2022 PC 12-22 CHOC HORIZONTAL PARKING STRUCTUREMAJOR SITE PLAN REVIEW NO. 1050-21
DESIGN REVIEW NO.5044-21
ENVIRONMENTAL REVIEW NO. 1877-21
RESOLUTION NO. PC 12-22
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF ORANGE APPROVING MAJOR SITE
PLAN REVIEW NO.1050-21, DESIGN REVIEW NO. 5044-
219 AND ENVIRONMENTAL REVIEW NO. 1877-21 FOR
THE CONSTRUCTION OF A 630-STALL HORIZONTAL
EXPANSION OF AN EXISTING 9-STORY ASSOCIATE
PARKING STRUCTURE WITHIN THE EXISTING
CHILDREN'S HOSPITAL OF ORANGE COUNTY
CAMPUS BOUNDARY LOCATED AT 525 S. MAIN
STREET
APPLICANT: Children's Hospital of Orange County (CHOC)
Moved by Commissioner Simpson and seconded by Commissioner Martinez that the
following Resolution be adopted:
WHEREAS, the Planning Commission has authority per Orange Municipal Code (OMC)
Table 17.08.020, and Sections 17.08.020.13.2.a, 17.10.060.E, and 17.10.070.13 to take action to
grant or deny Major Site Plan Review No. 1050-21, Design Review No. 5044-21, and
Environmental Review No. 1877-21 for the construction of a 630-stall horizontal expansion of
CHOC's existing 9-story associate parking structure within the existing CHOC Campus boundary;
and
WHEREAS, Major Site Plan Review No. 1050-21, Design Review No. 5044-21, and
Environmental Review No. 1877-21 were filed by CHOC in accordance with the provisions of the
OMC; and
WHEREAS, the environmental impacts of the project and its project alternatives were
evaluated through Environmental Impact Report (EIR) No. 1805-08, State Clearinghouse No.
2008081118, which was prepared in accordance with the provisions of the California
Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15070 et seq. and in
conformance with the Local CEQA Guidelines The horizontal expansion as proposed was
analyzed by EIR No. 1805-08 and no further environmental analysis is required; and
WHEREAS, on March 2, 2022, the Staff Review Committee reviewed the project,
determined that the project includes all necessary application materials and meets code
requirements, and recommended Planning Commission approval of the project; and
WHEREAS, on April 20, 2022, the Design Review Committee reviewed the project and
recommended approval of the project subject to conditions that have been incorporated into the
draft Planning Commission Resolution; and
WHEREAS, the Planning Commission conducted a duly advertised public meeting on June
20, 2022, at which time interested persons had an opportunity to testify either in support of, or
Planning Commission
Resolution No. PC 12-22
Page 2
opposition to, the proposed project consisting of Major Site Plan Review No. 1050-21, Design
Review No. 5044-21, and Environmental Review No. 1877-21 upon property located at 525 South
Main Street, as legally described in the title report and included as Attachment "A" to this
Resolution.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission approves Major
Site Plan Review No. 1050-21, Design Review No. 5044-21, and Environmental Review No.
1877-21 for the construction of a 630-stall horizontal expansion of an existing 9-story associate
parking structure within the existing CHOC Campus boundary, based on the following findings:
SECTION 1— FINDINGS
General Plan FindinK.
1. The project must be consistent with the goals and policies stated within the City's General
Plan.
The project is consistent with the City's General Plan Land Use and Economic Development
Element in that the proposed horizontal expansion of the existing 9-story associate parking
structure helps to provide a service that contributes to a diversified mix of land uses in the
surrounding community. The horizontal expansion will consist of up to 630 additional
parking stalls supporting the existing CHOC Campus. The site is located within the "South
Main Street Corridor" area, one of the land use "Focus Areas" in the City's 2010 General
Plan. The proposal assists in meeting the City's goals in the focus area, by promoting
development of a medical corridor that capitalizes on existing hospital and medical uses. The
proposal will provide additional parking for CHOC's employees and visitors and will
facilitate the future medical office building called for in the CHOC Master Plan.
