Loading...
AGR-6950 - SMITH EMERY LABORATORIES INC - GEOTECHNICAL SERVICES CONTRACT - FEB 26, 2020b95 0 CONSULTANT SERVICES AGREEMENT THIS CONSULTANT SERVICES AGREEMENT the "AgreemenY') is made a[ Orange, Califomia, on this day of Fe i-Gr 20 (the "Effective Date") by and between the CITY OF ORANGE, a municipal corpora[ion ("City"), and SMITH EMERY LABORATORIES, INC., a California corporation ("ConsultanY'), who agree as follows: 1. Services. Subject to the terms and conditions set for[h in this Agreement, Consultant shall provide to the reasonable satisfaction of City the services set forth in Exhibit"A," which is attaclied hereto and incorporated herein by this reference. As a material inducement to City to enter into ffiis Agreement, Consultant represents and warrants that it has thoroughly imestigated and considered the scope of services and fully understands the difficulties and restrictions in performing the work. Consultant represents that it is experienced in performing the work and will follow the highest professional standards in performance of the work. All services provided shall conform to all federal, state and local laws, rules and regulations and to the best professional standards and practices. The terms and conditions set forth in this Agreement shall control over any terms and conditions in Exhibit "A"to the contrary. Youichi Nakagawa, Associate Civi] Engineer ("City's Project Manager"), shall be the person to whom Consultant wi11 report for the performance of services hereunder. It is understood that ConsultanYs performance hereunder shall be under the direction and supervision of City's Project Manager(or his/her designee),that Consultant shall coordinate its services hereunder with City's Project Manager to the extent required by City's Project Manager,and that all performances required hereunder by Consultant shall be performed to the satisfaction of City's Project Manager and the City Manager. 2. Compensation and Fees. a. ConsultanYs total compensation for all services performed under this Agreement, shall not exceed TWENTY-NINE THOUSAND FIVE HLINDRED DOLLARS and 00/100 ($29,500.00) without the prior written authorization of City. b. The above fee shall include all costs, including, but not limited to, all clerical, administrative, overhead, insurance, reproduction, telephone, travel, auto rental, subsistence and all related expe ses. 3. Pavment. a. As schedu]ed services are completed, Consultant shall submit to Ciry an invoice for the services completed, authorized expenses and authorized extra work actually performed or incurred. b. All such invoices shall state the basis for the amount invoiced, including services completed,the number of hours spent and any extra work performed. c.City will pay Consultant the amount invoiced within thirty (30) days after the approval of the invoice. d. Payment shall constitute payment in full for all services, authorized costs and authorized extra work covered by that invoice. 4. Chanee Orders. No payment for extra services caused by a change in the scope or complexity of work, or for any other reason, shall be made unless and until such extra services and a price therefor have been previously authorized in wri[ing and approved by City as an amendment to this Agreement. The amendment shall set forth the changes of work, extension of time, and adjustment of the compensation to be paid by City to Consultant. 5. Licenses. Consultant represents that it and any subcontractors it may engage, possess any and al] licenses which are required under state or federal law to perform [he work contemplated by this Agreement and that Consultant and its subcontractors shall maintain all appropriate licenses, including a City of Orange business license, a[ its cost, during the performance of[his Agreement. 6. Indeoendent Contractor. At all times during the term of this Agreement, Consultant shall be an independent contractor and not an employee of City. City shall have the right to control Consultant only insofar as the result of ConsultanYs services rendered pursuant to this Agreement. City shall not have the right to control the means by which Consultant accomplishes services rendered pursuant to this Agreemen[. Consultant shall, at its sole cost and expense, furnish all facilities, materials and equipment which may be required for furnishing services pursuant to this Agreement. Consultant shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment o£ its subcontractors, agents and employees,including compliance with social security,withholding and all other wages, salaries, benefits, tases, exactions, and regulations of any nature whatsoever. Consultant acknowledges that Consultant and any subcontractors, agents or employees employed by Consultant shall not, under any circumstances, be considered employees of City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including,but not limited to, sick leave,vacation leave, holiday pay, Public Employees Retirement System beneSts, or health, life, dental, long-term disability or workers'compensation insurance benefits. 7. Consultant Not Aeent. Except as City may specify in writing, Consultant shall have no authority, express or implied, to act on behalf of City in any capaciTy whatsoever as an agent. Consultant shall have no authority, express or implied, to bind City to any obligation whatsoever. 8. Desienated Persons. Except as otherwise authorized by City's Project Manager, only Robert Greeley shall perform work provided for under this Agreement. It is understood by the parties that clerical and other nonprofessional work may be performed by persons other than those designated. 9. Assianment or Subcontractin¢. No assignment or subconhacting by Consultant of any part of this Agreement or of funds to be received under this Agreement shall be of any force 2 or effect unless the assignment has had the prior written approval of City. City may terminate this Agreement rather than accept any proposed assignment or subcontracting. Such assignment or subcontracting may be approved by the City Manager or his/l er designee. 10. Time of Comoletion. Consu]tant agrees to wmmence the work provided for in this Agreement within ten (10) days of the date herein above stated and to diligently prosecute completion of the work in accordance with the time period set for[h in Exhibit "A" hereto or otherwise agreed to by and between the representatives of the parties. 11. Time Is of the Essence. Time is of the essence in this Agreement. Consultant shall do all things necessary and incidental to the prosecution of ConsultanYs work. 12. Reserved. 13. Delays and Extensions of Time. ConsultanYs sole remedy for delays outside its control, other than those delays caused by City, shall be an extension of time. No matter what the cause ofthe delay,Consultant must document any delay and reques[an extension oftime in writing at the time of the delay to [he satisfaction of City. Any extensions granted shall be limited to the length of the delay outside ConsultanYs controL If Consultant believes that delays caused by City will cause it to incur additional costs, it must specify, in writing, why the delay has caused additional costs to be incurred and the exact amount of such cost at the time the delay occurs. No additio al costs can be paid that exceed the not to exceed amount stated in Section 2.a, above, absent a written amendment to this Agreement. 14. Products of Consultant. The documents, studies, reports, plans, citations, materials, manuals and other products produced or provided by Consultant for this Agreement shall become the property of City upon receipt. Consultant shall deliver all such products to City prior to payment for same. City may use, reuse or otherwise utilize such products without restriction. 15. Euual Emalovment OopoMunitv. During the performance of this Agreement, Consultant agrees as follows: a. Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.Consultant shall ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. Such actions shall include, but not be limited to the following: employment,upgrading,demotion or transfer,recruitment or recruitment advertising,layoff or termination,rates ofpay or other forms of compensation and selection for training, including apprenticeship. Consul[ant agrees to post in conspicuous places, available to employees and applicants for employment, a notice setting for[h provisions of this non-discrimination clause. b. Consultant shall, in all solicitations and advertisements for employees placed by, or on behalf of Consultant, state that all qualified applicants wil] receive consideration 3 for employment without regard to race, color, religion, sex, national origin, mental or physical disability, or any other basis prohibited by applicable law. c.Consultant shall cause the foregoing paragraphs(a)and(b)to be inserted in all subcontracts for any work covered by this Agreement, provided that the foregoing provisions shall not apply to subcontracts for standard commercial supplies or raw materials. 16. Conflicts oF Interest. Consultant agrees that it shall not make, participate in the making, or in any way attempt to use its position as a consultant[o influence any decision of City in which Consultant knows or has reason to know that Consultant, its officers, partners, or employees have a financial interest as defined in Section 87103 of the Govemmen[Code. 17. Indemnitv. a. To the fullest extent permitted by law, Consultant agrees to indemnify, defend and hold City, its City Council and each member thereof, and[he officers, officials, agents and employees of City (collectively the "Indemnitees") entirely harmless from all liability arising aut af: 1) Any and all claims under workers' compensation acts and other employee benefit acts with respect to ConsultanYs employees or ConsultanYs contractor's employees arising out of ConsultanYs work under this Agreement, including any and all claims under any law pertaining to ConsultanYs status as an independent contractor; and 2) Any claim, loss, injury to or death of persons or damage to property caused by any act, neglect, default, or omission other than a professional ac[ or omission of the Consultant, or person, firm or corporation employed by the Consultant, either directly or by independent contract, including all damages due to loss or thefr sustained by any person, firm or corporation including the Indemnitees, or any of them, arising out of, or in any way connected with the work or services which are the subject of this Agreement, including injury or damage either on or off City's property; but not for any loss, injury, death or damage caused by the active negligence or willful misconduct of City. The Consultant, at ConsultanYs own expense, cost and risk, shall indemnify any and all claims, actions, suits or other proceedings that may be brought or instituted against the Indemnitees on any such claim or liability covered by this subparagraph,and shall pay or satisfy anyjudgment that may be rendered against the Indemnitees, or any of them, in any action, suit or other proceedings as a result of coverage under this subparagraph. b. To the fullest extent permitted by law, Consultant agrees to indemnify and hold Indemnitees entirely harmless from all liability arising out of any claim, loss, injury to or death of persons or damage to property caused by the negligent professional act or omission in the performance of professional services pursuant to this Agreement. c. Except for the Indemnitees, the indemnifications provided in this Agreement shall not be construed to extend any third party indemnification rights of any kind to any person or entity which is not a signatory to this Agreement. 4 d. The indemnities set forth in this section shall survive any closing, rescission, or termination of this Agreement, and shall continue to be binding and in full force and effect in perpetuity with respect to Consultan[and its successors. 18. Insurance. a. Consultant shall carry workers' compensation insurance as required by law for the protection of its employees during the progress of the work. Consultant understands that it is an independent contractor and not entitled to any workers' compensation benefits under any City program. b. Consultant shall maintain during the life of this Agreement the following minimum amount of comprehensive general liability insurance or commercial general liability insurance: the greater of (1) One Million Dollars ($1,000,000) per occurrence; or (2) all the insurance coverage and/or limits carried by or available to Consultant. Said insurance shall cover bodily injury, death and property damage and be written on an occurrence basis. c.Consultant shall maintain during the life of this Agreement, the following minimum amount of automotive liability insurance: the greater of(1) a combined single limit of One Million Dol]ars ($1,000,000); or (2) all the insurance coverage and/or limits carried by or available to Consultant. Said insurance shall cover bodily injury, death and property damage for all owned,non-owned and hired vehicles and be written on an occurrence basis. d. Any insurance proceeds in excess of or broader than the minimum required coverage and/or minimum required limits which are applicable to a given loss shall be available to City. No representation is made that the minimum insurance requirements of this Agreement are sufficient to cover the obligations o£Consultant under this Agreement. e. Each policy of general liability and automotive liability shall provide [hat City, its officers, officials, agents, and employees are declared to be additional insureds under the terms of the policy, but only with respect to the work performed by Consultant under this Agreement. A policy endorsement to that effect shall be provided to City along with the certificate of insurance, which endorsement shall be on Insurance Services Office, Inc. Form CG 20 10 10 O 1. In lieu of an endorsement, City will accept a copy of the policy(ies)which evidences that City is an additional insured as a contracting party. The minimum coverage required by Subsec[ion 18.6 and c, above, shall apply to City as an additional insured. f.Consultant shall maintain during the life of this Agreement professional liability insurance covering errors and omissions arising out of the performance of this Agreement with a minimum limit of One Million Dollars ($1,000,000) per claim. Consultant agrees to keep such policy in force and effect for at least five (5) years from the date of completion of this Agreement. g. The insurance policies maintained by Consultant shall be primary insurance and no insurance held or owned by City shall be called upon to cover any loss under the policy. 5 Consultant will determine its own needs in procurement of insurance to cover liabilities other[han as stated above. h. Before Consultant performs any work or prepares or delivers any materials, Consultant shall furnish certificates of insurance and endorsements, as required by City, evidencing the aforementioned minimum insurance coverages on forms acceptable to City,which shall provide that the insurance in force will not be canceled or allowed to lapse without at least ten(10) days' prior written notice to City. i.Except for professionalliabiliTy insurance coverage that may be required by this Agreement, all insurance maintained by Consultant shall be issued by companies admitted to conduct the pertinent line of insurance business in Califomia a d having a rating of Grade A or better and Class VII or better by the latest edition of Best Key Rating Guide. In the case of professional liability insurance coverage, such coverage shall be issued by companies either licensed or admitted to conduct business in Califomia so long as such insurer possesses [he aforementioned Best rating. j Consultant shal] immediately notify City if any required insurance lapses or is otherwise modified and cease performance of this Agreement unless otherwise directed by City. In such a case, City may procure insurance or self-insure the risk and charge Consultant for such costs and any and all damages resulting therefrom, by way of set-off from any sums owed Consultant. k. Consultant agrees that in the event of loss due to any of the perils for which it has agreed to provide insurance, Consu]tant shall look solely to its insurance for recovery. Consultant hereby grants to City,on behalf of any insurer providing insurance to either Consultant or City with respect to the services of Consultant herein,a waiver of any right[o subrogation which any such insurer may acquire against CiTy by vir[ue of the payment of any loss under such insurance. 1.Consultant shall include all subcontractors, if any, as insureds under i[s policies or shall furnish separate certificates and endorsements for each subcontractor to City for review and approval. All coverages for subcontractors shall be subject to all of the requirements stated herein. 19. Termination. City may for any reason terminate this Agreement by giving the Consultant not less than five (5) days' written notice of intent to terminate. Upon receipt of such notice, the Consultant shall immediately cease work, unless the notice from City provides otherwise. Upon the termination of this Agreement, CiTy shall pay Consultant for services satisfactorily provided and all allowable reimbursements incurred to the date of termination in compliance with this Agreement,unless termination by City shal] be for cause,in which event City may withhold any disputed compensation. City shall not be liable for any claim of lost profits. 20. Maintenance and Insaection oFRecords. In accordance with generally accep[ed accounting principles, Consultant and its subcontractors shall maintain reasonably full and complete books, documents, papers, accounting rewrds, and other information (collectively, the 6 records") pertaining to the costs of and completion of services performed under this Agreement. City and its authorized representatives shall have access to and the right to audit and reproduce any of Consultant's records regarding the services provided under this Agreement. Consultant shall maintain all such records for a period of at least three(3)years after termination or completion of this Agreement. Consultant agrees to make available all such records for inspection or audit at its offices during normal business hours and upon three (3) days' notice from City, and copies thereof shall be furnished if requested. 21. Comoliance with all Laws/Immieration Laws. a. Consultant shall be knowledgeable of and comply with all local, state and federal laws which may apply to the performance of this Agreement. b. Consultant represents and warrants that Consultant: 1) Has complied and shall at all times during the term of this Agreement comply, in all respects, with all immigration ]aws, regulations, statutes, rules, codes, and orders, including, without limitation, the Immigration Reform and Control Act of 1986 IRCA); and 2) Has not and will not knowingly employ any individual to perform services under this Agreement who is ineligible to work in the United States or under the terms of this Agreement; and 3) Has properly maintained, and shall at all times during the term of this Agreement properly maintain, all related employment documentation records including, without limitation, the completion and maintenance of the Form I-9 for each of ConsWtant's employees; and 4) Has responded, and shall at all times during the term of this Agreement respond, in a timely fashion to any government inspection requests relating to immigration law compliance and/or Form I-9 compliance and/or worksite enforcement by the Department of Homeland Security, the DepaRment of Labor, or the Social Security Administration. c.Consultant shall require all subcontractors or sub-consultants to make the same representations and warranties as set foRh in Subsection 21.6. d. Consultant shall, upon request of City, provide a list of all employees working under this Agreement and shall provide,to the reasonable satisfaction of City,verification that all such employees are eligible to work in the United States. All costs associated with such verification shall be borne by the Consultant. Once such request has been made, Consultant may not change employees working under this Agreement without written notice to City,acwmpanied by the verification required herein for such employees. 7 e.Consultant shall require all subcontractors or sub-consultants to make the same verification as set for[h in Subsection 21.d. f.If Consultant, subcontractor or sub-consultant knowingly employs an employee providing work under this Agreement who is no[authorized to work in the United Sta[es, and/or fails to follow federal laws to determine the status of such employee,that shall constitute a material breach of this Agreement and may be cause for immediate termination of this Agreement by City. g. Consultant agrees to indemnify and hold City, its officials, and employees harmless for, of and from any loss, including but not limited to fines, penalties and corrective measures, City may sustain by reason of the ConsultanYs failure to comply with said laws, rules and regulations in connection with the performance of this Agreement. 22. Governine Law and Venue. This Agreement shall be construed in accordance with and governed by the laws of the State of California and Consultant agrees to submit to the jurisdiction of California courts. Venue for any dispute arising under this Agreement shall be in Orange CounTy, California. 23. Intearation. This Agreement constitutes the entire agreement of the parties. No other agreement,oral or written,pertaining to the work[o be performed under this Agreement shall be of any force or effect unless it is in writing and signed by both parties. Any work performed which is inconsistent with or in violation of the provisions of this Agreement shall not be compensated. 24. Notice. Except as otherwise provided herein, all notices required under this Agreement shall be in writing and delivered personally, by e-mail, or by first class U.S. mail, postage prepaid, to each party at the address listed below. Either party may change the notice address by notifying the other party in writing. Notices shall be deemed received upon receipt of same or within three (3) days of deposit in the U.S. Mail,whichever is earlier. Notices sent by e- mail shall be deemed received on the date of the e-mail transmission. CONSULTANT" CITY" Smith Emery Laboratories, Ina City of Orange 1195 N. Tustin Avenue 300 E. Chapman Avenue Anaheim, CA 92807 Orange, CA 92866-1591 Attn.: Rober[Greeley Attn.: Youichi Nakagawa Telephone No.: (714) 231-2049 Telephone No.: (714) 744-5572 E-Mail Address: rob@smithemery]abs.com E-Mail Address: ynakagawa@cityoforange.org 25. Counteroarts. This Agreement may be executed in one or more coun[erparts,each of which shall be deemed an original, bu[all of which together shall constitute one and the same 8 i strument. Signatures transmitted via facsimile and elechonic mail shall have the same effect as original signatures. IN WITNESS of this Agreement, the paRies have entered into this Agreement as of the year and day first above written. CONSULTANT" CITY" SMITH EMERY LABORATORIES, INC., CITY OF ORANGE, a municipal corporation a California corpor. ion By:By: Printed Name: Jar s R •t ick Otto, City Managet Title: Civil i?;nineer Presiaant gy; APPROVED AS TO FORM: Printed Name: u2 Title: Mary E. B ming, Senior Ass stant City Attorn y NOTE:City requires the fo![owing signature(s) on behalf of the Consultant: I) the Chairman of the Board, tlre President or a Vice-Presrdent, AND (2) the Secretary, the Chief Financia[Officer, the Treasurer, an Assistant Secretary or an Assistant Treasurer. If on[y one corporate officer eeists or one corporate offrcer holds more than one carporate office,please so indicate. OR The corporate ojficer named in a corporate resolution as authorized to enter into this Agreement. A copy of the corporate resolution, certified by the Secretary c[ose in time to the ezecution of the Agreement, must be provided to Crty. 9 EXHIBIT "A" SCOPE OF SERVICES Beneath this sheet.] EXHIBIT'"A" SCOPE OE:WORK for GEOTECHIVICAL SERVICES A) Ggneral: This:agreement_does not guarantee the Contractor to receive any work from the City. The Cdntractoi.sliall provide geoteclinical services as requested_by,the City.6ased on a project's availability, needs and cotnparibility. The typical geoteclinical services and scope of work which the Consultant:may:be requested to peiform shall:include,but not be limited tq the following. Concrete/Asphalt.Batcli Plant Inspections Fie1d Inspections Moisture and Density Tests Sieve elnalysis Tests SandEquivalent,Tests Maximum Density Tests Concrete/Asphalt Mix Design Review ConcreteCompressive.SlrengthTests Cement/F1y Ash Sampling; Aggregate Sampling and Testing Water Sampling and Testing(Concrete Mix) Concrete Sampling and,Testidg(plant and site) Asphelt Sampling and Testing(plant and sit8)• Percent Crushed Particles Tests Asphalt Maximum Density AspLalt Extracrion/Gradarion Quality Assurance on Federal Funded:Projects All tests and inspections are to be cond'ucfed;per tlie ,fiequency and method outlined in,the current Calhens QAP. B) Soecific Reuu[rements: 1) Materials Laboratory — Shall be under the responstble ivanagement of. a CalIfornia registered .Engineer w[th ezperience In sampling, Inspecrion .and testing o€ construction materials: The'Engineer. stiall certify the results of all tests perFormed by laborafory personnel'under,'the"Engineer's.supervision. Tfie materials' laboratory shall contain cerHtied. test; eq ifpment capable of performing the,tests confor ning to.current Calfrans standards and sha11 provIde documentaHoa oF ,compliance (and current •:certifcation) with all of the following: E ibit "A" Page 1 a) Shall be a participant in one or more of the following'testing programx AASHTO Materials Reference Laboratory Ceme¢t and Concrete Reference Laboratory Caltrans' Reference Samples Program b) Shall employ personnel who aze cectified by one or more.o£the followin Calhans Disfrict Materials Engineer Nationally recognized non-Celhans 'organireHons• such as 'the..American Concrete Insfitute; NaHonal InsKitute of "Certifieafion'-of Engineering Technologies, eta Other,recognized organizations.approved by the State of Califocnia and/or recognized by]ocal govemments or private associations. c) The materials laboratory,shall only use latwratory,and testing:equipment tUat is in good working ordez All'such_equipment shall be calibrated at least once each year: AIl testing equipment must be calibrated:tiy impartisl means using devices of.accuracy haceable to the Narional Insritute of Standards and Technology. :4 decal shall be fiimly affi ced"to each.piece of'equipment showing the date of the last calibrarion 2) Acceptance Testing (AT —AT will be perfomied by a materials laboratory certified to perform the required tests. 1'he test results will be used to ensure that all materials incorporated into tlie project are in coinpliance with the contract specificallons. Testing methods will be in-accordance.witti tiie C'f Iviatliods:or-a national iecognized standard(i.e. AASHTO, ASTM;etc.) as specified in fhe wuhact specifcations. Sample locations and fiequencies', may; be iu accor8ance .•with 'the contract specifications. If not so specified: in.tfie;contracY,speaifications, mples shall be taken at the locafions and ffequencies es shown in Appendix D of the Calhans QAP Manual 3). The Contractor's rate of pay as shown lierein sliall inclitde labor, equipment, traveL time, and materials necessary to perform the geotechnical services.as specified liy the City. The Contractor's rates shall:be in effecGtluwgh the life o£tfiis Agreemen 4) All.rates shall be prevailing wage retes f Public Works pro jects speciFed':by the D'uector of Indusfiial'Relations 5) The actual hours of payment shall lie:deteimined by the total hours on site including batch plants inspections. Two-hour minimum qharge f each site visit less than two working hours n The total cost for eacli request stiall be_based on a tiine-and.materials basis in accordance witfi the Contractor's Sciiedules,'of Fees, and/or a "not to exceed" total. The Contraotoi shall proceed to provide the service within hventy-four (24) hours oF verbal/written request from the City unless othenvise d'uected"by the City. Exhibit"A" Page 2 SH.E 9g SMITH- EMERY LABORATORIES INC. IHL E.WASffiNGTONBLVD.•LOS ANGELES CA 90021 y v, g Pxoxe(213)749-3411•Far(213)749-7232 e RATo. _. SCHEDULE OF FEES Prepared For: City of Orange—Public Works Dept. SOUTHERN CALIFORNIA AREA July 1,2019-June 30,2020 E chibit"A" 8) Contractor must provide its proposed Quality Assurance personnel certificate of. proficiency and qualifications to the Ci,ry fQ review when requested. 9) Provide daily report and time sheet at the:end of the work day to the City fa review. 10)Coordinate with City Con4actor Quality Con ol Firm ro perform various testing services 11)Con actor shall_comply with all of the latest Calhans reqwrements fa Quality Assurance testing services. 