Loading...
RES-11473 MEASURE M2 SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM FY 2023-24RESOLUTION NO. 11473 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ORANGE APPROVING AND AUTHORIZING STAFF TO SUBMIT TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY THE MEASURE M2 SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEAR 2023-24 THROUGH 2029-30 TO COMPLY WITH MEASURE M2 ELIGIBILITY CRITERIA WHEREAS, an annual submittal of Measure M2 eligibility documentation to the Orange County Transportation Authority (OCTA) is required to remain eligible to receive Measure M2 sales tax revenue funds; and WHEREAS, the submittal documentation requires City Council approval of an updated Measure M2 Seven-Year Capital Improvement Program; and WHEREAS,the City's Measure M2 Seven-Year Capital Improvement Program for Fiscal Year 2023-24 through 2029-30 is a transportation planning and fiscal forecasting document used to guide future programming for transportation capital improvement projects; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program emphasizes projects that improve circulation, mitigate traffic congestion, and maintain the City's investment in existing transportation infrastructure; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program is consistent with the proposed citywide Capital Improvement Program budget and the City's General Plan;and WHEREAS, the City's M2 Seven-Year Capital Improvement Program includes 42 projects with a total preliminary projected budget requirement of$63,656,300 over the seven-year period; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program projects are attached as Exhibit "A." NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Orange hereby approves and authorizes staff to submit to OCTA the Measure M2 Seven-Year Capital Improvement Program for Fiscal Years 2023-24 through 2029-30 to comply with Measure M2 eligibility criteria. ADOPTED this 27th day of June 2023. iel R. Slater, Mayor, City of Orange ATTEST: Pamela Coleman, City Clerk, City of Orange STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ORANGE I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Resolution was duly and regularly adopted by the City Council of the City of Orange at a regular meeting thereof held on the 27th day of June 2023, by the following vote: AYES:COUNCILMEMBERS: Barrios, Dumitru, Tavoularis, Bilodeau, and Slater NOES:COUNCILMEMBERS: Gyllenhammer ABSENT: COUNCILMEMBERS: Gutierrez ABSTAIN: COUNCILMEMBERS: None 1A/t4j-14...e/ale_a4/1-e Pamela Coleman, City Clerk, City of Orange Resolution No. 11473 2 Orange County Transportation Authority FY 2023-24 Capital Improvement Program TIP ID CP-10975 IMPLEMENTING AGENCY Orange.City of Local Project Number:11328 Project Title Additional Project IDs: ADA Improvements-Access Ramps Type of Work: Pedestrian Project Description Type of Work Description: Pedestrian-Installation of This project will modify curbs at various locations throughout the City to Comply with American with Disability Act ADA access ramps ADA)regulations.This has been an ongoing project,funded with Community Development Block Grants CDBG). Limits FISCAL TOTAL Citywide YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED Project Notes 2024 Traffic Impact Fees 20,000 $0 $180,000 $0 $200,000 $205,400 TSIP Citywide(287),CDBG(310)and Capital Project 2024 Community Development $ 9,000 $0 $81,000 $0 $90,000 $92,430 Fund(500).Carry Over. Block Grant 2025 Community Development $ 7,000 $0 $63,000 $0 $70,000 $73,837 Block Grant 2025 Traffic Impact Fees 18,000 $0 $162,000 $0 $180,000 $189,866 2026 Community Development $ 7,000 $0 $63,000 $0 $70,000 $75,842BlockGrant 2026 Traffic Impact Fees 18,000 $0 $162,000 $0 $180,000 $195,022 2027 Community Development $ 7,000 $0 $63,000 $0 $70,000 $77,907 Block Grant 2027 Traffic Impact Fees 18,000 $0 $162,000 $0 $180,000 $200,332 2028 Community Development $ 7,000 $0 $63,000 $0 $70,000 $80,034BlockGrant 2028 Traffic Impact Fees 18,000 $0 $162,000 $0 $180,000 $205,802 2029 Community Development $ 7,000 $0 $63,000 $0 $70,000 $82,225BlockGrant 2029 Traffic Impact Fees 18,000 $0 $162,000 $0 $180,000 $211,436 Totals:$154,000$0 $1,386,000$0 $1,540,000$1,690,133 Last Revised:23-00-Submitted Total Programmed:$1,540,000 TIP ID CP-10976 IMPLEMENTING AGENCY Orange,City of Local Project Number:20379 Project Title Additional Project IDs: Batavia and Taft Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to MainInterconnecttrafficsignalstoimprovecoordinationandStreetandonBataviaStreetfromTaftAvenuetoFletcherAvenue. communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Taft Avenue from Shaffer ST to Main St and on Batavia 2024 Traffic Impact Fees $62,000 $0 $558,000 $0 $620,000 $636,740 St from Taft Ave to Flectcher Ave Project Notes TSIP Citywide(287).Carry Over Totals:$62,000 $0 $558,000 $0 $620,000 $636,740 Last Revised:23-00-Submitted Total Programmed:$620,000 TIP ID CP-12183 IMPLEMENTING AGENCY Orange,City of Local Project Number:20527 Project Title Additional Project IDs: Bicycle Master Plan Update Type of Work: Bikeways Project Description I Type of Work Description: Bikeways-Planning This update will include a comprehensive examination of the city's existing and future bikeway facilities that were previously identified while exploring new possibilities. