Loading...
2022 PC 16-22 RAPIDS EXPRESS INCCONDITIONAL USE PERMIT NO.3154-21 DESIGN REVIEW NO.5060-21 MINOR SITE PLAN REVIEW NO. 1074-21 RESOLUTION NO. PC 16-22 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF ORANGE RECOMMENDING THAT THE CITY COUNCIL APPROVE OF CONDITIONAL USE PERMIT NO. 3154-21, DESIGN REVIEW COMMITTEE NO. 5060-21, AND MINOR SITE PLAN REVIEW NO. 1074-21 FOR THE CONSTRUCTION OF A NEW 13,860 SQUARE FOOT AUTOMATIC DRIVE THROUGH EXPRESS CARWASH FACILITY WITH ASSOCIATED VACUUM STALLS AND RELATED SITE IMPROVEMENTS LOCATED AT 1325 WEST KATELLA AVENUE. APPLICANT: RAPIDS EXPRESS INC. (GEOFF VON DER AHE) Moved by Chair Vazquez and seconded by Commissioner Martinez that the following resolution be adopted: WHEREAS, the Planning Commission has authority per Orange Municipal Code (OMC) Sections 17.10.020.13.2, 17.08.020, 17.10.030.C, and 17.13.030 to review and make a recommendation to the City Council on applications involving zone changes, Conditional Use Permit No. 3154-21, Design Review Committee No. 5060-21, and Minor Site Plan Review No. 1074-21 for the development of a new 13,860 square foot automatic drive through express carwash facility with associated vacuum stalls and related site improvements; and WHEREAS, Zone Change No. 1305-21, Conditional Use Permit No. 3154-21, Design Review Committee No. 5060-21, and Minor Site Plan Review No. 1074-21 were filed by Rapids Express Inc. ("applicant") in accordance with the provisions of the OMC; and WHEREAS, Zone Change No. 1305-21, Conditional Use Permit No. 3154-21, Design Review Committee No. 5060-21, and Minor Site Plan Review No. 1074-21 were processed in the time and manner prescribed by state and local law; and WHEREAS, on May 25, 2022, the City's interdepartmental Staff Review Committee (SRC) reviewed the project and recommended the applications proceed subject to certain conditions; and WHEREAS, on August 17, 2022, the City's Design Review Committee reviewed the project and recommended approval subject to conditions by a 4-0 vote; and Resolution PC 16-22 Page 2 of 10 WHEREAS, Final Program Environmental Impact Report (EIR) No. 1815-09 for the Comprehensive General Plan Update was certified on March 9, 2010 and prepared in accordance with the California Environmental Quality Act. The proposed change in zoning is within the scope of the previously approved General Plan and is adequately described in the previously certified General Plan Program EIR for purposes of CEQA; and WHEREAS, The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) per State CEQA Guidelines 15332 (Class 32 - In - fill Development Projects) because the project site is less than five acres; the project site has no value as habitat for endangered, rare, or threatened species; the approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services; and WHEREAS, the Planning Commission conducted one duly advertised public hearing on September 19, 2022, at which time interested persons had an opportunity to testify either in support of or in opposition to Zone Change No. 1305-21, Conditional Use Permit No. 3154-21, Design Review Committee No. 5060-21, and Minor Site Plan Review No. 1074-21 upon property described as follows: LEGAL DESCRIPTION THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF ORANGE, COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL 1, IN THE CITY OF ORANGE, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED IN BOOK 91, PAGES 39 AND 40 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF ORANGE COUNTY, CALIFORNIA. EXCEPTING FROM THE NORTH 15 FEET OF SAID LAND, AN UNDIVIDED ONE-FOURTH INTEREST IN AND TO ALL MINERALS, OIL, GAS AND KINDRED SUBSTANCES LYING IN, UPON AND UNDER SAID LAND, TOGETHER WITH THE RIGHT OF ENTRY THEREON FOR THE PURPOSE OF DEVELOPING, EXTRACTING AND REMOVING SAID SUBSTANCES, AS RESERVED IN THE DEED FROM POMONA COLLEGE, A CORPORATION, RECORDED JANUARY 14, 1943 IN BOOK 1172, PAGE 528 OF OFFICIAL RECORDS. APN: 375-232-17 AND 375-232-19 NOW, THEREFORE, BE IT RESOLVED that the Planning Commission recommends that the City Council approve Conditional Use Permit No. 3154-21, Design Review Committee No. 5060-21, and Minor Site Plan Review No. 1074-21 to redevelop an existing 1.109-acre site with a 13,860 square foot automatic drive through express carwash facility with associated vacuum stalls and related site improvements, and Zone Change No. 1303-21 as addressed in Resolution No. PC No. 24-22, based on the following findings: Resolution PC 16-22 Page 3 of 10 SECTION 1— FINDINGS General Plan Finding: 1. The project must be consistent with the goals and policies stated within the City's General Plan. The proposed project is consistent with the goals and policies stated within the City's General Plan in that the project will enhance and promote