task 6: Project Management - O&M Phase
Task 7: Continuing Support
9
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
Agency Caltrans Offset Total
15 2 1 18
2,200.00$ 39,600.00$
1,200.00$ 21,600.00$
- 1,454,250.00$
5,000.00$ 10,000.00$
1,000.00$ 18,000.00$
400.00$ 7,200.00$
2,100.00$ 37,800.00$
300.00$ 5,400.00$
PI
O&M
Agency Caltrans Offset Total
20 2 22
2,200.00$ 48,400.00$
1,000.00$ 22,000.00$
- 1,752,382.50$
-$ -$
1,000.00$ 22,000.00$
400.00$ 8,800.00$
2,100.00$ 46,200.00$
300.00$ 6,600.00$
PI
O&M
10,080.00$
M2 Requested
Santa Ana
Number of Signals:
12,320.00$ 61,600.00$
Task 1: Project Management - PI Phase
Task 2: Data Collection
Task 3: System Design and Construction
Cost / Int Total Cost
Task 4: Signal Timing Optimization and Implementation
Task 5: Project Report
368,956.50$
1,234,760.00$ 308,690.00$ 1,543,450.00$
40,320.00$
Project Tasks (Orange)Cost / Int
Match Total Cost
M2 Requested Match Total Cost
Task 4: Signal Timing Optimization and Implementation
Task 5: Project Report
Task 6: Project Management - O&M Phase
Task 7: Continuing Support
Task 8: Final Technical Memorandum
Total Cost
Orange
Task 1: Project Management - PI Phase
Project Tasks (Santa Ana)
Task 6: Project Management - O&M Phase
Task 7: Continuing Support
Task 8: Final Technical Memorandum
1,475,826.00$ 1,844,782.50$
49,280.00$
50,400.00$
Task 2: Data Collection
Task 3: System Design and Construction
Number of Signals:
10
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
c. Summary of Intersection Improvement Costs
Design Construction TOTAL
Average
Score
1 Brea Lambert Road 7,000.00$ 89,250.00$ 96,250.00$ 31.3
2 Brea Birch Street 7,000.00$ 89,250.00$ 96,250.00$ 31.3
3 Brea Orbiter Street 6,000.00$ 76,500.00$ 82,500.00$ 31.7
4 Brea Birch Hills Mall 10,000.00$ 127,500.00$ 137,500.00$ 31.3
5 Brea Imperial Highway (SR-90) * -$ 2,500.00$ 2,500.00$ 50.0
6 Brea Buttonwood Drive/ Saturn Street 7,000.00$ 89,250.00$ 96,250.00$ 31.3
7 Placentia Golden Avenue 6,200.00$ 79,050.00$ 85,250.00$ 27.5
8 Placentia Patrician Lane 7,200.00$ 91,800.00$ 99,000.00$ 31.3
9 Placentia Bastanchury Road 9,400.00$ 119,850.00$ 129,250.00$ 35.0
10 Placentia Yorba Linda Boulevard 2,800.00$ 35,700.00$ 38,500.00$ 32.5
11 Placentia Sheffield Street/Morse Avenue 1,000.00$ 12,750.00$ 13,750.00$ 15.0
12 Placentia Madison Avenue 2,000.00$ 25,500.00$ 27,500.00$ 22.5
13 Placentia Alta Vista Street 11,400.00$ 145,350.00$ 156,750.00$ 32.0
14 Placentia Chapman Avenue (North) 6,800.00$ 86,700.00$ 93,500.00$ 31.3
15 Placentia Hawaii Way 1,000.00$ 12,750.00$ 13,750.00$ 15.0
16 Placentia Crowther Avenue 1,000.00$ 12,750.00$ 13,750.00$ 15.0
17 Placentia Orangethorpe Avenue 6,200.00$ 79,050.00$ 85,250.00$ 26.7
18 Anaheim La Jolla Street 6,850.00$ 87,337.50$ 94,187.50$ 31.0
19 Anaheim Miraloma Avenue 7,850.00$ 100,087.50$ 107,937.50$ 32.5
20 Anaheim Coronado Street 5,850.00$ 74,587.50$ 80,437.50$ 31.3
21 Anaheim Fire Signal 1,550.00$ 19,762.50$ 21,312.50$ 45.0
22 Anaheim La Palma Avenue 6,450.00$ 82,237.50$ 88,687.50$ 33.0
23 Anaheim SR-91 Westbound Off -Ramp * -$ 2,500.00$ 2,500.00$ 50.0
24 Anaheim Frontera Street 7,850.00$ 100,087.50$ 107,937.50$ 32.5
25 Orange Riverdale Avenue 5,300.00$ 67,575.00$ 72,875.00$ 27.0
26 Orange Riverbend Parkway/Richland Avenue 5,300.00$ 67,575.00$ 72,875.00$ 27.0
27 Orange Lincoln Avenue 6,600.00$ 84,150.00$ 90,750.00$ 36.7
28 Orange Fletcher Avenue 6,600.00$ 84,150.00$ 90,750.00$ 36.7
29 Orange Meats Avenue 11,600.00$ 147,900.00$ 159,500.00$ 31.7
30 Orange Grove Avenue 13,500.00$ 172,125.00$ 185,625.00$ 31.7
31 Orange Orange Olive Road -$ -$ -$
32 Orange Taft Avenue 2,600.00$ 33,150.00$ 35,750.00$ 40.0
33 Orange Katella Avenue 1,900.00$ 24,225.00$ 26,125.00$ 30.0
34 Orange Wilson Avenue/Adams Avenue 2,600.00$ 33,150.00$ 35,750.00$ 40.0
35 Orange Collins Avenue 2,600.00$ 33,150.00$ 35,750.00$ 40.0
36 Orange Walnut Avenue 6,600.00$ 84,150.00$ 90,750.00$ 36.7
37 Orange Sycamore Avenue/University Drive 6,600.00$ 84,150.00$ 90,750.00$ 36.7
38 Orange Palm Avenue 6,600.00$ 84,150.00$ 90,750.00$ 40.0
39 Orange La Veta Avenue 7,700.00$ 98,175.00$ 105,875.00$ 35.0
40 Orange SR-22 Westbound Ramp * -$ 2,500.00$ 2,500.00$ 50.0
41 Orange SR-22 Eastbound Ramp * -$ 2,500.00$ 2,500.00$ 50.0
42 Santa Ana Fairhaven Avenue 16,200.00$ 208,447.50$ 224,647.50$ 32.9
43 Santa Ana Santa Clara Avenue 2,700.00$ 36,322.50$ 39,022.50$ 35.0
44 Santa Ana 21st Street 8,900.00$ 115,372.50$ 124,272.50$ 37.0
45 Santa Ana 17th Street 8,900.00$ 115,372.50$ 124,272.50$ 37.0
46 Santa Ana I-5 Northbound Ramp 2,700.00$ 36,322.50$ 39,022.50$ 35.0
47 Santa Ana Santa Ana Blvd/I -5 Southbound Ram 4,000.00$ 52,897.50$ 56,897.50$ 33.8
48 Santa Ana Fruit Street 8,700.00$ 112,822.50$ 121,522.50$ 30.0
49 Santa Ana OC Register 2,100.00$ 28,672.50$ 30,772.50$ 40.0
50 Santa Ana 4th Street 7,800.00$ 101,347.50$ 109,147.50$ 40.0
TASK 3 IMPROVEMENT TOTALS
LOC.AGENCY PROJECT CROSS STREETS
11
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 4: FUNDING NEEDS / COSTS FOR PROPOSED PROJECT BY TASK
