Loading...
AGR-7004 - FABRIC WALLCRAFT OF CALIFORNIA INC - INSTALLATION OF FABRITRACK SYSTEM AT SHAFFER PARK COMMUNITY ROOMR=7obz}- CONTRACT Installation of Fabritrac 5ystem at Shaffer Park Community Room] THIS CONTRACT (the "Contract") is made and entered into as of 2020 ("Effective Date") by and between the CITY OF ORANGE, a municipal orporation City"), and FABRIC WALLCRAFT OF CALIFORNIA, INC., a California corporation Contractor"),who agree as follows. ARTICLE 1 Work Performed a. For and in consideration of the payments and agreements hereinafter mentioned,to be made and performed by City, and incorporated herein by this reference, Contractor hereby agrees to and shall do all the work and furnish all the labor,materials,tools and equipment,except such as are mentioned in the specifications to be furnished by City to Contractor, necessary to complete in good workmanship and substantial manner the work(the"Work")described in: 1) The"Contractor's Proposal"attached hereto as Exhibit A and incorporated herein by this reference; 2) The Acoustic Plans and Specifications ("the Plans") attached hereto as Exhibit B and incorporated herein by this reference; and 3) The latest edition of the "City of Orange Standard Plans and Specifications" (the Orange Book") with the term "Engineer," as used in the Orange Book and in this Contract, to specifically include the City Engineer(or his/her designee). b. Contractor acknowledges that it has received the Plans from City and that a complete copy of the Plans are in its possession and are hereby specifically referred to and by such reference made a part hereof. The Orange Book are hereby specifically referred to and by such reference made a part hereof. Contractor hereby acknowledges that it has read, reviewed and understands the Plans and the Orange Book, as they relate to the Work, all of which documents shall be referred to herein collectively as the"Plans and Specifications." c. Contractor acknowledges the provisions of Chapter 8.28 of the Orange Municipal Code which requires, among other things, that Contractor utilize City's exclusive solid waste hauler for the rental of bins for trash and debris remov,al and imposes mandatory recycling requirements for self-hauled construction and demolition waste. The terms and conditions set forth in this Contract shall control over any terms and conditions in the Plans and Specifications to the contrary. d. The Work shall be performed in conformity with the Plans and Specifications and the Bid Proposal and all applicable laws, including any and all applicable federal and state labor laws and standards and applicable prevailing wage requirements and any and all state, federal and local statutes, regulations and ordinances relating to the protection of human health or the environment. e. Unless and until otherwise notified in writing by City's Community Services Director, City's Community Services Assistant Director, Leslie Hardy ("Authorized City Representative"), shall be the person to whom Contractor will report for the performance of the Work hereunder. It is understood that Contractor's performance hereunder shall be under the direction and supervision of the Authorized City Representative or such other person as City's Community Services Director may designate from time to time, that Contractor shall coordinate the Work hereunder with the Authorized City Representative to the extent required by the Authorized City Representative, and that all performances required hereunder by Contractor shall be performed to the satisfaction of the Authorized City Representative or City's Community Services Director. f.It is expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and Contractor's Bid Proposal, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said Bid Proposal conflicting herewith. ARTICLE 2 Commencement of Work Contractor shall commence the Work provided for in this Contract within fifteen(15)days of the date of the issuance by City of a Notice to Proceed and diligently prosecute completion of the Work within thirty (30) calendar days from such date, unless legal extension is granted in accordance with the terms set forth in the Green Book. Time is of the essence in this Contract. Contractor shall do all things necessary and incidental to the prosecution of Contractor's Work. ARTICLE 3 Compensation a. Contractor agrees to receive and accept an amount not to exceed TWENTY-FIVE THOUSAND SEVEN HUNDRED EIGHTY-TWO DOLLARS ($25,782.00)as compensation for furnishing all materials and doing all the Work contemplated and embraced in this Contract. Said compensation covers (1) all loss or damage arising out of the nature of the Work, from the acts of the elements; (2) any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the Work until its acceptance by City,other than as provided below; (3)all risks of every description connected with the Work; (4) all expenses incurred by or in consequence of the suspension or discontinuance of the Work; and (5) well and faithfully completing the Work, and for the whole thereof, in the manner and according to the Plans and Specifications, and requirements of the Authorized City Representative under them. Retention amounts shall be withheld from progress payments as required by law unless Contractor provides securities in lieu of retention. ARTICLE 4 Licenses Contractor represents that it and any subcontractors it may engage, possess any and all licenses which are required under state or federal law to perform the Work contemplated by this 2 Contract and that Contractor and subcontractors shall maintain all appropriate licenses, including a City of Orange business license, at its cost, during the perfortnance of this Contract. ARTICLE 5 Guarantees a. Contractor guarantees the construction and installation of all Work included in the Plans and Specifications for which Contractor has been awarded this Contract. b. Should any of the materials or equipment installed pursuant to this Contract prove defective or should the Work as a whole prove defective, due to faulty equipment,workmanship, materials furnished or methods of installations, or should said Work or any part thereof fail to function properly, as designed, due to any of the above causes within twelve(12)months after the date on which said Work is accepted by City, Contractor shall make repairs and furnish such materials and equipment as are necessary to be furnished and installed within fifteen(15)calendar days after the receipt of a demand from City. c. Said Work will be deemed defective within the meaning of this guarantee in the event that it fails to function as originally intended either by the Plans and Specifications of this Contract or by the manufacturer(s) of the equipment incorporated into the Work. d. In the event repairs are not made within fifteen(15)calendar days after Contractor's receipt of a demand from City, City shall have the unqualified option to make any needed repairs or replacements itself or by any other contractor. Contractor shall reimburse City, upon demand, for all expenses incurred in restoring said Work to the condition contemplated in this Contract, including the cost of any equipment or materials replaced. e. It is understood that emergency repairs may, by necessity, be made by City. Therefore, when defective equipment, materials or workmanship result in emergency repairs by City,Contractor shall reimburse City,upon demand,for all expenses incurred. Emergency repairs will be deemed as those repairs determined by City's Director of Public Works to be necessary due to an immediate detriment to the health, safety, welfare or convenience of the residents of City. ARTICLE 6 Water Quality a. The Santa Ana Regional Water Quality Control Board ("RWQCB") has issued National Pollutant Discharge Elimination System ("NPDES") Pertnit No. R8-2009-0030 (the Permit"), which governs storm water and non-storm water discharges resulting from municipal activities performed by City or its contractors. In order to comply with the Permit requirements, the County of Orange has prepared a Drainage Area Management Plan ("DAMP"), containing Model Maintenance Procedures with Best Management Practices ("BMPs") that City and its contractors must adhere to. The Model Maintenance Procedures contain pollution prevention and source control techniques to minimize the impact of those activities upon dry-weather urban runoff, storm water runoff, and receiving water quality. Examples include: wash water from 3 cleaning of sidewalks or parking lots must be collected and disposed of in the sewer or landscaped areas. b. The Permit, the DAMP and the Model Maintenance Procedures are on file in the office of City's Director of Public Works. Contractor hereby acknowledges that it has read, reviewed and understands the Permit,the DAMP and the Model Maintenance Procedures, as they relate to the Work and hereby shall perform the Work in conformance therewith. ARTICLE 7 Independent Contractor; Contractor not Agent a. At all times during the tertn of this Contract, Contractor shall be an independent contractor and not an employee of City. City shall have the right to control Contractor only insofar as the result of Contractor's services rendered pursuant to this Contract. City shall not have the right to control the means by which Contractor accomplishes services rendered pursuant to this Contract. Contractor shall, at its sole cost and expense, furnish all facilities, materials and equipment which may be required for furnishing services pursuant to this Contract. Contractor shall be solely responsible for,and shall indemnify,defend and save City harmless from all matters relating to the payrnent of its subcontractors, agents and employees, including compliance with social security,withholding and all other wages,salaries,benefits,ta ces,exactions,and regulations of any nature whatsoever. Contractor acknowledges that Contractor and any subcontractors, agents or employees employed by Contractor shall not, under any circumstances, be considered employees of City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits. b. Except as City may specify in writing, Contractor shall have no authority, express or implied,to act on behalf of City in any capacity whatsoever as an agent. Contractor shall have no authority, express or implied,to bind City to any obligation whatsoever. ARTICLE 8 Public Work; Prevailing Wage a. The Work which is the subject of this Contract is a "public work," as that term is defined in Section 1720 of the California Labor Code, for which prevailing wages must be paid. To the extent Contractor's employees will perform any work that falls within any of the classifications for which the Department of Labor Relations of the State of California promulgates prevailing wage determinations, Contractor hereby agrees that Contractor, and any subcontractor under it, shall pay not less than the specified prevailing rates of wages to all such workers. The general prevailing wage determinations for crafts can be located on the website of the Department of Industrial Relations (www.dir.ca.gov/DLSR). Additionally, to perform work under this Contract, Contractor must meet all State registration requirements and criteria, including project compliance monitoring. b. Attached hereto as Attachment No. 1 and incorporated herein by this reference is a copy of the provisions of Sections 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 4 1815 of the California Labor Code. Contractor hereby acknowledges that it has read, reviewed and understands those provisions of the Labor Code and shall prosecute and complete the Work under this Contract in strict compliance with all of those terms and provisions. c. Contractor shall secure the payment of compensation to its employees in accordance with the provisions of Section 3700 of the California Labor Code. Accordingly, and as required by Section 1861 of the California Labor Code, Contractor hereby certifies as follows: I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract." d. Contractor shall indemnify,protect,defend and hold harmless City and its officers, employees, contractors and agents, with counsel reasonably acceptable to City; from and against any and all loss, liability, damage, claim, cost, expense, and/or "increased costs" (including reasonable attorney's fees, court and litigation costs, and fees of expert witnesses)which result or arise in any way from the noncompliance by Contractor of any applicable local,state and/or federal law, including, without limitation, any applicable federal and/or state labor laws (including, without limitation,the requirement to pay state prevailing wages). It is agreed by the parties that, in connection with the construction of the Work which is the subject of this Contract, Contractor shall bear all risks of payment or non-payment of state prevailing wages. "Increased costs" as used in this paragraph shall have the meaning ascribed to it in Labor Code Section 1781, as the same may be enacted, adopted or amended from time to time. The foregoing indemnity shall survive termination of this Contract. ARTICLE 9 Equal Employment Opportunity During the performance of this Contract, Contractor agrees as follows: a. Contractor shall not discriminate against any employee or applicant for employment because of race, color,religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Contractor shall ensure that applicants are employed and that employees are treated during employment, without regard to their race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Such actions shall include,but not be limited to the following: employment,upgrading,demotion or transfer,recruitment or recruitment advertising,layoff or termination,rates of pay or other forms of compensation and selection for training, including apprenticeship. Contractor shall post in conspicuous places, available to employees and applicants for employment, a notice setting forth provisions of this non-discrimination clause. b. Contractor shall,in all solicitations and advertisements for employees placed by,or on behalf of Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. 