Loading...
HomeMy WebLinkAboutRES-11621 MEASURE M2 SEVEN YEAR CIP 2025-2026 THROUGH 2031-2032RESOLUTION NO. 11621 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ORANGE TO APPROVE AND AUTHORIZE STAFF TO SUBMIT TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY THE MEASURE M2 SEVEN- YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEAR 2025-2026 THROUGH 2031-2032 TO COMPLY WITH MEASURE M2 ELIGIBILITY CRITERIA WHEREAS, an annual submittal of Measure M2 eligibility documentation to the Orange County Transportation Authority (OCTA) is required to remain eligible to receive Measure M2 sales tax revenue funds; and WHEREAS, the submittal documentation requires the City Council approval of an updated Measure M2 Seven-Year Capital Improvement Program; and WHEREAS,the City's Measure M2 Seven-Year Capital Improvement Program for fiscal year 2025-2026 through 2031-2032 is a transportation planning and fiscal forecasting document used to guide future programming for transportation capital improvement projects; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program emphasizes projects that improve circulation, mitigate traffic congestion, and maintain the City's investment in existing transportation infrastructure; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program is consistent with the proposed citywide Capital Improvement Program budget and the City's General Plan;and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program includes 40 projects with a total preliminary projected budget requirement of$71,928,109 million over the seven-year period; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program projects are attached as Exhibit"A." NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Orange does hereby-approves and authorizes staff to submit to OCTA the Measure M2 Seven-Year Capital Improvement Program.for Fiscal years 2025-2026 through 2031-2032 to comply with Measure M2 eligibility criteria. ADOPTED this 24th day of June 2025 S4C- Darnel R. Slater, Mayor, City of Orange ATTEST: Pamela Coleman, City Clerk, City of Orange APPROVED AS TO FORM: Wayne W._Winthers Interim City Attorney, City of Orange Attachment: Exhibit A STATE OF CALIFORNIA ) COUNTY OF ORANGE ) CITY OF ORANGE I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Resolution was duly and regularly adopted by the City Council of the City of Orange at a regular meeting thereof held on the 24th day of June 2025 by the following vote: AYES: COUNCILMEMBERS: Bilodeau,Barrios,Dumitru,Tavoularis, Gutierrez, Gyllenhammer, Slater; NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None Pamela Coleman, City Clerk, City of Orange 2 EXHIBIT A Orange County Transportation Authority FY 2025/26 -FY 2031/32 Capital Improvement Program TIP ID CP-10975 IMPLEMENTING AGENCY Orange,City of Local Project Number:11328 Project Title Additional Project IDs: ADA Improvements-Access Ramps Type of Work: Pedestrian Project Description Type of Work Description: Pedestrian- This project will modify curbs at various locations throughout the City to Comply with American with Installation of ADA access ramps I Disability Act(ADA)regulations.This has been an ongoing project,funded with Community Development Block Grants(CDBG). Limits FISCAL TOTAL Citywide YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED Project Notes 2026 Community Development $ 10,000$0 $90,000 $0 $100,000 $102,250 Block Grant TSIP Citywide(287),CDBG(310)and Capital 2026 Traffic Impact Fees 0 $0 $0 0 $0 $0 Project Fund(500).Carry Over. 2027 Traffic Impact Fees 0 $0 $0 0 $0 $0 2027 Community Development $ 0 $0 $0 0 $0 $0 Block Grant 2028 Community Development $ 0 $0 $0 0 $0 $0BlockGrant 2028 Traffic Impact Fees " $0 $0 $0 0 $0 $0 2029 Community Development $ 0 $0 $0 0 $0 $0 Block Grant 2029 Traffic Impact Fees 0 $0 $0 0 $0 $0 Totals: $10,000$0 $90,000 $0 $100,000 $102,250 Last Revised:25-00-Submitted Total Programmed:$100,000 TIP ID CP-12709 IMPLEMENTING AGENCY Orange,City of Local Project Number:30241 Project Title - Additional Project IDs: Ball Rd/Taft Ave RTSSP Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The Ball Road/Taft Avenue Regional Traffic Signal Synchronization Program Project(Ball-Taft RTSSP) Interconnect traffic signals to improve coordination is a multi-jurisdictional project between Knott Avenue and Ball Road in the City of Anaheim to Tustin and communications Street and Taft Avenue in the City of Orange.Th Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Ball Road and Taft Avenue 2026 Traffic Impact Fees $0 $0 $120,000 $0 $120,000 $123,000 Project Notes TSIP(287) Totals: $0 $0 $120,000 $0 $120,000 $123,000 Last Revised:25-00-Submitted Total Programmed:$120,000 TIP ID CP-10976 IMPLEMENTING AGENCY Orange,City of Local Project Number:20379 Project Title Additional Project IDs: Batavia and Taft Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer StreetInterconnecttrafficsignalstoimprovecoordinationtoMainStreetandonBataviaStreetfromTaftAvenuetoFletcherAvenue. and communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Taft Avenue from Shaffer ST to Main St and on 2026 Traffic Impact Fees $0 $0 $0 0 $0 0 Batavia St from Taft Ave to Flectcher Ave 2027 Traffic Impact Fees $0 $0 $170,000 $0 $170,000 $178,606 Project Notes 2028 Traffic Impact Fees $0 $0 $0 0 $0 0 TSIP Citywide(287).Carry Over. 2029 Traffic Impact Fees $0 $0 $0 0 $0 0 2030 Traffic Impact Fees $0 $0 $0 0 $0 0 Totals: $0 $0 $170,000 $0 $170,000 $178,606 Last Revised:25-00-Submitted Total Programmed:$170,000 TIP ID CP-10977 IMPLEMENTING AGENCY Orange,City of Local Project Number:16304 Project Title Additional Project IDs: Biennial Traffic Signal Coordination Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- This project will study traffic signals on the City's major streets,count&analyze traffic flows,:&provide Coordinate signals within project limits appropriate traffic signal timing to minimize delay to drivers.Changes in traffic flows require updating at two year intervals. Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL City-Wide YEAR ESCALATED Project Notes 2026 Measure M2 Local 0 $0 $0 0 $0 $0Fairshare Measure"M2".Carry Over. 2027 Measure M2 Local 0 $0 $95,000 $0 $95,000 $99,809 Fairshare 2028 Measure M2 Local 0 $0 $0 0 $0 $0 Fairshare 2029 Measure M2 Local 0 $0 $95,000 $0 $95,000 $104,862Fairshare 2030 Measure M2 Local 0. $0. $0 0 $0 $0 Fairshare Totals: $0 $0 $190,000 $0 $190,000 $204,671 Last Revised:25-00-Submitted Total Programmed:$190,000 TIP ID CP-12712 IMPLEMENTING AGENCY Orange,City of Local Project Number:30264 Project Title Additional Project IDs: CDBG Street Improvements Fiscal Year 2025-2026 Type of Work: Road Maintenance Project Description Type of Road Maintenance- This project will rehabilitate Wheeler Street,Killingworths Avenue,and Highland'Street which includesTypeofWorkDescription: of roadway but is not limited to,cold planning(milling)the existing asphalt,asphalt concrete overlay installation, Rehabilireconstruction of sidewalks,curb and Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Wheeler Street,Killingworths Avenue,and YEAR ESCALATED Highland Street 2026 Community Development $ 57,239$0 $515,151 $0 $572,390 $585,269 Project Notes - Block Grant Community Development Block Grant(CDBG) 310) Totals: $57,239 $0 $515,151 $0 $572,390 $585,269 Last Revised:25-00-Submitted Total Programmed:$572,390 TIP ID CP-11581 IMPLEMENTING AGENCY Orange,City of Local Project Number:30166 Project Title Additional Project IDs: Cambridge St Infrastructure Improvement Type of Work: Safety Project Description Type of Work Description: Safety-Improve This project will upsize the existing 18"RCP storm drain line from Palm Avenue to Walnut Avenue to roadway drainage alleviate the localized flooding issue on Cambridge Street.Other improvements include roadway pavement,concrete,sewer and water lines. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cambridge Street from Palm Avenue to Walnut Avenue Project Notes Totals: $0 $0 $0 0 $0 $0 Sanitation&Sewer(220),Gas Tax(272),Capital Projects(500),Sewer Construction(520),and Water(600).Carry Over Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-11795 IMPLEMENTING AGENCY Orange,City of Local Project Number:30174 Project Title Additional Project IDs: 21-ORNG-ACE-3994 Cannon Street Bridge Widening Type of Work: Road Widening Project Description Type of Work Description: Road Widening-Add This project will widen portions of Cannon Street from Santiago Canyon Road to Serrano Avenue to 1 lane to existing roadway in project limits add a third northbound thru lane. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cannon Street from Santiago Canyon Road to Serrano Avenue Project Notes Totals: $0 $0 $0 0 $0 $0 ITSIP Citywide(287)&Reimbursable Capital Project(550).Carry Over. Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-10983 IMPLEMENTING AGENCY Orange,City of Local Project Number:20354 Project Title Additional Project IDs: Chapman&Cambridge Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection- The project will provide for a protected left turn phase for the eastbound,westbound,northbound,and Upgrade traffic signal equipment at intersection southbound approaches on Chapman Avenue at Cambridge Street. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Ave and Cambridge St Intersection 2026 Traffic Impact Fees $0 $0. $75,000 $0 $75,000 $76,875 Project Notes TSIP Citywide(287). Totals: $0 $0 $75,000 $0 $75,000 $76,875 Last Revised:25-00-Submitted Total Programmed:$75,000 TIP ID CP-11319 IMPLEMENTING AGENCY Orange,City of Local Project Number:20329 1Project Title Additional Project IDs: Chapman and Batavia Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection- Left turn Phase for NB and SB,Chapman Ave and Batavia St Upgrade traffic signal equipment at intersection Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Chapman Ave and Batavia St Intersection YEAR ESCALATED Project:Notes 2026 Other 654 $0 $0 0 $654 $654 HSIP M2(263)&Reimbursable Capital Projects 2026 Measure M2 Local $3,000$0 $27,000 $0 $30,000$30,675 550).Carry Over. Fairshare Totals: $3,654$0 $27,000 $0 $30,654$31,329 Last Revised:25-00-Submitted Total Programmed:$30,654 TIP ID CP-10984 IMPLEMENTING AGENCY Orange,City of Local Project Number:20353 Project Title Additional Project IDs: i Chapman and Grand Left Turn Signal Modification Type of Work: Intersection Project Description. Type of Work Description: Intersection-Add left The project will provide for a protected left turn phase for the eastbound and westbound approaches turn lane(s)to intersection on Chapman Avenue at Grand Street.The proposed signal modification will enhance the capacity and improve the traffic signal operation at the intersec Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Ave and Grand St Intersection 2026 Traffic Impact Fees $0 $0 $75,000 $0 : $75,000 $76,875 Project Notes TSIP Citywide(287). Totals: $0 $0 $75,000 $0 $75,000 $76,875 Last Revised:25-00-Submitted Total Programmed:$75,000 TIP ID CP-12710 IMPLEMENTING AGENCY Orange,City of Local Project Number:30247 , Project Title Additional Project IDs: Citywide Active Transportation Plan Type of Work: Safety Project Description This project will develop an Active Transportation Plan by analyzing socioeconomic and crash data to Type of Work Description: Safety-Other provide recommendations to improve walking and biking conditions at high need areas throughout the City.Using technical data and robust public engag Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Wide 2026 Other 308,000$0 $0 0 $308,000 $308,000 Project Notes 2026 Traffic Impact Fees $42,000 $0 $0 0. $42,000 $42,000 550 Reimbursable&TSIP(287) Totals: $350,000 $0 . $0 0 $350,000$350,000 Last Revised:25-00-Submitted Total Programmed:$350,000 TIP ID CP-12717 IMPLEMENTING AGENCY Orange,City of Local Project Number:20539 Project Title Additional Project IDs: Citywide Bike Lane Enhancements Type of Work: Safety . Project Description Type of Work Description: Safety-Restripe This project will implement green-colored pavement to enhance the conspicuity of existing City bike roadway lanes.Colored pavement within a bicycle lane increases the visibility of the facility,identifies potential areas of conflict,and reinforces priorit Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Wide 2026 General Fund $0 $0 $0 0 $0 0 Project Notes 2027 General Fund $0 $0 $0 0 , $0 0 Capital Projects(500). 2028 General Fund $0 $0 $0 0 $0 0 2029 General Fund $0 $0 $0 0 $0 0 2030 General Fund $0 $0 $150,000 $0 $150,000 $169,711 Totals: $0 $0 $150,000 $0 $150,000 $169,711 Last Revised:25-00-Submitted Total Programmed:$150,000 TIP ID CP-12181 IMPLEMENTING AGENCY Orange,City of Local Project Number:20522 Project Title Additional Project IDs: Evaluation of Smart Parking Devices for Old Towne Type of Work: Transportation Planning Project Description Type of Work Description: Transportation The purpose of this evaluation is to explore and identify feasible options for smart parking systems and Planning-Studies products,including those that are cost-effective,reliable,have the potential for phased deployment best fitting the City's needs,and can be a Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Old Towne Orange Project Notes Parking In Lieu(555):Old Towne Parking Facility. Totals: $0 $0 $0 0 $0 $0 Carry Over. Last Revised:25-00-Submitted ' Total Programmed:$0 TIP ID CP-10996 IMPLEMENTING AGENCY Orange,City of Local Project Number:20380 Project Title Additional Project IDs: Glassell Street Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer StreetInterconnecttrafficsignalstoimprovecoordination to Glassell Street and on Glassell Street from Taft Avenue to Lincoln Avenue.and communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Taft Avenue from Shaffer St to Glassell St and on . 2026 Traffic Impact Fees $0 $0 $0 0 $0 0 Glassell St from Taft Ave to Lincoln Ave 2027 Traffic Impact Fees $0 $0 $100,000 $0 $100,000 $105,062 Project Notes 2028 Traffic Impact Fees $0 $0 $0 0 $0 0 TSIP Citywide(287).Carry Over. 2029 Traffic Impact Fees $0 $0 $0 0 $0 0 2030 Traffic Impact Fees $0 $0 $0 0 $0 0 Totals: $0 $0 $100,000 $0 $100,000 $105,062 Last Revised:25-00-Submitted Total Programmed:$100,000 TIP ID CP-11003 IMPLEMENTING AGENCY Orange,City of Local Project Number:20382 Project Title Additional Project IDs: Katella Ave Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Katella Avenue.The installation Interconnect traffic signals to improve coordination of F/O lines will enable the City's TMC to communicate with the traffic signals to improve traffic signal and communications operations and traffic flow. Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Katella Ave from Tustin St to Santiago Blvd.and on YEAR ESCALATED Santiago Blvd from Katella Aveto Meats Ave. 2026 Traffic Impact $ 1,300,000 $0 $0 0 $1,300,000 $1,300,000 Project Notes Fees TSIP Citywide(287).Carry Over. 2027 Traffic Impact $ 0 0 $0 0 $0 0 Fees 2028 Traffic Impact $ 0 0 $0 0 $0 0 Fees 2029 Traffic Impact $ 0 0 $0 0 $0 0 Fees 2030 Traffic Impact $ 0 0 $0 0 $0 0 Fees Totals: $1,300,000 $0 $0 0 $1,300,000 $1,300,000 Last Revised:25-00-Submitted Total Programmed:$1,300,000 TIP ID CP-11007 IMPLEMENTING AGENCY Orange,City of Local Project Number:20378 Project Title Additional Project IDs: Katella and Batavia Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Katella Avenue from Main StreetInterconnecttrafficsignalstoimprovecoordinationtoStruckStreetandonBataviaStreetfromKatellaAvenuetoPalmAvenue. and communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Katella Ave from Main St to Struck and Batavia St 2026 Traffic Impact Fees $0 $0 $0 0 $0 0 from Katella to Palm Ave 2027 Traffic Impact Fees $0 $0 $0 0 $0 0 Project Notes 2028 Traffic Impact Fees $0 $0 $150,000 $0 $150,000 $161,534 TSIP Citywide(287).Carry Over. 2029 Traffic Impact Fees $0 $0 $0 0 $0 0 2030 Traffic Impact Fees $0 $0 $0 0 $0 0 Totals: $0 $0 $150,000 $0 $150,000 $161,534 Last Revised:25-00-Submitted Total Programmed:$150,000 TIP ID CP-12708 IMPLEMENTING AGENCY Orange,City of Local Project Number:30240 ' Project Title Additional Project IDs: Kraemer Blvd/Glassell St/Grand Ave RTSSP Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The Kraemer Boulevard/Glassell Street/Grand Avenue Regional Traffic Signal Synchronization Interconnect traffic signals to improve coordination Program Project(KGG RTSSP)is a multi-jurisdictional project between Lambert Road and Kraemer and communications Boulevard in the City of Brea to Dyer Road and Grand Avenue in t Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Kraemer Boulevard,Glassell Street,and Grand YEAR ESCALATED Avenue 2026 Measure M2 Local 0 $0 $330,000 $0 $330,000 $338,250 Project Notes Fairshare Traffic Improvement-Measure M2(263).New Project. Totals: $0 $0 $330,000 $0 $330,000 $338,250 Last Revised:25-00-Submitted Total Programmed:$330,000 TIP ID CP-11577 IMPLEMENTING AGENCY Orange,City of Local Project Number:30150 Project Title Additional Project IDs: Local Roadway Safety Plan Type of Work: Safety, Project Description Type of Work Description: Safety-Other This project will develop a Local Road Safety Plan(LRSP)that will define goals,objectives,and strategies to reduce accidents on local roads. Limits . FISCAL TOTAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATEDCitywide Project Notes 2028 Measure M2 Local $ 50,000$0 $0 0 $50,000$50,000 Fairshare M2 Traffic Improvements(263)Carry Over. Totals: $50,000$0 $0 0 $50,000$50,000 Last Revised:25-00-Submitted Total Programmed:$50,000 TIP ID CP-11029 IMPLEMENTING AGENCY Orange,City of Local Project Number 16302 Project Title Additional Project IDs: - i Minor Traffic Control Devices Type of Work: Safety Project Description Type of Work Description: Safety-Traffic This project will provide minor traffic control devices such as signage,striping and other related traffic calming such as bulbout,chokers,speed hump,etc. calming devices as directed by the Traffic Commission and City Traffic Engineer. Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL City-Wide YEAR ESCALATED Project Notes 2026 General Fund 20,000 $0 $180,000 $0 $200,000 $204,500 Traffic Improvements-Measure"M2"(263)& 2026 Measure M2 Local $ 5,000 $0 $45,000 $0 $50,000 $51,125 Capital Projects(500).Carry Over. Fairshare 2027 General Fund 20,000 $0 $180,000 $0 $200,000 $209,112 2027 Measure M2 Local $5,000 $0 $45,000 $0 $50,000 $52,278 Fairshare 2028 Measure M2 Local $5,000 $0 $45,000 $0 $50,000 $53,460 Fairshare 2028 General Fund 20,000 $0 $180,000 $0 $200,000 $213,840 2029 Measure M2 Local $ 5,000 $0 $45,000. $0 $50,000 $54,672 Fairshare . 2029 General Fund 20,000 $0 $180,000 -$0 $200,000 $218,686 2030 General Fund 20,000 $0 $180,000 $0 $200,000 $223,653 2030 Measure M2 Local $ 5,000 $0 $45,000 $0 $50,000 $55,913 Fairshare Totals: $125,000$0 $1,125,000 $0 $1,250,000 $1,337,239 Last Revised:25-00-Submitted Total Programmed:$1,250,000 TIP ID CP-12713 IMPLEMENTING AGENCY Orange,City of Local Project Number:14997 1 Project Title Additional Project IDs: 1 Municipal Parking Lot Maintenance Type of Work: Road Maintenance Project Description of Work Road Maintenance- This project rehabilitates municipal parking lots every seven years and any maintenance issuesTypeDescription: Slurry seal of roadway annually.Work consists of slurry sealing,crack filling,removing and replacing defective asphalt concrete paving,striping,asphalt concrete overlays,mi Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Wide 2026 General Fund $0 $0 $0 0 $0 $0 Project