RES-11474 MASTER SCHEDULE OF FEES AND CHARGES - JULY 1, 2023RESOLUTION NO. 11474
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF ORANGE AMENDING THE MASTER
SCHEDULE OF FEES AND CHARGES FOR
VARIOUS SERVICES AND THE RENTAL OF
ROOMS AND EQUIPMENT
WHEREAS, pursuant to Chapter 3.10 of the Orange Municipal Code, the City Council
has established and maintained a Master Schedule of Fees and Charges, consisting of fees and
charges for various services provided by the City, as well as fees for the rental of City facilities
and equipment; and
WHEREAS, in accordance with Chapter 3.10 of the Orange Municipal Code, the Master
Schedule of Fees and Charges has been periodically amended and revised from time to time by the
City Council; and
WHEREAS,pursuant to Government Code Section 50076 the amount the City may charge
for specified services cannot exceed the estimated reasonable cost of providing the service; and
WHEREAS, the fees and charges being recommended for change are as a result of(1)
updating the fee model provided by Matrix Consulting Group, who completed a user fee study in
Fiscal Year 2017-18, to estimate the cost of providing services for which fees are charged; (2)
adding the animal control and shelter fees set by the City, to be administered and collected by
Orange County Animal Care; and
WHEREAS, fees charged for the rental of City facilities and equipment are not subject to
Government Code Section 50076.
NOW, THEREFORE,BE IT RESOLVED by the City Council of the City of Orange as
follows:
1.The Master Schedule of Fees and Charges is hereby amended and Attachment"A"
to this Resolution is hereby adopted, modifying the Master Schedule of Fees and Charges to
provide for the inclusion of the amounts of fees for those listed in Attachment"A."
2.The City Council finds that the fees set forth in Attachment"A" do not exceed the
reasonable cost of services provided by the City in connection with the services provided and that
the fees for the rental of City facilities are set at a rate to reasonably ensure that the cost of the
facilities and equipment rental is borne by those seeking to utilize such facilities and equipment.
3.The fees listed in Attachment"A" shall be effective July 1, 2023.
4.If the fees set forth in this Resolution or the application thereof to any person or
circumstance is held to be unconstitutional or otherwise invalid by any court of competent
jurisdiction, such invalidity shall not affect any other fee, charge, or rate, or application thereof,
which can be implemented without the invalid fee, charge, or rate, or application thereof, and to
this end the fees, charges and rates of this Resolution are declared to be severable.
ADOPTED this 27th day of June 2023.
niel R. Slater, Mayor, City of Orange
ATTEST:
Pamela Coleman, City Clerk, City of Orange
Attachment: Attachment A
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ORANGE
I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify
that the foregoing Resolution was duly and regularly adopted by the City Council of the City of
Orange at a regular meeting thereof held on the 27th day of June 2023, by the following vote:
AYES:COUNCILMEMBERS: Barrios, Dumitru, Tavoularis, Bilodeau, and Slater
NOES:COUNCILMEMBERS: Gyllenhammer
ABSENT: COUNCILMEMBERS: Gutierrez
ABSTAIN: COUNCILMEMBERS: None
Pamela Coleman, City Clerk, City of Orange
Resolution No. 11474 2
ATTACHMENT"A"
MASTER SCHEDULE OF FEES AND CHARGES EFFECTIVE JULY 1,2023
Behind this sheet.]
CITY OF ORANGE
MASTER SCHEDULE OF FEES
Effective 7/1/2023(Resolution No. 11474)
TABLE OF CONTENTS
DEPARTMENT PAGE
CITY CLERK 1
COMMUNITY DEVELOPMENT
PLANNING DIVISION 2
BUILDING DIVISION*
NEW CONSTRUCTION-PLAN CHECK 3
NEW CONSTRUCTION-INSPECTION 8
MECHANICAL,ELECTRICAL,PLUMBING FEES 13
MISCELLANEOUS FEES 16
Developer Impact Fees are available through Building&Safety Services
COMMUNITY SERVICES 19
FINANCE 26
FIRE 27
LIBRARY 33
POLICE 34
PUBLIC WORKS
ENGINEERING DIVISION 36
FIELD SERVICES DIVISION 37
TRAFFIC DIVISION 38
WATER DIVISION 39
NON-DEPARTMENTAL
ANIMAL CONTROL AND SHELTER FEES 41
CITY CLERK
FEE/CHARGE RATE UNIT NOTES
1 Document Certification 10.00 each
2 Filing of Circulators of an Initiative 200.00 each
3 Orange Municipal Code Book 544.00 each
4 Orange Municipal Code Supplement 45.00 each 3 times per year
5 Subpoena for Records 15.00 each Evidence Code Section 1563
6 Photocopy:
7 Election-Related 0.10 per copy
8 Black&White 0.15 per copy
9 Color Copy 0.25 per copy
10 Information Requests 65.00 per hour
11 CD/DVD Copy 25.00 each
12 Passport Processing 35.00 each
13 Passport Photo 15.00 each
14 Room Rental
15 Weimer Room,Conference Room C 115.00 per hour
1
COMMUNITY DEVELOPMENT-PLANNING DIVISION
FEE/CHARGE RATE UNIT NOTES
1 Sober Living Permit Fee 2,134.00 each
2 Alcohol License Permit 1,049.00 each
3 Accessory Dwelling Unit(ADU)Application 1,037.00 each
4 SB9 Application 1,747.00 each
5 Mills Act Program:
6 Original Application Fee 1,050.00 each
7 Inspection/Annual Report 100.00 each
8 Zone Clearance,Over the Counter Review 42.00 each
9 Staff research,information requests-per hour 122.00 per hour
10 Temporary Use Permit(recurring) 387.00 each
11 Temporary Use Permit(non-recurring uses) 1,000.00 each
12 Zoning Verification Letter 332.00 each
13 General Plan Update 0.05% %of valuation
14 CODE COMPLIANCE FEES:
15 Special Promotion(Banner)Permit 110.00 each
16 Special Event Application/Permit 110.00 each plus actual cost
17 Violation&Reinspection Fee 459.00 each
18 Sidewalk Vending Permits:
19 Per Applicant 645.00 each
20 Per Employee 169.00 each
21 Change Fee 169.00 each
22 DEPOSIT-BASED FEES:
23 Administrative Design Review 500.00 deposit Billed at actual cost
24 Design Review,Historic Districts
25 Commercial 4,000.00 deposit Billed at actual cost
26 Residential 1,500.00 deposit Billed at actual cost
27 Signs and Sign Programs 500.00 deposit Billed at actual cost
28 Design Review,Outside Historic Districts 1,000.00 deposit Billed at actual cost
29 CUP/Variance-Zoning 3,000.00 deposit Billed at actual cost
30 CUV/Variance-Planning Commission 3,000.00 deposit Billed at actual cost
31 Major Site Plan Review 15,000.00 deposit Billed at actual cost
32 Tentative Tract Map 2,000.00 deposit Billed at actual cost
33 Zone Change Applications 10,000.00 deposit Billed at actual cost
34 Negative Declaration 6,000.00 deposit Billed at actual cost
35 Mitigation Monitoring 3,000.00 deposit Billed at actual cost
36 General Plan Amendment 10,000.00 deposit Billed at actual cost
37 Environmental Impact Report 10,000.00 deposit Billed at actual cost
38 Appeals to City Council or Planning Commission 1,000.00 deposit Billed at actual cost
Planning Commission Modification to CUP,Major Site Plan or
39 Variance 3,000.00 deposit Billed at actual cost
40 Minor Site Plan Review-Staff 1,000.00 deposit Billed at actual cost
41 Pre-Application Review 500.00 deposit Billed at actual cost
42 Administrative Adjustments 1,000.00 deposit Billed at actual cost
43 Time Extension 1,000.00 deposit Billed at actual cost
2
Community Development-Building Division
Construction Plan Check Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IIIA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
A-1 Assembly-Fixed Seating 500 $1,997 $99.8325 $1,664 $83.1938 $1,331 $66.5550
Theater,Concert Hall 2,500 $3,993 $47.9100 $3,328 $39.9250 $2,662 $31.9400
5,000 $5,191 831.9400 $4,326 $26.6167 $3,461 821.2933
10,000 $6,788 $7.9967 $5,657 $6.6639 $4,525 $5.3311
25,000 $7,988 $25.5500 $6,656 $21.2917 $5,325 $17.0333
50,000 $14,375 $28.7500 $11,979 $23.9583 $9,583 $19.1667
A-2 Assembly-Food&Drink 500 $2,225 $111.2475 $1,854 $92.7063 $1,483 $74.1650
Restaurant,Night Club,Bar 2,500 $4,450 $53.4000 $3,708 $44.5000 $2,967 $35.6000
5,000 $5,785 $35.5950 $4,821 $29.6625 $3,857 $23.7300
10,000 $7,565 $8.8950 $6,304 $7.4125 $5,043 $5.9300
25,000 $8,899 $28.4850 $7,416 $23.7375 $5,933 $18.9900
50,000 $16,020 $32.0400 $13,350 • $26.7000 $10,680 $21.3600
A-3 Assembly-Worship,Amusement 500 $2,567 $128.3513 $2,139 $106.9594 $1,711 $85.5675
Arcade,Church,Community Hall 2,500 $5,134 $61.6050 $4,278 $51.3375 $3,423 $41.0700
5,000 $6,674 $41.0850 $5,562 $34.2375 $4,450 $27.3900
10,000 $8,729 $10.2600 $7,274 $8.5500 $5,819 $6.8400
25,000 $10,268 $32.8500 $8,556 $27.3750 $6,845 $21.9000
50,000 $18,480 $36.9600 $15,400 $30.8000 $12,320 $24.6400
A-4 Assembly-Indoor Sport Viewing 500 $2,054 $102.6810 $1,711 $85.5675 $1,369 $68.4540
Arena,Skating Rink,Tennis Court 2,500 $4,107 $49.2840 $3,423 $41.0700 $2,738 $32.8560
5,000 $5,339 $32.8680 $4,450 $27.3900 $3,560 $21.9120
10,000 $6,983 $8.2080 $5,819 $6.8400 $4,655 $5.4720
25,000 $8,214 $26.2800 $6,845 $21.9000 $5,476 $17.5200
50,000 $14,784 $29.5680 $12,320 $24.6400 $9,856 $19.7120
A-5 Assembly-Outdoor Activities 1,000 $1,198 $29.9588 $998 $24.9656 $799 $19.9725
Amusement Park,Bleacher,Stadium 5,000 $2,396 $14.3550 $1,997 $11.9625 $1,598 $9.5700
10,000 $3,114 $9.6000 $2,595 $8.0000 $2,076 $6.4000
20,000 $4,074 $2.3950 $3,395 $1.9958 $2,716 $1.5967
50,000 $4,793 $7.6650 $3,994 $6.3875 $3,195 $5.1100
100,000 $8,625 $8.6250 $7,188 $7.1875 $5,750 $5.7500
A Commercial Tenant Improvements 150 513 $85.5638 $428 $71.3031 342 $57.0425
750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
B Business-Professional Office 1,000 $2,225 $55.6238 $1,854 $46.3531 $1,483 $37.0825
5,000 $4,450 $26.6850 $3,708 $22.2375 $2,967 $17.7900
10,000 $5,784 $17.7900 $4,820 $14.8250 $3,856 $11.8600
20,000 $7,563 $4.4650 $6,303 $3.7208 $5,042 $2.9767
50,000 $8,903 $14.2350 $7,419 $11.8625 $5,935 $9.4900
100,000 $16,020 $16.0200 $13,350 $13.3500 $10,680 $10.6800
B Commercial Tenant Improvements 150 513 $85.5638 $428 $71.3031 342 $57.0425
750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
3
Community Development-Building Division
Construction Plan Check Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IIIA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size. 100 sf* Size 100 sf* Size 100 sf*
E Educational-Group Occupancy 1,000 $4,022 $100.5488 $3,352 $83.7906 $2,681 $67.0325
6+persons,up to the 12th Grade 5,000 $8,044 $48.2550 $6,703 $40.2125 $5,363 $32.1700
10,000 $10,457 $32.1750 $8,714 $26.8125 $6,971 $21.4500
20,000 $13,674 $8.0450 $11,395 $6.7042 $9,116 $5.3633
50,000 $16,088 $25.7250 $13,406 $21.4375 $10,725 $17.1500
100,000 $28,950 $28.9500 $24,125 $24.1250 $19,300 $19.3000
E Commercial Tenant Improvements 150 513 $85.5638 $428 $71.3031 $342 $57.0425
750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
3,000 _ $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