12)Conlractor shall submit insurance certif'icates and endorsements, per the City requirements. Consultant shall,be notified and requested ro. submit witUin five (5) working daya 13)City reserves the righYto teiminate this Agreement fa any reason:by giving five (5) days written notice of intent to terminate to Consultant. E ibit "A" Page 3 Sou[hem Califomia Area Effec[ive 7/01/19 y` SN•EM p< f9Q g SNIITH-EMERY LABORATORIES SCHEDULE OF FEES R"O" Table of Contents Effective July 1, 2019 Southern California Area Professional Staff,Memberships, and Accreditations......................................................................................ii Affiliations.......................................................................................................................................................iii Charges for Services and Contract Terms ....................................................................................................... iv GeneralConditions .......................................................................................................................................... vi GeneralField Services................................................................................................................................:......1 LaboratoryServices ...........................................................................................................................................3 ASgregate........................................................................................................................................................4 AsphaltConcrete.............................................................................................................................................5 Calibrati on.......................................................................................................................................................6 CeramicTile....................................................................................................................................................7 Concrete........................................................................................................................................................10 ConstructionMaterials..................................................................................................................................1 l CurtainWa11..................................................................................................................................................13 Masonry................................................................................................:.......................................................15 Metallurgical..................................................................................................................................:..............16 Plasticsand Plumbing...................................................................................................................................19 Quality Assurance- 3`a Par[y Audit..........................:....................................................................................21 Reinforcement...............................................................................................................................................22 Soil................................................................................................................................................................24 Structural.......................................................................................................................................................25 Geotechnical and Environmental Services ......................................................................................................28 ChemicalServices.....................................................................:.....................................................................30 OrganicChemistry.......................................................................................................................................31 InorganicChemistry......................................................................................................................................32 AdministrationFees........................................................................................................................................34 i E ibit"A" Southem Califomia Area Effective 7/OId9 SH•EMF9 c9Q 6 SMITH-EMERY e RAtOP Principal JamesE.Partridge P.E:Civi1........................................................................................................................................................President Professional Staff-SEL Artedi Cortez P.E.,G.E.,M.S.G.E. World Open University,S.Dakom Praful Patel P.E:Metallurgy,Ph.D,Manchester University,U.K. Janeth Quintero P.E.,-Civil,B.S.C.E.Jweriana(I,Bogot6 Calam6ia Simon Bittar P.E:Civil,B.S.C.E,Cal Sta[e UniversiTy,Los Augeles Robert Rineer P.E.Civil,B.S.C.E.,Cal State University,Pomona Ted Peet P.E-Civil,B.S.C.E,ASNT Level IlI UniversiTy of Pittsburgh Mgelim Cabanilla,B.S.C.E,Adamson University,Philippines Joe Kings[on,B.S.C.E.,University ofPittsburgh Will Partridge B.S.M.E University of San Diego,USA Wilfredo So[e,B.S.C.E,Cenhal Luzon Poly[echnic,Philippines Agerico M.Banzuela,B.S E.M.,Mapua Ins(.ofTech,Philippines Ayesha 5.Syeda R.E.A.,M.S.C.E,-Cal Sta[e University,Long Beach William 7.Tate Jr AA-Civil,B.S.Pudget Sound College Idebrando Resurzeccioq B.S.C.E.,Far Eas[em U,Philippines GuildaNeshvad-chemistry,Ph.D.,Essex UuiversiTy,UK Rafael Cruz,B.S.E.E.,University of San[o Tamas,Philippines Azmat Imam—Chemical Engineering,M.Sc.,Ohio University,USA Lynn Klimasofski—B.Sc.,Cal Sta[e,Los Mgeles Christian Granada—Chemistry,National Universiry of Colombia Rick O Parlier Chemical Engineering,University of Califomia Offce Locations Main Oftice: Los Mgeles,CA 213)745-5333 • Fax: Administration 2l3)749-7232 GeneralLab 213)741-8626 Environmental 213)746-0744 Geotechnical 213)746-0744 Environmental Testing 2l3) 745-5312 (213)745-6372 Branch OfHces: Anaheim,CA 714)238-6133 • Fax(714)238-6144 Salem,OR 509)285-4337 • Fac(504)255-4355 Shanghai,China 86)-138-019-0 • Fex(86)21-6327-1433 San Francisco,CA 415)-642-7326 • Fax(415)642-0055 Las Vegas,NV 702)-840-7666 • Cell(714)264-6332 11 Exhibit"A" SouthemCalifomiaArea EfTective 7/01/19 y` SH-E t Professional Affiliatians 9A RATQ International Conference of Building Officials American Chemical Society. American Concrete Institute American SocieTy of SafeTy Engineers American Marketing Associa[ion American Welding SocieTy American National Standards Ins[itute Associa[ion ofEnvironmental and Engineering Geologists American SocieTy of Civil Engineers Society of Peholeum Engineers American SocieTy for Non Destructive Testing Geological Society of America American SocieTy for Testing Materials Intema[ional Association ofPlumbing&Mechanical Ofticials Construc[ion Specificalions Institute Shuchual Engineers Associa[ion of Southem Califomia Society of Fire Pmtection Engineers Nazional Society oFProfessional Engineers Califomia Geo[echnical Engineers Association American Water Works Association American Society for Quality Registrar Accreditation Boazd Approvals and Accreditations American Associa[ion of Transporta[ion O cials National Bureau Regula[ory Commission California Department of Heal[h,Sanitation,and Radiation Dept. Nucleaz Regula[ory Commission Ceramic Tile Institute United S[ates Navy City and CounTy of San Francisco O ce of Statewide Health Planning and Development CiTy of Los Mgeles Divjsion oFthe State Mchitect Calitomia Departrnent of Transpor[ation American Architectural Manufac[urers Association Intemational Accreditation Service A]VSI ASIvffi NQA-1 (Bechtel ASL) Army Corps of Enginee s Concrete and Cement Reference Labora[ory American Materials Reference Labora[ory Clark CounTy Approved Agency and Laboratory US Depaztment of State,Overseas Buiidings Operations Sta[e Of Florida and Dade County Appmved Ageucy end Labora[ory Interna[ional Code Conference-Evaluation Service IAPMO Inspection Agency and Laboratory Recogni[ion RABQSA/Ezemplar Registra[ion and Certifica[ion(Int)ChevRon,Exon,Shell,and BP,Petroleum Reg.Audifing Agency CaliComiaWaterBoardsELAPAccroditation CowtySanitationDistricfsofLosAngelesCounty Uniled Sfates Department of Agriculture Soil Permit NFPA Committees on Fire Science Technology Education Section Building Safety Sectioq CommerciaVResidential Architect,Engineers and Building Offcial Section National Fire Nlarshals Associate Oregon/NFPA Fire chief Association NFPA International AssociaHon of Arson Investigators Florida S[ate Strucwral Provisions Committee .LABC SWctural Committee Califomia Ti[le 24 Sub-Committee LABC Life and Safety Commit[ee Jurisdictional Approvals -Third Pacty Quality Assurance Agency and Testing Laboratory City and CounTy of Salem,Oregon Los Mgeles County;California City of Corvallis,Oregon NnHonal City,Califomia City of Ocean Shores,Washington Oakland,Califomia City Of Palmdale,Califomia Portland,Oregon Clark County,Nevada City and County of Riverside,Califomia S[ate Of Florida and Dade County,Florida San Diego County City and County of Spokane,Washingron San Jose,Califomia Emeryville,California San Mateo,Califomia Grays Hazbor CounTy,Washington State of Oregon Honolulu,Hawaii WABO,Seattle,Washington OSHA Approvals for Testing Califomia OSHA Oregon OHSA Federal OHSA Washington OSHA 111 Exhibit"A" SouthemCalifomiaArea Effec[ive 7/Ol/19 y` SH EMF9a9oa.° Charges for Services and Contract Terms RAt The Charges for Services and Genernl Conditions set fonh below will govem ihe provision of servica and will cons[iMe the conhact terms becween ihe Client and Smith-Emery Laboramries("Smith-Emery")unless he Client end Smith-Emery have execuled e written contract wi h respect to such services,in which case the rertns and provisions of the written contracl shallconUol. 1. Working Conditions and Hours—Field Services LI MinimumCharges Show-up—No work pedormed—2 hours. 4 hour minimum-- 1 ro 4 hours work completed before noon. 8 hour minimum—Work over 4 hours-My work entending put noon. NOTE: Less ihan 24 how call-out may necessitate premium charges. 1.2 RegularTime Firs[8 hours,Monday thmugh Fnday,behveen 6:30am to 4:OOpm. 1.3 TimeaodOue-Half Hows 9 ihrough 12,Monday Ihmugh Friday. Hours 1 hmugh I2 Samrday. Day Shift benveen 3:00 a.m.and 5:00 a.m. 1.4 Dau6leTime All hours after 12 Monday through Saturday and all day Sunday. All holiday hours for in-plant off-site shop inspections.' I.5 TripleTime Holiday atjobsite.Holidays are:New Year's,Memorial,Presidents,Independence,Labor,Vetemns,Thankagiving,Day eRerThanksgiving and Cfvistmas. 1.6 TravelTimeandMiieage No Travel Time or Mileage vnlhin 50-mile radius of ow laboratory for Deputy inspections only.For projecis aucside ihe 50-mile mdius, special quotations will be made. Technicien time cherges may be portal ro portal(if necessary ro pick up equipment)ro closest lab location pWs mileage reimbursement. 17 ParidngWhennot fiunished,parking vrill be charged es paid by lhe SEL represen[a[ive. 1.8 Subsistence On remote jobs,subsistence,when mt fumished,will be chazged by quotation. l9 ShiftDifterenlial Second(Swing Shift)--Eight(8)hours will be charged for 6rst 7'/:hours vrorked.Time worked in excess of 7'/,hours will be billed at time andone-halfrate. Third(Greveyerd Shifl)—Ei t(8)hours will be charged fot firs[7 hours workM.Time xrorked in ezcess of7 hours wi116e billyd at time and one-half rate. Northem Califomia Steel Shops--add 12.5%for Nigh[Shift ifferen[ial. 1.10 Compktion SELrepresentativewillremainonjobwtildischargedbycompetentauthority 1.11 Canrellation No charge ifmade before 4:00 p.m,oflhe preceding day.Sce Minimum Charge. 1.12 3'"Party illingSothvare Customer requests to submi[imoice(s)via customers Software will be cha ged for special billing hendling.Cha ges will show on Ihe imoice u Speciel Billing Handling at a flat Iate of$45. 1.13 InsuraoceSmith-Emery cerries all insufance mquired by law.Additional costs ofeatra insurance certificares,coinsurance endarsements or additional insurance will be invoiced[o the clienL N Exhibit"A" SouthemCalifomiaArea Effective 7/Ol/19 ZH•E y Charges for Services and Contract Terms - Continued 9 RA10Q' 2. Terms of Payment 2.1 Upon ordering work from Smith-Emery and in wnsideration of[he extension of credi[,Client and Smith-Emery agree as follows: a Invoices for services will be rendered weekly and payments Ihereof are due upon presentation of invoice. b. Where credit terms have been reques[ed and approved by Smith-Emery,invoice terms will be net fifteen(15)days. a Clien[will mtify Smi[h-Emery of any invoice errors or necessary correc[ions within fifteen(15)days of receip[of invoice; hereafter,clien[aclmowledges invoices shall be deemed[o be correct. d. Invoices shall be deemed delinquent if not paid wi[hin thirty(30)days Gom the da[e of invoice,and will be subject[o a late paymen[ charge of I.5% of[he invoice Wtal plus an additionel charge of I.5% of the invoice [otal for each month for addi[ional credit and collection expense incurred Ihereby. e. Smith-Emery reserves the righ[to terminate its Services[o Client,with 3-day notice, if all invoiws are no[paid currently. Upon such[ermination of Services,the enlire amoun[accmed for atl Services pedormed shall immediately become due and payable. Client waives any and all claims agains[ Smith-Emery, its subsidiaries, a liazes, servants and agents, in wnnection with[ermination of work pursuan[to[his paragraph. f. Should Smith-Emery deem i[necessary to refer a pasEdue acrqunt[o an attomey or to file suit for wllection,Clien[agrees o pay all actual expenses and costs incurred thereby, including actual attomey's fees and cos[s. Jurisdiction and venue of all such actions and any olher actions arising Gom this agreement or the provision of services by Smith-Emery shall be in Los Mgeles County,State of Califomia. 3. Escalatian Clause 31 The prices quoted below for All Services will change aRer June 30°each year. On July 1^of each year thereaRey [he charges for services se[ forfti in this Schedule of Fees will be adjus[ed by changes in our general administra[ive and overhead expenses. These adjusted charges shall bewme the agreed upon basis for charges by Smi[h-Emery to Client. 4. Anticipated Costs 4.1 Client recognizes and agrees that any"anticipa[ed cos[s,""budget es[imates,"or ihe like that may be prepared by Smi[h- Emery are NOT "guaran[eed macimums," "lump sums," or'fiot-to-exceed totals." Client will be invoic d tor all work performed and only for work pedormed based ori Smith-Emery's Working Conditions and Hours es an attachmen[[o[heir coutraot. 4.2 7'he Clien[recognius that if Shop S[eel inspection is lis[ed in the proposal,that udess noteQ[he inspection is estimated to be performed in only one steel fabrication faciliTy. In addi[ion, it is recognized by [he Client Ihat any weekly overtime hours,SaNrday or Sunday work,double shift,anNor nigh[shift dif£erenfial for shop s[eel inspection is not included in this proposal unless nored. ' 5. Prevailing Wage 5.1 Smi[h-Emery reserves[he right[o re-negotiate the hourly wage portion of the projec[proposal if the project is deemed to be prevailing wage after lhe proposal is submitted and/or signed. 5.2 Wage de[ertnina[ions for PW projecis are set by the Depar[ment of Labor and bewme effec[ive Suly 1°of each year. At that[ime,[he charges Por services set forth in this Schedule of Fees will be adjusted by the new determination and changes in our general adminisfrative and overhead expenses. These adjusted charges shall become the agreed upon basis for charges by Smi[h-Emery to Elient. V E ibit"A" Sou[hern Califomia Area EfPective 7Po l/19 SN'EM General Conditions 9 Vr< RAT 1. Indemnification 11 In the event of any claim against Smi[h-Emery by any party other than the Client, Clien[ agrees to hold Smith-Emery, incWding its shareholders,oEticers,directors,employees,agents and representatives,free and hermless of and from,and to indemnify and defend Smith-Emery against, any and all liability, claims, causes of action, demands,judgments, losses, damages, expenses or costs (including, bu[ nat Iimited [q all cos[s and fees of li[igafion) of every kind, naNre and descriptioq including, but not Iimited to, eny and all demands arising by reason of injury or death[o person or darnage to properly, real or personal, including loss of use thereof, ewnomic loss or loss or damages otherwise arising direc[ly or indirectly ou[of[he obligations herein undertakeq or out of operations conducted by Clien[,however caused or alleged W have been caused, even if due to Ihe acts, errors, omissious or negligence, active, aftirma[ive or passive of Smith-Emery, except for such losses or damages arising out of or caused by the sole negligence or willful misconduct of Smith•Emery. 2. Limitation of Liability 21 Client and Smith-Emery agree [o limit the liability, including but not limited to liability for consequenfial damages, of Smith-Emery, including i[s shareholders, o cers, directors, employees, agents end representa[ives for any acts, errors, omissions,breaches of contrac[,or negligence,ac[ive,af£umative,passive,concurren[or sole,on the par[of Smith-Emery, arising direc[ly or indirectly from Ihe performance of the professional services under ihis Ageement,to Clien[to$IQ000 or an amount equal to Smith-Emery's fee,whichever is grea[er. 22 Clien[ agrees and understands [het, in order [o provide [he professional services reques[ed at [he agreed-upon fees, [his Agreement does wt provide for full liability of Smith-Emery for losses or damages which may arise directly or indirectly under this Agreement. Client further understands that should Client require Smith-Emery to accept exposure to grea[er Iiability under this Agreemen[, Clien[ has the opportunity to negotia[e in advance a higher limifation of liability, or to eliminate entirely such limit of liability, but tha[Ihe higher fees commensura[e with Ihis higher risk of liability to Smitlo- Emery shnll be subject[o agreement Client agrees that Ihis pmvision limiting Smith-Emery's liability canno[be modified, al[ered,or varied except by a written instrument signed by client and Smith-Emery. 2l Client unders[ands and agrees hat Smith-Emery is mt an insurer, Ihat this Agreemen[ does not provide Client with insurance coverage by Smi[h-Emery or anyone acting on its behalf;that all fees heremder are based solely on the value of he professional services m be provided by Smith-Emery;that insurance,if any,shall be obtained by Clientat ClienPs sole expense. 3. Dominant Terms 11 The terms and conditions,of[his Agreement shall take precedence over any terms and conditions which may appear in ClienPs purohase ordeq approval or acceptance. Any terms and conditions of ClienPs purohase ordey approvel or acceptance which are not identical to the terms and condifions of this Agreement are null end void, ure not part of the Agreement behveen Smith-Emery and Client and are not binding upon Smith-Emery. The terms aud wndi[ions of this agreement may not be vazied or changed, nor any of its provisions waived, except by written agreement, signed by an au[horized representa[ive of Smith-Emery. PLEASE READ THESE GENERAL CONDITIONS WITH CARE vi Exhibit"A" Southem Califomia Area Effective 7/Ol/19 SN'EM General Conditions 9 4 RAT p Schedule of Fees for Inspection Services The prices qwted below for All Services will change after June 30st each year.On July lst of each year IhereaRey the chazgu Cor services set Corth in this Schedule of Fees rill be adjus[ed by changes in our generel administrative and overhead eacpenses."1Lese adjusted charges shall become the ageed upon basis for cha'ges by Smith-Emery to Client My customiud pricing wceived in a"Project Cos[EsNnate"shall supersede his document. Concrete Inspection Steel Shop Visual Inspection 111I Regulaz Time 83.00 1210 Regular Time By Quote Gradi g Inspection Steel Shop Non-Destructive Testing 1510 Regular Time 125.00 2210 Regular Time By Quote Fireproofing Inspection Steel Field VisualInspection 1314 Regular Time 583.00 1314 Regular Time 83.00 Membrane Inspection Steel Field Non-Destructive TesNng 1810 Regular Time 90.00 2310 Regular Time 90.00 Field Technician (ACUSOILS/AC) Masonry Inspection 1815 RegularTime 83.00 3510 RegularTime 83.00 WoodFramingInspection CWI/Non-DestructiveInspection . 1819 Regular Time 83.06 Regular Time 90.00 Subsistence/Per-Diem rate for Steel shop and/or shop non-destructive testing or any other shop inspection out of the state of California and in state greater than 50 miles from Smith Emery shall be imoice is a T&M rate by quote rate. GSA establishes[he per diem rates For[he]ower 48 Continental United S[ates(CON[IS),which are the maximum allowances that employees are reimbursed for expenses incurzed while on official travel. In accordance with per diem rate for an azea are actually three allowances:the lodging allowance,meals allowance'and the incidental expense allowance(carrental). Smith Emery shall make travel and/or subsistence payments to each worker to execute the work out of state and in state grea[er[han 50 miles from Smith Emery.All havel and subsistenceshall be invoiced to client. VI Exhibit"A" SouthemCalifomiaArea Ef£ec[ive 7/01/19 SN'EM Schedule of Fees for General Field Services 9 4` RAtOP General Field Services Activity Cost Film Adhesion,ASTM D4541,Regulaz Time,Per hour,4-hourminimum.........................................................4474....................................I10.00 Dry Film Thickness,ASTM D6132,Regular Time,per hour,4-hour minimum................................................4475....................................]]0.00 Adhesion/Cohesion Testing of Spray Applied Fireproofmg Regular Time,per hour,4-hour minimum............3210....................................1]0.00 Firestopping Technician,Regular'Iime,Per hour 4-hour minimum...................................................................3211 ....................................I10.00 Ba[ch Plant Technician,Regular Time,Per hour,4-hour minimum....................................................................3310.....................................I10.00 Roofing Technicien,Regular Time,Per hour,4-hour minimum.........................................................................3410.....................................I10.00 Membrane Technician,Regular Time,Per hour,4-hour minimum.....................................................................3510.....................................110.00 Roo ng/Waterproo ng Technician,Regular Time,per hour,4-hour minimum.................................................3511....................................I10.00 Pull Testing of Post Installed Mchors,Technician,Regular Time,per hour,4-hour minimum........................3512....................................110.00 Torque Testing of Post Mixed Concrete,Technician,Regular Time,per hour,4-hour minimum............................................................3610....................................1]0.00 Mileage................................................................................................................................................................5101.........................................0.80 Special TestinpJlnspection Services....................................................................................................................4420...............................By Quote Structural Investigations of Exis[ing Buildings..................................................................................................3088 ..............................By Quote CorzosionSurvey.........................:.......................................................................................................................3096...............................By Quote Ground PeneVating Radar,Per hour,4-hour minimum.......................................................................................3097.....................................180.00 Equipmen[Delivery and Stand by time,per Hour.............................................:................................................3099.....................................]00.00 Non-Deswctive Testing,4-hour minimum ......................................................................................................3061 ...............................By Quote Non-Deshuctive Testing,Phased Array UT,4-hour minimum ........................................................................3062...............................By Quote Field Technician Minimums Regular Hours:Monday tluough Friday,6:30am[0 4:OOpm. Show-up time,no work performed.......................................................................................................................................2-hour minimum chazge FieldService Calls.......................................................................................................................................................4 end 8-hour minimum charge Field Services Work.................................................................................a minimum of 1 hour per week engineering supervision may be charged Overtime Monday[hrough Friday,Over 8 Hours or after 4:00 p.m.;Salurday,1 to 12 Hours......................................................................time and one-half Sundaysand Holidays, 1 [0 8 Hours...............................................................................................................................................[ime and one-half Monday[hrough SaNrday,Over 12 Hours;Sundays and Holidays,Over 8 Hours.................................................................................double[ime Field Equipment Charges Activity Cost Skidmore,Per day..........................................................................:..:..................................................................4415................................$ 100.00 TorqueWrench,Perday......................................................................................................................................4413.......................................75.00 Multiplier,Per day...............................................................................................................................................4414.......................................30.00 Pull Test Equipment(ram,P mP,BaBe)Per day................................................................................................4464.....................................150.00 Dynamometeyper day.................................::.....................................................................................................4465.......................................75.00 SchmidtHammer,Per day...................................................................................................................................9704.......................................75.00 Ground Penetrating Radar(GPR)(4-hr min),Per hour......................................................................................3097.....................................175.00 Ren[a]Dips[ick 2000,Per week...........................................................................................................................4825................................2,500.00 Fla[ness Tes[ing,halfday....................................................................................................................................4814.....................................600.00 FlatnessTestinS,Per day.....................................................................................................................................4526................................ 1,200.00 FieldHarMess Equipmen;per day................................................................................................:....................9117.......................................65.00 DryFilm Thickness Gage,per day......................................................................................................................4409.........................:.............65.00 Misc.Equipment Charge............................................................................................................:........................4416...............................By Quo[e Photostress,per day...........................................................................................:.................................................4419...............................By Quote Vibrationand Sound Moni[orinB,Per day...........................................................................................................4430...............................By Quote Concrete Air Meter,Pressure of Volume[ric,Per day.........................................................................................4431.......................................75.00 Concrete Unit Weight Kit,scale,bucke[,Plate,mallet,and rod,Per day............................................................4436.......................................75.00 2-inch cube brass embecco molds,each per day.................................................................................................4437.......................................75.00 Film Adhesion Equipmen4 Dollies and EpoxY Per day......................................................................................9127.....................................100.00 ShainGages.........................................................................................................................................................4467...............................By Quo[e FallPrevention Equipment,Per day....................................................................................................................4397.......................................50.00 MobileConcrete Laboratory...............................................................................................................................4398.....................................260.00 UltrasonicTes[ing Equipment,Per day....................................................................................................:..........2400.......................................50.00 Phased Array Ultrasonic'Ies[ing Equipment ....................................................................................................2500...............................By Quote I of 34 Eachibit"A" Sou[hernCalifomiaMea Effec[ive 7/01/19 SH'EM General Field Services Continued 9 4 e RAtOP Concrete Coring Services Technician and Equipmen[Concrete(4 and 8 hour minimum),Per hour............................................................3710.................................$I50.00 Coring for Overhead/Ceiling corinB,(4 hr.minimum),Per hour......................................................................3910................................$ 185.00 Miscellaneous Concre[e Coring Prices: Patching Slab on Grade Cored Holes with 2500 psi Concrete Patch,each..................................................7345......................................40.00 ScaffoldinB Per day.....................................................................................................................................7348.....................................150.00 Thickness Determination per ASTM C42,each..........................................................................................7346.......................................30.00 Compression Streng[h Determinetion(Including sample preparation and capping),each ........................7347....................................100.00 Travel Time,per hour(havel[ime by quote for prevailing wage projects).........................................................7235......................................90.00 Mileage,Per mile.................................................................................................................................................7313.........................................0.80 Asphalt Concrete Coring Services Technician and Equipment Asphaltic Concrere Cores(4 and 8 hour minimum),per hour.................................3710....................................150.00 Altema[e Individual Core Prices(all prices are for a four core minimum job): Asphaltic Coucrete Cores 2",3"and 4"Diameter(First 6"in dep[h),each...............................................J022......................................60.00 Asphaltic Concre[e Cores 6"and 8"Diame[er(firs[6"in depth),each.....:.................................................7029.......................................60.00 Asphaltic Coucre[e Cores price per inch after 6"in depth),each................................................................7030........................................3.50 Miscellaneous Asphaltic Coring Prices: Pa[ching of Core Drilled Holes Using Cold Patch Ma[erial,each...............................................................7031......................................25.00 Thiclmess Determination per ASTM C42,each..........................................................................................7032.......................................25.00 Specific Gravity for Determinazion ofPercent Compaction per ASTM D 2726,each...............................J033......................................35.00 Specific Gravity for Detennination of Percent Compaction by paraflin,each............................................7034......................................55.00 2 of 34 Exhibit"A" Sou[hem Califomia Area EffeMive/Ol/19 SN'EM Schedule of Fees for Laboratory Services 9 4t RASOP Professional Staff Activity Cost Registered Professional Engineey Laboratory,Per hour.....................................................................................3011 ................................