AGR-7479 - MAINTSTAR INCDocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
D5 n,�
AGR# 7479 FT
SOFTWARE SERVICES AGREEMENT
[Land Management and Work Asset Management Software Services]
THIS SOFTWARE SERVICES AGREEMENT (the "Agreement") is made at Orange,
California, on this .14 day of MARCH , 2023 (the "Effective Date") by and between the
CITY OF ORANGE, a municipal corporation ("City"), and MAINTSTAR, INC., a Texas
corporation ("Contractor"), who agree as follows:
1. Services. Subject to the terms and conditions set forth in .this Agreement,
Contractor shall provide to the reasonable satisfaction of City.the services set forth in Exhibit "A"
and Exhibit "B," which are attached hereto and incorporated herein by reference.. As a material
inducement to City to 'enter into this Agreement, Contractor represents and warrants that it has
thoroughly investigated and considered the scope of services and fully understands the difficulties
and restrictions in performing the work. The services which are the subject of this Agreement are
not in the usual course of City's business and City relies on Contractor's representation that it is
independently engaged in the business of providing such services and is experienced in performing
the work. Contractor shall perform all services in a manner reasonably satisfactory to City and in
a manner in conformance with the standards of quality normally observed by an entity providing
such services to a municipal agency. All services provided shall conform to all federal, state and
local laws, rules and regulations and to the best professional standards and practices. The terms
and conditions set forth in this Agreement shall control over any terms and conditions in Exhibit
"A" and. Exhibit `B" to the contrary.
Frank Sun, Assistant Public Works' Director/City Engineer ("City's Project Manager"),
shall be the person to whom Contractor will report .for the performance of services hereunder. It
is understood that Contractor's performance hereunder shall be under the supervision of City's
Project Manager (or designee), that Contractor shall coordinate its services hereunder with City's
Project Manager to the extent required by City's Project Manager, and that all performances
required hereunder by Contractor shall be performed to the satisfaction of City's Project Manager
and the City Manager.
2.= Compensation and Fees.
a. Contractor's total compensation for all services performed under this
Agreement, shall not exceed ONE MILLION ONE HUNDRED NINETY-SEVEN THOUSAND
FOUR HUNDRED EIGHTY-SIX DOLLARS and 00/100 ($1,197,486.00) without the prior
written authorization of City. The subscription fees component of the compensation is payable as
follows:
• The first year subscription cost shall be ONE HUNDRED
EIGHTEEN THOUSAND DOLLARS and 00/100 ($118,000:00). Subsequent'year subscription
costs shall be increased by the CPI, up to a maximum of 5%. The first annual subscription cost
shall be. prorated according to the actual months the software is implemented.
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
b. The above compensation shall include all costs, including, but not limited
to, a 10% contingency, all clerical, administrative, overhead, insurance, reproduction, telephone,
travel, auto rental, subsistence, and all related expenses.
2.1 Term and Extension(s)
a. The Initial Term of this Agreement is five (5) years (the "Initial Term"),
commencing April 1, 2023, and expiring on March 31, 2028 (the "Expiration Date). The City has
the right to extend the term of this Agreement by giving not less than sixty (60) days' notice for
the following extension and upon the following terms:
• The First Extension Term is five (5) years (the "First Extension
Term"), commencing April 1, 2028, and terminating March 31, 2033, in a total amount not to
exceed NINE HUNDRED FIFTEEN THOUSAND THREE HUNDRED THIRTY-NINE
DOLLARS and 00/100 ($915,339.00).. The First Extension Term year subscription cost shall be
no greater than ONE .HUNDRED FIFTY THOUSAND SIX HUNDRED ONE DOLLARS and
00/100 ($150,601.00). Subsequent year subscription costs shall be increased by the CPI, up to a
maximum of 5%.
b. The City Manager is hereby authorized on behalf of ,City to give written
notice to Contractor of City's intention to exercise the Extension (if at all) no later than sixty (60)
days prior to the Expiration Date of the Initial Term; provided, however, that City's notice of its
intention to extend the term of this Agreement shall be expressly conditioned upon and subject to
the approval. by the City Council, in its sole and absolute discretion, of an amount sufficient to pay
the compensation set forth herein for the Extension as part of its annual budget approval process
prior to the beginning the Extension. While the parties acknowledge that City is required to give
its notice of intention to extend the -term of this Agreement not later than sixty (60) days prior to
the Expiration Date of Initial Term, it is possible that the City Council's approval of its annual
budget and appropriation of funds for the Extension in question may occur thereafter. Accordingly,
if the City Council. fails to approve and appropriate funds sufficient to pay the amount of
compensation set forth herein for the Extension, this Agreement shall terminate and be of no
further force, and effect as of the expiration of the Initial Term. Notwithstanding anything in this
provision to the contrary, in the event City gives Contractor written notice exercising the Extension
and City receives notice that appropriation of funds for the Extension in question are not available
after Contractor has performed services under the Extension, City agrees that Contractor will be
equitably compensated for all services performed under any portion of the Extension through the
date of termination of the Agreement. Except as specifically set forth herein, the terms and
conditions of the First Extension will be the same as the Initial Agreement.
C. The'Extension, if properly exercised, shall be memorialized in the form of
an amendment to this Agreement. The City Manager is hereby authorized to approve. and execute
amendments to this Agreement reflecting the exercise of the Extension and the amount of
compensation (including the amount of funds to be made available for additional work or services)
payable to Contractor for the Extension
3. Payment.
2
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
a. As scheduled services are completed, or as otherwise provided in Exhibits
"A" and `B," Contractor shall submit to -City an invoice for the services completed, authorized
expenses and authorized extra work actually performed or incurred.
b. All such. invoices shall state the basis for the amount invoiced, including
services completed, the number of hours spent and any extra work performed.
C. City will pay Contractor the amount invoiced within thirty (30) days of
receipt of all deliverables.
d. Payment shall constitute payment in full for all services, authorized costs
and authorized extra work covered by that invoice.
4. Change Orders. No payment for extra services caused by a change in the scope
or complexity of work, or for any otherr reason, shall be made unless and until such extra services
and a price therefor have been previously authorized in writing and approved by City as an
amendment to this Agreement. City's Project Manager is authorized to approve a reduction in the
services to be performed and compensation therefor. All amendments shall set forth the changes
of work, extension of time, and/or adjustment of the compensation to be paid by City to Contractor
and shall be signed by the City's Project Manager, City Manager or City Council, as applicable.
5. Licenses. Contractor represents that it and any subcontractors it may engage,
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
a. As scheduled services are completed, or as otherwise provided in Exhibits
"A" and `B," Contractor shall submit to -City an invoice for the services completed, authorized
expenses and authorized extra work actually performed or incurred.
b. All such. invoices shall state the basis for the amount invoiced, including
services completed, the number of hours spent and any extra work performed.
Contractor acknowledges that it and any subcontractors, agents or employees employed by
Contractor shall not, under any circumstances, be considered employees of City, and that they shall
not be entitled to any of the benefits or rights afforded employees of City, including, but not limited
to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or
health, life, dental, long-term disability or workers' compensation insurance benefits.
7. Contractor Not Agent. Except as City may specify in writing, Contractor shall
have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
agent. Contractor shall have no authority, express or implied, to bind City to any obligation
whatsoever.
8. Designated Persons. Only those qualified persons authorized by City's Project
Manager, or as designated in Exhibits "A" or `B," shall perform work provided for under this
Agreement. It is understood by the parties that clerical and other nonprofessional work may be
performed by persons other than those designated.
9.. Assignment or Subcontracting. No assignment or subcontracting by Contractor
of any part of this Agreement or of funds to be received under this Agreement shall be of any force
or effect unless the assignment has the prior written approval of City. City may terminate this
Agreement rather than accept any proposed assignment or subcontracting. Such assignment or
subcontracting may be approved by the City Manager or designee.
10. Time of Completion. Except as otherwise specified in Exhibit "A" or Exhibit `B,"
Contractor shall commence the work provided for in this Agreement within thirty (30) days of the
Effective Date of this Agreement and diligently prosecute completion of the work in accordance
with the time period set forth in the Exhibits hereto or as otherwise agreed to by and between the
representatives of the parties.
11. Time Is of the Essence. Time is of the essence in this Agreement. Contractor shall
do all things necessary and incidental to the prosecution of Contractor's work.
12. Reserved.
13. Delays and Extensions of Time. Contractor's sole remedy for delays outside its
control, other than those delays caused by City' shall be an extension of time. No matter what the
cause of the delay, Contractor must document any delay and request an extension of time in writing
at the time of the delay to the satisfaction of City. Any extensions granted shall be limited to the
length of the delay outside Contractor's control. If Contractor believes that delays caused by City
will cause it to incur additional costs, it must specify, in writing, why the delay has caused
additional costs to be incurred and the exact amount of such cost at. the time the delay occurs. No
additional costs can be paid that exceed the not to exceed amount stated in Section 2.a, above,
absent a written amendment to this Agreement.
14. Products of Contractor. The documents, studies, evaluations, .assessments,
reports, plans, citations, materials, manuals, technical data, logs, files, designs and other products
produced or provided by Contractor for this Agreement shall become the property of City upon
receipt. Contractor shall deliver all such products to City prior to payment for same. City may
use, reuse or otherwise utilize such products without restriction.
15. Equal Employment Opportunity. During the performance of this Agreement,
Contractor agrees as follows:
a. Contractor shall not discriminate against any employee or applicant for
employment because of race, color, religion, sex, national origin, mental or physical disability, or
4
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
any other basis prohibited by applicable law. Contractor shall ensure that applicants are employed,
and that employees are .treated during employment, without regard to their race, color, religion,
sex, national origin, mental or physical disability, or any other basis prohibited by applicable law.
Such actions shall include, but not be limited to the following: employment, .upgrading;, demotion
or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms
of compensation and selection for training, including apprenticeship. Contractor agrees to post in
conspicuous places, available to employees and applicants for employment, a notice setting forth
provisions of this non-discrimination clause.
b. Contractor shall, in all solicitations and advertisements for employees
placed by, or on behalf of Contractor, state that all qualified applicants will receive consideration
for employment without regard to race, color, religion, sex, national origin, mental or physical
disability, or any other basis prohibited by applicable law.
C. Contractor shall cause the foregoing paragraphs (a) and (b) to be inserted in
all subcontracts for any work covered by this Agreement, provided that the foregoing provisions
shall not apply to subcontracts for standard commercial supplies or.raw materials.
16. Conflicts of Interest. Contractor agrees. that it shall not make, participate in the
making, or in any way attempt to use its position as a consultant to influence any, decision of City
in which Contractor knows or has reason to. know that Contractor, its officers, partners, or
employees have a financial interest as defined in Section 87103 of the Government Code.
17. Indemnity.
a. To `the fullest extent permitted by law, Contractor agrees to indemnify,
defend and hold City, its City Council and each member thereof, and the officers, officials, agents
and employees of City (collectively the "Indemnitees") entirely harmless from all liability arising
out of
(1) Any and all claims under workers' compensation acts and other
employee benefit acts with respect to Contractor's employees or Contractor's subcontractor's
employees arising out of Contractor's work under this Agreement, including any. and all claims
under any law pertaining to Contractor or its employees' status as an independent contractor and
any and all claims'under Labor Code section 1720 related to the payment of prevailing wages for
public works projects; and
(2) Any claim, loss, injury to or death of persons or damage to property
caused by any act, neglect, default, or omission other than a professional act or omission of
Contractor, or person, firm or corporation employed by Contractor, either directly or by
independent contract, including all damages due to loss or theft sustained by any person, firm or
corporation including the Indemnitees, or any of them, arising out of, or in any way connected
with the work or services which are the subject of this Agreement, including injury or damage
either on or off City's property; but not for any loss, injury, death or damage caused by the active
negligence or willful misconduct of City. Contractor, at its own expense, cost and risk, shall
indemnify any. and all claims, actions, suits or other proceedings that may be brought or instituted
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
against the Indemnitees on any such claim or liability covered by this subparagraph, and shall pay
or satisfy any judgment that may be rendered against the Indemnitees, or any of them, in any
action, suit or other proceedings as,a result of coverage under this subparagraph.
b. To the fullest extent permitted by law, and as limited by California Civil
Code 2782.8, Contractor agrees to indemnify and hold Indemnitees harmless from all liability
arising out of any claim; loss, injury to or death of persons or damage to property to the extent
caused by its negligent professional act or omission in the performance of professional services
pursuant to this Agreement.