the quality of life in the community by supporting and enhancing diverse living environments. The proposed zone change from C-R to UMU brings the site's zoning into compliance with its Urban Mixed Use General Plan land use designation. The zone change would rectify an existing General Plan and zoning inconsistency and the proposed development of the site for mixed use and would implement the land use vision outlined in the General Plan Land Use Element. The project is also consistent with other General Plan goals and policies including: Land Use Element Goal 3.0: Create commercial uses that provide a solid economic base and employment opportunities and identify Orange as an attractive and diverse shopping destination. Land Use Policy 3.1: Promote development of revenue -generating land uses that help defray the costs of high quality public services Land Use Policy 3.3: Improve vehicular, pedestrian, and visual connections between commercial areas and the rest of the community. Urban Design Element Goal 2.0: Create commercial and mixed -use areas of varying scale and function that are visually distinct and complement the City's identity. Urban Design Policy 2.3: Improve the appearance of arterials and corridors that pass through commercial and mixed -use areas. Use street trees and other landscape and hardscape improvements to improve the visual and spatial experience of drivers, transit riders, and pedestrians using City streets. Urban Design Element Goal 4.0: Establish and reinforce district and neighborhood characteristics recognized both within the community and throughout the region. Urban Design Policy 4.1: Establish appropriate transitions between commercial, industrial, higher density residential, mixed -use development, and lower density residential areas Zone Change Findings: 1. There are no required findings for a Zone Change since it is a legislative action. Resolution PC 16-22 Page 4 of 10 The Planning Commission finds that the proposed Zone Change from Commercial Recreation (C-R) to Urban Mixed Use (UMU), brings the site's zoning into consistency with the existing Urban Mixed Use (UMIX) General Plan land use designation in accordance with state law. Therefore, approval of the zone change contributes to implementation of the City's Land Use Plan and furthers the goals and policies of the City's General Plan. Conditional Use Permit Required Findings: 1. A conditional use permit shall be granted upon sound principals of land use and in response to services required by the community. (OMC 17.10.030.F.1) The granting of this Conditional Use Permit is based upon the sound principals of land use and in response to services required by the community in that consideration has been given to whether the proposed use will detrimentally affect the adjacent land uses. The subject property is currently a standalone restaurant in a transitional area of the Katella Avenue Corridor Focus Area. With the existing neighboring uses ranging from general industrial uses, a major car dealership, gas station, and a multitenant commercial mall, the proposed carwash facility offers a transitional use of the site. The project site will remain a commercial use and the proposed use is compatible with the established community and may support nearby regional attractions by increasing the frequency of local visitors by offering services that are attractive to the community. Granting a permit in this instance is therefore based upon sound land use principles and responds to the needs of the community at -large. 2. A conditional use permit shall not be granted if it will cause deterioration of bordering land uses or create special problems for the area in which it is located. (OMC 17.10.030.F2) The project is not expected to detrimentally affect adjacent land uses or create special problems in the area. The project site is adjacent to general industrial uses to the north and west, to the Mazda dealership to the south, by a gas station to the southwest and by the Stadium Promenade to the west. The proposed site layout will not alter the existing driveway access locations. A queuing analysis for the vehicle stacking for the project has been analyzed and has been deemed acceptable by the City's Traffic Engineer. The applicant has proposed a contingency plan in the event that the queue exceeds twenty vehicles. Employees will monitor vehicle stacking and direct vehicle access to prevent spill out onto Katella Avenue and Main Street. A Noise Study was not required for the project because the site is on a major commercial intersection and there are no nearby residential neighborhoods. 