AGR-6771.1 - TESCO CONTROLS INC - FIRST AMENDMENT WATER SYSTEM SCADA UPGRADES, FIREWALL PROTECTION & ADDITIONAL PROGRAMMINGA R-(71 . f FIRST AMENDMENT TO CONTRACT THIS FIRST AMENDMENT TO CONTRACT (the "First AmendmenY') is made and entered into as of S 1 2020, by and between the CITY OF ORANGE, a municipal corporation ("City"), and TE O CONTROLS, INC., a Califomia corporation ("Contractor"), with reference to the following: A. City and Contractor entered into a Contract Agreement(Agreement No. 6771)dated as of May 14, 2019, which is incorporated herein by this reference(the"Original ContracY'); and B. City and Confractor desire to modify, amend and supplement certain portions of the Original Contract to revise the scope of work and increase the compensation. NOW,THEREFORE,the parties hereby agree as follows: Section 1. Defined Terms. Except as otherwise defined herein,all capitalized terms used herein shall have the meanings set forth for such tertns in the Original Contract. Section 2. Cross-References. Ciry and Contracror agree that all references in this First Amendment are deemed and conshved to refer to the Original Contract, as implemented by this First Amendment. Section 3 Rerised Scooe of Work. Article 1 of the Original Contract, Work Performed, is hereby amended,modified and supplemented to include the services described on Exhibit A attached hereto and incorporated herein by this reference. Section 4 Comoensation. Article 3 of the Original Contract, Compensation, is hereby amended to increase the total not-to-exceed compensation for the services to be rendered by One Hundred Sixty-Four Thousand Ttiree I-Iundred 1'hirty Dollars and 00/]00($164,330.00)and Article 3 is hereby amended in its entireTy to read as follows: Contractor agrees to receive and accept the lump sum amount of ONE MILLION NINE fIUNDRED FIFTY-SIX THOUSAND SIX IIUNDRED DOLLARS and 001100 ($1,956,600.00) as full compensation for furnishing all materials and doing the Work contemplated and embraced in this Contract; also for all loss or damage arising out of the nature of the Work aforesaid, or from the acts of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the Work until its acceptance by the City, and all risks of every description connected with the Work, also for all expenses incurred by or in consequence of the suspension or discontinuance of the Work, and for the well and faithfully completing the Work, and for the whole thereof, in the manner and according to the Plans and Specifications, and requirements of the Authorized City Representative under them." Section 5. Inteeration. This First Amendment amends, as set forth herein, the Original Contract and, except as specifically amended hereby,the Original ConVact shall remain in full force and effect. To the extent that there is any conflict or inconsistency between the terms and provisions of this First Amendment and the terms and provisions oF the Original Contract, the tertns and provisions of this Firs[Amendment shall control and govem the rights and obligations of the parties. IN WITNESS of this Contract, the parties enter into this Contract on the year and day first above written. CONTRACTOR" CITY" TESCO CON7T20LS, INC., CIT'Y OF ORANGE, a municipal corporation a Califomia corporation gy: BY:L Gi Printed Name: Mazk A.Murphy, Mayor Ti[le: By: EST: Prin ame: U Title:_ C D Pame a Coleman, City Clerk APPROVED AS TO EORM: ___ kl,. Mary E.Bi ing Senior Assi tant City Attome NOTE:If Contractor is a corporation,the City requires the following siguature(s): 1)the Chairman of the Board,the President or a Vice-President,AND(2)the Secretary, the Chief Fioaocial Officer, the Treasureq an Assistant Secretary or an Assistant Treasurer. IP only one corporate officereAsts or one corporate offcer holds more than one corporate oftice,please so indicate.OR The corporate officer named in a corporate resolution as authorized to enter into this Agreement. A copy of the corporate resolution, certified by the Secretary close in time to the execufion of the Agreement, must be provided to the City. 2 EXHIBIT "A" SUPPLEMENTAL SCOPE OF SERVICES Behind this page.] w // Corporate O ce 8440 Florin Road,Sacramento,CA 95828 www.TBSCOCOfItl019.0001 P.0.6ox299007,5acrdmento,CA95829 coNreo s, roc. r PH:916.395.8800 FX:916.429.2817 To: City of Orange Quote Date: 11/12/19 Attn: leannette Guereca Quote No.: 191179Q03 COQ3B Re: City of Orange Project No.: T-49357 SCADA Hardware&Software Upgrade Dearleannette: Thank you for your continued