$205.00 Staff Engineer,Per hour.......................................................................................................................................3015.....................................155.00 Laboratory Supervisor,regular[ime,per hour.....................................................................................................3012.....................................115.00 Tes[Technicians--Labora[ory,regular time,per hour.......................................................................................3013.....................................110.00 Test Technicians--Away from Lab,Regular Time,per hour.............................................................................3014.....................................110.00 FieldTes[ing-Training,regular time,per hour...................................................................................................3009.....................................110.00 SubmittalReview,Per hour.................................................................................................................................2441.....................................205.00 S[eel Shop Management,per hour.......................................................................................................................2442.....................................1 I5.00 Level III Supervisor—ASNT,Perhour...............................................................................................................2443.....................................I40.00 Expert Wituess Testimony CouR Appearauce,Per hour,Four-hour minimum.......................................................................................9603.....................................400.00 Prepaza[ion for Court,Consultations,Per hour............................................................................................9605.....................................300.00 Plus aetua(expenses when ouboj-Jmvn Miscellaneous Support Fees Administrative AdminishativeSupport........................................................................................................................................4443........................5%of Invoice Report Chazge,per report,per copy..................................................................................................................9110.........................................2.75 FinalReport Charge.............................................................................................................................................9111...............................By Quote GeneralTes[ing-Rush Chazges............................................................................................................................4812.......................................50% Special Testing MiscelleneousSample Pick-uP,Per hour.............................................................................................................5022.......................................80.00 Miscellaneous Pick-uP,Per Vip minimum(within 40-mile radius) ....................................................................5023....................................150.00 Miscellaneous Pick-uP,Per hip minimum(more than 40-mile radius) ..............................................................5028....................................250.00 MaterialsPurchazed.............................................................................................................................................4406...............................By Quote SemplePrepazation..............................................................................................................................................4408...............................By Quo[e Special Test SeaUp(2-[echs+l engineer crew)per hour....................................................................................4422.....................................300.00 SpecialTesting..............................................................................:.....................................................................4420...............................By Quote SampleDisposal..................................................................................................................................................4425...............................By Quote Travel xpenses Subsistence,per day............................................................................................................................................ 1 t03...............................By Quote TravelExpense.................................................................................................................................................... 1106.............................Cost+25% TravelTime,per hour...............:..............::..........................................................................................................4456.......................................90.00 Mileage,Per mile.................................................................................................................................................5101.........................................0.80 IltSldO.SBfVICCS Concre[e Core Cutting.........................................................................................................................................4313...........................Cost+25% MaterialsPurchued.............................................................................................................................................4406...............................By Quote Rentalof Equipment............................................................................................................................................4416...........................Cost+20% OutsideLaboratory............................................................................................................................................4417...............................By Quote OutsideServices..................................................................................................................................................9702...........................Cost+25% Laboratory Hours Labora[ory hours aze 7:OOAM through 4:OOPM,Monday through Friday. Addi[ional charges will be made for off-hours or weekend testing as follows: Off-hour Laboratory Operatians,Per day............................................................................................................5051 ..................................... 1,000 Holiday Labora[ory Operations,Per day.............................................................................................................5052..................................... 1,500 Generally for Compression Testing oF Concrete,Base PIa[e Grout,Masonry Mocfar and Grout,es well as Tension and Bend Tes[ing of Reinforcing Steel. 3 of34 Exhibit"A" Sou[hem Califomia Area Ef£ective 7/01/19 SH'EM 9Q` Laboratory Testing-Aggregate RATOP Aggregate Properties AcHvity Cost Absorp[ion,Coarse,ASTM C 127,each.............................................................................................................7000..................................$45.00 Fine,ASTM C 128,each.................................................................................................................7001.......................................55.00 HarMess Tes[,ASTM D 1865,each...................................................................................................................7557...............................By Quote InLab Rock Coring and Cutting.........................................................................................................................4312.....................................100.00 Loss On Ignition,ASTM C25..............................................................................................................................7037...............................By Quote Percent FIaUElongated CRD C 119,ASTM D 4791,each..................................................................................7010.....................................200.00 Plate Bearing Tes;ASTM D 1195,D 1196........................................................................................................7118...............................By Quote Petrographic Analysis of Aggregate for Concrete,ASTM C295,each...............................................................7024...............................By Quo[e Poten[ial Alkali-Silica Reactivity of Aggregate for Concrete,ASTM C 289,Chemical Method,each..............7551 ...............................By Quote Potential Alkali Reactivity of Aggregate for Concrete,ASTM C 1260,Mortaz•Bar Method,each....................7552...............................By Quote Po[en[ial Alkali Reac[ivity of Carbonate Rocks for Concre[e,ASTM C 586,Rock Cylinder Method,each......7565...............................By Qw[e Sodium soundness-Fine,5 cycles,ASTM C 88,each.......................................................................................7012.....................................220.00 Sodium soundness-Fine,5 cycles,with sample prepazation AS7Tv1 C 88,each................................................7046....................................295.00 Sodium soundness-Coarse,5 cycles,ASTM C 88,each...................................................................................7047....................................230.00 Sodium soundness-Coarse,5 cycles,with sample preparation ASTM C 88,each............................................7050........:...........................280.00 Magnesium soundness-Fine,5 cycles,ASTM C 88,each.................................................................................7048....................................235.00 Magnesium somdness-Coarse,5 cycles,AS7T1 C 88,each.............................................................................7049....................................270.00 Specific Gravity,Bulk SSD,Coazse up to 1 Y:",ASTM C 127,each.................................................................7013......................................70.00 Specific Gravity,Bulk SSD,Coazse up W 2%:",ASTM C 127,each.................................................................7051 ....................................110.00 Specific Gravity,Bulk SSD,Coarse up W 2%z„ Complete ASTM C 127,each.................................................7052....................................175.00 Specifc Gravity,Bulk SSD,Fine,ASTM C 128,each.......................................................................................7014.......................................80.00 Specific Gravity,Buik SSD,Coarse,Complete AS1'M C 127,each...................................................................7045....................................125.00 Specifc Gravity,Bulk SSD,Fine,Comple[e ASTM C 125,each.......................................................................7046.....................................135.00 Unconfined Compression Test of Intact Rock,ASTM D2938,each...................................................................7021......................................70.00 Uni[Weight,ASTM C 29,(No Air Void Determination)each...........................................................................7017.......................................70.00 Unit Weight and Air Void De[ermination—Coarse Aggrega[es up to 1",AS1M C 29,each.............................7035....................................200.00 Unit Weight and Air Void De[e mination—Fine Aggrega[es,ASTM C 29,each...............................................7036..........................,.........200.00 Unit Weight only—Coarse Aggregates up to 2'/:",ASTM C 29,emh...............................................................7053....................................125.00 Uni[Weight and Air Void De[ermination—Coarse Aggregates up ro 2'h",ASTM C 29,each.........................7054....................................225.00 Conformity Clay Lumps/Friable Particles,ASTM C 142,each..............................................................................................7101...............:.......................50.00 Cleanness V alue,Calif.227, 2%"x 1 '/:"each..................................................................................................7055.....................................225.00 Cleanness Value,Calif.227, 1 '/:"x 1"each......................................................................................................7056.....................................I50.00 Cleanness V alue,CaliE 227 up to 1"each.......:.................................................................................................7004.....................................125.00 Durability Index,Calif.229,Coarse,Method A(Dc)retained#4,each............................................................J005....................................170.00 Durability Index,Calif.229,Coarse,Method C end D (D fine,each..............................................................7006....................................165.00 Durability Index,Calif.229,Method B Dc Mod.Lightweight aBB,each..........................................................7059....................................I75.00 Los Angeles Rattler,up tol '/:„ ASTM C 131,each..........................................................................................7008.....................................170.00 Los Mgeles Rattler,up tol '/:"with sample preparation ASTM C'131.each..................................................7057....................................200.00 Los Mgeles Rattler,up to 2'/:" ASTM C 535.each..........................................................................................7009.....................................200.00 Los Mgeles Rattler,up to 2%z"with sample prepazation ASTM C 535,each..................................................7058....................................235.00 Lightweight Aggmgate,Coarse,ASTM C 123,each..........................................................................................7007........................,......By Qwte Lighhveight Aggregate,Fine,ASTM C 123,each..............................................................................................8514...............................By Quote OrganicImpuri[ies,ASTM C40.........................................................................................................................71I5.......................................50.00 Sand Equivalen[(Average oF3)Calif.217,each................................................................................................5516.......................................90.00 Sand Equivalen[(Average of 3)ASTM D 2419 each.........................................................................................7123.......................................90.00 Sieve Analysis,Coazse,ASTM C 136,Cal Test 202 each up[0 1 Y" ...............................................................7015....................................125.00 Sieve Analysis,Coazse,ASTM C 136,Cal Test 202 each greater that 1 '/:".......................................................7039....................................200.00 Sieve Malysis,Fine,ASTM C 136,Cal Test 202,each.....................................................................................7016.....................................110.00 Sieve Malysis,Fine and Coerse Combined up to 1 '/:",ASTM C 136,Cal Tes[202,each...............................7549....................................210.00 S[aining Materials,ASTM C 64I,each...............................................................................................................7553...............................By Quo[e A Aush Charge of 100%for same-day results apply[o the following tests: ASTMC136 ASTM C29(Unit Weight only) 4 oC34 Exhibit"A" Sou[hemCalifomiaMea EtTective 7/Ol/19 y`` H EMFy 9Q Laboratory Testing-Asphalt Concrete RA70P Asphalt Concrete Activity Cost AggrcgateCorzection for Igni[ion Oven,each....................................................................................................4117..................................E 50.00 AsphaltCore DensiTy,each.................................................................................................................................4112.......................................35.00 CentrifugeKerosene Equivalent..........................................................................................................................4118.....................................150.00 Complete Asphalt Concrete Mix Design,each....................................................................................................4119...............................By Quo[e Extraction,%Asphal;ASTM D 2172(Method A,B,or C)or Calif.310.Ezcluding Ash Correction,each.....4110......................................75.00 Extraction,%Asphalt Ignirion Oven,each........................................................................................................4111.....................................100.00 Gradation on Extracted Sample(Including Wash)Calif.202,each....................................................................4108....................................100.00 Mazimum Density Hveem,Lab-mixed-Calif.366,each..........................................................................................................4104.....................................175.00 Hveem,Pre-mixed-Calif.366,each...........................................................................................................4105..................................... I35.00 Marshall,4-Inch Lab-mixed-ASTM D 1559,each....................................................................................4106..................................... 175.00 Marshall,4-Inch Pre-mixed-ASTM D 1559,each.....................................................................................4107.....................................125.00 Marshall,6-Inch Lab-miaced-ASTM D 5581,each....................................................................................4122.....................................300.00 Mazshall,6-Inch Pre-mixed-ASTM D SSS l,each.....................................................................................4123.........:...........................250.00 Maximum Theoretical Unit Weight(Rice Gravity)ASTTvI2041,euh...............................................................4120....................................175.00 Moisture Content of Asphal[,CT382..................................................................................................................7019.......................................35.00 MoistureVapor SusceptibiliTy.............................................................................................................................4113.....................................200.00 PeneVationASTM D 5,each...............................................................................................................................4109.......................................60.00 Stability Tcsts: Hveem,Lab-mixed-Calif.304,each..........................................................................................................4100.....................................250.00 Hveem,Pre-mised-Calif.304,each...........................................................................................................4101.....................................200.00 Marshall,4-inch Lab-mixed-ASTM D 1559 each....................................................................................4102.....................................250.00 Marshall,4-Inch Pre-mixed-ASTM D 1559,each....................................................................................4103.....................................200.00 Marshall,6-Inch Lab-mixed-ASTM D 5581,each....................................................................................4124.....................................250.00 Marshall,6-Inch Pre-mixed-ASTM D 5581,each....................................................................................4125.....................................200.00 Non-Destructive Pavement Deflection Testing using Benkelman Beam.............................................................4141 ...............................By Quo[e 5 of 34 E ibit"A" Sou[hemCalifomiaArea EfTective 7/01/19 SN"EM 9Q Laboratory Testing-Calibration Verification Services RATo Calibration Verification of Skidmore-Wilhelm Device&Torque Wrench Activily Cost Calibration of Skidmore-Wilhelm Device,in I.ab up to 110,000 Ibs..........:.......................................................4403....................................200.00 Calibration of Skidmore-Wilhelm Device,in Lab up to 115,000 ro 200,000 Ibs................................................4126....................................300.00 Calibra[ion of Torque Wrench by Skidmore-Wilhelm Device,each bol[size(3 required).................................4404....................................200.00 Calibration Verification of Hydraulic Jacks Up[0 50-[ons.......................................................................................................................................................4450.....................................225.00 51 [0 74-tons........................................................................................................................................................4451.....................................250.00 75 to 99-tons........................................................................................................................................................4452.....................................275.00 100 to 199-tons....................................................................................................................................................4453.....................................325.00 200 to 299-[ons....................................................................................................................................................4454.....................................350.00 300 to 500-tons....................................................................................................................................................4466.....................................600.00 CustomSystems..................................................................................................................................................4455...............................Dy Quote No[e:Extra-handling charges will be made on any ram or pump too heary or bullq tor one man to lift. Calibration Verification of Measuring Device Calibration of Linear Measuring Device,each....................................................................................................4497...............................By Quote Calibration of TemperaNre Measuring Device,each..........................................................................................4498...............................By Quo[e Calibration of Mass Measuring Device,each......................................................................................................4499...............................By Quote Calibration of Force Measuring Device,each.....................................................................................................4483...............................By Quote Calibration ofPressure Measuring Device,each.................................................................................................4484...............................By Quote Calibration ofMiscellaneous Measuring Device,each........................................................................................4485...............................By Quote Calibration of Infrared TemperaNre Gun,each...................................................................................................4486..................................... I25.00 Calibration of Amp Meuuring Device,each......................................................................................................4487.....................................125.00 Calibrntion of Torque Wrench,each(0[0 250 ft-Ibs).........................................................................................4488.....................................175.00 Calibration of Torque Wrench,each(0[0 251 to 600 ft-Ibs)..............................................................................4127.....................................250.00 Calibration of Pressure Gage,each(0[0 600 psi)..............................................................................................4128.....................................200.00 Calibration ofPressure Gage,each(601 to 5000 psi)........................................................................................4129.....................................300.00 6of34 Exhibit"A" SouthemCalifamiaArea Effec[ive 7/Ol/19 SN'EM Laboratory Testing- Ceramic Tile and Stone 9 v RA*°` Minimum Charge of$375 for any Tile Testing Service Apply Laboratory Ceramic, Porcelain, and Clay Tile Testing Activity Cost LabTechnician,Per hour.....................................................................................................................................3013.....................................I10.00 Dimensional Thiclaess 5.50 each(ANSI requires 80)................................................................AS7'M C499.......................4900.....................................500.00 Facial Dim.5.50 each(ANSI requires 80)..............................................................ASTM C499.......................4901.....................................500.00 Warpage,731 each(80 required)............................................................................ASTM C485.......................4902.....................................585.00 Wedging.731 each(80 required)...........................................................................ASTM C502.......................4903.....................................585.00 Friction Sta[ic Coe cien[of Friction(3)per set(Not Modified)(•Withdrawn AS77..AS7'M C1028".......................4904....................................440.00 Coe cient ofFriction(3)per se[(Modified)(`Withdrawn AS7T..................ASTM C1028".......................4934....................................440.00 Dynamic Coe cien[of Fric[ion(3)per se[(Ceramic Only).................................ANSI.AI37.1.......................4935.....................................440.00 Dynamic Coefficient of Friction(5)per set(all except Ceramic).........................ANSI B101.3.......................4960........:...........................440.00 Physical Na[er Absorption,65.00 each(5 required).............................................................ASTM C373.......................4905.....................................395.00 Initial Rate of Absorytion,47.00 each(5 required).................................................ASTM C373.......................4936.....................................235.00 Thermal Shock,(5 required)perse[........................................................................ASTT1 G184.......................4911.....................................365.00 MohsHardness(5 required)per set.....................................................................................................................4923.....................................175.00 Length Change(3 required)per set.......................................................ASTM C157'Modified.......................4980.....................................900.00 StYength (ANSI A137.1) Bond Strength,92.00 each(shear tes[)(5 required)................................................ASTM C482.......................4906.....................................460.00 Breakiug Strength,30.00 each(10 required) ..........................................................AS7M C648.......................4907.....................................285.00 Breaking Load Strength-Flex or Center point.(5 requ've per set........................A51M C293.......................4981....................................300.00 Compressive Strength,Modified with Cutting,each ...............................................ASTM C67.......................4937..................................... 100.00 Compressive SVength Test,(5 Iequired)per se[....................................ASTM C42'Modi ed......................4982....................................475.00 Flexural Strength Test,(5 required)per set ........................................AS7T1 C674"Modi ed......................4983....................................365.00 Modulus of Rupture,Ceramic 85.00 each(5 required) ..........................................ASTM C133.......................4916...............:.....................425.00 Impact,IO required)Per se[...................................................................................ASTM C368.......................4920.....................................315.00 Impact,(LA S-601-3),(5 re per set.................................................ASTM D2444'Modified......................4984.....................................440.00 Tensile Tests in Laboratory...................................................................................................CTI.......................4924...............................By Quote Veneer Bond Strength,2-required..................................................:........AS7'M C482 Modified.......................4928...............................By Quote Shear Tests,(GrouVThin Set Evaluation;Tile to Tile) 5 minimum..................................ANSI.......................4925....................................350.00 Shear TestS Material Shear),5 miuimum .......................................................................ANSI.......................4926.....................................350.00 Wa[er Immersion Processing for Shear Tests,5 minimum.................................................A1VSI.......................4927.....................................350.00 Oven Processing for Shear TesLs.5 minimum..................................:...............................:.ANSI.......................4932.....................................350.00 Low Temperature Processing for Shear Tests,5 minimum................................................ANSI.......................4933.....................................350.00 Bond SVength,65.00 each(Glazs tile 4 dry 4 wet,28 Days)...............................ANSI A 1372.:.....................4965....................................520.00 Performance Abrasive Wear Index,100.00 euch(4 required) ..............................................x.....ASTM C501.......................4908.....................................420.00 . Crazin6,5 cycles)...................................................................................................ASTM C424.......................4909.....................................750.00 Per ANSI Cruing Requiremen[)per set(65 samples).......................ANSUASTM CI26.......................4910....................................365.00 Glaze Adhesio4 each(modified ASTtvn.....................................:........................ASTM D454] ......................4938.......................................90.00 Color Uniformity........................................:............................................................ASTM C609.......................4912...............................By Quote Chemical Resistance(qualitative Only 10%HCL and KOI-n......................ASTM C650/C126.......................4913....................................365.00 Chemical Resistance(above+Swim Pool Chem)........................................ASTM C650/C126.......................4961....................................535.00 Chemical Resistance(Extended ASTM Version).........................................ASTM C650/C126.......................4962..................................... 