3. A conditional use permit must be considered in relationship to its effect on the community or neighborhood plan for the area in which it is located. (OMC 17.10.030.F.3) The new carwash facility and associated landscaping improvements generally satisfies the development standards for the Urban Mixed Use (UMU) zone. The building design incorporates a contemporary architectural style with features that Resolution PC 16-22 Page 5 of 10 include varied flat roof lines, alternating wall planes, and curved canopies. Integrated into the design of the architecture are trees with a large Coastal Live Oak- to be planted in front of the Katella Avenue building elevation. The proposed landscaping will complement the building design and provides much more than landscaping than is required than the project site requires. A right of way dedication of two feet has been provided for the critical intersection of Katella Avenue and Main Street and all right-of-way improvements including accessibility have been satisfied. Therefore, the effects on the community within this area of the City have been considered and appropriately addressed and any specific requirements are included as conditions to be satisfied prior to permit issuance. 4. A conditional use permit, if granted, shall be made subject to those conditions necessary to preserve the general welfare, not the individual welfare of any particular applicant. (OMC 17.10.030.F.4) All project conditions maintain a purpose of preserving the general welfare of the City and community. Conditions specifically serve to manage project construction impacts, provide for site maintenance, address water quality, accommodate disabled person site access, protect or improve the public right-of-way, protect or improve utilities and accommodate aesthetics. In addition, conditions have been included to prevent drive -through queuing impacts on Katella Avenue and Main Street, and to ensure the drive -through car wash complies with the City's regulations. Design Review Findings: 1. The project design upholds community aesthetics through the use of an internally consistent, integrated design theme and is consistent with all adopted specific plans, applicable design standards, and their required findings (OMC 17.10.07.F.3). The subject property is not within any specific plan area or established district with applicable design standards. The proposed building and design may establish a new phase of design. Few sites in the area have fully developed any projects using the UMU development standards. And over time, the Katella Avenue Corridor will fully develop into a more urban setting focused on retail, office, and services thereby strategically maximizing the development potential of the area as intended by the City's General Plan. Overall, the project presents a unifying theme and results in a high quality, internally consistent design that is compatible with the eclectic mix of styles in the surrounding area. Minor Site Plan Review Findings: 1. The project design is compatible with surrounding development and neighborhoods. (OMC 17.10.060. H.1) The surrounding development and neighborhood consist of general industrial uses to the north and east and commercial uses to the south and west. The project will provide a Resolution PC 16-22 Page 6 of 10 revitalized architectural and landscaped appearance to the Katella Avenue commercial corridor, consistent with surrounding development in its massing, scale, design and function. 2. Minor Site Plan approval shall be granted if the project conforms to City development standards and any applicable special design guidelines or specific plan requirements (OMC 17.10. 060. H. 2). The proposed building does not meet the minimum lot size and maximum floor area ratio requirements of 1.5-3.0 of the Urban Mixed -Use land use designation. The proposed building does bring the property into greater compliance with the current Urban Mixed - Use General Plan and zoning standard. There are no special design guidelines or specific plans affecting the property. 3. Minor Site Plan approval shall be granted if the project provides for safe and adequate vehicular and pedestrian circulation, both on- and off -site (OMC 17.10.060.H.3). The project provides safe and adequate access and circulation for vehicles and pedestrians from Katella Avenue and Main Street. The on -site circulation has been designed to accommodate all access needs for parking spaces and for emergency vehicles. There is sufficient queue stacking for twenty vehicles with an overflow before any vehicles would spill out onto the public streets. In addition, the study provides for a contingency plan to be activated should there be periods where longer queues form that could impact traffic flow on Katella Avenue and Main Street. The contingency plan includes monitoring of the queue should an increase arise where access will be directed by employees to enter on Main Street away from the Katella Avenue entrance. Disabled parking and access has been designed to accommodate building code requirements. 