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
c. Summary of Intersection Improvement Costs
Design Construction TOTAL
Average
Score
TASK 3 IMPROVEMENT TOTALS
LOC.AGENCY PROJECT CROSS STREETS
51 Santa Ana 1st Street 8,100.00$ 103,275.00$ 111,375.00$ 31.7
52 Santa Ana Chestnut Avenue 1,900.00$ 26,122.50$ 28,022.50$ 27.5
53 Santa Ana McFadden Avenue 14,900.00$ 191,872.50$ 206,772.50$ 33.3
54 Santa Ana Century High School 3,900.00$ 51,622.50$ 55,522.50$ 38.8
55 Santa Ana Edinger Avenue 2,700.00$ 34,425.00$ 37,125.00$ 22.5
56 Santa Ana St Andrew Place 3,500.00$ 46,522.50$ 50,022.50$ 33.8
57 Santa Ana St Gertrude Place 2,700.00$ 36,322.50$ 39,022.50$ 35.0
58 Santa Ana Warner Avenue 8,700.00$ 110,925.00$ 119,625.00$ 20.0
59 Santa Ana Hotel Terrace Drive/Brookhollow Dr 2,700.00$ 36,322.50$ 39,022.50$ 35.0
60 Santa Ana SR-55 Southbound Off -Ramp 2,700.00$ 36,322.50$ 39,022.50$ 35.0
61 Santa Ana Dyer Road 1,900.00$ 26,122.50$ 28,022.50$ 27.5
-- - -$ -$ -$
1 Orange Taft Avenue & Shaffer Street 12,800.00$ 163,200.00$ 176,000.00$ 22.5
2 Santa Ana Fairhaven Avenue & Cambridge Stre 2,100.00$ 26,775.00$ 28,875.00$ 40.0
3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp 2,700.00$ 34,425.00$ 37,125.00$ 32.5
- Santa Ana TMC Improvements -$ 63,250.00$ 63,250.00$ 40.0
- Placentia TMC Improvements -$ 126,500.00$ 126,500.00$ 40.0
- Orange TMC Improvements 1,900.00$ 87,475.00$ 89,375.00$ 35.0
- Anaheim TMC Improvements -$ 94,875.00$ 94,875.00$ 40.0
- Brea TMC Improvements -$ 37,950.00$ 37,950.00$ 40.0
5,236,457.50$ 33.6SIGNAL IMPROVEMENT TOTAL =
12
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 5: DETAILED LOCAL MATCH COMMITMENT
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
PI OMM PI OMM PI OMM
$116,120.00 $3,360.00 $0.00 $0.00 $116,120.00 $3,360.00
$185,790.00 $6,160.00 $0.00 $0.00 $185,790.00 $6,160.00
$126,735.00 $3,920.00 $0.00 $0.00 $126,735.00 $3,920.00
$308,690.00 $10,080.00 $0.00 $0.00 $308,690.00 $10,080.00
$338,956.50 $12,320.00 $30,000.00 $0.00 $368,956.50 $12,320.00
$1,076,291.50 $35,840.00 $30,000.00 $0.00 $1,106,291.50 $35,840.00
A. Cash Match
Agency Funding Source
Amount of Cash
Contribution
Brea Gas Tax/ M2 Fairshare $119,480.00
Placentia Gas Tax/ AB2766 $191,950.00
Anaheim Gas Tax/ M2 Fairshare $130,655.00
Orange Gas Tax/ M2 Fairshare $318,770.00
Santa Ana M2 Fairshare $351,276.50
$1,112,131.50
B. In-Kind Services
i. Specific Improvements (List items and Cost):
Agency Expenditure
Select a City
$0.00
ii. Staffing Commitment:
Agency Staff Position No. of Hours
Fully Burdened
Hourly Rate Total*
Sr. Civil Engineer 60 $170.00 $10,200.00
Assistant Signal
Operations Engineer 120 $140.00 $16,800.00
Assistant Engineer 30 $100.00 $3,000.00
$0.00
$30,000.00
$30,000.00
$30,000.00
Description
$1,142,131.50 $30,000.00
TOTAL CASH MATCH:
TOTAL MATCH
$1,112,131.50
Type of Service to Project
Project Oversight, Construction Engineering
Total Specific Improvements (i):
*Total amount is the required participation by the identified agency. The number of hours and hourly rate will be based on each agency’s actual fully burdened billing rates, which must collectively equal the same value
of the assigned “Total” dollars. Each agency will be responsible for keeping detailed records of hours worked and description of work. An accounting record of personnel, hours at fully burdened rate shall be included
with the in-kind report submittals. Records will be subject to auditing. In-kind match can be converted to Cash Match, but Cash Match cannot be converted to in-kind match.
Total for City of Santa Ana:
TOTAL IN-KIND MATCH* (i + ii):
Total Staffing Commitment (ii):
Anaheim
$130,655.00
Orange
$318,770.00 $0.00
$0.00
$318,770.00
Santa Ana
$351,276.50 $30,000.00 $381,276.50
PART 1: AGENCY TOTAL MATCH SUMMARY
PART 2: MATCH BREAKDOWN (CASH vs IN-KIND SERVICES)
Agency
Placentia
$191,950.00 $0.00
CASH
Brea
$119,480.00
TOTAL MATCH
$119,480.00
$191,950.00
$130,655.00 $0.00
IN‐KIND
Equipment configuration, installation and
integration/ Construction Engineering
Santa Ana
Equipment configuration, installation and
integration/ Construction Engineering
13
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
SECTION 6: PROJECT SCHEDULE BY TASK
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
a.Projected Start and End Dates:
January 1, 2025
December 31, 2027
b.Projected Schedule by Task
Starting Date Ending Date
January 1, 2025 December 31, 2025
January 1, 2025 April 30, 2025
January 1, 2025 December 31, 2025
January 1, 2025 December 31, 2025
October 1, 2025 December 31, 2025
January 1, 2026 December 31, 2027
January 1, 2026 December 31, 2027
October 1, 2027 December 31, 2027
By checking this box, the Applicant Agency, on behalf of all the participating agencies, agree to
implement this project within 12 months. (This means the project will be ineligible for delays
and timely use funds extensions. This is not applicable to projects requesting OCTA to lead
and Baseline Project participants.)