5 c. Contractor shall cause the foregoing paragraphs (a) and (b) to be inserted in all subcontracts for any Work covered by this Contract, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials: ARTICLE 10 Conflicts of Interest Contractor agrees that it shall not make, participate in the making, or in any way attempt to use its position as a contractor to influence any decision of City in which Contractor knows or has reason to know that Contractor, its officers,partners, or employees have a financial interest as defined in Section 87103 of the Government Code. ARTICLE 11 Indemnity Contractor shall defend, indemnify and hold harmless City and its officers, officials, agents, and employees from and against: a. Any and all claims, liabilities, losses, damages, penalties, costs or expenses including reasonable attorneys'fees and court costs)which City may directly or indirectly sustain or suffer arising from or as a result of the death of any person or any accident, injury, loss or damage whatsoever caused to any person or the property of any person which shall occur on or adjacent to the real property which is the subject of this Contract, or in connection with performance of this Contract which may be directly or indirectly caused by the acts or omissions of Contractor or its officers, employees, contractors or agents, or as a consequence of any use, generation, manufacture, storage, disposal, release or threatened release of a hazardous waste or substance. Contractor shall not be responsible for (and such indemnity shall not apply to) any willful misconduct, negligence or breach of this Contract by City or its officers, officials, agents, and employees. The foregoing indemnity shall survive termination of this Contract. b. Any and all claims under workers' compensation acts and other employee benefit acts with respect to Contractor's employees or Contractor's subcontractor's employees arising out of Contractor's Work under this Contract, including any and all claims under any law pertaining to Contractor's status as an independent contractor. ARTICLE 12 Insurance a. Contractor shall procure and maintain for the duration of this Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder and the results of that Work by Contractor,its agents, representatives, employees or subcontractors. b. Contractor shall maintain the following minimum amount of insurance: the greater of either the limits set forth in(1)through(4),below;or all of the insurance coverage and/or limits carried by or available to Contractor. 6 1) General Liability 2,000,000 per occurrence for bodily injury,personal injury and property damage. If Commercial General Liability insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. 2) Automobile Liability 1,000,000 per accident for bodily injury and property damage. 3) Workers' Compensation as required by the State of California. 4) Employer's Liability 1,000,000 per accident for bodily injury or disease. c. Any insurance proceeds in excess of or broader than the minimum required coverage andJor minimum required limits which are applicable to a given loss shall be available to City. No representation is made that the minimum insurance requirements of this Contract are sufficient to cover the obligations of Contractor under this Contract. d. Any deductibles or self-insured retentions must be declared to and approved by City. At the option of City, either: the insurer shall reduce or eliminate such deductibles or self- insured retentions with respect to City, its officers, officials, agents and employees; or Contractor shall provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses. e. Each policy of general liability and automotive liability insurance shall contain, or be endorsed to contain, the following provisions: 1) City, its officers, officials, agents, and employees are declared to be additional insureds under the terms of the policy,with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of Contractor (any auto), and with respect to liability arising out of Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such Work or operations. A policy endorsement to that effect shall be provided to City along with the certificate of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences that City is an additional insured as a contracting party. The minimum coverage required by Subsection 12.b, above, shall apply to City as an additional insured. 2) For any claims related to this Contract, Contractor's insurance coverage shall be primary insurance with respect to City,its officers,officials,agents and employees. Any insurance or self-insurance maintained by City, its officers, officials, agents and employees shall be excess of Contractor's insurance and shall not contribute with it. 3) Coverage shall not be canceled, except after thirty (30) days' prior written notice has been provided to City. 7 f.Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Article 12. The endorsements shall be on forms acceptable to City. All certificates and endorsements are to be received and approved by City before the Work commences. However, failure to do so shall not operate as a waiver of these insurance requirements. City reserves the right to require complete,certified copies of all required insurance policies,including endorsements effecting the coverage required by these specifications at any time. g. All insurance procured and maintained by Contractor shall be issued by insurers admitted to conduct the pertinent line of insurance business in California and having a rating of Grade A or better and Class VII or better by the latest edition of Best Key Rating Guide. h. Contractor shall immediately notify City if any required insurance lapses or is otherwise modified and cease performance of this Contract unless otherwise directed by City. In such a case,City may procure insurance or self-insure the risk and charge Contractor for such costs and any and all damages resulting therefrom by way of set-off from any sums owed Contractor. i.Contractor agrees that in the event of loss due to any of the perils for which it has agreed to provide insurance, Contractor shall look solely to its insurance for recovery. Contractor hereby grants to City, on behalf of any insurer providing insurance to either Contractor or City with respect to the services of Contractor herein, a waiver of any right to subrogation which any such insurer may acquire against City by virtue of the payment of any loss under such insurance. The Workers' Compensation policy shall be endorsed with a waiver of subrogation in favor of City for all Work performed by Contractor, its employees, agents and subcontractors. Contractor shall obtain any other endorsement that may be necessary to effect this waiver of subrogation. j.Contractor shall require and verify that all subcontractors maintain insurance meeting all of the requirements stated herein. ARTICLE 13 Termination City, acting through its City Manager or his/her designee, reserves the right to terminate this Contract for any reason by giving five (5) days' written notice of intent to terminate to Contractor. Upon receipt of notice, Contractor shall immediately cease work, unless the notice provides otherwise. Should City terminate this Contract, City shall pay Contractor for services satisfactorily provided and all allowable reimbursements incurred to the date of termination in compliance with this Contract,unless such termination shall be for cause, in which event City may withhold any disputed compensation. City shall not be liable for any claim of lost profits. ARTICLE 14 Maintenance and Inspection of Records In accordance with generally accepted accounting principles, Contractor and its subcontractors shall maintain reasonably full and complete books, documents,papers, accounting records and other information (collectively, the "records") pertaining to the costs of and 8 completion of services performed under this Contract. During the term of this Contract and for a period of three (3) years after termination or completion of this Contract, City shall have the right to inspect and/or audit Contractor's records pertaining to the performance of this Contract at Contractor's office. Contractor shall make available all such records for inspection or audit at its offices during normal business hours and upon three(3)days' notice from City, and copies thereof shall be furnished if requested. ARTICLE 15 Compliance with Laws a. Contractor shall be knowledgeable of and comply with all local, state and federal laws pertaining to the subject matter hereof or in any way regulating the activities undertaken by Contractor or any subcontractor hereunder.. b. Contractor represents and warrants that it: 1) Has complied and shall at all times during the term of this Contract comply, in all respects, with all immigration laws, regulations, statutes, rules, codes, and orders, including, without limitation, the Immigration Reform and Control Act of 1986 (IRCA); and 2) Has not and will not knowingly employ any individual to perform services under this Contract who is ineligible to work in the United States or under the terms of this Contract; and 3) Has properly maintained, and shall at all times during the term of this Contract properly maintain, all related employment documentation records including, without limitation, the completion and maintenance of the Form I-9 for each of Contractor's employees; and 4) Has responded, and shall at all times during the term of this Contract respond, in a timely fashion to any government inspection requests relating to immigration law compliance and/or Form I-9 compliance and/or worksite enforcement by the Department of Homeland Security,the Department of Labor, or the Social Security Administration. c. Contractor shall require all subcontractors and/or subconsultants to make the same representations and warranties required by this Article 15 when hired to perfortn services under this Contract. d. Contractor shall,upon request of City,provide a list of all employees working under this Contract and shall provide, to the reasonable satisfaction of City, verification that all such employees are eligible to work in the United States. All costs associated with such verification shall be borne by Contractor. Once such request has been made, Contractor may not change employees working under this Contract without written notice to City, accompanied by the verification required herein for such employees. Contractor shall require all subcontractors and/or sub-consultants to make the same verification when hired to perform services under this Contract. e. If Contractor,or a subcontractor or subconsultant,knowingly employs an employee providing Work under this Contract who is not authorized to work in the United States, and/or . fails to follow federal laws to determine the status of such employee, such shall constitute a 9 material breach of this Contract and may be cause for immediate termination of this Contract by City. f.Contractor shall indemnify and hold City, its officials and employees harmless for, of and from any loss, including but not limited to fines, penalties and corrective measures, City may sustain by reason of Contractor's failure to comply with said laws, rules and regulations in connection with the performance of this Contract. ARTICLE 16 Governing Law and Venue This Contract shall be construed in accordance with and governed by the laws of the State of California and Contractor shall submit to the jurisdiction of California courts. Venue for any dispute arising under this Contract shall be in Orange County, California. ARTICLE 17 Integration and Amendment a. This Contract constitutes the entire agreement of the parties. No other agreement, oral or written,pertaining to the Work to be performed under this Contract shall be of any force or effect unless it is in writing and signed by both parties. Any Work performed which is inconsistent with or in violation of the provisions of this Contract shall not be compensated. b. Amendments to this Contract must be in writing and signed by both parties. ARTICLE 18 Notice Except as otherwise provided herein, all notices required under this Contract shall be in writing and delivered personally, by e-mail, or by first class mail, postage prepaid, to each party at the address listed below. Either party may change the notice address by notifying the other party in writing. Notices shall be deemed received upon receipt of same or within three (3) days of deposit in the U.S. Mail,whichever is earlier. Notices sent by e-mail shall be deemed received on the date of the e-mail transmission. CONTRACTOR" CITY" Fabric Wallcraft of California, Inc. City of Orange 1980 Petra Lane, Suite B. 300 E. Chapman Avenue Placentia, CA 92870 Orange, CA 92866-1591 Attn: Hector Villagomez Attn: Leslie Hardy Telephone: 714-792-3624 Telephone: 714-744-7287 E-Mail: hector@fabricwallcraft.com E-Mail: lhardy@cityoforange.org 10 ARTICLE 19 Claim Resolution City and Contractor agree that the claim resolution process applicable to any claim by Contractor in connection with the Work provided herein shall be subject to the procedures set forth in California Public Contract Code Section 9204, attached hereto as Attachment No. 2, and incorporated herein by this reference. ARTICLE 20 Counterparts This Contract may be executed in one or more counterparts,each of which shall be deemed an original, but all of which together shall constitute one and the same instrument. Signatures transmitted via facsimile and electronic mail shall have the same effect as original signatures. CITY" CITY OF ORANGE, a municipal corporation By: ck Otto, City Manager CONTRACTINSURANCE APPROVED BY: Mary E. nning Senior As istant City Atto ey CONTRACTOR" FABRIC WALLCRAFT OF CALIFORNIA, INC., a California corporation Note: Signature of Chairman of the By: Board,President or Vice President is Printed ame: Bart Moore requiredJ Title: President Note: Signature of Secretary,Assistant By: Secretary, Chief Finarccial Officer or Printed Name: lanet auterjung Assistant Treasurer is also requiredJ Title: Secretary 11 EXHIBIT "A" CONTRACTOR'S PROPOSAL Beneath this Sheet] Exhibit A-Page 1 of 5 From: Paul Miller<pmiller@cityoforange.org> Sent:Thursday, November 14,2019 9:48 AM To: Hector<Hector@fabricwallcraft.com> Subject: City of Orange--Shaffer Park Hector, As you know,the City of Orange recently completed a Park renovation of Shaffer Park, 1930 N.Shaffer Ave. You and I met back in June and you provided a proposal to remedy concerns about the echo in the new community room. Since that time,the City has consulted with Acoustics Group Inc to give us an evaluation and recommendations. Attached is the recommendation from Acoustics Group