4. Minor Site Plan approval shall be granted if City services are available and adequate to serve the project (OMC 17.10.060.H.4). A review of the project with all City departments concludes that City services will be available and adequate to serve this site, including water, sewer, police and fire services. 5. Minor Site Plan approval shall be granted if the project has been designed to fully mitigate or substantially minimize adverse environmental effects (OMC 17.10.060.H.5). No environmental effects have been identified for the project. The OMC will adequately manage construction and use regulation needs of the project. SECTION 2 — ENVIRONMENTAL REVIEW Final Program Environmental Impact Report (EIR) No. 1815-09 for the Comprehensive General Plan Update was certified on March 9, 2010 and prepared in accordance with the California Environmental Quality Act. The proposed change in zoning is within the scope of the previously Resolution PC 16-22 Page 7 of 10 approved General Plan and is adequately described in the previously certified General Plan Program EIR for purposes of CEQA. Categorical Exemption: The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) per State CEQA Guidelines 15332 (Class 32 - In -fill Development Projects) because the project site is less than five acres; the project site has no value as habitat for endangered, rare, or threatened species; the approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services. No public review is required. SECTION 3— CONDITIONS OF APPROVAL BE IT FURTHER RESOLVED that the following conditions are imposed: General: 1. The project shall conform in substance and be maintained in general conformance with plans and exhibits date stamped August 23, 2022, including any modifications required by conditions of approval, and as approved by the Planning Commission. Any future expansion in area or in the nature and operation of the use approved by Conditional Use Permit No. 3154-21 shall require an application for a new or amended Conditional Use Permit. 2. The applicant agrees to indemnify, hold harmless, and defend the City, its officers, agents and employees from any and all liability or claims that may be brought against the City arising out of its approval of this permits, save and except that caused by the City's active negligence. The City shall promptly notify the applicant of any such claim, action, or proceedings and shall cooperate fully in the defense. 3. The applicant shall comply with all federal, state, and local laws, including all City regulations. Violation of any of those laws in connection with the use may be cause for revocation of this permit. 4. Conditional Use Permit No. 3154-21 shall become void if not vested within two years from the date of approval. Time extensions may be granted for up to one year, pursuant to OMC Section 17.08.060. 5. Any modifications to the plans including, but not limited to, the landscaping and parking as a result of other Department requirements such as Building Codes, water quality, Fire, or Police shall be submitted for review and approval to the Community Development Director or designee. Should the modifications be considered substantial, the modifications shall be reviewed and approved by the City Council. 6. Except as otherwise provided herein, this project is approved as a precise plan. After any application has been approved, if changes are proposed regarding the location or alteration of any use or structure, a changed plan may be submitted to the Community Development Director for approval. If the Community Development Director determines that the proposed change complies with the provisions and the spirit and intent of the approval action, and that the action would have been the same for the changed plan as for Resolution PC 16-22 Page 8 of 10 the approved plan, the Community Development Director may approve the changed plan without requiring a new public hearing. 7. Any future expansion in area or in the nature and operation of the approved use by Conditional Use Permit No. 3154-21 shall require a new or amended application for an automatic drive through carwash facility and associated vacuum stalls. 8. Building permits shall be obtained for all construction work, as required by the City of Orange, Community Development Department's Building Division. Failure to obtain the required building permits may be cause for revocation of this entitlement. 9. The project approval includes certain fees and/or other exactions. Pursuant to Government Code Section 66020, these conditions or requirements constitute written notice of the fees and/or exactions. The applicant is hereby notified that the ninety (90) day protest period commencing from the date of approval of the project has begun. If the applicant fails to file a protest regarding these conditions or requirements, the applicant is legally barred from later challenging such exactions per Government Code Section 66020. 