1.800 Glaze Pe meability,(Ink Coating Inspec[ion)...........................................................ASTM C67 ......................4963.....................................185.00 7 of34 Exhibit"A" SouthemCalifomiaArea Effec[ive 7/Ol/]9 SH'EM aa<Laboratory Testinp- Tile ContinuedRATb Minimum Charge of$375 For any Tile Testing Service Apply Freeze-Thaw Resistance(10)50 cycles,Per set....................................................ASTM C1026.......................4914.....................................2,995 Additionalcycles,Per cyclekile..................................................................................................................4915.......................................65.00 Freeze Thaw(10)50 cycles)2-3 months,Per se[.....................................................ASTM C67.......................4985................................2,250.00 Moisture Expmsion,(5 required).........................................................AS7'M C370' Modified.......................4917.....................................630.00 C.T.I.Stain Resistance(8 required)Se[.........................................................................C1I T72.......................4921 ................................$ I58.00 Retlec[arice Test,each...........................................................................................................CTI.......................4922...............................By Quote Autoclave(3 required),each..................................................................................................C11.......................4930.....................................350.00 Imperviousness Test,each.......................................................................................ASTM C126.......................4939.......................................90.00 Water Absorption and SaNration Coe(ficient,90.00 each(5 required),per se[........ASTM C67.......................4952....................................450.00 Abrasion Test&Skid Coeff.(LA 5-601-3),4pcs,se[.......................ASTM C2486 and c 1028.......................4986....................................990.00 Abrasion Tes[only.(LA 5-601-3),2pcs,set........................................................ASTM C2486.......................4987.........,...........................660.00 Floor Systems and Components Floor Installation Performanw Level,Robinsons Floor Test...........................ASTM C627-76: First Panel--Not Including Tile or Installatioa..........................................................................................4918................................ 1,890.00 Second or More on Same Purchase Order...................................................................................................4919................................... 1260.00 Miscellaneous Ceramic Tile Material Purchase............................................................................................CTI.......................4956...............................By Quote Ceramic Tile Miscellaneous..................................................................................................CTI.......................4929...............................By Quo[e Mortar Testing Mor[ar ANSI Test.........................................................................:....................................ANSI.......................4940...............................By Quo[e Mortar Compression Tes[,each...............................................................................ASTTvI C109.......................4944.......................................65.00 MortarMiscellaneous Test....................................................................................................CTI.......................4945...............................By Quote MortarSkinning Test,each....................................................................................................CTI.......................4941.....................................115.00 Mortaz Initial Setting Time, each...........................................................................................CT[.......................4942.......................................80.00 MortarDrop-oll'Test,each............................................................:.......................................C1T.......................4943...............................By Quo[e Grout Testing Grou[ANSI Tes[.................................................................................................................ANSI.......................4950...............................By Quo[e GroutDrop-ofTTes[.......................................:.......................................................................CTI.......................4953 ...............................By Quote Grou[Miscellaneous Test........:...............:.............................................................................CTI.......................4955...............................By Quo[e Grout Skinning Tes,each.....................................................................................................CTT.......................4951..................................... 1 I5.00 GroutCompression-2"cubes,each .................................................................................C1019.......................4954.......................................65.00 Dimeusion Stone/Building Stone Testing Compression Tes;('20 required),Per set...............................................................ASTM C170.......................4800.............................$1,060.00 Flex Strength,Cu[Samples(•20 required),Per set..........................................t.....AS1'M C880.......................4801 .............................._ 1,060.00 Flez S[reng[h,Full Size Samples("20 required),per set(max 40 lbs/sample)......ASTM C880.......................4931 ................................3,660.00 Modulus/Rupture ('20 required)Per se[..................................................................ASTM C99.......................4802................................ 1.060.00 20 Samples tes[ed as follows: 5 Samples tested Wet,Parallel to the grain 5 Samples[ested Wet,Perpendicular to the grain 5 Samples tested Dry,Pazallel[o he grain 5 Samples tes[ed Dry,Peryendicular ro the grain 8 of 34 E chibit"A" SouthemCalifomiaArea EfTective 7/Ol/19 SN'EM ea Laboratory Testing- Tile ContinuedRqt Minimum Charge of$375 for any Tile Testing Service Apply Water Abso`ption and Density,(5 required),Per se[......................................ASTM C97/C672.......................4804....................................395.00 Abrasion Resistance,(3 required),Per set.............................................................ASTM C1353.......................4810.....................................460.00 Mchor Pull Test(No deflection measurement),each...........................................ASTM C1354.......................4811.....................................135.00 Anchor Pull Test(With detlection meuuremen[),each.......................................ASIM C1354.......................4819.....................................235.00 SounMess Tes[, (5 samples required),Per set ......................................................ASTM CSS.......................4818.....................................470.OD Breaking Load,(5 samples required),Per set .........................................................A51'M C67.......................4817.....................................350.00 Field Testing ASTM C482 FieldTechnician,Per hour...................................................................................................................................3014.....................................105.00 Ceramic Tile Technician Miieage,per mile........................................................................................................5101.........................................0.80 Pick-up Semple-within 40-mile radius Prom Laboratory,Per hour....................................................................5019........:.............................65.00 Field Slip Resistance Test,ASTM CI028,first test (•Withdrawn Standard)....A51'M CI028".......................4957....................................750.00 Field Slip Resistance Tes[,ASTM C1028,additional[est in same area,each.......AS1'M 1028'.......................4958....................................440.00 Dynamic Coefficien[of Fric[ion(installed floor),first[est..................................ANSI B1013.......................4970.....................................750.00 Dynamic Coef£cient of Friction(installed floor),eddmo al m:f.eme a a h......ANSI 8101.3.......................4964....................................440.00 Dynarnic Coe cient of Friction(ceramic only installed)first IesL.....................ANSIAI37.1.......................4971....................................750.00 Dynamic Coefficien[of Friction(ceramic only installed)edd mn in seme ama,eacn..ANSI AI37.1.......................4966....................................440.00 Field Veneer Bond Shengih....................................................................................ASTM C482.......................4959...............................By Quote 9 of 34 E chibit"A" Southem Califomia Mea Ef}'ective 7/Ol/19 SH"EM 9eal. Laboratory Testing-ConcreteRqT Cylinders,Beams & Cores Activity Cost Compression Test sample prep.and cap.,6"x 12"cylinders,including untested holds,ASTM C 39,each......4300..................................$40.00 Compression Test sample prep.and cap,4"x 8"cylinders,including untes[ed holds,ASTM C 39,each.......4329..................................$40.00 Weight per cubic foot of lighlweight concrete cylinders,each............................................................................4303.......................................80.00 Flexure TesC 6"x 6"beams,ASTM C 78 each..................................................................................................4304.......................................90.00 Splitting Tensile,6"x 12"cylinders,ASTM C 496,each...................................................................................4305.......................................70.00 Modulus of Elasticity Test-Statiq ASTM C 469,each(includes comp.and Unit weight)...............................4306....................................225.00 Thermal Expansion of Concrete,AASHTO T336,each......................................................................................4228.....................................400.00 Uni[Weight,Absorp[ion,end Voids in Hardened Concrete,ASTM C642,each................................................4227....................................250.00 Compression Test,2"-4"=6"Cores,ASTM C 42 Including sample preparation and capping each................431 I....................................100.00 InLaboratory Core Cutting,each........................................................................................................................4312.......................................65.00 Cylinder Trans.and Processing(within 40-mile radius from Laboratory•Add$100 for more than 40 mile radius) 6:30 a.m.[0 4:00 p.m.,Monday through FridaY'Per sample......................................................................5000......................................20.00 Before 6:30 a.m.and after 4:00 p.m.and SaNrday....................................................................................5001.......................................30.00 Sundayand Holidays-per sarnple..............................................................................................................5002.......................................35.00 Minimum Pick-up Charge.........................................................................................................................5003.........:...........................I50.00 Trans.and Processing of Flexural Test Beams-within 40-mile redius from Laboratory,each...........................5021......................................40.00 Forensic Testing Petrographic Examination,ASTM C856.............................................................................................................4319...............................By Quote Moisture Vapor Transmission,Calcium Chloride Moisture Kit,Per Location ASTM F1S69............................4459......................................25.00 InplaceMoisNre Content....................................................................................................................................4457.......................................75.00 Corrosion Poten[ial,Half Cell,ASTM C876......................................................................................................4489...............................By Quote PulseVelocity,ASTM C597...............................................................................................................................4301 ...............................By Quote CementAnalysis,ASTM CI 14,each..................................................................................................................4473...............................By Quote Shrinkage Length Change(3 bars,4 readings,up to 90 days),ASTM C 157 ModiFed.......................................................4307....................................400.00 Additional ReadinB Per set of 3 bars..................................................................................................................4308.......................................75.00 Storageover 90 days,Per set of 3 bars,Per month..............................................................................................4302.......................................75.00 Irans.and Processing/Deliver Shrinkage Molds/Samples-within 40-mile radius 6om Labora[ory,per se[......5020......................................60.00 Mix Design Mix Design,Determination ofProportions,(3 Business Day Tum Around)each..............................................9500....................................200.00 Mix Desigq Determination of Proportions,(Nex[Day Tum Around)each........................................................9505....................................250.00 Mix Design,Determination ofProportions,Requiring Same Day Service,each................................................9501....................................300.00 Preparation of Special5trength Documentation for Mix Desigq per hour.........................................................9502....................................I95.00 Amend or Retype Existing Smith-Emery Miz Designs not involving calculations,each...................................9503....................................150.00 Review Mix Design prepared by Others,Per hour..............................................................................................9504.....................................195.00 Laboratory Trial Batch Laboratory Trial Batch,(includes slump,%aiq unit weight,and up to 7-cylinders;ASTM C 192,each..........4309....................................750.00 Laboratory Trial Batch,(including the i[ems above and shrinkage;ASTM C 192,each..............:.....................4310....................................800.00 Sampling Material for Laboratory Trial Batches,Per hour..................................................................................4315.........................:...........200.00 Gunite& Shotcrete Compressioq 2",4",G'Cores,including prepazation,capping,and trimming ASTM C 42,each....................4314....................................100.00 Trans.znd Pmcessing Shotcre[e Coreswithin 40-mile radius 6om Laboramry.................................................5016......................................25.00 Trans.and Pmcessing Gunite Field Sample(wi[hin 40-mile radius from Laboratory)less 12x12x6-in,ea......5017......................................60.00 Trans.and Pmcessing Gunite Field Sample(within 40-mile radius @om Laborazory)up to 12x12x12,ea.......5018....................................]00.00 Trans.and Processing Guni[e Field Sample(within 40-mile radius 6om Labora[ory)2-fee[square min.,ea....5028....................................250.00 ACI 506.2 Core Gradin8,Per core.......................................................................................................................5027.....................................150.00 Lighhveight RooCFill ASTM C 495 Compressiori Test including capping,and preparation,each...............................................................................4380.....................................100.00 Density,each.......................................................................................................................................................4381.....................................100.00 Cell-Crete 7-days and 14-days repor[..................................................................................................................4382.......................................75.00 0of34 Exhibit"A" Sou[hemCalifomiaMea Et£ective 7/01/19 SN'EM a'La r rRqTboato y Testing-Construction Materials Raoting Tile Activity Cost Absorption,each..................................................................................................................................................4700..................................$65.00 AdditionaVSpecialTests......................................................................................................................................4701 ...............................By Quote BreakingStrength per U.B.C.,each.....................................................................................................................4702.......................................65.00 Slat¢ Modulus of Elasticity,ASTM C I20,3 parallel,3 perpendicular,$90 each........................................................4805....................................540.00 Modulus of RupNre,ASTM C120,3 parallel,3 perpendicular,S90 each..........................................................4806....................................540.00 Water Abso+ption,ASTM C121,3 parallel,3 perpendicular,$40 each..............................................................4807....................................240.00 Weathering ASTM C217,3-sarnples,$90 each..................................................................................................4808.....................................3I0.00 Wire Rope Wire Rope 0 tluough 1"diarneter,each..............................................................................................................4426.....................................150.00 W've Rope] through 2"diarneter,each........................................:.....................................................................4427.....................................250.00 Wire Rope over 2"diameter,each.......................................................................................................................4428...............................By Quo[e Note: Sockets furnished by client Epoicy - Cores & Coring Field Coring Technician and s[endard equipmen[,Per hour................................................................................3710..................................... I50.00 SheazTes[on Epoxied Cores,each.....................................................................................................................4318.....................................100.00 Epoxied Cores Visual Inspection,each...............................................................................................................4346.....................................100.00 CompressionTest,Cylinders,each......................................................................................................................4316.....................................100.00 Compression Test,Cores,each............................................................................................................................4317.....................................100.00 Pick-up Epo cy Cylinders-within 40-mile radius from Laboratory,Per sample...................................................5026......................................20.00 Fireproofing Tests Oven Dry Densiry',Per sample.............................................................................................................................4350.....................................]00.00 Adhesion/Cohesion TestinB,Per hour,4-hour minimum.....................................................................................4351.....................................]00.00 Pick-up Fireproofing Samples-within 40-mile radius from Laborffiory,per sample............:..............................5014......................................25.00 Glass Fiber Reinforced Concrete Flexural Strength,without M.O.E.6 require4$45.00 each................................................................................4320.....................................270.00 Flexural Strength with M.O.E,6 required,$145.00 each...................................................................................4321.....................................870.00 Density,3 required,$50.00 euh.......................:.................................................................................................4322.....................................150.00 Tensile Strength.3 required,$75.00 each...........................................................................................................4323.....................................225.00 Shear SVength,3 required,$75.00 each.......:......................................................................................................4324.....................................225.00 Fiber Wrap Tensile Strength,ASTM D 30391 panel(12"x12',5 samples(1 X]0 in),$170.00 each................................4326....................................850.00 Saturation Resin for Fiber Composite Water Absorption,AS77v1 D570..........................................................................................................................4340.....................................200.00 Compressive Yield Strength,ASTM D695.........................................................................................................4341.....................................600.00 Flexural Streng[h,AS'IM D790...........................................................................................................................4342.....................................750.00 Shore Hardness,ASTM D2240...........................................................................................................................4343.....................................200.00 Tensile Strengih and Elongation,ASTM D638...................................................................................................4344.....................................750.00 Evaluationper MWD RFQ 704...........................................................................................................................4345...............................By Quote ll of 34 Exhibit"A" Southem Califomia Mea Effec[ive 7/Ol/19 N` SN•EM p< 9Q Laboratory Testing-Construction Materials Continued RAt Structural Lumber Activity Cost Flexure,ASTM D198..........................................................................................................................................4470...............................By Quate Compression,ASTM D198.................................................................................................................................4471 ...............................By Quate Tension,ASTM D 198.........................................................................................................................................4472...............................By Quo[e Torsion,ASTM D198..........................................................................................................................................4478...............................By Quote Shear,ASTM DI98.............................................................................................................................................4476...............................By Quote Specialty Grout Rapid-Hardening Grout,ASTM C928.................................................................................................................4395...............................By Quote Non-Shrink Grout,ASTM C1107........................................................................................................................4396...............................By Quo[e Time of Setting,AS17vi C266 each....................................................................................................................4490...............................By Quote Sulfa[e Expansion.ASTM C1012,each..............................................................................................................4491 ........:......................Hy Quote Flexural Strength,ASTM C348,each.................................................................................................................4492...............................By Quote Consistence(Cone Tes[)ASTM C939 each.....................................................:................................................4493...............................By Quote Bleeding,ASTM C940........................................................................................................................................4494...............................By Quo[e Total Chloride lons.ASTM CI152,each............................................................................................................4495...............................By Quote Permeability,ASTM C1202,each.......................................................................................................................4496...............................By Quote S[andard Specification for Mortar for Uni[Masonry,ASTM C270....................................................................4550...............................By Quote Po[en[ial Alkali-Silica Reactivity by Mortaz Bar Method,ASTM CI260...........................................................4551...............................By Quote Potential Alkali-Silica Reactivity by Accelerated Mortar Bar Method,CI567..................................................4552...............................By Quote Standerd Specification for Plastic(Smcco)Cemen[............................................................................................4553...............................By Quote Standard Specificatim for Non-Asbes[os Fiber Ma[Reinforced Cement Subshate$heets................................4554...............................By Quote 12 of34 Exhibit"A" Sou[hernCalifomiaArea Effective 7/Ol/19 q., H_EM Q Laboratory Testing - Curtain Wall 9g RATop Los Angeles and San Francisco Mock-Up Performance Testing; Testing Bays Available in the Following Sizes: Test Bays HeiRht(feet)Width(feet) 1 00 35 1 45 75 5 34 20 1 30 10 1 20 20 Custom Test Bay Sizes Available by Quote. Inspection and Testing Activity . Cost LabTech Away 6om Lab...................................................................................................................................3019................................$125.00 SpecialCurtain Wall Evaluation,Per hour.........................................................:........................................................................................$ 125.00 Cur[ain Wall Attachment,per how.................................................................................................................................................................. 125.00 Exterior Skin from Swing S[age(2 men),Per hour..........................................................................................................................................250.00 Caulking,SealanLs,Adhesives,per hour..........................................................................................................................................................125.00 Coazings Paint,Per hour............................................................................................................................................................................By Quo[e Field Testing Field Water TesS AAMA 501.2,2 men)per hour..............................................................................................8113.....................................250.00 Field Testing of Newly Installed Fenestration System Products,AAMA 502....................................................8114...............................By Quote Field Testing ofNewly Installed Storefronfs,Curtain Walis,and Sloped Glazing Systems,AAMA 503..........8115...............................By Qmre Field Testing of Masonry Walls,ASTM C1601..................................................................................................8116...............................By Quote FieldPosi Test,ASTM E1186.............................................................................................................................8133...............................By Quo[e Adhesion Testing SSG ASTM C1401 .................................................................................................................8134...............................By Quote Adhesion Testing ASTM C1521 .........................................................................................................................8135...............................By Quote Wa[er Penetration of Masonry ASTM C1601 .....................................................................................................S136...............................By Quote Evaluating Water I.eakage in Buildings ASTM E2128.......................................................................................8137.............;.................By Quote Portable Adhesion Testing of Coatings ASTTvI D4541.................:......................................................................8138...............................By Quo[e Field Dynamic Wa[er Penetration AAMA501.1..................................................................................................8139...............................By Quote Materials Evaluation Glass,Granite,Metal Cladding,Caulking,Psint Coatings Adhesive Bond,Chemical Malysis........................8112...............................By Quote Point Load Testing on Structurally Glazed Glass,ASTM STP1286...................................................................8123...............................By Quo[e Lab Testing of Muonry Walls,ASTM E514......................................................................................................8124...............................By Quo[e Sness and Ruplure-Stone and Granite...............................................................................................................8111 ...............................By Quote Water Testing Leakage Through Masonry ASTM E514.....................................................................................8140...............................By Quote Air and Water Stazic Water Infilhation,ASTM E 331/1105..............................................................................:........................8102...............................By Quote Static Air In ltration,ASTM E 283/783......................................:....................'