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Wide 2024 Traffic Impact Fees $100,000 $0 $0 0 $100,000 $100,000 Project Notes TSIP City wide(287) Totals:$100,000 $0 $0 0 $100,000 $100,000 Last Revised:23-00-Submitted Total Programmed:$100,000 TIP ID CP-10977 IMPLEMENTING AGENCY Orange.City of Local Project Number:16304 Project Title Additional Project IDs: Biennial Traffic Signal Coordination Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals-Coordinate This project will study traffic signals on the City's major streets,count&analyze traffic flows,&provide signals within project limits appropriate traffic signal timing to minimize delay to drivers.Changes in traffic flows require updating at two year intervals. Limits FISCAL YEARR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City-Wide 2025 Measure M2 Local Fairshare $0 $0 $95,000 $0 $95,000 $100,786 Project Notes 2027 Measure M2 Local Fairshare $0 $0 $95,000 $0 $95,000 $106,923 Measure"M2"Turnback Was"Biennial City Traffic 2029 Measure M2 Local Fairshare $0 $0 $95,000 $0 $95,000 $113,435 Signal Coordination"-Carry Over Totals: $0 $0 $285,000 $0 $285,000 $321,144 Last Revised:23-00-Submitted Total Programmed:$285,000 TIP ID CP-11581 IMPLEMENTING AGENCY Orange,City of Local Project Number:30166 Project Title Additional Project IDs: Cambridge St Infrastructure Improvement Type of Work: Safety Project Description This project will upsize the existing 18"RCP storm drain line from Palm Avenue to Walnut Avenue to alleviate theTypeofWorkDescription: Safety-Improve roadway rainage localized flooding issue on Cambridge Street.Other improvements include roadway pavement,concrete,sewer and water lines. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cambridge Street from Palm Avenue to Walnut Avenue Project Notes Totals: $0 $0 $0 0 $0 $0 Sanitation&Sewer(220),Gas Tax(272),Capital Projects 500),Sewer Construction(520),and Water(600).Carry Over Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11795 IMPLEMENTING AGENCY Orange.City of Local Project Number:21-ORNG-ACE-3994 Project Title Additional Project IDs: Cannon Street Bridge Widening Type of Work: Road Widening Project Description Type of Work Description: Road Widening-Add 1 This project will widen portions of Cannon Street from Santiago Canyon Road to Serrano Avenue to add a third lane to existing roadway in project limits northbound thru lane. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cannon Street from Santiago Canyon Road to Serrano Avenue Project Notes Totals: $0 $0 $0 0 $0 $0 TSIP Citywide(287)&Reimbursable Capital Project 550).Use to be"Cannon Street Widening".Carry over for FY23/24.Funding reflected in prior year(s) Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP--3472 IMPLEMENTING AGENCY Orange,City of Local Project Number:18-ORNG-ICE-3906 Project Title Additional Project IDs: 18-ORNG-ICE-3906 Cannon and Serrano Intersection Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-Add right turn This project will add a second dedicated right turn lane on northbound Cannon Street unto eastbound Serrano lane(s)to intersection Avenue,to accommodate the increase in right turn movements. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cannon Street and Serrano Ave Intersections Project Notes Totals:$0 $0 $0 0 $0 $0 M2(263),TSIP Citywide(287)&Reimbursable Capital Projects(550).Carry Over.Construction estimated to be complete July 2023. Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-10983 IMPLEMENTING AGENCY Orange.City of Local Project Number:20354 Project Title Additional Project IDs: Chapman&Cambridge Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-Upgrade The project will provide for a protected left turn phase for the eastbound,westbound,northbound,and traffic signal equipment at intersection southbound approaches on Chapman Avenue at Cambridge Street. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Ave and Cambridge St Intersection Project Notes TSIP Citywide(287).Carry Over for FY 23/24.Funding Totals: $0 $0 $0 0 $0 $0 Ireflected in prior year(s). Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11579 IMPLEMENTING AGENCY Orange.City of Local Project Number:20-ORNG-ECP-3987 Project Title Additional Project IDs: Chapman Avenue BioClean Installation Type of Work: Environmental Cleanup Project Description Type of Work Description: Environmental Cleanup- This project will install a BioClean Debris Separating Baffle Box(DSBB)or equal on Chapman Avenue.The Continuous Deflection Separator(CDS) project will also install thirteen connector pipe screens(CPS). Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Avenue and Eckhoff Street for DSBB. Citywide for CPS. Project Notes Totals: $0 $0 $0 0 $0 $0 Sanitation and Sewer(220),Tier 1 Reimbursable Capital Project(550).Carry Over for FY 23/24.Funding reflected in prior year(s). Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11319 IMPLEMENTING AGENCY Orange,City of Local Project Number:20329 Project Title Additional Project IDs: Chapman and Batavia Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-Upgrade Left turn Phase for NB and SB,Chapman Ave and Batavia Sttrafficsignalequipmentatintersection Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Ave and Batavia St Intersection Project Notes Totals: $0 $0 $0 0 $0 $0 HSIP M2(263)&Reimbursable Capital Projects(550). Carry Over Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-10984 IMPLEMENTING AGENCY Orange,City of Local Project Number:20353 Project Title Additional Project IDs: Chapman and Grand Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-Add left turn The project will provide for a protected left turn phase for the eastbound and westbound approaches on lane(s)to intersection Chapman Avenue at Grand Street.The proposed signal modification will enhance the capacity and improve the traffic signal operation at the intersec Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Ave and Grand St Intersection Project Notes Totals: $0 $0 $0 0 $0 $0 TSIP Citywide(287).Carry Over for FY 23/24.Funding reflected in prior year(s). Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11583 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project IDs: East Walnut Ave Infrastructure Improvement Type of Work: Safety Project Description This project will construct a new 48"RCP storm drain line on Walnut Ave from Cambridge St to California St toTypeofWorkDescription: Safety-Improve roadway rainage alleviate the localized flooding issues.In addition,AC pavement and concrete will be improved from CambridgedSttoTustinSt. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Walnut Avenue from Cambridge Street to Tustin Street Project Notes Sanitation&Sewer(220),Measure"M2"Traffic Totals: $0 $0 $0 0 $0 $0 Imprvmnt(263),Sewer Construction(520)&Water 600)Utility Operations Previously named"Walnut Ave Infrastructure Improvement"Carry Over Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-12181 IMPLEMENTING AGENCY Orange.City of Local Project Number:20522 Project Title Additional Project IDs: Evaluation of Smart Parking Devices for Old Towne Type of Work: Transportation Planning Project Description Type of Work Description: Transportation Planning- The purpose of this evaluation is to explore and identify feasible options for smart parking systems and products, Studies including those that are cost-effective,reliable,have the potential for phased deployment best fitting the City's needs,and can be a Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Old Towne Orange 2024 Other 109,000 $0 $0 0 $109,000 $109,000 Project Notes Parking In Lieu(555):Old Towne Parking Facility Totals: $109,000 $0 $0 0 $109,000 $109,000 Last Revised:23-00-Submitted Total Programmed:$109,000 TIP ID CP-11321 IMPLEMENTING AGENCY Orange,City of Local Project Number:18-OCTA-TSP-3897 Project Title Additional Project IDs: Garden Grove Blvd Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- Multi-jurisdictional project between Valley View Street in Garden Grove and Bristol Street in Santa Ana.InInterconnecttrafficsignalstoimprovecoordinationand Orange the corridor is Garden Grove Blvd from Lewis Street to The City Drivecommunications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Garden Grove Boulevard,located at Lewis Street shared with Garden Grove)and at The City Drive Project Notes Totals: $0 $0 $0 0 $0 $0 TSIP Citywide(287).Carry Over Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-10996 IMPLEMENTING AGENCY Orange.City of Local Project Number:20380 Project Title Additional Project IDs: Glassell Street Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to GlassellInterconnecttrafficsignalstoimprovecoordinationand Street and on Glassell Street from Taft Avenue to Lincoln Avenue. communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Taft Avenue from Shaffer St to Glassell St and on 2024 Traffic Impact Fees $0 $0 $1,020,000 $0 $1,020,000 $1,050,600 Glassell St from Taft Ave to Lincoln Ave Project Notes TSIP Citywide(287).Carry Over Totals: $0 $0 $1,020,000 $0 $1,020,000 $1,050,600 Last Revised:23-00-Submitted Total Programmed:$1,020,000 TIP ID CP-10993 IMPLEMENTING AGENCY Orange.City of Local Project Number:30115 Project Title Additional Project IDs: Glassell and Palmyra Signal Install Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals-Install new Project will provide for the installation of a traffic signal at the intersection of Glassell St and Palmyra Ave.Work traffic signals and equipment includes installation of signal poles,associated equipment,and ADA ramps. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Glassell St at Palmyra Ave Project Notes Totals: $0 $0 $0 0 $0 $0 Reimbursable Capital Projects(550).Carry Over ILast Revised:23-00 Submitted Total Programmed:$0 TIP ID CP-11003 IMPLEMENTING AGENCY Orange,City of Local Project Number:20382 Project Title Additional Project IDs: Katella Ave Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Katella Avenue.The installation of F/O Interconnect traffic signals to improve coordination and lines will enable the City's TMC to communicate with the traffic signals to improve traffic signal operations and communications traffic flow. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Katella Ave from Tustin St to Santiago Blvd.and on Santiago Blvd from Katella Aveto Meats Ave. Project Notes Totals:$0 $0 $0 0 $0 $0 TSIP Citywide(287).Carry Over Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11322 IMPLEMENTING AGENCY Orange.City of Local Project Number:18-OCTA-TSP-3894 Project Title Additional Project IDs: Katella Ave Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The Katella Avenue Traffic Signal Synchronization Corridor is a multi-jurisdictional project,being led by OCTA.In Interconnect traffic signals to improve coordination and Orange,the corridor is between Struck Avenue and Santiago Canyon Road/Jamboree Road and includes 19 communications traffic signals. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Struck Avenue and Santiago Canyon Road/Jamboree Road Project Notes Totals: $0 $0 $0 0 $0 $0 TSIP Citywide(287)Carry Over Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11582 IMPLEMENTING AGENCY Orange.City of Local Project Number:30167 Project Title Additional Project IDs: Katella Ave Street Rehabilitation Type of Work: Road Maintenance Project Description Type of Work Description: Road Maintenance- This project is the rehabilitation of Katella Avenue,including pavement surfacing,replacement of broken curb and Reconstruction of roadway gutter,reconstruction of ADA ramps,adjusting utility covers to grade,restriping and landscaping improvements. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Katella Avenue from SR-55 to Harding Street Project Notes Measure"M2"Traffic Improvement(263).Carry Over Totals:$0 $0 $0 0 $0 $0 I Last Revised:23-00-Submitted Total Programmed:$0 ITIP ID CP-11007 IMPLEMENTING AGENCY Orange.City of Local Project Number:20378 Project Title Additional Project IDs: Katella and Batavia Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Katella Avenue from Main Street to StruckInterconnecttrafficsignalstoimprovecoordinationand Street and on Batavia Street from Katella Avenue to Palm Avenue. communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Katella Ave from Main St to Struck and Batavia St from 2024 Traffic Impact Fees $0 $0 $0 0 $0 0 Katella to Palm Ave 2025 Traffic Impact Fees $0 $0 $150,000 $0 $150,000 $159,135 Project Notes TSIP Citywide(287).Carry Over Totals:$0 $0 $150,000 $0 $150,000 $159,135 Last Revised:23-00-Submitted Total Programmed:$150,000 TIP ID CP-11577 IMPLEMENTING AGENCY Orange,City of Local Project Number:30150 Project Title Additional Project IDs: Local Roadway Safety Plan Type of Work: Safety Project Description Type of Work Description: Safety-Other This project will develop a Local Road Safety Plan(LRSP)that will define goals,objectives,and strategies to reduce accidents on local roads. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Citywide 2028 Measure M2 Local Fairshare $50,000 $0 $0 $0 $50,000 $50,000 Project Notes M2 Traffic Improvements(263)Carry Over Totals: $50,000 $0 $0 $0 $50,000 $50,000 Last Revised:23-00-Submitted Total Programmed:$50,000 TIP ID CP-11315 IMPLEMENTING AGENCY Orange.City of Local Project Number:18-OCTA-TSP-3901 Project Title Additional Project IDs: Main Street Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- Traffic Signal Synchronization Project is a multi-jurisdictional project.The corridor is between CHOC Court and Interconnect traffic signals to improve coordination and Taft Avenue and includes 12 traffic signals.This Project will be led by OCTA The programmed funds represent a communications 20%fair share contribution Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Maint St,between CHOC Court and Taft Avenue and includes 12 traffic signals Project Notes Totals: $0 $0 $0 0 $0 $0 TSIP Citywide(287).Carry Over Last Revised:2:3-00-Submitted Total Programmed:$0 TIP ID CP-11029 IMPLEMENTING AGENCY Orange.City of Local Project Number:16302 Project Title Additional Project IDs: Minor Traffic Control