Notes 2027 General Fund $0 $0 $0 0 $0 $0 Capital Projects(500).Carry Over. 2028 General Fund $0 $0 $0 0 $0 $0 2029 General Fund $0 $0 $0 0 $0 $0 02030GeneralFund $0 $0 $0 0 $0 Totals: $0 $0 $0 0 $0 $0 Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-12716 IMPLEMENTING AGENCY Orange,City of Local Project Number:20443 Project Title Additional Project IDs: Orange Community Shuttle Feasibility Study Type of Work: Transit Project Description Type of Work Description: Transit-Service This project will explore opportunities and benefits for a new community shuttle service.The service Planning could provide an alternative to driving while connecting key destinations such as the Outlets of Orange,medical corridor,Old Towne,and Chapman Un Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL City Wide YEAR ESCALATED Project Notes 2026 Measure M2 Local 8,415$0 $0 0 $8,415 $8,415Fairshare Reimbursable(550),Measure M2(263).Carry Over. 2026 Other 135 $0 $0 0 $135 $135 Totals: $8,550 $0. $0 0 $8,550 $8,550 Last Revised:25-00-Submitted Total Programmed:$8,550 TIP ID CP-12429 IMPLEMENTING AGENCY Orange,City of Local Project Number:30243 Project Title Additional Project IDs: PIXLEY NEIGHBORHOOD AND WALNUT STREET REHABILITATION Type of Work: Road Maintenance Project Description Type of Work Description: Road Maintenance- Rehabilitate Parker Street,Pixley Street,Foley Place,Clark Street,Marietta Avenue,Washington Reconstruction of roadway Avenue,and Walnut Avenue,which includes but is not limited to,asphalt concrete grinding and overlay. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Project Notes Fund CDBG(310).Carry Over. Totals: $0 $0 $0 0 $0 $0 Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-11885 IMPLEMENTING AGENCY Orange,City of Local Project Number: 20397I Project Title Additional Project IDs: Parker Street Restriping Type of Work: Other Project Description This project will provide for the ultimate roadway configuration as the City builds out and adjacent Type of Work Description: Other Other parcels potentially redevelop.By reorganizing the existing paved roadway,this will provide features necessary to best serve various road users. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Parker Street from La Veta Avenue to South City 2028 Other 0 $0 $0 0 $0 0 Limit 2029 Other 10,000 $0 $90,000 $0 $100,000 $109,343 Project Notes Reimbursable Capital Projects(550). Totals: $10,000 $0 $90,000 $0 $100,000 $109,343 Last Revised:25-00 Submitted Total Programmed:$100,000 TIP ID CP-11048 IMPLEMENTING AGENCY Orange,City of Local Project Number:-13120 Project Title Additional Project IDs Pavement Management Program(PMP) Type of Work: Road Maintenance Project Description Type of Road Maintenance- The City's PMP identifies the condition for 320 miles of streets and identifies maintenance needs ofTypeofWorkDescription: of roadway this roadway system requiring$6 million annually for slurry sealing,asphalt overlay and Rehabilireconstructions. Limits FISCAL • TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL City-Wide YEAR ESCALATED Project Notes 2026 Measure M2 Local $ 270,000 $0 $2,430,000 $0 $2,700,000 $2,760,750 Fairshare Traffic Improvement Measure"M2"(263),Gas Tax Maintenance(270),RMRA(274),Capital Projects 2026 Gas Tax 15,000 $0 $135,000 $0 $150,000 $153,375 500)and Reimbursable Capital Projects(550). 2026 General•Fund 200,000 $0 $1,800,000 $0 $2,000,000 $2,045,000 Carry Over. Local Streets and 2026 Roads 340,000 $0 $3,060,000 $0, $3,400,000 $3,476,500 apportionments 2027 General Fund 200,000 $0 $1,800,000. $0 $2,000,000 $2,091,125 2027 Measure M2 Local $ 300,000 $0 $2,700,000 $0 $3,000,000 $3,136,687Fairshare 2027 Gas Tax 15,000 $0 $135,000 $0 $150,000 $156,834 Local Streets and 2027 Roads 350,000 $0 $3,150,000 $0 $3,500,000 $3,659,469 apportionments 2028 Gas Tax 15,000 $0 $135,000 $0 $150,000 $160,380 2028 Measure M2 Local $ 300,000 $0 $2,700,000 $0 $3,000,000 $3,207,605 Fairshare Local Streets and 2028 Roads 360,000 $0 $3,240,000 $0 $3,600,000 $3,849,126 apportionments 2028 General Fund 200,000 $0 $1,800,000 $0 $2,000,000 $2,138,403 2029 Measure M2 Local $ 310,000 $0 $2,790,000 $0 $3,100,000 $3,389,638 Fairshare Local Streets and 2029 Roads 370,000 $0 $3,330,000 $0 $3,700,000 $4,045,697 apportionments 2029 Gas Tax 15,000 $0 $135,000 $0 $150,000 $164,015 2029 General Fund 200,000 $0 $1,800,000 $0 $2,000,000 $2,186,863 2030 General Fund 200,000 $0 $1,800,000 $0 $2,000,000 $2,236,535 2030 Gas Tax 15,000 $0 $135,000 $0 $150,000 $167,740 2030 Measure M2 Local $ 310,000 $0 $2,790,000 $0 $3,100,000 $3,466,629 Fairshare Local Streets and 2030 Roads 380,000 $0 $3,420,000 $0 $3,800,000 $4,249,416 apportionments Totals: $4,365,000$0 $39,285,000$0 $43,650,000$46,741,787 Last Revised:25-00-Submitted Total Programmed:$43,650,000 TIP ID CP-11049 IMPLEMENTING AGENCY Orange,City of Local Project Number:13115 Project Title Additional