C. Except for the Indemnitees, the indemnifications provided in this
Agreement shall not be construed to extend any third party indemnification rights of any kind to
any person or entity which is not a signatory to this Agreement.
d. The indemnities set forth in this section shall survive any closing,
rescission, or termination of this Agreement, and shall continue to be binding and in full force and
effect in perpetuity with respect to Contractor and its successors.
18. Insurance.
a. Contractor shall carry workers' compensation insurance as required by law
for the protection of its employees during the progress of the work. Contractor understands that it
is an independent contractor and not entitled to any workers' compensation benefits under any
City program.
b. Contractor shall maintain during the life of this Agreement the following
minimum amount of comprehensive general liability insurance or commercial general liability
insurance: the greater of (1) One Million Dollars ($1,000,000) per occurrence; or (2) all the
insurance coverage and/or limits carried by or available to Contractor. Said insurance shall cover
bodily injury, death and property damage and be written on an occurrence basis.
C. Contractor shall maintain during the life of this Agreement, the following
minimum amount of automotive liability insurance: the greater of (1) a combined single limit of
One Million Dollars ($1,000,000); or (2) all the insurance coverage and/or limits carried by or
available to Contractor. Said insurance shall cover bodily injury, death and property damage for
all owned, non -owned and hired vehicles and be written on an occurrence basis.
d. Any insurance proceeds in excess of or broader than the minimum required
coverage and/or minimum required limits which are applicable to a given loss shall be available
to City. No representation is made that the minimum insurance requirements of this Agreement
are sufficient to cover the obligations of Contractor under this Agreement.
e. Each policy of general liability and automotive liability shall provide that
City, its officers, .officials, agents, and employees are declared to be additional insureds under the
terms of the policy, but only with respect to the work performed by Contractor under this
Agreement. A policy endorsement to that effect shall be provided to City along with the certificate
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences
that City is an additional insured as a contracting party. The minimum coverage required by
Subsection 18.b and c, above, shall apply to City as an additional insured. Any umbrella liability
insurance that is provided as part of the general or automobile liability minimums set forth herein
shall be maintained for the duration of the Agreement.
f. Contractor shall maintain during the life of this Agreement professional
liability insurance covering errors and omissions arising out of the performance of this Agreement
with a minimum limit of One Million Dollars ($1,000,000) per claim. Contractor agrees to keep
such policy in force and effect for at least five (5) years from the date of completion of this
Agreement.
g. The insurance policies maintained by Contractor shall be primary insurance
and no insurance held or owned by City shall be called upon to cover any loss under the policy.
Contractor will determine its own needs in procurement of insurance to cover liabilities other than
as stated above.
h. Before Contractor performs any work or prepares or delivers any materials,
Contractor shall furnish certificates of insurance and endorsements, -as required by City,
evidencing the aforementioned minimum insurance coverages on forms acceptable to City, .which
shall provide that the insurance in force will not be canceled or allowed to lapse without at least
ten (10) days' prior written notice to City.
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
of insurance. In lieu of an endorsement, City will accept a copy of the policy(ies) which evidences
that City is an additional insured as a contracting party. The minimum coverage required by
Subsection 18.b and c, above, shall apply to City as an additional insured. Any umbrella liability
insurance that is provided as part of the general or automobile liability minimums set forth herein
shall be maintained for the duration of the Agreement.
f. Contractor shall maintain during the life of this Agreement professional
liability insurance covering errors and omissions arising out of the performance of this Agreement
i ffias agreed to provide msur'ance, Contractor' fflalf food solely to its insurance for recovery.
Contractor hereby grants to City, on behalf of any insurer providing insurance to either Contractor
or City with respect to the services of Contractor herein, a waiver of any right to subrogation which
any such insurer may acquire against City by virtue of the payment of any loss under such
insurance.
1. . Contractor shall include all subcontractors, if any, as insureds under its
policies or shall furnish separate certificates and endorsements for each subcontractor to City for
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
review and approval. All coverages for subcontractors shall be subject to all of the requirements
stated herein.
19. Termination. City may for any reason terminate this Agreement by giving
Contractor not less than five (5) days' written notice of intent to terminate during the
implementation phase. Upon receipt of 'such notice, Contractor shall immediately cease work,
unless the notice from City provides otherwise. Upon the termination of this Agreement, City
shall pay Contractor for services satisfactorily provided and all allowable reimbursements incurred
to the date of termination in compliance with this Agreement, unless termination by City shall be
for cause, in which event City may withhold any disputed compensation. City shall not be liable
for any claim of lost profits. After implementation phase of the project and go live, City may for
any reason terminate this Agreement by giving Contractor not less than ninety (90) days' written
notice of intent to terminate, the City annual subscription cost shall be prorated for the month
software service used.
20. Maintenance and Inspection of Records. In accordance with generally accepted
accounting principles, Contractor. and its subcontractors .shall maintain reasonably full and
complete books, documents, papers, accounting records, and other information (collectively, the
"records") pertaining to the costs of and completion of services performed under this Agreement.
City and its authorized representatives shall have access to and the right to audit and reproduce
any of Contractor's records regarding the services provided under this Agreement. Contractor shall
maintain all such records for a period of at least three (3) years after termination or completion of
this Agreement. Contractor agrees to make available all such records for inspection or audit at its
offices during normal business hours and upon three (3) days' notice from City, and copies thereof
shall be furnished if requested.
21. Compliance with all Laws/Immigration Laws.
a. Contractor shall be knowledgeable of and comply with all local, state and
federal laws which may apply to the performance of this Agreement.
b. If the work provided for in this Agreement constitutes a "public works," as
that term is defined in Section 1720 of the California Labor Code, for which prevailing wages must
be paid, to the extent Contractor's employees will perform any work that falls within any of the
classifications for which the Department of Labor Relations of the State of California promulgates
prevailing wage determinations, Contractor hereby agrees that it, and any subcontractor under it,
shall pay not less than the specified prevailing rates of wages to all such workers. The general
prevailing wage. determinations for crafts can, be located on the website of the Department of
Industrial Relations (www.dir.ca.gov/DLSR). Additionally, to perform work under this Contract,
Contractor must meet all State registration requirements and criteria, including project compliance
monitoring.
C. Contractor represents and warrants that it:
(1) Has complied and shall at all times during the term of this
Agreement comply, in all respects, with all immigration laws, regulations, statutes, rules, codes,
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
and orders, including, without limitation, the Immigration Reform and Control Act of 1986
(IRCA); and
(2) Has not and will not knowingly employ any individual to perform
services under this Agreement who is ineligible to work in the United States or under the terms of
this Agreement; and
(3) Has properly maintained, and shall at all times during the term of
this Agreement properly maintain, all related employment documentation records including,
without limitation, the completion and maintenance of the Form I-9 for each of Contractor's
employees; and
(4) Has responded, and shall at all times during the term of this
Agreement respond, in a timely fashion to any government inspection requests relating to
immigration law compliance and/or Form I-9 compliance and/or worksite enforcement by the
Department of Homeland Security, the Department of Labor, or the Social Security
Administration.
d. Contractor shall require all subcontractors or subconsultants to make the
same representations and warranties as set forth in Subsection 21.c.
e. Contractor shall, upon request of City, provide a list of all employees
working under this Agreement and shall provide, to the reasonable satisfaction of City, verification
that all such employees are eligible to work in the United States. All costs associated with such
verification shall be borne by Contractor. Once such request has been made, Contractor may not
change employees working under this Agreement without written notice to City, accompanied by
the verification required herein for such employees.
f. Contractor shall require all subcontractors or sub -consultants to make the
same verification as set forth in Subsection 2Le.
g. If Contractor or subcontractor knowingly employs an employee providing
work under this Agreement who is not authorized to work in the United States, and/or fails to
follow federal laws to determine the status of such employee, that shall constitute a material breach
of this Agreement and may be cause for immediate termination of this Agreement by City.
h. Contractor agrees to indemnify and hold City, its officers, officials, agents
and employees harmless for, of and from any loss, including but not limited to fines, penalties and
corrective measures City may sustain by reason of Contractor's failure to comply with said laws,
rules and regulations in connection with the performance of this Agreement..
22. Governing Law and Venue. This Agreement shall be construed in accordance
with and governed by the laws of the State of California and Contractor agrees to submit to the
jurisdiction of California courts. Venue for any dispute arising under this Agreement shall be in
Orange County, California.
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
23. Integration. This Agreement constitutes the, entire agreement of the parties. No
other agreement, oral or written, pertaining to the work to be performed, under this Agreement shall
be of any force or effect unless it is in writing and signed by both parties. Any work performed
which. is inconsistent with or in violation of the provisions of this Agreement shall not be
compensated.
24. Notice. Except as otherwise provided herein, all notices required under this
Agreement shall be in writing and delivered personally, by e-mail, or by first class U.S. mail,
postage prepaid, to each party at the address listed below. Either party may change the notice
address by notifying the other party in writing. Notices shall be deemed received upon receipt of
same or within three (3) days of deposit in the U.S. Mail, whichever is earlier. Notices sent by e-
mail shall be deemed received on the. date of the e-mail transmission.
"CONTRACTOR"
Maintstar, Inc.
2510 Turtle Creek Blvd., Unit 178
Dallas, TX 75319
Attn.: Eric Sabato
Telephone: 714-883-8 851
E-Mail: Eric@maintstar.com
"CITY"
City of Orange
300 E. Chapman Avenue
Orange, CA 92866-1591
Attn.: Frank Sun
Telephone: 714-744-5529
E-Mail: fsun@cityoforange.org
25. Counterparts. This Agreement may be executed in one or more counterparts, each
of which shall be deemed an original, but all of which together shall constitute one and the same
instrument. Signatures transmitted via facsimile and electronic mail shall have the same effect as
original signatures.
[Remainder of page intentionally left blank; signatures on next page]
10
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
IN. WITNESS of this Agreement, the parties have entered into this Agreement as of the
year and day first above written.
"CONTRACTOR" "CITY"
MAINTSTAR, INC., a Texas corporation CITY OF ORANGE, a municipal corporation
EDncuSigned by:
By.74730986A557478..
Printed Name: Eric Sabato
Title: VP of Sales
*By:
Printed Name:
Title:
DncuSigned by:
[ �, 9. sW
By. 02D86B777A20417..
Daniel R. Slater, Mayor
ATTEST:
DncuSigned by:
Pamela Coleman, City Clerk
APPROVED AS TO FORM:
EDncuSigned by:
Mary E. Binning, City Attorney
*NOTE: City requires the following signature(s) on behalf of the Contractor:
-- (1) the Chairman of the Board, the President or a Vice -President, AND (2) the
Secretary, the Chief Financial Officer, the Treasurer, an Assistant Secretary
or an Assistant Treasurer. If only one corporate officer exists or one corporate
officer holds more than one corporate office, please so indicate. OR
-- The corporate officer named in a corporate resolution as authorized to enter
into this Agreement. A copy of the corporate resolution, certified by the
Secretary close in time to the execution of the Agreement, must be provided to
City.