Devices Type of Work: Safety Project Description Type of Work Description: Safety-Traffic calming This project will provide minor traffic control devices such as signage,striping and other related traffic calming such as bulbout,chokers,speed hump,etc. devices as directed by the Traffic Commission and City Traffic Engineer. Limits FISCAL TOTALFUNDTYPEENGROWCON/IMP O&M TOTAL City-Wide YEAR ESCALATED Project Notes 2024 Measure M2 Local 5,000 $0 $45,000 $0 $50,000 $51,350 Traffic Improvements-Measure"M2"(263)&Capital Fairshare Projects(500).Carry Over 2024 General Fund 15,000 $0 $135,000 $0 $150,000 $154,050 2025 General Fund 20,000 $0 $180,000 $0 $200,000 $210,962 2025 Measure M2 Local 5,000 $0 $45,000 $0 $50,000 $52,740Fairshare 2026 General Fund 20,000 $0 $180,000 $0 $200,000 $216,691 2026 Measure M2 Local 5,000 $0 $45,000 $0 $50,000 $54,173Fairshare 2027 General Fund 20,000 $0 $180,000 $0 $200,000 $222,592 2027 Measure M2 Local 5,000 $0 $45,000 $0 $50,000 $55,648 Fairshare 2028 Measure M2 Local 5,000 $0 $45,000 $0 $50,000 $57,167 Fairshare 2028 General Fund 20,000 $0 $180,000 $0 $200,000 $228,669 2029 General Fund 20,000 $0 $180,000 $0 $200,000 $234,929 2029 Measure M2 Local 5,000 $0 $45,000 $0 $50,000 $58,732 Fairshare Totals:$145,000$0 $1,305,000$0 $1,450,000$1,597,703 Last Revised:23-00-Submitted Total Programmed:$1,450,000 TIP ID CP-11326 IMPLEMENTING AGENCY Orange.City of Local Project Number:20-ORNG-CBT-3957 Project Title Additional Project IDs: Orange Community Shuttle Feasibility Study Type of Work: Transit Project Description This project will explore opportunities and benefits for a new community shuttle service.The service could Type of Work Description: Transit-New Service provide an alternative to driving while connecting key destinations such as the Outlets,medical corridor,Old Towne,and Chapman University. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Wide Project Notes Totals:$0 $0 $ 0I 0 $0 $0 M2(263)&Reimbursable Capital Projects(550).Carry Over Last Revised;23-00-Submitted Total Programmed:$0 TIP ID CP-11385 IMPLEMENTING AGENCY Orange,City of Local Project Number:20397 Project Title Additional Project IDs: Parker Street Restriping Type of Work: Other Project Description This project will provide for the ultimate roadway configuration as the City builds out and adjacent parcels Type of Work Description: Other-Other potentially redevelop.By reorganizing the existing paved roadway,this will provide features necessary to best serve various road users. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Parker Street from La Veta Avenue to South City Limit 2028 Other 10,000 $0 $90,000 $0 $100,000 $114,335 Project Notes Reimbursable Capital Projects(550). Totals: $10,000 $0 $90,000 $0 $100,000 $114,335 Last Revised:23-00-Submitted Total Programmed:$100,000 TIP ID CP-11048 IMPLEMENTING AGENCY Orange,City of Local Project Number:13120 Project Title Additional Project IDs: Pavement Management Program(PMP) Type of Work: Road Maintenance Project Description Type of Work Description: Road Maintenance- The City's PMP identifies the condition for 320 miles of streets and identifies maintenance needs of this roadway Rehabilitation of roadway system requiring$6 million annually for slurry sealing,asphalt overlay and reconstructions. Limits FISCAL TOTAL City-Wide YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED Project Notes 2024 General Fund 60,000 $0 $540,000 $0 $600,000 $616,200 Traffic Improvement Measure"M2"(263),Gas Tax 2024 Gas Tax 0 0 $0 0 $0 0 Maintenance(270),RMRA(274),Capital Projects(500) 2024 Local Streets and Roads $300,000 $0 $2,700,000 $0 $3,000,000 $3,081,000 and Reimbursable Capital Projects(550).Carry Over.apportionments 2024 Measure M2 Local Fairshare $270,000 $0 $2,430,000 $0 $2,700,000 $2,772,900 2025 Gas Tax 25,000 $0 $225,000 $0 $250,000 $263,702 2025 Local Streets and Roads $340,000 $0 $3,060,000 $0 $3,400,000 $3,586,354 apportionments 2025 Measure M2 Local Fairshare $270,000 $0 $2,430,000 $0 $2,700,000 $2,847,987 2025 General Fund 120,000 $0 $1,080,000 $0 $1,200,000 $1,265,772 2026 General Fund 120,000 $0 $1,080,000 $0 $1,200,000 $1,300,145 2026 Measure M2 Local Fairshare $300,000 $0 $2,700,000 $0 $3,000,000 $3,250,363 2026 Local Streets and Roads $350,000 $0 $3,150,000 $0 $3,500,000 $3,792,090 apportionments 2026 Gas Tax 20,000 $0 $180,000 $0 $200,000 $216,691 2027 General Fund 130,000 $0 $1,170,000 $0 $1,300,000 $1,446,845 2027 Measure M2 Local Fairshare $300,000 $0 $2,700,000 $0 $3,000,000 $3,338,874 2027 Gas Tax 15,000 $0 $135,000 $0 $150,000 $166,944 2027 Local Streets and Roads $360,000 $0 $3,240,000 $0 $3,600,000 $4,006,649 apportionments 2028 General Fund 130,000 $0 $1,170,000 $0 $1,300,000 $1,486,351 2028 Gas Tax 10,000 $0 $90,000 $0 $100,000 $114,335 2028 Local Streets and Roads apportionments 370,000 $0 $3,330,000 $0 $3,700,000 $4,230,383 