interest in TESCO products, services, and solutions. We are pleased to quote the following scope of work pertaining to the above-referenced project. Scope of Work This change order quote is inclusive of the materials and services required to upgrade the City of Oronge's (City) existing SCADA hardware and software. The intent of the current project/contract(Potable WoterSystem SCADA Controls Upgrades/T-4935 has heen to Integrate the system-wide RTU/PLC upgrades into the Citys existing iFIX SCADA application. However, through further evaluation of the existing SCADA hardware and software that currently hosts the iFIX platform,the determination is that this equipment is nearing end-of-life and susceptibie to failure without the appropriate disaster recovery in place. Therefore, TESCO highly recommends upgrading the SCADA hardware/software to a currently supported platform and configuring a system that is securely managed and can be quickly recovered in the event of a failure. In addition to performing the recommended SCADA hardware and software upgrades, this quote also includes migration from the existing iFIX platform to a new Ignition application. As part of the transition to the new SCADA application,TESCO will construct a virtualized architecture for hosting the Ignition 6ased system. If the City chooses to proceed with this change order, TESCO will integrate each remote site upgrade into the newly developed Ignition SCADA application one-by-one, while still running the existing iFIX system in parallel. Once each site is integrated into the new SCADA platform,final cutover/commissioning will he completed and the old system taken offline. For a complete listing of the materials and services to be provided by TESCO, refer to the Scope of Supply below. Scope of Supply SCADA HARDWARE&SOFTWARE UPGRADE 1 1 SCADA Server Hardware&Software to include: 67,400.00 Dell PowerEdge R440 Rack Server Xeon 23GHz Pracessor 32GB RDIMM RAID 1:(2)2T8 SATA HDD DualPowerSupply Windows5erver20165tandard Dell PowerEdge R340 Rack Server(DMZ/GotewoyServer) Windows05 QNAP TS-977XU Network Attached Storage Device 4)4T8 HDD Check Point 3100 Firewall/SecurityAppliance Cisco 9300 Managed Ethernet5witch File Re(. 191179403 Page 1 of 5 Cluofafion TESCO CONTROLS, INC. Cisco 4331 Router TimeMachines TM200A Network Time Protocol Server 3kVAUninterruptablePowerSupply SCADARackCabinet Dell OptiPlex 5060(Works[a[ion Camputer)with 24"Monitor, Keyboard,&Mouse iPad Pro(for remote access) VMware vSphere Essentials Plus Veeam Backup&Replication Enterprise Please Nate: The SCADA hardwa e/software upgrades described within this quote ore inclusive of a TESCO furnished SNMP support applionce, which will be utilized[a provide alerts regording server ho dware onomolies/faults(e.g.,hard drive failure,powe supply failure,etc.J 2 1 SCADAApplication Sohware(Ignition)to include: 23,330.00 Ignition Custom Package Vision Module Perspec[iveModule—Mobile Symhol Fac[ory SQL Bridge Module Tag Historian a Alarm Notification Module SMS Notification Module Voice Notification Module Modbus Driver Basic Care Contract(1-vear term:includes emoil support and fiee sof[ware upgrades[o any Ignition modules purchased) Please Note: Purchase af the Ignition SCADA platform includes a 3,200 credit(included in total piice belowJ,due ta incompotibility of the specified WIN-911/Interac[ive Alorm No[ification software. 3 Lot 3-Year Hardware Limited Warrantyto include: No Charge Dell PowerEdge Rack Servers 0.00) QNAP NAS Device Check Point Firewall/Security Appliance Cisco Managed Ethernet Switch Cisco Router TimeMachines NTP Server UninterruptablePowerSupply SCADA Rack Cabinet Dell OptiPlex Computer iPad Pro Please Note: This hardwore warranty affirms tha[these products shall be free from material defects in design,moterials,and warkmanship and will function undernormal use and ci cumstances. If it is determined/verified that o defect ormolfunction does exist during this warranty period,then TESCO will provide o replocemen[part/unit a[ no addi[ionol chorge. File Re/ 191779Q03 Page I z of 5 4uotafion TESCO CONTROLS, INC. 4 Lot Professional5ervicestoinclude: 36,070.00 Proiect Mana¢ement Eneineerin¢ engineered hill of materials,engineered submittals, technical data,as-built documentation,and project remrds SCADA Proerammine PADA Platfarm U rade Vinualizattan—130 Hou setup and configuration of the new SCADA servers as required to host a virtualized architenure installation and confguration of the VMware software to develop