4
11
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
EXHIBIT "A"
SCOPE OF SERVICES
ENTERPRISE ASSET MANAGEMENT SYSTEM
[Beneath this sheet.]
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
EXHIBIT "B"
SCOPE OF SERVICES
LAND MANAGEMENT SYSTEM
[Beneath this sheet.]
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
800 • 255 • 5678 phone
949 • 458 • 7626 fax
eric@maintstar.com
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
PROJECT INTRODUCTION............................................................................................3
ExecutiveSummary.................................................................................................3
TASKS AND DELIVERABLES..........................................................................................3
SharedResponsibilities...........................................................................................3
Requirements Review and Confirmation.................................................................4
Project Planning and Management.........................................................................4
Meetingsand Updates.............................................................................................9
TrainingPlan...........................................................................................................9
Go -Live Conditions.................................................................................................10
SupportOptions....................................................................................................11
ProjectCloseout....................................................................................................12
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK. FOR THE CITY OF ORANGE
MARCH 3, 2023'
Contents
PROJECT INTRODUCTION............................................................................................3
ExecutiveSummary.................................................................................................3
TASKS AND DELIVERABLES--------------=---------------------------------------------------------------------------I
MAI ETA R 3510 Turtle Creek Blvd #17B
Dallas • TX . 75319
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 31 2023
PROJECT INTRODUCTION
Executive Summary
This Statement of Work (SOW) defines the tasks and deliverables required of MaintStar for the,
installation, configuration, integration and maintenance and support of the MaintStar version 15
Enterprise Asset Management System for the City of Orange, CA. Working in a partnership with city
staff, this project will consist of the following:
• Upgrade of existing MaintStar application to Version 15
• Conversion of Assets, all work history, Work Orders, and appropriate Setup Tables
• Setup and Implementation of Street Maintenance, Water, Fleet, Traffic, Engineering, Facilities
and Parks
• Setup of Maintstar Mobile Citizen and Work Request
• Setup Warehouse Network
• Conduct Facilities Conditions Assessment Data and Integrate Data into Facilities Module
• GIS Setup and Implementation
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 31 2023
PROJECT INTRODUCTION
Executive Summary
This Statement of Work (SOW) defines the tasks and deliverables required of MaintStar for the,
At a minimum, the following City of Orange staff resources are recommended to comprise the
Orange Project Team:
• Project Manager (primary and secondary)
• Functional business expert(s) for work requests, work orders inventory and fiscal reports,
service writers, crew leaders, supervisors, and end users.
AIN7STARDa Mllas • TX • 75319Ivd #17B
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FORTHE CITY OF ORANGE
MARCH 3, 2023
• Third -Party Implementor
In addition to staff member availability, it is also requested that MaintStar be provided all appropriate
access to existing databases, applications, and available resources to successfully facilitate database
conversion. City reserves full rights to MaintStar access to existing databases, applications, and
available resources.
Requirements Review and Confirmation
The specified. requirements will be reviewed, confirmed, and finalized and,will be conducted with
MaintStar and designated key members of the Orange Project Team, especially business subject
matter experts. Any additional requirements identified beyond those previously specified in this SOW
or in a requirements list will be analyzed and documented. Additional requirements will be discussed
to determine feasibility of inclusion into the project, `either in or out of scope.
Customizations and modules outside the scope of this document are subject to a change order
process.
Any additional or future interfaces and training beyond what is contained within this Scope of
Work and Quote will be subject to additional charges.
Project Planning and Management
MaintStar will provide a dedicated primary and backup project manager throughout implementation.
In addition, a developer, database analyst and GIS specialist will be assigned with backups available to
assist. Implementation staff will partner with appropriate City of Orange staff to en. sure project
success. In consideration of technology requirements, project timelines and staff availability a project
plan will be developed and will consist of the following:
• Install and make operational version 15 with all selected modules
• Perform data conversion of historical data, asset IDs, reports, previous attachments, and.other
associated information to be sent to a test environment.
• MaintStar shall provide an outline of the system configuration and on -going maintenance
procedures to the City's IT Department.
Requirements and Process Analysis
• Onsite project: management
AIN7STAR MDallas o• TX * 75319Ivd #17B
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE _CITY OF ORANGE
MARCH 3, 2023
• Review and Enhancement of existing processes and systems
® Project Mission, Scope, and Objectives
• Technology Assessment
Infrastructure Preparation
® Provision Server(s) and instance(s) in AWS environment
S Configure reporting server
• Assign license modules (Work Request, Portal, Mobile, GIS, Fleet —where
applicable)
• Configure: email, attachments, workgroups, and all other default modules
• Setup Work Request and Portal
.Conversion
• Obtain legacy database
e Conduct database mapping and run test import of work orders and assets
• Run data validation against legacy records
® Kick.Off Meeting -
o Project team introductions
o Timelines and milestones
-�-- --—
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE _CITY OF ORANGE
MARCH 3, 2023
• Review and Enhancement of existing processes and systems
® Project Mission, Scope, and Objectives
• Technology Assessment
Infrastructure Preparation
® Provision Server(s) and instance(s) in AWS environment
ana wno tasKs are assignea to
• Preventative Maintenance Scheduling with Updating Logic
• Analytic Dashboard Configuration
• Financial Software Integration
• Currently using Tyler Technologies — Eden
• Work Order customization and including the legacy codes from MaintStar (This
list below includes the minimum, but does not limit to the following):
7STAR 3510Turtle Creek Blvd #17B
MAINDallas• TX•15319
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
• Street Maintenance
• Preventative Maintenance (PM)
o. Logic to assist with efficiency of PM'scheduling
Roadway
® Concrete
• . Asphalt
• Storm .
® Sewer
o Import and Integration with Cues and Granite Net (Daily)
• Sign and Striping
® Sidewalk
i Graffiti
• Public Right of Way
o PM
i Trees
o Data Import from West Coast Arborist
o Data Import of Landscabe Maintenance Districts
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
• Street Maintenance
• Preventative Maintenance (PM)
o. Logic to assist with efficiency of PM'scheduling
Roadway
® Concrete
• Repairs
• Asset depreciation and replacement .
• Based on the finding from the Facilities Conditions Assessment, the
information from the report will be uploaded into MaintStar
i Building Assets and Inventory (Container File)
■ Water
AIN7STAR 3510 Turtle CreekBlvd #17B
MDallas • TX • 75319
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-76B4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
• Preventative Maintenance (PM)
o Logic to assist with efficiency of PM scheduling
•
Water hydrant
•
Exercise Valve
Pump Maintenance
•
Water Distribution .
•
Customer Service
•
Service Crew
•
Miscellaneous
•
Sub warehouse
■ . Traffic
• Preventative Maintenance (PM) .
o Logic to assist with efficiency of PM scheduling
• Signal
o Battery Backup
• Street light
• Network Segments
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-76B4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
• Preventative Maintenance (PM)
o Logic to assist with efficiency of PM scheduling
® Water hydrant
• Exercise Valve
. . Pump Maintenance
rootoau rieia
rootoau rieia ugnung
tsencnes vvooa 3teei
Soccer Field
Fountain Lighting
Benches Wood
Softball Field
Handball Court Lighting
Bleachers Aluminum (3 row)
Basketball Court
Horseshoe Pit Lighting
Bleachers Aluminum (4 row)
Handball Court
Parking lot Lighting .
Bleachers Aluminum (15 ft, 5
Horseshoe Pit
Picnic Shelter Lighting
Row)
Tennis Court
Pool Lighting (exterior)
Bleaches Aluminum (10 Row)
Volleyball Court (hard)
Pool Lighting (interior)
Bleaches Aluminum (12 Row)
Volleyball Court (sand)
Tennis Court Lighting
Bike Racks
Groundcover/shrubs
Volleyball Court Lighting
Picnic Tables Aluminum
Wild flowers
Wallkway/Landscape Lighting
Picnic Tables Aluminum (ADA)
7STAR 3510Turtle Creek Blvd #17BMAIN'
Dallas . TX • 75319
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
Turf
Playground/Tot Lot
Tot Lot Slide
Tot Lot Swing
Shade Sail
Rubberized Surface
Pool
Pool Deck
Pool Building
Amphitheaters
Animal Pen Barn
Animal Pen Building
Armory
Barn Building (Museum)
Community Buildings
Concession Buildings
Honey House
Kiosks
Maintenance Building
Monument Signs
Multipurpose Building
Restrooms
Asphalt Parking Lots
Ball Field Lighting
Basketball Court Lighting
Concrete
DG Path
Asphalt
Exercise Equipment
Backflow Prevention Devices
Booster Pumps
Controllers
Gate Valves
Manual Valves
Pressure Relief Valves
Fencing
Walls
Pedestrian Bridges
Aluminum Bench (5 ft no/back)
Aluminum Bench (8 ft w/back)
Aluminum Bench (8 ft dugout)
Aluminum Bench (12 ft dugout)
Aluminum Bench (15ft dugout)
Aluminum Bench (16ft dugout)
Aluminum Bench (21 ft dugout)
Aluminum Bench (24 ft dugout)
Benches Concrete
Benches Recycled Plastic (Sft)
Benches Recycled Plastic (8ft)
Benches Rubberized
• Trees (separate data group from street trees)
• Etc. (park will add)
■ Misc.
■ Work Request customization
• General Warehouse setup
• Portal configuration
• Labor, Equipment and Materials
• -Reports.and Queries
• Setup Table integration
• Mobile Citizen customization
Picnic Tables Concrete
Picnic Tables Concrete (Circular)
Picnic Tables Rubberized
Picnic Tables Wood
Picnic Shelter
BBQs
Hot Coal Receptacle
Trash Cans Aluminum
Trash Cans Concrete
Trash Cans Metal (drum)
Trash Cans Metal (flat top)
Trash Cans Metal (funnel)
Trash Cans Plastic (Rubbermaid)
Trash Cans Recycled Plastic
Planks
Trash Cans For Recyclables
Drinking Fountains
Drinking taps (for dogs)
Decorative Fountains
Flag Pole
Dedication Plaques
Doggy Bag Stations
• Integration and import data from GoGov
Link with GoGov and integration
• Fuel Master integration
■ Vehicle fuel usage tracking
■ Vehicle engine run and idle time
• Sewer Video Inspection and Data import (GraniteXP integration)
■ Store future video and inspection on Maintstar if possible
■ MicroPaver integration
• Pavement conditional index (PCI) on segment Id
M AIN7STARDallas • TX'* 75319 Blvd #17B
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK -FOR THE CITY OF ORANGE
MARCH 3, 2023
■ Arbor Access Integration
• Tree inventory and last trim maintenance activities
® Document integration with Laserfiche
Milestone Sign Off
Go Live
6 Onsite Training and Go Live Support
Option to have multiple Go Live phases
Post Go Live Support
® Milestones and Deliverables
• Quarterly assistance on each module, along with assistance on changing,
importing, updating, or altering configurations and codes.
ESTIMATED DURATION: 3 Months
The above estimations are made with ,the assumption that City of Orange staff are reasonably
available to work with MaintStar and vice versa. To facilitate timely completion of the project, Orange
will endeavor to provide access to existing databases and systems, conversion testing, end user
acceptance, 'requirements for reports and milestone acknowledgement.
Meetings and Updates
Regularly scheduled meetings are critical to ensure two-way communication, expectation
management and project milestones are achieved. MaintStar recommends twice weekly scheduled
meetings to discuss actions, issues, and other.project related items. At a minimum, project managers
and technical leads should be available for these meetings.