F-1 Factory Industrial-Moderate Hazard 4,000 $2,047 $4.4430 $1,706 $3.7025 $1,364 $2.9620
20,000 $2,758 $3.5640 $2,298 $2.9700 $1,838 $2.3760
40,000 $3,470 $0.9000 $2,892 $0.7500 $2,314 $0.6000
80,000 $3,830 $1.3280 $3,192 $1.1067 $2,554 $0.8853
200,000 $5,424 $0.6240 $4,520 $0.5200 $3,616 $0.4160
400,000 $6,672 $1.6680 $5,560 $1.3900 $4,448 $1.1120
F-2 Factory Industrial-Low Hazard 3,000 $1,840 $15.3263 $1,533 $12.7719 $1,226 $10.2175
15,000 $3,679 $7.3650 $3,066 $6.1375 $2,453 $4.9100
30,000 $4,784 $4.9050 $3,986 $4.0875 $3,189 $3.2700
60,000 $6,255 $1.2250 $5,213 $1.0208 $4,170 $0.8167
150,000 $7,358 $3.9150 $6,131 $3.2625 $4,905 $2.6100
300,000 $13,230 $4.4100 $11,025 $3.6750 $8,820 $2.9400
F Commercial Tenant Improvements 150 513 $85.5638 $428 $71.3031 $342 $57.0425
750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
H-1 High Hazard Group H-1 1,000 $1,797 $44.9250 $1,498 $37.4375 $1,198 $29.9500
Pose a detonation hazard 5,000 $3,594 $21.5600 $2,995 $17.9667 $2,396 $14.3733
10,000 $4,672 $14.3800 $3,893 $11.9833 $3,115 $9.5867
20,000 $6,110 $3.6000 $5,092 $3.0000 $4,073 $2.4000
50,000 $7,190 $11.5000 $5,992 $9.5833 $4,793 $7.6667
100,000 $12,940 $12.9400 $10,783 $10.7833 $8,627 $8.6267
H-2 High Hazard Group H-2 2,000 $1,814 $22.6680 $1,512 $18.8900 $1,209 $15.1120
Pose a deflagration hazard 10,000 $3,628 $10.8840 $3,023 $9.0700 $2,418 $7.2560
20,000 $4,716 $7.2600 $3,930 $6.0500 $3,144 $4.8400
40,000 $6,168 $1.8200 $5,140 $1.5167 $4,112 $1.2133
100,000 $7,260 $5.7960 $6,050 $4.8300 $4,840 $3.8640
200,000 $13,056 $6.5280 $10,880 $5.4400 $8,704 $4.3520
H-3 High Hazard Group H-3 1,000 $1,733 $43.3238 $1,444 $36.1031 $1,155 $28.8825
Readily support combustion 5,000 $3,466 $20.7750 $2,888 $17.3125 $2,311 $13.8500
10,000 $4,505 $13.8750 $3,754 $11.5625 $3,003 $9.2500
20,000 $5,892 $3.4600 $4,910 $2.8833 $3,928 $2.3067
50,000 $6,930 $11.1000 $5,775 $9.2500 $4,620 $7.4000
100,000 $12,480 $12.4800 $10,400 $10.4000 $8,320 $8.3200
4
Community Development-Building Division
Construction Plan Check Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IIIA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
H-4 High Hazard Group H 4 1,000 $2,156 $53.9100 $1,797 $44.9250 $1,438 $35.9400
Pose health hazards 5,000 $4,313 $25.8720 $3,594 $21.5600 $2,875 $17.2480
10,000 $5,606 $17.2560 $4,672 814.3800 $3,738 $11.5040
20,000 $7,332 $4.3200 $6,110 $3.6000 $4,888 $2.8800
50,000 $8,628 $13.8000 $7,190 $11.5000 $5,752 $9.2000
100,000 $15,528 $15.5280 $12,940 $12.9400 $10,352 $10.3520
H-5 High Hazard Group H-5 1,000 $2,156 $53.9100 $1,797 $44.9250 $1,438 $35.9400
Semiconductor Fabrication,R&D 5,000 $4,313 $25.8720 $3,594 $21.5600 $2,875 $17.2480
10,000 $5,606 $17.2560 $4,672 $14.3800 $3,738 $11.5040
20,000 $7,332 $4.3200 $6,110 $3.6000 $4,888 $2.8800
50,000 $8,628 $13.8000 $7,190 $11.5000 $5,752 $9.2000
100,000 $15,528 $15.5280 $12,940 $12.9400 $10,352 $10.3520
H Commercial Tenant Improvements 150 513 $85.5638 $428 $71.3031 342 $57.0425
750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
1-1 Institutional-7+persons,ambulatory 1,000 $2,841 $71.0280 $2,367 $59.1900 $1,894 $47.3520
5,000 $5,682 $34.0800 $4,735 $28.4000 $3,788 $22.7200
10,000 $7,386 $22.7400 $6,155 $18.9500 $4,924 $15.1600
20,000 $9,660 $5.6800 $8,050 $4.7333 $6,440 $3.7867
50,000 $11,364 $18.1920 $9,470 $15.1600 $7,576 $12.1280
100,000 $20,460 $20.4600 $17,050 $17.0500 $13,640 $13.6400
1-2 Institutional-6+persons,non-ambulatory 1,000 $3,551 $88.7850 $2,959 $73.9875 $2,367 $59.1900
5,000 $7,103 $42.6000 $5,919 $35.5000 $4,735 $28.4000
10,000 $9,233 $28.4250 $7,694 $23.6875 $6,155 $18.9500
20,000 $12,075 $7.1000 $10,063 $5.9167 $8,050 $4.7333
50,000 $14,205 $22.7400 $11,838 $18.9500 $9,470 $15.1600
100,000 $25,575 $25.5750 $21,313 $21.3125 $17,050 $17.0500
1-3 Institutional-6+persons,restrained 1,000 $3,466 $86.6288 $2,888 $72.1906 $2,310 $57.7525
5,000 $6,931 $41.5950 $5,776 $34.6625 $4,621 $27.7300
10,000 $9,011 $27.7350 $7,509 $23.1125 $6,007 $18.4900
20,000 $11,784 $6.9200 $9,820 $5.7667 $7,856 $4.6133
50,000 $13,860 $22.1700 $11,550 $18.4750 $9,240 $14.7800
100,000 $24,945 $24.9450 $20,788 $20.7875 $16,630 $16.6300
1-4 Institutional-6+persons,day care 1,000 $2,610 $65.2538 $2,175 $54.3781 $1,740 $43.5025
5,000 $5,220 $31.3200 $4,350 $26.1000 $3,480 $20.8800
10,000 $6,786 $20.8800 $5,655 $17.4000 $4,524 $13.9200
20,000 $8,874 $5.2200 $7,395 $4.3500 $5,916 $3.4800
50,000 $10,440 $16.7100 $8,700 $13.9250 $6,960 $11.1400
100,000 $18,795 $18.7950 $15,663 $15.6625 $12,530 $12.5300
I Commercial Tenant Improvements 150 513 $85.5638 $428 $71.3031 342 $57.0425
750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
5
Community Development-Building Division
Construction Plan Check Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IIIA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
L Labs(California ONLY) 2,000 $3,149 $39.3570 $2,624 $32.7975 $2,099 $26.2380
10,000 $6,298 $18.8880 $5,248 $15.7400 $4,198 $12.5920
20,000 $8,186 $12.6120 $6,822 $10.5100 $5,458 $8.4080
40,000 $10,709 $3.1520 $8,924 $2.6267 $7,139 $2.1013
100,000 $12,600 $10.0800 $10,500 $8.4000 $8,400 $6.7200
200,000 $22,680 $11.3400 $18,900 $9.4500 $15,120 $7.5600
M Mercantile-Retail or wholesale store 150 856 $142.6088 $713 $118.8406 $570 $95.0725
750 $1,711 $68.4600 $1,426 $57.0500 $1,141 $45.6400
1,500 $2,225 $45.6300 $1,854 $38.0250 $1,483 $30.4200
3,000 $2,909 $11.4000 $2,424 $9.5000 $1,940 $7.6000
7,500 $3,422 $36.5100 $2,852 $30.4250 $2,282 $24.3400
15,000 $6,161 $41.0700 $5,134 $34.2250 $4,107 $27.3800
M Commercial Tenant Improvements 150 513 $85.5638 $428 $71.3031 $342 $57.0425
750 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
1,500 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
3,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
7,500 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
15,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
R-1 Residential-Transient 2,000 $7,628 $19.0650 $6,357 $15.8875 $5,085 $12.7100
Boarding Houses,Hotels,Motels 10,000 $9,153 $15.2700 $7,628 $12.7250 $6,102 $10.1800
20,000 $10,680 $7.6200 $8,900 $6.3500 $7,120 $5.0800
40,000 $12,204 $6.3600 $10,170 $5.3000 $8,136 $4.2400
100,000 $16,020 $6.8700 $13,350 $5.7250 $10,680 $4.5800
200,000 $22,890 $11.4450 $19,075 $9.5375 $15,260 $7.6300
R-2 Residential-Permanent,2+Dwellings 1,500 $7,628 $25.4175 $6,357 $21.1813 $5,085 $16.9450
Apartment,Dormitory,Timeshare 7,500 $9,153 $20.3400 $7,628 $16.9500 $6,102 $13.5600
15,000 $10,679 $10.1700 $8,899 $8.4750 $7,119 $6.7800
30,000 $12,204 $8.4800 $10,170 $7.0667 $8,136 $5.6533
75,000 $16,020 $9.1500 $13,350 $7.6250 $10,680 $6.1000
150,000 $22,883 $15.2550 $19,069 $12.7125 $15,255 $10.1700
R-3 Dwellings-Custom Homes 1,500 $2,225 $44.4825 $1,854 $37.0688 $1,483 $29.6550
2,500 $2,670 $44.5200 $2,225 $37.1000 $1,780 $29.6800
3,500 $3,115 $44.5125 $2,596 $37.0938 $2,077 $29.6750
4,500 $3,560 $55.6125 $2,967 $46.3438 $2,373 $37.0750
6,500 $4,672 $57.2229 $3,894 $47.6857 $3,115 $38.1486
10,000 $6,675 $66.7500 $5,563 $55.6250 $4,450 $44.5000
R-3 Dwellings-Production Phase 1,500 $1,112 $22.2600 $927 $18.5500 $742 $14.8400
of Master Plan(repeats) 2,500 $1,335 $22.2150 $1,113 $18.5125 $890 $14.8100
3,500 $1,557 $22.2825 $1,298 $18.5688 $1,038 $14.8550
4,500 $1,780 $27.8063 $1,483 $23.1719 $1,187 $18.5375
6,500 $2,336 $28.6114 $1,947 $23.8429 $1,557 $19.0743
10,000 $3,338 $33.3750 $2,781 $27.8125 $2,225 $22.2500
6
Community Development-Building Division
Construction Plan Check Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,111A,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
II
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
R-4 Residential-Assisted Living(6-16 persons) 1,500 $4,768 $15.8850 $3,973 $13.2375 $3,178 $10.5900
7,500 $5,721 $12.7050 $4,767 810.5875 $3,814 88.4700
15,000 $6,674 $6.3600 $5,561 $5.3000 $4,449 $4.2400
30,000 $7,628 $5.3000 $6,356 $4.4167 $5,085 $3.5333
75,000 $10,013 $5.7300 $8,344 $4.7750 $6,675 $3.8200
150,000 $14,310 $9.5400 $11,925 $7.9500 $9,540 $6.3600
R R Occupancy Remodel 150 795 $26.4788 $662 $22.0656 $530 $17.6525
750 953 $21.1950 $795 $17.6625 $636 $14.1300
1,500 $1,112 $10.5900 $927 $8.8250 $742 $7.0600
3,000 $1,271 $8.8250 $1,059 $7.3542 $848 $5.8833
7,500 $1,668 $9.5250 $1,390 $7.9375 $1,112 $6.3500
15,000 $2,383 $15.8850 $1,986 $13.2375 $1,589 $10.5900
S-1 Storage-Moderate Hazard,Repair Garage 500 $1,643 $82.1490 $1,369 $68.4575 $1,095 $54.7660
Motor Vehicles(not High Hazard)2,500 $3,286 $39.4200 $2,738 $32.8500 $2,191 $26.2800
5,000 $4,271 $26.2920 $3,560 $21.9100 $2,848 $17.5280
10,000 $5,586 $6.5800 $4,655 $5.4833 $3,724 $4.3867
25,000 $6,573 $21.0360 $5,478 $17.5300 $4,382 $14.0240
50,000 $11,832 $23.6640 $9,860 $19.7200 $7,888 $15.7760
S-2 Storage-Low Hazard,Parking Garages 1,000 $2,464 $61.6140 $2,054 $51.3450 $1,643 $41.0760
Open or Enclosed 5,000 $4,929 $29.5800 $4,108 $24.6500 $3,286 $19.7200
10,000 $6,408 $19.7040 $5,340 $16.4200 $4,272 $13.1360
20,000 $8,378 $4.9320 $6,982 $4.1100 $5,586 $3.2880
50,000 $9,858 $15.7800 $8,215 $13.1500 $6,572 $10.5200
100,000 $17,748 $17.7480 $14,790 $14.7900 $11,832 $11.8320
S S Commercial Tenant Improvements 500 513 $85.5638 $428 $71.3031 $342 $57.0425
2,500 $1,027 $41.0850 $856 $34.2375 $685 $27.3900
5,000 $1,335 $27.3750 $1,112 $22.8125 $890 $18.2500
10,000 $1,746 $6.8350 $1,455 $5.6958 $1,164 $4.5567
25,000 $2,053 $21.9150 $1,711 $18.2625 $1,369 $14.6100
50,000 $3,697 $24.6450 $3,081 $20.5375 $2,465 $16.4300
U Accessory-Private Garage 200 257 $32.0925 $214 $26.7438 $171 $21.3950
1,000 513 $15.4050 $428 $12.8375 $342 $10.2700
2,000 668 $10.2750 $556 $8.5625 $445 $6.8500
4,000 873 $2.5750 $728 $2.1458 $582 $1.7167
10,000 $1,028 $8.2050 $856 $6.8375 $685 $5.4700
20,000 $1,848 $9.2400 $1,540 $7.7000 $1,232 $6.1600
R-3 Residential Room Addition 150 795 $26.4788 $662 $22.0656 $530 $17.6525
750 953 $21.1950 $795 $17.6625 $636 $14.1300
1,500 $1,112 $10.5900 $927 $8.8250 $742 $7.0600
3,000 $1,271 $8.8250 $1,059 $7.3542 $848 $5.8833
7,500 $1,668 $9.5250 $1,390 $7.9375 $1,112 $6.3500
15,000 $2,383 $15.8850 $1,986 $13.2375 $1,589 $10.5900
SHELL BUILDINGS
All Shell Buildings 1,000 685 $17.1150 $571 $14.2625 $456 $11.4100
5,000 $1,369 $8.2080 $1,141 $6.8400 $913 $5.4720
10,000-_ $1,780 $5.4840 $1,483 $4.5700_ $1,186 $3.6560
20,000_ $2,328 $1.3600 $1,940 81.1333 $1,552 $0.9067
50,000 $2,736 $4.3920 $2,280 $3.6600 $1,824 $2.9280
100,000 $4,932 $4.9320 $4,110 84.1100 $3,288 $3.2880
Each additional 100 square feet,or portion thereof,up to the next highest project size threshold.