10. In conjunction with construction, all activity will be limited to the hours between 7:00 a.m. and 8:00 p.m. Monday through Saturday. No construction activity will be permitted on Sundays and Federal holidays. 11. Within two (2) days of final approval of this project, the applicant shall deliver to the Planning Division a cashier's check payable to the Orange County Clerk in an amount required to fulfill the fee requirements of Fish and Game Code Section 711.4(d)(2) and the County Administrative fee, to enable the City to file the Notice of Determination required under Public Resources Code 21152, & Cal Code Regulations 15075. 12. These conditions shall be reprinted on the second page of the construction documents when submitted to the Building Division for the plan check process. 13. Any graffiti shall be removed within 72 hours from the time the City of Orange Notice of Violation is received by the applicant/property owner. 14. Prior to the operation of the business, the applicant shall file for, or if applicable, amend a business license with the Business License Division. Failure to obtain the required business license will be cause for revocation of this approval. 15. In conjunction with the operation of the business, all noise levels generated shall conform to the levels allowed by the OMC. 16. In conjunction with the operation of the business, all loading and trash enclosure areas shall be maintained and kept clean and free of debris. 17. In conjunction with the operation of the business, should parking or queuing issues arise on the site or the surrounding neighborhood, the applicant shall work with the Community Development Department to resolve any issues. If such issues are not resolved to the City's satisfaction, the Conditional Use Permit shall be presented to the Planning Commission for its consideration of further conditions and modifications 18. The automatic car wash service shall operate its vehicle queuing and on -site circulation in the manner as described in the drive -through Queuing Analysis. At no time shall the Resolution PC 16-22 Page 9 of 10 operator allow vehicles of customers to straddle the public right-of-way (sidewalk, driveway, street) and shall employ measures to direct customers from causing any such conflict with keeping the public right-of-way clear by ensuring a maximum queue stacking of twenty vehicles. Water Quality: 19. Prior to City approval of the landscape plans, the applicant shall review the approved Water Quality Management Plan and ensure the proposed landscape plans are consistent with the project grading plans. The plans must show any proposed storm water treatment Best Management Practices such as bioretention planters, drywells, permeable pavers, or any other proposed surface water quality BMPs. Fire Department: 20. Prior to Building Permit issuance, the applicant shall provide a specification data sheet for proposed roof -translucent material, Acrylite. Public Works, Development Services: 21. Prior to building permit issuance, the project proponent shall request and complete a quitclaim deed of the SAVI line within the property by the City of Orange. 22. Prior to building permit issuance, the project proponent shall complete a street right-of- way dedication with Public Works Department for an additional 2 foot of street frontage along Katella Avenue, and additional area to accommodate a standard sidewalk access ramp at the northeast corner of Katella Avenue and Main Street. 23. Prior to building permit issuance, project proponent shall complete and record a reciprocal sewer/drainage agreement with the adjacent parcel to the east with AP Number: 375-232-20. The agreement shall include but not limited to responsibility for the removal/reconstruction of proposed structures along the existing 15-foot easement for maintenance or repairs of sewer/drainage. Design Review Committee: 24. Tree maintenance shall be performed in such a manner as to allow all trees to retain their full canopy height and breadth for shade at the point of maturity, except as required for public safety purposes. In addition to the above conditions, procedural requirements are contained herein as Attachment A to this Resolution. I hereby certify that the foregoing Resolution was adopted on September 19, 2022 by the Planning Commission of the City of Orange by the following vote: AYES: Vazquez, Glasgow, Simpson, Martinez and Trapesonian NOES: None RECUSED: None ABSENT: None Resolution PC 16-22 Page 10 of 10 Davi Vazquez, Planning C mmission Chair Date