Major Site Plan Review Findings:
1. The project design is compatible with surrounding development and neighborhoods.
The design of proposed horizontal expansion of the parking structure responds to the existing
urban area. It relates to the immediate prominent neighbor, which is also part of the hospital
campus, harmonizing with the existing buildings. The elevations facing Main Street and SR
22 have been emphasized, the other two sides are simplified as they front existing buildings.
2. Major Site Plan approval shall be granted if the project conforms to City development
standards and any applicable special design guidelines or specific plan requirements.
The site is located within the "South Main Street Corridor" area, one of the land use "Focus
Areas" in the City's 2010 General Plan. The South Main Street Corridor includes the St.
Joseph Hospital medical centers on La Veta Avenue, as well as various commercial and
office uses on Main Street between La Veta Avenue and Chapman Avenue. South Main
Street serves as a key approach to the major medical hub created by CHOC and St. Joseph
Hospital medical centers. The proposal promotes development of a medical corridor that
capitalizes on existing hospital and medical uses.
3. Major Site Plan approval shall be granted if the project provides for safe and adequate
vehicular and pedestrian circulation, both on- and off -site.
Planning Commission
Resolution No. PC 12-22
Page 3
The project has safe and adequate access and circulation for vehicles and pedestrians from
S. Main Street. The on -site circulation has been designed to accommodate all access needs,
parking spaces, and emergency vehicles. Disabled parking and access has been designed to
accommodate building code requirements.
4. Major Site Plan approval shall be granted if City services are available and adequate to serve
the project.
A review of the project with the inter -departmental Staff Review Committee concludes that
City services will be available and adequate to serve this site, including water, sewer, police,
and fire services.
5. Major Site Plan approval shall be granted if the project has been designed to fully mitigate or
substantially minimize adverse environmental effects.
The environmental impacts of the project and its project alternatives were evaluated through
EIR No. 1805-08, State Clearinghouse No. 2008081118), which was prepared in accordance
with the provisions of CEQA per State CEQA Guidelines Section 15070 et seq. and in
conformance with the Local CEQA Guidelines. The analysis in certified EIR No. 1805-08
included mitigation measures to address potential impacts related to Aesthetics, Air Quality,
Hazards and Hazardous Materials, Noise, Transportation and Traffic, and Utilities and
Service Systems. The horizontal expansion as proposed was analyzed by EIR No. 1805-08,
the proposal does not create or alter any existing mitigation measures, no further
environmental analysis is required.
Design Review Findings:
1. The project design upholds community aesthetics through the use of an internally consistent,
integrated design theme and is consistent with all adopted specific plans, applicable design
standards, and their required findings (OMC 17.10.07. G. 3).
The project site is located in an urbanized area of the City surrounded by office,
commercial/retail, medical, and residential uses. The project design and use would be
compatible with the surrounding uses and would not result in alteration or modification of
the existing public street or sidewalk systems and patterns in the area. The proposed
horizontal expansion of the existing parking structure has been designed to blend in with the
existing surrounding structures. Overall, development of the proposed project would enhance
and strengthen the character of the site.
SECTION 2 ENVIRONMENTAL REVIEW
The environmental impacts of the project and its project alternatives were evaluated through
EIR No. 1805-08, State Clearinghouse No. 2008081118), which was prepared in accordance
with the provisions of CEQA per State CEQA Guidelines Section 15070 et seq. and in
conformance with the Local CEQA Guidelines. The analysis in certified EIR No. 1805-08
included mitigation measures to address potential impacts related to Aesthetics, Air Quality,
Hazards and Hazardous Materials, Noise, Transportation and Traffic, and Utilities and
Service Systems. The horizontal expansion as proposed was analyzed by EIR No. 1805-08,
the proposal does not create or alter any existing mitigation measures, no further
environmental analysis is required.
Planning Commission
Resolution No. PC 12-22
Page 4
SECTION 3 — CONDITIONS OF APPROVAL
BE IT FURTHER RESOLVED that the following conditions are imposed with approval:
1. The permittee agrees to indemnify, hold harmless, and defend the City, its officers, agents and
employees from any and all liability or claims that may be brought against the City arising
out of its approval of this permit, save and except that caused by the City's active negligence.