Inc, photos of the community room,and a floor plan. Please provide a proposal to complete the work as described in option 1 in the report from Acoustics Group Inc. Please contact me with any questions. I look forward to seeing your proposal. Thank you, Paul Miller Park Maintenance Supervisor City of Orange 714-532-6472 Office U. Ex 'bit A-P e f 5 YOURSOUNDSOLUTIONI./'" V/ L L C R 1 F Y 1980 Petra Lane,Suite B,Placentia,CA 92870 800-615-0516(714)792-3624 Fax(714)792-3634 Committed to Life Safety" CSLB No.799190*SBE No.62549 www.fabr i cwal Icraft.com March 10,2020 Via Fax No. Leslie Hardy City of Orange 230 E. Chapman Ave, Orange, CA 92866 Re: City of Orange--Shaffer Park Dear Leslie: I Enclosed please find our Proposnl#9955 covering FabriTrak System for the 1930 Shaffer Community room. Once you have had un opportunity to review the Proposal,please sign and return the copy of the Proposnl indicating your acceptance. Conditions that should be completed prior to the FabriTrak installation nre as follows; I 1. Build-in millwork 2. Ceiling grid system 3. All electrical work complete 4. Floor and base installed 5. Windows,doors and trim 6. Painted nreas abutting FabriTrak 7. Floor coverings(carpet mny be an exception) 8. Other miscellnneous finishes 9. Ambient temperatures and humidity maintained prior to fabric installation Our Scheduling Department will coordinate with your Job Superintendent on the readiness of the project. This proposal j is based upon one continuous installation. Thank you for your assistance and cooperation in enabling us to provide you with a product that will meet the high standnrds of both your company and Fabric WaIlCraft of California,Inc. Should you have any questions,please don't hesitate to contact me. Sincerely I H.V GI Hector Villagomez Project Manager/Estimator i i Exhibit A-Page 3 of 5 FABRIC WALLCRAFT of California,Representntive: Inc. Hector Villagomez 1980 Petra Lane,Suite B pROPOSAL/COP ITRA 1"Plncentiu,CA 92870 NO. 9955 714)792-3624 (714)792-3634 Fax CSLB No. 799190*SBE No.62549 TO: City of Orange JOB NAME: Shaffer Community Room ADDRE55 230 E. Chapman Ave, JOB LOCATION: Orange Orange,CA 92866 SPECIFIER: A Leslie Hardy JOB PHONE: PHONE: 714-744-7287 FAX: DATE: March 10,2020 SOUND-ABSORBING WALL PANELS Furnish and Instull 1"Square Edge FabriTRAK System as follows: 1. Install site fabricnted FabriTRAK System per emnil request by Leslie Hardy on 3/4/2020 2. Install acoustic wall pQnels covering approximntely 13005QFT. 3. Panel Cores to be 1"acoustic infill(N.R.C.0.85) 4. Fabric to be Guilford of Maine Studio 54 Ross 7044 for lower panels and Anchorage 2335 White 2664 for upper wall panels. 5. Includes prevailing wage and Certified payroll. 6. Work to be done during normal business hours. Excludes: Acoustic ceiling panels. Committed to Life Safety-FabrTmk meets cument AST'M E-84-08a incarparating E 2573-07n(or the latest version thereofl. Excludes.'Union Labar,Prefabricated Panels,Electrical,Lighting,Blocking,Shop drawings,Shimming,Attic stock,Direcf opply,Doors,Laba and Moterial for liners due to tronsparent fabrics and allother areas not in this proposal. Limited Warran Exc/uded For Fobrics We,the Installation Company,propose to furnish material nnd labor complete in accordance with the above specifications for Twenty-Five Thousand Seven Hundred Eighty-Two and 00/100 ******Dollars$ 25,782.00 Terms:50%deposit due upon approval of proposal/contrnct. Remaining balance due 10 days after completion. Installation Co.'s limited warranty is attached with this Authorized Signature: Proposal. Neither Installation Co.,nor Manufacturer grant any wurrnnty express or implied,including merchantability of fitness for a U' particular purpose. Note:(Cancellntion Provision),All cancellations are non-refundable Hector Villagomez Project Manager/Estimator Note:(Deadline Provision);This proposal may be withdrawn by us if not accepted by: 4/17/2020 Date of Acceptance: Signature: Note:The above prices,specifications and conditions nre sntisfactory and hereby accepted. You ore authorized to do this work as proposed. Payment will be made as detailed above. If payment is not received when due,customer agrees to pay interested at the rate of 1 Title; 1/2%per month and all cost af collections including,but not limited to, reasonnble attorney fees. Exhibit A- age 4 of 5 YOUR SOUND SOL UTION L`"' W A L L C R A F T 1980 Petra Lane,Placentia,CA 92870 ASoundSolution..WithoutComprom8e'" 714-792-3624 FAX 714-792-3634 CSLB No. 799190 www.fabricwallcrnft.com STANDARD FORM OF WARRANTY AND DISCLAIMER General Client Name Contractor: ATTN: Address 1 Address 2 Project:Project Name Project Address 1 ProjectAddress 2 Date of Completion: We, the undersigned, hereby warrant and/or guarantee that the FabriTRAK acoustical wall system installation for the above-mentioned project has been performed in accordance with the Contract Documents and that the work provided will fulfill all the warranty and/or guarantee requirements included in the Contract Documents. We hereby agree to replace at our sole cost and expense any and all materials (except fabric) adjudged defective or improperly installed as well as guarantee the Owner and Contractor against liability, losses or to any or all parts of the work arising from said installation during a period of One (1) Year. If, however, the period of guarantee is stipulated in excess of One (1) Year by the Contract Documents,the Subcontractor shall be bound as specified. All guarantees will inure to the benefit of the Contractor, Owner, their successors or assigns, including equipment warranties,ordinary wear and tear and unusual abuse or neglect expected. In the event of our failure to comply with the above-mentioned conditions within a reasonable time as determined by the Owner, after being notified in writing, We, the undersigned, do hereby authorize the Owner to have said defects, repairs and/or replacements made good and We will refund to the Owner on demand all costs and charges,including all collection costs and reasonable attorney's fees. Date:Local representative to be contacted FABRIC WALLCRAFT OF CALIFORNIA,INC. for maintenance,repair and/or replacement service: Hector Villagomez,Project Manager/Estimator Hector Villagomez,Project Manager/Estimator 714) 792-3624 CA CSLB No.779190 hector@fabricwallcraft.com Exhibit A-Page 5 of 5 SCHEDULE 2.5 LIMITED WARRANTY AND DISCLAIMER Statement of Limited Warranty Fabric Wallcraft of California, Inc. ("We", "Us" or "Our") provides this Limited Warranty to Our customer, Company Name("You"or"Your"). The FabriTRAK Product(s)("Product(s)")We supplied will be reasonably free from Defect(s)under normal use for a Warranty Period of Five(5)Years("Warranty Period"). The Warranty Period begins on the date installation is completed; if installation occurs in phases, a separate Warranty Period will run for each phase beginning on the date installation is completed for the respective phase. Under this Limited Warranty, the terms "Defect(s)" & "Defective" are expressly limited to mean that Product(s)supplied&installed by Us is not fit for the ordinary& intended purpose. Defective Product(s)or workmanship will be repaired or replaced (as We deem appropriate to remedy the Defect(s))by Us at no charge to You for part(s).That is the sole remedy for breach of this Limited Warranty.This Limited Warranty shall be void if We determine that the Defect(s) resulted from improper use of the Product(s)or if someone other than Us) attempted to repair and/or replace the Defect(s). This Limited Warranty only applies to Defect(s)brought to Our attention by You during the Warranty Period. After Expiration of the Warrantv Period After expiration of the Warranty Period,We will be happy to service the Product(s)&installation at Our standard rates in effect at that time. Chanainq Your Fabric Decor If You desire to change Your fabric decor,We will remove Your existing fabric surface&replace it with new fabric at one-half of Our then current charge for installation. LIMITED WARRANTY IS SOLE AND EXCLUSIVE WARRANTY THIS LIMITED WARRANTY CONSTITUTES THE SOLE & EXCLUSIVE WARRANTY, WITH RESPECT TO THE PRODUCT(S) & THEIR INSTALLATION. WE, INCLUDING OUR SUPPLIERS AND/OR DISTRIBUTORS, DO NOT MAKE, AND HEREBY DISCLAIM, ANY AND ALL OTHER REPRESENTATIONS OR WARRANTIES OF ANY KIND OR NATURE WHETHER EXPRESSED OR IMPLIED (EITHER IN FACT OR BY OPERATION OF LAW), INCLUDING ALL WARRANTIES OF TITLE, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR NON-INFRINGEMENT OF THIRD PARTIES' RIGHTS. THIS LIMITED WARRANTY ONLY PERTAINS TO DEFECT(S) (AS DEFINED IN THIS DOCUMENT)AND DOES NOT COVER ANY OTHER PROBLEMS (such as claims and/or damages relating to or arising from fabrics -whether supplied by You or by Us at Your request; or accidents, misuse and/or abuse of the Product(s), or natural causes by unforeseen problems such as earthquakes,fire,floods and/or any damages done by others). TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, WE, INCLUDING OUR SUPPLIERS AND/OR DISTRIBUTORS, IN NO EVENT SHALL BE LIABLE FOR ANY INCIDENTAL, SPECIAL, CONSEQUENTIAL, AND/OR PUNITIVE DAMAGES, REGARDLESS OF WHETHER ANY CLAIM IS BASED UPON ANY CONTRACT, TORT, OR ANY OTHER CAUSE OF ACTION, INCLUDING ANY LEGAL OR EQUITABLE THEORIES. TO THE EXTENT APPLICABLE LAW PROHIBITS THIS LIMITATION, YOU ACKNOWLEDGE THAT IN NO EVENT SHALL OUR TOTAL LIABILITY TO YOU FOR ALL DAMAGES IN ANY ONE (1)OR MORE CAUSES OF ACTION EXCEED THE TOTAL AMOUNT PAID BY YOU FOR THE PRODUCT(S) AND INSTALLATION. THIS LIMITATION SHALL APPLY REGARDLESS OF THE FAILURE OF ANY ESSENTIAL REMEDY. THIS ALTERNATIVE DAMAGE LIMITATION MAY NOT APPLY (IN SOME STATES) TO DEATH OR PERSONAL INJURY CLAIMS CAUSED BY OUR NEGLIGENCE. Dated By: Hector Villagomez, Project Manoger/Estimntor CSLB No. 799190 EXHIBIT "B" ACOUSTIC PLANS AND SPECIFICATIONS Beneath this Sheet] Exhibit B-Page 1 of 21 ACOUSTZCS m Consultants n Acoustics,Nofse Yzbratioa September 6, 2019 Paul Miller City of Orange Community Services Department 230 E, Chapman Ave Orange, CA 92865 Subject:Acoustical Study of the City of Orange Multi-Purpose Room located at 1930 N. Shaffer St. in Orange, CA. Dear Mr. Miller: Acoustics Group, Inc., (AGI) was retained by the City of Orange to address acoustical issues within the Multi-Purpose Room located in Shaffer Park. AGI conducted a site visit, conducted acoustical measurements, analyzed the room acoustics, and provided noise reduction recommendations. The following provides a summary of our findings: ROOM ACOUSTICS Room acoustics are an integral part of a room design and daily operation of Shaffer Park's Multi-Purpose Room. The combined reverberant effects of interior noise from music, speech, and people talking can greatly affect the acoustics within the room. This study was conducted to determine the adequacy of the interior acoustics with respect to industry standards for acceptable multi-purpose room acoustics. Noise control measures have been identified to improve the room acoustics within the evaluated space. September 6,2019 ACOUSTZCS T,IN. 1 Phone 877.595.9988 For City of Orange Use Only Exhibit B-Page 2 of 21 i Acoustica/Study for City of Orange Multi-Purpose Room in Shaffer Park i A-WEIGHTED NOISE LEVEL Noise is most often defined as unwanted sound. Although sound can be easily measured, the perceptibility is subjective and the physical response to sound complicates the analysis of its impact on people. People judge the relative magnitude of sound sensation in subjective terms such as "noisiness" or "loudness." Sound pressure magnitude is measured and quantified using a logarithmic ratio of pressures, the scale of which gives the level of sound in decibels (dB). The human hearing system is not equally sensitive to sound at all frequencies. Therefore, to approximate this human, frequency-dependent response, the A-weighting filter system is used to adjust measured sound levels. The A-weighted sound level is expressed in "dBA" or "dB(A)." Figure 1 provides typical A-weighted sound levels measured for various sources, as well as people's responses to these levels. When sound is measured for distinct time intervals, the statistical distribution of the overall sound level can be obtained during that period. The energy-equivalent sound level (Leq) is the most common parameter associated with such measurements. The Leq metric is a single-number noise descriptor which represents the average sound level over a given period of time, where the actual sound level varies with time. Lmax, Lmin, and Lxx are also common noise descriptors. Lmax and Lmin are the maximum and minimum noise levels, respectively, and Lxx, known as a statistical sound level, is the time-varying noise level which would be exceeded xx percent of the time. REVERBERATION TIME Reverberation is the prolongation of sound after the source has stopped. RT60 is a measure of the amount of absorption within a space or the "liveliness" of the room. Reverberation time (RT60), for a given frequency, is the number of seconds it takes for the average sound pressure level in a room (originally in a steady state) to decrease 60 dB after the source is stopped. Table 1 shows the recommended reverberation times for a Multi-Purpose Room. An ideal RT60 for a Multi-Purpose Room is 0.6-0.8 seconds. Table 1. Recommended Reverberation Time T e of Occu anc /Activit Reverberation Time Multi-Pur ose Room 0.6-0.8 September 6,2019 ACOUSTZCS RO J,INaC. 2 Phone 877.595.9988 For City of Orange Use Only Exhibit B-Page 3 of 21 i Acoustical Study for City of Orange Multi-Purpose Room in Shaffer Park Y __. ..,_. ._, n._ _._______a__e____._n=_ . J E Ett ne Hannfuliy loud r_ _ S tatgun`ring `- . ; Pa n Tbr+h td f un ert ap gular+posure over n inuteR+ck Musi nd 1 isks permanent he ring loss Vo rr ore than t minuleGr"b g''tt'Iltk e rp,sure recammended l.awmmotuer Q;% Annoying Average C ty Traffic ititolse `# ` g'! ` Annoyin-inter eres 1, Wifh COnVtI'Sati011 i Y. V tIItlltl C dI1 C f'-Q Telephane use Difficult t y ; 7rr . Normal Conver atl n 'i' Q Camfonable r tr Qu f Q6fice 50 Quiet Refri erata r Hu nin, 4D r a w r 3o v Qu t 1 i a", RustUng Leav 20 n Jus#Audible 1 Q IormaY Breathing Q Threshuld of Hearing e a i Source: Melvilfe Branch nnd R.Beland,1970. EPA/ONAC S50/9-74-004,March 1974. Figure 1. Typical A-weighted Sound Levels from Indoor and Outdoor Noise Sources. September 6,2019 ACOUSTZCS Zfg..77,3LIv 7<C. 3 Phone 877.595.9988 For Cify of Orange Use On/y Exhibit B-Page 4 