Developer Impact Fees are available through Building&Safety Services
7
Community Development-Building Division
Construction Inspection Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IBA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
A-1 Assembly-Fixed Seating 500 $2,325 $116.2625 $1,938 $96.8854 $1,550 $77.5083
Theater,Concert Hall 2,500 $4,651 $93.0000 $3,875 $77.5000 $3,100 $62.0000
5,000 $6,976 $139.5100 $5,813 $116.2583 $4,650 $93.0067
10,000 $13,951 $31.0100 $11,626 $25.8417 $9,301 $20.6733
25,000 $18,603 $9.2900 $15,502 $7.7417 $12,402 $6.1933
50,000 $20,925 $41.8500 $17,438 $34.8750 $13,950 $27.9000
A-2 Assembly-Food&Drink 500 $3,488 $174.3938 $2,907 $145.3281 $2,325 $116.2625
Restaurant,Night Club,Bar 2,500 $6,976 $139.5000 $5,813 $116.2500 $4,651 $93.0000
5,000 $10,463 $209.2650 $8,719 $174.3875 $6,976 $139.5100
10,000 $20,927 $46.5150 $17,439 $38.7625 $13,951 $31.0100
25,000 $27,904 $13.9350 $23,253 $11.6125 $18,603 $9.2900
50,000 $31,388 $62.7750 $26,156 $52.3125 $20,925 $41.8500
A-3 Assembly-Worship,Amusement 500 $3,488 $174.3938 $2,907 $145.3281 $2,325 $116.2625
Arcade,Church,Community Hall 2,500 $6,976 $139.5000 $5,813 $116.2500 $4,651 $93.0000
5,000 $10;463 $209.2650 $8,719 $174.3875 $6,976 $139.5100
10,000 $20,927 $46.5150 $17,439 $38.7625 $13,951 $31.0100
25,000 $27,904 $13.9350 $23,253 $11.6125 $18,603 $9.2900
50,000 $31,388 $62.7750 $26,156 $52.3125 $20,925 $41.8500
A-4 Assembly-Indoor Sport Viewing 500 $2,790 $139.5150 $2,325 $116.2625 $1,860 $93.0100
Arena,Skating Rink,Tennis Court 2,500 $5,581 $111.6000 $4,651 $93.0000 $3,720 $74.4000
5,000 $8,371 $167.4120 $6,976 $139.5100 $5,580 $111.6080
10,000 $16,741 $37.2120 $13,951 $31.0100 $11,161 $24.8080
25,000 $22,323 $11.1480 $18,603 $9.2900 $14,882 $7.4320
50,000 $25,110 $50.2200 $20,925 $41.8500 $16,740 $33.4800
A-5 Assembly-Outdoor Activities 1,000 $2,093 $52.3275 $1,744 $43.6063 $1,395 $34.8850
Amusement Park,Bleacher,Stadium 5,000 $4,186 $41.8350 $3,488 $34.8625 $2,791 $27.8900
10,000 $6,278 $62.7750 $5,231 $52.3125 $4,185 $41.8500
20,000 $12,555 $13.9500 $10,463 $11.6250 $8,370 $9.3000
50,000 $16,740 $4.2000 $13,950 $3.5000 $11,160 $2.8000
100,000 $18,840 $18.8400 $15,700 $15.7000 $12,560 $12.5600
A Commercial Tenant Improvements 150 419 $69.7613 $349 $58.1344 $279 $46.5075
750 837 $55.8150 $698 $46.5125 $558 $37.2100
1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
B Business-Professional Office 1,000 $5,232 $130.7850 $4,360 $108.9875 $3,488 $87.1900
5,000 $10,463 $104.6550 $8,719 $87.2125 $6,976 $69.7700
10,000 $15,696 $156.9600 $13,080 $130.8000 $10,464 $104.6400
20,000 $31,392 $34.8850 $26,160 $29.0708 $20,928 $23.2567
50,000 $41,858 $10.4550 $34,881 $8.7125 $27,905 $6.9700
100,000 $47,085 $47.0850 $39,238 $39.2375 $31,390 $31.3900
B Commercial Tenant Improvements 150 419 $69.7613 $349 $58.1344 $279 $46.5075
750 837 $55.8150 $698 $46.5125 $558 $37.2100
1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
8
Community Development-Building Division
Construction Inspection Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IIIA,I11B,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
E Educational-Group Occupancy 1,000 $3,488 $87.1988 $2,907 $72.6656 $2,325 $58.1325
6+persons,up to the 12th Grade 5,000 $6,976 $69.7650 $5,813 $58.1375 $4,651 $46.5100
10,000 $10,464 $104.6400 $8,720 $87.2000 $6,976 $69.7600
20,000 $20,928 $23.2400 $17,440 $19.3667 $13,952 $15.4933
50,000 $27,900 $6.9900 $23,250 $5.8250 $18,600 $4.6600
100,000 $31,395 $31.3950 $26,163 $26.1625 $20,930 $20.9300
E Commercial Tenant Improvements 150 419 $69.7613 $349 $58.1344 $279 $46.5075
750 837 $55.8150 $698 $46.5125 $558 $37.2100
1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
F-1 Factory Industrial-Moderate Hazard 4,000 $1,783 $2.7750 $1,486 $2.3125 $1,189 $1.8500
20,000 $2,227 $3.0960 $1,856 $2.5800 $1,485 $2.0640
40,000 $2,846 $1.5960 $2,372 $1.3300 $1,898 $1.0640
80,000 $3,485 $0.7560 $2,904 $0.6300 $2,323 $0.5040
200,000 $4,392 $0.7800 $3,660 $0.6500 $2,928 $0.5200
400,000 $5,952 $1.4880 $4,960 $1.2400 $3,968 $0.9920
F-2 Factory Industrial-Low Hazard 3,000 895 $7.4663 $746 $6.2219 $597 $4.9775
15,000 $1,791 $5.9700 $1,493 $4.9750 $1,194 $3.9800
30,000 $2,687 $8.9550 $2,239 $7.4625 $1,791 $5.9700
60,000 $5,373 $1.9800 $4,478 $1.6500 $3,582 $1.3200
150,000 $7,155 $0.6000 $5,963 $0.5000 $4,770 $0.4000
300,000 $8,055 $2.6850 $6,713 $2.2375 $5,370 $1.7900
F Commercial Tenant Improvements 150 419 $69.7613 $349 $58.1344 $279 $46.5075
750 837 $55.8150 $698 $46.5125 $558 $37.2100
1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
H-1 High Hazard Group H-1 1,000 586 $14.6375 $488 $12.1979 $390 $9.7583
Pose a detonation hazard 5,000 $1,171 $11.7000 $976 $9.7500 $781 $7.8000
10,000 $1,756 $17.5600 $1,463 $14.6333 $1,171 $11.7067
20,000 $3,512 $3.9100 $2,927 $3.2583 $2,341 $2.6067
50,000 $4,685 $1.1700 $3,904 $0.9750 $3,123 $0.7800
100,000 $5,270 $5.2700 $4,392 $4.3917 $3,513 $3.5133
H-2 High Hazard Group H-2 2,000 702 $8.7840 $585 $7.3200 $468 $5.8560
Pose a deflagration hazard 10,000 $1,405 $7.0200 $1,171 $5.8500 $937 $4.6800
20,000 $2,107 $10.5360 $1,756 $8.7800 $1,405 $7.0240
40,000 $4,214 $2.3360 $3,512 $1.9467 $2,810 $1.5573
100,000 $5,616 $0.6960 $4,680 $0.5800 $3,744 $0.4640
200,000 $6,312 $3.1560 $5,260 $2.6300 $4,208 $2.1040
H-3 High Hazard Group H-3 1,000 878 $21.9563 $732 $18.2969 $586 $14.6375
Readily support combustion 5,000 $1,757 $17.5500 $1,464 $14.6250 $1,171 $11.7000
10,000 $2,634 $26.3400 $2,195 $21.9500 $1,756 $17.5600
20,000 $5,268 $5.8650 $4,390 84.8875 $3,512 $3.9100
50,000 $7,028 81.7550 $5,856 $1.4625 $4,685 $1.1700
100,000 $7,905 $7.9050 $6,588 $6.5875 $5,270 $5.2700
9
Community Development-Building Division
Construction Inspection Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IIIA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
H-4 High Hazard Group H-4 1,000 703 $17.5650 $586 $14.6375 $468 $11.7100
Pose health hazards 5,000 $1,405 $14.0400 $1,171 $11.7000 $937 $9.3600 •
10,000 $2,107 $21.0720 $1,756 $17.5600 $1,405 $14.0480
20,000 $4,214 $4.6920 $3,512 $3.9100 $2,810 $3.1280
50,000 $5,622 $1.4040 $4,685 $1.1700 $3,748 $0.9360
100,000 $6,324 $6.3240 $5,270 $5.2700 $4,216 $4.2160
H-5 High Hazard Group H-5 1,000 703 $17.5650 $586 $14.6375 $468 $11.7100
Semiconductor Fabrication,R&D 5,000 $1,405 $14.0400 $1,171 $11.7000 $937 $9.3600
10,000 $2,107 $21.0720 $1,756 $17.5600 $1,405 $14.0480
20,000 $4,214 $4.6920 $3,512 $3.9100 $2,810 $3.1280
50,000 $5,622 $1.4040 $4,685 $1.1700 $3,748 $0.9360
100,000 $6,324_ $6.3240 $5,270 $5.2700 $4,216 $4.2160
H Commercial Tenant Improvements 150 419 $69.7613 $349 $58.1344 $279 $46.5075
750 837 $55.8150 $698 $46.5125 $558 $37.2100
1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
1-1 Institutional-7+persons,ambulatory 1,000 879 $21.9750 $733 $18.3125 $586 $14.6500
5,000 $1,758 $17.5680 $1,465 $14.6400 $1,172 $11.7120
10,000 $2,636 $26.3640 $2,197 $21.9700 $1,758 $17.5760
20,000 $5,273 $5.8640 $4,394 $4.8867 $3,515 $3.9093
50,000 $7,032 $1.7520 $5,860 $1.4600 $4,688 $1.1680
100,000 $7,908 $7.9080 $6,590 $6.5900 $5,272 $5.2720
1-2 Institutional-6+persons,non-ambulatory 1,000 $1,099 $27.4688 $916 $22.8906 $733 $18.3125
5,000 $2,198 $21.9600 $1,831 $18.3000 $1,465 $14.6400
10,000 $3,296 $32.9550 $2,746 $27.4625 $2,197 $21.9700
20,000 $6,591 $7.3300 $5,493 $6.1083 $4,394 $4.8867
50,000 $8,790 $2.1900 $7,325 $1.8250 $5,860 $1.4600
100,000 $9,885 $9.8850 $8,238 $8.2375 $6,590 $6.5900
1-3 Institutional-6+persons,restrained 1,000 $1,099 $27.4688 $916 $22.8906 $733 $18.3125
5,000 $2,198 $21.9600 $1,831 $18.3000 $1,465 $14.6400
10,000 $3,296 $32.9550 $2,746 $27.4625 $2,197 $21.9700
20,000 $6,591 $7.3300 $5,493 $6.1083 $4,394 $4.8867
50,000 $8,790 $2.1900 $7,325 $1.8250 $5,860 $1.4600
100,000 $9,885 $9.8850 $8,238 $8.2375 $6,590 $6.5900
1-4 Institutional-6+persons,day care 1,000 $1,099 $27.4688 $916 $22.8906 $733 $18.3125
5,000 $2,198 $21.9600 $1,831 $18.3000 $1,465 $14.6400
10,000 $3,296 $32.9550 $2,746 $27.4625 $2,197 $21.9700
20,000 $6,591 $7.3300 $5,493 $6.1083 $4,394 $4.8867
50,000 $8,790 $2.1900 $7,325 $1.8250 $5,860 $1.4600
100,000 $9,885 $9.8850 $8,238 $8.2375 $6,590 $6.5900
I Commercial Tenant Improvements 150 419 $69.7613 $349 $58.1344 $279 $46.5075
750 837 $55.8150 $698 $46.5125 $558 $37.2100
1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
10
Community Development-Building Division
Construction Inspection Fees
Construction Type Construction Type Construction Type
IA,IB IIA,IIB,IIIA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
L Labs(California ONLY) 2,000 $5,580 $69.7590 $4,650 $58.1325 $3,720 $46.5060
10,000 $11,161 $55.8120 $9,301 846.5100 $7,441 837.2080
20,000 $16,742 $83.7120 $13,952 $69.7600 $11,162 $55.8080
40,000 $33,485 $18.5920 $27,904 $15.4933 $22,323 $12.3947
100,000 $44,640 $5.5920 $37,200 $4.6600 $29,760 $3.7280
200,000 $50,232 $25.1160 $41,860 $20.9300 $33,488 $16.7440
M Mercantile-Retail or wholesale store 150 $1,395 $232.5300 $1,163 $193.7750 $930 $155.0200
750 $2,790 $186.0150 $2,325 $155.0125_ $1,860 $124.0100
1,500 $4,185 $279.0300 $3,488 $232.5250 $2,790 $186.0200
3,000 $8,371 $62.0050 $6,976 $51.6708 $5,581 $41.3367
7,500 $11,161 $18.6150 $9,301 $15.5125 $7,441 $12.4100
15,000 $12,557 $83.7150 $10,464 $69.7625 $8,372 $55.8100
M Commercial Tenant Improvements 150 419 $69.7613 $349 $58.1344 $279 $46.5075
750 837 $55.8150 $698 $46.5125 $558 _ $37.2100
1,500 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
3,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
7,500 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
15,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
R-1 Residential-Transient 2,000 $13,952 $34.8750 $11,626 $29.0625 $9,301 $23.2500
Boarding Houses,Hotels,Motels 10,000 $16,742 $41.8650 $13,951 $34.8875 $11,161 $27.9100
20,000 $20,928 $20.9100 $17,440 $17.4250 $13,952 $13.9400
40,000 $25,110 $9.3000 $20,925 $7.7500 $16,740 $6.2000
100,000 $30,690 $11.1600 $25,575 $9.3000 $20,460 $7.4400
200,000 $41,850 $20.9250 $34,875 $17.4375 $27,900 $13.9500
R-2 Residential-Permanent,2+Dwellings 1,500 $13,952 $46.5113 $11,626 $38.7594 _ $9,301 $31.0075
Apartment,Dormitory,Timeshare 7,500 $16,742 $55.8000 $13,952 $46.5000 $11,162 $37.2000
15,000 $20,927 $27.9150 $17,439 $23.2625 $13,952 $18.6100
30,000 $25,115 $12.3900 $20,929 $10.3250 $16,743 $8.2600
75,000 $30,690 $14.8800 $25,575 $12.4000 $20,460 $9.9200
150,000 $41,850 $27.9000 $34,875 $23.2500 $27,900 $18.6000
R-3 Dwellings-Custom Homes 1,500 $2,093 $41.8650 $1,744 $34.8875 $1,395 $27.9100
2,500 $2,511 $62.7600 $2,093 $52.3000 $1,674 $41.8400
3,500 $3,139 $62.8200 $2,616 $52.3500 $2,093 $41.8800
4,500 $3,767 $41.8388 $3,139 $34.8656 $2,511 $27.8925
6,500 $4,604 $47.8157 $3,837 $39.8464 $3,069 $31.8771
10,000 $6,278 $62.7750 $5,231 $52.3125 $4,185 $41.8500
R-3 Dwellings-Production Phase 1,500 $2,093 $41.8650 $1,744 $34.8875 $1,395 $27.9100
of Master Plan(repeats) 2,500 $2,511 $62.7600 $2,093 $52.3000 $1,674 $41.8400
3,500 $3,139 $62.8200 $2,616 $52.3500 $2,093 $41.8800
4,500 $3,767 $41.8388 $3,139 $34.8656 $2,511 $27.8925
6,500 $4,604 $47.8157 $3,837 $39.8464 _$3,069 $31.8771
10,000 $6,278 $62.7750 $5,231 $52.3125 $4,185 $41.8500
11
Community Development-Building Division
Construction Inspection Fees
Construction Type Construction Type Construction Type
IA,IB IIA,JIB,IIIA,IIIB,IV VA,VB
Base Cost Cost for Base Cost Cost for Base Cost Cost for
Project @ Each @ Each @ Each
IBC Size Threshold Additional Threshold Additional Threshold Additional
Class IBC Occupancy Type Threshold Size 100 sf* Size 100 sf* Size 100 sf*
R-4 Residential-Assisted Living(6-16 persons) 1,500 $13,952 $46.5113 $11,626 $38.7594 $9,301 $31.0075
7,500 $16,742 $55.8000 $13,952 $46.5000 $11,162 $37.2000
15,000 $20,927 $27.9150 $17,439 $23.2625 $13,952 $18.6100
30,000 $25,115 $12.3900 $20,929 $10.3250 $16,743 $8.2600
75,000 $30,690 $14.8800 $25,575 $12.4000 $20,460 $9.9200
150,000 $41,850 $27.9000 $34,875 $23.2500 $27,900 $18.6000
R R Occupancy Remodel 150 $1,395 $46.5113 $1,163 $38.7594 $930 $31.0075
750 $1,674 $55.8000 $1,395 $46.5000 $1,116 $37.2000
1,500 $2,093 $27.9150 $1,744 $23.2625 $1,395 $18.6100
3,000 $2,511 $12.3900 $2,093 $10.3250 $1,674 $8.2600
7,500 $3,069 $14.8800 $2,558 $12.4000 $2,046 $9.9200
15,000 $4,185 $27.9000 $3,488 $23.2500 $2,790 $18.6000
S-1 Storage-Moderate Hazard,Repair Garage 500 $1,395 $69.7590 $1,163 $58.1325 $930 $46.5060
Motor Vehicles(not High Hazard) 2,500 $2,790 $55.8120 $2,325 $46.5100 $1,860 $37.2080
5,000 $4,186 $83.7120 $3,488 $69.7600 $2,790 $55.8080
10,000 $8,371 $18.5920 $6,976 $15.4933 $5,581 $12.3947
25,000 $11,160 $5.5920 $9,300 $4.6600 $7,440 $3.7280
50,000 $12,558 $25.1160 $10,465 $20.9300 $8,372 $16.7440
S-2 Storage-Low Hazard,Parking Garages 1,000 $6,697 $167.4120 $5,581 $139.5100 $4,464 $111.6080
Open or Enclosed 5,000 $13,393 $133.9440 $11,161 $111.6200 $8,929 $89.2960
10,000 $20,090 $200.9040 $16,742 $167.4200 $13,394 $133.9360
20,000 $40,181 $44.6440 $33,484 $37.2033 $26,787 $29.7627
50,000 $53,574 $13.4040 $44,645 $11.1700 $35,716 $8.9360
100,000 $60,276 $60.2760 $50,230 $50.2300 $40,184 $40.1840
S S Commercial Tenant Improvements 500 419 $69.7613 $349 $58.1344 $279 $46.5075
2,500 837 $55.8150 $698 $46.5125 $558 $37.2100
5,000 $1,256 $83.7150 $1,046 $69.7625 $837 $55.8100
10,000 $2,511 $18.5900 $2,093 $15.4917 $1,674 $12.3933
25,000 $3,348 $5.5800 $2,790 $4.6500 $2,232 $3.7200
50,000 $3,767 $25.1100 $3,139 $20.9250 $2,511 $16.7400
U Accessory-Private Garage 200 767 $95.8350 $639 $79.8625 $511 $63.8900
1,000 $1,533 $76.6500 $1,278 $63.8750 $1,022 $51.1000
2,000 $2,300 $114.9900 $1,917 $95.8250 $1,533 $76.6600
4,000 $4,600 $25.5650 $3,833 $21.3042 $3,066 $17.0433
10,000 $6,134 $7.6650 $5,111 $6.3875 $4,089 $5.1100
20,000 $6,900 $34.5000 $5,750 $28.7500 $4,600 $23.0000
R-3 Residential Room Addition 150 837 $27.9038 $698 $23.2531 558 $18.6025
750 $1,005 $33.4950 $837 $27.9125 $670 $22.3300
1,500 $1,256 $16.7250 $1,046 $13.9375 $837 $11.1500
3,000 $1,507 $7.4450 $1,256 $6.2042 $1,004 $4.9633
7,500 $1,842 $8.9250 $1,535 $7.4375 $1,228 $5.9500
15,000 $2,511 $16.7400 $2,093 $13.9500 $1,674 $11.1600
SHELL BUILDINGS
All Shell Buildings 1,000 837 $20.9220 $698 $17.4350 $558 $13.9480
5,000 $1,674 $16.7520 $1,395 $13.9600 $1,116 $11.1680
10,000 $2,512 $25.1160 $2,093 $20.9300 $1,674 $16.7440
20,000 $5,023 85.5760 $4,186 $4.6467 $3,349 83.7173
50,000 $6,696 81.6800 $5,580 81.4000 $4,464 $1.1200
100,000 $7,536 $7.5360 $6,280 $6.2800 $5,024 $5.0240
Each additional 100 square feet,or portion thereof,up to the next highest project size threshold.