2028 Measure M2 Local Fairshare $310,000 $0 $2,790,000 $0 $3,100,000 $3,544,375 2029 Measure M2 Local Fairshare $212,000 $0 $1,908,000 $0 $2,120,000 $2,490,252 2029 General Fund 10,000 $0 $90,000 $0 $100,000 $117,465 2029 Local Streets and Roads $293,000 $0 $2,637,000 $0 $2,930,000 $3,441,716 apportionments 2029 Gas Tax 70,000 $0 $630,000 $0 $700,000 $822,253 Totals:$4,385,000$0 $39,465,000$0 $43,850,000$48,199,646 Last Revised:23-00-Submitted Total Programmed:$43,850,000 TIP ID CP-11049 IMPLEMENTING AGENCY Orange,City of Local Project Number:13115 Project Title Additional Project IDs: Pavement Management Program(PMP)Survey Type of Work: Road Maintenance Project Description of Work Description: Road Maintenance- Windshield field surveys of the City's pavement are conducted every four years to determine pavement conditionType Studies or PMP updates indexes for each segment.These surveys are conducted as a requirement for numerous grant programs,OCTA bi-annual reports,and overall PMP Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City-Wide 2025 Measure M2 Local Fairshare $70,000 $0 $0 $0 $70,000 $70,000 • Project Notes 2027 Measure M2 Local Fairshare $70,000 $0 $0 $0 $70,000 $70,000 Traffic Improvement-Measure 7M2"(263)&TSIP 2029 Measure M2 Local Fairshare $70,000 $0 $0 $0 $70,000 $70,000 Citywide(287)Carry Over Totals: $210,000 $0 $0 $0 $210,000$210,000 Last Revised:23-00-Submitted Total Programmed:$210,000 TIP ID CP-12179 IMPLEMENTING AGENCY Orange.City of Local Project Number:20518 Project Title Additional Project IDs: Pedestrian Beacon Upgrades Type of Work: Safety Project Description TypeThis project will upgrade and modernize existing flashing beacon systems at several pedestrian crossingsofWorkDescription: Safety-Signage installation and/or replacement throughout the City.The project will also involve minor modifications to/refurbishment of ancillary equipment, roadway features,and traffic con Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations Throughout the City 2024 General Fund $0 $0 $27,730 $0 $27,730 $28,562 Project Notes 2024 Other 0 $0 $249,570 $0 $249,570 $257,057 General Fund(500)&Reimbursable Capital Projects 550) Totals: $0 $0 $277,300 $0 $277,300 $285,619 Last Revised:23-00-Submitted Total Programmed:$277,300 TIP ID CP-11576 IMPLEMENTING AGENCY Orange,City of Local Project Number:16065 Project Title Additional Project IDs: Quiet Zone Maintenance Type of Work: Safety Project Description This project will provide for the annual Quiet Zone and Safe Railroad Crossing maintenance agreement with Type of Work Description: Safety-Other Southern California Regional Rail Authority and any related maintenance or improvements necessary for compliance. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Citywide 2024 Other 0 $0 $0 50,000 $50,000 $50,000 Project Notes 2025 Other 0 $0 $0 50,000 $50,000 $50,000 City TRF:Merged 2008 Tax Exempt Bonds(954).Carry 2026 Other 0 $0 $0 50,000 $50,000 $50,000 Over 2027 Other 0 $0 $0 50,000 $50,000 $50,000 2028 Other 0 $0 $0 50,000 $50,000 $50,000 2029 Other 0 $0 $0 50,000 $50,000 $50,000 Totals:$0 $0 $0 300,000 $300,000 $300,000 Last Revised:23-00-Submitted Total Programmed:$300,000 TIP ID CP-11052 IMPLEMENTING AGENCY Orange.City of Local Project Number:20325 Project Title Additional Project IDs: Santiago Bike Trail Phase IV Type of Work: Bikeways Project Description Type of Work Description: Bikeways-New bike route This project is the final phase of the Santiago Creek Bike Trail alignment in the Master Bikeway Plan. Construction of the multi-purpose trail will connect the existing bike trail west of Cannon St. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cannon to Windes Project Notes Totals: $0 $0 $0 0 $0 $0 Capital Projects(500)&Reimbursable Capital Projects 550).Grants-Construction.Grants-Engineering and Env.-This was the"Santiago Creek Multipurpose Trail Extension"Carry Over Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11051 IMPLEMENTING AGENCY Orange.City of Local Project Number:30019 Project Title Additional Project IDs: Santiago Canyon Road Multi-Purpose Trail Type of Work: Bikeways Project Description Construction of a multipurpose trail adjacent to Santiago Canyon Rd connecting the ex.trail at the Reserve Type of Work Description: Bikeways-Planning neighborhood to Cannon Street.The trail would be constructed of decomposed granite,and would allow for pedestrians equestrians,and bicycles Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Santiago Canyon Rd-Orange Park Blv to Cannon 2025 Other 75,000 $0 $0 0 $75,000 $75,000 Street. 