Project start date:
Project end date:
Task 8: Final Technical Memorandum
Task
Task 1: Project Management - PI Phase
Task 2: Data Collection
Task 3: System Design and Construction
Task 4: Signal Timing Optimization and Implementation
Task 5: Project Report
Task 6: Project Management - O&M Phase
Task 7: Continuing Support
14
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
CALCULATIONS AND ESTIMATED POINTS
Appendix A
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
Estimated
Points
Yes,
3 / 115 =
=10
=15
/=
=
61 =10
61 /61 =
=10
6
Yes,=5
Not =0
Not Implementing within 12 months = 0
/=
75
APPENDIX A: CALCULATIONS AND ESTIMATED POINTS
Total Estimated Points:
Calculation for Total Project Cost / VMT =
Participating Jurisdiction(s)
# of signals along entire length of corridor :
# of signals being synched / total # of corridor signals:
5. Number of Jurisdictions: (10 points)
6. Current Project Status (10 points)
4. Project Scale: (20 points)
$5,710,658
100.0%
$5,710,657.50
0
20.00%$1,142,131.50
7. Funding Match: (5 points)
Retiming 75% of previous project
25
10
5
1. Transportation Significance (25 points)
Inclusion of offset signals w/in 2,700'
Vehicle Miles Traveled (VMT): 367,503
10
5
20
Average project improvement score 33.6
Timing 75% of new eligible project
All agencies are participating in the Countywide Baseline Project
Criteria (Max Points)
# of offset signals on project / total # of offset signals : 100.0%
2. Economic Effectiveness (Cost to Benefit Ratio): (10 points)
3. Project Characteristics: (20 points)
367,503 15.54
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
Appendix B
AGENCY IMPROVEMENT CALCULATIONS
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE I: AGENCY IMPROVEMENT PREFERENCES
Brea Placentia Anaheim Orange Santa Ana Brea Placentia Anaheim Orange Santa Ana Brea Placentia Anaheim Orange Santa Ana
1 Above ground (e.g. wireless, cellular, etc.)$19,000 $13,000 $1,900 $1,300
Encom Radio, Fiber
Switch & power
supply, SFPs
Encom Wireless
Radio and Etherwan
Ethernet Swich w/
SFPs
2 Fiber Optic underground $10,000 $10,000 $5,000 $90,000 $19,000 $1,000 $1,000 $500 $9,000 $1,900
Fiber Optic Ethernet
Switch w/ SFPs and
Power Supply, Layer
3 HUB Switch w/
SFPs and Power
Supply
Reterminate Fiber Opitc
Cable, Fiber Optic Ethernet
Switch w/ SFPs and Power
Supply, Layer 3 HUB
Switch w/ SFPs and Power
Supply
Ethernet Switch
120 SMFO, conduit,
Fiber Drop Cable,
Splice enclosure,
FPP/FDU, Fiber
Switch, SFPs, Fiber
Switch & power
supply
120 SMFO Fiber
Optic Cable In
Existing Conduit,
Fiber Splicing (FDU
and Splice
Enclosure), Etherwan
Switch w/ SFPs, Drop
Cable, No 6E Pullbox
3 All other (e.g. copper, aerial fiber, GPS, etc.)$8,000 $800
Fiber Switch & power
supply, SFPs, Fiber
Patch Panel
4 ATC signal controller $10,000 $8,000 $5,500 $7,000 $8,000 $1,000 $800 $550 $700 $800
Qubic Commander w/
Scout Software
Econolite Cobalt w/ EOS
Software
Econolite 2070 TS2
Type 1 w/ 1C board
w/ EOS software
Econolite Cobalt w/
ASC3 Software
Econolite Cobalt w/
EOS Software
5 Signal cabinet on existing foundation $40,000 $24,000 $24,000 $38,000 $4,000 $2,400 $2,400 $3,800
Type P44 Cubic
Trafficware Cabinet Western Systems Type P+Western Systems
Type P+
Modify/extend
existing foundation or
use exitsing
foundation as is,
Econolite TS Type II
P Cabinet
6 Signal cabinet on new foundation $44,000 $60,000 $4,400 $6,000
Western Systems Type P+
w/ Service and SCE Design
Fee
Econolite ATCC w/
Service and SCE
Design Fee
7 BBS/USP (attached)
8 BBS/UPS on existing foundation $11,000 $1,100 Myers / Clary
9 BBS/UPS on new foundation Myers / Clary
10 CCTV $10,000 $10,000 $10,000 $11,000 $8,000 $1,000 $1,000 $1,000 $1,100 $800
Axis Q6000 + PTZ
Camera Bosch / COHU Axis Cohu Rise Axis
11 Vehicle detection (ATSPM inputs + counts)
12 Vehicle detection (ATSPM inputs)
13 Vehicle detection + bicycle detection $40,000 $40,000 $24,000 $50,000 $4,000 $4,000 $2,400 $5,000
Iteris Next Iteris Next Econolite Econolite Vision or
Iteris Apex
14 Vehicle detection $40,000 $4,000 Iteris Next Gridsmart w/
mounting brackets
15 Bicycle detection
16 Pedestrian detection (audible) $12,000 $23,000 $12,000 $1,200 $2,300 $1,200 Polara (iN2S APS System) Campbell APS
Polara (iN2S APS
System)
17 Pedestrian detection
18 Active transportation/pedestrian safety
19 Transit Signal Priority
20 EVP (hybrid or GPS) $15,000 $12,000 $1,500 $1,200
GTT Opticam GPS
System GPS EVP
21 EVP (infrared)
22 Speed feedback signs (existing post)
23 Speed feedback signs (new post)
24 Signal Performance Monitoring $10,000 $1,500 $1,000
Software, Licensing
and Server Centracs SPM
25 Channelization
26 Signal phasing improvement
27 Central System (server, licenses, workstations) $30,000 $100,000 $75,000 $50,000 $50,000
Synchro Green
Central System
Licenses, Etherwan
Layer 3 Switch w/
SFPs and Power
Supply, Dell
Workstation
Etherwan Layer 3 w/
SFPs and Power Supply,
Digital Watchdog VMS
Server/ Licensing, Dell
Server (Video/ Traff
Mgt), Dell Workstations,
Synchro License, IP
Schematic, Server Rack
Econolite Centracs
Software and Server
Workstations (w/
monitors),
Touchpanel, TMC
Console; Switches
Dell Server, Milestone
VMS Licenses, Dell
Workstations
28 Display (video wall, VMS, etc.)
29 UPS for TMC $10,000 $1,000 Rack Mount UPS
30 Timing Only
31 Timing + Traffic Responsive (license only)
32 Timing + Peer-to-Peer (configuration only)
33 Timing + Traffic Adaptive (license only)
Caltrans 34 Caltrans Cooperative Agreement $2,500 $2,500 $2,500
Cooperative
Agreement and Data
Collection
Cooperative
Agreement and Data
Collection
Cooperative
Agreement
UNIT PRICE (MATERIAL + LABOR) APPLICABLE DESIGN COST PER UNIT VENDOR/BRAND & ADDITIONAL NOTES
ITEM DESCRIPTIONID
Signal Timing Only
TMC/TOC
CATEGORIES
Comm
Field Elements
Minor Signal Op Improve
Yes No
18
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE II: DESCRIPTION OF WORK BY INTERSECTION
Ab
o
v
e
g
r
o
u
n
d
(
e
.
g
.
w
i
r
e
l
e
s
s
,
ce
l
l
u
l
a
r
,
e
t
c
.