Project IDs: Pavement Management Program(PMP)Survey Type of Work: Road Maintenance Project Description of Work Description: Road Maintenance- Windshield field surveys of the City's pavement are conducted every four years to determineType Studies or PMP updates pavement condition indexes for each segment.These surveys are conducted as a requirement for numerous grant programs,OCTA bi-annual reports,and overall PMP Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL City-Wide YEAR ESCALATED Project Notes 2026 Traffic Impact Fees $60,000 $0 $0 0 $60,000 $60,000 Traffic Improvement-Measure"M2"(263)&TSIP 2027 Measure M2 Local $ 70,000 $0 $0 0 $70,000 $70,000 Citywide(287).Carry Over. Fairshare 2027 Traffic Impact Fees $40,000 $0 $0 0 $40,000 $40,000 2028 Traffic Impact Fees $60,000 $0 $0 0 $60,000 $60,000 2029 Measure M2 Local $ 70,000 $0 $0 0 $70,000 $70,000 Fairshare 2029 Traffic Impact Fees $40,000 $0 $0 0 $40,000 $40,000 2030 Traffic Impact Fees $60,000 $0 $0 0 $60,000 $60,000 Totals: $400,000 $0 $0 0 $400,000 $400,000. Last Revised:25-00-Submitted Total Programmed:$400,000 TIP ID CP-12179 IMPLEMENTING AGENCY Orange,City of Local Project Number:20518 Project Title Additional Project IDs: Pedestrian Beacon Upgrades. Type of Work: Safety Project Description TypeWork Description: Safety-Signage This project will upgrade and modernize existing flashing beacon systems at several pedestrianof installation and/or replacement crossings throughout the City.The project will also involve minor modifications to/refurbishment of ancillary equipment,roadway features,and traffic con Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations Throughout the City 2026 Other 0 $0 $249,570 $0 $249,570 $255,809 Project Notes 2026 General Fund $0 $0 $27,730 $0 $2.7,730 $28,423 General Fund(500)&Reimbursable Capital Projects(550)Carry Over. Totals;$0 $0 $277,300 $0 $277,300 $284,232 Last Revised:25-00-Submitted Total Programmed:$277,300 TIP ID CP-11576 IMPLEMENTING AGENCY Orange,City of Local Project Number:16065 Project Title Additional Project IDs: Quiet Zone Maintenance Type of Work: Safety Project Description This project will provide for the annual Quiet Zone and Safe Railroad Crossing maintenance Type of Work Description: Safety-Other agreement with Southern California Regional Rail Authority and any related maintenance or improvements necessary for compliance. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Citywide 2026 Other 0 $0 $0 50,000 $50,000 $50,000 Project Notes 2027 Other 0 $0 $0 50,000 $50,000 $50,000 City TRF:Merged 2008 Tax Exempt Bonds(954). 2028 Other 0 $0 $0 50,000 $50,000 $50,000 Carry Over. 2029 Other 0 $0 $0 50,000 $50,000 $50,000 2030 Other 0 $0 $0 50,000 $50,000 $50,000 Totals: $0 $0 $0 250,000 $250,000 $250,000 Last Revised:25-00-Submitted Total Programmed:$250,000 TIP ID CP-12427 IMPLEMENTING AGENCY Orange,City of Local Project"Number.30244 Project Title Additional Project IDs: RIVERDALE AVENUE COMPLETE STREET IMPROVEMENTS Type of Work: Bikeways Project Description Type of Work Description: Bikeways- Reconfiguration of Riverdale Avenue from Glassell Street to Orange City limits that allows for the Reconstruction/rehabilitation of existing bike route installation of bike and pedestrian facilities,traffic calming strategies and curb space management. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Glassell to Tustin Project Notes Fund Capital Projects Reimbursement(550).Carry Totals: $0 $0 $0 0 $0 $0 Over. Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-11052 IMPLEMENTING AGENCY Orange,City oft Local Project Number:20325 Project Title Additional ProjectlDs: Santiago Bike Trail Phase IV Type of Work: Bikeways Project Description Type of Work Description: Bikeways-New bike This project is the final phase of the Santiago Creek Bike Trail alignment in the Master Bikeway Plan. route Construction of the multi-purpose trail will connect the existing bike trail west of Cannon St. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cannon to Windes 2026 Other 0 $0 $0 0 $0 $0 Project Notes 2027 Other 0 $0 $0 0 $0 $0 Capital Projects(500)&Reimbursable Capital 2028 Other 0 $0 $0-0 $0 $0 Projects(550).Carry Over. 2029 Other 0 $0 $0 0 $0 $0 2030 Other 0 $0 $0 0 $0 $0 Totals: $0 $0 $0 0 $0 $0 Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-12182 IMPLEMENTING AGENCY Orange,City of Local Project Number:20525 Project Title Additional Project IDs: Santiago Canyon Road Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the City's Traffic Signal Network along Santiago Canyon Rd.from Cannon St. Interconnect traffic signals to improve coordination to Chapman Ave..The new fiber optic lines will enable the City's Traffic Management Center to improve and communications traffic signal operations,and traffic flow. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Santiago Canyon Rd.from Cannon St.to 2028 Traffic Impact Fees $0 $0 $0 0 $0 $0 Chapman Ave. 2029 Traffic Impact Fees $25,000 $0 $225,000 $0 $250,000 $273,358 Project Notes TSIP citywide(287).Carry Over. Totals: $25,000 $0 $225,000 $0 $250,000 $273,358 Last Revised:25-00-Submitted Total Programmed:$250,000 TIP ID CP-12707 IMPLEMENTING AGENCY Orange,City of Local Project Number:15509 Project Title Additional Project IDs: Sewer Cleaning&Video Type of Work: Other Project Description The State's Waste Discharge Elimination(WDR)requires the City to complete a condition assessment Type of Work Description: Other-Other of its entire 300+mile sewer line system and develop a rehabilitation and replacement plan.Additional contract services are needed to comply with WDR Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations in the City of Orange 2026 Other 0 $0 $500,000 $0 $500,000 $512,500 Project Notes 2027 Other 0 $0 $500,000 $0 $500,000 $525,312 Sanitation and Sewer(220) 2028 Other 0 $0 $500,000 $0 $500,000 $538,445 2029 Other 0 $0 $500,000 $0 $500,000 $551,906 2030 Other 0 $0 $500,000 $0 $500,000 $565,704 Totals: $0 $0 $2,500,000 $0 $2,500,000 $2,693,867 Last Revised:25-00-Submitted Total Programmed:$2,500,000 TIP ID CP-12706 IMPLEMENTING AGENCY Orange,City of Local Project Number:15508 Project Title Additional Project IDs: Sewer Line Maintenance&Replacement Type of Work: Other Project Description This project annually fixes hot spots due to root intrusion,offset joints,and damaged sewer mains.It Type of Work Description: Other-Other also replaces both hydraulically and structurally deficient sewer mains.As part of the 2023 Sanitation Fee study,a new capital improvement compo Limits FISCAL FUND TOTAL ENG ROW CON/IMP O&M TOTAL Various Locations Through the City of Orange YEAR TYPE ESCALATED Project Notes 2026 Other $243,878 $0 $2,194,905 $0 $2,438,783 $2,493,656 Sanitation and Sewer(220) 2027 2028 Other $251,195 $0 $2,260,751 $0 $2,511,946 $2,626,397 Other $258,730 $0 $2,328,574 $0 $2,587,304 $2,766,350 2029 Other $266,492 $0 $2,398,431 $0 $2,664,923 $2,913,911 2030 Other $274,487 $0 $2,470,384 $0 $2,744,871 $3,069,500 Totals: $1,294,782 $0 $11,653,045 $0 $12,947,827 $13,869,814 Last Revised:25-00-Submitted Total Programmed:$12,947,827 TIP ID CP-11882 IMPLEMENTING AGENCY Orange,City of Local Project Number:20430 Project Title Additional Project IDs: Storm Drain Improvements Type of Work: Safety Project Description Type of Work Description: Safety-Improve This project replaces existing deficient drainage systems and constructs new storm drain lines as. roadway drainage needed per the Master Plan of Drainage to alleviate localized flooding. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations Throughout the City ' 2026 Other 50,000 $0 $450,000 $0 $500,000 $511,250 Project Notes 2027 Other 50,000 $0 $450,000 $0 $500,000 $522,781 Sanitation and Sewer(220).Carry Over. 2028 Other 50,000 $0 $450,000 $0 $500,000 $534,601 2029 Other 50,000 $0 $450,000 $0 $500,000 $546,716 2030 Other 50,000 $0 $450,000 $0 $500,000 $559,134 Totals: $250,000 $0 $2,250,000 $0 $2,500,000 $2,674,482 Last Revised:25-00-Submitted Total Programmed:$2,500,000 TIP ID CP-11881 IMPLEMENTING AGENCY Orange,City of Local Project Number:20374 Project Title Additional Project IDs: Streetlight Pole Replacement Program Type of Work: Safety Project Description Type of Work Description: Safety-Improve This program will biannually replace 40 existing steel streetlight poles with City standard LED- lighting of roadway retrofitted concrete poles and underground overhead wires. Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Various locations throughout the City YEAR ESCALATED Project Notes 2026 General Fund 47,000 $0 $423,000 $0 $470,000 $480,575 Traffic Improvements-Measure"M2"(263). 2026 Measure M2 Local $3,000 $0 $27,000 $0 $30,000 $30,675 Capital Project(500).Carry Over.Fairshare 2027 General Fund 47,000 $0 $423,000 $0 $470,000 $491,414 2027 Measure M2 Local $3,000 $0 $27,000 $0 $30,000 $31,367 • Fairshare 2028 Measure M2 Local $3,000 $0 $27,000 $0 $30,000 $32,076 Fairshare 2028 General Fund 47,000 $0 $423,000 $0 $470,000 $502,525 2029 General Fund 47,000 $0 $423,000 $0 $470,000 $513,913 2029 Measure M2 Local $3,000 $0 $27,000 $0 $30,000 $32,803 Fairshare 2030 General Fund 47,000 $0 $423,000 $0 $470,000 $525,586 2030 Measure M2 Local $3,000 $0 $27,000 $0 $30,000 $33,548 Fairshare Totals: $250,000 $0 $2,250,000 $0 $2,500,000 $2,674,482 Last Revised:25-00-Submitted Total Programmed:$2,500,000 TIP ID CP-10979 IMPLEMENTING AGENCY Orange,City of Local Project Number:13816 I Project Title Additional Project IDs:71 Structural Evaluation of City Bridges Type of Work: Bridge Project Description Type of Work Description: Bridge- A maintenance and retrofit plan are ready for implementation for 8 bridges located throughout the City Rehabilitation of existing pavement/structure that require maintenance.The City is awaiting Caltrans funding for construction phase in FY 24-25. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations City Wide Project Notes Totals: $0 $0 $0 0 $0 $0 Reimbursable Capital Projects(550).Carry Over. Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-11884 IMPLEMENTING AGENCY Orange,City of Local Project Number:20500 1 Project Title Additional Project IDs Sycamore and Palmyra Neighborhoods Street Rehabilitation Type of Work: Road Maintenance Project Description Type of Work Description: Road Maintenance- This project will rehabilitate streets in the Sycamore and Palmyra Neighborhoods.Work includes cold Rehabilitation of roadway planing,AC overlay installation,slurry seal,reconstruction of sidewalks,curb and gutters,driveways and cross gutters. Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Sycamore Avenue,Holly Street,Ash Street, YEAR ESCALATED Palmyra Avenue,Flower Street,and Lilac Lane 2026 Community Development $ 0 $0 $0 0 $0 $0 Project Notes Block Grant CDBG(310)&Capital Projects(500).Carry Over. 2027 Community Development $ 0 $0 $0 0 $0 $0 Block Grant 2028 Community Development $0 $0 $0 0 $0. $0 Block Grant 2029 Community Development so $0 $0 0 $0 $0 Block Grant 2030 Community Development $ 0 $0 so 0 $0 $0 Block Grant Totals: $0 $0 $0 0 $0 $0 Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-11055 IMPLEMENTING AGENCY Orange,City of Local Project Number:16305 Project Title Additional Project IDs: Traffic Signal Controller Changeout Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The City maintains 158 traffic signals,most of which contain older controllers.Nearly 2/3 of the Replace and upgrade traffic signals and equipment controllers have been updated or replaced to allow for better coordination with the City's Transportation Management Center. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City-Wide 2026 Gas Tax $0 $0 $125,000 $0 $125,000 $128,125 Project Notes 2027 Gas Tax $0 $0 $125,000 $0 $125,000 .$131,328 Gas Tax Maintenance(270).Carry Over. 2028 Gas Tax $0 $0 $125,000 $0 $125,000 $134,611 2029 Gas Tax $0 $0 $125,000 $0 $125,000 $137,977 2030 Gas Tax $0 $0 $125,000 $0 $125,000 $141,426 Totals: $0 $0 $625,000 $0 $625,000 $673,467 Last Revised:25-00-Submitted Total Programmed:$625,000 TIP ID CP-12714 IMPLEMENTING AGENCY Orange,City of Local Project Number:20425 Project Title Additional Project IDs:Tustin St Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The Tustin Street Traffic Signal Synchronization project a multi-jurisdictional project between First Interconnect traffic signals to improve coordination Street in Tustin and Wabash Avenue in Yorba Linda.The corridor is over eleven miles and includes 55 and communications signals across seven jurisdictions.25 of the s Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Tustin St. 2026 Traffic Impact Fees $0 $0 $52,000 $0 $52,000 $53,300 Project Notes 2026 Other 0 $0 $854,388 .$0 $854,388 $875,748 TSIP Citywide(287),Capital Projects I Reimbursement(550).Carry Over. Totals: $0 $0 $906,388 $0 $906,388 $929,048 Last Revised:25-00-Submitted Total Programmed:$906,388 TIP ID CP-12715 IMPLEMENTING AGENCY Orange,City of Local Project Number:30168 Project Title Additional Project IDs: Walnut Ave Infrastructure Improvement Type of Work: Safety Project Description Type of Work Description: Safety-Improve This project will construct a new 48"RCP storm drain line on Walnut Avenue from Cambridge Street to roadway drainage California Street per the Master Plan of Drainage to alleviate the localized flooding issue on Walnut Avenue during a 25-year or higher storm events. Limits FISCAL YEAR • FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Walnut Avenue from.Cambridge Street to 2026 Other 0 $0 $0 0 $0 $0 California Street 2027 Other 0 $0 $0 0 $0 $0 Project Notes 2028 Other 0 $0 $0 0 $0 $0 Sanitation&Sewer(220),Measure"M2"Traffic 2029 Other 0 $0 $0 0 $0 $0 ' Imprvmnt(263),Sewer Construction(520)&Water 2030 Other 0 $0 $0 0 $0 $0•600)Utility Operations Previously named"Walnut Ave Infrastructure Improvement"Carry Over Totals: $0 $0 $0 0 $0 $0 Last Revised:25-00-Submitted Total Programmed:$0 TIP ID CP-12711 IMPLEMENTING AGENCY Orange,City of Local Project Number:30259 Project Title Additional Project IDs: Walnut Avenue&Orange Street New Traffic Signal Type of Work: Traffic Signals Project Description This project will provide for a new traffic signal at the intersection of Walnut Avenue and OrangeTypeofWorkDescription: Traffic Signals-Install new traffic signals and equipment Street.The traffic signal will improve the overal flow and safety of the intersection,including managing the flow of vehicles entering and exiting Ch Limits FISCAL YEAR. FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Walnut Avenue&Orange Street Project Notes 550 Reimbursable.Carry Over. Totals: $0 $0 $0 0 $0 $0 Last Revised:25-00-Submitted Total Programmed:$0