At the request of City of Orange, MaintStar will provide a dedicated project managerto be on site and
in the field for 3 weeks during Month 1, 2 weeks of Month 2 and 2,weeks of Month 3. The
investment of this time will be invaluable to the project and ensure timely completion.
Training Plan
During the implementation, 35 days of onsite and (optional) online training will be provided to ensure
staff are sufficiently trained in customizations, asset management, work order entry and completion,
report generation and other agreed upon requirements. To ensure appropriate resources are
7STA I \3510 Turtle Creek
Da las w TX * 75319Ivd #17B
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
available, MaintStar requests as much.notice as possible when scheduling any training: The training
plan will be developed and provided to ensure training is tailored to the staff in attendance.
At the City's option, MaintStar may be available to provide 1 week of training for years 2-5.
5 Days onsite training @ $13,500 per week all expenses included. Upgrades are of no
charge first 5 years as Hosting,'Licenses, and Support are current.
The estimated professional fees are based on the resource requirements forecast at the time of the
quotes and are subject to change. because of changes in the project schedule, scope, or resource
requirements for given tasks/activities.
Go -Live Conditions
The purpose of the Go -Live process to ensure that the MaintStar system is fully functional and
operating properly. Particularly important will be the Public facing modules which must perform all
advertised functions for City of Orange residents by the end of the go -live process. MaintStar will
work with the City of Orange to coordinate a mutually agreeable Go -Live date which will be
dependent on staff availability, end user training and system readiness. During the system
implementation and data conversion phase, all customizations, setup tables, data validation and
reports will be confirmed prior to, during and after Go -Live, as follows:
• Conditions for Go Live: City of Orange sign -off on reports, screen customizations, data
import, asset and asset type setup, workgroup configuration, user accounts, work request and
portal setup, and critical setup tables.
• Pre -Go Live: Subject Matter Expert crossover training, end user training, access to
legacy database, City communications and outreach to internal/external customers,
scheduling of downtime.
• Go Live: MaintStar to run final conversion, usually on a Thursday and Friday with
Saturday and Sunday being reserved for any necessary work. City to shut down legacy
system during this time and commit to running on "paper" during the outage.
• Post Go Live: MaintStar staff to be available to provide production support. City of Orange to
schedule the retirement of.the legacy system
MAIN7STAR a loas a TX • 75319Ivd #17B
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 31 2023
Support Options
POST GO LIVE WARRANTY SUPPORT — for 90 days following application "Go Live", MaintStar will,
provide direct support to the customer to ensure application functions as expected. This support will
be coordinated'through regular meetings with the Project Team(s).
TRANSITION TO REGULAR,SUPPORT — following the warranty period, the customer will transition to
the regular support model, as outlined below.
NORMAL SUPPORT HOURS — means Monday — Friday, 4:00am — 4:00pm PST,.except CONTRACTOR'S
seven (7) Observed Holidays, which are:
1. New Year's Day
2. Memorial Day
3. Independence Day
4. Labor Day
5. Thanksgiving Day
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 31 2023
Support Options
POST GO LIVE WARRANTY SUPPORT — for 90 days following application "Go Live", MaintStar will,
provide direct support to the customer to ensure application functions as expected. This support will
be coordinated'through regular meetings with the Project Team(s).
SUPPORT AVAILABILITY — is during Normal Support Hours. Compliance means providing a response
within one to four hours of the Issue Beginning for Severity one (1) issue (see table below). For other
issues, MaintStar will respond within accordingly, depending on the priority.
BEST EFFORTS — means that MaintStar will provide best efforts to use all resources at our disposal to
resolve the issue as quickly as possible. We cannot guarantee exactly how long this will be, and it will
3510 Turtle Creek Blvd #17B
MAIN7STARDallas* ® TX • 75319
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH. 3, 2023
vary depending upon the nature of the outage. Certain outages caused by an Act of God (beyond
anyone's reasonable control) may take longer to resolve than others.
PROCEDURE TO REPORT AN ISSUE — the Customer is responsible to report an issue. This can be
completed in three (3) ways:
• For Non -Emergency Issues (Priorities 2 or 3):
o Utilize the Issue Tracker within the MaintStar Application
• Use Support.Maintstar.com
• For Emergency After Hour Issues (Priority 1) call (800) 255-5675
Project Closeout
Project Closeout signifies final acceptance and formal closing of the Project and that all project goals
and objectives have been achieved. At this time the City of Orange may choose to pursue additional
or other out of scope at continuous improvement Projects, applications or interfaces, further building
on the completed solution. At closeout the following is true:
Objectives:
• Confirm no critical issues remain for the project teams to resolve
• Determine proper knowledge transfer to the City of Orange teams for key processes and
subject areas has occurred
• Verify all deliverables included in the Agreement are delivered
Billing Schedule
• 50% due at project start
• 50% due at Go Live -
• Optional training and services due after services rendered
• Add storage capacity and option to increase per TB free of charge.
• $59,000 Year 1
• $61,950 Year 2
• $65,047 Year 3
• $68,299 Year 4
• $71,713 Year 5
o Include CPI table CPI*.5% if actual is lower, we will lower.
• Includes any upgrades during the length of the agreement
MAIN7STARDa lOas ® TX Creek #17B
DocuSigmEnvelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
o MaintStar will provide support on any new upgrades
® $75,298 Year 6
• $79,062 Year 7
$83,015 Year 8
e $87;165 Year 9
•, $91,523 Year 10
ACCEPTANCE
Customer Company.Name
Full Name
Service Provider Name
Full Name
DocuSigmEnvelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
o MaintStar will provide support on any new upgrades
® $75,298 Year 6
• $79,062 Year 7
$83,015 Year 8
e $87;165 Year 9
3510 Turtle Creek Blvd #17B
MAIN7STARDallas • TX • 75319
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
STATEMENT OF WORK FOR THE CITY OF ORANGE
MARCH 3, 2023
PROJECT QUOTE
MAI11N7STAR
1278 Glenn yre Strecl, Ste 405
Laguna Beach, CA 92651
etic0)ma1ntstar.com
(Naltl)255-5675
Date; Afanll3n12023
gmuea a3unu
Erpi,Alinn Dal.: 120 Days
To: AlanTruong
styof0r nge
3W e Clup,uan A%v
0,angr, CA Qnfi
(71-1) 532.6,180
s e.
nc
V... ion 15 UP8r4de
4
f
}'�
1.Ct)
:01leTia w Uata Conversion & Upgrade from
S19 SINI i -
-
$111,T_•{:(1
V rsion 12 to version 15
10)
iAoaual IAnnual Hncthi License, Support'
$33,500
:E34a(7J
- -
- _ -....($74,000),
1.(g}
One Tine .Snftwaca for.Traffie, Engrne.rfng,
$7,1,000 ._•._-
3 Far cililte6, And Parlc.S
100
`One71me 'Implementation: Traffic, Engineerin&
.
and Parisi
$•19,gU0 -
- -
I
$3�,C>CA
LOi)
,Annual AJditionatHosling,License, Sup`pmi-
�- $15,000�.�..-_.�__...
- -j
475.C,00 �
-
-
t.IX)
?Optustal 'GuGovinlerfAre (2 way)
$15,Of1D'
1
$15SM
WE) .
.. Opthmal Graait.XPlnterfue (zw.y)— ..
,_. $15,090
.. �
$15,(}:Ill��
(!tDO},ta
LL.
vtal 5Daya On ite Trainin g
,
�-�..„..,
1
._.._
.
1
_ .. ... _ __ ......
iOateTine §CIS ISfodulealnterfAce
1 $3[U-)o
{$;3(}(HYI):
I.(7�
Opti,vtal Mobile Citizen Applkatiun-
[A)
'Optional ;Annual Hosting. Licuue, 5uppod•
S1,Stx)
_
Total
Subl.W. S
1-52.600.00
' Zl.i.1..yuA.ti.Y.uvn.y.J.,u.c�y..lj..a
Wl:auJau.r.u1.4J Ala..:
Sales Ta><�--_—____
F
iG�,iA w,y a.uJilua� Iv.lu..ey� L•IIu� tui. u. rJ r.� aS1ai�.uJ 4.au..
] uu.uy w.cY W Lui...r...0 YuiUx�es .Ivl uifl .,I.al u. yw.l,tin 1
Total' $
1---
252,600.00 1
--- __J
11tan4 you for your business!
MAIN7STARDa las * TX • 75319Ivd #17B
�
-----
Envelope ID: ' Ess1eoEc �
28Hammond Unit O
Irvine, C4926l8
800-255-5678
949-458-7820fax
Eric Sabat0
Vice President ofSales
714-883'8851
'
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E �.iLy Of Orange
Statement of Work — Land Management Software and Deployment
CONTENTS
Table of Contents
Overview
Services Description
Project Schedule
Project Management
Critical Success Factors
Iterative Refinement
Web -Based Shadow Training
Work Description
Initiation
Deliverable 1 — Project Initiation
Assumptions and City Responsibilities
Acceptance Criteria
Analysis
Deliverable 2 — Conversion Analysis
Assumptions and City Responsibilities
Acceptance Criteria
Configuration Support
Deliverable 3 - Configuration
2
4
4
5
5
5
6
6
6
7
7
8
9
9
9
9
10
10
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E �.iLy Of Orange
Statement of Work — Land Management Software and Deployment
CONTENTS
Table of Contents
Overview
Services Description
Project Schedule
Project Management
Critical Success Factors
Veiivera0e`/ — neporis
Assumptions and City Responsibilities
Acceptance Criteria
Readiness '
Deliverable 8 -Training
Assumptions and City Responsibilities
Acceptance Criteria
2
4
4
5
5
5
15
15
15
16
16
16
17
? MalntStar, Inc. 1 3510 Turtte Creek Blvd. Unit17B • Dallas, TX 75219 I City of'Orange I February 8, 2023
--
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
telly of Orange
Statement of Work - Land Management Software and Deployment
Deploy
18
Deliverable 9 - Production Support
18
Assumptions and City Responsibilities
18
Acceptance Criteria
18
Deliverable 10 - Post Deployment Support and Transition to MaintStar Support
19
Assumptions and City Responsibilities
19
Acceptance Criteria
19
Attachment A - Required Features and Capabilities
20
General Requirements
20
On -Line Requirements
22
Mobile Field Access
23
Standard and Custom Reporting
24
Intake and Processing Module
25
MaintStar Electronic Plan Review
27
Inspection Module
29
Code Enforcement Module
31
Attachment B - Cost Quote
32
Attachment C - Sign Sheet
35
.Project Costs and Fees
35
Payment Milestones
35
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
telly of Orange
Statement of Work - Land Management Software and Deployment
Deploy 18
Deliverable 9 - Production Support 18
Assumptions and City Responsibilities 18
Acceptance Criteria 18
Deliverable 10 - Post Deployment Support and Transition to MaintStar Support 19
Assumptions and City Responsibilities 19
Acceptance Criteria 19
___--
_____------__.__._. —_.______--_.�. sTX 75
I MalntStar, Inc: I 3510 Turtle Creek Blvd. Unit 17B _ Dallas, , TX 75219 1 City. of Orange. I February 8, 2023 {
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
of Orange
Statement of Work - Land Management Software and Deployment
OVERVIEW
MaintStar Inc. ('MaintStar') will work with City of Orange, CA ("City") staff to implement the software, leverage
best practices, improve the customer experience, and meet functionality, timing, and cost requirements. This
Statement of Work (SOW) sets forth a scope and definition of professional services work and project ("Services")
to be provided by MaintStar to the City.