)
Fi
b
e
r
O
p
t
i
c
u
n
d
e
r
g
r
o
u
n
d
Al
l
o
t
h
e
r
(
e
.
g
.
c
o
p
p
e
r
,
a
e
r
i
a
l
fi
b
e
r
,
G
P
S
,
e
t
c
.
)
AT
C
s
i
g
n
a
l
c
o
n
t
r
o
l
l
e
r
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
e
x
i
s
t
i
n
g
fo
u
n
d
a
t
i
o
n
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
n
e
w
fo
u
n
d
a
t
i
o
n
CC
T
V
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
+
b
i
c
y
c
l
e
de
t
e
c
t
i
o
n
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
(a
u
d
i
b
l
e
)
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
Si
g
n
a
l
P
e
r
f
o
r
m
a
n
c
e
Mo
n
i
t
o
r
i
n
g
Ce
n
t
r
a
l
S
y
s
t
e
m
(
s
e
r
v
e
r
,
li
c
e
n
s
e
s
,
w
o
r
k
s
t
a
t
i
o
n
s
)
Ca
l
t
r
a
n
s
C
o
o
p
e
r
a
t
i
v
e
Ag
r
e
e
m
e
n
t
1234561013141617242734
1 Brea Lambert Road
11 11
2 Brea Birch Street
11 11
3 Brea Orbiter Street
11 1
4 Brea Birch Hills Mall
111 1
5 Brea Imperial Highway (SR-90) *
1
6 Brea Buttonwood Drive/ Saturn Street
11 11
7 Placentia Golden Avenue
111 1
8 Placentia Patrician Lane
1111
9 Placentia Bastanchury Road
111 11
10 Placentia Yorba Linda Boulevard
21
11 Placentia Sheffield Street/Morse Avenue
1
12 Placentia Madison Avenue
11
13 Placentia Alta Vista Street
11111
14 Placentia Chapman Avenue (North)
21 1 1
15 Placentia Hawaii Way
1
16 Placentia Crowther Avenue
1
17 Placentia Orangethorpe Avenue
111
18 Anaheim La Jolla Street
11111
19 Anaheim Miraloma Avenue
11111 1
20 Anaheim Coronado Street
111 1
21 Anaheim Fire Signal
11
22 Anaheim La Palma Avenue
11 21 1
23 Anaheim SR-91 Westbound Off-Ramp *1
24 Anaheim Frontera Street
11111 1
25 Orange Riverdale Avenue
111
26 Orange Riverbend Parkway/Richland Avenue
111
27 Orange Lincoln Avenue
11 1
28 Orange Fletcher Avenue
11 1
29 Orange Meats Avenue
11 1
30 Orange Grove Avenue
111
31 Orange Orange Olive Road
32 Orange Taft Avenue
11
33 Orange Katella Avenue
1
34 Orange Wilson Avenue/Adams Avenue
11
35 Orange Collins Avenue
11
36 Orange Walnut Avenue
11 1
37 Orange Sycamore Avenue/University Drive
11 1
38 Orange Palm Avenue
11 1
39 Orange La Veta Avenue
1111
40 Orange SR-22 Westbound Ramp *1
41 Orange SR-22 Eastbound Ramp *1
42 Santa Ana Fairhaven Avenue
1111111
LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
DESCRIPTION OF WORK
19
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE II: DESCRIPTION OF WORK BY INTERSECTION
Ab
o
v
e
g
r
o
u
n
d
(
e
.
g
.
w
i
r
e
l
e
s
s
,
ce
l
l
u
l
a
r
,
e
t
c
.
)
Fi
b
e
r
O
p
t
i
c
u
n
d
e
r
g
r
o
u
n
d
Al
l
o
t
h
e
r
(
e
.
g
.
c
o
p
p
e
r
,
a
e
r
i
a
l
fi
b
e
r
,
G
P
S
,
e
t
c
.
)
AT
C
s
i
g
n
a
l
c
o
n
t
r
o
l
l
e
r
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
e
x
i
s
t
i
n
g
fo
u
n
d
a
t
i
o
n
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
n
e
w
fo
u
n
d
a
t
i
o
n
CC
T
V
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
+
b
i
c
y
c
l
e
de
t
e
c
t
i
o
n
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
(a
u
d
i
b
l
e
)
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
Si
g
n
a
l
P
e
r
f
o
r
m
a
n
c
e
Mo
n
i
t
o
r
i
n
g
Ce
n
t
r
a
l
S
y
s
t
e
m
(
s
e
r
v
e
r
,
li
c
e
n
s
e
s
,
w
o
r
k
s
t
a
t
i
o
n
s
)
Ca
l
t
r
a
n
s
C
o
o
p
e
r
a
t
i
v
e
Ag
r
e
e
m
e
n
t
1234561013141617242734LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
DESCRIPTION OF WORK
43 Santa Ana Santa Clara Avenue
11 1
44 Santa Ana 21st Street
11 111
45 Santa Ana 17th Street
11 111
46 Santa Ana I-5 Northbound Ramp 11 1
47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp 11 1 1
48 Santa Ana Fruit Street
111 1
49 Santa Ana OC Register
11 1
50 Santa Ana 4th Street
1 1111
51 Santa Ana 1st Street
111
52 Santa Ana Chestnut Avenue
11
53 Santa Ana McFadden Avenue
111111
54 Santa Ana Century High School
11 11
55 Santa Ana Edinger Avenue
11
56 Santa Ana St Andrew Place
11 1 1
57 Santa Ana St Gertrude Place
11 1
58 Santa Ana Warner Avenue
111
59 Santa Ana Hotel Terrace Drive/Brookhollow Dr
11 1
60 Santa Ana SR-55 Southbound Off-Ramp 11 1
61 Santa Ana Dyer Road
11
-
1 Orange Taft Avenue & Shaffer Street
11
2 Santa Ana Fairhaven Avenue & Cambridge Street
11
3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp
11
- Santa Ana TMC Improvements
1
- Placentia TMC Improvements
1
- Orange TMC Improvements
1 1
- Anaheim TMC Improvements
1
- Brea TMC Improvements
1
164524710715206102215 4
QUANTITY TOTAL =
20
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE II: DESCRIPTION OF WORK BY INTERSECTION
1 Brea Lambert Road
2 Brea Birch Street
3 Brea Orbiter Street
4 Brea Birch Hills Mall
5 Brea Imperial Highway (SR-90) *
6 Brea Buttonwood Drive/ Saturn Street
7 Placentia Golden Avenue
8 Placentia Patrician Lane
9 Placentia Bastanchury Road
10 Placentia Yorba Linda Boulevard
11 Placentia Sheffield Street/Morse Avenue
12 Placentia Madison Avenue
13 Placentia Alta Vista Street
14 Placentia Chapman Avenue (North)
15 Placentia Hawaii Way
16 Placentia Crowther Avenue
17 Placentia Orangethorpe Avenue
18 Anaheim La Jolla Street
19 Anaheim Miraloma Avenue
20 Anaheim Coronado Street
21 Anaheim Fire Signal
22 Anaheim La Palma Avenue
23 Anaheim SR-91 Westbound Off-Ramp *
24 Anaheim Frontera Street
25 Orange Riverdale Avenue
26 Orange Riverbend Parkway/Richland Avenue
27 Orange Lincoln Avenue
28 Orange Fletcher Avenue
29 Orange Meats Avenue
30 Orange Grove Avenue
31 Orange Orange Olive Road
32 Orange Taft Avenue