the necessary virtual machines(VMs)for supporting the selec[ed SCADA platform installation and configuration ofthe Veeam software to perform hackups and snapshots ofthe virtualized SCADA architecture and historical data at predefined intervals setup of the licensing and user access/permissions required of the Ignition SCADA platform testing and functional verification oftheTE5C0 supplied SCADA hardware and software SCADA Integration—560 Hours(Base Bid) develop standardized SCA A graphic screens/templates and tag/historian databases as required to integrete the upgraded monitoring and control functions of the RTU sites automated report and alarm notification development Networkin¢/Communications/Telemetry configuretion of the TESCO supplied network hardware rewoll,monaged switch,and router)as required of the upgraded SCADA system and accordingto cybersecurity hest practires Product5tartuo5ervices produc[quality review,veri£cation of product installation, product paremeter/configuration adjustments as required,software upload/download as required,product function checks,and produc[startup OnsiteTroininz O&M Manuals Please Note: The cost of the equired SCADA services lis[ed in blue above has already been occoanted for in the base bid of[his projed and is not included in the cost of this chonge order. Whereas,[he additiona11205CADAhaurs i li hte above will be required for canFguration of the upgraded SCADA hardware/sof[wore and developmen[of the virtualized architec[ure to host the new Ignition pla[form. TOTAL(Items 1-4,including applicable sales tax): $126,800.00 File Re(. 191179403 Page I 3 ot 5 Quofofion TESCO CONTROLS, INC. Optional Adder- Extended Software Support 3-YEAR SOFTWARE SUPPORT TERM 5 1 3-Year Support/Services—Basic Level to include: VMware v5phere EsSentials Plus Veeam Backup&Replication Enterprise Ignition Custom Package Please Note: The Basic Level support far[hese sof[ware items includes technical support(12-hours/day,Monday-FridoyJ 6y phone oremail, as well as access[o praduct updotes/upgrades during[he support te m. TOTAL(Item 5,including applicable sales tax): $23,680.00 Project Clarifications Unless otherwise indicated by the Scope of Work above,quote is to furnish onlv and does not include any trode labor,trade work,construction work,site improvement,contractor services,or any trade installation services. Any trade lahor and/or related trade work shall be performed by others/contrector. Unless otherwise indicated by the Scope of Work above,the following is not included within this quotation: Conduit,field wire,tubing,or basic trade installation materials(brackets,screws,bolts,j-box,stanchions, pull-box,etc.) Instrumentation mounting components, brackets,stanchions,sunshields,etc. Local control stations and/orfield mounted disconnects. Instrumentation,devices,camponents,or equipment not specifically identified in the above quotation. Fiber optic patch panels,cable,splicing or terminations. Networking infrastructure or architecture modifications to existing facilities. Any 3'^party testing,harmonic testing/analysis,protective device coordination study,short-circuit analysis,or Arc-Flash Risk Assessment(AFRA)services. ElectricalinterconnectiondiagramsforequipmentnotfurnishedbyTE5C0. ISA process control loop diagroms. SignalloopdiagramsforequipmentnotfurnishedbyTE5C0. Terms and Conditions Quote is firm for 30 days unless otherwise stated. Submittals:to be provided approximately 6=8 weeks after receipt of purchase order,written notice of inten[, or notice to proceed. Delivery:to be scheduled approximately 10=12 weeks minimum aker submittal approval. Unless otherwise stated above,price does not include any sales tax, use tax,or applicable fees;please apply anytaxes and/orfees as appropriate. Please note that all invoices will include sales tax where applicable. TESCO price is FOB factory,full freight allowed. TESCO carries liabiliry insurance,with full workers'compensation coverage. Terms are net 30 days on approved credit accounts. Interest will 6e applied to all past due invoices. All merchandise sold is subject to lien laws. Final retention to be paid within 10 days after the project notice of completion. File Ref. 191179Q03 Page 4 of 5 Quotation TESCO CONTROLS,INC. Please feel free to contact us at(916)395-8800 to discuss any questions or comments you may have regarding this quotation. Sincerely, TESCO CONTROLS, INC. John Wright Technical5ales jwright @ tesco controls.com File Re% 19/179Q03 Page I 5 0(5 TEscaA/J Corporafe