Developer Impact Fees are available through Building&Safety Services
12
COMMUNITY DEVELOPMENT-BUILDING DIVISION-MECHANICAL,ELECTRICAL,PLUMBING
FEE/CHARGE RATE UNIT NOTES
1 Inspection outside of normal business hours 137.00 per hour 3 hour minimum
2 Inspection/Re-inspection fees during business hours 137.00 per hour 1 hour minimum
3 Inspection for which no fee is indicated 137.00 per hour 1 hour minimum
4 Plan review for changes,additions,and revisions to plan 143.00 per hour 1 hour minimum
5 Change of Occupancy,requiring new and temporary C.of 0. 152.00 per hour 1 hour minimum
6 Security Plan Check 143.00 per hour 2 hour minimum
7 Alternate Materials or Methods Request 152.00 per hour 1/2 hour minimum
8 Records Research 64.00 each 1/2 hour minimum
9 Waste Management Plan 148.00 each
10 ELECTRICAL:
11 Service or Panel:
12 Up to 1,000 amp 137.00 each
13 1,000+amps 243.00 each
up to 10 at regular price,then
14 Outlets-per item 14.00 per item every 5
up to 10 at regular price,then
15 Lights-per item 14.00 per item every 5
up to 10 at regular price,then
16 Switches-per item 14.00 per item every 5
17 New Construction 69.00 per inspection plus$0.05 per sq.ft.
18 Power Equipment:
up to 10 at regular price,then
19 Up to 1 HP or to lkva 69.00 each every 5
up to 10 at regular price,then
20 Over 1 HP 137.00 each every5
21 Sign&Circuit(electrical portion only) 137.00 each
22 Temporary Power-(main pole of equipment) 69.00
23 Temporary Power-distance poles 69.00 per pole
24 Busways 137.00 each
25 Private street Light 137.00 each
26 Issuance Fee 64.00 each
27 Plan Review-1/2 hr min 72.00 each 1/2 hour minimum
28 Inspection of Solar Panel System-1/2 hr min. 69.00 each 1/2 hour minimum
29 Inspection of items not listed-1/2 hr min 69.00 each 1/2 hour minimum
30 Re-inspection fee-1/2 hr min 69.00 each 1/2 hour minimum
EV Charger 69.00 each
31 PLUMBING:
up to 10 at regular price,then
32 Water Closet 69.00 each every 5
up to 10 at regular price,then
33 Urinal 69.00 each every5
up to 10 at regular price,then
34 Bathtub(including shower head)69.00 each every5
up to 10 at regular price,then
35 Shower Stall 69.00 each every 5
13
COMMUNITY DEVELOPMENT-BUILDING DIVISION-MECHANICAL,ELECTRICAL,PLUMBING
FEE/CHARGE RATE UNIT NOTES
up to 10 at regular price,then
36 Kitchen Sink 69.00 each every 5
up to 10 at regular price,then
37 Dishwasher 69.00 each every 5
up to 10 at regular price,then
38 Garbage Disposal 69.00 each every 5
up to 10 at regular price,then
39 Clothes Washer 69.00 each every5
up to 10 at regular price,then
40 Water Heater 69.00 each every5
41 Sewer(new,add,alter,repair) 69.00 each
up to 10 at regular price,then
42 Water Softener 69.00 each every 5
up to 10 at regular price,then
43 Clothes Dryer 69.00 each every 5
up to 10 at regular price,then
44 Gas Piping 27.00 per outlet every 5
up to 10 at regular price,then
45 Miscellaneous Fixtures 69.00 each every 5
46 Industrial Waste Receptors 69.00 each
up to 10 at regular price,then
47 Drainage Piping(alter,repair) 69.00 each every 5
up to 10 at regular price,then
48 Drinking Fountain 69.00 each every 5
49 Roof Drainage System 69.00 each
50 Cesspool 69.00 each
51 Septic Tank 140.00 each 1/2 hour minimum
52 Backflow Devices-per device 69.00 each 1/2 hour minimum
53 Solar Systems(plumbing portion) 140.00 each 1/2 hour minimum
54 Issuance Fee 64.00 each 1/2 hour minimum
55 Plan Review 72.00 per hour 1/2 hour minimum
56 Inspection of Solar Panel System 69.00 per hour 1/2 hour minimum
57 Inspection of items not listed 69.00 per hour 1/2 hour minimum
58 Re-inspection fee 69.00 per hour 1/2 hour minimum
59 MECHANICAL:
60 Heater-less than 100,000 BTU 137.00 each
61 Heater-greater than 100,000 BTU 206.00 each
62 Air Conditioner:
63 0-100,000 BTU 137.00 each
64 100,000-1,000,000 BTU 206.00 each
65 1,000,000+BTU 274.00 each
66 Air Handler-10,000 CFM or less 137.00 each
67 Air Handler-over 10,000 CFM 206.00 each
68 Evaporative Cooler 103.00 each
69 Fan Coil 69.00 each
up to 10 at regular price,then
70 Ventilation Fan 69.00 each every 5
14
COMMUNITY DEVELOPMENT-BUILDING DIVISION-MECHANICAL,ELECTRICAL,PLUMBING
FEE/CHARGE RATE UNIT NOTES
71 Grease Hoods 274.00 each
72 Mechanical Firebox(metal Fireplace) 137.00 each
Mini Split System 197.00 each includes electrical/multi-zones
up to 10 at regular price,then
73 Registers(inlet or outlet)14.00 each every 5
74 Issuance Fee 64.00 each
75 Plan Review-1/2 hr min 72.00 per hour 1/2 hour minimum
76 Inspection of Solar Panel System-1/2 hr min. 69.00 per hour 1/2 hour minimum
77 Inspection of Items not listed-1/2 hr min 69.00 per hour 1/2 hour minimum
78 Re-inspection fee-1/2 hr min 69.00 per hour 1/2 hour minimum
79 Pool/Spa Equipment 274.00 each
80 Technology Fee-%of Valuation 0.13% %of valuation
81 Technology Fee-MEP Permits 5.00 each
Developer Impact Fees are available through Building&Safety Services
I
15
COMMUNITY DEVELOPMENT-BUILDING DIVISION-MISCELLANEOUS FEES
FEE/CHARGE RATE UNIT NOTES
1 Antenna-Telecom Facility
2 Cellular/Mobile Phone,free-standing 345.00 each every 10
3 Cellular/Mobile Phone,attached to building 345.00 each every 10
4 Arbor/Trellis 415.00 each
5 Chimney Repair 219.00 each
6 Demolition(each 3,000 sf)
7 Commercial 546.00 each
8 Residential 484.00 each
9 Disabled Access Compliance Inspection 349.00 each
10 Door
11 New door(non structural) 238.00 each
12 New door(structural shear wall/masonry) 238.00 each
13 Fence
14 Over 6 ft.in height 238.00 each
15 Each addl 100 If 23.00 each
16 Fireplace
17 Masonry 405.00 each
18 Pre-Fabricated/Metal 301.00 each
19 Flag pole(over 20 feet in height) 301.00 each
20 Foundation Repair 417.00 each
21 Garage(detached)
22 Wood frame up to 1,000 sf 528.00 each
23 Masonry up to 1,000 sf 632.00 each
24 Modular Structures
25 Partition-Commercial,Interior(up to 30 If) 141.00 each
26 Additional partition 53.00 each
27 Partition-Residential,Interior(up to 30 If) 141.00 each
28 Additional partition 53.00 each
29 Patio Cover 415.00 each
30 Photovoltaic System
31 Residential 383.00 each
32 Commercial,up to 10 kilowatts 664.00 each
33 Commercial,each additional 1 kilowatt 71.00 each
34 Pile Foundation
35 Cast in Place Concrete(first 10 piles) 706.00 each
36 Additional Piles(increments of 10) 706.00 each
37 Driven(steel,pre-stressed concrete) 706.00 each
38 Additional Piles(increments of 10) 706.00 each
39 Product Review 143.00 each
40 Re-roof
41 Residential 206.00 each
42 Multi-Family Dwelling 453.00 each
43 Commercial 453.00 each
44 Commercial Addition 453.00 each
45 Retaining Wall(concrete or masonry)
46 Up to 3'high/50 If 471.00 each
16
COMMUNITY DEVELOPMENT-BUILDING DIVISION-MISCELLANEOUS FEES
FEE/CHARGE RATE UNIT NOTES
each additional 50 If or portion
47 Additional retaining wall 71.00 each thereof
48 Over 3-10'high/50 If 511.00 each
each additional 50 If or portion
49 Additional retaining wall 71.00 each thereof
50 Over 10'high/50 If 530.00 each
each additional 50 If or portion
51 Additional retaining wall 71.00 each thereof
52 Gravity/Crib Wall,0-10'high(up to 50 If) 242.00 each
each additional 50 If or portion
53 Additional Gravity/Crib Wall 73.00 each thereof
54 Gravity/Crib Wall,over 10'high(up to 50 If) 383.00 each
each additional 50 If or portion
55 Additional Gravity/Crib Wall 73.00 each thereof
56 Roof Structure Replacement 264.00 each
57 Additional roof structure replacement 53.00 each
58 Sauna-steam 211.00 each
59 Siding
60 Stone and Brick Veneer(interior or exterior) 207.00 each
61 All Other 207.00 each
62 Additional siding 70.00 each
63 Signs
64 Directional 297.00 each every 5
65 Ground/Roof/Projecting Signs 237.00 each every 5
66 Rework of any existing Ground Sign 203.00 each every 5
67 Other Sign 273.00 each every 5
68 Wall/Awning Sign,Non-Electric 273.00 each every 5
69 Wall,Electric 273.00 each
70 Skylight
71 Less than 10 sf 273.00 each
72 Greater than 10 sf or structural 176.00 each
73 Stairs-First Flight 211.00 each
74 Each additional flight 59.00 each
75 Storage Racks
76 0-8'high(up to 100 If) 141.00 each
77 each additional 100 If 71.00 each
78 over 8'high(up to 100 If) 211.00 each
79 each additional 100 If 71.00 each
80 Supplemental Plan Check Fee(after 3rd review)143.00 each
81 Supplemental Inspection Fee 140.00 each
82 Swimming Pool/Spa
83 Vinyl lined(up to 800 sf) 449.00 each
84 Fiberglass 695.00 each
85 Gunite(up to 800 sf) 695.00 each
86 Additional pool(over 800 sf) 283.00 each
87 Commercial pool(up to 800 sf)767.00 each
88 Commercial pool(over 800 sf) 705.00 each
17
COMMUNITY DEVELOPMENT-BUILDING DIVISION-MISCELLANEOUS FEES
FEE/CHARGE RATE UNIT NOTES
89 Spa or Hot Tub(Pre-fabricated)283.00 each
90 Window or Sliding Glass Door
91 Replacement 168.00 each
92 New Window(non structural) 203.00 each
93 New window(structural shear wall/masonry) 415.00 each
94 Bay Window(structural) 415.00 each
Developer Impact Fees are available through Building&Safety Services
18
COMMUNITY SERVICES
FEE/CHARGE RATE UNIT NOTES
1 FILMING FEES:
2 Application Fees 40.00 each
3 Citywide(Excludes Plaza District) 208.00 each
4 Plaza District Motion 444.00 each
5 Plaza District Still 208.00 each
6 Parks 218.00 each
7 Preparation and Strike Days 50% daily use rate
Additional Staff Time Charged Hourly in Excess of
8 Two Hours actual cost
9 Police Officer actual cost
10 COMMUNITY SERVICES FEES:
11 Aquatic Programs:
12 Recreational/Lap Swim 3.00 each
13 Recreation/Lap Swim Pass 30.00 each 15 sessions
14 Group lessons 45.00 per participant 9 lessons
15 Swim lessons,private 30.00 each
per participant
16 Parent and Me 22.00 and parent 4 sessions
17 Mini Lesson 22.00 per participant 5 sessions
18 Aqua Aerobics Class 34.00 each
19 Family Pool Event 7.00 each
20 Life Guard Training Class 169.00 each
21 Water Safety Instructor Class actual cost each
22 City Special Events-3rd of July
23 3rd of July Celebration,general public pre-sale 7.00 each
24 3rd of July Celebration,general public day of event 7.00 each
25 3rd of July Celebration,non-profit pre-sale 4.50 each
26 3rd of July Celebration,children under 2 0.00 each
27 Day Camp-Resident 105.00 each
28 Day Camp-Non-Resident 125.00 each
29 Basketball League 246.00 per season
30 Basketball League-Deposit 150.00 deposit
31 Open Gym 2.00 per session
32 Party Equipment Permit Fee 30.00 per permit
33 Moon Bounce Permit 30.00 each
34 Special Event Permit 60.00 each