33 Orange Katella Avenue
34 Orange Wilson Avenue/Adams Avenue
35 Orange Collins Avenue
36 Orange Walnut Avenue
37 Orange Sycamore Avenue/University Drive
38 Orange Palm Avenue
39 Orange La Veta Avenue
40 Orange SR-22 Westbound Ramp *
41 Orange SR-22 Eastbound Ramp *
42 Santa Ana Fairhaven Avenue
LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
Construction
Management
& Inspection Contingency
15% 10%
7,000.00$ 70,000.00$ 10,500.00$ 8,750.00$ 96,250.00$
7,000.00$ 70,000.00$ 10,500.00$ 8,750.00$ 96,250.00$
6,000.00$ 60,000.00$ 9,000.00$ 7,500.00$ 82,500.00$
10,000.00$ 100,000.00$ 15,000.00$ 12,500.00$ 137,500.00$
-$ 2,500.00$ -$ -$ 2,500.00$
7,000.00$ 70,000.00$ 10,500.00$ 8,750.00$ 96,250.00$
6,200.00$ 62,000.00$ 9,300.00$ 7,750.00$ 85,250.00$
7,200.00$ 72,000.00$ 10,800.00$ 9,000.00$ 99,000.00$
9,400.00$ 94,000.00$ 14,100.00$ 11,750.00$ 129,250.00$
2,800.00$ 28,000.00$ 4,200.00$ 3,500.00$ 38,500.00$
1,000.00$ 10,000.00$ 1,500.00$ 1,250.00$ 13,750.00$
2,000.00$ 20,000.00$ 3,000.00$ 2,500.00$ 27,500.00$
11,400.00$ 114,000.00$ 17,100.00$ 14,250.00$ 156,750.00$
6,800.00$ 68,000.00$ 10,200.00$ 8,500.00$ 93,500.00$
1,000.00$ 10,000.00$ 1,500.00$ 1,250.00$ 13,750.00$
1,000.00$ 10,000.00$ 1,500.00$ 1,250.00$ 13,750.00$
6,200.00$ 62,000.00$ 9,300.00$ 7,750.00$ 85,250.00$
6,850.00$ 68,500.00$ 10,275.00$ 8,562.50$ 94,187.50$
7,850.00$ 78,500.00$ 11,775.00$ 9,812.50$ 107,937.50$
5,850.00$ 58,500.00$ 8,775.00$ 7,312.50$ 80,437.50$
1,550.00$ 15,500.00$ 2,325.00$ 1,937.50$ 21,312.50$
6,450.00$ 64,500.00$ 9,675.00$ 8,062.50$ 88,687.50$
-$ 2,500.00$ -$ -$ 2,500.00$
7,850.00$ 78,500.00$ 11,775.00$ 9,812.50$ 107,937.50$
5,300.00$ 53,000.00$ 7,950.00$ 6,625.00$ 72,875.00$
5,300.00$ 53,000.00$ 7,950.00$ 6,625.00$ 72,875.00$
6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$
6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$
11,600.00$ 116,000.00$ 17,400.00$ 14,500.00$ 159,500.00$
13,500.00$ 135,000.00$ 20,250.00$ 16,875.00$ 185,625.00$
-$ -$ -$ -$ -$
2,600.00$ 26,000.00$ 3,900.00$ 3,250.00$ 35,750.00$
1,900.00$ 19,000.00$ 2,850.00$ 2,375.00$ 26,125.00$
2,600.00$ 26,000.00$ 3,900.00$ 3,250.00$ 35,750.00$
2,600.00$ 26,000.00$ 3,900.00$ 3,250.00$ 35,750.00$
6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$
6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$
6,600.00$ 66,000.00$ 9,900.00$ 8,250.00$ 90,750.00$
7,700.00$ 77,000.00$ 11,550.00$ 9,625.00$ 105,875.00$
-$ 2,500.00$ -$ -$ 2,500.00$
-$ 2,500.00$ -$ -$ 2,500.00$
16,200.00$ 163,500.00$ 24,525.00$ 20,422.50$ 224,647.50$
NOTESDesign Construction TOTAL
SIGNAL IMPROVEMENT COSTS
21
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE II: DESCRIPTION OF WORK BY INTERSECTION
LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
43 Santa Ana Santa Clara Avenue
44 Santa Ana 21st Street
45 Santa Ana 17th Street
46 Santa Ana I-5 Northbound Ramp
47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp
48 Santa Ana Fruit Street
49 Santa Ana OC Register
50 Santa Ana 4th Street
51 Santa Ana 1st Street
52 Santa Ana Chestnut Avenue
53 Santa Ana McFadden Avenue
54 Santa Ana Century High School
55 Santa Ana Edinger Avenue
56 Santa Ana St Andrew Place
57 Santa Ana St Gertrude Place
58 Santa Ana Warner Avenue
59 Santa Ana Hotel Terrace Drive/Brookhollow Dr
60 Santa Ana SR-55 Southbound Off-Ramp
61 Santa Ana Dyer Road
-
1 Orange Taft Avenue & Shaffer Street
2 Santa Ana Fairhaven Avenue & Cambridge Street
3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp
- Santa Ana TMC Improvements
- Placentia TMC Improvements
- Orange TMC Improvements
- Anaheim TMC Improvements
- Brea TMC Improvements
QUANTITY TOTAL =
Construction
Management
& Inspection Contingency
15% 10%NOTESDesign Construction TOTAL
SIGNAL IMPROVEMENT COSTS
2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$
8,900.00$ 90,500.00$ 13,575.00$ 11,297.50$ 124,272.50$
8,900.00$ 90,500.00$ 13,575.00$ 11,297.50$ 124,272.50$
2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$
4,000.00$ 41,500.00$ 6,225.00$ 5,172.50$ 56,897.50$
8,700.00$ 88,500.00$ 13,275.00$ 11,047.50$ 121,522.50$
2,100.00$ 22,500.00$ 3,375.00$ 2,797.50$ 30,772.50$
7,800.00$ 79,500.00$ 11,925.00$ 9,922.50$ 109,147.50$
8,100.00$ 81,000.00$ 12,150.00$ 10,125.00$ 111,375.00$
1,900.00$ 20,500.00$ 3,075.00$ 2,547.50$ 28,022.50$
14,900.00$ 150,500.00$ 22,575.00$ 18,797.50$ 206,772.50$
3,900.00$ 40,500.00$ 6,075.00$ 5,047.50$ 55,522.50$
2,700.00$ 27,000.00$ 4,050.00$ 3,375.00$ 37,125.00$
3,500.00$ 36,500.00$ 5,475.00$ 4,547.50$ 50,022.50$
2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$
8,700.00$ 87,000.00$ 13,050.00$ 10,875.00$ 119,625.00$
2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$
2,700.00$ 28,500.00$ 4,275.00$ 3,547.50$ 39,022.50$
1,900.00$ 20,500.00$ 3,075.00$ 2,547.50$ 28,022.50$
-$ -$ -$ -$ -$
12,800.00$ 128,000.00$ 19,200.00$ 16,000.00$ 176,000.00$
2,100.00$ 21,000.00$ 3,150.00$ 2,625.00$ 28,875.00$
2,700.00$ 27,000.00$ 4,050.00$ 3,375.00$ 37,125.00$
-$ 50,000.00$ 7,500.00$ 5,750.00$ 63,250.00$
-$ 100,000.00$ 15,000.00$ 11,500.00$ 126,500.00$
1,900.00$ 69,000.00$ 10,350.00$ 8,125.00$ 89,375.00$
-$ 75,000.00$ 11,250.00$ 8,625.00$ 94,875.00$
-$ 30,000.00$ 4,500.00$ 3,450.00$ 37,950.00$
5,236,457.50$ SIGNAL IMPROVEMENT TOTAL =
22
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES
Ab
o
v
e
g
r
o
u
n
d
(
e
.