SERVICES DESCRIPTION
PURPOSE
The purpose of this project is to implement the City's MaintStar LMS cloud environment. Through this
SOW, MaintStar and the City will detail the scope of activities, deliverables, roles and responsibilities, and
acceptance criteria that will enable the City to achieve its objectives through the implementation and
configuration of:
• Record / Config /.Sub -types Configuration — this will include the following record types:
• Building Permit
• Planning and Zoning
• Code Enforcement with housing config. type
• Grading
• Encroachment / Transportation
• Workflow Configurations.
• Inspection Configuration for all types of required inspections
• Fee Configurations
• Email Templates
• Attachment, Contact Types Configuration
• Security Configuration
• Reports, Queries, and Form Writing
• Image Capturing (Attachments)
• ESRI Integration (ArcGIS)
• Laserfiche Integration
• Contractor State Licensing Board Integration
• City Area / GIS Zones Configuration
• Portal Configuration
• Payment Vendor Integration for portal payment processing
MaintStar, Inc- 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219' 1 City of Orange 1 February 8, 202.3
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%,.lLy of Orange
Statement of Work — Land Management Software and Deployment
PROJECT SCHEDULE
Upon execution of this SOW, MaintStar and the City will collaborate to determine a start date for services to be
rendered. MaintStar will work with City staff to collaboratively define a baseline project schedule to achieve a
6 to 12-month schedule.
PROJECT MANAGEMENT
By mutual agreement, MdintStar will work with the City to provide ongoing project management services
throughout the implementation to plan and monitor the execution. of the project following the activities outlined
in the SOW. These services include the following:
• Facilitate a weekly project status meeting with MaintStar and the City Project Team to review tasks
completed during the prior weeks, the upcoming tasks requiring completion during the coming weeks,
the resources needed to complete the tasks, a listing of any issues that may be placing the project at
risk (e.g., issues thatmaydelay the project orjeopardize the production date).
• The City Project Manager will work with MaintStar to manage Project Documentation using the LMS
Implementation record type, including:
Issue log management and escalation
Status reporting
Change Order Management
Resource Management
Project oversight
Facilitate a monthly project review meeting with the Project Steering Committee
• Payment Vendor Integration for portal payment processing
CRITICAL SUCCESS FACTORS
To successfully execute the services described herein, there are several critical success factors for the project:
• Knowledge Transfer: A critical part of the implementation involves MaintStar's transfer of knowledge to
the City so that the City builds its knowledge to become self -sustainable in supporting MaintStar LMS.
After post -production assistance tasks are completed by MaintStar, The City will be responsible for .
the normal administrative support for -the MaintStar LMS system. The administration support includes
tasks like: fee updates, updating TBS document templates, managing users and rights, internal training,
etc. Strong and focused participation by City staff throughout the configuration and deployment of
MaintStar LMS will enable MaintStar to equip the City to assume operation of MaintStar LMS once the
Dedicated City Participants: The success of the project hinges on thoughtful, prepared, and sustained
participation from City staff. MaintStar fully understands City staff has responsibilities that will compete
with the time that can be dedicated to the MaintStar LMS implementations project and will take steps to
be respectful of that time.
MaintStar, Inc: 1 3510 Turtle Creek Blvd. Unit 17B Dallas, TX 75219 I City of Orange I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—ILY of Orange
Statement of Work — Land Management Software and Deployment
ITERATIVE REFINEMENT TO SYSTEM IMPLEMENTATION
MaintStar will use the proven phased and iterative implementation approach, ensuring process -specific
detail perfection before each subsequent stage (iterative refinement processing). A collaborative Project
Management system offers project governance and a mutual method for tracking implementation. All
implementation uses a formalized sign -off process, defined by clearly stated deliverables.
WEB -BASED SHADOW TRAINING
During the course of implementation MaintStar performs web based shawdow training: Shawdow training
method ("show you, show me") is a proven method to provide users and customer teams to gain a confident
strong understanding not only of system operation but system design concepts that they Leverage to get the
most advantages from the applications.
As each milestone is achieved, mutual testing with shawdow training provides optimal combination of
implementation success measurement, ease of use feedback, and system understanding.
WORK DESCRIPTION
The following section describes the activities and tasks that will be executed to meet the objectives and
requirements of the City for this project. In support of the implementation, MaintStar will provide the following
implementation services. For each deliverable, a description is provided as well as assumptions, City
responsibilities, and criteria for acceptance of deliverables.
MalntStar. Inc 1 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of Orange l February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%_11Ly of Orange
Statement of Work - Land Management Software and Deployment
INITIATION
DELIVERABLE 1 — PROJECT INITIATION
Project initiation ensures the project starts in a well -organized, structured fashion and reconfirms expectations
regarding the implementation. This deliverable is comprised of project planning activities, set up of project
management templates and tools, and the first meeting conducted between the City and MaintStar after
signing of the SOW.
In conjunction with City representatives and any designated support consultants, MaintStar will perform the
following tasks:
• Kickoff: Conduct formal Project Initiation Kickoff to bring together key project sponsors to review the
project scope and methodology — and set expectations for the delivery team.
• Methodology: communicate the MaintStar methodology that will be used to deliver the services.
• Project Document Management: Utilize the City's LMS sandbox site for project documentation.
Communication Plan and Project Guidelines: Develop a Communication Plan and project guidelines
• including communication norms, escalation procedures, status reporting templates, issue/risk
management logs, work locations, etc.
• Scheduling: Establish weekly Project Status meeting and monthly Steering Committee schedule and
confirm attendees.
Deliverable.Acceptance: Finalize and document formal deliverable sign -off procedures, identify team
members that will be responsible for sign -off from the City and MaintStar.
• Baseline Project Plan: Review and provide feedback to the integrated baseline project plan that
includes resource allocation for all work in the project.
ASSUMPTIONS AND CITY RESPONSIBILITIES
Project initiation ensures the project starts in a well -organized, structured fashion and reconfirms expectations
regarding the implementation. This deliverable is comprised of project planning activities, set up of project
management templates and tools, and the first meeting conducted between the City and MaintStar after
signing of the SOW.
In conjunction with City representatives and any designated support consultants, MaintStar will perform the
following tasks:
• The city will:
• Assign a project manager.
• Assist in the development of the implementation plan
• Assign appropriate resources to each of the kickoff activities described above.
Identify and set expectations with key resources and Subject Matter Experts (SMEs) for ongoing
participation in the project.
• Provide timely and appropriate responses to MaintStar's requests for project planning input and
meeting Logistics requests.
• Adhere to agreed time -lines for deliverable review and acceptance.
• Project Sponsors will participate in the Project Kickoff meeting to lay the groundwork for a successful
project.
• MaintStar, the City and their designated support consultants will participate in a meeting before the
kickoff to mutually agree on the above listed deliverables.
MaintStar, Inc. 3510 Turtle Creek Blvd. Unit 17B •Dallas, TX 75219 I City of Orange I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
of Orange
Statement of Work — Land Management Software and Deployment
ACCEPTANCE CRITERIA
The deliverable will be considered complete when the following is executed: • Review and acceptance of:
In conjunction with City representatives and any designated support consultants, MaintStar will perform the
following tasks:
• Review and acceptance of:
• Projecf Initiation Kickoff presentation
• Project Status Report Template
• Baseline Project Plan
• Completion of:
• Project Initiation Kickoff meeting
MalntStar, Inc. 1 3510 Turtte Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of Orange I February 8, 2023 i
N
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
—ILY of Orange.
Statement of Work —Land Management Software and Deployment
ANALYSIS
DELIVERABLE 2 — CONVERSION ANALYSIS
Conversion Analysis is comprised of activities required to identify the current procedures and data to be
converted. MaintStar will review the comprehensive summary documentation provided by the City to learn as -
is process work -flows and previously identified issues, opportunities, and recommendations. The key output of
the process is the screen and data conversion mapping documentation, which serves as a blueprint for design
and configuration efforts throughout the project and establishes the benchmarks for testing and acceptance at
the conclusion of the project.
In conjunction with City representatives and their designated support consultants, MaintStar will perform the
following tasks:
Develop the screen and data conversion mapping documentation. MaintStar will work closely
with City SMEs and their designated support consultants to .identify any necessary revisions in
planning, organizing, direction, and resource monitoring functionality processes as the.resu,lt of LMS
implementation with City SMEs and their designated support consultants to identify any necessary
revisions in planning, organizing, direction, and resource monitoring functionality processes as the
result of LMS impleT entation.
Familiarize City' leads and SMEs with MaintStar LMS software and capabilities to ground them in the
knowledge they need going into the implementation.
Create of the screen and data conversion mapping documentation. Provide input and guidance on
development of the screen and data conversion mapping documentation.
ASSUMPTIONS AND CITY RESPONSIBILITIES
The City will:
• The City will:
• Provide the screen shots, working reports, data maps and other existing business process
documentation including process flows, reports and forms, and other relevant information.
• Make available the appropriate City SMEs to provide the required information, participate in the
configuration analysis and verify the accuracy.of the documented formats and data elements.
• Schedule participants for meetings in workshops as needed.
• Provide timely and appropriate responses to MaintStar's request for information.
• Documentation and analysis sessions as necessary will be performed remotely.
ACCEPTANCE CRITERIA
The deliverable will be considered complete when the following is executed:
Review of the screen and data mapping documents to validate that the content accurately reflects the
identified required planning, organizing, direction, and resource monitoring functionality processes as a
result of conversion to MaintStar LMS.
• Acceptance of the updated Comprehensive Summary Document..
MaintStar, Inc. 1 3510 Turtle Creek Blvd; Unit 17B • Daltas, TX 75219 1 City of Orange I February 8, 2023 i
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%.,ILY of Orange
Statement of Work - Land Management Software and Deployment
CONFIGURATION SUPPORT
DELIVERABLE 3 — CONFIGURATION
MaintStarwill provide the Configuration of MaintStar LMS to support the require.ments defined in the developed
screen and data conversion mapping documentation.
MaintStar wilt perform the following tasks: '
• Configure System: Work with the City and designated support consultants to configure MaintStar LMS
as defined in the developed screen, fees, inspection, work -flows, and all other aspects of system
configuration. The configuration of the system will be the basis for the data conversion mapping from
the existing system to the configured record types in MaintStar LMS.
Knowledge Transfer: Provide support in the demonstration of the configuration process to City staff so
that they may learn through observation.
ASSUMPTIONS AND CITY RESPONSIBILITIES
The City will:
• The City will:
Make available the appropriate City users and SMEs to:
• Participate in configuring the system to learn about the system.
• Work with MaintStar to verify the system has been configured as required in the
• Provide timely and appropriate responses to MaintStar's request for information.
• Documentation and analysis sessions as necessary will be performed remotely.
ACCEPTANCE CRITERIA
This deliverable will be considered complete when the following is executed:
• Review and approve the base implemented configuration of MaintStar LMS as documented in the
approved developed screen and data conversion mapping documentation..
• Acceptance -of the updated Comprehensive Summary Document.
MaintStar. Inc. 1 3510 Turtle Creek Blvd. Unit 17B, • Datlas TX 75219 1 City of Orange I February 8, 2023 •
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—ILY Of Orange
Statement of Work — Land Management Software and Deployment
BUILD
The build stage includes the data conversion; development of interfaces, and custom report development. It
comprises all the additional critical activities outside of the core configuration. Similar to Configuration, the City
and their designated support consultants involvement in each step is critical to ensure success.
DELIVERABLE 4 - LEGACY DATA CONVERSION ANALYSIS
The required data mapping effort will be conducted by MaintStar staff in conjunction with City personnel
and their designated support consultants. MaintStar will work in partnership with appropriate City staff and
their designated support consultants, to prepare for the migration of data from the City's legacy system(s) to
MaintStar's Cloud LMS Development Environment.