Omce 8440 Florin Road,Sacramento,CA 95828 WWW.TeScoContlols.COm P.O.Box 299007,Sacramento,CA 95829 CONTROLS, INC. 1 PH:916.395.8800 F%:916.4292817 To: City of Orange Quote Date: 11/18/19 Attn: Jeannette Guereca Quote No.: 19K092Q01 COQ4 Re: City of Orange Project No.: T-49357 Radio Propagation Modeling&Baseline Analysis DearJeannette: Thank you for your continued interest in TESCO products, services, and solutions. We are pleased to quote the following scope of work pertaining to the above-referenced project. Scope of Work This change order quote is inclusive of the TESCO services required to model radio frequency(RF)propagation and determine the feasibility of establishing specific communications links for the City of Orange's (City) upgraded redio telemetry system. Based on the requirements of the City's telemetry and process control system, the propagation models will be utilized to evaluate individual links with potential frequencies and equipment configurations. The modeled path profiles are generated using 30-meter elevations,ground cover data,environmental influences, and hardware type. Through this compiled information,the models predict the Receive Signal Level (RSL)and fade margin for each link. A fade margin is one of the basic metrirs for path evaluation. In an ideal system the fade margin is the difference between the RSL measurement and the minimum receive signal level for acceptable performance, or receiver sensitivity,which varies with redio hardware. In real-world systems the ambient noise level may be greater than the receiver sensitivity, effectively decreasing the fade margin. The frequency and modulation type for a specific radio influence the minimum fade margin. Unlicensed frequenry bands are shared and frequently have higher ambient noise levels, however the radio equipment for these bands incorporates features to reduce the impact. The maximum outpui power permitted by the FCC regulations for the unlicensed bands varies, but the values are typically lower than the power available in the licensed bands. The propagation models will be analyzed byTE5C0 to understand the potential impacts of deploying certain radio frequencies, as well as identifying the effect of various an[enna heights and hardware configurations. TESCO's analysis will further aid in the evaluation of possible telemetry solutions for the Ci[y,in addition to establishing the needs for the field survey/testing. Refer to the Scope of Supply below for a list of the services to be provided by TESCO. Scope of Supply p SYSTEM-WIDE COMMUNICATIONS EVALUATION 1 Lot Professional Services to include: Networkin¢/Communications/Telemetry preliminary needs assessment evaluation of radio frequenty(RF)band selection File Ref. 19K092401 Page 1 of 2 quotation TESCO CONTROLS,INC. propagation modeling through the use of application software to establish a baseli e analysis evaluate and identify potential telemetry system challenges evalua[e po[ential RF paths and trajectories for proposed data telemetry links based on propagation models and the preliminary needs assessment generate a geographical RF propagation map and path profiles develop a plan for the sites requiring an onsite RF survey, field testing,and further data collection/analysis post analysis meeting with the City to discuss TESCO's findings and recommendations forthe sites requiring an onsite RF survey TOTAL(Item 1,not including applicable sales tax): $13,650.00 Terms and Conditions Quote is firm for 30 days unless otherwise stated. Unless otherwise stated above,price does not include any sales tax,use tax,or applicable fees;please apply anytaxesand/orfeesasappropriate. Pleasenotethatallinvoiceswillincludesalestaxwhereapplicable. TESCO price is FOB factory,full treight allowed. TESCO warranties against defect in design,workmanship,and materials for a period of one year from date of installation and does not exceed 18 months from the daie of shipment from the factory. TESCO carries liability insurence,with full workers'compensation coverage. Terms are net 30 days on approved credit accounts. Interest will be applied to all past due invoices. All merchandise sold is subject to lien laws. Final retention to be paid within 10 days after the project notice of completion. Please feel free to contact us at(916)395-8800 to discuss any questions or comments you may have regarding this quotation. Sincerely, TESCO CONTROLS,INC. lohn Wright Technical Sales jwright@tescocontro Is.com File Ref. 19K092Q07 Page 2 of 2