35 Refund Processing Fee 10.00 each
36 Booth Participation Fee-Third of July 100.00 each
Booth Participation Fee-Tree Lighting and Treats in the
37 Streets 25.00 each
38 Landscape&Irrigation Permit&Plan Check
39 Projects 20,000 SF or less 154.00 each
40 Projects 20,000-70,000 SF 463.00 each
41 Projects 70,000 SF and above 771.00 each
42 FACILITY RENTALS
43 Pool Rentals
44 Groups 1-100 People
45 Deposit 150.00 deposit
19
COMMUNITY SERVICES
FEE/CHARGE RATE UNIT NOTES
46 Non-Orange Based Business 435.00 per hour
47 Orange Based Business 375.00 per hour
48 Non-Resident,Non-Resident Non-Profit 185.00 per hour
49 Resident,Resident Non-Profit 165.00 per hour
50 Groups 101-200 People
51 Deposit 225.00 deposit
52 Non-Orange Based Business 765.00 per hour
53 Orange Based Business 705.00 per hour
54 Non-Resident,Non-Resident Non-Profit 255.00 per hour
55 Resident,Resident Non-Profit 235.00 per hour
56 Green/Open Space Fee:
57 Groups 1-50 People
58 Deposit 50.00 deposit
59 Non-Orange Based Business 120.00 per hour
60 Orange Based Business 90.00 per hour
61 Non-Resident,Non-Resident Non-Profit 40.00 per use
62 Resident,Resident Non-Profit 30.00 per use
63 Groups 51-100 People
64 Deposit 75.00 deposit
65 Non-Orange Based Business 150.00 per hour
66 Orange Based Business 120.00 per hour
67 Non-Resident,Non-Resident Non-Profit 50.00 per use
68 Resident,Resident Non-Profit 40.00 per use
69 Groups 101-200 People
70 Deposit 150.00 deposit
71 Non-Orange Based Business 225.00 per hour
72 Orange Based Business 195.00 per hour
73 Non-Resident,Non-Resident Non-Profit 75.00 per use
74 Resident,Resident Non-Profit 65.00 per use
75 Groups 201-300 People
76 Deposit 250.00 deposit
77 Non-Orange Based Business 330.00 per hour
78 Orange Based Business 300.00 per hour
79 Non-Resident,Non-Resident Non-Profit 110.00 per use
80 Resident,Resident Non-Profit 100.00 per use
81 Groups 301-400 People
82 Deposit 350.00 deposit
83 Non-Orange Based Business 435.00 per hour
84 Orange Based Business 405.00 per hour
85 Non-Resident,Non-Resident Non-Profit 145.00 per use
86 Resident,Resident Non-Profit 135.00 per use
87 Groups 401-500 People
88 Deposit 450.00 deposit
89 Non-Orange Based Business 540.00 per hour
90 Orange Based Business 510.00 per hour
91 Non-Resident,Non-Resident Non-Profit 180.00 per use
92 Resident,Resident Non-Profit 170.00 per use
93 Groups 501 or More People
20
COMMUNITY SERVICES
FEE/CHARGE RATE UNIT NOTES
94 Deposit 500.00 deposit
95 Non-Orange Based Business 645.00 per hour
96 Orange Based Business 615.00 per hour
97 Non Resident,Non Resident Non Profit 215.00 per use
98 Resident,Resident Non-Profit 205.00 per use
99 Band Shells
100 Deposit 50.00 deposit
101 Non-Resident 55.00 per hour
102 Resident 35.00 per hour
103 Orange-Based Business 70.00 per hour
104 Non Orange-Based Business 110.00 per hour
105 Community Garden
106 Deposit 100.00 deposit
107 Non-Resident,Non-Resident Non-Profit 100.00 per year
108 Resident,Resident Non-Profit 75.00 per year
Facilities-Handy,Hart, El Camino,Ambriz,Killefer,and
109 Grijalva Building A
110 Deposit 75.00 deposit
111 Non-Orange Based Business 150.00 per hour
112 Orange Based Business 90.00 per hour
113 Non-Resident,Non-Resident Non-Profit 50.00 per hour
114 Resident,Resident Non-Profit 30.00 per hour
Approved City of Orange Youth Sports Non-Profit
115 Organizations(monitored monthly use) 0.00 each
116 Facilities-Olive&Shaffer
117 Deposit 75.00 deposit
118 Facility Kitchen Cleaning actual cost
119 Non-Orange Based Business 180.00 per hour
120 Orange Based Business 120.00 per hour
121 Non-Resident,Non-Resident Non-Profit 60.00 per hour
122 Resident,Resident Non-Profit 40.00 per hour
123 Picnic Areas:
124 Groups 1-50 People
125 Deposit 50.00 deposit
126 Non-Orange Based Business 240.00 first 5 hours
127 Non-Orange Based Business 60.00 each add'I hr.
128 Orange Based Business 180.00 first 5 hours
129 Orange Based Business 45.00 each add]hr.
130 Non-Resident,Non-Resident Non-Profit 80.00 first 5 hours
131 Non Resident,Non Resident Non Profit 20.00 each add.]hr.
132 Resident,Resident Non-Profit 60.00 first 5 hours
133 Resident, Resident Non-Profit 15.00 each add'I hr.
134 Groups 51-100 People
135 Deposit 100.00 deposit
136 Non-Orange Based Business 300.00 first 5 hours
137 Non-Orange Based Business 75.00 each add'I hr.
138 Orange Based Business 240.00 first 5 hours
139 Orange Based Business 60.00 each add]hr.
21
COMMUNITY SERVICES
FEE/CHARGE RATE UNIT NOTES
140 Non-Resident,Non-Resident Non-Profit 100.00 first 5 hours
141 Non-Resident,Non-Resident Non-Profit 25.00 each add'I hr.
142 Resident,Resident Non-Profit 80.00 first 5 hours
143 Resident,Resident Non-Profit 20.00 each add'I hr.
144 Groups 101-200 People
145 Deposit 150.00 deposit
146 Non-Orange Based Business 450.00 first 5 hours
147 Non-Orange Based Business 112.00 each add'I hr.
148 Orange Based Business 390.00 first 5 hours
149 Orange Based Business 97.00 each add'I hr.
150 Non-Resident,Non-Resident Non-Profit 150.00 first 5 hours
151 Non-Resident,Non-Resident Non-Profit 37.00 each add'I hr.
152 Resident,Resident Non-Profit 130.00 first 5 hours
153 Resident,Resident Non-Profit 32.00 each add'!hr.
154 Groups 201-300 People
155 Deposit 250.00 deposit
156 Non-Orange Based Business 660.00 first 5 hours
157 Non-Orange Based Business 165.00 each add!hr.
158 Orange Based Business 600.00 first 5 hours
159 Orange Based Business 150.00 each add'I hr.
160 Non-Resident,Non-Resident Non-Profit 220.00 first 5 hours
161 Non-Resident,Non-Resident Non-Profit 55.00 each add'!hr.
162 Resident,Resident Non-Profit 200.00 first 5 hours
163 Resident,Resident Non-Profit 50.00 each add'I hr.
164 Groups 301-400 People
165 Deposit 350.00 deposit
166 Non-Orange Based Business 870.00 first 5 hours
167 Non-Orange Based Business 217.00 each add'I hr.
168 Orange Based Business 810.00 first 5 hours
169 Orange Based Business 202.00 each add'!hr.
170 Non-Resident,Non-Resident Non-Profit 290.00 first 5 hours
171 Non-Resident,Non-Resident Non-Profit 72.00 each add'I hr.
172 Resident,Resident Non-Profit 270.00 first 5 hours
173 Resident,Resident Non-Profit 67.00 each add'!hr.
174 Groups 401-500 People
175 Deposit 450.00 deposit
176 Non-Orange Based Business 1,080.00 first 5 hours
177 Non-Orange Based Business 270.00 each add'!hr.
178 Orange Based Business 1,020.00 first 5 hours
179 Orange Based Business 255.00 each add'!hr.
180 Non-Resident,Non-Resident Non-Profit 360.00 first 5 hours
181 Non-Resident,Non-Resident Non-Profit 90.00 each add!hr.
182 Resident, Resident Non-Profit 340.00 first 5 hours
183 Resident, Resident Non-Profit 85.00 each add'!hr. .
184 Groups 501 or More People
185 Deposit 500.00 deposit
186 Non-Orange Based Business 1,290.00 first 5 hours
187 Non-Orange Based Business 322.00 each add'!hr.
22
EZ
lsoDlenpedaadPla!}IleaOEZ
l!sodep00'0L$ l!sodaa6ZZ
palg8!luoNaa!waad8ZZ
wnw!u!wanoyZanoyaad00'SE$ anogJed-3!}oad-uoNluap!saa`luaplsaaLZZ
wnwiu!wanoyZanoyaad00'SS$ 311.oad-uoNluap!saa-uoN'luapisal!-uoN9ZZ
wnw!u!wanoyZmoilaad00'58$ ssau!sngpasega8uea0SZZ
wnw!u!wanoyZanoyaad00'Sb1$ ssaulsngpasega8ueJO-uoN1ZZ
lsoDlenpedaadPla!}Ilse £ZZ
l!sodap00'0L$ l!sodaaZZZ
paly8!l-aa!waadTZZ
wnwlu!wanogzmot"aad007$suopez!uelo0ZZ
oaduoNslaodsylnoAa8uaic}opanoaddy
wnw!u!wanoyZanoyaad00'0Z$ 3!}oad-uoNluap!saa'luap!saa6TZ
wnw!u!wanoyZanoyaad00'SE$ l!}oad-uoNluap!saa-uoN'luap!saa-uoN8TZ
wnw!u!wanoyZanoyaad00'517$ ssau!sngpasega8uea0LTZ
wnw!u!wanogZanogaad00'SOT$ ssau!sngpasega8uwO-uoN9TZ
3!sodap00'OS$ 3!sodaaSTZ
pa11-18!1-uoN17TZ
wnw!u!wnogZanogaad0S'6$suo!lez!ue8JO £TZ
l!}oad-uoNslaodsglnoAa8ueJopanoaddy
l!sodap00'0SZ$ suo!lez!ue8a0ZTZ
3110ad-uoNslaodsglnoAa8ueJO}oAl!jpanaddy
wnw!u!wanogZanoyaad00'SZ$ 3!}oad-uoNluaplsaa'luaplsa8TTZ
wnw!u!wanoyZanogJed00'S17$ 3410ad-uoNluap!saa-uoN'luap!saa-uoN0TZ
wnw!u!wanoyZanogJed00'SL$ ssaulsngpasega8ueJO60Z
wnwlulwanogZanoyaad00'SET$ ssau!sngpasegaSuwo-uoN80Z
l!sodap00'0S$ l!sodaaLOZ
PalgBll90Z
sp!a!do!lalyldSOZ
wnwlulwanoyZanogaad007$suollez!ue8JO170Z
3!}0ad-uoNslaodsglnoAa8ueJO}oAl!jpanoaddy
wnw!ulwanoyZanogaad00'01$ luap!saa £0Z
wnw!u!wanogZanogaad00'ST$ luap!saa-uoNZ0Z
l!sodep00'0S$ 3!sodaaTOZ
pazgSn-uoN00Z
wnw!u!wanogZanogJed0017$suo!lez!ue8JO661
3!}oad-uoNslaodsglnoAa8uejO}oAl!Jpanoaddy
wnw!u!wanoyZanoyaad00'0T$ anogaad-luap!saa861
wnw!u!wanoyZanogaad00'ST$ anoyaad-luap!saa-uoNL6T
31sodap00'05$ l!sodaa961
paly8!lS6T
slanoasodandIIV1761
agI,ppegDee007OT$ 3110ad-uoNluap!saa'luap!saa6T
smog5lsa!} 00'0117$ road-uoNluap!saa'luap!saaZ6T
agI.PPegoes00'LOT$340ad-uoNluap!saa-uoN'luap!saa-uoNT6T
smogSlsa!} 00'OE17$3410ad-uoNluap!saa-uoN'luapisa -uoN061
agI,ppegDea00'LOE$ ssau!sngpasega8ueJ0681
smog5lsa!} 00'0EZ'T$ssau!sngpasega8ueJO881
S31ON1INfl31V2I39NVH3/333
SDIA213SAlINf1WINOD
bZ
wnwlulwanoyZanoyaad00'017$ il;wd-uoNluaplsaaluaplseilSLZ
wnwlulwanoyZanoyaad00'09$ lgoad-uoN1uaplsau-uoNluaplsa8-uoN1LZ
wnwlulwanoyZanoyaad00'08$ ssaulsngpasega8uea0ELZ
wnwlulwanoyZanoyaad00'00T$ ssaulsngpasega8uea0-uoNZLZ
ls0dap00'SL$ lsodadIL?
WOOSaDueaOa
anoyZanoyaad00'0b$ road-uoNluaplsau'uaplsag69Z
wnwlulwanoyZanoyaad00'09$ lgo.id-uoN),uaplsag-uoN'uaplsag-uoN89Z
wnwlulwanoyZanoyaad00'08$ ssaulsngpasega8uea0L9Z
wnwlulwanoyZanoyaad00'00T$ ssaulsngpasega8uea0-uoN99Z
llsodap00'SL$ llsodaa59Z
gyWOOJsseIDb9Z
wnwlulwanoyZanoyaad00'0Z$ 3l;o.id-uoNluaplsaa';uaplsagE9Z
wnwlulwanoyZanoyaad00'0E$ ll4ad-uoN1uaplsag-uoNluaplsag-uoNZ9Z
wnwlulwanoyZanoyaad00'017$ ssaulsngpasega&uea0T9Z
wnwlulwanoyZanoyaad00'05$ssaulsngpasega8uea0-uoN09Z
lsodap00'O17$ lsodaa6SZ
gwooasselj8SZ
wnwlulwanoyZanoyaad00'0Z$ ldad-uoN;uaplsagluaplsaJLSZ
wnwlulwanoyZanoy_tad00'0E$ 1l}oad-uoN1uaplsag-uoN';uaplsag-uoN9SZ
wnwlulwanoyZanoyaad00'017$ ssaulsngpasega8uea0SSZ
wnwlulwanoyZanoyJed00'0S$ssaulsngpasega8uea0-uoN1SZ
llsodap00'0b$ llsodaaESZ
vwoasseDZSZ
wnwlulwanoyZanoyaad00'S4l!}oad-uoNslaodsTS?
ylnoApaseguoleaJDaga8uea0;oAI10panoaddy
wnwlulwanoyzanoyaad00'S9$ ll}oad-uoNslaodsylnoAanlmadwoJOSZ
gnlj/Beglaneala8uea0;oAlDpanoaddy
wnwlulwanoyZanoyaad00'59$ luoad-uoN;uaplsagluaplsag61Z
wnwlulwanoyZanoyaad00'56$ ll4oad-uoN1uaplsag-uoN';uaplsag-uoN81Z
wnwlulwanalZanoyaad00'OST$ ssaulsngpasega2uea0LVZ
wnwlulwanoyZanoyaad00'SLT$ ssaulsngpasega8uea0-uoN9bZ
lls0dap00'00Z$ ls0daaS1Z
wnlseuwADbbZ
wedenlefp0;eaa}uaDsJodSElz
asnaad00'0S$ssaulsngpasega8uea0-uoNZlZ
asnaad00'O17$ ssaulsngpaseg-a8uea0T1Z