MaintStar will perform the following tasks:
• Data Specification: Provide consultation to City personnel in mutually agreed upon requirements and
mapping of the City's legacy data into MaintStar LMS.
ASSUMPTIONS AND CITY RESPONSIBILITIES
The City will:
Provide staff knowledgeable with the legacy data to assist in the data migration/conversion
effort.
The City maintains responsibility for data quality assessment and/or data cleansing. The City
will need to review it's existing data that is intended to be converted and do any adjustments
or corrections they deem needed in the existing data prior to final conversion. Some data
issues may be handled post conversion using the tools available in the MaintStar system and
this should be discussed in detail with your MaintStar implementation team to define the best
methods for handling any data corrections in the historical data.
The conversion process will execute up to three (3) iterations of the data conversion with testing
of the converted data after each conversion run. If additional conversions are required and
project schedule permits, additional conversion can be conducted upon mutual agreement
ACCEPTANCE CRITERIA
This deliverable will be considered complete when the following is executed:
• All data elements have been identified and confirmed by the City for conversion from the legacy
system to MaintStar LMS.
MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of orange I _ February 8, 2023 i
DocuSignEnvelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E�tty Of Orange
Statement of Work —Land Management Software and Deployment
DELIVERABLE 5 — LEGACY DATA CONVERSION: MAINTSTAR LMS
MaintStar will migrate appropriate legacy data into the MaintStar LMS Development Environment.
MaintStar will perform the following,'working in partnership with appropriate City staff and their designated
support consultants, to convert the data from the City's legacy data to MaintStar LMS Cloud Development
Environment:
• Migrate: MaintStar will migrate appropriate legacy data into the MaintStar LMS Development
Environment.
• Validation: Provide confirmation documentation during each conversion test to verify data is being
transferred correctly.
• Planning: Work with the City and their designated support consultant to plan and execute the final data
conversion.
• Conversion: MaintStar to provide guidance on data elements that cannot be mapped,
ASSUMPTIONS AND CITY RESPONSIBILITIES
• The City will:
• Maintain responsibility for data quality/data cleansing.
•. Provide staff knowledgeable with the legacy data to assist in the data migration/conversion
effort.
• Validate/test the converted data. - Provide access to appropriate SMEs or system owners as
needed throughout the conversion process.
• Provide timely and appropriate responses to MaintStar's request for information. - Facilitate
mapping effort and. map the data.
• Provide access to legacy data for the mapping tool.
The conversion process will execute up to 3 iterations of the data conversion with testing of the
converted data after each conversion run. If additional conversions are required and the project
schedule permits, additional conversions can be conducted upon mutual agreement.
.. Each data conversion will include up to three test runs.
• The City will provide resources to accurately assess the quality of Legacy data to be converted and
take mutually acceptable measures to improve the quality of the data to meet project requirements.
ACCEPTANCE CRITERIA
This deliverable will be considered complete when the following is executed:
• Legacy data has been converted to MaintStar LMS Cloud Development Environment and confirmed by
the City.
i MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of Orange I February 8, 2023 .. -
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
~ ILy of Orange
Statement of Work — Land Management Software and Deployment
DELIVERABLE 6 — INTERFACES — ESRI, CSLB, Laserfiche, and Tyler EDEN_
The City will use ESRI as a source for address, parcel, owner information, asset details, etc. The City will
be responsible for atl working portions of this interface as they pertain to ESRI whereas MaintStar will be
responsible for all portions as they pertain to MaintStar. MaintStar will perform the following tasks in partnership
with City staff:
• Data Gathering: Conduct interface analysis sessions with the City to determine requirements.
• Interface Specification: Produce ESRI Interface/map and feature services specifications document as a
basis for configuring the map services.
• Create GIS Service: Create and maintain a GIS service to be utilized by the interface.
• Assist in testing and debugging: Assist the City with testing and debugging of the interface.
The City system will implement the standard interface to the California State Licensing Board (CSLB) that will
validate a contractor's state license in a real-time mode. The options for use of this module will be reviewed
and configured during the implementation meetings.
The system will be configured to use the City Laserfiche document management system as the Long-
term repository of system related documents. The City will need to provide the API license and related
documentation from Laserfiche that the LMS system will use for interaction with the Laserfiche system. The
City will need.to ensure the MaintStar LMS cloud system will have connection access to the Citg's Laserfiche
platform for testing and production.
The system will utilize the standard MaintStar interface to the Tyler EDEN accounting system utilizing the City's
available EDEN file import format as EDEN does not have a direct API interface for posting transactions.
ASSUMPTIONS AND CITY RESPONSIBILITIES
• The City will:
• Provide the necessary information needed to assist in developing the ESRI Interface
Specifications document.
• Provide interface data in the format(s) specified by the MaintStar team including:
• Ensure proper data is being pushed to MaintStar LMS module.
• Assist in the interface specification development and data mapping process between
MaintStar LMS module and ESRI GIS.
• Review and approve the ESRI Interface Specifications document.
• Allocate the time for qualified personnel to test the interface for acceptance and
ensure the data is pushed successfully according to the ESRI Interface Specifications
document.
• Create test data for and certify interface before the start of User Acceptance Testing
(UAT).
• Provide timely and appropriate responses to MaintStar's request for information.
• The purpose of all interfaces will be limited to an exchange of data.
MaintStar, Inc'. 1 3510 Turtle Creek Blvd. Unit 17B • Daltas, TX 75219 1 City of Orange I February 8, 2023 1
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E ALY of Orange
Statement of Work — Land Management Software and Deployment
ACCEPTANCE CRITERIA
This deliverable will be considered complete when the following is executed:
• Legacy data has been converted to MaintStar LMS Cloud Development Environment and confirmed by
the City.
• Demonstration and approval of the completed interface as per the requirements detailed in the ESRI
Interface Specifications document.
• MaintStar LMS is fully operational with the City's GIS interface
0
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E ALY Of Orange
Statement of Work — Land Management Software and Deployment
ACCEPTANCE CRITERIA
This deliverable will be considered complete when the following is executed:
• Legacy data has been converted to MaintStar LMS Cloud Development Environment and confirmed by
the City.
• Demonstration and approval of the completed interface as per the requirements detailed in the ESRI
Interface Specifications document.
MaintStar, Inc 3510 Turtle Creek Blvd Unit17B • Dallas, TX 75219 I City of Orange I February 8, 2023 j
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%-ILy of Orange
Statement of Work — Land Management Software and Deployment
DELIVERABLE 7 — REPORTS
Reports are defined as anything that can be printed from the system, including but not limited to, reports,
forms, queries, documents, notices,and correspondence the City wishes to print or export as identified during
configuration analysis. During the system implementation process (up -to the system going live), the City can
identify any forms or reports they want created and the MaintStar implementation team will configure those
forms and reports as part of the implementation process at no additional cost. Reports and exports will be
developed using Queries/SSRS/Word-TBS.
In support of report development, MaintStar will perform the following tasks:
• Optional Custom Reports (if requested)
• Analysis: Work .with key City Stakeholders to identify reports to be developed as part of the
implementation.
• Specifications: Provide Report Design Specification document as the basis for developing in -
scope reports.
• Development: Based on Reports Design Specification document, develop all in -scope reports.
• Training: Train City staff on Queries/SSRS/Word-TBS in support of the City authoring their own
reports. After the appropriate training on the database and Queries/SSRS/Word-TBS report
writing tool is completed, the City staff will be able to handle additional and future report
requirements.
• Knowledge Transfer: Mentor the City throughout the process of developing in -scope reports,
providing opportunity for knowledge transfer.
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%-ILy of Orange
Statement of Work — Land Management Software and Deployment
DELIVERABLE 7 — REPORTS
Reports are defined as anything that can be printed from the system, including but not limited to, reports,
forms, queries, documents, notices,and correspondence the City wishes to print or export as identified during
configuration analysis. During the system implementation process (up -to the system going live), the City can
identify any forms or reports they want created and the MaintStar implementation team will configure those
forms and reports as part of the implementation process at no additional cost. Reports and exports will be
developed using Queries/SSRS/Word-TBS.
In ci i .,r+ . f ration
r-lr��i�lnr�mr�n+ AA_in+C+n 'mill rrrf�rm +1'— fr�lI_� in- +r I".
• Demonstration and approval of the completed interface as per the requirements detailed in the ESRI
Interface Specifications document.
• MaintStar LMS is fully operational with the City's GIS interface
MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 . _ City of 0range I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
',—lLy of Orange
Statement of Work — Land Management Software and Deployment
READINESS
DELIVERABLE 8 — TRAINING
MaintStar will provide training for City staff that focuses on the administration, maintenance, and augmentation
of the MaintStar LMS configuration. MaintStar's goal is to educate City resources on all aspects of MaintStar
system to ensure the City becomes self-sufficient once the project ends. MaintStar recommends that training
session are limited to 10 —15 people to allow students to have more one -on- one interaction with the trainer.
This is only a recommendation and not a restriction, there is no additional cost if the City wants to hold larger
class sizes.
MaintStar may be requested by the City to provide the following training in support of the implementation in
this SOW:
• Core Team Training: day course, this course will give clients the knowledge they need about MaintStar
LMS prior to going into the Analysis and Configuration phases. It will familiarize them with the .
terminology, basic to advanced concepts, possibilities of automation, and other relevant MaintStar LMS
information. The audience should consist of the team that will be most involved in the Analysis and
Configuration sessions and are working.with the MaintStar team on making decisions.
• MaintStar Admin Training: day course, generally after Analysis, which includes information on skill sets
needed for Administrative level role played by the client. Client will become full familiar with these .
concepts so they may either completely build out the City on their own or assist in business analysis
and process design. Participants will also Learn how to manage the day to day operation of MaintStar
LMS and perform minor ongoing system enhancements. and changes.
• MaintStar End User Training: day course conducted close to the go -Live date. Participants will Learn
the processes within MaintStar LMS and how to navigate to the appropriate information and update as
needed.
• MaintStar Optional Reports Query Builder/SSRS Training: day course, generally conducted following
the Analysis phase. The skill sets learned are essential for any report development role played by the
City.
MaintStar wilt also provide the following:
Scheduling: Coordinate with the City to define the training schedule and logistics (the City will be
responsible for the scheduling of participants).
• Documentation: Deliver standard training documentation in' a format that can be used to customize the
documentation.
ASSUMPTIONS AND CITY RESPONSIBILITIES
Training is limited to 15-20 participants per course. By Mutual agreement, the MaintStar trainer and City
may modify the class size.
• The City.will:
• Support the training with City and designated support consultant participating in the training
session applying actual work processes.
• Identify all trainers and engage them with the project .team as early as possible in the schedule
to develop their knowledge of the system.
• Arrange the time and qualified people for the training.who are critical to the project's success.
Manage the scheduling of all City attendees.
• Documents delivered by MaintStar to the City will be valid for LMS and the version the City is trained
on.
MaintStar, Inc. 1 3510 Turtle Creek Blvd Unit 17B • Dallas TX 75219 1 City of Orange 1 February 8, 2023
t
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—lLy of Orange
Statement of Work — Land Management Software and Deployment
ACCEPTANCE CRITERIA
This deliverable will be considered complete when the following is executed:
• Completion of pre and post Live support following the contractual scope
The production system is in use by the City on a daily basis.
t
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—lLy of Orange
Statement of Work — Land Management Software and Deployment
ACCEPTANCE CRITERIA
This deliverable will be considered complete when the following is executed:
• Completion of pre and post Live support following the contractual scope
The production system is in use by the City on a daily basis.
MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of Orange I February 8, 2023 {
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E vlLy Of OCCIIlg2
Statement of Work — Land Management Software and Deployment
DEPLOY
DELIVERABLE 9 — PRODUCTION SUPPORT
Production support transpires when MaintStar LMS moves from the Development Environment to the Production
Environment. The go -live date will be agreed to by both MaintStar and the City. In the days before moving to
Production, MaintStar will assist in final data conversion and system validation.
As part of Production Support, MaintStar will perform the following tasks:
• . Pre -Production Checklist: Assist in the development of a Pre -Production checklist that details the critical
tasks that must be accomplished before moving to Production.
• Cut -over: Provide resources to support the move from the Development Environment to the Production
Environment. MaintStar,will provide resources during pre -production deployment and cut -over
operations and will provide resources for post -production support.
• System Configuration Migration: With assistance from the City, lead the effort to transfer the system
configuration and ang.required data from Support to Production.
ASSUMPTIONS AND CITY RESPONSIBILITIES
• The City will:
• Allocate appropriate staff to this effort to ensure the system is operating per signed
specifications and ready for the move to production.
• Develop the User Acceptance Test scripts.
Identify and document any issues encountered during UAT and provide them to MaintStar to
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E vlLy Of OCCIIlg2
Statement of Work — Land Management Software and Deployment
DEPLOY
DELIVERABLE 9 — PRODUCTION SUPPORT
Production support transpires when MaintStar LMS moves from the Development Environment to the Production
Environment. The go -live date will be agreed to by both MaintStar and the City. In the days before moving to
Production, MaintStar will assist in final data conversion and system validation.
As part of Production Support, MaintStar will perform the following tasks:
• . Pre -Production Checklist: Assist in the development of a Pre -Production checklist that details the critical
tasks that must be accomplished before moving to Production.
MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of Orange I February & 2023 .•
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—ILy of Orange
Statement of Work — Land Management Software and Deployment
DELIVERABLE 10 — POST DEPLOYMENT SUPPORT AND TRANSITION TO MAINTSTAR SUPPORT
MaintStar will provide assistance to address issues and provide consultative advice immediately following the
move to Production for daily use by their annual maintenance agreement.
As part of Post Deployment Support MaintStar will perform the following tasks via their annual maintenance
agreement for the cloud -based system:
• Support: Provide post -production support for MaintStar developed configuration and components..
• Issue Identification: Assist with the identification of post -production issues and identify issues to be
resolved by MaintStar.
• Troubleshooting: Resolve issues on the list; address issues that may arise related to the deliverables in
this SOW. Help City staff answer questions associated with using MaintStar LMS and advice in training
issues.
ASSUMPTIONS AND CITY RESPONSIBILITIES
• The City will:
• Provide technical and functional user support for post -production support and monitoring.
• Develop and maintain a post -production issues list.
• Provide timely and appropriate responses to MaintStar's request for information.
• Ensure appropriate project leadership and ongoing support staff participants in the hand-off
call with MaintStar Support.
rl.-,.. .:.-1— 1; —I., --A — a... A.1...:—Cl— I— — . — _. r-.-:-..r- a:—
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—ILy of Orange
Statement of Work — Land Management Software and Deployment
DELIVERABLE 10 — POST DEPLOYMENT SUPPORT AND TRANSITION TO MAINTSTAR SUPPORT
MaintStar will provide assistance to address issues and provide consultative advice immediately following the
move to Production for daily use by their annual maintenance agreement.
As part of Post Deployment Support MaintStar will perform the following tasks via their annual maintenance
agreement for the cloud -based system:
• Support: Provide post -production support for MaintStar developed configuration and components..
• Issue Identification: Assist with the identification of post -production issues and identify issues to be
MaintStar, Inc. 1 3510 Turtle Creek Blvd Unit 178 Dallas, TX 75219 1 City of Orange 1 February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
of Orange
Statement of Work — Land. Management Software and Deployment
!ATTACHMENT A — REQUIRED FEATURES AND CAPABILITIES
General Requirements
1 System is browser -based (W., "cloud -based").
2 System centralizes and integrates all aspects of the activity life -cycles, from initiation/application
through ultimate disposition.
3 System provides dynamic screen generation, based on type of case, permit, activity, etc.
4 System provides multi -modal screens allowing users to use/access several records or windows at
once to support multi -tasking.
5 System provides configurable menus and lookup options.
6 System provides ability to tab from field to field.
7 System provides ability to -search on all fields.
8 System provides a calendar interface. for date fields.
9 System provides confirmation prompts prior to deletion, with option to cancel.
10 System provides ability to import/attach multiple electronic documents from staff or customers to
permits, inspections, plans, activities, cases, parcels, violations, etc.
11 System work -flows management structure is *flexible, expandable, and configurable.
12 System work -flows features sequential flow, automatically alerting staff or customers to the next task,
action, deadline or milestone in the process.
13 System work -flows provides the flexibility to re-route or reassign tasks, add or delete steps, delay
rescheduling of tasks and milestones, or defer a condition to a future date.
14 System work -flows features flexibility to add activities such that the newly -added activities will auto -
generate requisite, associated activities, based on type of activity.
15 System work -flows features should allow City to be able to associate multiplepersons with planning .
tasks, permit processing, inspection assignment, plan review, miscellaneous activities,.and code
enforcement cases/violations, in essence generating a running contact/reference list for each stage of
the process.
16 System should allow all staff to easily verify status of required fields and conditions prior to
proceeding to next sequential step or activity. In order to complete tasks, users should be able to
access or link to task -related information, such as permit applications, digital plans, staff comments,
etc.
17 System provides integrated, multi -functional GIS capabilities for users, including staff, applicants and
the general public.
18 System utilizes City's GIS syste m. as the basis upon which all subsequent geographic data sets are
derived and maintained, avoiding third party mapping systems.
MalntStar, Inc. I 3510 TurtLe Creek BLvdl Unit17B Dallas TX 75219 1 City of Orange I February 8, 2023 j .. - •
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
LILY of Orange
Statement of Work - Land Management Software and Deployment
19 System maintains a real-time connection to ESRI's ArcServer 10.x and higher version geo-databases
without reliance on shapefiles.
20 System provides parcel history, and tracking through spatial queries to create link between "parent
tables and "child" tables in the database schema.
21 System provides ability to auto populate fields providing basic information (e.g., ownership, address,
parcel number, zoning, etc.). using either a parcel identifier, spatial query, or selection of a GIS feature.
22 System provides ability to retrieve system data (e.g., permits, cases, inspections) by selecting parcels,
either by point or polygon.
23 System provides ability to display all development information (e.g..projects, permits, violations) on
any geographical area upon demand.
24 System provides ability to assign a project/case to a spatial entity other than U parcel. Should have
the ability to assign to point and line features, as well as user -defined polygons.
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
LILY of Orange
Statement of Work - Land Management Software and Deployment
19 System maintains a real-time connection to ESRI's ArcServer 10.x and higher version geo-databases
without reliance on shapefiles.
20 System provides parcel history, and tracking through spatial queries to create link between "parent
tables and "child" tables in the database schema.
21 System provides ability to auto populate fields providing basic information (e.g., ownership, address,
parcel number, zoning, etc.). using either a parcel identifier, spatial query, or selection of a GIS feature.
MointStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B • DoLtas, TX'75219 1 City of Ordnge I February 8, 2023 ... -
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
ally of Orange
Statement of Work — Land Management Software and Deployment
On -Line Requirements
1 System allows submission of permit application(s) on-line.
2 System allows existing data in the system (i.e., account information, related projects, owner, company,
location, or license information) to pre -populate information into the on-line application.
3 System allows applicants to submit plans and supporting documentation.
4 System allows generation of fee estimates by calculating various fee types, including minimum-,
fixed-, basic-, variable-, additive-, multiplicative-, or incremental -fee calculations dependent on various
factors, such as base amounts, multipliers, steps, etc.
5 Ability to process fee payments through payment platform hosted by Contractor or qualified third -
party provider.
6 Ability to generate a fee history and audit trail, including fee distribution information corresponding to -
City business rules (e.g., general ledger codes, departments, business units, or accounts).
7 System provides applicants ability to check status of applications, review comments.
8 System provides applicants ability to request an inspection and preferable time (e.g., a.m. or p.m.).
9 System provides ability to view current fines, fees, liens due.
10 System provides ability to request a refund of fees or other payments.
11 System provides ability to report a code violation or submit a complaint.
12 System provides ability to request an appeal or variance.
13 System provides ability to generate fee estimates and receive on-line payments, and print receipts
and payment history.
14 System provides customers with detailed instructions and requirements for applications and
submissions.
15 System provides customers with save points to avoid lost progress and allows customers to return
Later to complete applications.
MaintStar, Inc. I' 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of Orange I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%.1ILy of Orange
Statement of Work — Land Management Software and Deployment
Mobile Field Access
1 System allows designated users to interact with all relevant data and task functions remotely, using a
range of mobile devices.
2 System allows designated users to access sortable, filterable lists of daily or weekly inspections,
including inspection type, and priority, status.
3 System allows designated users to access real-time updates to the mobile device, including any
changes to an assigned inspection.
4 System allows designated users to view results, comments, outcomes of previous inspections, if any.
5 System allows designated users to view application, plans, previous inspection records and
comments.
6 System allows designated users to access location -specific information via GIS integration.
7 System allows designated users to utilize dynamic checklists for inspection types.
8 System allows designated users to upload of photos and videos.
9 System allows designated users to initiate re -inspections.
10 System allows designated users to initiate enforcement actions, such as stop work orders, violations,
etc.
11 System allows designated users to reassign inspections from one inspector to another, either by
inspector or supervisor action.
12 System allows designated users to digitally capture signatures in the field.
MaintStar, Inc. I 3510 Turtle creek Blvd. Unit 176 •Dallas, TX 75219 1 City of Orange I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
of Orange
Statement of Work — Land Management Software and Deployment
Standard and Custom Reporting
1 System data will be readily available in standardized, integrated report templates.
2 System allows City to create and save custom reports which, once created, offer the same
functionality as'standardized reports.
3 Standardized or custom reports are exportable into Adobe format and Microsoft Office Suite formats.
4 Standardized and custom reports provide standard word processing functionality (e.g., cut and. paste,
word wrap, and spell check).
5 Standardized or custom reports displayed in columnar or grid format are configurable by users (i.e.,
sorting, grouping, and subtotaling).
6 System provide users the ability to report on all fields, including custom, user defined fields.
7 System provides mail -merge capability for mass mailings/reports/notifications.
8 System provide ability to generate.notifications using GIS (i.e., notify adjacent properties or properties
within a user -defined radius of a selected point, parcel, or polygon).
9 System provides ability to utilize dashboards and dynamic charts and graphs or to create some.
10 System provides ability to view and/or generate real-time "to-do" lists.
11 System allows the import of graphics, such as City logo or departmental logos, into standardized and
customized reports.
MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B Dallas, TX 75219 1 City of Orange I February 8, 2023 •!
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC,
N1Ly of Orange
Statement of Work — Land Management Software and Deployment
Intake and Processina Module
1 System will facilitate project intake via a variety of methods, including on-line applicant submissions
and intake/entry by City staff of over-the-counter submission.
2 System will auto -generate a temporary, pre -filing number and assign it to unsubmitted applications to.
assist with support, if needed, to take the application to formal submission.
3 System will auto -generate a unique project I.D. once required project information is provided and
application is submitted.
4 System will pre -populate information into the on-line application based on preexisting data in the
system (i.e., account information, related projects, owner, company, location, license information).
5 System will support the capability to queue the application for review by personnel prior to routing to
departments for processing or to reopen a closed or canceled application.
6 System will retrieve pertinent parcel and property -related information, including any existing records
on uses, citations, inspections, or reports, based on the location entered on the application.