..................................................8104...............................By Quote DynamicWater Infiltration................................................................................................................................. 8103 ................................ 1,80D.00 Water Penetra[ion By Cyclic Air Pressure,ASTM E547/El 105.........................................................................S I05...............................By Quote Pressure Fqualiud Aain Screen,AAMA 508.....................................................................................................8125...............................By Quote 13 of 34. Exhibit"A" SouthernCalifomiaArea Effective 7/Ol/19 SH'EM 9B WO RAt Laboratory Testing - Curtain Wall Continued Special Testing Structural SeismicSwc[ural Loading..................................................................................................................................8122...............................By Quote S[ructural Performance AS1'M E 330..................................................................................................................8106...............................By Quote Seismic and Wind Induced In[ers[ory Drift,AAMA 501.4.................................................................................8126...............................By Quote Seismic Drift Causing Glass Fallout,AAMA 501.6............................................................................................8127...............................By Quo[e Vertical Interstory Movements AAMA 501.7....................................................................................................8128...............................By Quote Impact and Cycling Tes[ing,AAMA 506............................................................................................................5129...............................By Quote Concentrated Load Testing(window wasfier,e[c.)..........................................................:...................................8109...............................By Quote Thermal AAMAThermal Testing......................................................................................................................................8110...............................By Quote Thermal Performance Test,AAMA 1503............................................................................................................8130...............................By Quote Thermal Cycling o(Exterior Walls,AAMA 501.5 .............................................................................................8131 ...............................By Quote Hurricaine Impact Cannon Testing,ASTM EI996/EI886....................................................................................................SI32...............................By Quote Multi-Channel Computer Aided Data Acquisition of: Acceleration...........................................................................................................................:.............................4946...............................By Quo[e Vibration..............................................................................................................................................................4430...............................By Quote Movements(0.0001 inch)....................................................................................................................................4947..............:................By Quote Pressure...............................................................................................................................................................4948...............................By Quote MachineControl Movement................................................................................................................................4466...............................By Quote Temperature........................................................:................................................................................................4469...............................By Quo[e StrainGauge...................................................................................:....................................................................4418...............................By Quote StressAnalysis...............................................'......................................................................................................4949...............................By Quo[e Cyclic Seismic Testing of Components oG Steel Shuctures,ATC-24,FEMA 350,FEMA 450..........................4439...............................By Quote 14 of 34 Eachibit"A" SouthemCalifomiaArea EfCective 7/01/19 SN'EM Laboratory Testing-Masonry 9 41 RATOP Brick ASTM C 67 Activity Cost Compressive Strength including sample preparation and capping,each.....:.......................................................4200................................$ 100.00 Modulus ofRupNre(Flexure)including sampling preperation,each..................................................................4201.................................... 100.00 Flezural Bond Strengrh,One set of five joinu....................................................................................................4217.....................................300.00 Dimensions,overall,coring,shell and web thiclmess,Per brick.........................................................................4202.......................................50.00 Coetticient ofFric[ion(slip test)each................................................................................................................4203.....................................185.00 InitialRa[e of Absorytion,each...........................................................................................................................4204.......................................45.00 Absorption-5 hour or 24 hour,set of 3..............................................................................................................4205.....................................150.00 Boil, l,2 or 5 houy set of 3.................................................................................................................................4206.....................................250.00 Efilorescence,each..............................................................................................................................................4207..................................... I30.00 Freeze Thaw(Sx8,4x4),5 samples,50 cycles....................................................................................................4222................................ 1,500.00 Pick-up Brick Samples,cach...............................................................................................................................5009.......................................20.00 Solid Concrete Interlocking Paving Units ASTM C 936 Activity . Cost Compressive Strength including sample preparation,each.................................................................................4232................................$100.00 Unit Weigh4 each................................................................................................................................................4233.....................................100.00 Concrete Block ASTM C 140 Compression,3 requ'ved,$75.00 each including sarnple trimming preparation and capping..............................4210.................................$225.00 Moisture Conten[as Received,each....................................................................................................................4211.......................................75.00 Absorp[ion,3 required,$75.00 each....................................................................................................................4212.....................................225.00 Shrinkage,Modified British,AS'I'M C 426,3 required,$I50.00 each................................................................4213....................................450.00 CouponCutting,each..........................................................................................................................................4229.......................................50.00 Compressioq 4"-6"-8"Cores including sample prepazation and capping,each.............................................4221 .................................... I00.00 CompleteC140....................................................................................................................................................4220.....................................900.00 Transportation and pmcessing Block Samples-within a 40-mile radius of labora[ory,each.............................5010...................................._25.00 Masonry Prisms ASTM C 1314 Compression Test,8"xl6"Grouted Prisms including Vimming and capping,each............:.............................4218.................................$200.00 Compression Test, 12'S24"Grouted Prisms including Vimming and capping,each..........................................4225....................................350.00 Compression 7'est,16"x32"Grouted Prisms including trimming and capping each..........................................4226...............:....................750.00 Compression Test with MOE,Grouted Prisms,each..........................................................................................4223.....................................600.00 UnitWeigh;Grouted Prisms each.....................................................................................................................4224.....................................100.00 Cutting Prisms,when required(Solid)...............:.................................................................................................4219.....................................130.00 Cutting Prisms,when required(Not Solid)....................................::....................................................................4230.....................................100.00 Cores,Compression,6"and S"Diameter,eaCh...................................................................................................4208.....................................100.00 Cores,Shear,6"and&"Diemeter,2 Faces,per core...........................................................................................4209.....................................150.00 Pick-up Prisms Sx8z16-in-within a 40-mile radius of laboratory,each............................................................5013......................................60.00 Pick-up Prisms 12xSx16 and ]bx16x16-n-within a 40-mile radius of labora[ory,each...................................4347......................................75.00 Mortar& Grout UBC Sandard 21-16 &21-18 Compression,2"x 4"Masonry MoRer Cylinder including himming and capping,each...................................4214........................:.............75.00 Compressioq 2"Grout Cubes,ASTM C 109 including sample piepazation and capping,eacti........................4215......................................75.00 Compressioq non-standard Grout Cubes,ASTM C ]09-Modified 109 includSng sample prep./cap,each......4231......................................75.00 Compressioq 3"x 6"Masonry Grout including sample prepazation and capping,each.....................................4216......................................75.00 Transportation and processing Mortar Samples-within a 40-mile adius of Iahoratory,each............................5011......................................25.00 Transportation md processing Grout Sarnples-within a 40-mile radius of laboratory,each.............................5012......................................25.00 Transportation and processing Grou[Cubes-within a 40-mile radius of laboratory,each.................................5015......................................25.00 Un-Reinforced Masonry Building Tests In-Place Shear(Push)Tes[s.................................................................................................................................4809...............................By Quote 15 Degree Core Shear Tes4................................................................................................................................4815...............................By Quote WallMchors.......................................................................................................................................................4816...............................By Quo[e Flat7ack Testing..................................................................................................................................................4827...............................By Quo[e 15 of 34 Exhibit"A" SouthernCalifomiaMea Effective 7/Ol/19 SN"EM sal. Laboratory Testing-MetallurgicalRA7 Professional Staff ActiviTy Cost MetallurgicalEngineer,per hour.........................................................................................................................6933................................S 225.00 MelallurgicalTeclmician,per hour......................................................................................................................6919.....................................I25.00 Metallurgical Services Tes[CVN at 75°F(Set of3 specimens)...............................................................................................................6902.....................................168.00 Tes[CVN at 70°F(Se[of 3 specimens)...............................................................................................................6903.....................................204.00 Tes[CVN a[40°F(Set oF3 specimens)...............................................................................................................6976.....................................222.00 Tes[CVN at 30°F(Set of 3 specimens)...............................................................................................................6977.....................................228.00 Tes[CVN a[0°F(Set of 3 specimens).................................................................................................................6978.....................................237.00 Test CVN a[10°F(Set oF3 specimens)...............................................................................................................6801.....................................276.00 Test CVN at-20°F(Se[of 3 specimens).........................................................................:...................................6979....................................297.00 Galvaniud Coating-Acid Ship Method,Per specimen of pla[e,and wire........................................................6904....................................200.00 Stucco Netting,ICC Evaluation,Per roll......................................:....................:.................................................6912...............................By Quo[e Hazdness Tests IIrinell,Rockwell(Standard or Superficial),excluding specimen prepazation if required.........6905......................................95.00 Chemical Malysis—Ferrous Ma[erial of solid piece,each.................................................................................6920.....................................I85.00 Chemical Analysis—Ferrous Ma[erial of filings,each........................................................................................6012...............................By Quo[e Chemical Analysis—Non-Ferrous Material of solid piece,each.........................................................................6980...............................By Quo[e Chemical Malysis—Non-Ferrous Material of filings,each................................................................................6981 ...............................By Quote Evalua[e Carbon Equivalent(C.E),each to include chemical analysis ofsolid piece.........................................6943.................................... 195.00 Evalua[e Carbon Equivalent(C.E),each to irmlude chemical analysis of filings................................................6011 ...............................By Quote MicroharMessSurvey,(includes metallurgical mount&prepazation),each......................................................6017...............................By Quote Scanning Electron MicroscoPY(SEiv,and EDS,Per Hour(min 1 hr)....................:........................................ 6913....................................370.00 Scanning Electron Photomicrographs,each(5"x 4'.........................................................................................6915.........................................8.50 Laboratory NDT Tes[ing(UT,MT,P"I)..............................................................................................................6112...............................By Quote Mileage,per mile.................................................................................................................................................5101.........................................0.80 Administrative Surcharge....................................................................................................................................4443........................5%of Invoice Mechanical Testing BendTest—Base ma[erial............................................................:......................................................................6900...............................By Quo[e Load Tests(Proof I.oad,Flexural,Shess-wrtosion,e[c.)...................................................................................6907...............................By Quo[e Tensile Tes[—With Elec ronic Ex[ensometer,excludes sample cutting and specunen prepera[ion,each...........6934......................................90.00 Tensile Test—Square or Round Tube up to 2.00-in.OD,Full size with plugs,ea.............................................6939....................................265.00 Talbot Test—Sample prepaza[ion and test per specimen.....................................................................................6957.....................................250.00 Fastener Testing Tevsile Test—Anchor Bolts,Studs or Threaded Rods wder]00,OOO lbf,tested full-size,each......................6948....................................175.00 Tensile Test—Anchor Bolts,SNds or Tlveaded Rods 100,000-120,000 Ibf,tested full-size,each...................6958....................................I95.00 Tensile Test—Mchor Bolts,Studs or Threaded Rods up W I.0-in diem.by machined specimeng,each...........6959....................................195.00 Tensile Tes[—Mchor$olts,SNds or Threaded Rods,1.0-2.Oin diam.by machined specimens,each.............6013........................,...........205.00 Tensile Test—Anchor Bolts,Sluds or Threaded Rods over 2.0-in diam.by machined specimens,each,...........6014....................................235.00 Nut—Hardness and Proof Load test under 100,000 Ibf,each...........................Y.................................................6949.......................................35.50 Nut—Hardness and Proof Load[es[100,000-120,000 Ibt,each.......................................................................6960......................................47.50 Nut—HarMess In Core Method in lieu of proof Load[es[above 120,OOOIbf,each............................................6015......................................95.00 Washer—Not Galvanized-HazMess,each.........................................................................................................6950.......................................28.00 Nut—Not Galvanized-Hazdness each...............................................................................................................6982.......................................28.00 NutCone Proof Load Test each..........................................................................................................................6961 ...............................By Quote 16 of 34 Exhibit"A" SouthernCalifomiaArea Effective 7/01/19 0` SH E 9Q Laboratory Testing-Metallurgical Continued RA7o Fastener Testing Continued Activity Cost A325 or A490-Bol[hardness only,each...................................................:.......................................................6951..................................E 47.50 Bolt A325 or A490-Wedge Tensile up to 1.0-in diameter,and Hardness,each...............................................6952.......................................98.00 Bolt A325 or A490-Wedge Tensile up to 1-1/8-in diametey and HazMess,each...........................................6802....................................I45.00 Bol[A325 or A490-Wedge Tensile up to 1-1/4-in diame[er,and Hardness,each...........................................6803....................................155.00 Bolt A325 or A490-Wedge Tensile up[0 13/8-in diame[ey and Hardness,each...........................................6804....................................165.00 Bol[A325 or A490-Wedge Tensile up to 1-1/2-in diameter,and HarMess,each...........................................6805....................................I85.00 Bol[A325 or A490-Tensile test by machined specimens,each........................................................................6975...............................By Quote Weld Procedure Qualifcation and Welder Qualification Welded Fabric Weld sheaz strength,each semple...............................................................................................6963.......................................75.00 Guided Weld Bend Test,excluding specimen preparation,each.........................................................................6927.......................................50.00 Age Bend Specimens-48 Hrs,up[0 3 specimens.............................................................................................6956.....................................140.00 Sample Cut&Perform Weld-Fille[Weld FracNre Test,each........................................:...................................6929..................................... 160.00 Weld-Fille[Weld Fracture Test In Shee[Steel&Evaluate,each........................................................................6969.....................................130.00 Weld-Macro E[ch(Plate)-cut,Polish,etch,and evaluate,each.........................:................................................6930...............................By Quo[e Weld-Macro Etch(Rebar#3 tlw#7)- each....................................................................................................6972.....................................138.00 Weld-Macro E[ch(Rebar#B thru# 10)-each...................................................................................................6113.....................................I50.00 Weld-Macro Etch(Rebar# 11 thru# 14)-cu[,polish,etch,and evalua[e,each................................................6973....................................152.00 Weld-Macro Etch(Rebar# 18)-cut,Polish,etch,and evaluate,each................................................................6974.....................................215.00 Weld-Radiography..............................................................................................................................................6931 ...............................By Quote Weld Transverse Tensile Test,plate up to ].0-in thick excluding machining,each............................................6932......................................85.00 Weld Transverse Tensile TesS p ate over I.0-in thick excluding machining,each.............................................6964....................................205.00 Welded Rebar Transverse Tensile Test,#3 thru 1!7...........................................................................................6965..................................... 135.00 Welded Rebaz Transverse Tensile Test,#8 thru#10................................................:........................................6114.....................................155.00 Welded Rebar Transverse Tensile Test,t!11 ttw#14.......................................................................................6966..................................... 185.00 Welded Rebaz Transverse Tensile Test,#IB.......................................................................................................6967.....................................460.00 Review Welding Procedure Speci cation(WPS)each......................................................................................6921.....................................175.00 Prepare Welding Procedure Speci cation(WPS),each......................................................................................6922.....................................350.00 WPS,PQR Weld Certificate,each.......................................................................................................................6971.....................................130.00 Unless othcrwise natcd,rosts above do not include sample preparetion. Sample Preparation Sample Cu[&Machine Specimen-under%:-in,each.................:.:....................................................................6910.......................................75.00 Semple Cut&.Machine Specimen-Y:-inch to 1.0-in,each...............................................................................6911.......................................90.00 Sample Cu[&Machine Specimen-1.0-in to 1/s'inch thick,each.....................................................................6968.....................................150.00 Sample Cu[&.Machine Specimen-over 1/z'ch 2.0-in thick,each................................................................6984..................................... 165.00 Sample Cut&Machine Specimen-over 2.0-in[0 2/z-inch ihick,each.............................................................6985.....................................185.00 Sample Cu[&Machine Specimen-over 2/z'nch 3.0-in thick,each.................................................................6986..................................... 195.00 Sample Cut&Machine Specimen-over 3.0-in to 3/:'inch ihick,each.............................................................6987.....................................205.00 Sample Cut&Machine Specimen-over 3/z'inch[hic$each...........................................................................6988........................,......By Quo[e Sample Cut&.Machine Charpy V-No ch Specimens(Se[of 3 specimens),per set............................................6909....................................282.00 Machine end V-Notch one se[ CVN specimens from Altemate Location.........................................................6941....................................294.00 Machine and V-No[ch one set/asize Specunens...............................................................................................6989.....................................291.00 Machine and V•Notch one set'/n size Specimen5...............................................................................................6990.....................................294.00 Machine and V-Notch one set/xsize Specimen5...............................................................................................6991.....................................303.00 Machine and V-Notch one set/3 size CVN Specimens......................................................................................6992.....................................315.00 Machine and V-Notch one se[/a size CViV Specimens......................................................................................6993.....................................318.00 17 of 34 Exhibit"A" Sou[hemCalifomiaArea Effecfive 7/01/19 9` 1 Laboratory Testing-Metallurgical Continued RATOP Sample Preparation Cantinued Activity Cost Rough cu[`K' Crom full beam sec[ion.................................................................................................................6994..................................$60.00 Roughcu[`K'trom Tbeam section..........................................................:.........................................................6995.......................................40.00 Roughcut from`K'sec[ion only.........................................................................................................................6996.......................................30.00 Rough cut Gom Flange of(ulI beam section.......................................................................................................6997.......................................50.00 Rough cu[from Flange of T beam section...........................................................................................................6998.......................................30.00 Rough cut otherjoint configuration.....................................................................................................................6999...............................By Quo[e Macroe[ch rough cu[sample to locate HAZ,ea..................................................................................................6111 ...............................By Quote Me[allurgical Moun[,1-1/4=in.including preparation without evalualioq each.................................................6914....................................145.00 Metallurgical Mount,2.0-in.including preparation without evaluation,each.....................................................6918....................................I85.00 Add additional piece in moun,each piece..........................................................................................................6925.......................................35.00 Administrative Charges Rush Tumaround,48-72 hours(50%Surcharge) 6935 +50%of invoice Rush Tumaround,24-48 hours(100%Surchazge)............................................................................................6936.................