asnaad00'SZ$ 1I40-1d-uoN1.uaplsag-uoN'1uaplsag-uoNOn
asnaad00'0Z$ ly.oad-uoNluaplsag'tuaplsag6EZ
asnJed00'0$ pasequo4eanaa) 8EZ
goad-uoNsvodsylnoAa8uea04oAIDpanoaddy
llsodap00'0S$od
1u)
lsewdlnb3aa
A`d9EZLEZ
soylenpeasnand}l}edalao/puepedwlgBIHa0;aa3aoueualu1eINSEZ
wnwlulwmoyZanoyaad00'OE$ 1140ad-uoN;uaplsag'luaplsagbEZ
E£Z wnwlulwanoyZanoyJac' 00'Sb$ ll;oaduoN;uaplsaa-uoN';uaplsaauoN
wnwlulwanoyZanoyaad00'SS$ anoyaadssaulsngpasega8uea0Z£Z
wnwlulwnogZnogaad00'STT$ anoyaad-ssaulsngpasega8uea0-uoNTEZ
S310NllNfl31V2139HVH3/33J
S3JIA213SALINMAIWOJ
COMMUNITY SERVICES
FEE/CHARGE RATE UNIT NOTES
276 Senior Citizen Center:
277 Large Banquet Room
278 Deposit 500.00 deposit
279 Facility Cleaning actual cost
280 Non Orange Based Business 600.00 1st 5 hours
281 Non Orange Based Business 120.00 each add'I hr.
282 Orange Based Business 600.00 1st 5 hours
283 Orange Based Business 120.00 each add'I hr.
284 Non-Resident,Non-Resident Non-Profit 600.00 1st 5 hours
285 Non-Resident,Non-Resident Non-Profit 120.00 each add'I hr.
286 Resident,Resident Non-Profit 500.00 1st 5 hours
287 Resident,Resident Non-Profit 100.00 each add'I hr.
288 Meeting Rooms:
289 Deposit 75.00 deposit
290 Non-Orange Based Business 50.00 per hour
291 Orange Based Business 50.00 per hour
292 Non-Resident,Non-Resident Non-Profit 50.00 per hour
293 Resident,Resident Non-Profit 30.00 per hour
Cancellations(excluding Senior Center large banquet
294 room):
295 30 Days Prior to Event Full refund less$10.00
296 29 to 14 Days Prior to Event Full refund less$50.00
297 13 Days Prior to Event or Fewer Forfeit Rental Fee
298 Cancellations(Senior Center large banquet room):
299 Written,60 Days Prior to Event Full refund less$10.00
300 Written,59 to 45 Days Prior to Event Full refund less$100.00
301 44 Days Prior to Event or Fewer Forfeit Rental Fee
25
FINANCE
FEE/CHARGE RATE UNIT NOTES
1 Returned Check Charge-1st check 25.00 each
2 Returned Check Charge-subsequent check 35.00 each
3 Accounts Receivable Delinquent Penalty
The Finance Director or his designee
shall have the authority to waive a
penalty fee on a case by case basis
4 when appropriate.)
outstanding
5 After 30 Days 20% balance
outstanding
6 After 60 Days 30% balance
7 Business Licenses:
8 New Business License Application 76.00 each
9 Annual Renewal Processing Fee:
10 Paper 41.00 each
11 Online 26.00 each
12 Duplicate Certificate 10.00 each
13 Change of Location 10.00 each
14 Massage Permit-includes material+inspection 250.00 each
15 Initial Regulatory Permit Application 100.00 each
16 Secondhand Dealer Renewal Permit 40.00 each
17 Police Regulatory Permit Review 30.00 each
18 Firearm Regulatory Permit Renewal 40.00 each
19 Delinquent Penalty 25% per month Not to exceed 100%
20 Non-compliance Penalty:
21 After 90 Days for Renewals 50.00 each
22 After 45 Days for New Applicants 50.00 each
23 Short Term Rental Permit 250.00 each
24 Fines for Violations of Short Term Rental Regulations:
25 1st Offense:
26 Minor Offense 250.00
27 Major Offense 1,000.00
Within any continuous period
of 12 months in connection
28 2nd Offense: with the same property
29 Minor Offense 500.00
30 Major Offense 1,500.00
Within any continuous period
of 12 months in connection
31 3rd and Subsequent Offenses: with the same property _
32 Minor Offense 1,000.00
26
FIRE
FEE/CHARGE RATE UNIT NOTES
1 Paramedic Services
2 Annual Paramedic Subscription Program 60.00 per year
per 10
Additional 10 employees/residents for businesses and employees/reside
3 congregate living facilities(11 100 persons) 60.00 nts(11-100)
per 10
employees/reside
Additional 10 employees/residents for businesses and nts(over 100
4 congregate living facilities(over 100 persons) 50.00 persons)
5 Basic Life Support(BLS) 405.00 per call
6 Advanced Life Support(ALS) 508.00 per call
7 Transport Fees 1,876.24 each
8 Mileage 19.51 per mile
9 Emergency Transport Standby Time 132.10 per 30min after the first 30min
10 Late Fees for Haz Mat Disclosure
annual disclosure
11 After 30 days 20%fee
annual disclosure
12 Incomplete form submittal after 30 days 20%fee
annual disclosure
13 After 45 days Additional 30%fee
annual disclosure
14 Incomplete form submittal after 45 days Additional 30%fee
Hazardous Materials Specialist consultation charge for failure
15 to disclose 60.00 each
Penalty for failure to comply with precautions against fire and
16 the spread of fire 350.00 each
17 False Alarms
18 Excess of 1 alarm in any 30 day period 174.00 each
19 Excess of 2 alarms in any 6 month period 174.00 each
Failure to Notify of Testing or Work on
20 System 174.00 each
21 Valid Code Complaint(billed to violator)actual cost
22 ANNUAL FIRE PERMITS/SPECIAL EVENT:
23 Inspections:
24 Apartments:
25 3-25 units 85.00 per inspection
26 26-75 units 285.00 per inspection
27 76-150 units 400.00 per inspection
28 151-250 units 660.00 per inspection
29 251 350 units 808.00 per inspection
30 351-450 units 955.00 per inspection
Waste Handling-Including Wrecking Yards,Junk Yards,and
31 Waste Material Handling 280.00 each
32 Open Burning-Excluding Recreational Fires 232.00 each
33 Open Flames&Candles 232.00 each
34 Cellulose Nitrate Film in Group A Occupancy 47.00 each
27
FIRE
FEE/CHARGE RATE UNIT NOTES
Combustible Fiber Storage or Handling in Excess of 100 Cubic
35 Feet 187.00 each
Cryogenics Fluids Not Requiring Hazardous Materials
36 Disclosure 47.00 each
37 Dry Cleaning 187.00 each
38 Dust Producing Operation-Combustible Dust 93.00 each
39 Repair Garages-Includes Associated Fuel Dispensing 47.00 each
40 High Piled Storage in Excess of 500 Square Feet 140.00 each
41 Lumber Yard or Woodworking Plant 280.00 each
Magnesium-Melting,Casting,Heat-Treating or Grinding an
42 Amount in Excess of 10 Pounds 93.00 each
43 Organic Coatings-Production in Excess of 1 Gallon per Day 140.00 each
44 Ovens,Industrial Baking or Dry 93.00 each
45 Tank Vehicles 47.00 each
46 Temporary Membrane Structures and Tents 232.00 each
47 Hot Work;or Cutting or Welding 47.00 each
Explosives-Explosive Materials,Fireworks or Pyrotechnic
48 Special Effects 309.00 per hour 2 hour minimum
Flammable or Combustible/Liquid Pipeline Operation/
49 Excavation 322.00 per hour 2 hour minimum
Buildings Originally Constructed to High-Rise Standards -Less
50 than 75 Ft.in Height 1,545.00 each
51 High Rise Building 1,854.00 each
Mall Buildings,Covered or Open-Placement of Fixtures,
Displays or Equipment;Display of Liquid or Gas-Fired
Eqiupment;or Use of Open-Flame or Flame-Producing
52 Equipment
53 Temporary Kiosks 154.00 each
54 Open flame/flame producing devices 154.00 each
55 Parade Floats 39.00 each
56 Places of Assembly 187.00 each
Spraying or Dipping-Utilization of Flammable or Combustible
57 Liquids or Combustible Powder 93.00 each
58 Tire Rebuilding Plant 93.00 each
59 Care Facilities:
60 7-99 Occupants 348.00 each
61 100-199 occupants 463.00 each
62 200+occupants 502.00 each
63 New Facility Inspection Fee:
64 25 clients or less 463.00 each
65 26+clients 502.00 each
66 Hospitals&Convalescent:
67 1-99 beds 348.00 each
68 100-199 beds 463.00 each
69 200+beds 502.00 each
70 Day Care Facilities
28
FIRE
FEE/CHARGE RATE UNIT NOTES
71 Non-Residential Based 232.00 each
72 General Use Permits 163.00 per hour
73 Fireworks Display-min 2 hours 309.00 per hour 2 hour minimum
74 Spill Response:
75 Up to 5 gallons 894.00 each
76 Over 5 gallons actual cost
77 After Hours Work Fire Safety Specialist 154.00 per hour 2 hour minimum
78 After Hours Work Hazardous Materials Specialist 161.00 per hour 2 hour minimum
79 After Hours Work Fire Plan Examiner 166.00 per hour 2 hour minimum
80 After Hours Work Fire Captain 201.00 per hour 2 hour minimum
81 Re-inspection Fee for Rejected Prevention Division Inspection 179.00 each
82 Report Fees 61.00 each
83 Non-Criminal Cause&origin Investigators Report 196.00 per hour
84 Non-Criminal Misc.Investigators Report 196.00 per hour
85 Non-Criminal SFD Investigators Report 196.00 per hour
86 Non-Criminal Commercial Occupancy Investigators Report 196.00 per hour
87 Standby Time Hazardous Materials Specialist 161.00 per hour 2 hour minimum
Change Hazardous Materials Contents of Underground
88 Storage Tank 561.00 per hour 2 hour minimum
89 Hazardous Materials-Store,Handle,Use Sell 561.00 per hour
90 Review HMMP Plans 154.00 per hour
91 Hazardous Materials-Disclosure Fees:
92 1 material 272.00 each
93 2-4 materials 433.00 each
94 5-9 materials 594.00 each
95 10-15 materials 674.00 each
96 16-20 materials 795.00 each
97 21-25 materials 996.00 each
98 26-30 materials 1,117.00 each
99 31-44 materials 1,238.00 each
100 45+materials 1,399.00 each
101 Underground Tanks:
102 1 tank 705.00 each
103 2 tanks 866.00 each
104 3 tanks 1,027.00 each
105 4 tanks 1,188.00 each
106 5 tanks 1,349.00 each
107 Class I or II liquids Removal 322.00 each
To install,alter, remove,abandon,or temporarily place out
108 of service 161.00 each
To change type of contents to a material other than
109 designed for-2 hour min-per hour 161.00 per hour 2 hour minimum
110 Plan Check Hazmat Fee 161.00 per hour
111 Existing Tank Monitoring System Restart 644.00 each
112 Aerosol Products-Level 2 or 3 in excess of 500 pounds 140.00 each
29
FIRE
FEE/CHARGE RATE UNIT NOTES
113 Amusement Building 386.00 _each
114 Aviation Facility 421.00 _each
115 Carnival or Fair 309.00 per hour 2 hour minimum
Compressed Gas Not Requiring Hazardous Materials
116 Disclosure 140.00 _each
117 Exhibits&Trade Shows-Min 2 hours 309.00 per hour 2 hour minimum
118 Flammable&Combustible Liquids 140.00 each
Floor Finishing-in Excess of 350 Sq.Ft.Using Class I or II
119 liquids 154.00 each
120 Fruit&Crop Ripening-Using Ethylene Gas 140.00 each
121 Fumigation&Insecticidal Fogging 77.00 each
Hazardous Materials Not Requiring Hazardous Materials
122 Disclosure 140.00 each
123 Hazardous Production Materials Facility 309.00 each
124 Liquid or Gas-Fueled Vehicle(s)in an Assembly Building 154.00 each
Liquid Propane Gas Not Requiring Hazardous Materials
125 Disclosure 140.00 each
Miscellaneous Combustible Storage in Excess of 2,500 Cubic
126 Feet 140.00 each
Open Flame or Torch-Removal of Paint or Use within a
127 Wildfire Risk Area 77.00 each
Private Fire Hydrant-Use or Removal from Service(1 hour
128 min) 154.00 per hour 1 hour minimum
Pyrotechnic Special Effects Material-Use or Handling(1 hour