2. The project shall conform in substance and be maintained in general conformance with plans
and exhibits date labeled June 20, 2022, and conditions of approval, as approved by the
Planning Commission.
3. Within two (2) days of final approval of this project, the applicant shall deliver to the Planning
Division a cashier's check payable to the Orange County Clerk in an amount required to fulfill
the fee requirements of Fish and Game Code Section 711.4(d)(2) and the County
Administrative fee, to enable the City to file the Notice of Determination required under
Public Resources Code 21152, & Cal Code Regulations 15075.
4. Prior to building permit issuance, the landscape plan shall include four Mexican fan palm
trees in the southern planting area.
5. Prior to building permit issuance, the graphic panels on the south elevation shall be full height
with a graphic of the sky.
6. Prior to building permit issuance, construction plans shall indicate shielding on the rooftop
lighting on the south so as to avoid glare into the residential complex to the south of SR 22.
7. Prior to certificate of occupancy, all landscaping improvements shall be completed according
to the approved plans and to the satisfaction of the Community Development Director.
8. Plans submitted for Building Plan Review shall comply with the California Fire Code as
amended by the City and as frequently amended and in effect at the time of application for
Building Permit.
9. Prior to grading permit issuance, the applicant shall submit a grading plan in compliance with
City standards for review and approval by the Public Works Director. All grading and
improvements on the subject property shall be made in accordance with the Manual of
Grading and Standard Plans and Specifications to the satisfaction of the Public Works
Director. The applicant may be required to include Phased Erosion and Sediment Control
Plans, Site Demolition Plan, and Utility Plan as parts of the grading plan.
10. During building plan check review, the applicant shall provide a photometric survey of all
levels of the parking structure including the stairways showing compliance with OMC
Chapter 15.52 and IESNA standards.
11. All interior walls, columns, ceilings, etc., of the parking structure shall be of a light color stain
or paint to increase uniformity and reflective light. This shall be verified by the Police
Department prior to issuance of building permits.
12. All stairwells serving the parking structure facility should be open and offer maximum
visibility and utilized convex mirrors to increase visibility around corners. Shear walls within
the structure should be limited due to the lack of visibility and creation of concealed areas.
This shall be verified by the Police Department prior to issuance of building permits.
Planning Commission
Resolution No. PC 12-22
Page 5
13. All landscape areas shall be maintained in a neat and healthy condition. Should the plant
material die, the property owner/operator shall replace it with new plant material.
14. Prior to building permits, final landscaping plans for the project shall be designed to comply
with the City's Water Efficient Landscape Guidelines as described in Section IX et al of the
City of Orange Landscape Standards and Specifications.
15. The final landscape plan shall include a note that a fully automated irrigation system will be
provided. The landscape and irrigation design shall include the Calsense irrigation control
system or equivalent including remote communication, flow sensor, and master value
components.
16. Prior to certificate of occupancy, all landscaping improvements shall be completed according
to the approved plans, the City of Orange Water Efficient Landscape Guidelines, and City of
Orange Landscape Standards and Specifications. The project landscape architect shall submit
documentation certifying compliance with this requirement (Appendices B and E of City of
Orange Landscape Standards and Specifications) for review and approval by the Community
Development Director, in coordination with the Public Works Director.
17. In conjunction with construction, all activity will be limited to the hours between 7:00 a.m.
and 8:00 p.m. Monday through Saturday. No construction activity will be permitted on
Sundays and Federal holidays.
18. These conditions shall be reprinted on the second page of the construction documents when
submitted to the Building Division for the plan check process.
19. All project Mitigation Measures shall be complied with and implemented as stated in the
Mitigation Monitoring and Reporting Program located in EIR No. 1805-08.
In addition to the above conditions, procedural requirements are contained in Attachment "B" to
this Resolution.