of 21 Acoustica/Study for City of Orange Multi-Purpose Room in Shaffer Park RT60 MEASUREMENTS &ASSESSMENT AGI conducted RT60 measurements within the Multi-Purpose Room to quantify the existing reverberation times within the space. The RT60 times were measured using a Bruel & Kjaer Model 2270 Real-Time Analyzer. Two loudspeakers were used to generate a high level "pink" noise spectrum in the room. The loudspeakers were pulsed multiple times and the reverberation times were measured at 30 Iocations within the space. The average existing RT60 times are summarized below in Table 2. Refer to the Appendix for the measurement data. Table 2. Measured RT60 Times Ideal RT60 Octave Band Center Fre uenc Range ROOIIA 63 125 250 500 1000 2000 4000 8000 Seconds Assessment Multi- Purpose 3.3 3.6 5.1 6.1 5.8 5.3 4.6 2.8 0.6-0.8 Excessive Room Source: https://www.sciencedirect.com/topics/engineering/reverberation The measured existing RT60 times for the rooms are well above the ideal range of 0.6-0.8 seconds within the frequency bands measured. Noise control measures in the form of adding room absorption would be needed to improve the room acoustics of each space. ABSORPTION ANALYSIS The acoustical absorption of the room was analyzed using AGI's in-house acoustical model and industry standard algorithms for room acoustics. Two noise control options were analyzed for the Multi-Purpose Room. Option 1 entails the installation of acoustical wall panels and Option 2 entails the installation of Option 1 with additional absorptive ceiling blades (clouds). For Option 1, the addition of approximately 800 square feet of absorptive acoustical wall panels with an NRC of 0.85 would provide up to a 5.6 dB noticeable improvement over the existing conditions. Option 2 would include Option 1 plus an additional 1,285 square feet of absorptive ceiling blades with an NRC 1.05 to provide up to a 9.8 dB highly noticeable improvement. Table 3 summarizes the absorption coefficients and improvements over the existing conditions for each room and option. Cyril M. Harris, Handbook of Acoustical Measurements and Noise Control, 1998. September 6,2019 ACOUSTZCS Il J, Ci_ 4 Phone 877.595.9988 For City of Orange Use Only Exhibit B-Page 5 of 21 Acoustical Study for City of Orange Multi-Purpose Room in Shaffer Park Table 3. Summa of Absor tion Anal sis for Multi-Pur ose Room Octave Band Center Frequency ROOM QTY 125 250 500 1000 2000 4000 Im rovement' MULTI-PURPOSE ROOM Existin RT60 3.3 3.6 5.1 6.1 5.8 4.6 Option 1:Add 800 sq.ft Acoustical Wall Panels with Absorption Coeff. (0.85 NRC) 800 0.14 0.27 0.8 1.11 1.14 1.14 5.6 dB O tion 1 RT60 2.7 2.7 1.4 1.1 1.1 1.0 Noticeable Option 2:Option 1 & Add 1,400 sq.ft Absorptive Ceiling Blades with Absorption Coeff. (1.05 NRC) 1,285 0.09 0.68 1.2 1.18 1.12 1.05 9.8 dB Highiy O tion 2 RT60 2.2 0.9 0.5 0.5 0.5 0.5 Noticeable Note: ' -Acoustical improvement calculated from average RT60 times between frequency bands of 250 Hz to 2,000 Hz ROOM ANALYSIS Speech intelligibility is important to clearly understand and communicate with people within a room. Factors that can affect speech intelligibility levels are how loud someone is speaking, the amount of reverberation in the room and the distance from the talker to the listener. Assuming 10 people are seated at a table and are having a conversation, the typical A-weighted sound level would be approximately 67 dBA at 3-feet. Maintaining a spacing of 7 to 10 feet between tables would minimize the speech interference from. adjacent conversations. Based on the room's floor dimensions, the maximum number of people in the Multi-Purpose Room at any one time should be limited to approximately 80 people before speech intelligibility begins to diminish. NOISE CONTROL RECOMMENDATIONS The following noise control measures are identified to improve the room acoustics within the Multi-Purpose Room. September 6,2019 ACOUSTZCS U,IN_ 5 Phone 877.595.9988 For City of Orange Use Only Exhibit B-Page 6 of 21 Acoustical Study for City of Orange Multi-Purpose Room in Shaffer Park 1. Install absorption to the room to minimize the liveliness of the space. Option 1 should be installed and evaluated. If determined necessary, increments of Option 2 should be installed thereafter. The following quantities of absorption with minimum absorption coefficients should be installed on the walls and/or ceiling. Absorption Coefficient at Octave QTY Band Center Frequency, Hz Frequency, Hz (sq ft) NRC 125 250 500 1k 2k 4k OPTION 1: Acoustical Surfaces, Inc. STOP Perforated g00 0.85 0.81 0.97 0.78 0.99 1.07 1.02 Vinyl Acoustical Wall Panels or Acousfical Equivalent OPTION 2: Option 1 plus Armstrong Soundscapes Ceiling Blades 1,285 1.05 0.09 0.68 1.2 1.18 1.12 1.05 or Acoustical Equivalent 2. Absorptive wall panels should be installed and if necessary, incorporate a combination of absorptive ceiling blades oriented perpendicular or parallel to the ceiling surface as shown in Figures 2 and 3. rw r r `f' f . j """" a` x P `` . ,.. F ;;fltfr%' r z t ,/",. '' t s '.i . ;.,,:.- a aa a a {.. r. r; a ` " a....1 n , ;+- E r Figure 2. Absorptive Wall Panels Figure 3. Absorptive Ceiling Blades 3. All materials should be installed per manufacturer specifications. 4. Refer to the Appendix for the Manufacturer's Data. 5. A registered engineer should be consulted to ensure that the modifications meet all safety and building codes. Septem6er 6,2019 iCOUSTZCS ..TT, INC. 6 Phone 877.595.9988 For City of Orange Use Only Exhibit B-Page 7 of 21 Acoustical Study for City of Orange Multi-Purpose Room in Shaffer Park i CONCLUSION AGI has conducted a noise study of Shaffer Park's Multi-Purpose Room in Orange, CA. RT60 measurements were performed to quantify the reverberation time within the space. A comparison with Industry Guidelines for RT60 indicated that the room is overly reverberant for the current uses. An analysis of the room acoustics was performed, and alternative noise control measures have been recommended to reduce the reverberation times within the space. An Architect or registered engineer should be consulted to ensure that the recommended modifications comply with all safety and city code requirements. Please contact Mr. Robert Woo at 877-595-9988 if you have any questions regarding this report. Sincerely, ACOUSTICS GROUP, INC. K/— 1?d Robert Woo Omar Ramos Principal Consultant Associate Consultant September 6,2019 ACOUSTZCS R03J, NC. 7 Phone 877.595.9988 For City of Orange Use Only Exhibit B-Page 8 of 21 Acoustical Study for City of Orange Multi-Purpose Room in Shaffer Park APPENDIX Measurement Data /Acoustical Analysis Manufacturer's Specifications September 6,2019 ACOUSTZCS CT,IP4C. 8 Phone 877.595.9988 For City of Orange Use Only Exhibit B-Page 9 of 21 Acoustical Study for City of Orange Multi-Purpose Room in Shaffer Park Measurement Data / Acoustical Analysis September 6,2019 ACOUSTZCS G D JP,Z3 T. Phone 877.595.9988 For City of Orange Use On/y Exhibit B-Page 10 of 21 MULTI-PURPOSE ROOMANALYSIS Room: MULTI-PURPOSE ROOM Date: 8I9/2019 Nominal Room Dimensions: Length,ft: 51 Wall Area-Openings,sq ft: 874 Width,ft: 37 Floor Area,sq ft: 2068 Total Surface Zp98 Wall,sq k: Height,ft: 73 Clg Area,sq ft: 2298 Surtace Arez 2068 Long Wail Area,sq ft: 514 Room Volum 24723 New Wall Panel Area,sq ft: 800 Openings,sq ft: 712 New Ceiling Panel Area,sq it: 1285 Octave Band Center Frequency a,verage Improvement Frequency: 125 250 500 1000 2000 4000 Existing Conditions RT60 Average: 3.6 5.1 6.1 5.8 5.3 4.6 5.4 Absorption,Ft Sabines: 334.5 235.9 199.8 208.8 229.3 265.0 A=0.049'(V olume/RT60) Average Absorption Coefficient: . 0.162 0.114 0.097 0.101 0.111 0.128 NSurface Area) Alternative Option 1:Acoustical Surfaces,Inc.STOP Pertorated Vinyl Acoustic Wall Panels New Wall Panels Absorptive Coefficient: 0.14 '0.27 0.8 7.11 1.14 1.14 New Wall Absorption,Ft Sabines: .112.0 216.0 640.0 888.0 912.0 912.0 Old Room Absorption Ft Sabines: 334.5 235.9 199.8 208.8 229.3 265.0 Total New Room Absorption Ft,Sabines: 446.5 451.9 839.8 1096.8 1141.3 1177.0 Option 1 RT60: 2.7 2.7 1.4 1.1 1.1 1.0 7.5 5.6 Alternative Option 2:1"Armstrong SoundSoak Acoustical Wall and SoundScapes Blades New Wall Panels Absorptive Coefficient: 0.14 027 0.8 1.11 1.14 1.14 New Wall Absorption,Ft Sabines:112.0 216.0 640.0 888.0 912.0 912.0 New Ceiling Clouds Absorptive Coefficient: 0.09 0.68 1.2 1.18 1.12 1.05 New Ceiling Clouds Absorption,Ft Sabines:115.7 873.8 1542.0 1516.3 1439.2 1349.3 Old Room Absorption Old Flooring Ft Sabines: 334.5 235.9 199.8 208.8 229.3 265.0 Total New Room Absorption Ft,Sabines: 562.1 1325.7 2381.8 2613.1 2580.5 2526.3 Option 2 RT60: 2.2 0.9 0.5 0.5 0.5 0.5 0.6 9.6 Exhibit B-Page 11 of 21 i Acoustical Study for City of Orange Multi-Purpose Room in Shaffer Park Manufacturer's Specifications September 6,2019 ACOUSTZCS R, ZN. Phone 877.595.9988 For City of Orange Use Only Exhibit B-Pa e 12 of 21 Acoustical Surfaces, Inc. SOUNDPROOFING,ACOUSTICS, NOISE&VIBRATION CONTROL SPECIALISTS 123 Columbia Court North •Suite 201 •Chaska, MN 55318 952) 448-5300 •Fax(952) 448-2613 •(800) 448-0121 Email: salesQacousticalsurfaces.com Visit our Website: www.acousticalsurfaces.com TM we Identify and S.T.O.P. Your Noise Problems Noise ST.O.P.° Perforated Acoustic Vinyl For Easy Cleaning and Durabilitys `'°_ ; s.— ., in a High Performace Acoustical Wall Covering Durable High Performance Acoustics; g A , . : Washable' Noise S.T.O.P.T"^ perforated acoustical vinyl can be used in cafeterias, restaurants and lunchrooms where washability and periodic maintenance is desirable. MATERIAL: Easy clean microperforated acoustical vinyl available in subtle textures and colors.Also available in standard perforated and microperforated' APPLICATIOIVS: Great for home theater,home studio, multi-purpose rooms, healthcare facilities,auditoriums, music rooms, offices and anyplace you need high_durability and easy clean acoustical facings' SIZE: Custom max size 4' x 10' COLOR: White FLAMMABLILITY: ASTM E-84 Class 1-A, Nonflammable Continued on page 2 Soundproofing Products•SonexTM'Ceiling 8 Wall Panels•Sound Control Curtains•Equipment Enclosures•Acoustical Baffles&Banners•Solid Wood&Veneer Acoustical Ceiling&Wall Systems Professional Audio Acoustics•Vibration&Damping Control•Fire RetardantAcoustics•Hearing Protection•Moisture 8 Impact Resistant Products•Floor Impact Noise Reduction Sound Absorbers•Noise Barriers•Fabric Wrapped Wall Panels•Acoustical Foam(Egg Crate)•Acoustical Sealants&Adhesives•Outdoor Noise Control•Assistive Listening Devices OSHA,FDA,ADA Compliance•On-Site Acoustical Analysis•Acouslical Design 8 Consulting•Large Inventory•Fast Shipment•No Project too Large or Small•Major Credit Cards Accepted Exhibit B-Page 13 of 21 Acoustical Surfaces, Inc. SOUNDPROOFING,ACOUSTICS, PVOISE&VIBRATION CONTROL SPECIALISTS 123 Columbia Court North •Suite 201 •Chaska, MN 55318 952) 448-5300 •Fax (952) 448-2613 •(800) 448-0121 Email: sales@acousticalsurfaces.com Visit our Website: www.acousticalsurfaces.com TM we Identify and S.T.O.P. Your Noise Problems F.IBRIC PANEL S.T.O.P.'' Web Core Microperforated Vinyl Facings Description: Total Weight(oz./lin.yd.)54"width average...........................................................................................................12.0 TotalWeight(oz.11in.yd.)................................................................................................................................................8.0 Vin I Wei ht oz.11in. d. 5.0Y9 Y )............................................................................... FabricWeight(oz./lin.yd.).............................................................................................................................................3.0 Fabric type and count.....................................................................................:..................Polyester Sheeting(22 x 26) Totalaverage thickness................................................................................................................................................018 Light Reflectance Value(LR Value)is reported as average percent reflectance as measured by ASTM E-97 test method. Web Core was applied to 1"thick 7PCF rigid acoustical fiberglass on a#4 mounting and tested for noise reduction coefficient.The result was 0.80 NRC. This pattern satisfactorily passes physical requirements for type I as listed in G.S.A. Federal Specification CCC-W-408A.(Federal Specification CCC-T-191 details test procedures required.) Fire Resistance: This pattern meets the requirements of National Fire Protection Association(NFPA) Class A or 1." FlameSpread...........................................................20 Smoke Developed...................................................65 Note:The numerical flame spread rating and other test results referenced herein are not intended to reflect hazards presented by this or any other material under actual fire conditions. Stain Resistance: ASTM D-1308, METHOD B-24 hour exposure followed by washing with soap and water.)The following staining agents resulted in NO Stain on the material when using the aforementioned test method. Ethanol Pencil Tea 10%Hydrochloric Acid Vinegar Mayonnaise Milk 10%Sodium Hydroxide Detergent Bleach Coca-Cola Oleic Acid Lemon Juice Crayon Port Wine 10%Ammonia Coffee Ketchup Hydrogen Peroxide Cleaning Procedures: Common dirt and stains may be removed from Web Core products by rubbing lightly with a moistened cloth,sponge or stiff bristle brush using a mild soap,detergent or non-abrasive cleanser. It is important that clean water be used on a constant basis and that the material be towel dried. CAUTION!Strong organic solvents(such as ketones)and harsh abrasive cleaners are not recommended.These materials will cause dulling,discoloration or softening of the vinyl,thus causing permanent damage. Soundproofing Products•Sonex""Ceiling&Wall Panels•Sound Control Curtains•Equipment Enclosures•Acoustical Ba(fles&Banners•Solid Wood&Veneer Acoustical Ceiling&WaII Systems Professional Audio Acoustics•Vibration&Damping Control•Fire Retardant Acoustics•Hearing Protection•Moisture&Impact Resistant Products•Floor Impact Noise Reduction Sound Absorbers•Noise Barriers•Fabric Wrapped Wall Panels•Acoustical Foam(Egg Crate)•Acoustical Sealants 8 Adhesives•Ouldoor Noise Control•Assislive Listening Devices OSHA,FDA,ADA Compliance•On-Site Acoustical Analysis•Acoustical Design&Consulting•Large Inventory•Fast Shipment•No Project too Large or Small•Major Credit Cards Accepted Exhibit B-Page 14 of 21 SOUNDSCAPES° BladesTM Linear Acoustical Panels fine texture v j .: Y' jH j~ y r v t T d TM ia. 1 i y ! 