g
.
w
i
r
e
l
e
s
s
,
ce
l
l
u
l
a
r
,
e
t
c
.
)
Fi
b
e
r
O
p
t
i
c
u
n
d
e
r
g
r
o
u
n
d
Al
l
o
t
h
e
r
(
e
.
g
.
co
p
p
e
r
,
a
e
r
i
a
l
fi
b
e
r
,
G
P
S
,
e
t
c
.
)
AT
C
s
i
g
n
a
l
c
o
n
t
r
o
l
l
e
r
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
e
x
i
s
t
i
n
g
fo
u
n
d
a
t
i
o
n
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
n
e
w
fo
u
n
d
a
t
i
o
n
BB
S
/
U
S
P
(
a
t
t
a
c
h
e
d
)
BB
S
/
U
P
S
o
n
e
x
i
s
t
i
n
g
fo
u
n
d
a
t
i
o
n
BB
S
/
U
P
S
o
n
n
e
w
f
o
u
n
d
a
t
i
o
n
CC
T
V
Ve
h
i
c
l
e
d
e
t
e
c
t
io
n
(
A
T
S
P
M
in
p
u
t
s
+
c
o
u
n
t
s
)
Ve
h
i
c
l
e
d
e
t
e
c
t
io
n
(
A
T
S
P
M
in
p
u
t
s
)
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
+
b
i
c
y
c
l
e
de
t
e
c
t
i
o
n
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
Bi
c
y
c
l
e
d
e
t
e
c
t
i
o
n
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
(a
u
d
i
b
l
e
)
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
Acti
ve
tr
a
n
s
p
o
r
t
a
t
i
o
n
/
p
e
d
e
s
t
r
i
a
n
sa
f
e
t
y
Tr
a
n
s
i
t
S
i
g
n
a
l
P
r
i
o
r
i
t
y
EV
P
(
h
y
b
r
i
d
o
r
G
P
S
)
EV
P
(
i
n
f
r
a
r
e
d
)
Sp
e
e
d
f
e
e
d
b
a
c
k
s
i
g
n
s
(e
x
i
s
t
i
n
g
p
o
s
t
)
Sp
e
e
d
f
e
e
d
b
a
c
k
s
i
g
n
s
(
n
e
w
po
s
t
)
Si
g
n
a
l
P
e
r
f
o
r
m
a
n
c
e
Mo
n
i
t
o
r
i
n
g
Ch
a
n
n
e
l
i
z
a
t
i
o
n
Si
g
n
a
l
p
h
a
s
i
n
g
i
m
p
r
o
v
e
m
e
n
t
Ce
n
t
r
a
l
S
y
s
t
e
m
(
s
e
r
v
e
r
,
li
c
e
n
s
e
s
,
w
o
r
k
s
t
a
t
i
o
n
s
)
Di
s
p
l
a
y
(
v
i
d
e
o
w
a
l
l
,
V
M
S
,
et
c
.
)
UP
S
f
o
r
T
M
C
1 Brea Lambert Road 15 50 30 30
2 Brea Birch Street 15 50 30 30
3 Brea Orbiter Street 15 50 30
4 Brea Birch Hills Mall 15 50 30 30
5 Brea Imperial Highway (SR-90) *
6 Brea Buttonwood Drive/ Saturn Street 15 50 30 30
7 Placentia Golden Avenue 15 50 15 30
8 Placentia Patrician Lane 15 30 30 50
9 Placentia Bastanchury Road 15 50 30 30 50
10 Placentia Yorba Linda Boulevard 15 50
11 Placentia Sheffield Street/Morse Avenue 15
12 Placentia Madison Avenue 15 30
13 Placentia Alta Vista Street 15 50 15 30 50
14 Placentia Chapman Avenue (North)15 50 30 30
15 Placentia Hawaii Way 15
16 Placentia Crowther Avenue 15
17 Placentia Orangethorpe Avenue 15 50 15
18 Anaheim La Jolla Street 15 50 30 30 30
19 Anaheim Miraloma Avenue 15 50 30 30 30 40
20 Anaheim Coronado Street 15 50 30 30
21 Anaheim Fire Signal 50 40
22 Anaheim La Palma Avenue 15 50 30 30 40
23 Anaheim SR-91 Westbound Off -Ramp *
24 Anaheim Frontera Street 15 50 30 30 30 40
25 Orange Riverdale Avenue 15030
26 Orange Riverbend Parkway/Richland Avenue 15030
27 Orange Lincoln Avenue 30 50 30
28 Orange Fletcher Avenue 30 50 30
29 Orange Meats Avenue 30 15 50
30 Orange Grove Avenue 15 50 30
31 Orange Orange Olive Road
32 Orange Taft Avenue 30 50
33 Orange Katella Avenue 30
34 Orange Wilson Avenue/Adams Avenue 30 50
35 Orange Collins Avenue 30 50
36 Orange Walnut Avenue 30 50 30
37 Orange Sycamore Avenue/University Drive 30 50 30
38 Orange Palm Avenue 30 50 30 50
39 Orange La Veta Avenue 30 50 30 30
40 Orange SR-22 Westbound Ramp *
41 Orange SR-22 Eastbound Ramp *
42 Santa Ana Fairhaven Avenue 30 15 50 15 30 50 40
LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
DESCRIPTION OF WORK
Time Source None/5+ Years or Within 5 Years 0/5+ or <5 0/10+ or < 10
23
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES
Ab
o
v
e
g
r
o
u
n
d
(
e
.
g
.
w
i
r
e
l
e
s
s
,
ce
l
l
u
l
a
r
,
e
t
c
.