129 min) 154.00 per hour 1 hour minimum
Pyroxylin Plastics-Storage or Handling in Excess of 25 Pounds;
or Assembly or Manufacture of Products containing Pyroxylin
130 Plastics 280.00 each
131 Mechanical Refrigeration Equipment Regulated by CFC 140.00 each
132 Rooftop Heliport 140.00 each
Storage of Scrap Tires&Tire Byproducts-Exterior Storage
133 Exceeding 2,500 Cubic Feet;or Indoor Storage of Any Amount 280.00 each
Wood Products-Storage of Chips,Hogged Material,Lumber
134 or Plywood in Excess of 200 Cubic Feet 140.00 each
Activity Related to Motion Picture,Television,or Commercial
Production-Change of Building Use or Occupancy;
Attendance of Live Audience;Wrap Party;Use of Pyrotechnic
Special Effect;Open Flame;Use of Flammable or Combustible
135 Liquid or Gas; 154.00 each
136 2nd and subsequent Re-Inspection for Same Violation. 292.00 each
137 FIRE CONSTRUCTION PERMITS:
138 Fire Protection Systems:
139 New:
30
FIRE
FEE/CHARGE RATE UNIT NOTES
140 1-5 devices 966.00 each
141 6-15 devices 1,207.00 each
142 16-30 devices 1,610.00 each
143 31-50 devices 2,253.00 each
144 Each additional 50 devices or portion thereof 322.00
145 Modifications:
146 1-5 devices 644.00 each
147 6-15 devices 724.00 each
148 16-30 devices 1,046.00 each
149 31-50 devices 1,207.00 each
150 Each additional 50 devices or portion thereof 322.00
151 Fire Sprinklers-13/13D/13R:
152 New Construction:
153 Up to 50 Heads 1,449.00 each
154 50-100 Heads 2,012.00 each
155 Each additional 50 heads or portion thereof 322.00
156 Tenant Improvements/Modifications:
157 Up to 50 Heads 805.00 each
158 50-100 Heads 1,046.00 each
159 Each additional 50 heads or portion thereof 322.00
160 Preaction Fire Sprinklers:
161 New Construction:
162 Up to 50 Heads 1,932.00 each
163 50-100 Heads 2,253.00 each
164 Each additional 50 heads or portion thereof 322.00
165 Tenant Improvements/Modifications:
166 Up to 50 Heads 1,046.00 each
167 50-100 Heads 1,449.00 each
168 Each additional 50 heads or portion thereof 322.00
169 Underground Private Fire Service Line 1,851.00 each
Automatic Fire Extinguishing Systems(Hoods,spray booths,
170 etc.) 644.00 each
Spraying or Dipping-Flammable or Combustible Liquids
171 Booths 805.00 each
172 Clean Agent Systems 1,127.00 each
173 Smoke Control Systems 2,897.00 each
174 Fire Pumps 1,610.00 each
175 Standpipe System 885.00 each
176 High Piled Storage 966.00 each
177 Dry Cleaning 644.00 each
178 Dust Production 805.00 each
179 Industrial Ovens 805.00 each
Carbon Dioxide System Exceeding 100 pounds of CO2 Used
180 in Beverage Dispensing Application 140.00 each
181 High Rise Building-Base(includes 6 floors) 3,219.00 each
182 High Rise Building-per additional floor 322.00 each
183 Temporary Membrane Structures and Tents 724.00 each
31
FIRE
FEE/CHARGE RATE UNIT NOTES
184 Tanks:
185 Underground Tanks:
186 First Tank 2,575.00 each
187 Each additional tank 483.00 each
188 Aboveground Tanks:
189 First Tank 966.00 each
190 Each additional tank 322.00 each
191 Vegetation Management Fuel Modifications 1,127.00 each
192 Special Events Application 121.00 each
Building
Construction Plan
Check&
193 Plan Check&Inspection Fees-Construction 10% Inspection Fees
194 Miscellaneous Plan Review-per hour 161.00 each
195 Miscellaneous Services and Materials actual cost
196 Technology Fee(Fire Construction Permits) 5.00
32
LIBRARY
FEE/CHARGE RATE UNIT NOTES
1 Lost Library Card 2.00 each
2 Inter Library Loan 2.00 each
3 Processing Fees Damaged&Lost Materials 5.00 each
4 Local History Reproduction
5 Commercial Use+Processing Fee 35.00 each
6 Personal Use 0.00 each
7 Local History Research
8 Obituary Request 25.00 per request
9 Extensive Research Request 35.00 per hour
10 Printing&Photocopying
11 Black&White 0.15 per copy
12 Color 0.35 per copy
Holds not picked up 0.50 per item
13 Facility Rentals
El Modena Community Room,Orange Public Library&
History Center Room A,Orange Public Library&History
14 Center Room B,Rotary Room
15 Deposit 100.00 deposit
16 Non-Profit in Orange 40.00 per hour 2.5 hour minimum
17 Non-Profit outside of Orange 45.00 per hour 2.5 hour minimum
18 For Profit in Orange 55.00 per hour 2.5 hour minimum
19 For Profit outside of Orange 65.00 per hour 2.5 hour minimum
20 Orange Public Library&History Center Room A&B
21 Deposit 100.00 deposit
22 Non-Profit in Orange 65.00 per hour 2.5 hour minimum
23 Non-Profit outside of Orange 70.00 per hour 2.5 hour minimum
24 For Profit in Orange 75.00 per hour 2.5 hour minimum
25 For Profit outside of Orange 80.00 per hour 2.5 hour minimum
cancellation received less than
26 Cancellation Fee 45.00 each 14 days from reservation date
room not vacated after a 15
27 Overtime Fee 45.00 each minute grace period
room not cleaned up and reset
28 Room Cleaning Fee 45.00 each to standard configuration
29 Equipment Rental
30 TV/DVD/Microphone
31 Deposit 100.00 deposit
32 Non-Profit in Orange 20.00 per rental
33 Non-Profit Outside of Orange 25.00 per rental
34 For Profit in Orange 30.00 per rental
35 For Profit Outside of Orange 35.00 per rental
33
POLICE
FEE/CHARGE RATE UNIT NOTES
ABC License(Alcoholic Beverage License);fee includes costs
to conduct background investigation required by the ABC
1 Dept and to process the application
2 New ABC License Application 5,000.00 deposit Billed at actual cost
3 Renewal ABC License Application 67.00 each
4 Bike License:
5 New Bike License 4.00 each Per Veh Code 69004
6 Renewal Bike License 2.00 each Per Veh Code 69004
7 False Alarms:
8 1st False Alarm 0.00 each
9 2nd False Alarm 0.00 each
10 3rd False Alarm 150.00 each
11 4th False Alarm 200.00 each
12 5th False Alarm 200.00 each
13 FINES:
14 Commercial Vehicle in Residential Areas 100.00 each
15 Handicapped Fine 300.00 each
16 Parking Fines 65.00 each
17 Party Calls/Noise Disturbance actual cost
18 Seventy-Two Hour Parking 150.00 each
19 Massage Operator Testing Service
Plus DOJ live scan fee of$32
20 Background Information 114.00 each collected on behalf of DOJ
21 Testing Cost(initial or retake) 114.00 each
22 On Street Parking of Oversized Vehicles
23 Annual Permit/Sole Means of Transportation 15.00 per year
24 Seven-Day Visitor Permit 27.00 each
25 Other Fees
26 Business License Review 49.00 each
27 Citation Validation 30.00 each
28 Civil Subpeona-per subpeona 15.00 per subpeona Per Evid Code 1563
29 Copies of Citations-per citation 6.00 each
30 Digital Media CD/DVD Copy 25.00 each
Plus$6.00 USB cost,per Evid
31 Evidence Digital Media(Redacted) 24.00 per hour Code 1563.b.1
32 Immigration Clearance Letter 30.00 each
33 Livescan 35.00 each
Includes all third party
34 Local Background Check 30.00 each background checks
Includes all types of notification
35 Notification Letter 30.00 each letters
Building
Construction Plan
Check&
36 Plan Check&Inspection Fees-Construction 3% Inspection Fees
34
POLICE
FEE/CHARGE RATE UNIT NOTES
37 Private Property Impound 18.00 each
38 Photocopy
39 Black&White Copy 0.15 per page
40 Color Copy 0.25 per page
Plus DOJ live scan fee$32 and
41 Tow Truck Driver Background-Initial 85.00 each City live scan fee$35
42 Tow Truck Driver Background-Renewal 65.00 each
43 Vehicle ID Verification-per vehicle 75.00 each
44 Vehicle Repossession 15.00 each Per Gov't Code 41612
Per Gov't Code 68096.1,billed
45 Witness Fee 275.00 deposit per day at actual cost
46 Parking Permits
47 Business Parking Permit 30.00 each
per student,per
48 Chapman Parking Permit 30.00 year
49 Landlord Permit(Up to 1 permits per household) 29.00 each
50 3+Units/Apartments(Up to 3 permits per household)30.00 each
51 Duplex(Up to 4 permits per household)30.00 each
52 Single-Family(up to 5 permits per household) 30.00 each
53 Retail Establishment Inspection-Firearms
54 Annual Inspection 88.00 each
55 Initial Inspection 221.00 each
56 Re-inspection Fee(upon 3rd inspection)97.00 per hour
57 Tow Fees
58 OMC/CVC Tow Release 200.00 each Non-DUI
59 30-day Impound Release 245.00 each
60 DUI Arrest Tow Release 285.00 each
35
PUBLIC WORKS-ENGINEERING DIVISION
FEE/CHARGE RATE UNIT NOTES
1 DEVELOPMENT SERVICES:
2 Lot Line Adjustment 2,393.00 each
3 Certificate of Compliance 2,393.00 each
4 Certificate of Correction/Amended Map 2,392.00 each
5 Process Grading Application 345.00 each
6 Encroachment Permits:
7 Process Encroachment Application 327.00 each
8 Driveways-non-arterial 638.00 each
9 Driveways-arterial 1,147.00 each
10 Grease Interceptor 1,304.00 each
11 Sidewalk 567.00 each
12 Streetwork/Trench Repair:
13 0-100 feet 928.00 each
14 101-300 feet 1,288.00 each
15 301-500 feet 2,024.00 each
16 501-1000 feet 2,887.00 each
17 1,001-1,500 feet 3,608.00 each
18 1,501-2,000 feet 4,202.00 each
19 Minor Encroachment Permit 426.00 each
20 Utility Lateral for house connection on residential streets 1,005.00 each
21 Fire Service Connection 1,854.00 each
22 ENGINEERING SERVICES:
23 Flood Zone Written Notice 392.00 each
24 Street Addressing 789.00 each
25 Summary Abandonment 1,642.00 each
26 Full Abandonment 1,642.00 each
27 Quit Claims 1,642.00 each
28 Grease Interceptor License 7,500.00 each
29 Simple Research&CD Prep 266.00 each
30 Map Sheets 208.00 each
Irregularly shaped lots will be
31 Sewer Frontage Charges-per I.f. 155.00 per linear foot evaluated on a case by case basis
32 Waste Bins and Pods 228.00 each
33 DEPOSIT-BASED FEES:
34 Tract Development 10,000.00 deposit Billed at actual cost
35 Tract or Parcel Map(Map Only) 2,000.00 deposit Billed at actual cost
Non-Priority Water Quality Management Plan(WQMP)
36 Review 500.00 deposit Billed at actual cost
37 Priority Water Quality Management Plan(WQMP)Review 1,000.00 deposit Billed at actual cost
38 Grading Plan Review&Inspection 3,000.00 deposit Billed at actual cost
Large Encroachment Projects or Streetwork/Trenchwork
39 2,001 ft.or greater 5,000.00 deposit Billed at actual cost
40 Annual Blanket Encroachment Permit 30,000.00 deposit Billed as needed at actual cost
41 Extensive Research 500.00 deposit Billed at actual cost
36
PUBLIC WORKS-FIELD SERVICES DIVISION
FEE/CHARGE RATE UNIT NOTES
Initial Inspection&Application-Mail Carriers,Newspaper
1 Racks, Drop Off Boxes,Recycling Bins,etc. 100.00
2 Renewal Inspection-all boxes 50.00 each
3 Removal of Abandoned Shopping Cart 56.00 each
4 Banner Installation&Removal 259.00 each
5 Graffitti Removal:
6 0-50 sq.ft. 146.00 up to 50 sq ft.