2026 Other 0 $0 $750,000 $0 $750,000 $819,545 I Project Notes Reimbursable Capital Projects(550).Carry Over Totals: $75,000 $0 $750,000 $0 $825,000 $894,545 Last Revised:23-00-Submitted Total Programmed:$825,000 TIP ID CP-11887 IMPLEMENTING AGENCY Orange,City of Local Project Number:30194 Project Title Additional Project IDs: Santiago Canyon Road Rehabilitation Project Type of Work: Road Maintenance Project Description of escription: Road Maintenance- The work will include pavement rehabilitation,replacement of failed pavement areas,damaged sidewalk andTypeWorkD Rehabilitation of roadway curb and gutter,removal and construction of existing ADA ramps to conform to federal guidelines and restriping the roadway. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Santiago Canyon Road from Newport Boulevard to Jamboree Road Project Notes Totals: $0 $0 $0 0 $0 $0 RMRA(274)&Reimbursable Capital Projects(550). Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-12182 IMPLEMENTING AGENCY Orange.City of Local Project Number:20525 Project Title Additional Project IDs: Santiago Canyon Road Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the City's Traffic Signal Network along Santiago Canyon Rd.from Cannon St.to Chapman Interconnect traffic signals to improve coordination and Ave.The new fiber optic lines will enable the City's Traffic Management Center to improve traffic signal communications operations,and traffic flow. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Santiago Canyon Rd.from Cannon St.to Chapman Ave. 2028 Traffic Impact Fees $25,000 $0 $225,000 $0 $250,000 $285,837 Project Notes TSIP citywide(287) Totals:$25,000 $0 $225,000 $0 $250,000 $285,837 Last Revised.23-00-Submitted Total Programmed:$250,000 TIP ID CP-11882 IMPLEMENTING AGENCY Orange.City of Local Project Number:20430 Project Title Additional Project IDs: Storm Drain Improvements Type of Work: Safety Project Description Type of Work Description: Safety-Improve roadway This project replaces existing deficient drainage systems and constructs new storm drain lines as needed per the drainage Master Plan of Drainage to alleviate localized flooding. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations Throughout the City 2024 Other 40,000 $0 $360,000 $0 $400,000 $410,800 Project Notes 2025 Other 50,000 $0 $450,000 $0 $500,000 $527,405 Sanitation and Sewer(220).Carry Over 2026 Other 50,000 $0 $450,000 $0 $500,000 $541,727 2027 Other 50,000 $0 $450,000 $0 $500,000 $556,479 2028 Other 50,000 $0 $450,000 $0 $500,000 $571,673 2029 Other 50,000 $0 $450,000 $0 $500,000 $587,324 Totals: $290,000 $0 $2,610,000 $0 $2,900,000 $3,195,408 Last Revised:23-00-Submitted Total Programmed:$2,900,000 TIP ID CP-11881 IMPLEMENTING AGENCY Orange,City of Local Project Number:20374 Project Title Additional Project IDs: Streetlight Pole Replacement Program Type of Work: Safety Project Description Type of Work Description: Safety-Improve lighting of This program will biannually replace 40 existing steel streetlight poles with City standard LED-retrofitted concrete roadway poles and underground overhead wires. Limits FISCAL FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL Various locations throughout the City YEAR ESCALATED Project Notes 2024 General Fund 47,000 $0 $423,000 $0 $470,000 $482,690 Capital Project(500)&Measure M2(263). 2024 Measure M2 Local 3,000 $0 $27,000 $0 $30,000 $30,810Fairshare 2025 Measure M2 Local 3,000 $0 $27,000 $0 $30,000 $31,644Fairshare 2025 General Fund 47,000 $0 $423,000 $0 $470,000 $495,761 2026 General Fund 47,000 $0 $423,000 $0 $470,000 $509,224 2026 Measure M2 Local 3,000 $0 $27,000 $0 $30,000 $32,504Fairshare 2027 Measure M2 Local 3,000 $0 $27,000 $0 $30,000 $33,389Fairshare 2027 General Fund 47,000 $0 $423,000 $0 $470,000 $523,090 2028 Measure M2 Local 3,000 $0 $27,000 $0 $30,000 $34,300Fairshare 2028 General Fund 47,000 $0 $423,000 $0 $470,000 $537,373 Totals:$250,000$0 $2,250,000$0 $2,500,000$2,710,785 Last Revised:23-00-Submitted Total Programmed:$2,500,000 TIP ID CP-10979 IMPLEMENTING AGENCY Orange,City of Local Project Number:13816 Project Title Additional Project IDs: Structural Evaluation of City Bridges Type of Work: Bridge Project Description Type of Work Description: Bridge-Rehabilitation of A maintenance and retrofit plan are ready for implementation for 8 bridges located throughout the City that existing pavement/structure require maintenance.The City is awaiting Caltrans funding for construction phase in FY 24-25. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations City Wide 2025 State 0 $0 $2,000,000 $0 $2,000,000 $2,121,800 Project Notes Caltrans BPMP,Pending E76-$1,665,715.00 Was Totals: $0 $0 $2,000,000 $0 $2,000,000 $2,121,800BridgeMaintenance"Gas Tax Maintenance(270),Gas Tax 2105(272)&Reimbursable Capital Projects(550). Carry Over Last Revised:23-00-Submitted Total Programmed:$2,000,000 TIP ID CP-11884 IMPLEMENTING AGENCY Orange,City of Local Project Number:20500 Project Title Additional Project IDs: Sycamore and Palmyra Neighborhoods Street Rehabilitation Type of Work: Road Maintenance Project Description Type of Work Description: Road Maintenance- This project will rehabilitate streets in the Sycamore and Palmyra Neighborhoods.Work includes cold planing,AC Rehabilitation of roadway overlay installation,slurry seal,reconstruction of sidewalks,curb and gutters,driveways and cross gutters. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Sycamore Avenue,Holly Street,Ash Street,Palmyra Avenue,Flower Street,and Lilac Lane Project Notes Totals: $0 $0 $0 0 $0 $0 CDBG(310)&Capital Projects(500). Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-12172 IMPLEMENTING AGENCY Orange.City of Local Project Number:30215 Project Title Additional Project IDs: Taft Avenue Bioclean Installation&Lewis Street Water Quality Improvements Type of Work: Other Project Description This project will install a Debris Separating Baffle Box(DSBB)or equal on Taft Avenue east of the intersection of Type of Work Description: Other-Other Taft Avenue and O'Donnell Way.The project will also install seven connector pipe screens(CPS)on various streets within the City. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED East of intersection of Taft Ave.&O'Donnell Way and Various Locations throughout the City. Project Notes Totals: $0 $0 $0 0 $0 $0 Sanitation and Sewer(220)and Reimbursable Capital projects(550).Project X Tier 1 Fund. Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11055 IMPLEMENTING AGENCY Orange,City of Local Project Number:16305 Project Title Additional Project IDs: Traffic Signal Controller Changeout Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals-Replace The City maintains 158 traffic signals,most of which contain older controllers.Nearly 2/3 of the controllers have and upgrade traffic signals and equipment been updated or replaced to allow for better coordination with the City's Transportation Management Center. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City-Wide 2024 Gas Tax $0 $0 $100,000 $0 $100,000 $103,000 Project Notes 2025 Gas Tax $0 $0 $100,000 $0 $100,000 $106,090 Gas Tax Maintenance(270)Carry Over 2026 Gas Tax $0 $0 $100,000 $0 $100,000 $109,273 2027 Gas Tax $0 $0 $100,000 $0 $100,000 $112,551 2028 Gas Tax $0 $0 $100,000 $0 $100,000 $115,927 2029 Gas Tax $0 $0 $100,000 $0 $100,000 $119,405 Totals:$0 $0 $600,000 $0 $600,000 $666,246 Last Revised'23-00-Submitted Total Programmed:$600,000 TIP ID CP-11056 IMPLEMENTING AGENCY Orange.City of Local Project Number:16469 Project Title Additional Project IDs: Traffic Signal Equipment Painting Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals-Replace This project provides for the painting,wrapping,or application of an anti-graffiti coating to traffic signal equipment and upgrade traffic signals and equipment at intersections within the City.This project would fund a portion of the City's 158 intersections as needed. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City-Wide 2024 Measure M2 Local Fairshare $0 $0 $45,000 $0 $45,000 $46,350 Project Notes 2025 Measure M2 Local Fairshare $0 $0 $45,000 $0 $45,000 $47,740 TSIP Citywide(287)&Traffic Improvements-Measure 2026 Measure M2 Local Fairshare $0 $0 $45,000 $0 $45,000 $49,173 M2"(263).Carry Over 2027 Measure M2 Local Fairshare $0 $0 $45,000 $0 $45,000 $50,648 2028 Measure M2 Local Fairshare $0 $0 $45,000 $0 $45,000 $52,167 2029 Measure M2 Local Fairshare $0 $0 $45,000 $0 $45,000 $53,732 Totals: $0 $0 $270,000 $0 $270,000 $299,810 Last Revised:23-00-Submitted Total Programmed:$270,000 TIP ID CP-11323 IMPLEMENTING AGENCY Orange,City of Local Project Number:20-ORNG-TSP-3976 Project Title IAdditional Project IDs: Tustin St Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- A multi-jurisdictional project between First Street in Tustin and Wabash Avenue in Yorba Linda.25 of the signals Interconnect traffic signals to improve coordination and are within the City of Orange.This Project will be led by City of Orange and primarily funded through Measure communications M2. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Tustin Street Project Notes TSIP B-Carry Over Reimbursable Capital Projects Totals: $0 $0 $0 0 $0 $0 Carry Over for FY22/23.Funding reflected in prior years. Includes$2,766,833 from M2 TSSP. Last Revised:23-00-Submitted Total Programmed:$0 TIP ID CP-11883 IMPLEMENTING AGENCY Orange,City of Local Project Number:20485 Project Title Additional Project IDs: 21-ORNG-ECP-4010 Tustin Street BioClean Installation Type of Work: Other Project Description Type of Work Description: Other-Other This project will install a BioClean Separating Baffle Box or equal on Tustin Street north of Santiago Creek Bridge. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Tustin Street near 445 S Tustin St,Orange,CA 92866 and Various Location Throughout the City. Project Notes Totals: $0 $0 $0 0 $0 $0 Sanitation and Sewer(220)and Reimbursable Capital Projects(550).Project X Tier 1 Fund. Last Revised:23-00-Submitted Total Programmed:$0