)
Fi
b
e
r
O
p
t
i
c
u
n
d
e
r
g
r
o
u
n
d
Al
l
o
t
h
e
r
(
e
.
g
.
co
p
p
e
r
,
a
e
r
i
a
l
fi
b
e
r
,
G
P
S
,
e
t
c
.
)
AT
C
s
i
g
n
a
l
c
o
n
t
r
o
l
l
e
r
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
e
x
i
s
t
i
n
g
fo
u
n
d
a
t
i
o
n
Si
g
n
a
l
c
a
b
i
n
e
t
o
n
n
e
w
fo
u
n
d
a
t
i
o
n
BB
S
/
U
S
P
(
a
t
t
a
c
h
e
d
)
BB
S
/
U
P
S
o
n
e
x
i
s
t
i
n
g
fo
u
n
d
a
t
i
o
n
BB
S
/
U
P
S
o
n
n
e
w
f
o
u
n
d
a
t
i
o
n
CC
T
V
Ve
h
i
c
l
e
d
e
t
e
c
t
io
n
(
A
T
S
P
M
in
p
u
t
s
+
c
o
u
n
t
s
)
Ve
h
i
c
l
e
d
e
t
e
c
t
io
n
(
A
T
S
P
M
in
p
u
t
s
)
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
+
b
i
c
y
c
l
e
de
t
e
c
t
i
o
n
Ve
h
i
c
l
e
d
e
t
e
c
t
i
o
n
Bi
c
y
c
l
e
d
e
t
e
c
t
i
o
n
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
(a
u
d
i
b
l
e
)
Pe
d
e
s
t
r
i
a
n
d
e
t
e
c
t
i
o
n
Acti
ve
tr
a
n
s
p
o
r
t
a
t
i
o
n
/
p
e
d
e
s
t
r
i
a
n
sa
f
e
t
y
Tr
a
n
s
i
t
S
i
g
n
a
l
P
r
i
o
r
i
t
y
EV
P
(
h
y
b
r
i
d
o
r
G
P
S
)
EV
P
(
i
n
f
r
a
r
e
d
)
Sp
e
e
d
f
e
e
d
b
a
c
k
s
i
g
n
s
(e
x
i
s
t
i
n
g
p
o
s
t
)
Sp
e
e
d
f
e
e
d
b
a
c
k
s
i
g
n
s
(
n
e
w
po
s
t
)
Si
g
n
a
l
P
e
r
f
o
r
m
a
n
c
e
Mo
n
i
t
o
r
i
n
g
Ch
a
n
n
e
l
i
z
a
t
i
o
n
Si
g
n
a
l
p
h
a
s
i
n
g
i
m
p
r
o
v
e
m
e
n
t
Ce
n
t
r
a
l
S
y
s
t
e
m
(
s
e
r
v
e
r
,
li
c
e
n
s
e
s
,
w
o
r
k
s
t
a
t
i
o
n
s
)
Di
s
p
l
a
y
(
v
i
d
e
o
w
a
l
l
,
V
M
S
,
et
c
.
)
UP
S
f
o
r
T
M
C
LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
DESCRIPTION OF WORK
Time Source None/5+ Years or Within 5 Years 0/5+ or <5 0/10+ or < 10
43 Santa Ana Santa Clara Avenue 15 50 40
44 Santa Ana 21st Street 15 50 30 50 40
45 Santa Ana 17th Street 15 50 30 50 40
46 Santa Ana I-5 Northbound Ramp 15 50 40
47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp 30 15 50 40
48 Santa Ana Fruit Street 15 50 15 40
49 Santa Ana OC Register 30 50 40
50 Santa Ana 4th Street 50 30 30 50 40
51 Santa Ana 1st Street 15 30 50
52 Santa Ana Chestnut Avenue 15 40
53 Santa Ana McFadden Avenue 15 50 15 30 50 40
54 Santa Ana Century High School 15 50 50 40
55 Santa Ana Edinger Avenue 15 30
56 Santa Ana St Andrew Place 15 50 30 40
57 Santa Ana St Gertrude Place 15 50 40
58 Santa Ana Warner Avenue 15 15 30
59 Santa Ana Hotel Terrace Drive/Brookhollow Dr 15 50 40
60 Santa Ana SR-55 Southbound Off-Ramp 15 50 40
61 Santa Ana Dyer Road 15 40
00-
1 Orange Taft Avenue & Shaffer Street 15 30
2 Santa Ana Fairhaven Avenue & Cambridge Street 30 50
3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp 15 50
- Santa Ana TMC Improvements 40
- Placentia TMC Improvements 40
- Orange TMC Improvements 30 40
- Anaheim TMC Improvements 40
- Brea TMC Improvements 40
24
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES
1 Brea Lambert Road
2 Brea Birch Street
3 Brea Orbiter Street
4 Brea Birch Hills Mall
5 Brea Imperial Highway (SR-90) *
6 Brea Buttonwood Drive/ Saturn Street
7 Placentia Golden Avenue
8 Placentia Patrician Lane
9 Placentia Bastanchury Road
10 Placentia Yorba Linda Boulevard
11 Placentia Sheffield Street/Morse Avenue
12 Placentia Madison Avenue
13 Placentia Alta Vista Street
14 Placentia Chapman Avenue (North)
15 Placentia Hawaii Way
16 Placentia Crowther Avenue
17 Placentia Orangethorpe Avenue
18 Anaheim La Jolla Street
19 Anaheim Miraloma Avenue
20 Anaheim Coronado Street
21 Anaheim Fire Signal
22 Anaheim La Palma Avenue
23 Anaheim SR-91 Westbound Off -Ramp *
24 Anaheim Frontera Street
25 Orange Riverdale Avenue
26 Orange Riverbend Parkway/Richland Avenue
27 Orange Lincoln Avenue
28 Orange Fletcher Avenue
29 Orange Meats Avenue
30 Orange Grove Avenue
31 Orange Orange Olive Road
32 Orange Taft Avenue
33 Orange Katella Avenue
34 Orange Wilson Avenue/Adams Avenue
35 Orange Collins Avenue
36 Orange Walnut Avenue
37 Orange Sycamore Avenue/University Drive
38 Orange Palm Avenue
39 Orange La Veta Avenue
40 Orange SR-22 Westbound Ramp *
41 Orange SR-22 Eastbound Ramp *
42 Santa Ana Fairhaven Avenue
LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
Ti
m
i
n
g
O
n
l
y
Ti
m
i
n
g
+
T
r
a
f
f
i
c
R
e
s
p
o
n
s
i
v
e
(l
i
c
e
n
s
e
o
n
l
y
)
Ti
m
i
n
g
+
P
e
e
r
-
t
o
-
P
e
e
r
(c
o
n
f
i
g
u
r
