AGR-6575.1 - CITY OF ANAHEIM - AMENDMENT NO. 1 TO COOPERATIVE AGREEMENT FOR ORANGEWOOD AVE BRIDGE WIDENING AND NEW WATER MAIN ALONG ORANGEWOOD AVEoran e. AIR-1057S.1 orie
AMENDMENT NO. 1 TO COOPERATIVE AGREEMENT BETWEEN CITY OF
ORANGE AND CITY OF ANAHEIM FOR FUNDING, DESIGN AND
CONSTRUCTION OF THE ORANGEWOOD AVENUE BRIDGE WIDENING OVER
THE SANTA ANA RIVER AND A NEW CITY OF ORANGE WATER MAIN ALONG
ORANGEWOOD AVENUE
This AMENDMENT NO. 1 TO COOPERATIVE AGREEMENT ("Amendment No. 1"),
dated for identification purposes only as of 202_, is entered into by and
between the CITY OF ORANGE,a municipal corporation of the State of California("Orange"),
and the CITY OF ANAHEIM, a municipal corporation and charter city ("Anaheim") with
reference to the following:
RECITALS
A. Orange and Anaheim (hereinafter "Parties") entered into that certain Cooperative
Agreement dated as February 13, 2018 (the "Agreement") regarding their respective
responsibilities for design, right-of-way acquisition, utility relocation, environmental
documents and construction of the Orangewood Avenue widening project (the
Project").
B. The Project will incorporate plans to accommodate the Orangewood Bridge Preventive
Maintenance / Repair Work on the Orangewood Avenue Bridge over the Santa Ana
River. The scope of work includes,but is not limited to,joint repair,methacrylate deck
treatment, concrete spall repair, and asphalt resurfacing.
C. The Parties desire to amend the Agreement to: increase the Project funding obligations
to reflect current construction unit costs and account for the Orange Water Main Phase
II (Base and Alternate Bids), Base Bid water main within the Orangewood Avenue
Bridge, Alternate Bid A, water main within Caltrans right of way, and Alternative Bid
B, water main from the eastern Caltrans right of way to Eckhoff Street; address
Orangewood Bridge Preventive Maintenance /Repair Work in Orange's Bridge
Preventive Maintenance Program ("BPMP"); and to account for Orange using its own
local funds for construction.
NOW, THEREFORE, FOR AND IN CONSIDERATION OF THE MUTUAL PROMISES,
COVENANTS AND CONDITIONS CONTAINED HEREIN, ORANGE AND ANAHEIM
AGREE AS FOLLOWS:
SECTION 1. AMENDMENT OF AGREEMENT. The Agreement is hereby amended as set
forth in this Section.
1.1 Section 1.1 of the Agreement,is hereby amended to read as follows:
a. Anaheim shall be responsible for actual project costs and expenses for the work
to be performed within the City of Orange from the Platinum Triangle Community
Page 1 of 3
Facilities District Funds in the estimated amount of Fourteen Million One Hundred
Fifty-Seven Thousand($14,157,000).
c. Anaheim shall be responsible for all actual expenses incurred by Orange as
part of the on-going Project related activities for meetings, Project coordination
and management, engineering, design, review,plan check and construction.
1.2 Section 1.2.a of the Agreement, is hereby amended to read as follows:
a. Orange shall pay Anaheim for all actual expenses, an estimated amount of Five
Million, Eight Hundred Seventy-Eight Thousand, Eight Hundred Sixty Dollars
5,878,860), for Design, including right-of-way engineering, Construction,
Construction Contingency, and Construction Management&Inspection of the
Orange Water Main."
1.3 Section 1.2.b.ii of the Agreement, is hereby amended to read as follows:
ii. Five Million, Seven Hundred Fifty-Eight Thousand Dollars ($5,758,000) for
Construction, Construction Contingency, and Construction Management&
Inspection within sixty(60) calendar days from the construction bid opening
date."
1.4 Section 1 of the Agreement is hereby amended to add a new Section 1.3 to the
Agreement as follows:
1.3 Anaheim and Orange will cooperate in a Bridge Preventive Maintenance
Program("BPMP") for the Project.
a The costs associated with the BPMP work is estimated to be about One
Hundred Fifty Thousand Dollars and No/100 Cents($150,000.00).
h Anaheim and Orange shall each be responsible for 50%of the BPMP costs.
Orange shall be responsible for using its own local funds for construction related to
the BPMP.
c In addition, each party shall be responsible for 50% of any and all
unforeseen costs above and beyond the estimated amounts noted above for the
BPMP work.
d Anaheim will attach Orange's BPMP submittal to the Project's plan sheets,
specification language, and bid items."
SECTION 2. INTEGRATION. Except as expressly provided to the contrary herein, all
provisions of the Agreement shall remain in full force and effect. The Agreement and this
Amendment No. 1 shall hereinafter be collectively referred to as the "Amended Agreement."The
Amended Agreement integrates all of the terms and conditions of agreement between the Parties
Page 2 of 3
and supersedes all negotiations or previous agreements between the Parties with respect to the
subject matter hereof.
SECTION 3. EFFECTIVE DATE. The Effective Date of this Amendment No. 1 shall be the
latest date of execution hereinafter set forth opposite the names of the signatories hereto.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment No. 1 to be
executed on the dates hereinafter respectively set forth.
CITY OF ANAHEIM,
a municipal corporation
Date:
By:
Rudy Emami
Director of Public Works
Attest:
Approve as to Form:
ROBERT FABELA, CITY ATTORNEY
Theresa Bass, City Clerk
By:
B orley
De u City Attorney
147854
CITY OF ORANGE,
a municipal corporation
Date: a V 7 a o T By: 2- S:a -
aniel+R. Slater, Mayor
ATTEST: APPROVED AS TO FORM:
Y044419-A_,OALVI ---By: jc_t, '
4‘
Pamela Coleman, City Clerk Mike Vigliotta, City Attorney
Page 3 of 3