+100%a of iuvoice Tes[Report Charge..............................................................................................:...............................................61]0....................Minimum 65.00 Same day[esting+report(200%Surchazge)......................................................................................................6937.................+200%rof invoice Minimumlabora[ory charge................................................................................................................................6923.....................................150.00 Multiple copies for distribu[ion,copies and mailing,Per distribu[or per copy each............................................6924........................................4.50 Digital Photographs,Photo quality paper,each...................................................................................................9116.........................................8.50 Digital Photographs,Photo quality paper,per copy report each..........................................................................6115.........................................4.50 Metallurgical Technician'Iravel Time,Per hour.................................................................................................6116...............................By Quote Misc.Equipment Charge.....................................................................................................................................4416...............................By Quote Special Test Set-Up(2-techs+l engineer crew)per hour..........................................:.........................................4422.....................................300.00 pecial Testing....................................................................................................................................................4420...............................By Quote AdministrativeOffice Support.............................................................................................................................3075...............................By Quote FinalReport.........................................................................................................................................................9111 ...............................By Quote 18 of 34 E chibit"A" SouthemCalifomiaArea Effective 7101/19 c` tH eM 9.c9Q Laboratory Testing-Plastics & Plumbing RASOQ'` Plastic Activity Cost General WeatherometerTes[,each...................................................................................................................................4422...............................By Quote Plas[ic Tensile Tests,each...................................................................................................................................4425...............................By Quote Fixtures Plastic Toilet(Water Closet)Seats......................................................................................................................4532...............................By Quote Plu[ic Wa[er Close[Bowls and Tanks................................................................................................................4533...............................By Quote Plas[ic Lava[ories.................................................................................................................................................4534...............................By Quote Plas[ic Urinal Fizlm'es.........................................................................................................................................4535...............................By Quote Plastic BathNb and Shower units........................................................................................................................4536...............................By Quote PlazticSinks.........................................................................................................................................................4537...............................By Quo[e Pcefabricated Plastic Spa Shells..:....................................................................................:...................................4535...............................By Quote Pipe Polyethylene Plastics Pipe and Fittings Materials...............................................................................................4539...............................By Quote GeneralPipe testing.............................................................................................................................................4540...............................By Quote Plumbing Water Closets Wa[er C(oseGs..............................................................................................................:........................................4500...............................By Quote WallMounted Water Closets...............................................................................................................................4501 ...............................By Quote Water Closets Equipped with a Dual Flushing Device........................................................................................4502...............................By Quote Urinals.................................................................................................................................................................4503...............................By Quote Faucets Lawnand Sediment Faucets................................................................................................................................4504..............:................By Quo[e PulloutSpout Fauce[s..........................................................................................................................................4505...............................By Quote Shower Heads Showerhead or Body spray.............................................................:...................................................................4506...............................By Quote 1{igh-efficiency Shower head or Body spray.:.....................................................................................................4507...............................By Quote HandShower............................................:..........................................................................................................4508...............................By Quote High-etticiency Hand Shower.............................................................................................................................4509...............................By Quote Flexible Hose FlexibleWa[er Comec[ore.............................................................................................................:....................4510...............................By Quote Fittings Lavatory and Bar Supply Fittings........................................................................................................................4511 ...............................By Quate Bidet Supply Fitting(with or wi[hout a diverter)................................................................................................4512...............................By Quote Kitchen Supply Fitting(Kitchen faucet)..............................................................................................................4513 ...............................By Quote Ki[chen and Lava[ory Suppiy Fitting(FaucGt)with Side spray Diverter............................................................4514...............................By Qua[e Bathor Shower Supply Fitting............................................................................................................................4515...............................By Quote Ba[h or Shower Supply Fitting with Diverter......................................................................................................4516...............................By Quote LaundryTub Supply Fitting................................................................................................................................4517...............................By Quo[e Metering or Self Closing Supply Fittings............................................................................................................4518...............................By Quote 19 of 34 Exhibit"A" SouthemCalifomiaArea EFfective 7/Ol/19 9`Laboratory Testing-Plastics & Plumbing - Continued AORAT` Valves and Controls Supplystop..........................................................................................................................................................4519...............................By Quate Ki[chen and Lava[ory side spray func[ion control...............................................................................................4520...............................By Quo[e Shower head,hand shower,or body spray adjus[ing mechanisms or function control........................................4521 ...............................By Quote Au[omatic compensating valve............................................................................................................................4522...............................By Quote Temperature Actuated Miacing Valves for Hot Water Distribufion Sys[ems.......................................................4523...............................By Quo[e Au[omatic TemperaNre Conhol Mixing Valves.................................................................................................4524...............................By Quo[e Water Temperature Limi[ing Devices.................................................................................................................4525...............................By Quote AtmosphericType Vacuum Breakers..................................................................................................................4526...............................By Q ote kiose Connection Vacuum Breakers....................................................................................................................4527...............................By Quote Backflow Preventers with an Intertnediate A[mospheric Vent............................................................................4525...............................By Quote Reduced Pressure Principle Backflow Preventers and Reduced Pressure Principle Fire Protec[ion Backflow Preventers.....................................................................................4529...............................By Quo[e Double Check Backflow Preven[ion Assemblies and Double Check Fire Protection Backflow Preven[ion Assemblies................................................:...................................4530...............................By Quote Miscellaneous Plumbing Water Resistance,each........................................................................................................................4541 ...............................By Quo[e Plumbing Water Resis[ance Cycling Test............................................................................................................4542...............................By Quote GelCoat Thickness,each....................................................................................................................................4543...............................By Quo[e 20 of 34 Exhibit"A" Southem Califomia Area Ef£ective 7/Ol/]9 tN'EM 9@Q` Quality Assurance- 3`d Party Audit RAT Description Activity Cost Travel ime,Per hour(Min.maY aPP Y)..............................................................................................................4456...................................$75.00 Qualifying Audit,Per hour(81v.Minimum).......................................................................................................4533.....................................105.00 Technical DirecWr,per hour(Code Mee[ings)....................................................................................................4534.....................................135.00 Consultin6,Per hour(Min.maY aPP Y)...............................................................................................................4535.....................................]05.00 Projectmanager,per hour....................................................................................................................................4536.....................................105.00 Engineer,per hour...............................................................................................................................................4537.....................................158.00 PerDiem,Per day..............::................................................................................................................................1103.....................................120.00 PerDiem,per day(Ou[of Country)...................................................................................................................1107...............................By Quote Consumable/Erzpenses........................................................................................................................................ 1104.......................Cost plus IS% Manual Review,per hour(6 hr.Minimum).........................................................................................................4539.....................................105.00 Audit Report Fees,Per hour($I50.00 Minimum)...............................................................................................4540.......................................75.00 Annual Lis[ing Fees,(if Applicable)/or per Qwte/per product model and or series........................................3098................................1,000.00 Mileage,Per Mile........................:.......................................................................................................................510]..........:..............................0.80 CA.AdminFee....................................................................................................................................................4443 ........................5%oflnvoice Note:45 days advance notice required tor audit cancellatian.Audit cancelation Fees apply. Expenses with applied mark-up and B hours Audit prep time if less than 45 days' notice. 21 of 34 Exhibit"A" SouthemCalifomiaMea EfTective 7/Ol/19 SH'EM Laboratory Testing-Reinforcement9e 7 L A ReinForcing Steel ASTM A 615/A 706 Activity Cost TensileTes[,No.3 to 8 Baz,each........................................................................................................................4600.......................................55.00 BendTest,No.3 to 8,each..................................................................................................................................4601.......................................55.00 Tensile Test with MOE,No.3 to 8 Bar,each......................................................................................................4633.....................................175.00 Tensile Test,No.9 to 11 Bar,each......................................................................................................................4626.......................................80.00 BendTes[,No.9 to 1I Bar,each........................................................................................................................4627.......................................80.00 Tensile Tes[wi[h MOE,No.9 to 11 Bar,each....................................................................................................4630.....................................250.00 Tensile Test,No. 14 Bar,each.............................................................................................................................4602.....................................I50.00 BendTes,No. 14 Baz,eacfi................................................................................................................................4634.....................................150.00 Tensile Tes[with MOE No. 14 Bar,each...........................................................................................................4631.....................................300.00 TensileTest,No. 18 Bar,each.............................................................................................................................4603.....................................300.00 BendTest,No. 18 Bar,each................................................................................................................................4635.....................................300.00 Tensile Tes[with MOE,No. I B Bar,each...........................................................................................................4603.....................................400.00 TensileTesS No.20 Bar,each.............................................................................................................................4632.....................................500.00 High-Strength Steel Bars for Prestressed Concrete ASTM A722, Grade 80 TensileTest,No.24 Bar,each............................................................................:................................................4636.....................................800.00 TensileTest,No.28 Bar,each.............................................................................................................................4637................................ I,000.00 Tensile Tes[,No.32 Baz,each.............................................................................................................................4638................................ 1,200.00 ChemicalAnalysis,each......................................................................................................................................4616.....................................200.00 Deforma[ion Compliance,each...........................................................................................................................4617.......................................80.00 Sampling and Tagging at Fabricators Plan[(within 40-mile radius from Laboratory,add$l00 for more ihen 40-miles) 6:30 a.m.to 4:00 p.m.,Monday through Friday'Per sample......................................................................5005......................................30.00 Before 6:30 a.m.and after 4:00 p.m.and SaturdaY'Per sample.................................................................5006......................................45.00 Sundayand Holidays-per sample..............................................................................................................5007.......................................45.00 Minimum Sample CAarge,Per[rip...................................................................:........................................5008.....................................I50.00 Transporlation and Processing Rebaz Samples at Jobsi[e-within 40-mile radius from Laboratory-per samp1e5024.....................................30.00 Reinforcing Steel ASTM A 1035 TensileTest,each................................................................................................................................................4327...............................By Quote BendTest,each...................................................................................................................................................4328...............................By Quote Headed Steel Bars for Concrete Reinforcement ASTM A 970 Activity Cost Tensile Test No. 11 or smaller,each..................................................................................................................4639.....................................200.00 Tensile Tes[No. 14,each.................................:.................................................................................................4640.....................................250.00 TensileTes[,No. 18,each...............................................................:...................................................................4641.....................................400.00 Welded Specimens Tensile TesS Welded,No. I1 Bar or Smalley each...........................:.................................................................4604.....................................200.00 Tensile Test,Welded,No. 14 Bar,each..............................................................................................................4605.....................................250.00 Tensile Tes[,Welded,No. 18 Baz,each..............................................................................................................4606.....................................400.00 NickBreak,Welded Re-Bar,each.......................................................................................................................4607.....................................125.00 StraighteningHoops............................................................................................................................................4615.......................................50.00 Coupled Reinforcement Tensile Test,Mechanically Spliced Baz,No. 11 Bar or Smaller,each................................................................4612....................................200.00 Tensile Tes[,Mechanically Spliced Bay No. 14 Bay each.................................................................................4613.....................................250.00 Tensile Tes[,Mechanically Spliced Bar,No. 18 Baz,each.................................................................................4614.....................................400.00 CalTrans Mechanical Coupler Slip Test,No. I1 Bar or Smaller,each................................................................4623....................................250.00 CalTrans Mechanical Coupler Slip Test,No. 14 Bar,each.................................................................................4624.....................................300.00 CalTrans Mechanical Coupler Slip Test,No. 18 Bar,each.................................................................................4625.....................................500.00 CalTrans Machanical Coupler Slip Test,No.20 Bar,each.................................................................................4625.....................................600.00 22 of 34 Exlubit"A" Southem Califomia Area Effective 7/Ol/19 q` SH EMF9. t 9 i0 RA'[OQ Post-Tensioning Strand Tensile Test and Elongation in 24"for Pcestress Strand,ASi7vt A 416,each.....................................................4609....................................250.00 Tensile Test and Elonga[ion in 10"for PresVessing Wire,ASTM A 421,each..................................................4610....................................250.00 Modulus of Elazticity(Prestress Snand),each....................................................................................................461 I.....................................350.00 Transportation and Processing Post Tension Cables-within a 40-mile radius of laboratory,per sample..........5025......................................30.00 Welded Wire Fabric ASTM A 185 Pazent Material Tensile,5 required,$50.00 each................................................................................................4618.....................................250.00 Weld-Included Tensile,5 required,$50.00 each.................................................................................................4619.....................................250.00 Shear-Weld Aree,5 required,$50.00 each..........................................................................................................4620.....................................250.00 Bend Tes4 5 required,$40.00 each.....................................................................................................................4621.....................................200.00 Mesh Evaluation,ASTM C427...........................................................................................................................4622.................................$575.00 23 of 34 Exhibit"A" SouthemCalifomiaArea Effective 7/Olp 9 SH'EM ve I` Laboratory Testing-Soil Rqi Soil Praperties Activity Cost California Lnpac;CAL 216 each.......................................................................................................................70I8................................$I50.00 Classifica[ion of Soil for Engineecing Pucposes,ASTM D2487...................:......................................................7136.....................................350.00 Moisture Density-Chunk Density,In-Situ,ASTM D2937,each.........................................................................7555......................................50.00 Moisture Density-Drive Tube Density,In-SiN,eazh..........................................................................................7137.......................................50.00 Cortosivity:Resistivity,PH,Sulfates,Chlorides,each........................................................................................7020...............................By Quote Material Finer-#200 Sieve,ASTM D 1140/C 117,each...................................................................................7110.......................................50.00 Moisture,ASTM D2216,each.............................................................................................................................7111.......................................25.00 Moisture(microwave),ASTM D4643 each.......................................................................................................7019.......................................15.00 Mois[ure-Density Relations of Soils,ASTM DI557,Method A each.................................................................7113....................................135.00 Moismre-Density Rela[ions of Soils,ASTM D1557,Me[hod B or C each.........................................................7114....................................145.00 M/D Curve Rock Colrection...............................................................................................................................7138.....................................100.00 Moismre-Density Check Poink each...................................................................................................................7135.......................................50.00 R„(Aesistance)Value,Lime Treated or Requiring Recombining,each............................................................7120....................................250.00 R„(Resis[ance)Value,Calif.301,ASTM D 2844,each...................................................................................7119.....................................225.00 Relative Density(max/min)D 4254,each...........................................................................................................7534.........:.....................By Quote Sieve Malysis of Combined Fine and Coazse,ASTM D-422,each..................:................................................7124....................................200.00 Sieve and Hydrometer Malysis,ASTM D 422,each.........................................................................................7109.....................................270.00 Sieve Malysis,fines for sieves#4 to N20D AS"IM D 422,each.........................................................................7139....................................125.00 Specific GraviTy for Soils,AS17vi D 854,each...................................................................................................7127.....................................120.00 Foundation Testing Atterberg Limits,(LL,PI)ASTM D 4315,each.................................................................................................7100.....................................175.00 Atterberg Shrinkage Limi4 ASTM D 4318,each................................................................................................7099.....................................150.00 California Bearing Ratio,ASTM D 1883,set......................................................................................................7130.....................................450.00 CollapsePotential,each..............................................................................................:........................................7559...............................By Quo[e Consolidation Tes;ASTM D 2435,each............................................................................................................7102.....................................200.00 Consolidation Time/Rate Curves each........................................................................................................7103.......................................50.00 Remoldingof Samples each.................................................:.....................................................................7104.......................................30.00 Direct Shear Tes[,ASTM D 3080: Consolidated,Dwined 1 Poin[,each..............................................................................:.............................7107.....................................125.00 Consolida[ed,Undrained 1 Poin[,each........................................................................................................7106.....................................100.00 Unconsolidated,Undrained, 1 Point,each...................................................................................................7105................:....................100.00 Remoldingof Samples,each.......................................................................................................................7104.......................................30.00 Expansion Index,UBC-IS-2,ASTM D 4829,each.............................................................................................7108.....................................130.00 Permeability,Constan[Head,ASTM D 2434,CAI,220,each...........................................................................7116....................................225.00 Permeability,Falling Head,CAL 220,each..................................:.:...................................................................7117.....................................225.00 Triaziai Unwnsolidated,Undrained,ASTM D 2850,each.................................................................................7132...............................By Quote Unconfined Compression Tes[,ASTM D.2166,each..........................................................................................7129.......................................70.00 Unconfined Compression Tes[with Graph,ASTM D 2166,each.......................................................................7134....................................120.00 Peat Moss Loss on Ignition,ASTM D 2974 each............................................................................................:....................7040.......................................75.00 Bulk Specific Gravity,ASTTv1 D 4531,each.......................................................................................................7041.........................:.............45.00 Classifica[ion,ASTM D 4427 each..............................................:.............................................:.......................7038.....................................200.00 pH,ASTM D 2976,each....................................................................................'