5., ' . 11 r e y, r+: 4_ a.-." y"` n".. _ - ' S . ' e^ .+ a I` '` 1. .` 1,, :—.` r` r a i Wall appiication t , i it4 m. c- »..c ± ` s`' i . t tis , i , t `y,,f lus ca abilities r } s 3= i J' 0 x,. r 3= ', s.. r r e e- j. y, t ;$ f I x r t r n+ E.. i. v ,. y A 1 . g, ;< S. . Y:... . m:.;'. - . . . armsVongceilings.com/capabilities ; See more photos at: Custom SoundScapes Blades'",Rectangular in varying lengths and depths armsVongceilings.com/photogallery ; Acoustical v_ertical panels_reduce reverberation time inyouur_space,now with three ways to install on ceilings and,walls: KEY SELECTION ATTRIBUTES Three installation options for maximum . Linear,upscale visual ceiling and wall design flexibility Seismic-tested From standard suspension system Integrated hardware From individual cable suspension Direct-attach method using Axiom • Custom panel options available Wall Molding Add scrim to top edge as a Excellent acoustical absorption— premium option 1.38 Sabins/SF Twenry vertical panel sizes and shapes P e= COLORS Due to printing IimitaUons,shatle may vary from actual product q7 i';4 1 ' F, , I `. \.,. w.. • S White Shell Pale Lemon Pecan Sky Moss Stone Reef Lagoon Plum Cranberry Kiwi Tangerine Black Custom Cotors WH) (SH) (LA (PC) (SIQ (MS) (S (Rt (LA) (PM) (CM (KW) RG) (BI Available For premium and custom capabilities,contact TechLine at 877 276-7876. Coordinating Calla and Lyra DESIGNFIex"'colors available! 74 TechLine 877 276 7876 mstrong armstrongceilings.com/soundscapes CEILING&WALL SOLUTIONS 71 Q/ RECYCLED Calculate LEED contribution at Exhibit B-Page 15 of 21 CD armstrongceil s.com/greengenie SOUNDSCAPES° BladesTM Linear Acoustical Panels fine texture LUCATION OEPENDENT LAYOUT OPTIONS Install to Standard 15/16" Direct-Attach Methad using Suspension System Axiom Wall Molding t k f Vertical Panel 8'Wavelength Concave 7240—7.5 x 46 x 2" Vertical Panel 8'Wavelength Convex 7241—10.5 x 46 x 2" Vertical Panel S'Wavelength Concave 7240-7.5 x 46 x 2" Vertical Panel 8'Wavelength Wave 7244—10.5 x 94 x 2" q.. -. J p J, Vertical Panel Rectangular 7192—16 x 46 x 2" Vertical Panel Rectangular 7192—16 x 46 x 2" Vertical Panel Rectangular 7193—16 x 94 x 2" O c v i no c, q Vertical Panel Rectangular 7190—5 x 46 x 2" Vertical Panel 4'Wavelength Wave 7247—22 x 46 x 2" Vertical Panel Rectangular 7191—5 x 94 x 2" Vertical Panel 4'Wavelength Wave 7246—10 x 46 x 2" ao CUSTOM PANEL DESIGN EXAMPLES mv R 125 Min Radius for all 90°Inside Corners a;=;;;;:,:s,,s:,......., z,:.i.i z=;s„ ss:.,,, ., E".°:!;:;<2;%:i's:,, z:a:c. i 1.0 Min Radius anywhere other than 90°Inside Corners TechLine 877 276 7876 rmstrong°75armstrongceilings.com/soundscapes CEILING&WALL SOLUTIONS pI RECYCLED Calculate LEED contribution at Exhibit B-Page 16 of 21 o CO E armstrongceil s.com/greengenie SOUNDSCAPES° BladesTM l ,_ l Linear Acoustical Panels fine texture LOCATION UEPENOENT VISUAL SELECTION Shown in elevation view PERFORMANCE Dots represent high level of pertormance. O L t 'O'O++ — N ! O f — O y O- y t6 ' V p Item Description Dimensions x n. v s 3 E N N No.• Inches)N LL ' I White Inherent Humi- SOUNDSCAPES Blades'"Vertical Panel Rectangular Only) Guard+ a;rr,— - L 7190__ Vertical panel 5 X 46 X 2" r"'-24'-"' 1 2.2 0.90 Class • • • • • • J Rectangular s• A i ae• f p.... ......._..._ ........._.....r... ._.._..._..._.._... . ............... _...._..._ .1. ...... 7191__ Vertic8l anel 5 X 94 x 2" >>°-t—za•—y--za•—--za•—r-n• 4.5 0.90 CI85S • • • • • • Rectangular 5• A 3920__ Vertical panel 10 x 46 x 2" '--24'"' 4.4 0.90 Class • • • • • • T A io• 1 f 46 a 3927 _ Vertical panel 10 x 94 x 2" ''-2°'-2°°-—Z"'—n' 9.0 0.90 Class • • • • • • T A o• i sa. y 7792__ VertiCal panel 16 x 46 x 2" r"' 24'-"' 7.0 0.90 Class • • • • • • Rectangufar A 76' 1 46" 7193__ VeRical panel 16 x 94 x 2" ->>'-t—za•——za•——za•—r-n•-I 14.4 0.90 Class • • • • • • Rectangular A e• 1 za..................._i r..._._......................:.__........._.. 3922__ Vertical panel 22 x 46 x 2" - 9.7 0.90 Class T A zz. 1 d6.I NOTE:Scrimmed top etlges offeretl as"Premium."EXAMPLE:BPAS3920S6WH,where"S6"=scrimmed all sides. Add 2-letter color suffix to entl of item number(e.g.,3920 W H=White) 7 TechLine 877 276 7876 mstrong armstrongceilings.com/soundscapes CEILING&WALL SOLUTIONS 7 iQ RECYCLED Calculate LEED contribution at 1 /o CONTENT armstrongceilings.com/greengenieExhibitB-Page 17 of 21 SOUf DSCAPES° BladesTM 4' Linear Acoustical Panels fine texture LOCATION OEPEN ENT VISUAL SELECTION Shown in e evation view PERFORMANCE Dots represent high level of performance. i " O L C.1 OZS J f.1 y L L,) V L 9 'y M Q O d O-0 W N f.i O Item Description Dimensions rc n. en x 3 E y N No.• Inches)a= w 2 4 tn a iL (0`I I I Jj White Inherent Humi- ri6SOUNDSCAPESBlades'"Vertical Panel Wave Only) Guard+ ouraai irY 3923__ Vertical panel 22 X 94 x 2" I Z4 Z4 T 2a—--19.8 0.90 CIASs • • • • • • `t T I P:<_ zz• 1 r 94' r x: s.. 7194__ Vertical panel 28 x 46 x 2" r"'7—24'—t'"' 12.3 0.90 Class Rectangular A ze. c 1 46° 7195__ Vertical panel 28 x 94 x 2" —ir—i—za•—--za•—.—za•—i—n•— 25.2 0.90 CIasS • • • • • •A,;Rectangular A ze• 1 t P` 9.. .. r.. 94. I d ,`' 7240__ Vertical panel 7.5 x 46 x 2" r"'—24'-7`"''3.5 0.90 Class • • • • • • 8'Wavelength 5. A Concave I-w•-J i r<; 7241__ Vertical panel 10.5 x 46 x 2' r"'r—24'—r"'—4.4 0.90 Class • • • • • • 8'Wavelength 7 A Convex 105' av' I 4B• 5 F I Yw;=='s 7242__ Vertical panel 19.5 x 46 X 2' —'y—2°'——"'— 8.8 0.90 Class • • • • • • py a 8'Wavelength A a Concave 19.5'r.-. 46' 0.,s`=. a`4,`_:_ 00#;.'; Z 7243__ Vertical panel 22.5 x 46 x 2" r"'24'"'9.7 0.90 Class P: 8'Wavelength A Convex k sc= zxs• K. ic;; I 48. t t,....,,'.., NOTE:Scrimmed top edges offered as"Premium."EXAMPLE:BPAS3920S6WH,where"S6"=scrimmed all sides. Add 2-letter color suffix to end of item number(e.g.,3920 W H=White)y7 A' i .": TechLine 877 276 7876 mstrong 77 armstrongceilings.com/soundscapes CEILING WALL SOLUTIONS y RECYCLED y . o Calculate LEEp contribution at Exhibit B-Page 18 of 21 o CO E armstrongceil s.com/greengenie f:'r SOUNDSCAPES° BladesTM Linear Acoustical Panels E s. :.. fine texture 4,LOCATION DEPEN ENT VISUAL SELECTION Shown in elevation view PERFORMANCE Dots represent high level of performance. o g U i [i N L ti U a y m o m m E i - 'o Item Description Dimensions c, s a +s 3 ti y No.• pnches)a= awd u.c White Inherent Humi- SOUNDSCAPES Blades'""Vertical Panel Wave Only) Guard+ Durability 7244__ Vertical panel 10.5 x 94 X 2" r""'y—2"'—2^'---z"'----"'- 8.1 0.90 CI3Ss • • • • • • 8'Wavelength 7 A Wave o.s• s' h a r> a.. . _.... ............ _ p..... 7245__ VertiCal anel 22.5 x 94 x 2" -'-—2^''—2^°—(—Za'—-n'- I 18.9 0.90 CI3S5 • • • • • • 8'Wavelength A Wave szs• I 94. Ssa» c'.e. 3;. ': ....... .......... ...... ..... . S` .. 7246__ Vertical panel 10 X 46 x 2" r-"t—24"—-'-4.0 0.90 CIeSS • • • • • • 4'Wavelength f A Wave I I 10' 4 I--66'--V t r.ry 1,- w'(s Q ............. ..... . .. ............ .... .:._.__. _.:..___...... ...._............ 7247__ Vertical panel 22 x 46 x 2" r"'24'—+-"'-9.3 0.90 Class • • • • • • 4'Wavelength A t, Wave zz• 4 a q 46• p.......... 7248_ VBrtICeI anel 1OX94R2" r'-2°°-2°'—z°''ir- 8.1 0.90 Cl2SS • • • • • • 4'Wavelength f A Wave 10 I ya. I p L 7249__ Vertical panel 22 x 94 x 2" r"'—2°'—r—z^'——z^'—i-n'- 18.9 0.90 CIeSS • • • • • • 4'Wavelength A Wave zr 3,.° r.,..tp..,L 94. i y r,r z y Ft P... ....z_,.4"' NOTE:Scrimmed to edges offered as"Premium."EXAMPLE.BPAS3920S6WH,where'S6"=scrimmed all sides. Adtl 2-letter color suffix to end of item number(e.g.,3920 W H=White) 7 TechLine 877 276 7876 mstrong armstrongceilings,com/soundscapes CEILING&WALL SOLUTIONS p RECYCLED Calculate LEED contribution at Exhibit B-Pa e 19 of 21 0 CONTENT armstrongceilings.com/greengenie s ' g SOUNDSCAPES° BladesTM 3§.. Linear Acoustical Panels fine texture w:. LOCATIONUEPEN ENT rt 3=': THREE WAYS TO INSTALL X g: Attachment to I Individual Suspension Direct-attach Method x Suspension System using Hanging Kd using Axiom Wall Molding `' i I 7.;, i i 1a a-t: INSTALLATION OPTIONS Lin Ft/ Item No. Description Carton Item No. Description Pieces/Carton r• ', PRELUDE XL i'DIRECT-ATTACH WITH AXIOM WALL MOLDING u` 7301__HD Mam Beam 240 AXM34STR3__ Straight Wall Molding— (360 Paint Shadow 10' Recommended; XU341_ 48 Cross Tee 240 order by the piece) 1/4"(6mm) XL8320_ 24 Cross Tee 120 sns^14mm) F. 7800__7/8"Wall Angle 360 16" 43mm) 360°PAINTED GRID Suspension system available in RAL colors. INDIVIDUAL SUSPENSION USING HANGING KIT 56418 144 HD Main Beam 240 I isns^_I BP6655 4-Point Hanging Kit 4 per bag o 730136_ Black(BL)and White(WH)colors only 240 ( z4mm) F 56421 48 Cross Tee 240 XL734036__ Black(BL)and White(WH)colors only 240 x 56419 24"CrossTee 120 ACCESSORIES XU32036 Black(BL)and White(WH)colors only 120 pRBRKT Adjustable Hanger Bracket 80 7800 7/8"Wall Angle 360 780036__ Black(BL)and White(WH)colors only 360 QSUTC Rigid Attachment Clip 150 When specifying or ordering Items with a color,add ihe two-letter suffix to lhe entl of the item number(e.g.7301 STAC Single Tee Adapter Clip 120 m V 9 PHYSICAL DATA Material Desi n Considerations Panel Weight 2"thick fiberglass with DuraB ite scrim on face SoundScapes Blades'"panels maintain a natural bow 7190— 1.6 Ibs per panel r'" antl sides. that may be noticeable when installed 2"or less apart. 7191— 3.3 Ibs per panel p :_ Surface Finish Deflection up to 1/8"has been documented in some cases. 3920— 32 Ibs per panel.a Duraerite scrim with factory-applied aint on face Special care in installation and handling must 6e taken with 3921— 6.5 Ibs per panel P 77 92— 5.1 Ibs per panel and sides.Standard White has ener savin hi h color panels to avoid surface damage to the paint finish.9Y 9' 9 Custom colors are available. 7793— 10.4 Ibs per panel light-reflective finish(LR 0.90).Top of panel Is 3922— 7.0 Ibs per panel t' unfinished with emhedtled hanging clips. 5"SoundScapes Blades can now he used on walls,but are 3923— 14.4 Ibs per panel k Fire Performance not recommended for use in high-traffic or high-impact 77 g4— 8.9 Ibs per panel SoundScapes Blades"'panel materlal is ASTM E84 areas.For best results,install above 6'from floor level.77 g5— 18.3 Ibs per panel SoundScapes Blades panels can be ordered with scrim on 7240— 2.9 Ibs per panelClassA:Flame Spread 25 or under and Smoke Developed 50 or less. top edge as a premium.7241—:3.5 Ibs per panel CAN/ULC S102 surface burnin characteristics. Seismic Restraint 7242— 6.7 16s per panel pc,. 9 7243— 7.2 Ibs per panel Flame Spread Rating 25 or less.Smoke Developed SoundScapes°Blades'"are approved for all seismic areas 7p44— 5.9 16s per panel Classification 50 or less. when installed per the seismic guidelines in the Armstrong 7pq5— 13.7 Ibs per panel a SoundScapes Blades panels,as with other architectural Ceilings installatlon instructions. 7246— 3.2 Ibs per panel features located in the ceiling plane,may obstruct Recommended Suspension Systems 7247— 7•0 Ibs per panel or skew the existing or planned fire sprinkler water SoundScapes Blades panels are pre-assembled with metal 7248— 6.5 Ibs per panel distribution pattern,or possibly delay the activation of hanging clips in the top of the panels.See Installation 7249— 14.4 Ibs per panel the fire sprinkler or fire detection system.Consult a Instructions BPLA-297844 for installation details. Panels/Cartonfireprotectionengineer,NFPA 13,and local codes for guidance on the proper installation techniques where fire Warranty 4 detection or suppression systems are present. Details at armstrongceilings.com Minimum Order uantity W" 4` 7 carton o Acoustical Performance 1.38 Sabins per square foot or 64%more sound absorption than the same square footage of NRC 0.90 continuous s „ cellings.Blades'"colored panels have slightly retluced acoustical performance. TechLine/1 877 276 7876 LEED is a registered Uademark of the U.S.Green Building Councila v armstrongceilings.com/soundscapes NI other trademarks used herein are the property of m sea ch:soundsCepOS blades) AWI Licensing LLC and/or its affiliates mstrong s „ BPCS-5094-1018 O 2018 AWI Licensing LLC Printed in the United States af America CEILING 8 WALL SOLUTIONS rv„ ; Exhibit B-Page 20 of 21 tiv i i y tI i , s , d 1 3 9 i T ' 0 # 'i: . I t 1 s rt f , i 3 t- _ s T _ " z ` ' # 3 • L + m ,„. k, ,. _ r ' r ; I , j t a r j i . . E ea e -- f I `' jh , . 1 , i , , E!t F j i j * I :s ;t ! ' ilti, t E ; i ,. .. •., "S i i i ` 41 i t r i I- .. . . 1 , s ' i { f > 1 k ,.t r h i T .,. , .. z . i i 4 r — It x a I : ; j. t t 4 , , , l a_ i j{ ': I , ' ' : j , ___'s._. ; , . k I- ' , li - - - , y t. ,.._. t I` .I _ f .' . 1. i _ _ i .i i_ _ k . ° ` I ° 1 f , " 1`_ L . t` 1...:.. i 4 e 3 a o- • . 6,., ,p, ,,X r . t a . ' r' t td t n g t : a* w_ t' i t f 4 k :- ; t 1 a i 1 c i 1 6}- rl I k"r' {_ . W s }' ' 1 S C } t G ` i d ' i, . ; y p Y _' ' k .F I y t j t x tit , ' ,5 ' , , m:e , Exhibit B-Page 21 of 21 Y W" a . 1 . r f • r ' 0. d1 se*' ^ yp : 1 e ` . j e f . 4 t d # . ' . c i ` e .«. ...» j-. fi i i .i - }{ f . , q . f ..F- i t ' s } , i ` 1 ' * j ` . € r i s t . s t # 1 6 r b 3 . t . . 1't ! t -j s 3 } s -_ _ . 1 E t i . , , t ! t f ,t y ,.. t' E '" .c" , . ' # t ` e6 - _-- , v.$ I 9 ` i 5 ! --- .. rt , , A : t3 , I s k t r ; 3 ' x a v . t ! - ... } v 11 # { j .., . n+ t fu if E , i.,. y, .m .. t `'} 1 ^td,,....e. .^- a r 3 _ t r tt p € s y r' > i I W I ' F y I e t -# t „. r ,.t # $ f _ i I , [ r p " F i "' § " I = s..;.. f $ .. , g S.. .s_ 5 . :r , y. :-, . g r- e,i ti , .,..:wm . .'.«,+..«• 1.j .-. x.:. i .»,. Wea s y. i t; @-,.. ......Y .,. ..e w .,.,< . . .. n. f y i„. t 4£` k U, N e. g.€ `'k-"''';. *v.fas ... y ',a r a i v va @ a j t t a ! S;` s 1r -': a . « i 4„ m a r .. j t r # ..;: ,.«.