I hereby certify that the foregoing Resolution was adopted on June 20, 2022, by the Planning
Commission of the City of Orange by the following vote:
AYES: Glasgow, Simpson, Martinez, and Trapesonian
NOES: None
ABSTAIN: None
ABSENT: Vazquez
David Vazquez, Planning Commission Chair
]z
1.<A024
Date
ATTACHMENT A
LEGAL DESCRIPTION
Real property in the City of Orange, County of Orange, State of California, described as follows:
THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF ORANGE IN
THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS
FOLLOWS:
PARCELS 8 AND 9 OF PARCEL MAP NO.2008-162, IN THE CITY OF ORANGE, COUNTY
OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK
375, PAGES 25 THROUGH 32 INCLUSIVE OF PARCEL MAPS, IN THE OFFICE OF THE
COUNTY RECORDER OF SAID COUNTY.
APN 041-090-48; A PORTION OF APN 041-090-47
ATTACHMENT B
PROCEDURAL REQUIREMENTS
GENERAL
1. The project approval includes certain fees and/or other exactions. Pursuant to Government
Code Section 66020, these conditions or requirements constitute written notice of the fees
and/or exactions. The applicant is hereby notified that the ninety (90) day protest period
commencing from the date of approval of the project has begun. If the applicant fails to file a
protest regarding these conditions or requirements, the applicant is legally barred from later
challenging such exactions per Government Code Section 66020.
2. Building permits shall be obtained for all construction work, as required by the Public Works
Department Building Division. Failure to obtain the required building permits may be cause
for revocation of this entitlement.
3. Prior to building permits for the horizontal expansion, the applicant shall pay all applicable
development fees, including but not limited to: City sewer connection, Orange County
Sanitation District Connection Fee, Transportation System Improvement Program, Fire
Facility, Police Facility, Park Acquisition, Sanitation District, and School District, as required.
4. Any graffiti shall be removed within 72 hours from the time the City of Orange Notice of
Violation is received by the applicant/property owner.
Water
1. Prior to building permit issuance, the applicant shall submit improvement plans to the Water
Division for review and approval for any new fire hydrants, domestic water services, fire
services, landscape services, and any other proposed improvements or relocations affecting the
public water system facilities.
2. Prior to certificate of occupancy, the applicant shall be responsible for the installation of
necessary fire hydrants and fire services as approved by the Fire Department and Water
Division.
3. Prior to building permits, the Water Division shall approve the type and location of backflow
prevention device for proposed City services.
4. Prior to building permits, construction documents shall show that a six-foot minimum
horizontal clearance and a one -foot minimum vertical clearance would be maintained between
City water mains, laterals, services, meters, fire hydrants and all other utilities except sewer.
The Water Division shall review and approve the construction documents.
5. Prior to building permits, construction documents shall show that an eight -foot minimum
clearance is provided between City water mains, laterals, services, meters, fire hydrants, signs,
or trees or other substantial shrubs and plants as required by the Water Division. The Water
Division shall review and approve the construction documents.
6. Prior to building permits, construction documents shall show that permanent signs, awning,
surface water quality management features or other structures are not built over water mains,
laterals, services, meters, or fire hydrants as required by the Water Division.
7. Prior to building permits, the applicant shall be responsible for obtaining approval all of the
necessary encroachment permits from affected agencies for all public water construction work.
8. Prior to approval of a water improvement plan, the applicant shall satisfy all water main
connection, plan check, and inspections charges as determined by the Water Division.
9. Prior to grading permits, the applicant shall construct all public and/or private improvements
to the satisfaction of the Water Division. The applicant may be required to enter into an
agreement with the City, and post security in a form and amount acceptable to the City
Engineer and/or Water Division to ensure construction of said improvements.
10. Plans submitted during plan check shall show that the water improvement plans are consistent
with the fire suppression plans and or fire master plan. The applicant's consultant preparing
the water improvement plans shall coordinate its plans with the consultant preparing the fire
suppression plans and/or fire master plan so that their designs concur.
11. Plans submitted during plan check shall show that the minimum separation requirements are
met and that each of the various plan sets match. The project team shall coordinate
improvement and utility plans with the landscape, architectural, surface water quality
management, fire master and/or fire suppression plans so that all plan sets are consistent.
12. At least 14 calendar days prior to commencing construction, the applicant's civil engineer shall
prepare and provide product material submittals consistent with the water improvement plans
for all proposed public water system facilities to the Water Division per the City of Orange
General Water Construction Notes for review and approval.