.................................................7043.......................................45.00 Absorption,ASIM D 2980,each........................................................................................................................7044.......................................20.00 A Rush Chazge of 3 to 4 times of[he unit cost applies to the following tesu for same-day results before 2 pm: ASTM D1557,Method A ' ASTMC136 ASTM CI17,ASTM DI140 ASTM C29(Unit Weigh[onty) 24 of 34 Exhibit"A" SouthemCalifomiaArea EYTective 7/01/l9 SH'EM . 9 4 Laboratory Testing - Structural Testing RA7 Testing Machines Activity Cost 20,000[0 120,000 Pound Machine(Universal),including set-up[ime,per hour................................................4400................................S 240.00 440,000 Pound Machine(Universal),including se[-up time,per hour........:.......................................................4401....................................270.00 600,000 Pound Machine(Compression only),including se[-up time,per hour...................................................4402....................................320.00 I,100,000 Pound Machine(Universal),including set-up time,Per hour.............................................................4462....................................900.00 400,000 Pound Machine(Test mark),including sebup time,Per hour................................................................4541....................................320.00 120,000 Pound Machine(Instron),including set-up time,Per hour....................................................................4501....................................340.00 450,000 Pound Machine(Ins[ron),including set-up time,per hour....................................................................4502....................................440.00 Special Load Tests Up(2-techs+l engineer crew)Per hour...............................................................................4405.....................................500.00 Special Test Set-Up(2-techs+l engineer crew),Per hour............:......................................................................4422.....................................450.00 Manhole Cover and Tree Grate Tests, (L.A. City) Static Loading,22-inch diameter or smaller,each...............................................................................................4423.....................................150.00 Stuic Loading,grea[er than 22-inches and less than 36-inches in diameter,each up to 400k Ibs.......................4557....................................200.00 S[atic Loading,Brea[er than 36-inches in diame[er,each up W 400k Ibs.............................................................4558.....................................300.00 Weigh[of Manhole Samples,each......................................................................................................................4424.........:.............................50.00 Cyclic Loading,each(3-5 cycles)up to 22-inches in diameter..........................................................................4732.....................................300.00 Cyclic Loading,each(10 cycles)........................................................................................................................4468.....................................550.00 Cyclic Loading,each(3-5 cycles).......................................................................................................................4730.....................................400.00 L.A City S-601,each ASTM D2486..................................................................................................................4731.....................................850.00 Mechanical Testing Services Tensile 7'es[--No SVain Measuremen[,Yield by Halt ofDial,no report included Upto 100,000 lb.,each................................................................................................................................441 I.......................................75.00 100,001[0 200,000 Ib.,each........................................................................................................................4412.....................................100.00 200,001[0 400,00016.,each..............................................................................::........................................4410.....................................250.00 Greater than 400,000 lb.each......................................................................................................................4140.....................................450.00 SVainGauge Testing...........................................................................................................................................4415...............................By Quote Special Testing,Load Tests,Flexural,Bend,Impact,.4uial,Racking Shear......................................................4420...............................By Quote Tensile Test--Mechanical Non-Prin[out Eactensometer for Strain,each............................................................4432.......................................50.00 Tensile Test--Elec[ronic Extensometer with Recocded Printout, l test..............................:..............................4433.....................................150.00 MechanicalBend TesS each................................................................................................................................4141.......................................75.00 Machining and Prcparation of Samples(shoP)Per hour...............:......................................................................4142................:....................400.00 Monotonic test including shain gauge,each........................................................................................................4559.....................................375.00 Structural Testing General Struchral Mauotonic Testing ', DiaphragmSet-uP,Per Hour................................................................................................................................4703.....................................400.00 Diaphragm[est,each...............:..............:....................................:......................................................................4479................................3 000.00 Mono[onic Sheaz Wall Set Up,Per Hour.............................................................................................................4704.....................................250.00 MonotonicShear Wall test,each.........................................................................................................................4556................................2,500.00 GencralLmvCyclic/FatigucTesting-<1 OOOcycles—ComponenWorAssemblies CyclicSet-up,per Hour.......................................................................................................................................4705.........................:...........500.00 Cyclic Shear Wall Test,each...............................................................................................................................4438................................3,500.00 Cyclic AC133 or similar TesS each....................................................................'.................................................4706...............................By Quote Cyclic FM1950 or similar Test,euh...................................................................................................................4707...............................By Quote General High C}clic/Fa[igue Testing->1,000 cycles,up to 0.5 Hz CyclicSet-up,Per Hour.......................................................................................................................................4143................................ 1,200.00 Cyclic Shear Wall Test,per hour.........................................................................................................................4144................................ 1,500.00 25 of 34 Exhibit"A" Southem Califomia Area Effective 7/01/19 SH'EM 9e 4Q R"O Laboratory Testing - Structural Testing- Continued ASTM E72 Test or Similar(IncWding DAQ)—Walls Up[0 15-Tf high ASTME72 or similar SeauR Per Hour...............................................................................................................4708.....................................275.00 Compressionor similar Test,each.......................................................................................................................4709................................3.000.00 Flexwalor similar Test,each..............................................................................................................................4710................................2,000.00 Flexural and Compression or similar Test,each..................................................................................................4711 ................................2,500.00 Statid Shear or similar TesS each.......................................................................................................................4712................................ 1,800.00 Permanent Railing Systems,Guards,and Balustrades ASTM E935 LoadTest,each...................................................................................................................................................4733.....................................500.00 Note: •Prices su6jecf fo cGange depending af complvxity ojsample ICC-ES ACI66 Test or Similar(including DAQ)—Diaphragm Up to 20-R by 20-ft ICC-ES-AC166 or similar Set-uR Per Hour...................................................................:...................................4713.....................................450.00 RooCDiaphragm orsimilarTest,each................................................................................................................4714................................3,000.00 Wind Driven Rain or similar Tes[,each.............................................................:................................................4715................................4,000.00 Moment Frame Connection or similar Set-up,Per Hour.....................................................................................4560.....................................400.00 Momen[Frame Connection or similar Tes[,Each...............................................................................................4555.....................................400.00 Componen[Compression or similaz Se[-uP,Per Hour.........................................................................................4561.....................................350.00 Component Compression or similar Tes4 each .................................................................................................4440.....................................700.00 Component Shear or similar Se[-uR Per Hour.....................................................................................................4562.....................................400.00 Component Shear or similaz Test,each .............................................................................................................4441 ................................ 1,000.00 Componen[Flexural or similar Se[-uP,Per Hour................................................................................................4563.....................................350.00 Component Flezural or similar Tes[,each .........................................................................................................4442.....................................700.00 Unifolm Load or similar Set-uP Per Hour................................................................:.........................................4564.....................................500.00 UniformLoadorsimilarTest,each ...................................................................................................................8108................................ 1,500.00 Hydrosta[ic Tes[ing or similar Set-uP,Per Hour..................................................................................................4565.....................................500.00 Flydrosta[ic Testing or similar Test,each ..........................................................................................................4429................................ 1,500.00 Testing for Coatings used in Slip-Critical Bolted Connections Slip Coefficient Tes[(RCSC+5[es[s),Per set of 3 tests....................................................................................4570................................4,250.00 Tension Creep Test(RCSC+3 tests),Per set of 3 tests......................................................................................4571 ................................5,250.00 Geogrid Testing Connection Testing,NCMA Tes[Method SRW[J-1,each..................................................................................4444.....................................350.00 Shear S[reng[h Tes[ing,NCMA Test Me[hod SRWU-I,each..............................................................................4445....................................350.00 Product EvaluaHon Services ICC ES Produc[Evalua[ion Services...................................................................................................................4446...............................By Quote CISCA Product Evaluation Services...................................................................................................................4447...............................By Quote AAMA Product Evaluation Services...................................................................................................................4448........................,......By Quote ATC 24>FEMA 350,FEMA 450 Product Evaluation Services..........................................................................4449...............................By Quo[e Product Consulting Services CodeConsul[ing or similar,per hour...................................................................................................................3095.....................................175.00 ICC ES/IAS Fabricator Quality Assurance Services,Per hour............................................................................3090....................................175.00 Unifolm ES and ICC ES Product Consul[ing Services........................................................................................3091 ...............................By Quote IAPMO Product Consulting Services..................................................................................................................3092...............................By Quo[e AAMA Produc[Consulting Services...................................................................................................................3093...............................By Quote ATC 24,FEMA 350,FEMA 450 Product Consul[ing Services..........................................................................3094...............................By Quo[e Tes[ProcedurelPro[ocol Elabora[ion,Per hour....................................................................................................4150.....................................150.00 26 of 34 Exhibit"A" Southem Califomia Area Effec[ive 7/Ol/19 SH'EM adpRA7 Laboratory Testing - Structural Testing- Continued General Structural Field Testing Special Sampling a[Fabrica[ion plant,per hour...................................................................................................4151.....................................I50.00 Special field tes[serip(2-Techs+ I Engineer Crew),Per hour..........................................................................4152.....................................450.00 Special feld load[es[(2-Techs+I Engineer Crew),Per hour............................................................................4153.....................................525.00 Compu[er DAQ/Amplifiers,Per hour..................................................................................................................4154.....................................]20.00 LoadCell or transducer,per hour........................................................................................................................4155.......................................50.00 Mileage,per mile........ .......................................................................................................................................5101.........................................0.80 No1e: "Pricu subjec((o change depending of comple.xity of sample 27 of 34 E ibit"A" SouthemCalifomiaArea EfTective 7/Ol/19 at SN-EMF9 9Q Geotechnical and Environmental Services @ RA7oP Professional Staff(Geotechnical Engineers, Geologists, Staff Specialist) Activity Cost Senior Professional,Per hour...............................................................................................................................7206.....................................185.00 ProjeceManager,Per hour...................................................................................................................................7205.....................................I10.00 ProjectProfessional,Per hour..............................................................................................................................7204.....................................120.00 Staft'Professional,Per hour.................................................................................................................................7203.....................................115.00 PrincipalProfesional,per hour...........................................................................................................................7202.....................................150.00 CertifiedGeologist,per hour...............................................................................................................................7218...............................By Quote Senior Principal Professional,Per hour...............................................................................................................7201.....................................185.00 Expert W itness,Per hour......................................................................................................................................7200...............................By Quo[e Office SuPPmt,Per hour......................................................................................................................................7209.......................................35.00 WordProcessor,Per hour....................................................................................................................................7219.......................................40.00 Illustrator,Per hour..............................................................................................................................................7208.......................................45.00 QSP"Qualified SWPPP Practitioner",per hour..................................................................................................7231...:.................................120.00 Field Staff Field Technician,Labora[ory end Field with density equipment,Regular Time,per hour.................................7212................................S 105.00 Environmental Technician,Regular Time,per hour............................................................................................7240.....................................105.00 CalTrans Certified Technician with density equipment,Regular Time,per hour...............................................7274....................................105.00 Supervising Technician,Laboratory and Field with densiTy equipment,Regulaz Time,per hour.......................7214....................................110.00 Soils DepuTy Grading,or ICC Soils Inspector,Regulaz Time,per hour.............................................................7563...................................,125.00 Geotechnical Minimums Show-up[ime,no work performed.....................................................................................................................................2-hour minimum charge FieldService Calls.......................................................................................................................................................4 and S-hourminimum charge Field Soils Work.......................................................................................a minimum of 1 hour per week engineering supervision may be charged Overtime Monday[hrough Friday,Over 8 Hours or after 4:00 p.m.;Saturday,1 to 12 Hours...........:...............................7222..................time and one-half Surtdays and Holidays,1 to 8 Hours....................................................................................................................7222..................[ime and one-half Monday through SaNrday,Over 12 Hours;Sundays and Holidays,Over S Hours.............................................7232..............:............dauble[ime Administrative Charges Pick-Up/Delivery',Per hour(2-hours minimum)..........................:......................................................................7215.......................................55.00 Mileage,Per mile.................................................................................................................................................7313.........................................0.75 TravelTime,per hour....................................'......................................................................................................7235.......................................55.00 Facsimile,per page...................:...............:..........................................................................................................7315.........................................1.00 Reproduction,Per page........................................................................................................................................7225.........................................1.50 ReportSuroharge,Per copy.................................................................................................................................7317.......................................50.00 CellularTelephone,Per day.................................................................................................................................7319.......................................35.00 Air Express/Over-night Delivery,each..........................................................................................:....................7325.......................................35.00 Contrac[edServices-Drilling...............................................................................................................................7300........................:. B uo[eYQ ContractedServices-Testing.......................................................................................................:........................7301 ...............................By Quote ContractedServices-Expenses............................................................................................................................7303...............................By Quote 28 of34 Ezchibit"A" Southem Califomia Ama EBective 7/Ol/]9 SH'EM Geotechnical and Environmental Services-Continued 9 h0 RATO Foundation/GeologicalInvestigations Activity Cost GeotechnicalField Exploration...........................................................................................................................7308...............................By Quote Final Report of Compacted Fill(submitted at end ofproject,iFrequired)..........................................................7305...............................By Quote GeotechnicalAddendum Report..........................................................................................................................7338...............................By Quote Support Equipment Foundation/Geological Investigations NuclearDensity Gage,Per day............................................................................................................................7327.............................Field Staff SandCone Kit,per day........................................................................................................................................7328.............................Field Staff Soil Sampling: Encore Sample Container,Per container.....................................................................................................7125.......................................25.00 Tubesand Rings,Per sample.......................................................................................................................7122.......................................15.00 Environmental Investigations and Reports Si[e Assessments Phase I.....................................................................................................................................7306...............................By Quote SiteAssessmen s Phase II....................................................................................................................................7307...............................By Quote Property Condition Report.................................................................................................................................7323................................2,000.00 TankRemovaVClosure Report............................................................................................................................7326...............................By Quote GroundwaterSampling Report............................................................................................................................7329...............................Sy Q ote Import/Ezport Soil Testing..................................................................................................................................7334...............................By Quo[e ReportPreparation...............................................................................................................................................7340...............................By Quote Healthand Safety Plan..................................................................:.....................................................................7320.................................$350.00 SoilVapor Survey...............................................................................................................................................7321 ...............................By Quote Transac[ion Screen Report(TSA)........................................................................................................................7350...............................By Quote Documen[Review...............................................................................................................................................7351 ...............................By Quote Sampling Equipment SampleJars,each................................................................................................................................................7335.......................................25.00 TedlarBags each ..............................................................................................................................................7336.......................................25.00 Coring,each...........................................................................................................................:............................7337.......................................75.00 NylaflowTubing,each .......................................................................................................................................7339............:.......................... I5.00 Note: 'price migh(be higher depending ajthe property size%amplesity Support Equipment Environmental AirMonitoring Equipment,per day....................................................................................................................7216.....................................125.00 Magne[ome[er Equipment,Per day..........:...........................................................................................................7309.....................................100.00 Wa[er Pump and Genera[or,per day...................................................................................................:................7311.....................................I50.00 WaterMonitoring Equipmen[..............................................................................................................................7316.......................................50.00 Health SaFety Equipment: LevelA,Per Persan.....................................................................................................................................7227...............................By Quote Level B,Per Person,per daY Plus hourly rate.............................................................................................7228...............................By Quote LevelC,per Person,per daY Plus hourly ra[e...........................................'