7 Each addl sq.ft. 0.75 add'I sq.ft.
8 Old Towne Plaza Sidewalk Cleaning 1.57 per sq.ft.
per inch at DBH
Diameter at
10 Tree Removal 43.00 Breast Height)
11 Tree Planting 293.00 per 24 in box tree
12 Outdoor Dining Permits
13 New 385.00 each
14 Renewal 205.00 each
37
PUBLIC WORKS-TRAFFIC DIVISION
FEE/CHARGE RATE UNIT NOTES
1 Neighborhood Permit Parking Program Application 500.00 each
2 Neighborhood Permit Parking Program Processing Fee 500.00 each
3 Transportation Permit
4 Per Trip 16.00 each
5 Annual 90.00 each
6 DEPOSIT-BASED FEES:
Transportation Demand Management Review and
7 Development Fee 500.00 deposit Billed at actual cost
8 Traffic Commission Appeal 500.00 deposit Billed at actual cost
9 TSIP Appeal Fee 500.00 deposit Billed at actual cost
10 Street Name Change 1,000.00 deposit Billed at actual cost
I
38
PUBLIC WORKS-WATER DIVISION
FEE/CHARGE RATE UNIT NOTES
1 FLAT FEES:
2 Plan Check&Inspection Fee
3 Water Service,no on-site water facilities 595.00 each
4 Broken Curb Stop 225.00 each
5 Pull Water Meter 175.00 each
6 Utility Account Establishment 50.00 per account
7 As of Last Read Establishment Fee 25.00 per account
8 Reconnection Fee-during business hours 70.00 each
9 After Hours Reconnection Surcharge 100.00 each
10 Meter Testing 239.00 deposit Billed at actual cost
11 Research Fee 25.00 each
12 Monitoring Well Permit 151.00 per application
13 Returned Payment Processing Charge 25.00 each
14 Service Call/Door Hanger 35.00 each
15 Delinquent Surcharge 30.00 each
16 Backflow Prevention Inspection 342.00 each
17 Water Main Connection Charge
18 Below Elevation 400
19 Residential 1,500.00 per acre
20 Commercial 1,760.00 per acre
21 Industrial 2,020.00 per acre
22 Above Elevation 400
23 All Uses 2,290.00 per acre
per sq.foot of
Commercial and Industrial Developments with Multi-total building
24 Story Structures 0.22 area
outsta nding
25 Water Collection Delinquent Penalty(After 25 Days) 10% balance
outstanding
26 City Sanitation Services Delinquent Penalty(After 25 Days)10% balance
27 DEPOSIT-BASED FEES:
28 Plan Check&Inspection Fees:
29 Small Development,no on-site water pipeline 2,000.00 deposit Billed at actual cost
30 New development with on-site piepline 4,000.00 deposit Billed at actual cost
31 Metered Services(complete installation by city)
32 3/4" 3,500.00 deposit Billed at actual cost
33 1" 4,000.00 deposit Billed at actual cost
34 1.5" 4,500.00 deposit Billed at actual cost
35 2" 5,000.00 deposit Billed at actual cost
36 Hot Taps by City(Trench Excavation by contractor)
37 4"Laterals 2,600.00 deposit Billed at actual cost
38 6"Laterals 3,200.00 deposit Billed at actual cost
39 8"Laterals 4,200.00 deposit Billed at actual cost
40 10"Laterals 5,000.00 deposit Billed at actual cost
41 12"Laterals 5,800.00 deposit Billed at actual cost
42 Construction Meter Charges
43 Daily Rental Fee 2.75 per day
39
PUBLIC WORKS-WATER DIVISION
FEE/CHARGE RATE UNIT NOTES
44 2 1/2"Meter Installation Charge 1,500.00 deposit Billed at actual cost
45 4"Meter Installation Charge 3,000.00 deposit Billed at actual cost
46 6"Meter Installation Charge 5,000.00 deposit Billed at actual cost
40
ANIMAL CONTROL AND SHELTER FEES
Fee
1 I.Fees for Animal Licenses
2 Annual Dog Licenses(12 months)
3 a.Non-neutered 159
4 b.Neutered(Note 1) 42
5 c.Neutered,Sr.Citizen and Military discout(Note 2) 21
6 d.Puppy,6 months old or younger 42
7 Cat License(12 months)
8 a.Non-neutered 9
9 b.Neutered 9
10 Other
11 a.Reissue of lost dog or cat license tag 9
12 b.Transfer of dog or cat licence 9
13 c.Assistance dog licence 11
14 d.Police/Law Enforcement 11
15 e.Exotic Animal Permit
16 Per Aviary 500
17 Per Species 500
18 f.Animal Permit(per household per year)
19 more than three(3)animals 627
20 more than three(3)animals-Nonprofit 627
21 Late Fee 48
22 Non-Compliance Fee-Collections 58
23 Non-Compliance Fee 150
24 Rabies Vaccination Exemption Fee-New 65
25 4-1-95 Declared Dog
26 a.4-1-95 Declared Dog Permit 692
27
28 II.Fees For Animal Business Licences
29 Application Fee(Note 3) 138
Penalty Fee(Note 4) 25%
30 Re-inspection Fee 466
31 Commercial Kennels Permit-Modified
32 a.under 30 animals 650
33 b.over 30 animals 750
34 Pet Shop
35 a.Aquatic Only 1,000
36 b. Pet Shop 1,000
37 Fixed Locations Grooming Parlor(per year) 525
38 Mobile Groomers
39 a.Field Inspection 500
40 b.OCAC Inspection 400
41 Animal Rental Establishment(per year) 500
42 Permanent Animal Exhibition(per year) 707
43 Temporary Animal Exhibition
44 a.First day 150
45 b.Additional day(not to exceed per year max) 75
41
ANIMAL CONTROL AND SHELTER FEES
Fee
46 Commercial Stable(per year)
47 a.1-49 horses 750
48 b.50-99 horses 900
49 c.100 or more 1,500
50 Circus(billed as hourly rate)(Note 5)
51 Business Licensing Hourly Rate 145
52 Vet Services Hourly Rate 123
53 Rodeo(billed as hourly rate)(Note 6) 145
54 III.Fees For Animals Impounded
55 Daily Feed and Care
56 a.Large animal 155
57 b.Medium animal 101
58 C.Dog or Cat 68
59 d.All other animals 50
60 Veterinary Services
61 a.Rabies Vaccination 10
62 b.Services performed by County staff,per qtr.Hr. at cost
63 C.Emergency services performed by other than County 100
64 staff,per treatment(Note 10)
651 d.Other procedures(Note 7) N/A
66'e.Owner Requested Euthanasia 132
67 Health Related Grooming
68 a.Minor(Note 8) 21
69 b. Major 90
70 Health Related Bath
71 a.Small 24
72 b.Medium 33
73 c.Large 50
74 Disposal Options
75 Rendering 19
76 Impound Fees-Modified
77 Brought in by Field Officers
78 a.Large animal(horse,cow,etc.) 171
79 b.Medium animal (pig,sheep,etc.) 134
80 c.Dog,cat or other small animal* 175
81 Brought in by Citizens/Over the Counter
82 a.Large animal(horse,cow,etc.) 126
83 b.Medium animal(pig,sheep,etc.)99
84 c.Dog,cat or other small animal* 134
85 Owner Requested Disposal from Field
86 a.Large animal(horse,cow,etc.) 232
87 b.Medium animal (pig,sheep,etc.) 138
88 c.Dog,cat or other small animal* 32
89 Placement Fees
90 a.Dog
91 Days 1-5 after being made available 53
92 Days 6-30 after being made available 20
93 Day 31 and over after being made available 0
42
ANIMAL CONTROL AND SHELTER FEES
Fee
94 b.Cat
95 Days 1 after being made available 53
96 Days 2 after being made available 0
97 c.Exotic animals,including birds and reptiles 51
98 d.Other animals(except livestock) N/A
Lower of
actual cost
99 e.Livestock or market
100 f.Sr.Animal for Sr.Citizen-Dog
101 Dog 0
102 Cat 0
103 Microchip
104 a.Implant&Registration Fee 14
105 b.Home Again Re-Registration Only Fee(Note 9) 0
106 c.Home Again New Registration Only Fee(Note 9) 0
107 d.Avid Registration Only Fee 1
108 Canine Spay/Neuter Fee 75
109 Feline/Rabbit Spay Neuter Fee 75
110 Relinquishment Fee(Owner Surrender) 34
111 Deceased Animal Disposal(at shelter)Fee 13
112 Quarantine Fee 145
113 Animal Delivery Fee 54
114 Vicious Declaration Fee 1,571
115 4-1-95 Non-Compliance Fee _ 899
116 Taxable Sales
117 a.Cat carrier fee 4
118 b.Animal leash fee 1
119 c.Pet ID tag(Unlicensed) 2
120 Sedation Fee 15
Notes:
Note 1-Per CA Food and Agri.Code§30804.5,fees for sterilized animals shall be issued at no more than 50%
of the fee for unsterilized animals.
Note 2-Sr.Citizen and Military(active and veteran)fee for sterilized animals is equal to 50%of the regular fee for
sterilized animals(see Note 1).
Note 3-The Application fee is a non-refundable deposit toward the license fee.
Note 4-Penalty Fee is 25%of fee for animal business licenses not renewed within 30 days after expiration of the
previous license,or for licenses not timely obtained.
Note 5-Circus fee is an hourly rate;the fee will be a billing by hour or portion thereof at an hourly rate of$145
for Business License staff time;and at a rate of$123.00 for Veterinary Services staff time.
Note 6-Rodeo fee is an hourly rate;the fee will be a billing by hour or portion thereof at an hourly rate of$145
for Business License staff time;
Note 7-Vet Services-Other Procedures(Column G amount)is an estimate based on the current fees and fee
units reported in Chameleon Sys.Account Code Summary Report(FY 2014-15).
Vet Services-Other Procedures(Column H amount)is the sum total of a separate fee calculation for
each of these fees,using the Vet Services hourly rate plus actual cost of supplies.
43
ANIMAL CONTROL AND SHELTER FEES
Fee
Note 8-Per program staff,there is no S&EB or S&S related cost relating to this fee.
Currently Minor grooming is performed by volunteers.
Note 9-Per program staff,there is no staff program related cost associated with this fee.
Note 10-Program plans to charge the emergency veterinarian service at actual cost. The$100 rate is only for the
estimates,subject to change during contract negotiations with vendors.
Note 11-The total does not agree to the$17,244,201 of User Fee Related Service Costs in Attachment A.This is
due to the various methodologies in the fee calculations. Variance is within a reasonable amount.
44