13. Prior to certificate of occupancy, the applicant shall furnish and install individual pressure
regulators on new services where the incoming pressure exceeds eighty pounds per square
inch.
Street and Utility Improvements:
1. Prior to grading permits, all works within public right-of-way and public utility easements will
require Encroachment Permits, including sidewalk and driveway constructions and utility main
and lateral constructions.
2. Prior to grading permits, all public infrastructures, including street sections, sidewalk,
driveway apron, sidewalk access ramps, curb and gutter, cross gutter and spandrel, utilities,
etc. shall comply with City of Orange Standard Plans and Specifications.
3. Prior to certificate of occupancy, utilities serving the development, such as electric, cable
television, street lighting, and communication shall be installed underground, completed, and
approved by the appropriate utility provider.
4. Prior to grading permits, driveway aprons shall conform to Public Works Standard Plan 115
for commercial driveway with ADA accessibility.
5. Prior to grading permits, all private ways shall conform to Engineering Standard Plan 108.
6. Prior to grading permits, all driveway approaches shall conform to ADA standard for
wheelchair access conforming to Public Works Standard Plans 115 and 116.
7. Prior to certificate of occupancy, adequate wheelchair accessibility around driveway aprons
that do not conform to current ADA standards shall be provided.
8. Prior to certificate of occupancy, any cracked, uneven, or damaged public sidewalk, curb and
gutter along property frontage shall be repaired.
9. Prior to certificate of occupancy, sanitary sewer system connecting from the buildings to public
mainline shall be private and maintained by the property owner
10. Prior to building permits, any private sewer system connecting directly to Orange County
Sanitation District (OCSD) lines without using City of Orange sewer systems shall require a
Permit from OCSD.
Grading:
1. Prior to grading permits, the applicant shall submit a grading plan in compliance with City
standards for review and approval by the Public Works Director. All grading and
improvements on the subject property shall be made in accordance with the Manual of Grading
and Standard Plans and Specifications to the satisfaction of the Public Works Director. The
applicant may be required to include Phased Erosion and Sediment Control Plans, Site
Demolition Plan, and Utility Plan as parts of the grading plan.
2. Prior to grading permits, plans preparation and submittals shall be per Development Services
Plan Preparation Guidelines and Checklist, and Checklist for Submittal Packages.
3. Prior to grading permits, a geotechnical report shall accompany the grading plan review.
4. Prior to grading permits, a Drainage Assessment Letter shall be submitted for review and
approval by Public Works.
5. Prior to grading permits, the contractor shall obtain a Grading Permit from Public Works
Department prior to start of any site demolition, clearing and grubbing, and grading.
6. Prior to grading permits, any soil imported or exported shall require a Transportation Permit
from Public Works Traffic Division.
7. Prior to grading permits, upon submittal of grading plan for plan check, the applicant shall
submit a deposit to cover plan check and inspection services related to the grading activities.
8. Prior to grading permits, the grading plan shall detail all of the locations where retaining walls
will be constructed. Geometric detail of retaining walls shall be shown on the grading plan,
including material type, dimensions, backfill, and subdrains. A building permit is also required
for retaining walls over 4 feet in height measured from the bottom of the footing to the top of
the wall prior to construction. Structural details and design calculations shall be submitted as
a separate document and will be reviewed and permitted by City Building Division.
9. Prior to grading permits, any grading outside of the owner's property boundary shall require
the applicant to either obtain a temporary construction easements or permission by adjacent
property owners in a form suitable to the Public Works Director.
10. Prior to grading permits, trash receptacle locations and details shall be included on the Grading
Plan. The trash storage area shall be constructed per Public Works Standard Plan 409.
11. Prior to grading permits, all sewer and storm drain lines shall be shown on the Grading Plan.
Other utility lines, such as water lines, may also be shown on Grading Plan for reference.
12. Prior to grading permits, all structural Best Management Practices (BMPs) for water quality
purpose shall be shown on Grading Plan. Water quality features shown on the Grading Plan
must match Water Quality Management Plan (WQMP).
13. Prior to certificate of occupancy, all on -site driveways where heavy-duty trucks would travel
shall be maintained in good condition.