- -» •., i w ... ^e`." i i t f t` ' 1 L. 1- 1_ k ' t # 4 i R i 7 t ` j , , c 3 v G 3 i t . -s i I 7 . k=,..i' r i ATTACHMENT NO. 1 CALIFORNIA LABOR CODE SECTIONS 1725.5, 1771, 1771.1, 1771.4, 1775, 1776, 1777.5, 1813 and 1815 Section 1725.5. Registration of contractors; mandatory registration; qualifications and application; fees; exempt contractors A contractor shall be registered pursuant to this section to be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any public work contract that is subject to the requirements of this chapter. For the purposes of this section, contractor"includes a subcontractor as defined by Section 1722.1. a) To qualify for registration under this section, a contractor shall do all of the following: 1)(A) Register with the Department of Industrial Relations in the manner prescribed by the department and pay an initial nonrefundable application fee of four hundred dollars ($400) to qualify for registration under this section and an annual renewal fee on or before July 1 of each year thereafter. The annual renewal fee shall be in a uniform amount set by the Director of Industrial Relations,and the initial registration and renewal fees may be adjusted no more than annually by the director to support the costs specified in S.ection 1771.3. B) Beginning June 1, 2019, a contractor may register or renew according to this subdivision in annual increments up to three years from the date of registration. Contractors who wish to do so will be required to prepay the applicable nonrefundable application or renewal fees to qualify for the number of years for which they wish to preregister. 2)Provide evidence, disclosures, or releases as are necessary to establish all of the following: A) Workers' compensation coverage that meets the requirements of Division 4 (commencing with Section 3200) and includes sufficient coverage for any worker whom the contractor employs to perform work that is subject to prevailing wage requirements other than a contractor who is separately registered under this section. Coverage may be evidenced by a current and valid certificate of workers' compensation insurance or certification of self-insurance required under Section 7125 of the Business and Professions Code. B) If applicable,the contractor is licensed in accordance with Chapter 9 (commencing with Section 7000) of the Business and Professions Code. C) The contractor does not have any delinquent liability to an employee or the state for any assessment of back wages or related damages, interest, fines, or penalties pursuant to any.final judgment, order, or determination by a court or any federal,state,or local administrative agency,including a confirmed arbitration award. However, for purposes of this paragraph, the contractor shall not be disqualified for any judgment, order, or determination that is under appeal, provided that the contractor has secured the payment of any amount eventually found due through a bond or other appropriate means. D) The contractor is not currently debarred under Section 1777.1 or under any other federal or state law providing for the debarment of contractors from public works. E) The contractor has not bid on a public works contract, been listed in a bid proposal, or engaged in the performance of a contract for public works without being lawfully registered in accordance with this section, within the preceding 12 months or since the effective date of the requirements set forth in subdivision (e), whichever is earlier. If a contractor is found to be in violation of the requirements of this paragraph,the period Attachment No. 1 Page 1 of 13 of disqualification shall be waived if both of the following are true: i)The contractor has not previously been found to be in violation of the requirements of this paragraph within the preceding 12 months. ii)The contractor pays an additional nonrefundable penalty registration fee of two thousand dollars($2,000). b) Fees received pursuant to this section shall be deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. c)A contractor who fails to pay the renewal fee required under paragraph(1) of subdivision(a) on or before the expiration of any prior period of registration shall be prohibited from bidding on or engaging in the performance of any contract for public work until once again registered pursuant to this section. If the failure to pay the renewal fee was inadvertent, the contractor may renew its registration retroactively by paying an additional nonrefundable penalty renewal fee equal to the amount of the renewal fee within 90 days of the due date of the renewal fee. d) If, after a body awarding a contract accepts the contractor's bid or awards the contract, the work covered by the bid or contract is determined to be a public work to which Section 1771 applies, either as the result of a determination by the director pursuant to Section 1773.5 or a court decision,the requirements of this section shall not apply, subject to the following requirements: 1)The body that awarded the contract failed,in the bid specification or in the contract documents,to identify as a public work that portion of the work that the determination or decision subsequently classifies as a public work. 2) Within 20 days following service of notice on the awarding body of a determination by the Director of Industrial Relations pursuant to Section 1773.5 or a decision by a court that the contract was for public work as defined in this chapter, the contractor and any subcontractors are registered under this section or are replaced by a contractor or subcontractors who are registered under this section. 3) The requirements of this section shall apply prospectively only to any subsequent bid, bid proposal, contract, or work performed after the awarding body is served with notice of the determination or decision referred to in paragraph(2). e) The requirements of this section shall apply to any bid proposal submitted on or after March l, 2015, to any contract for public work, as defined in this chapter, executed on or after April 1, 2015, and to any work performed under a contract for public work on or after January 1, 2018, regardless of when the contract for public work was executed. fl This section does not apply to work performed on a public works project of twenty-five thousand dollars 25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars($15,000)or less when the project is for maintenance work. Section 1771. Payment of general prevailing rate Except for public works projects of one thousand dollars ($1,000) or less, not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the public work is performed, and not less than the general prevailing rate of per diem wages for holiday and overtime work fixed as provided in this chapter, shall be paid to all workers employed on public works. Attachment No. 1 Page 2 of 13 This section is applicable only to work performed under contract,and is not applicable to work carried out by a public agency with its own forces. This section is applicable to contracts let for maintenance work. Section 1771.1. Registration as a contractor or subcontractor required prior to bid submission; exceptions; violations; penalties a) A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. b) Notice of the requirement described in subdivision (a) shall be included in all bid invitations and public works contracts, and a bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor or subcontractor's current registration to perform public work pursuant to Section 1725.5. c) An inadvertent error in listing a subcontractor who is not registered pursuant to Section 1725.5 in a bid proposal shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive, provided that any of the following apply: 1)The subcontractor is registered prior to the bid opening. 2)Within 24 hours after the bid opening,the subcontractor is registered and has paid the penalty registration fee specified in subparagraph(E) of paragraph(2) of subdivision(a) of Section 1725.5. 3) The subcontractor is replaced by another registered subcontractor pursuant to Section 4107 of the Public Contract Code. d) Failure by a subcontractor to be registered to perform public work as required by subdivision(a) shall be grounds under Section 4107 of the Public Contract Code for the contractor, with the consent of the awarding authority, to substitute a subcontractor who is registered to perform public work pursuant to Section 1725.5 in place of the unregistered subcontractor. e) The department shall maintain on its Internet Web site a list of contractors who are currently registered to perform public work pursuant to Section 1725.5. fl A contract entered into with any contractor or subcontractor in violation of subdivision(a)shall be subject to cancellation,provided that a contract for public work shall not be unlawful, void, or voidable solely due to the failure of the awarding body, contractor, or any subcontractor to comply with the requirements of Section 1725.5 or this section. g) If the Labor Commissioner or his or her designee determines that a contractor or subcontractor engaged in the performance of any public work contract without having been registered in accordance with this section, the contractor or subcontractor shall forfeit, as a civil penalty to the state, one hundred dollars ($100)for each day of work performed in violation of the registration requirement,not to exceed an aggregate penalty of eight thousand dollars ($8,000) in addition to any penalty registration fee assessed pursuant to clause (ii) of subparagraph(E) of paragraph(2) of subdivision(a) of Section 1725.5. h)(1) In addition to, or in lieu of, any other penalty or sanction authorized pursuant to this chapter, a higher tiered public works contractor or subcontractor who is found to have entered into a subcontract with an Attachment No. 1 Page 3 of 13 unregistered lower tier subcontractor to perform any public work in violation of the requirements of Section 1725.5 or this section shall be subject to forfeiture,as a civil penalty to the state,of one hundred dollars($100) for each day the unregistered lower tier subcontractor performs work in violation of the registration requirement, not to exceed an aggregate penalty of ten thousand dollars ($10,000). 2) The Labor Commissioner shall use the same standards specified in subparagraph (A) of paragraph (2) of subdivision(a)of Section 1775 when determining the severity of the violation and what penalty to assess,and may waive the penalty for a first time violation that was unintentional and did not hinder the Labor Commissioner's ability to monitor and enforce compliance with the requirements of this chapter. 3)A higher tiered public works contractor or subcontractor shall not be liable for penalties assessed pursuant to paragraph (1) if the lower tier subcontractor's performance is in violation of the requirements of Section 1725.5 due to the revocation of a previously approved registration. 4) A subcontractor shall not be liable for any penalties assessed against a higher tiered public works contractor or subcontractor pursuant to paragraph (1). A higher tiered public works contractor or subcontractor may not require a lower tiered subcontractor to indemnify or otherwise be liable for any penalties pursuant to paragraph(1). i) The Labor Commissioner or his or her designee shall issue a civil wage and penalty assessment, in accordance with the provisions of Section 1741, upon determination of penalties pursuant to subdivision (g) and subparagraph (B) of paragraph (1) of subdivision (h). Review of a civil wage and penalty assessment issued under this subdivision may be requested in accordance with the provisions of Section 1742. The regulations of the Director of Industrial Relations, which govern proceedings for review of civil wage and penalty assessments and the withholding of contract payments under Article 1 (commencing with Section 1720) and Article 2 (commencing with Section 1770), shall apply. j)(1) Where a contractor or subcontractor engages in the performance of any public work contract without having been registered in violation of the requirements of Section 1725.5 or this section, the Labor Commissioner shall issue and serve a stop order prohibiting the use of the unregistered contractor or the unregistered subcontractor on all public works until the unregistered contractor or unregistered subcontractor is registered. The stop order shall not apply to work by registered contractors or subcontractors on the public work. 2) A stop order may be personally served upon the contractor or subcontractor by either of the following methods: A)Manual delivery of the order to the contractor or subcontractor personally. B) Leaving signed copies of the order with the person who is apparently in charge at the site of the public work and by thereafter mailing copies of the order by first class mail, postage prepaid to the contractor or subcontractor at one of the following: i)The address of the contractor or subcontractor on file with either the Secretary of State or the Contractors' State License Board. ii) If the contractor or subcontractor has no address on file with the Secretary of State or the Contractors' State License Board,the address of the site of the public work. 3) The stop order shall be effective immediately upon service and shall be subject to appeal by the party contracting with the unregistered contractor or subcontractor,by the unregistered contractor or subcontractor, or both. The appeal, hearing, and any further review of the.hearing decision shall be governed by the Attachment No. 1 Page 4 of 13 procedures,time limits, and other requirements specified in subdivision(a) of Section 238.1. 4)Any employee of an unregistered contractor or subcontractor who is affected by a work stoppage ordered by the commissioner pursuant to this subdivision shall be paid at his or her regular hourly prevailing wage rate by that employer for any hours the employee would have worked but for the work stoppage,not to exceed 10 days. k) Failure of a contractor or subcontractor, owner, director, officer, or managing agent of the contractor or subcontractor to observe a stop order issued and served upon him or her pursuant to subdivision (j) is guilty of a misdemeanor punishable by imprisonment in county jail not exceeding 60 days or by a fine not exceeding ten thousand dollars ($10,000), or both. 1) This section shall apply to any bid proposal submitted on or after March 1, 2015, and any contract for public work entered into on or after April 1, 2015. This section shall also apply to the performance of any public work, as defined in this chapter,on or after January 1, 2018,regardless of when the contract for public work was entered. m)Penalties received pursuant to this section shall Ue deposited in the State Public Works Enforcement Fund established by Section 1771.3 and shall be used only for the purposes specified in that section. n) This section shall not apply to work performed on a public works project of twenty-five thousand dollars 25,000) or less when the project is for construction, alteration, demolition, installation, or repair work or to work performed on a public works project of fifteen thousand dollars ($15,000)or less when the project is for maintenance work. Section 1771.4. Additional requirements when bidding and awarding public works contracts a) All of the following are applicable to all public works projects that are otherwise subject to the requirements of this chapter: 1)The call for bids and contract documents shall specify that the project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. 