.................................................7229.......................................75.00 Healthaud Safety Supplies Per day............................................................................................................7217.....................................I50.00 29 of 34 Exhibit"A" Southern Califomia Mea EfTective 7/O1/19 SN'EM Laboratory Testing - Chemical 98 4 RA1 Administrative Charges Activity Cost Manager,Supervisoy or Consul[an[,Per hour.....................................................................................................6409.........................By Quo[a[ion Chemist,per hour................................................................................................................................................6406.........................By Quotetion Clerical Assistant,Per hour..................................................................................................................................6432.........................By Quote[ion CalculationCharge..............................................................................................................................................6403.........................By Quotazion Repor[Preparation Charge..................................................................................................................................6418........................:By Quo[ation SamplePrepara[ion..............................................................................................................................................6424.........................By Quo[ation Sample Composi[e,Per sample............................................................................................................................6425.........................By Quotation SampleDisposal..................................................................................................................................................6421 .........................By Quotation SampleTransport,per hour.................................................................................................................................6427.........................By Quotation ShippiugCharges.................................................................................................................................................6433.........................By Quo[ation EquipmentRental................................................................................................................................................6435.........................By Quotation Photography.........................................................................................................................................................6420.........................By Quotation StandardAeporVQC Package..............................................................................................................................651 I.........................By Quotatian DisketteSurcharge...............................................................................................................................................6512.........................By Quotation EDF Surcharge....................................................................................................................................................6513.........................By Quotation NEESA,Army Corps of Engineers,CLP,Etc.,Surcharge..................................................................................6514.........................By Quo[ation Field Sampling Technician.Per hour............................................................................................................................................6430.........................By Quotation Mileage,per mile.................................................................................................................................................6415.........................By Quotation Automatic Composite Sampley per 24-hour s..................................................................................................................................:........................................6400.........................By Quo[ation Discharge Flow Measuremen,each.............................................:......................................................................6412.........................By Quotation Supplies 5035 Encore SB)each........................................................................................................................................6533.........................By Quo[ation 5035 Sampling Tool,each...................................................................................................................................6435.........................By Quota[ion 5035 Easy Draw..................................................................................................................................................6534.........................By Quo[a[ion SampleContainers...............................................................................................................................................6434.........................By Quota[ion Rush Analyses RushSurcharge,72 Hours..............................................................:....................................................................6535.........................By Quota[ion AushSurcharge,48 Hours............................!......................................................................................................6540.........................By Quota[ion Rush Surchazge,24 Hours......................:............................................................................................................6530.........................By Quota[ion RushSurchazge,Same Day.................................................................................................................................6545.........................By Quotetion 30 of 34 E chibit"A" Sauthem Califomia Mea EfPective 7/O1/19 9`4i Laboratory Tests — Organic Chemistry ORA70` Organic Aualyses Activity Cost EPA16641RPH.................................................................................................................................................6201 .........................By Quota[ion EPA1664 Oil and Greaze....................................................................................................................................6236.........................By Quotation OiI&Grease,Floatable.......................................................................................................................................6237.........................By Quotation EPA418.1 TRPH................................................................................................................................................6258.........................By Quoteaon EPA8015B 1'PH-Gasoline..................................................................................................................................6268.........................By Quotation EPA8015B 1PH-Diesel......................................................................................................................................6269.........................By Quotation EPA 8015B TPH-Gasoline and Diesel................................................................................................................6267.........................By Quo[a[ion LUFT—Gasoline and Diesel...............................................................................................................................6210.........................By Quota[ion EPA 8015B 1PH-Hydrocarbon Range................................................................................................................6263.........................By Quota[ion EPA SOISB MethanoVEthanol............................................................................................................................6264.........................By Quotetion EPA602 or 8021B BTEX...................................................................................................................................6202.........................By Quoration EPA SOlSB/8021B Combination-Guoline.........................................................................................................6203.........................By Quotation EPA624/8260B Vola[ile Orgmics....................................................................................................................6250.........................By Quotation EPA524 Vola[ile Organics.................................................................................................................................6249.........................By Quotation EPA 625 or 8270C EMractable Organics............................................................................................................6216.........................By Quotation EPA 608 or 8082 PCBs Mater or Soil.................................................................................................................6242.........................By Quotation EPA8082 PCBs Oii............................................................................................................................................6244.........................By Quotalion EPA 608 or 8081A Chlorina[ed Pesticides..........................................................................................................6206.........................By Quotation EPA 608 or 8082/8081 A PCBs and Pes[icides..................................................................................................6243 .........................By Quotation FlashPoint...........................................................................................................................................................6218.........................By Quo[arion Pe[roleum Malysis..............................................................................................................................................6246.........................By Quotation Identifica[ion/Interpretation of Spectrwn/Fingerprint..........................................................................................6260.........................By Quotation EPA 5035 or 5030,8260B Gasoline and Volatile Organics................................................................................6204.........................By Quotation EPA 8270 SIM-Polycyclic Moma[ic Hydrocarbons(PAI-Is)............................................................................6205.........................By Quotation EPA 8260—Soif Vapor(CHHSL).......................................................................................................................6208.........................By Quotation AmbienNlndoodOu[door Air...............................................................................................................................6211 .........................By Quotation Mobile Laboratory Services Mobilc Lab per 10 hour weekday........................................................................................................................6460.........................By Quotation Mobile Lab per 10 hour veekend........................................................................................................................6465.........................By Quotation Mobile Lab hours in excess of 10 hours........................................:.....................................................................6461 .........................By Quo[ation Mobili stion fee...................................................................................................................................................6467.........................By Quotation MobileLab Standby Time...................................................................................................................................6439.........................By Quotation MobileLab Cancellation....................................:................................................................................................6468.........................By Quotation 31 of34 E chibit"A" Soulhem Calitomia Area Ef£ec[ive 7/Ol/19 SN•.Eq Laboratory Tests — Inorganic Chemistry9aaaRAT Inorganic Analyses -Wet Chemistry Activity Cost Alkalinity.............................................................................................................................................................6001 .........................By Quota[ion Ammonia,Direc[.................................................................................................................................................6002.........................By Quotation Ammonia,Dis[illation.........................................................................................................................................6004.........................By Quota[ion Anions(F,Br,CI,NO>>NO:SOa,POa).............................................................................................................6003.........................By Quota[ion Biochemical Oxygen Demand(BOD).................................................................................................................6006.........................By Quo[a[ion Chemical Oxygen Demand(COD)......................................................................................................................6008.........................By Quotation Chloride Argentometric......................................................................................................................................6012.........................By Quotation Chlorine,Residual...............................................................................................................................................6014.........................By Quotation Color....................................................................................................................................................................6016.........................By Quota[ion Conduc[ance ........................................................................................................................................................ 6018 .........................By Quotation Cyanide,Amenable *(surcharge to Total cyanide)..............................................................................................6022.........................By Quotation Cyanide,Free.......................................................................................................................................................6024.........................By Quota[ion Cyanide,Total.....................................................................................................................................................6028.........................By Quotation Cyanide,Reactive................................................................................................................................................6026.........................By Quota[ian Hardness............................................................................................................._...............................................6050.........................ByQuo[a[ion Mercaptans..........................................................................................................................................................6070.........................By Q o[a[ion Nihogen,Kjeldahl...............................................................................................................................................6082.........................By Quotation Oxygen,Dissolved..............................................................................................................................................6096.........................By Quo[ation pH,Aqueous........................................................................................................................................................6102.........................By Quotation pH,Non-aqueous.................................................................................................................................................6100.........................By Quotation ParrOxygen Bomb..............................................................................................................................................6098.........................By Quota[ion Phosphorous........................................................................................................................................................6097.........................By Quotation Perchlorate...........................................................................................................................................................6099.........................By Quo[a[ion Phenols................................................................................................................................................................6104.........................By Quotation Salinity—NaCI....................................................................................................................................................6148.........................By Quota[ion Solids,Total Dissolved........................................................................................................................................6132.........................By Quo[a[ion Solids,Settleable.................................................................................................................................................6126.........................By Quotation Solids,Suspended................................................................................................................................................6128.........................By Quotation Solids,Total............................................................................................................................:............................6130.........................By Quota[ion Solids,Volatile....................................................................................................................................................6031 .........................By Quotation Sulfide,Dissolved................................................................................................................................................6138...............:.........By Quolation Sulfide,Reac[ive..................................................................................................................................................6140.........................By Quo[ation Sulfide,Total.......................................................................................................................................................6142.........................By Quofation SulFate,Gravimetric...........................................:.................................................................................................6134.........................By Quotation Surfactants,MBAS.........................................................................:....................................................................6150.........................By Quotetion Thiosulfate.....................................................:.....................................................................................................6158.........................By Quotation Turbidity..............................................................................................................................................................6174.........................By Quo[ation Water by Kazl Fischer titration............................................................................................................................6272.........................By Quotation Cons[ruction Materials Malysis........................................................:.................................................................6020.........................By Quotatian 32 of 34 Exhibit"A" Southem CaliFomia A+ea Effec[ive 7/01/19 SN'EM Laboratory Tests — Inorganic Chemistry Continued 9 6 e RAS Metals Preparation Activily Cost Digestion,Aqueous.............................................................................................................................................6030.........................By Quo[a[ion Digestion,Nonaqucous........................................................................................................................................6032.........................By Quotation STLC Extrac[ion..................................................................................................................................................6036.........................By Quotation EP-Tox...........................................................................................:.....................................................................6034.........................By Quotation TCLPExtrac[ion..................................................................................................................................................6154.........................By Quota[ion VOC ExVaction ZHE,STLC and/or TCLP)......................................................................................................6155.........................By Quo[ation Metals Analysis CalciumOxide.....................................................................................................................................................6168.........................By Quotation Individual Metals,Per element............................................................................................................................6072.........................By Quotation LowLevel Hexavalent Chromium......................................................................................................................6073.........................By Quotation Hexavalen[Chromium.........................................................................................................................................6052.........................By Quo[a[ion TrivalentChromium........................................................................................................:...................................6403........,................By Quotation Iron(Ferrous).......................................................................................................................................................6404.........................By Quotation Total Lead............................................................................................................:...............................................6069.........................By Quo[ation Leadin Paint........................................................................................................................................................6068.........................By Quota[ion Metals Group Determinations TTLCCAM Metals.............................................................................................................................................6162.........................By Quo[a[ion STLCCAM Metals.............................................................................................................................................6160.........................By Quotation RCRAMetals......................................................................................................................................................6118.........................By Quotation Priority Pollutant Metals......................................................................................................................................6112.........................By Quom[ion Dtinking Water Malysis Metals.........................................................................................................................6067.........................By Quota[ion TALMetals(23)..................................................................................................................................................6071 .........................By Quota[ion Outside Laboratory Services AsbestosAnalysis................................................................................................................................................6300.........................By Quo[a[ion Misc.Analyses......................................................................................................................:.............................6344.........................By Quota[ion I,4-Diozane......................................................................................................................................................6345 .........................By Quo[ation EPA8310 PAHS................................................................................................................................................6346................:........By Quotation EPA504 EDB......................................................................................................................................................6224 .........................By Quotation OrganophosphorusPes[icides..............................................................................................................................6209.........................By Quo[ation TotalOrganic Cazbon........................................:.................................................................................................6254.........................By Quotation Biotoxicity,aqueous............................................................................................................................................6500.........................By Quotation Biotoxicity,nonaqueous................................'......................................................................................................6505.........................By Quotation Colifocm,total.........................::...............:..........................................................................................................6515.........................By Quotation Colifortn,Fecal.....................................................................................................................................................6516.........................By Quotation EPA8151A Chlorina[ed Herbicides....................................................................................................................6207.........................By Quotation TotalOrganic Cazbon..........................................................................................................................................6254.........................By Quofa[ion FDA Testing of Lead and Cadmium, Proposition 65 FDA Testing of Lead and Cadmiurty Proposition 65..................::......................................................................6038.........................By Quotation VOC Testing EPA24—V OC per AQMD.................................................................................................................................6266.........................By Quota[ion 33 of34 E chibit"A" Sout6em Celifomia Area EfTective 7101/19 y` t N eM Qa9Qg Administrative Fees RASO` On occasion we are asked[o perform administrative services outside of our normal business activity.Under these circums[ances,such services will be billed a[the rates below. These services will be performed only at the request of the client. Administrative AdministrativeSupport........................................................................................................................................4443........................5%of Invoice Report Charge,Per report,Per copy..................................................................................................................91I0.........................................1.75 FinalReport.........................................................................................................................................................91l l...............................By Quo[e GeneralTes[ing-Rush Charges............................................................................................................................4812.......................................50% Generally for Compression Testing of Concrete,Base Plate Grout,Mesonry Morlar and Grout,as well as Tension and Bend Testing of Reinforcing Steel. Administrative Services-Laboratories Activity Cost Adminishative Support for Special Projec[s,Certified PayrolU Labor Compliance...........................................3074.......:..............................$135 Adminis[ra[ive O ce SupporC............................................................................................................................3075...............................By Quo e TaskTncking...............................................................................:......................................................................3076..................................$65.00 ReportSurcharge,per copy.................................................................................................................................3077.......................................50.00 ReportCopY Charge,per sheet............................................................................................................................3078.........................................2.75 Reproduction,Per page........................................................................................................................................3079.........................................1.50 FileReVieval,per file..........................................................................................................................................3080.......................................50.00 Insurance,Eztra Chazges as ordered by Client....................................................................................................3081 ...............................By Quote Processing Certificates,Affidavits,&No[ary Services,each..............................................................................3082.......................................25.00 ShippingCharges.................................................................................................................................................3084..................................A[Cost A'v Express/Delivery,each..................................................................................................................................3085...........................Cost+25% Contrac[ed Services.............................................................................................................................................3087...........................Cast+25% MinorRepon Revisian,minimum.......................................................................................................................3089.......................................25.00 ENDOFDOCUMENT 34 of 34 E ibit"A"