14. Prior to building foundation construction, a Certificate Letter of Line and Grade shall be
submitted to Public Works Construction Inspector demonstrating that the site grading and pad
elevation are completed according to the grading plan.
Water Quality
1. Prior to City approval of the landscape plans, the applicant shall review the approved WQMP
and ensure the proposed landscape plans are consistent with the project grading plans and show
the proposed storm water infiltration devices and other treatment BMPs affecting landscaping
areas.
2. Prior to grading permits the applicant shall submit a Priority Project WQMP for review and
approval to the Public Works Department that:
a. Prioritizes the use of Low Impact Development principles as follows: preserves natural
features; minimizes runoff and reduces impervious surfaces; and utilizes infiltration of
runoff as the method of pollutant treatment. Infiltration BMPs to be considered include the
use of permeable materials such as concrete and concrete pavers, infiltration trenches,
infiltration planters, and other infiltration BMPs as applicable;
b. Incorporates the applicable Site Design, Routine Source, Structural Control, and Low
Impact BMPs as defined in the Model WQMP and Technical Guidance Document.
c. Maintains the hydrologic characteristics of the site by matching time of concentration,
runoff, velocity, volume and hydrograph for a 2-year storm event;
d. Minimizes the potential increase in downstream erosion and avoids downstream impacts
to physical structures, aquatic and riparian habitat;
e. Generally describes the long-term operation and maintenance requirements for structural
and Treatment Control BMPs;
f. Identifies the entity or employees that will be responsible for long-term operation,
maintenance, repair and or replacement of the structural and Treatment Control BMPs and
the training that qualifies them to operate and maintain the BMPs;
g. Describes the mechanism for funding the long-term operation and maintenance of all
structural and Treatment Control BMPs;
h. Includes a copy of the forms to be used in conducting maintenance and inspection
activities;
i. Meets recordkeeping requirements (forms to be kept for 5 years); and
j . Includes a copy of the form to be submitted annually by the project owner to the Public
Works Department that certifies that the project's structural and treatment BMPs are being
inspected and maintained in accordance with the project's WQMP.
3. Prior to certificate of occupancy, the applicant shall demonstrate the following to the Public
Works Department:
a. That all structural and treatment control BMPs described in the Project WQMP have been
constructed and installed in conformance with the approved plans and specifications;
b. That the applicant is prepared to implement all non-structural BMPs described in the
Project WQMP; and
c. That an adequate number of copies of the project's approved final Project WQMP are
available for the future occupiers.
4. Prior to certificate of occupancy or final signoff by the Public Works Department, the applicant
shall demonstrate to the satisfaction of the Public Works Department, that the preparer of the
WQMP has reviewed the BMP maintenance requirements in Section V of the WQMP with the
responsible person and that a copy of the WQMP has been provided to that person. A
certification letter from the WQMP preparer may be used to satisfy this condition.
5. Prior to building permits, the applicant shall review the approved WQMP and grading plan to
ensure the structure's downspouts or drainage outlet locations are consistent with those
documents. Copies of the building or architectural plans specifically showing the downspouts
and drainage outlets shall be submitted to the Public Works Department for review.
6. The project applicant shall maintain all structural, treatment and low impact development
BMPs at the frequency specified in the approved WQMP. Upon transfer of ownership or
management responsibilities for the project site, the applicant shall notify the Public Works
Department of the new person(s) or entity responsible for maintenance of the BMPs.
7. For those projects requiring coverage under the State of California's General Construction
Permit: Prior to the issuance of grading permits (including grubbing, clearing, surface mining
or paving permits as appropriate) the applicant shall demonstrate that coverage has been
obtained under the State's General Permit for Stormwater Discharges Associated with
Construction Activity (General Construction Permit) by providing a copy of the Notice of
Intent (NOI) submitted to the State Water Resources Control Board and a copy of the
subsequent notification of the issuance of a Waste Discharge Identification (WDID) Number
or other proof of filing. A copy of the current Storm Water Pollution Prevention Plan (SWPPP)
required by the General Permit shall be kept at the project site and be available for review by
City representatives upon request.