2) The awarding body shall post or require the prime contractor to post job site notices, as prescribed by regulation. 3)Each contractor and subcontractor shall furnish the records specified in Section 1776 directly to the Labor Commissioner, in the following manner: A)At least monthly or more frequently if specified in the contract with the awarding body. B) In a format prescribed by the Labor Commissioner. 4) If the contractor or subcontractor is not registered pursuant to Section 1725.5 and is performing work on a project for which registration is not required because of subdivision( of Section 1725.5, the unregistered contractor or subcontractor is not required to furnish the records specified in Section 1776 directly to the Labor Commissioner but shall retain the records specified in Section 1776for at least three years after completion of the work. 5) The deparhnent shall undertake those activities it deems necessary to monitor and enforce compliance with prevailing wage requirements. Attachment No. 1 Page 5 of 13 b) The Labor Commissioner may exempt a public works project from compliance with all or part of the requirements of subdivision(a) if either of the following occurs: 1)The awarding body has enforced an approved labor compliance program, as defined in Section 1771.5,on all public works projects under its authority, except those deemed exempt pursuant to subdivision (a) of Section 1771.5, continuously since December 31, 2011. 2)The awarding body has entered into a collective bargaining agreement that binds all contractors performing work on the project and that includes a mechanism for resolving disputes about the payment of wages. c) The requirements of paragraph(1)of subdivision(a)shall only apply to contracts for public works projects awarded on or after January 1, 2015. d) The requirements of paragraph (3) of subdivision(a) shall apply to all contracts for public work, whether new or ongoing, on or after January 1, 2016. Section 1775. Penalties for violations a)(1) The contractor and any subcontractor under the contractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded,forfeit not more than two hundred dollars($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates as determined by the director for the work or craft in which the worker is employed for any public work done under the contract by the contractor or, except as provided in subdivision(b),by any subcontractor under the contractor. 2)(A) The amount of the penalty shall be determined by the Labor Commissioner based on consideration of both of the following: i)Whether the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor. ii) Whether the contractor or subcontractor has a prior record of failing to meet its prevailing wage obligations. B)(i) The penalty may not be less than forty dollars ($40) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate,unless the failure of the contractor or subcontractor to pay the correct rate of per diem wages was a good faith mistake and, if so, the error was promptly and voluntarily corrected when brought to the attention of the contractor or subcontractor. ii) The penalty may not be less than eighty dollars ($80) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the contractor or subcontractor has been assessed penalties within the previous three years for failing to meet its prevailing wage obligations on a separate contract,unless those penalties were subsequently withdrawn or overturned. iii) The penalty may not be less than one hundred twenty dollars ($120) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rate, if the Labor Commissioner determines that the violation was willful, as defined in subdivision (c) of Section 1777.1. C) If the amount due under this section is collected from the contractor or subcontractor, any outstanding wage claim under Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 against that contractor Attachment No. 1 Page 6 of 13 or subcontractor shall be satisfied before applying that amount to the penalty imposed on that contractor or subcontractor pursuant to this section. D) The determination of the Labor Commissioner as to the amount of the penalty shall be reviewable only for abuse of discretion. E) The difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the contractor or subcontractor, and the body awarding the contract shall cause to be inserted in the contract a stipulation that this section will be complied with. b) If a worker employed by a subcontractor on a public works project is not paid the general prevailing rate of per diem wages by the subcontractor,the prime contractor of the proj ect is not liable for any penalties under subdivision (a) unless the prime contractor had knowledge of that failure of the subcontractor to pay the specified prevailing rate of wages to those workers or unless the prime contractor fails to comply with all of the following requirements: 1) The contract executed between the contractor and the subcontractor for the performance of work on the public works project shall include a copy of the provisions of this section and Sections 1771, 1776, 1777.5, 1813, and 1815. 2)The contractor shall monitor the payment of the specified general prevailing rate of per diem wages by the subcontractor to the employees,by periodic review of the certified payroll records.of the subcontractor. 3)Upon becoming aware of the failure of the subcontractor to pay his or her workers the specified prevailing rate of wages, the contractor shall diligently take corrective action to halt or rectify the failure, including,but not limited to,retaining sufficient funds due the subcontractor for work performed on the public works project. 4) Prior to making final payment to the subcontractor for work performed on the public works project, the contractor shall obtain an affidavit signed under penalty of perjury from the subcontractor that the subcontractor has paid the specified general prevailing rate of per diem wages to his or her employees on the public works project and any amounts due pursuant to Section 1813. c)The Division of Labor Standards Enforcement shall notify the contractor on a public works project within 15 days of the receipt by the Division of Labor Standards Enforcement of a complaint of the failure of a subcontractor on that public works project to pay workers the general prevailing rate of per diem wages. Section 1776. Payroll records; retention; inspection; redacted information; agencies entitled to receive nonredacted copies of certified records; noncompliance penalties; rules a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee,employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: 1)The information contained in the payroll record is true and correct. 2) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project. Attachment No. 1 Page7of13 b)The payroll records enumerated under subdivision(a)shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis: 1)A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. 2)A certified copy of all payroll records enumerated in subdivision(a)shall be made available for inspection or furnished upon request to a representative of the body awarding the contract and the Division of Labor Standards Enforcement of the Department of Industrial Relations. 3)A certified copy of all payroll records enumerated in subdivision(a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph(2), the requesting party shall,prior to being provided the records,reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal office of the contractor. c) Unless required to be furnished directly to the Labor Commissioner in accordance with paragraph (3) of subdivision(a) of Section 1771.4, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division. The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision(a). d)A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request. e) Except as provided in subdivision (fl, any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual's name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a multiemployer Taft-Hartley trust fund (29 U.S.C. Sec. 186(c)(5)) that requests the records for the purposes of allocating contributions to participants shall be marked or obliterated only to prevent disclosure of an individual's full social security number, but shall provide the last four digits of the social security number. Any copy of records made available for inspection by, or furnished to, a joint labor- management committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual's social security number. fl(1)Notwithstanding any other provision of law, agencies that are included in the Joint Enforcement Strike Force on the Underground Economy established pursuant to Section 329 of the Unemployment Insurance Code and other law enforcement agencies investigating violations of law shall, upon request, be provided nonredacted copies of certified payroll records. Any copies of records or certified payroll made available for inspection and furnished upon request to the public by an agency included in the Joint Enforcement 5trike Force on the Underground Economy or to a law enforcement agency investigating a violation of law shall be marked or redacted to prevent disclosure of an individual's name, address, and social security number. Attachment No. 1 Page 8 of 13 2)An employer shall not be liable for damages in a civil action for any reasonable act or omission taken in good faith in compliance with this subdivision. g)The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address. h) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision(a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section. i) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section. j)The director shall adopt rules consistent with the California Public Records Act(Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1 of the Government Code) and the Information Practices Act of 1977 (Title 1.8 (commencing with Section 1798) of Part 4 of Division 3 of the Civil Code) governing the release of these records, including the establishment of reasonable fees to be charged for reproducing copies of records required by this section. Section 1777.5. Employment of registered apprentices; wages; standards; number; apprenticeable craft or trade; exemptions; contributions; compliance program a)(1) This chapter does not prevent the employtnent upon public works of properly registered apprentices who are active participants in an approved apprenticeship program. 2) For purposes of this chapter, "apprenticeship program" means a program under the jurisdiction of the California Apprenticeship Council established pursuant to Section 3070. b)(1) Every apprentice employed upon public works shall be paid the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered and shall be employed only at the work of the craft or trade to which he or she is registered. 2)Unless otherwise provided by a collective bargaining agreement,when a contractor requests the dispatch of an apprentice pursuant to this section to perform work on a public works project and requires the apprentice to fill out an application or undergo testing, training, an examination, or other preemployment process as a condition of employment, the apprentice shall be paid for the time spent on the required preemployment activity,including travel time to and from the required activity,if any,at the prevailing rate of per diem wages for apprentices in the trade to which he or she is registered. Unless otherwise provided by a collective bargaining agreement, a contractor is not required to compensate an apprentice for the time spent on preemployment activities if the apprentice is required to take a preemployment drug or alcohol test and he or she fails to pass that test. c)Only apprentices,as defined in Section 3077,who are in training under apprenticeship standards that have been approved by the Chief of the Division of Apprenticeship Standards and who are parties to written Attachment No. 1 Page 9 of 13 apprentice agreements under Chapter 4 (commencing with Section 3070) of Division 3 are eligible to be employed at the apprentice wage rate on public works. The employment and training of each apprentice shall be in accordance with either of the following: 1)The apprenticeship standards and apprentice agreements under which he or she is training. 