a
t
i
o
n
o
n
l
y
)
Ti
m
i
n
g
+
T
r
a
f
f
i
c
A
d
a
p
t
i
v
e
(l
i
c
e
n
s
e
o
n
l
y
)
Ca
l
t
r
a
n
s
C
o
o
p
e
r
a
t
i
v
e
Ag
r
e
e
m
e
n
t
Y/N
31.3
31.3
31.7
31.3
50 50.0
31.3
27.5
31.3
35.0
32.5
15.0
22.5
32.0
31.3
15.0
15.0
26.7
31.0
32.5
31.3
45.0
33.0
50 50.0
32.5
27.0
27.0
36.7
36.7
31.7
31.7
40.0
30.0
40.0
40.0
36.7
36.7
40.0
35.0
50 50.0
50 50.0
32.9
NOTESAV
E
R
A
G
E
I
M
P
R
O
V
E
M
E
N
T
SC
O
R
E
Online or Offline
25
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
APPENDIX B: AGENCY IMPROVEMENT CALCULATIONS Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
TABLE III: PROJECT AVERAGE IMPROVEMENT SCORES
LO
C
A
T
I
O
N
IM
P
L
E
M
E
N
T
I
N
G
A
G
E
N
C
Y
PROJECT CROSS STREETS
43 Santa Ana Santa Clara Avenue
44 Santa Ana 21st Street
45 Santa Ana 17th Street
46 Santa Ana I-5 Northbound Ramp
47 Santa Ana Santa Ana Blvd/I-5 Southbound Ramp
48 Santa Ana Fruit Street
49 Santa Ana OC Register
50 Santa Ana 4th Street
51 Santa Ana 1st Street
52 Santa Ana Chestnut Avenue
53 Santa Ana McFadden Avenue
54 Santa Ana Century High School
55 Santa Ana Edinger Avenue
56 Santa Ana St Andrew Place
57 Santa Ana St Gertrude Place
58 Santa Ana Warner Avenue
59 Santa Ana Hotel Terrace Drive/Brookhollow Dr
60 Santa Ana SR-55 Southbound Off-Ramp
61 Santa Ana Dyer Road
00-
1 Orange Taft Avenue & Shaffer Street
2 Santa Ana Fairhaven Avenue & Cambridge Street
3 Santa Ana Santa Ana Boulevard & I-5 SB Ramp
- Santa Ana TMC Improvements
- Placentia TMC Improvements
- Orange TMC Improvements
- Anaheim TMC Improvements
- Brea TMC Improvements
Ti
m
i
n
g
O
n
l
y
Ti
m
i
n
g
+
T
r
a
f
f
i
c
R
e
s
p
o
n
s
i
v
e
(l
i
c
e
n
s
e
o
n
l
y
)
Ti
m
i
n
g
+
P
e
e
r
-
t
o
-
P
e
e
r
(c
o
n
f
i
g
u
r
a
t
i
o
n
o
n
l
y
)
Ti
m
i
n
g
+
T
r
a
f
f
i
c
A
d
a
p
t
i
v
e
(l
i
c
e
n
s
e
o
n
l
y
)
Ca
l
t
r
a
n
s
C
o
o
p
e
r
a
t
i
v
e
Ag
r
e
e
m
e
n
t
Y/N NOTESAV
E
R
A
G
E
I
M
P
R
O
V
E
M
E
N
T
SC
O
R
E
Online or Offline
35.0
37.0
37.0
35.0
33.8
30.0
40.0
40.0
31.7
27.5
33.3
38.8
22.5
33.8
35.0
20.0
35.0
35.0
27.5
22.5
40.0
32.5
40.0
40.0
35.0
40.0
40.0
33.6AVERAGE SCORE =
26
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
Appendix C
VEHICLE MILES TRAVELED (VMT)
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
APPENDIX C: VEHICLE MILES TRAVELED (VMT)
ADTs Distance VMT
13,036 0.40 5,214
16,463 0.50 8,232
16,397 0.50 8,199
16,052 0.50 8,026
18,362 0.60 11,017
20,952 0.80 16,762
18,905 0.40 7,562
18,932 0.42 7,951
Anaheim 45,665 1.70 77,631
20,900 0.45 9,405
16,200 0.46 7,452
16,500 0.94 15,510
21,900 0.46 10,074
15,500 0.46 7,130
8,900 0.50 4,450
7,900 0.50 3,950
13,200 0.50 6,600
29,100 0.34 9,894
29,300 0.16 4,688
27,641 0.43 11,886
24,397 0.50 12,199
28,732 0.39 11,205
44,763 0.61 27,305
37,067 0.84 31,136
28,319 0.48 13,593
24,644 0.75 18,483
21,727 0.55 11,950
15.14 367,503
Edinger Ave - Warner Ave
Warner Ave - Dyer Rd
Katella Ave - Collins Ave
Chapman Ave (South) - La Veta Ave
La Veta Ave - SR-22 Fwy
SR-22 Fwy - Fairhaven Ave
Collins Ave - Walnut Ave
Walnut Ave - Chapman Ave (South)
McFadden Ave - Edinger Ave
Fairhaven Ave - Santa Clara Ave
Santa Clara Ave - 17th St
1st St - McFadden Ave
Source: 2023 - Brea, Placentia, Anaheim 2022 - Santa Ana, Orange
Total Project VMT:
Segment
Imperial Hwy (SR-90) - Golden Ave
Golden Ave - Bastanchury Rd
Yorba Linda Blvd - Alta Vista St
Lambert Rd - Birch St
Birch St - Imperial Hwy (SR-90)
Lincoln Ave - Fletcher Ave
Taft Ave - Katella Ave
Alta Vista St - Chapman Ave (North)
Chapman Ave (North) - Orangethorpe Ave
Orangethorpe Ave - Riverdale Ave
Pl
a
c
e
n
t
i
a
Or
a
n
g
e
Sa
n
t
a
A
n
a
Br
e
a
Riverdale Ave - Lincoln Ave
Bastanchury Rd - Yorba Linda Blvd
Fletcher Ave - Taft Ave
17th St - Santa Ana Blvd/ I-5 Fwy
I-5 Fwy - 1st St
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
AGENCY RESOLUTIONS AND LETTERS OF SUPPORT
Appendix D
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424
Kraemer Boulevard/ Glassell Street/ Grand Avenue RTSSP
Appendix E
Cabinet photos and As-built drawings (Uploaded to
OCFundTracker and included in Electronic Submittal Only)
Docusign Envelope ID: CF5F9E5A-BF10-44E5-AF73-F071BCD09424