Loading...
FY 25 Draft Five-Year Improvement Plan20528 ROLLING FILE CABINET REPLACEMENT PROJECT DESCRIPTION Originally installed in 1988, the rolling file cabinet in the City Clerk's office is fully utilized in the City's records management program. The cabinet offers 18 storage shelves, each measuring 7' 6" across and 16 inches deep which rotate on a mechanical crank to save space. During December of 2022, the mechanical crank failed and the shelves would no longer rotate. Olpin Group, who installed the system, also provides maintenance and upon inspection determined the system is outdated will need to be replaced within the next two years, with a total replacement cost estimated to be $60,000-$80,000. This project will fund the rolling file cabinet replacement over the next two fiscal years. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2026 Funding Source(s): Capital Projects FINANCIAL SUMMARY 20528 Rolling File Cabinet Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Capital Projects $50,000 $0 $0 $0 $0 AMOUNT $50,000 $0 $0 $0 $0 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM CITY CLERK FISCAL YEAR 2024-2025 1 THIS PAGE INTENTIONALLY LEFT BLANK 2 11210 HOME CHDO ALLOCATION PROJECT DESCRIPTION Federal HOME Investment Partnerships Program (HOME) funding set aside for Community Housing Development Organizations (CHDOs). The City-designated CHDO is Orange Housing Development Corporation (OHDC). The project is to be determined. Appropriation of HOME funds for housing projects is subject to City Council approval. PROJECT DETAILS Project Type: Ongoing Funding Source(s): HOME FINANCIAL SUMMARY 11210 HOME CHDO Allocation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Home $64,835 $0 $0 $0 $0 AMOUNT $64,835 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY DEVELOPMENT FISCAL YEAR 2024-2025 3 11250 HOME DEVELOPER PROJECTS PROJECT DESCRIPTION Federal HOME Investment Partnerships (HOME) Program funding allocation for affordable housing development projects. Housing development projects need to be determined. Appropriation of funds for affordable housing projects is subject to City Council approval. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Home FINANCIAL SUMMARY 11250 HOME Developer Projects Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Home $174,173 $0 $0 $0 $0 AMOUNT $174,173 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY DEVELOPMENT FISCAL YEAR 2024-2025 4 20482 LAND USE TRACKING AND PERMITTING SOFTWARE CARRYOVER PROJECT PROJECT DESCRIPTION The current permitting software used in Community Development was purchased in 2010. The system has become outdated and does not have the functionality needed to meet the growing demands for multi- department and system integration. This project proposes to upgrade the current permit tracking software to a comprehensive, flexible, fully integrated system that will automate workflow and tracking services for land use, building permits and other general permits, have online and mobile functionality, and act as a central portal for internal and external stakeholders to meet the current and future needs of the City. The project cost entails system set-up, information migration, training, and technical support. Any annual maintenance cost will be included in the annual budget. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Building Records Management Fee; Computer Replacement Total Budget: $1,000,000 CAPITAL IMPROVEMENT PROGRAM COMMUNITY DEVELOPMENT FISCAL YEAR 2024-2025 5 THIS PAGE INTENTIONALLY LEFT BLANK 6 20059 TOT LOT SHADE SAILS PROJECT DESCRIPTION As a long-standing City Council initiative, shade sails have been installed over existing tot-lot equipment in City parks to protect users from sun exposure, as well as equipment that can become very hot during the warmer months. There are currently shade sails over the tot-lots at the following parks: Belmont, El Camino Real, Grijalva, Handy, La Veta, Olive, Shaffer, Steve Ambriz, Serrano, Fred Barrera, and El Modena. In FY 25, shade sails will be installed at Hart Park and over each of the two playgrounds at Eisenhower Park. Shade sails will be installed over Killefer, McPherson, and Santiago Hills parks' tot lots in FY 26, pending available funding (including possible cost sharing with Orange Unified School District for the shade sail at McPherson). After these shade sails are installed, the project will be complete. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2026 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20059 Tot Lot Shade Sails Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$0 $430,000 $430,000 $0 $0 AMOUNT $0 $430,000 $430,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 7 20437 PARK SIGNAGE INSTALLATION PROJECT DESCRIPTION Park signage consists of two major types: monument signs and regulatory signs. Phase one of this project consisted of replacing monument signs at Eisenhower (2), El Modena, El Modena Basin, Hart (2), La Veta, and Killefer Parks in FY 23. Phase two of this project included an evaluation of existing regulatory signage and replacement of missing and/or damaged regulatory signs throughout City parks and bike trails. Fabrication and installation of monument signs, new park rules signs, and bike trail rules signage was completed in FY 24. Landscape improvements around the new Hart Park monument sign on Glassell Street also occurred in FY 24. In FY 25, Phase three will include the replacement of other missing and/or damaged regulatory signs throughout City parks and will update the entry adjacent to the new Hart Park monument sign located at the Glassell Street entrance. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20437 Park Signage Installation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$90,000 $0 $0 $0 $0 AMOUNT $90,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 8 20438 EL CAMINO REAL PARK COURT AND LIGHTING RENOVATIONS PROJECT DESCRIPTION In Summer 2022, pickleball court overlay lines were painted on two of the tennis courts at El Camino Real Park. Due to consistent use of the overlaid pickleball courts and requests from court users, the City intends to permanently convert two of the existing tennis courts to multiple pickleball courts. The project also includes resurfacing of all existing tennis court surfaces and new LED light fixtures for the courts. The lighting upgrades is anticipated to provide a utility cost savings with the conversion to LED fixtures. The project is currently scheduled to begin in FY 26. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2026 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20438 El Camino Real Park Court & Lighting Renovations Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$0 $592,450 $0 $0 $0 AMOUNT $0 $592,450 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 9 20476 EL MODENA BASIN AREA IMPROVEMENTS PROJECT DESCRIPTION Through a 1973 use agreement with Orange County Flood Control District (OCFD), the City operates the El Modena Basin located north of the intersection of S. Hewes St. and E. Jordan Ave. as a public park. Currently, the El Modena Basin’s amenities include a decomposed granite walking path around the interior open space. This project would provide area lighting to portions of the walking path and improve the walking path for an enhanced experience, and may also include possible ADA access improvements as necessary. The requested funding includes the costs to design the project. Preliminary construction costs for new lighting and irrigation are approximately $2 million. Funding has not been identified for construction. Design and construction will require approval from OCFD. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2020-2021 Estimated Completion Date: June 2026 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20476 El Modena Basin Area Improvements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$0 $30,000 $0 $0 $0 AMOUNT $0 $30,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 10 20506 BALL FIELD NETTING PROJECT DESCRIPTION The City has active baseball and softball fields at 9 of its 22 parks (El Camino Real, El Modena, Handy, Hart, Killefer, McPherson, Olive, Shaffer, and Steve Ambriz Parks). Many of these ballfields are located adjacent to residential housing, creating safety and liability concerns due to foul balls. This project will be addressed in two phases. Phase 1 includes performing a trajectory study of active, permitted ball fields including fields at El Camino Real, Hart, McPherson, Olive, Shaffer, and Steve Ambriz parks. Phase 2 includes the design and installation of netting at any of these parks based on need and will be prioritized over several years based on available funding. Through a separate CIP project titled Hart Park Diamond 1 Field Improvements (30133), the City and its partners (Chapman University and Orange Lutheran High School) will install foul ball netting along the first and third baselines to protect the perimeter from foul balls at Diamond 1 located at Hart Park. Additionally, the El Modena Park netting project is included in the El Modena Area Renovation project (30048). PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2021-2022 Estimated Completion Date: June 2026 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20506 Ball Field Netting Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$450,000 $100,000 $100,000 $0 $0 AMOUNT $450,000 $100,000 $100,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 11 20513 NEW PARK IN WEST ORANGE PROJECT DESCRIPTION A 2.4 acre piece of property managed by Orange County Flood Control (OCFC) located on W. Chapman between interstate 5 and the 57 freeway has been identified as a location for a new park on the west side of the City. The property is immediately adjacent to the Santa Ana River and bike trail. Adjacent to this property is a proposed workforce housing project sponsored by BLDG Partners. City staff worked with BLDG Partners and Agora Partners on the feasibility of building a park on the aforementioned site. Agora Partners completed a conceptual plan for a passive park in FY 23. Based on the conceptual plan and feedback from the County, the next steps include completing an environmental review, design, and construction. The environmental review and design process started in FY 24. Staff worked with OCFC in FY 24 to enter into a long-term 50-year lease on the property. City funding for construction has been identified; however, Congressman Correa submitted a federal FY 24 Community Projects Funding request of $850,000 for the project. While City funding may be appropriated to the project, City expenses will be off-set by the federal funding following execution of an agreement between the City and the federal granting agency. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2028 Funding Source(s): Park Acquisition (Infill); City Trf: Merged 2008 Tax Exempt Bonds FINANCIAL SUMMARY 20513 New Park in West Orange Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount City Trf: Merged 2008 Tax Exempt Bonds $3,000,000 $0 $0 $0 $0 AMOUNT $3,000,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 12 20544 SERRANO PARK LODGE POLE FENCING INSTALLATION PROJECT DESCRIPTION Serrano Park has several park amenities, including a large open field adjacent to the right-of-way sidewalk. The park and the passive field are not fenced in or gated. As the open field is accessible from the street, it often experiences vandalism as a result of unauthorized vehicles intentionally driving onto the grass. This project would install approximately 475 linear feet of new, 3’ high, single rail lodge pole fencing along two sections of the park to prevent unauthorized vehicle access into the park. The poles will be installed at one section off Sierra Vista Drive and another section along the base of the slope that separates the park from the adjacent HOA landscaped area. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20544 Serrano Park Lodge Pole Fencing Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$39,000 $0 $0 $0 $0 AMOUNT $39,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 13 20545 RUBBERIZED TOT LOT INSTALLATION AT LA VETA PARK PROJECT DESCRIPTION Tot lot rubberized surfaces are installed to ensure playground safety, allow for ADA accessibility and are an aesthetic asset to park facilities. Rubberized playground surfaces have a longevity of approximately 10 years with proper maintenance and care. This project would replace existing wood fibers in the La Veta Park tot lot with pour-in-place rubberized surfacing. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20545 Rubberized Tot Lot Installation at La Veta Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$0 $125,000 $0 $0 $0 AMOUNT $0 $125,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 14 20546 REPLACE INFIELD MIX AT EL CAMINO REAL & STEVE AMBRIZ PARK SOFTBALL FIELDS PROJECT DESCRIPTION The City’s sports fields are heavily used by youth and adults throughout the year. Safety is the number one priority and given the frequent use of these ball fields, the renovation of six softball fields at El Camino Real (4) and Steve Ambriz Parks (2) is needed. The project will include excavation and removal of existing base mix, laser leveling of sub-grade, and import, compaction, and laser grading of new infield mix. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20546 Replace Infield Mix at El Camino & Ambriz Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$270,000 $0 $0 $0 $0 AMOUNT $270,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 15 20547 EL CAMINO REAL PARK EXERCISE EQUIPMENT PROJECT DESCRIPTION Currently, the City has two parks with outdoor exercise equipment, Grijalva and Shaffer Parks. The fitness equipment at these locations are popular and highly used by park patrons. This proposed project would include design and installation of a lighted, shaded exercise equipment station at El Camino Real Park. The installation of the exercise equipment will encourage an active and healthy lifestyle for Orange residents and El Camino Real Park patrons. The project is pending grant funding and a project schedule will be determined based on grant award. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2026 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 16 30053 PARKING LOT PAVEMENT REHABILITATION PROJECT DESCRIPTION The asphalt parking lot pavement in parks are in various stages of degradation and will require protective measures over the next several years. Some lots require complete removal and replacement of asphalt pavement, some can be ground down and capped with new asphalt, and other lots require slurry coating and new striping to protect them from further degradation. As part of a multi-year parking lot pavement rehabilitation initiative, successful pavement M&R treatments have been completed at the following parking lots: Killefer parking lot in FY 17, Eisenhower and El Camino parking lots in FY 19, and Olive and Grijalva parking lots in FY 21. The parking lot at Shaffer Park was completed in FY 19 as part of the Shaffer Park Renovation project and Handy Park was incorporated into the Handy Park Maintenance Renovation project which was completed in FY 22. The City evaluated the parking lots at Fred Barrera, McPherson, Serrano, and Santiago Hills Park in FY 22. Design began in FY 23 and construction is scheduled to be completed at all 4 park locations in FY 24. The project is ongoing and the next parking lot location ready for possible renovation is Steve Ambriz Park. This project is scheduled to resume in FY 26. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Park Acquisition (Infill) Total Budget: $1,159,100 FINANCIAL SUMMARY 30053 Parking Lot Pavement Rehabilitation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Park Acquisition (Infill)$0 $75,000 $0 $0 $0 AMOUNT $0 $75,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 17 20315 HART PARK PICKLEBALL AND FITNESS CIRCUIT CARRYOVER PROJECT PROJECT DESCRIPTION The pickleball facility and fitness circuit has been designed to fulfill the recreational needs of the surging pickleball community, as well as provide a space for other exercise. The new facilities will be located in the southwest portion of the park, adjacent to the existing orange grove to create a unique setting overlooking the park. Proposed facility amenities will include ten lighted pickleball courts, shaded outdoor fitness equipment, area and pathway lighting, paved access to courts and amenities, shaded spectator seating, spaces for gathering, fencing, wind screens, benches, drinking fountains, trash receptacles, bike racks, landscaping, and signage. In FY 22, Congressman Lou Correa secured $2 million in federal FY 22 Community Projects Funding for this project. The City committed $750,000 to the project as well. The project includes multiple phases beginning with project design. In FY 24, the City completed environmental review, design of the project, and began construction. The project is anticipated to be complete in the Spring of 2025. PROJECT DESCRIPTION Project Type: One-Time Starting Fiscal Year: 2016-2017 Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill); Park Acquisition & Development (Quimby); Reimbursable Capital Projects Total Budget: $2,750,000 *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 18 20321 GRIJALVA PARK MASTER PLAN UPDATE CARRYOVER PROJECT PROJECT DESCRIPTION The City owns the 42-acre Grijalva Park site which is being developed in phases. In 2003, Phase I was completed on 15 acres and includes an active park with soccer fields, a tot lot, and a small activity room. In 2005, a Grijalva Park Master Plan was developed for the remaining 27 acres which included a sports center/gymnasium, skate park, amphitheater, additional restrooms, picnic facilities, an aquatics center, and additional parking. In 2011, the Sports Center at Grijalva Park was opened, along with adjacent parking. Nine acres remained undeveloped. In 2019, City Council gave their support for four community partners to fundraise to develop the vacant property. Since then, three groups began to fundraise for amenities including a skatepark, community arts theater, and community/library/senior center. In 2022, the City Council funded the skate park portion of the plan. This project will be developed as a separate CIP. This project has carryover funding of $100,000. As the Master Plan has evolved since its inception in 2003, the carryover funding would be used to re-conceptualize the remaining undeveloped acres to understand what will feasibly fit within the allowable open space. The re-conceptualized plan would also include an updated estimate regarding the parking necessary to accommodate all the proposed amenities and suggest what, if any, amendments or technical memoranda need to accompany the existing Mitigated Negative Declaration. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2016-2017 Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill) Total Budget: $100,000 *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 19 20477 AREA LIGHTING REPLACEMENT AT GRIJALVA PARK CARRYOVER PROJECT PROJECT DESCRIPTION Currently, there are a total of 54 light poles providing area/pathway lighting for Grijalva Park (side A). The lighting was designed with metal poles mounted on concrete foundations at ground level. Deterioration near the base of these poles has resulted in the need to replace several light poles in past years. Despite past measures taken to protect the poles, deterioration continues due to continued corrosion. Several light poles have now been removed, including two which came down during heavy winds. Nine poles in total have been removed due to safety concerns and all others are being evaluated regularly. The objective of this project is to replace all the area lighting to include new poles and fixtures, designed to resist corrosion. In FY 23, the City contracted with a design/engineering firm to provide design specifications and construction documents for the replacement of the lighting. The design was completed in FY 23 and construction is scheduled to be completed in FY 25. Additionally, this project will be partially funded through the Per Capita Allocation program funded through Prop 68. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2020-2021 Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill); Reimbursable Capital Projects Total Budget: $614,400 *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 20 20519 SKATE PARK AT GRIJALVA CARRYOVER PROJECT PROJECT DESCRIPTION The City owns the 42-acre Grijalva Park site which is being developed in phases. In 2005, a Grijalva Park Master Plan was developed for the remaining 27 acres and included a skate park, which was evaluated as a part of the corresponding Mitigated Negative Declaration at that time. Therefore, the environmental review for this project is complete. At the City Council meeting of November 15, 2022, the City Council directed staff to use $1.75 million in park development fees collected from a housing development in the east side of Orange, known as Orange Heights, to build a skate park at Grijalva Park. In FY 24, the City began the design process which included collecting input from stakeholders, local skaters, and its partner Contenders Board Shop. Construction is anticipated to begin in FY 25. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Capital Projects; Grijalva Park Fund CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 21 20520 CERRO VILLA OPEN SPACE IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION The City owns the Cerro Villa open space as a result of public benefit provided by the adjacent development in 1972. For the past 52 years, the area has been maintained as an open space park. This project would enhance the space by installing a new pedestrian gate and natural material entry path, trash receptacle, minimal signage, and natural material mile markers along the existing footpath. Additionally, the project would evaluate the potential to install benches. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 22 20521 YORBA DOG PARK IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION The city owns and maintains the Dog Park at Yorba Park. This project will make improvements to the Yorba Dog Park in phases. Phase 1 will replace the DG with new concrete walkways. The dog park at Yorba Park currently uses a system of decomposed granite (DG) entry paths. Compaction of the DG is difficult to maintain due to foot traffic in and out of the dog park areas, causing the DG to become loose and uneven, which creates tripping hazards. The loose DG also enters the drainage system, causing blockages and reoccurring maintenance issues. At the request of the Orange Dog Park Association, staff evaluated options for improving these areas. Installing the concrete in place of the DG will reduce overall ongoing maintenance costs. In addition, the project includes related irrigation and turf repairs. Phase 2 inculdes an evaluation and possible installation of several new amenities at the Dog Park at Yorba Park, including an individual dog run, shade structures, and lighting, at the request of the Orange Dog Park Association. The potential evaluation of these amenities will include approval from the Orange County Environmental Health Division, the Lead Enforcement Agency, for the methane monitoring system associated with the landfill upon which the dog park was built. Based on the results of the evaluation, a design will be completed. This phase of the overall project is pending full funding from the Orange Dog Park Association. The appropriation currently associated with the project will fund the DG project only. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill) *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 23 30048 EL MODENA PARK AREA RENOVATION CARRYOVER PROJECT PROJECT DESCRIPTION El Modena Park was constructed in the early 1970s and several amenities are in need of repair in order to maintain a safe and functional park environment for patrons. Improvements were planned as a phased renovation project. Phase 1 was completed in FY 23 and included irrigation improvements of passive areas and installation of the tot lot shade structure. Phase 2 was also completed in FY 23, and included the installation of rubberized surfacing at the tot lot. Phase 3 of the project includes installing netting around the existing baseball field to address safety concerns related to rogue foul balls. The design process for the field netting began in FY 24, with construction anticipated in FY 25. Staff will request funding for construction when making the recommendation to award a construction contract. Phase 3 also includes renovations to the baseball field infield to address the existing uneven infield surface, improving the playing condition of the field and addressing safety concerns. Renovations to the baseball field are anticipated to begin in FY 26, following completion of the netting installation and pending available funding. PROJECT DETAILS Project Type: Ongoing Starting Fiscal Year: 2013-2014 Funding Source(s): El Modena Park Facility - Cell Tower Fee Total Budget: $638,092 CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 24 30133 HART PARK DIAMOND 1 FIELD IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION Located at Hart Park, Diamond 1 is used as a collegiate level baseball field. Currently, the City partners with Chapman University (Chapman) and Orange Lutheran High School (OLU) to maintain this premier field. Installation of ball field netting along the first and third base foul lines will protect park users and the adjacent neighborhood from foul balls. Design services was awarded in FY 24, and the City will work with Chapman University to approve final design of the fencing and netting for this field. Additionally, new LED field lighting and poles will be an option considered as a part of the overall improvements. The City will manage and oversee the project and will appropriate the total amount of the project cost once a scope is identified. The City is working with Chapman and OLU to determine cost sharing for the project. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2019-2020 Estimated Completion Date: June 2026 Funding Source(s): Park Acquisition (Infill); Reimbursable Capital Projects Total Budget: $250,000 *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. CAPITAL IMPROVEMENT PROGRAM COMMUNITY SERVICES FISCAL YEAR 2024-2025 25 THIS PAGE INTENTIONALLY LEFT BLANK 26 20247 SOARA CAPITAL PROJECTS CARRYOVER PROJECT PROJECT DESCRIPTION In October 2014, the State Department of Finance approved a Bond Proceeds Funding Agreement in which the remaining redevelopment bond proceeds were approved for transfer to the City during the ROPS 14-15B period. This Agreement authorizes the City to expend the redevelopment bond proceeds in a manner that is consistent with the original bond covenants and of benefit to the Orange Merged and Amended Redevelopment Project Area, including public infrastructure improvements. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2014-2015 Estimated Completion Date: June 2025 Funding Source(s): City Trf: Tustin Project - Taxable Bonds; City Trf: Nw & Sw Merged 2003 Taxable Bonds; City Trf: Nw & Sw Merged 2003 Tax Exempt; City Trf: Merged 2008 Tax Exempt Bonds Total Budget: $10,189,917 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM ECONOMIC DEVELOPMENT FISCAL YEAR 2024-2025 27 THIS PAGE INTENTIONALLY LEFT BLANK 28 12406 SIGNAL PRE-EMPTION INSTALLATION PROJECT DESCRIPTION The Opticom Traffic Pre-emption project involves the purchase and installation of traffic signal pre-emption equipment on the City’s major roadways, intersections, and fire apparatus. This technology enables emergency vehicles to navigate through traffic more efficiently and safely, reducing response times and potentially saving lives during critical situations. Pre-emption equipment installed on fire apparatus triggers the associated equipment within traffic signals to control signal lights for oncoming fire apparatus right-of-way during Code 3 responses. This programming enhances the overall effectiveness of emergency response operations and contributes to public safety. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 12406 Signal Pre-Emption Installation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $55,000 $40,000 $40,000 $40,000 $40,000 AMOUNT $55,000 $40,000 $40,000 $40,000 $40,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 29 12506 BODY ARMOR PROJECT DESCRIPTION The objective of this project is to provide fire suppression personnel with body armor and supporting equipment during "active shooter" and "civil disturbance" type responses. Fire Department body armor consists of a ballistic style protective helmet and a chest-worn ballistic body vest. Equipping firefighters with this ballistic protection is crucial for their safety and well-being, enabling them to carry out their duties with increased security, reducing the potential for harm or injury. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Capital Projects; Prop 172 FINANCIAL SUMMARY 12506 Body Armor Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Prop 172 $0 $0 $60,000 $0 $0 AMOUNT $0 $0 $60,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 30 12540 THERMAL IMAGE CAMERAS PROJECT DESCRIPTION The objective of this project is to maintain a reliable and serviceable stock of Thermal Imaging Cameras (TICs) in the Fire Department. TICs are crucial tools for firefighters as they enable them to quickly locate individuals in smoke-filled and low-visibility environments, identify hot spots, and assess structural integrity during firefighting operations. The thermal imaging capabilities of these cameras provide invaluable insight into the evolving conditions of a fire scene, aiding in decision-making and resource allocation to ensure the best possible outcomes. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 12540 Thermal Image Cameras Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $0 $250,000 $0 $0 $0 AMOUNT $0 $250,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 31 12955 MOBILE DATA COMPUTERS PROJECT DESCRIPTION The purpose of this project is to maintain the department’s Mobile data computers (MDC) and Cradlepoint wireless routers. MDCs are specialized computer systems installed in emergency vehicles used to provide firefighters with access to critical information, such as building layouts, hazardous material data, and live incident updates, while en route to the scene. This real-time data empowers firefighters to make informed decisions and adapt their strategies based on the evolving situation, ultimately enhancing the safety and effectiveness of their response. MDC technology is continuously being improved and updated to maintain compatibility with dispatch centers, Automatic Vehicle Locator (AVL), and portable notebooks. Current Cradlepoint routers have reached their end of life and are no longer supported on the current 4G wireless connection devices. New mapping applications require new generation 5G wireless connection to support higher data transmission and provide real-time information. Cradlepoint is a company that specializes in cloud-delivered LTE and 5G wireless network edge solutions for businesses, including MDCs. The importance of Cradlepoint is to provide reliable and secure wireless connectivity for mission-critical applications. This includes enabling MDCs to access high-speed internet, connect to a variety of devices, and maintain communication in mobile and remote environments. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07; Computer Replacement *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 12955 Mobile Data Computers Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $0 $119,000 $0 $0 $119,000 Fire Facility Fee Districts All Com 6/07 $150,000 $119,000 $0 $0 $119,000 AMOUNT $150,000 $238,000 $0 $0 $238,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 32 20105 AUTOMATIC CHEST COMPRESSION DEVICE PROJECT DESCRIPTION This project aims to maintain a reliable and serviceable stock of Automatic Chest Compression Devices (ACCD) for all apparatus in the Fire Department. An ACCD is a tool that provides consistent and effective chest compressions during CPR emergencies. These devices are essential in providing high-quality chest compressions for prolonged periods, ensuring that blood circulation is maintained to vital organs while reducing the fatigue that rescuers may experience from manual CPR. By delivering precise and consistent compressions, ACCDs can improve the chances of survival for individuals experiencing cardiac arrest, especially during prolonged resuscitation efforts or in challenging environments. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07; Proposition 172 FINANCIAL SUMMARY 20105 Automatic Chest Compression Device Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Prop 172 $0 $340,000 $0 $0 $0 AMOUNT $0 $340,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 33 20124 TURNOUT EQUIPPING & REPLACEMENT PROJECT DESCRIPTION This project provides essential funding to equip fire suppression personnel with certified turnout safety equipment, ensuring that they have reliable, up-to-date protective gear to safeguard their safety and effectiveness during emergency response operations. Additionally, the project allocates funding for the annual cleaning and inspection of all 230 sets of turnout gear, adhering to the rigorous standards established by the National Fire Protection Association (NFPA) code 1851. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20124 Turnout Equipping & Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $105,000 $105,000 $110,000 $110,000 $115,000 AMOUNT $105,000 $105,000 $110,000 $110,000 $115,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 34 20166 EMS GURNEY REPLACEMENT PROJECT DESCRIPTION The program objective is to maintain and replace the department’s emergency medical services (EMS) gurneys as they approach the end of their ten-year service life. The current battery-operated EMS gurneys equipped with lift assist features are crucial in ensuring the safety of both patients and EMS personnel during patient transport. The lift assist functionality helps reduce the risk of musculoskeletal injuries for EMS providers and allows for smoother and more controlled transfers for patients. Having a gurney replacement program in place is essential for ensuring the ongoing effectiveness and safety of EMS operations. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Prop 172 FINANCIAL SUMMARY 20166 Gurney Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Prop 172 $0 $80,000 $0 $0 $80,000 AMOUNT $0 $80,000 $0 $0 $80,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 35 20169 WMD-DUODOTE AUTO INJECTOR REPLACEMENT PROJECT DESCRIPTION This project establishes a three-year replacement program for Weapons of Mass Destruction (WMD) auto injectors. These personal syringe-like devices are pre-filled with medication used to combat the effects of chemical, biological, radiological, and nuclear weapons commonly used in terrorist attacks. Auto injectors are crucial for emergency preparedness and are used throughout the country to protect public safety personnel. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Capital Projects; Fire Facility Fee Districts All Com 6/07; Prop 172 FINANCIAL SUMMARY 20169 WMD DuoDote Auto Injector Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Prop 172 $0 $50,000 $0 $0 $50,000 AMOUNT $0 $50,000 $0 $0 $50,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 36 20171 EPCR REPLACEMENT PROGRAM PROJECT DESCRIPTION This program equips and maintains the proper technology and equipment needed for the Emergency Medical Services (EMS) Electronic Patient Care Reporting (ePCR) documentation system. An ePCR is a digital documentation system that EMS personnel use to document patient data, medical care given, and general care given during an emergency response. All iPads are equipped with cellular activation to be used for gathering real-time patient data in the field. With updated equipment, ePCR systems can efficiently streamline data collection, improve accuracy, and enable seamless communication with hospitals and other healthcare providers. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07; Computer Replacement FINANCIAL SUMMARY 20171 EPCR Replacement Program Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $65,000 $20,000 $20,000 $20,000 $20,000 AMOUNT $65,000 $20,000 $20,000 $20,000 $20,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 37 20334 FIRE STATION REPAIRS PROJECT DESCRIPTION The Fire Station Maintenance project provides funding to address maintenance issues which go beyond current replacement capacities. This project addresses major station maintenance and repairs, such as painting, carpeting, roof repairs, and any necessary station updates. Regular maintenance is essential to maintaining readiness and operational effectiveness during emergencies, enhancing the safety of both the firefighters and the community they serve. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fees District All Com 6/07* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20334 Fire Station Repairs Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 38 20384 VEHICLE EXTRICATION RESCUE TOOL REPLACEMENT PROJECT DESCRIPTION This project establishes funding to maintain and replace four sets of vehicle extrication power rescue tools for the purpose of efficiently and safely removing individuals from vehicle emergencies. The project objective is to maintain a reliable and serviceable inventory of vehicle extrication rescue tools in the Fire Department. Having this equipment readily available on fire apparatus can significantly reduce rescue times and enhance the effectiveness of emergency response efforts, ultimately improving the chances of survival and minimizing potential injuries for those involved in vehicle accidents. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20384 Vehicle Extrication Rescue Tool Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $85,000 $0 $0 $0 $0 AMOUNT $85,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 39 20393 DEFIBRILLATOR, AED & BATTERY REPLACEMENT PROJECT DESCRIPTION This project maintains and replaces the department’s 25 Paramedic cardiac defibrillators. A Paramedic cardiac defibrillator, also known as a defibrillator or AED, is a portable medical device used to administer an electric shock to the heart in cases of cardiac arrest. Paramedic cardiac defibrillators are equipped with monitors that allow medical professionals to analyze the heart's rhythm and determine if a shock is necessary. These devices play a critical role in providing immediate and potentially life-saving treatment to individuals experiencing a cardiac emergency. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20393 Defibrillator, AED & Battery Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $250,000 $500,000 $250,000 $0 $0 AMOUNT $250,000 $500,000 $250,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 40 20502 FIRE STATION APPARATUS BAY DOOR REPLACEMENT PROJECT DESCRIPTION The Fire Station Apparatus Bay Door Replacement program assesses, maintains, and replaces the apparatus bay doors that provide critical access for emergency response vehicles at all 8 fire stations throughout the city. The systematic replacement program ensures all apparatus doors remain in optimal condition, minimizing the risk of malfunctions or delays during emergency response operations. It helps to mitigate the potential for unexpected door failures, reduces downtime for maintenance, and ultimately supports the continuous readiness of the fire station to respond to emergencies effectively. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2026 Funding Source(s): Capital Projects; Prop 172 FINANCIAL SUMMARY 20502 Fire Station Apparatus Bay Door Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Prop 172 $0 $300,000 $0 $0 $0 AMOUNT $0 $300,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 41 20504 FIRE STATION 3 BUILDING ADDITION PROJECT DESCRIPTION The Fire Department aims to replace two existing structures located behind Fire Station 3 with a single new building to better address current operational needs and optimize the use of space. This new facility will accommodate additional space for storing apparatus, a workshop, a laundry room, and a dedicated space for medical and disaster supplies. The current structures, consisting of a barn and a concrete masonry building, have been in use since the station was built in 1962 but have deteriorated over time. The proposed new building will address these operational needs, ensuring the department's functionality for years to come. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Fire Facility Fee Districts All Com 6/07 *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20504 Fire Station 3 Building Addition Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $0 $4,000,000 $0 $0 $0 AMOUNT $0 $4,000,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 42 20505 FIRE STATION 5 EXERCISE ROOM ADDITION PROJECT DESCRIPTION This project establishes funding for the addition of an exercise room at Fire Station 5. Constructed in 1965, Fire Station 5 currently lacks the necessary space to store and utilize exercise equipment, crucial for cultivating a stronger and more physically fit workforce. Presently, the exercise equipment is located on the apparatus bay floor, alongside the frontline apparatus used in daily emergencies, significantly impeding the parking of emergency vehicles within the structure. The addition of an exercise room to the rear of Station 5 will provide flexibility for the future operational needs of the Fire Department by creating more space for personnel and apparatus. The existing fire station will largely remain unchanged, with some minor aesthetic improvements to complement the new room addition. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2025 Funding Source(s): Capital Projects FINANCIAL SUMMARY 20505 Fire Station 5 Exercise Room Addition Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Capital Projects $0 $0 $600,000 $0 $0 AMOUNT $0 $0 $600,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 43 20523 FIRE STATION 2 REMODEL PROJECT DESCRIPTION This project establishes funding for the design and construction of a permanent facility for Fire Station 2, which provides emergency service response to the central portion of the City and neighboring City of Villa Park. The new facility will be designed to accommodate up to three frontline emergency vehicles and eight fire suppression personnel. This project will combine the newly built single-bay apparatus and workout rooms with 9,500 square feet of new construction, which will include the following accommodations: office, living room, kitchen, (8) sleeping dorms, (5) restrooms, training classroom, and two-bay apparatus room. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Capital Projects FINANCIAL SUMMARY 20523 Fire Station 2 Remodel Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Capital Projects $0 $0 $900,000 $7,000,000 $0 AMOUNT $0 $0 $900,000 $7,000,000 $0 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 44 30032 WELLNESS EQUIPMENT REPLACEMENT PROJECT DESCRIPTION The wellness equipment replacement program is essential in cultivating a healthy and physically fit workforce. The Orange Fire Department (OFD) is dedicated to embracing the wellness program sponsored by the International Association of Fire Chiefs (IAFC), with a focus on delivering exceptional service that prioritizes public safety and the well-being of both the community and firefighters. To ensure the ongoing effectiveness of this program, wellness equipment is made available at each of the eight fire stations, and a comprehensive long- term replacement plan has been put in place to address the specific needs of each station. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Districts All Com 6/07* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 30032 Wellness Equipment Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Fire Facility Fee Districts All Com 6/07 $45,000 $0 $45,000 $0 $45,000 AMOUNT $45,000 $0 $45,000 $0 $45,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 45 20104 SCBA RETROFIT & REPLACEMENT CARRYOVER PROJECT PROJECT DESCRIPTION Purchase 105 Self Contained Breathing Apparatus (SCBA) harnesses and associated equipment. The Fire Department embraces national firefighting safety standards set forth by the National Fire Protection Association (NFPA). SCBA are used to provide firefighter safety during fire attack, search, rescue, and other emergencies involving Immediately Dangerous to Life and Health environments. This proposed equipment has a 10-year life expectancy. New SCBA equipment was purchased in FY 20. Next SCBA replacement anticipated in FY 30. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Fire Facility Fee Districts All Com 6/07 Total Budget: $950,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 46 20501 USAR TOOLS AND EQUIPMENT REPLACEMENT CARRYOVER PROJECT PROJECT DESCRIPTION The Orange City Fire Department currently staffs and operates one of five Type 1 Heavy USAR units in Orange County. This unit may be dispatched locally or regionally on complex USAR incidents to provide highly specialized equipment and trained personnel to mitigate the following types of emergencies: This apparatus is equipped with a large variety of specialty power tools and equipment which require ongoing maintenance and repair. These tools and equipment include: power saws, drill hammers, on-board air compressor, Stanley Tool, rope/rigging equipment, shoring equipment, confined space air and communication lines. Most of the equipment that is currently housed on USAR 6 is over 20 years old and has reached its service life. The Fire Department must replace this equipment in order to continue providing urban search and rescue services safely and effectively. Confined Space Rescue1. Trench Rescue2. Swift Water Rescue3. Lifting and moving of heavy objects4. High-angle rope rescue5. Low-angle rope rescue6. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2021-2022 Estimated Completion Date: December 2024 Funding Source(s): Capital Projects Total Budget: $200,000 CAPITAL IMPROVEMENT PROGRAM FIRE DEPARTMENT FISCAL YEAR 2024-2025 47 THIS PAGE INTENTIONALLY LEFT BLANK 48 20278 SERVER REFRESHES PROJECT DESCRIPTION This project provides for replacement of aged servers. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20278 Server Refreshes Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $100,000 $55,000 $55,000 $55,000 $55,000 AMOUNT $100,000 $55,000 $55,000 $55,000 $55,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 49 20282 PERSONAL COMPUTER REPLACEMENTS PROJECT DESCRIPTION A recurring annual replacement of the City's aging PC (desktops, laptops, tablets) inventory is recommended. This initiative is a recommended guideline to replace a fourth of the City's PC inventory to prevent the inventory from becoming excessively aged and prevent impact to staff productivity due to PC failures. For FY25 a deferred inventory of approximately 500 PCs that are not windows 11 compliant will be replaced. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20282 Personal Computer Replacements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $200,000 $200,000 $200,000 $200,000 $200,000 AMOUNT $200,000 $200,000 $200,000 $200,000 $200,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 50 20338 STRATEGIC PLAN UPDATE PROJECT DESCRIPTION The City's former 3-year strategic IT plan was delivered in 2013. Therefore, IT Services recognizes the City is due for another strategic plan review. Due to recent structural changes with the IT Department, a Strategic Plan is still anticipated. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20338 Strategic Plan Update Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $0 $0 $0 $0 $60,000 AMOUNT $0 $0 $0 $0 $60,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 51 20339 NETWORK REFRESH PROJECT DESCRIPTION This project replaces various network appliances and infrastructure as they approach end of support. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20339 Network Refresh Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 52 20342 CONFERENCE ROOM AUDIO/VIDEO PROJECT DESCRIPTION Currently, City conference rooms have been furnished with audio/video equipment for meeting collaboration and presentations. This project includes the continued effort to maintain audio and video equipment in various conference room locations as well as refresh ageing audio/video conference room equipment. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20342 Conference Room Audio/Video Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $10,000 $10,000 $10,000 $10,000 $10,000 AMOUNT $10,000 $10,000 $10,000 $10,000 $10,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 53 20391 FINANCIAL SYSTEM REPLACEMENT PROJECT DESCRIPTION Tyler Technologies has indicated they are no longer improving or marketing the City’s current EDEN financial system product. Consistent with prior years, IT Services recommends the City continues accumulating funds to replace this system. It is anticipated a consultant will be retained in FY23 to commence the initial design for a new ERP with testing in FY25 and Go Live in FY26. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20391 Financial System Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $0 $0 $0 $0 $0 AMOUNT $0 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 54 20413 UPS REPLACEMENTS PROJECT DESCRIPTION Provide uninterruptable power supplies (UPS) and related electrical work to datacenter UPS and intermediate distribution frames (IDFs), or network equipment closets, to ensure that network and server infrastructure and audio visual equipment stays available in the event of a power outage. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20413 UPS Replacements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $100,000 $45,000 $45,000 $45,000 $45,000 AMOUNT $100,000 $45,000 $45,000 $45,000 $45,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 55 20456 PHYSICAL SECURITY PLATFORM REPLACEMENTS PROJECT DESCRIPTION This request recognizes the need with an aging security platform to replace or add cameras, wireless radios, additional door locations, intrusion detection zones, consulting services, network, servers, and storage replacement and expansion by FY 25. Additionally, for FY25, the integration of traffic cameras to the security platform is intended. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement; Capital Bond Proceeds FINANCIAL SUMMARY 20456 Physical Security Platform Replacements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $200,000 $200,000 $200,000 $200,000 $200,000 AMOUNT $200,000 $200,000 $200,000 $200,000 $200,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 56 20510 STORAGE AREA NETWORK REPLACEMENT PROJECT DESCRIPTION A recurring CIP budget is recommended to refresh SAN hardware on an ongoing basis for future repairs. Backup storage targets for the two datacenters and traffic management center will reach end of support in FY 25. The Storage Area Network (SAN) for the Police Department will reach end of support in FY 26. The requested budget over the next few fiscal years accumulates towards those respective replacement goals. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement FINANCIAL SUMMARY 20510 Storage Area Network Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $125,000 $125,000 $125,000 $125,000 $125,000 AMOUNT $125,000 $125,000 $125,000 $125,000 $125,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 57 20516 VIDEO PRODUCTION AND BROADCAST REFRESH PROJECT DESCRIPTION The City possesses three separate Audio Video (AV) systems rebuilt between 2015 and 2017 and includes the Council AV System, the City’s TV Production System (cameras, etc.) and the City’s TV Channel Playback system. The project anticipates a 5-year replacement schedule with annual upgrades to target the most vulnerable and critical systems through an annual assessment and evaluation of the current conditions to determine the overall health of the equipment and avoid failures. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Computer Replacement; 1% PEG Program FINANCIAL SUMMARY 20516 Video Production and Broadcast Refresh Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $67,500 $67,500 $67,500 $67,500 $67,500 1% Peg Program $67,500 $67,500 $67,500 $67,500 $67,500 AMOUNT $135,000 $135,000 $135,000 $135,000 $135,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 58 30071 FIBER OPTIC CABLE REPLACEMENTS PROJECT DESCRIPTION Having City locations on our own fiber increases security and bandwidth. The project will be used to replace aging IT Fiber infrastructure. The City's east fiber ring replacement is anticipated to occur in FY 25. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Capital Projects; Computer Replacement FINANCIAL SUMMARY 30071 Fiber Optic Cable Replacements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $100,000 $100,000 $100,000 $100,000 $100,000 AMOUNT $100,000 $100,000 $100,000 $100,000 $100,000 CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 59 20277 KACE FOR POLICE CARRYOVER PROJECT PROJECT DESCRIPTION The KACE appliance is useful at the Civic Center for helpdesk management, IT asset inventory management, software distribution, and software license management. This initiative is for licensing and professional services to expand the use of this product at the Police Department facility. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2015-2016 Estimated Completion Date: June 2025 Funding Source(s): Computer Replacement Total Budget: $25,000 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 60 20285 WORK ORDER MANAGEMENT CONSULTING CARRYOVER PROJECT PROJECT DESCRIPTION During FY 17, an effort was made to evaluate and select a consultant to assist the City to replace the existing Maintstar work order management system, which was implemented by the City 19 years ago. It is recommended to review and consider a replacement. The new system will include an inventory of all City assets and infrastructure, provide data and insight to guide capital project needs, record data on maintenance on each asset, and allow for work order requests for internal and external uses. This system would be used in tandem with a Citizen Request Management system, which would allow citizens and businesses to report issues online and receive updates as to the status of their request. Finally, the system would provide much of the data needed for reimbursement in the event of a major emergency or disaster. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2015-2016 Estimated Completion Date: June 2025 Funding Source(s): Computer Replacement; Sanitation and Sewer; Water Total Budget: $1,054,800 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 61 20347 ENTERPRISE ACCESS SYSTEM CARRYOVER PROJECT PROJECT DESCRIPTION The City possesses three different access control systems, which causes confusion with badge access management where staff require access to facilities across these three systems. In FY 17, the City acquired a Genetec security solution. This project anticipates licensing and hardware to implement access control exploiting the capabilities of the recently acquired Genetec system. In addition to replacing the existing access control system locations enabled today, this initiative envisions adding access control for seven park facilities. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2017-2018 Estimated Completion Date: June 2025 Funding Source(s): Park Acquisition (Infill); Fire Facility Fee Districts All; Police Facility Fees; Library Facility Fees; Capital Bond Proceeds; Computer Replacement Total Budget: $1,633,036 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 62 20455 MULTI-FACTOR AUTHENTICATION CARRYOVER PROJECT PROJECT DESCRIPTION Multi-factor authentication allows for three factors of identification: What you know is generally a password. This initiative considers either "what you have" or "what you are" using an access badge or biometrics. A card reader or camera at every PC location would be needed. If a password is somehow compromised, the additional required factor for credentialed access will prevent gaining credentialed access and therefore greatly increase the City's security posture. What you know1. What you have2. What you are3. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2019-2020 Estimated Completion Date: June 2025 Funding Source(s): Computer Replacement Total Budget: $210,000 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM INFORMATION TECHNOLOGY FISCAL YEAR 2024-2025 63 THIS PAGE INTENTIONALLY LEFT BLANK 64 30056 HVAC REPLACEMENT CARRYOVER PROJECT PROJECT DESCRIPTION The HVAC of the original building at the Orange Public Library & History Center is over 30 years old and is nearing the end of its service life. The unit is inefficient, and replacement parts are becoming difficult to locate, resulting in loss of control and uncomfortable temperatures for Library patrons, volunteers, and staff. Phase I involved the creation of a design to replace the one-of-a-kind unit and was completed in FY 20. Phase II will include the HVAC replacement as well as upgrades to the transformer and is expected to be completed by December 2024. Replacement of this unit was also included in the recommendations of the energy efficiency audit and the Facilities Condition Assessment that were completed. Funding for this project reflects projected energy savings related to an Energy Coalition Grant and revenue received from the Building Forward Main Grant. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2014-2015 Estimated Completion Date: December 2024 Funding Source(s): Reimbursable Capital Projects; Capital Projects; Library Facility Fees Total Budget: $567,670 CAPITAL IMPROVEMENT PROGRAM LIBRARY SERVICES FISCAL YEAR 2024-2025 65 THIS PAGE INTENTIONALLY LEFT BLANK 66 20335 POLICE VEHICLE MOBILE DATA COMPUTER REPLACEMENT PROJECT DESCRIPTION The Police Department’s Mobile Data Computer (MDC) replacement project identifies the need to maintain contemporary and functional MDCs in the patrol fleet. This project will replace a quarter of the MDCs, on an annual basis, for a total project cost of $440,000. Included in the purchase is approximately 65 mobile data computers, a two-year extended warranty that will provide five years of coverage and docking stations. The previous MDC replacement project was completed in June 2021. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2028 Funding Source(s): Asset Seizure - Federal FINANCIAL SUMMARY 20335 Police Vehicle Mobile Data Computer Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Asset Seizure- Federal $110,000 $0 $0 $0 $0 AMOUNT $110,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM POLICE DEPARTMENT FISCAL YEAR 2024-2025 67 30196 POLICE ENTERPRISE SYSTEM PROJECT DESCRIPTION The Police Enterprise System project provides a flexible platform to help the Police Department reach its vision of adopting a network solution that allows all systems to connect and integrate with one another to meet the objectives of the department. The system consolidates and manages police hardware and software including existing Tasers, body worn, fleet, and interview cameras, along with the evidence.com portal, which is cloud based for data storage and sharing, Records software, and Dispatch software used for basic operations. The project is led by the Police Department and primarily funded through the Computer Replacement fund for a total project cost of $7.5 million over ten years. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2032 Funding Source(s): Computer Replacement FINANCIAL SUMMARY 30196 Police Enterprise System Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Computer Replacement $635,000 $1,175,000 $750,000 $750,000 $750,000 AMOUNT $635,000 $1,175,000 $750,000 $750,000 $750,000 CAPITAL IMPROVEMENT PROGRAM POLICE DEPARTMENT FISCAL YEAR 2024-2025 68 11328 ADA IMPROVEMENTS PROJECT DESCRIPTION This project will modify curbs and ramps at various locations throughout the City to comply with the Americans with Disabilities Act (ADA) regulations. This has been an ongoing project, partially funded with Community Development Block Grants (CDBG). PROJECT DETAILS Project Type: Ongoing Funding Source(s): TSIP Citywide*; Community Development Block Grant; Capital Projects *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 11328 ADA Improvements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $200,000 $200,000 $0 $0 $0 Community Development Block Grant $100,000 $0 $0 $0 $0 AMOUNT $300,000 $200,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 69 12982 CORP YARD RENOVATIONS PROJECT DESCRIPTION Renovation of the Corporation Yard has completed the final design. This project will focus on improving space allocation, enhancing paths of travel and safety, maximizing equipment and vehicle storage, and redistributing departments’ storage areas of Police, Community Services, and Public Works. Upgrades will also include necessary improvements to comply with NPDES/environmental requirements. The first construction phase includes undergrounding utilities, completing the perimeter wall, lightings, landscaping, pavement reconstruction, and building the material storage for environmental compliance. Construction of the first phase is expected to begin in the Spring of 2024. The second phase of the project includes the replacement of modified wooden sheds / storage containers to prefabricated metal storage buildings along with building a permanent transfer station for environmental compliance. City staff is evaluating options for funding for the second phase. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2028 Funding Source(s): Sewer; Gas Tax Maintenance; Capital Projects; Capital Bond Proceeds FINANCIAL SUMMARY 12982 Corp Yard Renovations Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Gas Tax Maintenance $150,000 $150,000 $150,000 $150,000 $150,000 Sewer $150,000 $150,000 $150,000 $150,000 $150,000 AMOUNT $300,000 $300,000 $300,000 $300,000 $300,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 70 13115 PAVEMENT MANAGEMENT PROGRAM SURVEY PROJECT DESCRIPTION Windshield field surveys of the City's pavement are conducted every two years for arterial streets and every six years for local streets to determine the pavement condition indexes for each segment. These surveys are conducted as a requirement for numerous grant programs, OCTA bi-annual reports, and overall pavement management programs. This project also includes traffic data collection including traffic counts, parking surveys, and speed surveys to be done bi-annually. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Traffic Improvement - Measure M2; TSIP Citywide FINANCIAL SUMMARY 13115 Pavement Management Program Survey Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $70,000 $0 $70,000 $0 $70,000 Traffic Improvemnt -Measure M2 $70,000 $0 $70,000 $0 $70,000 AMOUNT $140,000 $0 $140,000 $0 $140,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 71 13120 PAVEMENT MANAGEMENT PROGRAM PROJECT DESCRIPTION The City's Pavement Management Program identifies the condition of 320 miles of streets and identifies the maintenance needs of this roadway system. This program requires $6 million annually for slurry sealing, asphalt overlays, and reconstructions to maintain the City's Pavement Condition Index rating. This fiscal year's CIP lists other road maintenance projects and CDBG projects. This project outlines the remaining funding needs from Gas Tax, Measure M2, and Capital Projects. Approximately $8.1 million of new funding will be allocated to the various roadway management projects for this fiscal year. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Traffic Improvement - Measure M2; Gas Tax Maintenance; Rmra Road Maintenance Rehabilitation Account; Capital Projects; Reimbursable Capital Projects FINANCIAL SUMMARY 13120 Pavement Management Program Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Traffic Improvemnt -Measure M2 $2,700,000 $3,000,000 $3,000,000 $3,100,000 $3,000,000 Rmra Road Maint Rehabilitation Account $3,400,000 $3,500,000 $3,600,000 $3,700,000 $3,600,000 Gas Tax Maintenance $250,000 $200,000 $150,000 $100,000 $150,000 Capital Projects $1,250,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 AMOUNT $7,600,000 $8,700,000 $8,750,000 $8,900,000 $8,750,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 72 13816 STRUCTURAL EVALUATION OF CITY BRIDGES PROJECT DESCRIPTION Currently, there are eight roadway bridges located throughout the City that require maintenance. Caltrans has inspected those bridges and has made recommendations for maintenance and repair. A maintenance and retrofit plan are ready for implementation. The City is waiting for Caltrans to program construction funding due to existing funding being no longer available. The project is expected to receive funding for construction phase in FY 26. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2026 Funding Source(s): Gas Tax Maintenance; Reimbursable Capital Projects FINANCIAL SUMMARY 13816 Structural Evaluation of City Bridges Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Reimbursable Capital Projects $2,000,000 $0 $0 $0 $0 AMOUNT $2,000,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 73 14997 MUNICIPAL PARKING LOT MAINTENANCE PROJECT DESCRIPTION This project rehabilitates municipal parking lots every seven years and any maintenance issues annually. Work consists of slurry sealing, crack filling, removing and replacing defective asphalt concrete paving, striping, asphalt concrete overlays, miscellaneous delineation, and wheel stops. This project also includes the maintenance and renovation of trash enclosures. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Capital Projects; Parking In Lieu FINANCIAL SUMMARY 14997 Municipal Parking Lot Maintenance Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Capital Projects $0 $20,000 $20,000 $20,000 $20,000 AMOUNT $0 $20,000 $20,000 $20,000 $20,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 74 15508 SEWER LINE MAINTENANCE & REPLACEMENT PROJECT DESCRIPTION This project annually fixes hot spots due to root intrusion, offset joints, and damaged sewer mains. It also replaces both hydraulically and structurally deficient sewer mains. As part of the 2023 Sanitation Fee study, a new capital improvement component has been established to address the replacement and upgrade needs of the City’s sewer system. This fiscal year, $2.4 million is available to fund necessary sewer facility improvements at various locations citywide. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Sewer Construction FINANCIAL SUMMARY 15508 Sewer Line Maintenance Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Sewer Construction $2,438,783 $2,511,946 $2,587,304 $2,664,923 $2,744,871 AMOUNT $2,438,783 $2,511,946 $2,587,304 $2,664,923 $2,744,871 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 75 15509 SEWER CLEANING & VIDEO PROJECT DESCRIPTION The State's Waste Discharge Elimination (WDR) requires the City to complete a condition assessment of its entire 300+ mile sewer line system and develop a rehabilitation and replacement plan. Additional contract services are needed to comply with WDR requirements. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Sewer FINANCIAL SUMMARY 15509 Sewer Cleaning & Video Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Sewer $500,000 $500,000 $500,000 $500,000 $500,000 AMOUNT $500,000 $500,000 $500,000 $500,000 $500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 76 16065 QUIET ZONE MAINTENANCE PROJECT DESCRIPTION This project provides for the annual Quiet Zone and Safe Railroad Crossing maintenance agreement with Southern California Regional Rail Authority and any related maintenance or improvements necessary for compliance. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Capital Projects; City Trf: Merged 2008 Tax Exempt Bonds FINANCIAL SUMMARY 16065 Quiet Zone Maintenance Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount City Trf: Merged 2008 Tax Exempt Bonds $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 77 16302 MINOR TRAFFIC CONTROL DEVICES PROJECT DESCRIPTION This project provides for minor traffic control devices such as signage, striping, lighting, undergrounding, wiring, and other traffic-related devices and appurtenances as directed by the Traffic Commission and City Traffic Engineer. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Traffic Improvement - Measure M2; Capital Projects FINANCIAL SUMMARY 16302 Minor Traffic Control Devices Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Traffic Improvemnt -Measure M2 $50,000 $50,000 $50,000 $50,000 $50,000 Capital Projects $200,000 $200,000 $200,000 $200,000 $200,000 AMOUNT $250,000 $250,000 $250,000 $250,000 $250,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 78 16304 BIENNIAL TRAFFIC SIGNAL COORDINATION PROJECT DESCRIPTION This project is for the on-going implementation of studies and improvements for traffic signals along the City's major arterials within its boundaries. The studies include traffic counts, analysis of traffic flows, provide signal timing, and synchronization. The project will provide for the traffic signal infrastructure improvements necessary to achieve optimum signal timing and synchronization. The coordinated signal timing will be implemented through the City's Traffic Management Center. Changes in traffic flow require updating at two- year intervals. The traffic signal coordination will reduce travel times, save on gas, and reduce vehicle emissions. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Traffic Improvement - Measure M2 FINANCIAL SUMMARY 16304 Biennial Traffic Signal Coordination Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Traffic Improvemnt -Measure M2 $95,000 $0 $95,000 $0 $95,000 AMOUNT $95,000 $0 $95,000 $0 $95,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 79 16305 TRAFFIC SIGNAL CONTROLLER CHANGEOUT PROJECT DESCRIPTION The City maintains 158 traffic signals. Nearly two-thirds of the controllers have recently been updated or replaced to allow for better coordination with the City's Transportation Management Center (TMC). The project is an on- going process of updating or replacing controllers, signal cabinets and communication equipment, CCTV cameras, traffic signal battery backups, future signal controller needs, and upgrading TMC equipment and software. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Gas Tax Maintenance; Capital Projects FINANCIAL SUMMARY 16305 Traffic Signal Controller Changeout Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Gas Tax Maintenance $100,000 $100,000 $100,000 $100,000 $100,000 AMOUNT $100,000 $100,000 $100,000 $100,000 $100,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 80 16469 TRAFFIC SIGNAL EQUIPMENT PAINTING PROJECT DESCRIPTION This project provides for the painting, wrapping, or application of an anti-graffiti coating to traffic signal equipment at intersections within the City. The paint on the City's traffic signal equipment (signal and pedestrian heads, pedestrian push buttons, and cabinets) requires routine maintenance to prevent deterioration. The City has 158 signalized intersections and this project would fund a portion of the intersections as needed. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Traffic Improvement - Measure M2; TSIP Citywide FINANCIAL SUMMARY 16469 Traffic Signal Equipment Painting Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Traffic Improvemnt -Measure M2 $45,000 $45,000 $45,000 $45,000 $45,000 AMOUNT $45,000 $45,000 $45,000 $45,000 $45,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 81 19809 CITY FACILITY IMPROVEMENTS PROJECT DESCRIPTION The Citywide Facilities Conditions Assessment (FCA) report identifies high priority facilities projects, and will continually be used as a tool in planning the City’s future facility improvements. Work Items include improvements at the Civic Center and other City facilities. Projects prioritized for Fiscal Year 2024-2025 are as follows: Fire Station 4, Fire Station 6, and Corp Yard Building 11. Plumbing repairs and upgrades at the Civic Center2. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Sanitation and Sewer; Reimbursable Capital Projects; Major Building Improvements; Capital Projects; City Trf: Merged 2008 Tax Exempt Bonds FINANCIAL SUMMARY 19809 City Facility Improvements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Capital Projects $450,000 $0 $0 $0 $450,000 AMOUNT $450,000 $0 $0 $0 $450,000 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 82 19826 POLICE HEADQUARTERS EXTERIOR WALL SEALING PROJECT DESCRIPTION The ceramic tile exterior of the Police Headquarters requires cleaning and sealing every five years to prevent internal damage from rainwater. This project accumulates funding which is critical for the maintenance of the Police Headquarters and will also fund other water leak repair costs. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Major Building Improvements; Capital Projects; City Trf: Merged 2008 Tax Exempt Bonds FINANCIAL SUMMARY 19826 Police Headquarters Exterior Wall Sealing Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount City Trf: Merged 2008 Tax Exempt Bonds $20,000 $20,000 $20,000 $20,000 $0 AMOUNT $20,000 $20,000 $20,000 $20,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 83 19999 MOTOR VEHICLE REPLACEMENTS PROJECT DESCRIPTION This project funds the replacement vehicles in the City's fleet. Fiscal Year 2025 replacements include vehicles for the Fire Department, Police Department, and Public Works. PROJECT DETAILS Project Type: Ongoing Funding Source(s): \Equipment Replacement FINANCIAL SUMMARY 19999 Motor Vehicle Replacements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Equipment Replacement $3,000,000 $0 $0 $0 $0 AMOUNT $3,000,000 $0 $0 $0 $0 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 84 20325 SANTIAGO BIKE TRAIL PHASE IV PROJECT DESCRIPTION This project is the final phase of the Santiago Creek Bike Trail alignment in the Master Bikeway Plan. Construction of the multi-purpose trail will connect the existing bike trail west of Cannon Street and parallel the existing equestrian trail on the northern bank and terminate at the Santiago Oaks Regional Park. The project will construct an asphalt concrete bike trail and rehabilitate the existing equestrian trail with decomposed granite along with needed amenities such as rest areas and trash receptacles. The trail will allow for pedestrian and bicycle traffic along an eight-mile stretch of trails. The City received funding sources from OCTA's BCIP Grant for this project's preliminary engineering and environmental costs. Estimated construction costs are $10 million. The City is also pursuing additional grants for the construction phase. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Capital Projects; Reimbursable Capital Projects FINANCIAL SUMMARY 20325 Santiago Bike Trail Phase IV Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Capital Projects $500,000 $0 $0 $0 $0 AMOUNT $500,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 85 20353 CHAPMAN & GRAND LEFT TURN SIGNAL MODIFICATION PROJECT DESCRIPTION The project provides for a protected left-turn phase for the eastbound and westbound approaches on Chapman Avenue at Grand Street. The proposed signal modification will enhance the capacity and improve the traffic signal operation at the intersection. The project features decorative signal poles consistent with the Old Towne District theme. The scope of work includes installation of signal poles and gear, controller and cabinet, wiring, CCTV camera, electrical service; upgrading emergency vehicle preemption; and restoration of existing improvements. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2016-2017 Estimated Completion Date: June 2026 Funding Source(s): TSIP Citywide FINANCIAL SUMMARY 20353 Chapman & Grand Left Turn Signal Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $75,000 $0 $0 $0 $0 AMOUNT $75,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 86 20354 CHAPMAN & CAMBRIDGE LEFT TURN SIGNAL MODIFICATION PROJECT DESCRIPTION The project provides for a protected left-turn phase for the eastbound, westbound, northbound, and southbound approaches at Chapman Avenue and Cambridge Street. The proposed signal modification will enhance the capacity and improve the traffic signal operation at the intersection. The scope of work includes installation of signal poles and gear, controller and cabinet, wiring, CCTV camera, and electrical service and restoration of existing improvements. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2016-2017 Estimated Completion Date: June 2025 Funding Source(s): TSIP Citywide Total Budget: $425,000 FINANCIAL SUMMARY 20354 Chapman & Cambridge Left Turn Signal Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $75,000 $0 $0 $0 $0 AMOUNT $75,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 87 20374 STREETLIGHT POLE REPLACEMENT PROGRAM PROJECT DESCRIPTION As a cost-saving measure, the City acquired an additional 4,359 streetlight poles from Southern California Edison (SCE) in Fiscal Year 2018. Over half the poles are steel poles. An annual pole replacement program is necessary to maintain the acquired streetlight infrastructure. This program will biannually replace 40 steel streetlight poles with City standard LED-retrofitted concrete poles and underground overhead wires. Additionally, this project provides for miscellaneous lighting, undergrounding, wiring, and pole knock downs. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Capital Projects FINANCIAL SUMMARY 20374 Streetlight Pole Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Traffic Improvemnt -Measure M2 $30,000 $30,000 $30,000 $30,000 $30,000 Capital Projects $470,000 $470,000 $470,000 $470,000 $470,000 AMOUNT $500,000 $500,000 $500,000 $500,000 $500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 88 20378 KATELLA & BATAVIA SIGNAL NETWORK EXTENSION PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Katella Avenue from Main Street to Struck Avenue and along Batavia Street from Katella Avenue to Palm Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2026 Funding Source(s): TSIP Citywide* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20378 Katella & Batavia Signal Network Extension Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $0 $0 $0 $140,000 $0 AMOUNT $0 $0 $0 $140,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 89 20379 BATAVIA & TAFT SIGNAL NETWORK EXTENSION PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to Main Street and along Batavia Street from Taft Avenue to Fletcher Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2024 Funding Source(s): TSIP Citywide* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20379 Batavia and Taft Signal Network Extension Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $170,000 $0 $0 $0 $0 AMOUNT $170,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 90 20380 GLASSELL STREET SIGNAL NETWORK EXTENSION PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to Glassell Street and along Glassell Street from Taft Avenue to Lincoln Avenue. This will connect to the existing fiber lines on Glassell Street from Lincoln Avenue to Riverdale Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. Current funding is for design of the project while construction funding is requested. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2024 Funding Source(s): TSIP Citywide* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20380 Glassell St Signal Network Extension Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $100,000 $0 $0 $0 $0 AMOUNT $100,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 91 20397 PARKER STREET RESTRIPING PROJECT DESCRIPTION This project will provide for the ultimate roadway configuration as the City builds out and adjacent parcels potentially redevelop. By reorganizing the existing paved roadway, this will provide features necessary to best serve various road users. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2029 Funding Source(s): Reimbursable Capital Projects FINANCIAL SUMMARY 20397 Parker Street Restriping Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Reimbursable Capital Projects $0 $0 $0 $0 $100,000 AMOUNT $0 $0 $0 $0 $100,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 92 20425 TUSTIN STREET SIGNAL SYNCHRONIZATION CARRYOVER PROJECT PROJECT DESCRIPTOIN The Tustin Street Traffic Signal Synchronization project a multi-jurisdictional project between First Street in Tustin and Wabash Avenue in Yorba Linda. The corridor is over eleven miles and includes 55 signals across seven jurisdictions. 25 of the signals are within the City of Orange. The benefits of signal synchronization include a reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel experience. This project will be led by City of Orange and primarily funded through OCTA's M2. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2019-2020 Estimated Completion Date: June 2025 Funding Source(s): TSIP Citywide; Reimbursable Capital Projects Total Budget: $3,485,588 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 93 20430 STORM DRAIN IMPROVEMENTS PROJECT DESCRIPTION This project replaces existing deficient drainage systems and constructs new storm drain lines as needed per the Master Plan of Drainage to alleviate localized flooding. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Sewer FINANCIAL SUMMARY 20430 Storm Drain Improvements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Sewer $500,000 $500,000 $500,000 $500,000 $500,000 AMOUNT $500,000 $500,000 $500,000 $500,000 $500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 94 20483 POLICE FACILITY IMPROVEMENTS PROJECT DESCRIPTION This project will encompass new furniture and miscellaneous facility improvements for police facilities including paint, carpet, lighting, window tint, and network cabling. This project will replace existing furniture with a new office design, refresh interior paint throughout the department and replace existing carpet and baseboards that have far exceeded its life expectancy. Additionally, the scope of work includes replacing existing lighting with energy efficient lighting to properly illuminate current workstations and offices. One division will be revitalized each year over a span of three years. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Police Facility Fees; Capital Projects; City Trf: Merged 2008 Tax Exempt Bonds; AB3229 COPS/State - Supplemental Law Enforcement Services FINANCIAL SUMMARY 20483 Police Facility Improvements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Ab3229-Cops/State-(Suppl Law Enf Servs $500,000 $0 $0 $0 $0 City Trf: Merged 2008 Tax Exempt Bonds $100,000 $0 $0 $0 $0 Police Facility Fees $45,000 $0 $0 $0 $0 AMOUNT $645,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 95 20525 SANTIAGO CANYON ROAD SIGNAL NETWORK EXTENSION PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Santiago Canyon Road from Cannon Street to Chapman Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations, and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2029 Funding Source(s): TSIP Citywide* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20525 Santiago Canyon Road Signal Network Extension Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $0 $0 $0 $250,000 $0 AMOUNT $0 $0 $0 $250,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 96 20527 BICYCLE MASTER PLAN UPDATE PROJECT DESCRIPTION The city’s Bicycle Master Plan is due for a major update. As the region builds out, traffic forecasts can evolve, along with preferred modes of transportation and recreation. The resulting change presents both an opportunity and responsibility to revise the city’s bicycle network in a manner that best serves future needs. This update will include a comprehensive examination of the city’s existing and future bikeway system (including bicycle routes, lanes, paths, and multi-use trails,) validating future facilities that were previously identified while exploring new possibilities. It would also take a holistic approach, considering local connections and integration with the regional bikeway system that surrounds Orange. And, it will contemplate the appropriateness of new bicycle facility treatments, technologies, and design standards that were not yet recognized or developed at the time of the previous update, with the goal of making the city’s roads safer and more comfortable for all users. The final document is expected to increase accessibility to grant funding. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2024 Funding Source(s): TSIP Citywide* *Project funding includes development impact fees. Funding is dependent on receipt of development revenue. FINANCIAL SUMMARY 20527 Bicycle Master Plan Update Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $100,000 $0 $0 $0 $0 AMOUNT $100,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 97 20539 CITYWIDE BICYCLE LANE ENHANCEMENTS PROJECT DESCRIPTION This project will implement green-colored pavement to enhance the conspicuity of existing City bike lanes. Colored pavement within a bicycle lane increases the visibility of the facility, identifies potential areas of conflict, and reinforces priority to bicyclists in conflict areas. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): Capital Projects FINANCIAL SUMMARY 20539 Citywide Bicycle Lane Enhancements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Capital Projects $0 $100,000 $100,000 $100,000 $100,000 AMOUNT $0 $100,000 $100,000 $100,000 $100,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 98 30019 SANTIAGO CANYON ROAD MULTIPURPOSE TRAIL PROJECT DESCRIPTION Construction of a multipurpose trail adjacent to Santiago Canyon Road connecting the existing trail at the reserve neighborhood to Cannon Street. The trail would be constructed of decomposed granite, and would allow travel for pedestrians, equestrians, and bicycles. Community Services will be seeking grant funding sources for both the design and implementation of the project. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2026 Funding Source(s): Reimbursable Capital Projects FINANCIAL SUMMARY 30019 Santiago Canyon Road Multipurpose Trail Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Reimbursable Capital Projects $75,000 $750,000 $0 $0 $0 AMOUNT $75,000 $750,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 99 30115 GLASSELL & PALMYRA SIGNAL INSTALLATION PROJECT DESCRIPTION The project will provide for the installation of a traffic signal at the intersection of Glassell Street and Palmyra Avenue. The signalization of the intersection is an effective countermeasure that can reduce the possibility of traffic incidents. The scope of work includes installation of signal poles, controller and cabinet, CCTV camera, new conduit, signal wiring, loop detectors, ADA ramps, wireless antenna, dual meter service, emergency vehicle preemption, and audible pedestrian push buttons. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2018-2019 Estimated Completion Date: December 2025 Funding Source(s): Reimbursable Capital Projects; TSIP Citywide FINANCIAL SUMMARY 30115 Glassell & Palmyra Signal Installation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $250,000 $0 $0 $0 $0 AMOUNT $250,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 100 30150 LOCAL ROADWAY SAFETY PLAN PROJECT DESCRIPTION This project develops a Local Road Safety Plan (LRSP) that will define goals, objectives, and strategies to reduce accidents on local roads. The LRSP will also provide a framework to identify, analyze, and prioritize roadway safety improvements and offers a proactive approach to addressing safety needs while demonstrating agency responsiveness to safety challenges. The scope of work includes the following key tasks: state of the system review, accident history assessment, countermeasure development, implementation program, and development of the LRSP document. This project also includes an update which is required by CalTrans every 5 years. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Traffic Improvement - Measure M2; Reimbursable Capital Projects FINANCIAL SUMMARY 30150 Local Roadway Safety Plan Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Traffic Improvemnt -Measure M2 $0 $0 $0 $50,000 $0 AMOUNT $0 $0 $0 $50,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 101 30168 EAST WALNUT AVENUE INFRASTRUCTURE IMPROVEMENT PROJECT DESCRIPTION This project will construct a new 48” RCP storm drain line on Walnut Avenue from Cambridge Street to California Street per the Master Plan of Drainage to alleviate the localized flooding issue on Walnut Avenue during a 25-year or higher storm events. Other improvements include replacement of deficient sewer and water mains. In addition, Walnut Avenue from Cambridge Street to Tustin Street roadway pavement will be rehabilitated, and the existing concrete curb will be replaced with new concrete curb and gutter. The project also includes replacing damaged sidewalk, reconstructing existing ADA ramps to conform to federal guidelines, adjusting utility covers to grade, and restriping the roadway. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2020-2021 Estimated Completion Date: December 2025 Funding Source(s): Sewer; Traffic Improvement - Measure M2; Sewer Construction; Water Total Budget: $2,749,000 FINANCIAL SUMMARY 30168 East Walnut Infrastructure Improvement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $1,400,000 $0 $0 $0 $0 AMOUNT $1,400,000 $0 $0 $0 $0 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 102 30174 CANNON STREET BRIDGE WIDENING PROJECT DESCRIPTION This project widens portions of Cannon Street from Santiago Canyon Road to Serrano Avenue to add a third northbound thru lane. The scope of work includes widening the bridge as well as the roadway north of the bridge in order to maintain the continuity of the thru lane until Serrano Avenue where it would get dropped into a dedicated right-turn lane to eastbound Serrano Avenue. The existing painted median will be replaced with a raised median. All improvements fall within the City of Orange public right-of-way except for a portion between Taft Avenue and Serrano Avenue which falls in City of Villa Park public right-of-way. Current funding is for the preliminary engineering and environmental phase of the project. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2020-2021 Estimated Completion Date: August 2024 Funding Source(s): TSIP Citywide; Reimbursable Capital Projects Total Budget: $206,250 FINANCIAL SUMMARY 30174 Cannon Street Bridge Widening Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount TSIP Citywide $300,000 $0 $0 $0 $0 AMOUNT $300,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 103 30243 PIXLEY NEIGHBORHOOD AND WALNUT STREET REHABILITATION PROJECT DESCRIPTION This project will rehabilitate Parker Street, Pixley Street, Foley Place, Clark Street, Marietta Avenue, Washington Avenue, and Walnut Avenue, which includes but is not limited to, asphalt concrete grinding and overlay, and adjustment of manholes and water valves to grade. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Community Development Block Grant FINANCIAL SUMMARY 30243 Pixley Neighborhood and Walnut Street Rehabilitation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Community Development Block Grant $638,000 $0 $0 $0 $0 AMOUNT $638,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 104 30244 RIVERDALE AVENUE COMPLETE STREET IMPROVEMENTS PROJECT DESCRIPTION This project’s scope of work includes the reconfiguration of Riverdale Avenue from Glassell Street to Orange City limits that allows for the installation of bike and pedestrian facilities, traffic calming strategies and curb space management. Bike and pedestrian facilities include the installation of buffered Class II bike lanes in both directions, installation of painted medians and turn lanes, installation of traffic signs including bike lane, wayfinding and SART access signage, installation of street trees, safety enhancements including street light installation, ADA improvements that include compliant curb access ramps at all intersections and a full build-out of roadway pavement, curb, gutter and sidewalk gap closure for the westbound segment between Orange Olive and Orange City Limits. Traffic calming improvements include consistent and narrowed traffic lanes from 15 feet to 11 feet and lane reductions from two lanes in each direction to one lane in each direction. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2026 Funding Source(s): Capital Projects FINANCIAL SUMMARY 30244 Riverdale Avenue Complete Street Improvements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Traffic Improvemnt -Measure M2 $426,000 $0 $0 $0 $0 Reimbursable Capital Projects $2,574,000 $0 $0 $0 $0 AMOUNT $3,000,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 105 20191 MAIN STREET SIGNAL SYNCHRONIZATION CARRYOVER PROJECT PROJECT DESCRIPTION The Main Street Traffic Signal Synchronization Project is a multi-jurisdictional project between Culver Drive in Irvine and Taft Avenue in Orange. The corridor is about twelve miles and includes 69 signals across the four jurisdictions of Irvine, Caltrans, Santa Ana, and Orange. The corridor is between CHOC Court and Taft Avenue and includes twelve traffic signals. The benefits of signal synchronization include a reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel experience. This Project will be led by OCTA. The programmed funds represent a 20% City fair share contribution to the TSSP grant through M2 funding. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2017-2018 Estimated Completion Date: December 2024 Funding Source(s): TSIP Citywide Total Budget: $272,350 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 106 20425 TUSTIN STREET SIGNAL SYNCHRONIZATION CARRYOVER PROJECT PROJECT DESCRIPTION The Tustin Street Traffic Signal Synchronization project a multi-jurisdictional project between First Street in Tustin and Wabash Avenue in Yorba Linda. The corridor is over eleven miles and includes 55 signals across seven jurisdictions. 25 of the signals are within the City of Orange. The benefits of signal synchronization include a reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel experience. This project will be led by City of Orange and primarily funded through OCTA's M2. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2019-2020 Estimated Completion Date: June 2025 Funding Source(s): TSIP Citywide; Reimbursable Capital Projects Total Budget: $3,485,588 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 107 20255 SANTIAGO HILLS LAD GENERAL RENOVATION ONGOING PROJECT PROJECT DESCRIPTION Santiago Hills Landscape Assessment District (SHAD) residents voted in 2015 to increase their assessment so that the landscape can be maintained, repaired, and renovated over time. This project represents a long- term Capital Improvement effort to re-landscape SHAD as funding accumulates beyond what is needed for ongoing maintenance. With the community’s input, funds will be utilized for landscape renovation to replace plants, shrubs, and irrigation, which are beyond their useful life. In FY 21, the community identified the following priorities. 1) Renovation of the second half of Skylark, including the four corners on Skylark and Canyon View Ave. 2) Renovation of three small medians on Canyon View Ave. between Skylark and Old Camp Road, on Skylark at Canyon View Ave., and on White Oak Ridge at Canyon View Ave. 3) Renovation of the corners at While Oak Ridge. The first two of the priorities were completed in FY 21. The third priority began in FY 24. Construction of the project will continue as the fund balance is rebuilt. Additional priorities will need to be identified with further community input in future years. PROJECT DETAILS Project Type: Ongoing Starting Fiscal Year: 2015-2016 Funding Source(s): Santiago Hills Landscape Maintenance 1986 & 2015 Total Budget: $800,000 Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 108 20329 CHAPMAN & BATAVIA LEFT TURN SIGNAL MODIFICATION CARRYOVER PROJECT PROJECT DESCRIPTION The project will provide for a protected left-turn phase for the northbound and southbound approaches on Batavia Street at Chapman Avenue to improve operational efficiency and enhance safety. The addition of a protected left turn is an effective countermeasure that can reduce the possibility of crashes. The scope of work includes installation of signal poles and gear, controller and cabinet, CCTV camera, new conduits, wiring, battery back-up system, loop detectors, ADA ramps, and restoration of existing improvements. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2016-2017 Estimated Completion Date: June 2025 Funding Source(s): Reimbursable Capital Projects; Traffic Improvement - Measure M2 Total Budget: $499,800 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 109 20376 GARDEN GROVE BOULEVARD SIGNAL SYNCHRONIZATION CARRYOVER PROJECT PROJECT DESCRIPTION The Garden Grove Boulevard Traffic Signal Synchronization Corridor is a multi-jurisdictional project between Valley View Street in Garden Grove and Bristol Street in Santa Ana. The corridor is 8.7 miles and includes 34 signals across the five jurisdictions of Garden Grove, Caltrans, Westminster, Santa Ana, and Orange. In Orange, there are two traffic signals along Garden Grove Boulevard, located at Lewis Street (shared with Garden Grove) and at The City Drive. The benefits of signal synchronization include a reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel experience. This project will be led by OCTA. The programmed funds are City fair share contribution to the TSSP grant, funded by M2. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2017-2018 Estimated Completion Date: December 2024 Funding Source(s): TSIP Citywide Total Budget: $7,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 110 20381 KATELLA AVENUE SIGNAL SYNCHRONIZATION CARRYOVER PROJECT PROJECT DESCRIPTION As part of an ongoing project, which began over ten years ago, the Katella Avenue Traffic Signal Synchronization Corridor is a multi-jurisdictional project between the I-605 on-ramp in Los Alamitos and Jamboree Road/Santiago Canyon Road in Orange. The corridor is 19.6 miles and includes 73 signals across the nine jurisdictions of Los Alamitos, Caltrans, Cypress, Stanton, County of Orange, Garden Grove, Anaheim, Villa Park, and Orange. In Orange, the corridor is between Struck Avenue and Santiago Canyon Road/Jamboree Road and includes nineteen traffic signals. The benefits of signal synchronization include a reduction in travel time, improvement in travel speed, greenhouse gas reduction, less fuel consumption, and an overall better travel experience. This project will be led by OCTA. The programmed funds are the City's fair share contribution to the TSSP grant-funded by M2. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2017-2018 Estimated Completion Date: September 2024 Funding Source(s): TSIP Citywide Total Budget: $250,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 111 20382 KATELLA AVENUE SIGNAL NETWORK EXTENSION CARRYOVER PROJECT PROJECT DESCRIPTION The project will extend the existing City's Traffic Signal Network along Katella Avenue from Tustin Street to Santiago Boulevard and on Santiago Boulevard from Katella Avenue to Meats Avenue. The installation of fiber optic lines will enable the City's Traffic Management Center to communicate with the traffic signals along critical arterials to improve traffic signal operations and traffic flow. This will also allow immediate incident monitoring and response to reduce traffic congestion. Construction of improvements include upgrades to the controller cabinet and communication appurtenances. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2017-2018 Estimated Completion Date: July 2024 Funding Source(s): TSIP Citywide Total Budget: $1,400,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 112 20383 CANNON & SERRANO INTERSECTION MODIFICATION CARRYOVER PROJECT PROJECT DESCRIPTION This project will add a second dedicated right-turn lane on northbound Cannon Street to eastbound Serrano Avenue, in order to accommodate the increase in right-turn movements. The project will also widen the northerly curb face on Serrano Avenue in order to mitigate the bottlenecking effect of the existing two left-turn lanes for Southbound Serrano Avenue. Public Works is working on the construction phase of the project and anticipates completion by July 2023. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2017-2018 Estimated Completion Date: August 2024 Funding Source(s): Traffic Improvement - Measure M2; TSIP Citywide; Reimbursable Capital Projects Total Budget: $1,092,419 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 113 20443 ORANGE COMMUNITY SHUTTLE FEASIBILITY STUDY CARRYOVER PROJECT PROJECT DESCRIPTION This project will explore opportunities and benefits for a new community shuttle service. The service could provide an alternative to driving while connecting key destinations such as the Outlets of Orange, medical corridor, Old Towne, and Chapman University. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2019-2020 Estimated Completion Date: June 2024 Funding Source(s): Traffic Improvement - Measure M2; Reimbursable Capital Projects Total Budget: $75,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 114 20444 POLICE HEADQUARTERS ATRIUM REHABILITATION CARRYOVER PROJECT PROJECT DESCRIPTION The Citywide Facilities Conditions Assessment (FCA) was completed in 2016 and identified that the Police Station Headquarters atrium glazing has reached the end of its life cycle. Public Works is working on the construction phase of the project which consists of all required work to replace the existing skylight roof system with a new metal deck and standing seam metal roof system and replace the facility’s HVAC system chiller, air handlers and other components. The work also includes the installation of photovoltaic panels and corresponding infrastructure on the existing building’s flat roof area. The electrical power generating system shall be rated 153.6 kW (STC). System output may range between 228,204 kWh and 245,810 kWh per year. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2019-2020 Estimated Completion Date: August 2024 Funding Source(s): Capital Bond Proceeds Total Budget: $5,000,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 115 20461 MAIN LIBRARY FACILITY IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION This project will encompass all facility improvements for Main Library. The north and south entrance automatic doors need to be replaced. The dumbwaiter elevator which transports surplus books to the basement needs to be replaced. These projects are expected to be completed by December 2024. Funding for replacement of the entrance doors and dumbwaiter reflects revenue received from the Building Forward Main Grant. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Library Facility Fees; Major Building Improvements; Capital Projects Total Budget: $754,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 116 20462 TAFT LIBRARY FACILITY IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION This project will encompass all facility improvements for Taft Library. The automatic entrance doors need to be replaced. The windows are in need of replacement and reframing due to aging and vandalism. These projects are expected to be completed by December 2024. Funding for replacement of the entrance doors and windows projects reflects revenue received from the Building Forward Taft Grant. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Library Facility Fees; Major Building Improvements; Capital Projects Total Budget: $377,125 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 117 20463 EL MODENA LIBRARY FACILITY IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION This project will encompass all facility improvements for El Modena Library. The automatic entrance doors need to be replaced. Roofing improvements are needed to mitigate leaks and restore its useful life. These projects are expected to be completed by December 2024. Funding for replacement of the entrance doors and roofing projects reflects revenue received from the Building Forward El Modena Grant. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Library Facility Fees; Major Building Improvements; Capital Projects Total Budget: $395,375 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 118 20494 ADMINISTRATION BUILDING LOBBY IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION This project will remodel the City Clerk’s Office and Lobby with a design aesthetic that pays homage to the mid- century architecture of the building. One of the goals of the design will be to provide functionality and integration of current technology within a historic resource. The Administration Building’s Lobby will be remodeled to add additional office spaces to better serve the City Clerk’s functions. The project will include new work stations, electrical and HVAC improvements, floor asbestos abatement, and carpet replacement. This will assist the City Clerk's customer service efforts. In addition, the City Clerk’s front counter area will be improved to allow more efficient interactions with the public. The budget will also include new furniture for the Weimer Room. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: December 2025 Funding Source(s): Capital Projects Total Budget: $220,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 119 20500 SYCAMORE & PALMYRA NEIGHBORHOODS STREET REHABILITATION CARRYOVER PROJECT PROJECT DESCRIPTION This project will rehabilitate Sycamore Avenue, Holly Street, Ash Street, Palmyra Avenue, Flower Street, and Lilac Lane in the Sycamore and Palmyra Neighborhoods, which includes but not is limited to cold planing (miling) the existing asphalt, asphalt concrete overlay installation, slurry seal, reconstruction of sidewalks, curb and gutters, driveways, cross gutters, and corresponding adjustment of manholes and water valves to grade on residential streets. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2022-2023 Estimated Completion Date: December 2024 Funding Source(s): Community Block Grant Total Budget: $629,530 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 120 20518 PEDESTRIAN BEACON UPGRADES CARRYOVER PROJECT PROJECT DESCRIPTION This project will upgrade and modernize existing flashing beacon systems at several pedestrian crossings throughout the City. Existing beacons that either flash perpetually or must be manually activated/de-activated will be replaced with push buttons that will activate the beacons on demand. In addition, circular beacons will be upgraded to newer rapid rectangular flashing beacons, which are expected to enhance visibility to motorists. The project will also involve minor modifications to/refurbishment of ancillary equipment, roadway features, and traffic control devices, including, but not limited to, poles, pavement markings, signs, and curb ramps. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Capital Projects; Reimbursable Capital Projects CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 121 20522 EVALUATION OF SMART PARKING DEVICES FOR OLD TOWNE CARRYOVER PROJECT PROJECT DESCRIPTION Identified as a game-changing tool for parking management, “smart” parking technologies can increase the efficiency of existing parking infrastructure by providing real time, app-based information that’s easily accessible to visitors. In addition, smart parking equipment can be designed for compatibility with future mobility initiatives, and serve as the foundation for other types of parking management programs currently being reviewed. The purpose of this evaluation is to explore and identify feasible options for smart parking systems and products, including those that are cost-effective, reliable, have the potential for phased deployment best fitting the City’s needs, and can be aesthetically customized to blend in with Old Towne Orange. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2024 Funding Source(s): Old Towne Parking Facility CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 122 30059 OCPT FACILITY IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION The 501(c)(3) non-profit, Orange Children and Parents Together (OCPT) has an agreement with the City to utilize facility space at the El Modena Branch Library. As part of their agreement, the City utilizes OCPT funding to make various improvements at the facility to comply with State inspections and an aging facility. PROJECT DETAILS Project Type: Ongoing Funding Source(s): OCPT Building Maintenance Total Budget: $95,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 123 30163 CHAPMAN AVENUE BIOCLEAN INSTALLATION CARRYOVER PROJECT PROJECT DESCRIPTION This project will install a BioClean Separating Baffle Box or equal on Chapman Avenue approximately 150 feet west of Eckhoff Street. The existing storm drain system is a 66" storm drain line that ultimately discharges into Bitterbush Channel located 2,000 feet downstream of the proposed location. The project will also install 13 connector pipe screens on Main Street, Brian Street, Chapman Avenue, and Katella Avenue to capture litter from commercial and residential sites draining into the Santa Ana River. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2020-2021 Estimated Completion Date: July 2024 Funding Source(s): Sewer; Reimbursable Capital Projects Total Budget: $386,004 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 124 30165 GRAND STREET PARKING LOT IMPROVEMENT CARRYOVER PROJECT PROJECT DESCRIPTION This project will evaluate different alternatives for the reuse of the former Fire Station No. 1 and Headquarter site. One alternative is the demolition of the existing Fire Station Building and reconstruct the site as a public parking lot to provide more parking spaces for the Civic Center and downtown Plaza area. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Capital Bond Proceeds; City Trf: Merged 2008 Tax Exempt Bonds CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 125 30166 CAMBRIDGE STREET INFRASTRUCTURE IMPROVEMENT CARRYOVER PROJECT PROJECT DESCRIPTION This project will upsize the existing 18” RCP storm drain line from Palm Avenue to Walnut Avenue per the Master Plan of Drainage to alleviate localized flooding on Cambridge Street during 25-year or higher storm events. Other improvements include replacement of deficient sewer and water mains. In addition, Cambridge Street roadway pavement will be rehabilitated, and the existing concrete curb will be replaced with new concrete curb and gutter. The project also includes replacing damaged sidewalk, reconstructing existing ADA ramps to conform to federal guidelines, adjusting utility covers to grade, and restriping the roadway. Staff is seeking federal funding through Hazard Mitigation grant for construction phase. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2020-2021 Estimated Completion Date: December 2024 Funding Source(s): Sewer; Capital Projects; Sewer Construction; Water Total Budget: $2,103,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 126 30215 TAFT AVENUE BIOCLEAN INSTALLATION & LEWIS STREET WATER QUALITY IMPROVEMENTS CARRYOVER PROJECT PROJECT DESCRIPTION This project will install a BioClean Debris Separating Baffle Box (DSBB) or equal on Taft Avenue east of the intersection of Taft Avenue and O’Donnell Way. The existing storm drain system is a 36” reinforced concrete pipe that ultimately discharges into Buckeye Channel. The project will also install seven connector pipe screens (CPS) on various streets within the City. Four CPS units will be installed on Taft Avenue to capture litter from manufacturing sites along Taft Avenue. Three CPS units will be installed on Lewis Street to capture litter from commercial and residential sites along Lewis Street and Metropolitan Drive. PROJECT DETAILS Project Type: One-Time Starting Fiscal Year: 2022-2023 Estimated Completion Date: July 2024 Funding Source(s): Sewer; Reimbursable Capital Projects Total Budget: $530,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 127 30220 FISCAL YEAR 2024 CDBG NEIGHBORHOOD STREET REHABILITATION CARRYOVER PROJECT PROJECT DESCRIPTION This project will rehabilitate Grand Street, which includes but is not limited to, cold planning (milling) the existing asphalt, asphalt concrete overlay installation, reconstruction of sidewalks, curb and gutters, driveways, cross gutters, spandrels, and corresponding adjustment of manholes and water valves to grade on residential streets. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2025 Funding Source(s): Community Development Block Grant Powered by OpenGov CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 128 30226 EL MODENA BASIN PUBLIC RESTROOM IMPROVEMENT CARRYOVER PROJECT PROJECT DESCRIPTION This project shall design and install a prefabricated restroom adjacent to El Modena Basin. Due to the location, Community Development Block Grant funding will cover the cost of the improvements. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2025 Funding Source(s): Community Development Block Grant CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS FISCAL YEAR 2024-2025 129 THIS PAGE INTENTIONALLY LEFT BLANK 130 18101 WATER UTILITY SECURITY IMPROVEMENTS PROJECT DESCRIPTION This project provides funding to replace and construct Water Utility Security improvements at various water facilities as identified in the Water System Vulnerability Assessment. The improvement areas include block walls, fencing, surveillance cameras, and other improvements. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 18101 Water Utility Security Improvements Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $25,000 $25,000 $25,000 $25,000 $25,000 AMOUNT $25,000 $25,000 $25,000 $25,000 $25,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 131 18102 METER REPLACEMENT PROGRAM PROJECT DESCRIPTION This project provides for the repair or replacement of water meters in the water system to reduce water loss and accurately bill for water usage. As part of the on-going 15-year small meter replacement program, an average of 1,800 small meters are replaced per year. Additionally, this project allows for the automated method of gathering meter reads, consumption data, and other system information that will benefit water operations and customers. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 18102 Meter Replacement Program Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $200,000 $200,000 $200,000 $1,250,000 $1,250,000 AMOUNT $200,000 $200,000 $200,000 $1,250,000 $1,250,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 132 18120 WELL 28 CONSTRUCTION PROJECT DESCRIPTION Well 28 is a proposed new 3,000 gallons per minute (GPM) groundwater production facility to be located at the northeast corner of Maple Avenue and Lemon Street. The property was acquired through an exchange of lands between the City and Chapman University. This project includes design, well drilling, pump installation, electrical, storm drain, treatment, and a pocket park. The Orange County Water District is funding a conjunctive use program and treatment program to assist with construction costs. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: September 2024 Funding Source(s): Water; Reimbursable Capital Projects FINANCIAL SUMMARY 18120 Well 28 Construction Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $85,000 $0 $0 $0 $0 AMOUNT $85,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 133 18214 WELL REHABILITATION PROJECT DESCRIPTION This project provides for on-going inspection, repair, and refurbishment of 12 existing water wells. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 18214 Well Rehabilitation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $150,000 $150,000 $150,000 $150,000 $150,000 AMOUNT $150,000 $150,000 $150,000 $150,000 $150,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 134 18225 LOWER SERRANO PUMP STATION PROJECT DESCRIPTION This project includes the design and construction to complete the 100-horsepower pressure pump station in northeast Orange. This pump station will move water from Zone 3 to Zone 4. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: July 2029 Funding Source(s): Water FINANCIAL SUMMARY 18225 Lower Serrano Pump Station Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $0 $0 $0 $1,500,000 $1,500,000 AMOUNT $0 $0 $0 $1,500,000 $1,500,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 135 18301 EXTERIOR CATHODIC PROTECTION SYSTEMS PROJECT DESCRIPTION This project provides for ongoing inspection, repair, and replacement of interior and exterior cathodic protection systems for steel water tanks in the water system. Each of the steel tanks rely on a functioning cathodic protection system for corrosion protection. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 18301 Exterior Cathodic Protection Systems Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $50,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $50,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 136 18302 RESERVOIR RECOATING PROJECT DESCRIPTION This project is part of a long-term reservoir maintenance program that provides for the repair and replacement of exterior/interior protective coatings for all fifteen steel reservoirs in the water system. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 18302 Reservoir Recoating Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $0 $750,000 $0 $0 $0 AMOUNT $0 $750,000 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 137 18315 RESERVOIR 3A CONSTRUCTION PROJECT DESCRIPTION This project provides for the design and construction of a one million gallon steel water tank at a site directly adjacent to the existing Reservoir 3. This tank will provide additional storage for existing residential needs and fire protection for Zone 3 in northeast Orange. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2029 Funding Source(s): Water FINANCIAL SUMMARY 18315 Reservoir 3A Construction Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $0 $0 $0 $0 $1,000,000 AMOUNT $0 $0 $0 $0 $1,000,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 138 18324 RESERVOIR 2A SITE REMEDIATION PROJECT DESCRIPTION This project provides for design, specifications, cost estimates, and construction of site stabilization for the Reservoir 2A site in the Vista Royale Tract, located in northwest Orange. This existing facility is being monitored for peripheral movement. The proposed remediation includes the installation of soldier piles and grade beams to minimize future differential movement on site. PROJECT DETAILS Project Type: One-Time Completion Date: June 2029 Funding Source(s): Water FINANCIAL SUMMARY 18324 Reservoir 2A Site Remediation Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $0 $0 $0 $1,000,000 $0 AMOUNT $0 $0 $0 $1,000,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 139 18400 PIPELINE RENEWAL PROJECTS PROJECT DESCRIPTION This project provides for the design and construction of water mainline replacements for the City's water system. Approximately 1.5 miles of pipeline are targeted to be replaced annually due to increasing age, substandard sizing, corrosion, or high maintenance. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 18400 Pipeline Renewal Projects Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $1,800,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 AMOUNT $1,800,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 140 18912 WATER PLANT TELEMETRY PROJECT DESCRIPTION This project provides for the maintenance of the Supervisory Control and Data Acquisition (SCADA) system. This computer-driven telemetry system allows for remote monitoring and automatic control of all water sources of supply, pumping, storage, and flow control facilities. PROJECT DETAILS Project Type: Ongoing Funding Source(s): Water FINANCIAL SUMMARY 18912 Water Plant Telemetry Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $35,000 $50,000 $50,000 $50,000 $50,000 AMOUNT $35,000 $50,000 $50,000 $50,000 $50,000 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 141 18925 EMERGENCY GENERATOR PROJECT DESCRIPTION This project provides for the acquisition of one fixed 480-volt three-phase emergency generator to be used to supply emergency electricity to water pumping facilities during power outages. Locations of the remaining generators are scheduled for Reservoir 4 and Reservoir 8. PROJECT DETAILS Project Type: One-Time Completion Date: June 2029 Funding Source(s): Water FINANCIAL SUMMARY 18925 Emergency Generator Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $0 $0 $250,000 $0 $0 AMOUNT $0 $0 $250,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 142 20312 WELL 29 CONSTRUCTION PROJECT DESCRIPTION Well 29 is a proposed new 3,000 gallons-per-minute groundwater production facility to replace Well 8 located at Katella Avenue and Struck Avenue. This project includes design, well drilling, pump installation, electrical, storm drain, piping connection, treatment, and an emergency power generator. The Orange County Water District is funding a treatment program to assist with construction costs. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: November 2028 Funding Source(s): Water; Reimbursable Capital Projects FINANCIAL SUMMARY 20312 Well 29 Construction Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $2,000,000 $2,700,000 $3,300,000 $0 $0 AMOUNT $2,000,000 $2,700,000 $3,300,000 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 143 20496 RESERVOIR 4A CONSTRUCTION PROJECT DESCRIPTION This project provides for the design and construction of a three million gallon steel water tank at a site near the intersection of Cannon Street and Creekside Avenue. This tank will provide additional storage for existing residential needs and fire protection for Zone 1 in southeast Orange. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2031 Funding Source(s): Water FINANCIAL SUMMARY 20496 Reservoir 4A Construction Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $0 $0 $0 $200,000 $0 AMOUNT $0 $0 $0 $200,000 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 144 20538 RESERVOIR 7 HYDROPNEUMATICS TANK REPLACEMENT PROJECT DESCRIPTION This project provides for the design and construction of the replacement hydropneumatics tank and pump station at Reservoir 7 in southeast Orange. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: January 2026 Funding Source(s): Water FINANCIAL SUMMARY 20538 Reservoir 7 Hydropneumatics Tank Replacement Funds Description 2025 Proposed 2026 Proposed 2027 Proposed 2028 Proposed 2029 Proposed Amount Water $1,400,000 $0 $0 $0 $0 AMOUNT $1,400,000 $0 $0 $0 $0 CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 145 20429 SOUTH WATER YARD STORAGE REPLACEMENT CARRYOVER PROJECT PROJECT DESCRIPTION This project provides for the design and construction of the warehouse replacement. The existing 5,000 square feet warehouse will be renovated and used in conjunction with the proposed Fire Department Headquarter. The replacement warehouse will be constructed at the water division's south yard for parts and equipment storage. This project also provides for the cover structure over the water division's materials storage area in compliance with the National Pollutants Discharge Elimination System (NPDES) requirements. The structure prevents run-off from washing out construction material such as sands, asphalt, base, and soil into the storm drain system. It also helps reduce noise and assists with dust control. PROJECT DETAILS Project Type: One-Time Estimated Completion Date: June 2027 Funding Source(s): Water CAPITAL IMPROVEMENT PROGRAM PUBLIC WORKS - WATER FISCAL YEAR 2024-2025 146