2)The rules and regulations of the California Apprenticeship Council. d) If the contractor to whom the contract is awarded by the state or any political subdivision, in performing any of the work under the contract, employs workers in any apprenticeable craft or trade, the contractor shall employ apprentices in at least the ratio set forth in this section and may apply to any apprenticeship program in the craft or trade that can provide apprentices to the site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. However,the decision of the apprenticeship program to approve or deny a certificate shall be subject to review by the Administrator of Apprenticeship. The apprenticeship program or programs, upon approving the contractor, shall arrange for the dispatch of apprentices to the contractor. A contractor covered by an apprenticeship program's standards shall not be required to submit any additional application in order to include additional public works contracts under that program. "Apprenticeable craft or trade," as used in this section, means a craft or trade determined as an apprenticeable occupation in accordance with rules and regulations prescribed by the California Apprenticeship Council. As used in this section, "contractor" includes any subcontractor under a contractor who performs any public works not excluded by subdivision e) Before commencing work on a contract for public works, every contractor shall submit contract award information to an applicable apprenticeship program that can supply apprentices to the site of the public work. The information submitted shall include an estimate of journeyxnan hours to be performed under the contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. A copy of this information shall also be submitted to the awarding body, if requested by the awarding body. Within 60 days after concluding work on the contract, each contractor and subcontractor shall submit to the awarding body, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the contract. The information under this subdivision shall be public. The apprenticeship programs shall retain this information for 12 months. The apprenticeship program supplying apprentices to the area of the site of the public work shall ensure equal employment and affirmative action in apprenticeship for women and minorities. g) The ratio of work performed by apprentices to journeymen employed in a particular craft or trade on the public work may be no higher than the ratio stipulated in the apprenticeship standards under which the apprenticeship program operates if the contractor agrees to be bound by those standards. However, except as otherwise provided in this section,in no case shall the ratio be less than one hour of apprentice work for every five hours of journeyman work. h) This ratio of apprentice work to journeyman work shall apply during any day or portion of a day when any journeyman is employed at the jobsite and shall be computed on the basis of the hours worked during the day by journeymen so employed. Any work performed by a journeyman in excess of eight hours per day or 40 hours per week shall not be used to calculate the ratio. The contractor shall employ apprentices for the number of hours computed as above before the end of the contract or, in the case of a subcontractor, before the end of the subcontract. However,the contractor shall endeavor,to the greatest extent possible,to employ apprentices during the same time period that the journeymen in the same craft or trade are employed at the jobsite. When an hourly apprenticeship ratio is not feasible for a partieular craft or trade, the Administrator Attachment No. 1 Page 10 of 13 of Apprenticeship, upon application of an apprenticeship program, may order a minimum ratio of not less than one apprentice for each five journeymen in a craft or trade classification. i)A contractor covered by this section who has agreed to be covered by an apprenticeship program's standards upon the issuance of the approval certificate, or who has been previously approved for an apprenticeship program in the craft or trade,shall employ the number of apprentices or the ratio of apprentices to j ourneymen stipulated in the applicable apprenticeship standards, but in no event less than the 1-to-5 ratio required by subdivision(g). j)Upon proper showing by a contractor that he or she employs apprentices in a particular craft or trade in the state on all of his or her contracts on an annual average of not less than one hour of apprentice work for every five hours of labor performed by journeymen, the Administrator of Apprenticeship may grant a certificate exempting the contractor from the 1-to-5 hourly ratio, as set forth in this section for that craft or trade. k)An apprenticeship program has the discretion to grant to a participating contractor or contractor association a certificate, which shall be subject to the approval of the Administrator of Apprenticeship, exempting the contractor from the 1-to-5 ratio set forth in this section when it finds that any one of the following conditions is met: 1)Unemployment for the previous three-month period in the area exceeds an average of 15 percent. 2) The number of apprentices in training in the area exceeds a ratio of 1 to 5. 3)There is a showing that the apprenticeable craft or trade is replacing at least one-thirtieth of its journeymen annually through apprenticeship training, either on a statewide basis or on a local basis. 4) Assignment of an apprentice to any work performed under a public works contract would create a condition that would jeopardize his or her life or the life,safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman. 1) If an exemption is granted pursuant to subdivision (k) to an organization that represents contractors in a specific trade from the 1-to-5 ratio on a local or statewide basis,the member contractors shall not be required to submit individual applications for approval to local joint apprenticeship.committees, if they are already covered by the local apprenticeship standards. m)(1) A contractor to whom a contract is awarded, who, in performing any of the work under the contract, employs journeymen or apprentices in any apprenticeable craft or trade shall contribute to the California Apprenticeship Council the same amount that the director determines is the prevailing amount of apprenticeship training contributions in the area of the public works site. A contractor may take as a credit for payments to the council any amounts paid by the contractor to an approved,apprenticeship program that can supply apprentices to the site of the public works project. The contractor may add the amount of the contributions in computing his or her bid for the contract. 2)(A) At the conclusion of the 2002-03 fiscal year and each fiscal year thereafter, the California Apprenticeship Council shall distribute training contributions received by the council under this subdivision, less the expenses of the Department of Industrial Relations for administering this subdivision, by making grants to approved apprenticeship programs for the purpose of training apprentices. The grant funds shall be distributed as follows: Attachment No. 1 Page 11 of 13 i) If there is an approved multiemployer apprenticeship program serving the same craft or trade and geographic area for which the training contributions were made to the council, a grant to that program shall be made. ii)If there are two or more approved multiemployer apprenticeship programs serving the same craft or trade and county for which the training contributions were made to the council, the grant shall be divided among those programs based on the number of apprentices from that county registered in each program. iii) All training contributions not distributed under clauses (i) and (ii) shall be used to defray the future expenses of the Department of Industrial Relations for the administration and enforcement of apprenticeship and preapprenticeship standards and requirements under this code. B)An apprenticeship program shall only be eligible to receive grant funds pursuant to this subdivision if the apprenticeship program agrees,prior to the receipt of any grant funds,to keep adequate records that document the expenditure of grant funds and to make all records available to the Department of Industrial Relations so that the Department of Industrial Relations is able to verify that grant funds were used solely for training apprentices. For purposes of this subparagraph, adequate records include, but are not limited to, invoices, receipts, and canceled checks that account for the expenditure of grant funds. This subparagraph shall not be deemed to require an apprenticeship program to provide the Department of Industrial Relations with more documentation than is necessary to verify the appropriate expenditure of grant funds made pursuant to this subdivision. C)The Department of Industrial Relations shall verify that grants made pursuant to this subdivision are used solely to fund training apprentices. If an apprenticeship program is unable to demonstrate how grant funds are expended or if an apprenticeship program is found to be using grant funds for purposes other than training apprentices, then the apprenticeship program shall not be eligible to receive any future grant pursuant to this subdivision and the Department of Industrial Relations may initiate the process to rescind the registration of the apprenticeship program. 3) All training contributions received pursuant to this subdivision shall be deposited in the Apprenticeship Training Contribution Fund, which is hereby created in the State Treasury. Upon appropriation by the Legislature, all moneys in the Apprenticeship Training Contribution Fund shall be used for the purpose of carrying out this subdivision and to pay the expenses of the Department of Industrial Relations. n) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section. The stipulations shall fix the responsibility of compliance with this section for all apprenticeable occupations with the prime contractor. o) This section does not apply to contracts of general contractors or to contracts of specialty contractors not bidding for work through a general or prime contractor when the contracts of general contractors or those specialty contractors involve less than thirty thousand dollars ($30,000). p)An awarding body that implements an approved labor compliance program in accordance with subdivision b) of Section 1771.5 may, with the approval of the director, assist in the enforcement of this section under the terms and conditions prescribed by the director. Section 1813. Forfeiture for violations; contract stipulation; report of violations The contractor or subcontractor shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit twenty- five dollars ($25) for each worker employed in the execution of Attachment No. 1 Page 12 of 13 the contract by the respective contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of this article. In awarding any contract for public work, the awarding body shall cause to be inserted in the contract a stipulation to this effect. The awarding body shall take cognizance of all violations of this article committed in the course of the execution of the contract, and shall report them to the Division of Labor Standards Enforcement. Section 1815. Overtime Notwithstanding the provisions of Sections 1810 to 1814, inclusive, of this code, and notwithstanding any stipulation inserted in any contract pursuant to the requirements of said sections, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon public work upon compensation for all hours worked in excess of 8 hours per day at not less than 1 '/2 times the basic rate of pay. Attachment No. 1 Page 13 of 13 ATTACHMENT NO. 2 CALIFORNIA PUBLIC CONTRACT CODE SECTION 9204 Section 9204. Legislative findings and declarations regarding timely and complete payment of contractors for public works projects; claims process (Eff: January 1, 2017) a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. b)Notwithstanding any other law,including,but not limited to,Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100)of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. c) For purposes of this section: 1) "Claim" means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works proj ect and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. C)Payment of an amount that is disputed by the public entity. 2) "Contractor" means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000)of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. 3)(A) "Public entity" means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division,bureau,board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district,public authority, political subdivision,public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. B) "Public entity" shall not include the following: i)The Department of Water Resources as to any project under the jurisdiction of that department. ii)The Department of Transportation as to any project under the jurisdiction of that department. iii) The Department of Parks and Recreation as to any project under the jurisdiction of that deparhnent. iv) The Deparhnent of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. Attachment No. 2 Page 1 of 3 v) The Military Department as to any project under the jurisdiction of that department. vi)The Department of General Services as to all other projects. vii) The High-Speed Rail Authority. 4) "Public works projecY' means the erection, construction, alteration, repair, or improvement of any public structure,building, road, or other public improvement of any kind. 5)"Subcontractor"means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000)of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. d)(1)(A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and,within a period not to exceed 45 days,shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may,by mutual agreement, extend the time period provided in this subdivision. B)The claimant shall furnish reasonable documentation to support the claim. C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. D)Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph 3) shall apply. 2)(A) If the claimant disputes the public entity's written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If inediation is unsuccessfitl, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. Attachment No. 2 Page 2 of 3 C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.Any mediation utilized shall conform to the timeframes in this section. D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program,if inediation under this section does not resolve the parties' dispute. 3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rej ected in its entirety.A claim that is denied by reason of the public entity's failure to have responded to a claim,or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. 4)Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. 5)If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist,the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor.A subcontractor may request in writing,either on their own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim,provide the subcontractor with a statement of the reasons for not having done so. e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. A waiver of the rights granted by this section is void and contrary to public policy,provided,however,that 1)upon receipt of a claim,the parties may mutually agree to waive,in writing,mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. g)This section applies to contracts entered into on or after January 1, 2017. h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. i)This section shall remain in effect only until January 1, 2027, and as of that date is repealed,unless a later enacted statute,that is enacted before January 1, 2027, deletes or extends that date. Attachment No. 2 Page 3 of 3