7 System will determine required permits; inspections, clearances, and/or conditions, based on type of
application or permit and prompt for required inputs by the applicant.
8 System will determine existing permitted use of proposed project site.
9 System will generate conditions of approval.
10 System allows generation of fee estimates by calculating various fee types, including minimum-, fixed-,
basic-, variable-, additive-, multiplicative-, or incremental -fee calculations.
11 System will process fee payments through systems native payment platform or qualified third -party
provider.
12 System will generate a fee history and audit trail, including fee distribution information corresponding
to City business rules (e.g., general ledger codes, departments, business units, or accounts).
13 System will connect with state Licensing boards to determine status of professional certifications/
Licenses.
14 System will facilitate manual and condition -based routing of applications, based on pre -defined work-
flows processes and business rules.
15 System will generate a menu of items that. are required, such as data, plans, and required studies
and reports and related status (i.e., received, incomplete, reviewed, approved, needs revision, or not
received).
16 System will track key dates, milestones, meetings, etc.
17 System will allow deferred submittal of required items, subject to approval by supervisors.
18 System .will generate notice(s) to applicants listing required items, either at specified point in the
process or on demand by staff.
MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B Dallas, TX 75219 1 City of Orange I February 8, 2023 ... -
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E Cl`y Of QCQClg2
Statement of Work — Land Management Software and Deployment
19 System will process and track appeals, including sending notifications to appropriate parties.
20 System will determine if permits are subject to renewal and, if so, auto -generate renewal date and
date for pre -expiration notification.
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E Cl`y Of QCQClg2
Statement of Work — Land Management Software and Deployment
19 System will process and track appeals, including sending notifications to appropriate parties.
20 System will determine if permits are subject to renewal and, if so, auto -generate renewal date and
date for pre -expiration notification.
MaintStar, Inc. 1 3510Turtle Creek Blvd Unit 17B • Dallas; TX 75219 1 City of Orange I February 8, 2023 t
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
�ll.y,of Orange
Statement of Work — Land Management Software and Deployment
MaintStar Electronic Plan Review Module
1 System provides ability for applicant to submit plans on-line in specified dimensions and digital
formats (e.g., PDF) or in person, in either specified digital or paper format, which can then be scanned
or uploaded into the system by City personnel.
2 System provides ability to an plans using pre-defined'shapes and colors, track
all versions of plans submitted for a project, superimpose two drawings to view differences and
automatically flag, or otherwisevisually indicate any new sheets or changes made.
3 System provides ability to markup plans on-line (tablet/stylus tools and text tools) and save changes
to the plans.
4 System provides ability to automatically notify applicant of key statuses via electronic notification and
for applicant to review plan review information,,updates, and status on-line.
5 System provides ability to load code sets into system (e.g., building, zoning, etc.).
6 System allows migrated application records to complete the permitting process through plan review,
permit issuance, and completion (includes recording plan review comments, fee calculation, fee
acceptance, permit issuance, inspection, and completion).
7 System provides ability to configure plan review work -flows based on permit requirements and
business rules (e.g., payment of fees) and accommodate simultaneous reviews and identify review
dependencies, includinq:
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
�ll.y,of Orange
Statement of Work — Land Management Software and Deployment
MaintStar Electronic Plan Review Module
1 System provides ability for applicant to submit plans on-line in specified dimensions and digital
formats (e.g., PDF) or in person, in either specified digital or paper format, which can then be scanned
or uploaded into the system by City personnel.
2 System provides ability to an plans using pre-defined'shapes and colors, track
all versions of plans submitted for a project, superimpose two drawings to view differences and
6Vi'fi%1i SitGti'liefiGC�eG?f%fir'fflCtuii'iCtlCi�ff t�l�'ifl�`ON}iiiland;'ui' Q �VLUif3�L001�16 OICCU-)iiiiieiits itviii
reviewers into a plan review report (e.g., comment sheet) exportable to multiple formats.
13 Capability to flag a plan review for supervisor review/approval.
14 Capability to automatically trigger a follow-up plan review when a modified plan is submitted by the
applicant.
15 Capability to allow the Supervisor to revise any comments and conditions that have been made and
captured changes in an audit trail.
MaintStar, Inc. 1 3510 Turtle Creek Blvd, Unit 17B Dallas, TX 75219 1 City pf Orange I February 8, 2023 . -
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%IIILy of Orange
Statement of Work — Land Management Software and Deployment
16 Capability -to restart the application. process at the appropriate step, as determined by the plan
reviewer or supervisor, if the requested corrections force the applicant to re -engineer the plans.
17 Ability to enable secure, electronic approval stamps/seals for all pages or a'specified range of pages
of a plan set. The stamps/seals shall be customizable by department, unalterable and non -duplicable,
including date, time and author.
18 Capability to save approved plans in a file format that prevents any further changes to the plans (e.g.,
PDF) and to provide the approved plans and review report available for download by the applicant via
.the on-line portal.
19 Ability to generate sortable and exportable performance metrics, such as priority and aging metrics,
preferably in a dashboard feature.
MaintStar, Inc: 1 3510 Turtle Creek Btvd. Unit 178 •Dallas, TX 75219 1 City of Orange I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E -ILy of Orange
Statement of Work — Land Management Software and Deployment
Inspection Module
1 System provides inspection module fully integrated with the work -flow module to allow for an
inspection to be automaticaLLy triggered as part of a work -flow process. Supervisors or designated staff
should have the ability to manually override a List of required inspections.
2 System provides fully customizable inspection module, with both the ability to manually assign or
reassign inspections and auto -configure inspection scheduling.
3 System provides flexible management of multiple inspection types, including, but not limited to,
building, electrical, plumbing, sign -age, encroachment, temporary, and special inspections.
4 System provides ability to categorize inspection types by department, division, or section and
associate fees with each inspection type.
5 System computes inspection scheduling availability based on designated inspector of record,
inspector availability, and complexity of inspection.
6 System provides ability for inspectors in the field the flexibility to schedule an ad -hoc inspection not on
the original inspection list..
7 System provides ability to notify an inspector of a change in his or her inspection schedule (e.g.,
addition, cancellation) and also notify applicant of scheduled inspection via electronic notification.
8 System provides ability for inspections to be triggered or halted if dictated by work-flow/project status.
Likewise, the work -flow should halt or advance based on the outcome/status of inspections.
9 System provides the ability to track and cross-reference inspection activity and performance across
a range of metrics, including by type of inspection and by respective personnel, as well as by date
range, geography, outcome and type of project work -flow.
10 System provides ability for mobile upload of mandatory inspection information (e.g. required fields and
checklists).
11 System provides ability for mobile upload of supporting documentation with or without connectivity.
12 System provides ability for mobile upload of pictures and/or video with or without connectivity.
13 System provides ability for mobile entry of standard disposition codes and rejection codes for
inspection types.
14 System provides ability for mobile entry of standard sets of comments and conditions for an inspection
tgpe(s).
15 System provides ability for mobile additions of a new inspection, follow-up inspection and/or permit
requirement.
16 System provides ability for mobile capture of electronic signature(s).
MaintStar, Inc. 1 3510 Turtle Creek Blvd. Unit 17B • Dallas, TX 75219 1 City of Orange I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190ECity Of Orange
Statement of Work — Land Management Software and Deployment
17. System provides ability for mobile, automated notification of inspection outcome to applicant and to
appropriate City staff/departments.
18 System provides ability for mobile close-out, hold or cancel permits based on inspection results.
19 System provides ability for mobile printing of inspection documentation (e.g., correction notice, red tag,
inspection results, violation notice, etc.).
20 System provides inspectors with mobile access to contact information for contractor or other
responsible party.
21 System provides inspectors with mobile access to permit application(s).
22 System provides inspectors with mobile access to permit history, if any.
23 System, provides inspectors with mobile access to project plans.
24 System provides inspectors with mobile access to prior inspection(s), outcome(s) and notes.
25 System provides inspectors with mobile access to correction notices, if any.
26 System provides inspectors with mobile access to code violations, active and historic.
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190ECity Of Orange
Statement of Work — Land Management Software and Deployment
17. System provides ability for mobile, automated notification of inspection outcome to applicant and to
appropriate City staff/departments.
18 System provides ability for mobile close-out, hold or cancel permits based on inspection results.
19 System provides ability for mobile printing of inspection documentation (e.g., correction notice, red tag,
inspection results, violation notice, etc.).
i MamtStar, Inc. I 3510 Turtte Creek Blvd Unit 17B • Dallas, TX 75219 1 City of Orange ' I February 8, 2023 • •
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—ILy of. Orange
Statement of Work — Land Management Software and Deployment
Code Enforcement Module
1 System provides enforcement module integrated with the permitting, work -flow and GIS aspects of the
system and fully accessible by mobile device.
2 System allows the general public to submit complaints via the on-line public portal using standardized
menus for complaints and violations that are also fully'customizable by the City.
3 System provides ability to generate a new complaint record either electronically via on-line portal
submission or manually by City staff via accessing the system in the office or through mobile access in
the field.
4 System provides ability to capture complaint type, details/description, address/location, and
complainant contact information.
5 System provides ability to generate a unique complaint number.
6 System provides mobile ability to upload of photos and video.
7 System provides ability to associate a complaint with an existing application(s) or project ID(s), if
applicable.
8 System provides ability to hide complainant personal contact information from view by the pubic in the
on-line portal.
9 System Drovides abilitu to automaticallu notifu the comDlainant of action taken in resDonse to the
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%—ILy of. Orange
Statement of Work — Land Management Software and Deployment
Code Enforcement Module
1 System provides enforcement module integrated with the permitting, work -flow and GIS aspects of the
system and fully accessible by mobile device.
2 System allows the general public to submit complaints via the on-line public portal using standardized
menus for complaints and violations that are also fully'customizable by the City.
16 System provides ability to issue enforcement -related documents to a complainant, property owner or
responsible party in response to a violation.
17 System provides ability to track all review, notification, enforcement, and disposition actions related to
a complaint.
18 System provides ability to generate letters, notices, and citations on standardized or customized
templates integrated into the enforcement work -flow for mailing, mail -merge, or export to other formats.
MaintStar, Inc 1 3510 Turtle Creek Blvd. Unit 17B Dallas, TX 75219 1 City of Orange I February 8, 2023 1
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC
%,-1Ly of Orange
Statement of Work — Land Management Software and Deployment .
ATTACHMENT B - COST QUOTE
City of Orange CA - Software License
Software Licensing
MaintStar LMS -Vendor Hosted Land Management
Permitting Module
$ 45,000.00
Inspections Module
$ 45,000.00
Code Enforcement Module
$ 40,000.00
Planning & Zoning Module
$ 45,000.00
Discount
- $ 60,000.00
Total Software Licensing Costs
$ 115,000.00
City of Orange CA - Implementation*
Professional Services
MaintStar LMS -Vendor Hosted Land Management
Configuration and Implementation
System Setup/Config., Data Input, Forms, Notifications
$ 55,000.00
Data ETL from CentralSgOareTraklT
Data Extract, Transform, and Load
$ 25,500.00
CQnfiguration'and Implementation
Public Portal
$ 65,000.00
Configuration and Implementation
Mobile Inspection
$ 14,500.00
On Site Training/Go Live Assistance
5 Days -On Site Training/fravel Expenses Included .
$ 13,500.00
Discount
-,$ 40,000.00 I
Total Professional Services Costs
$ 133,500.00
City of Orange CA - Agency Integration*
Interface Development Services
MaintStar LMS -Vendor Hosted Land Management
ESRI ArcGIS
Multiple layer, GIS Service - Bi-Direction
Standard Interface
Microsoft Exchange/Office 365 s
Business Software Integration
Standard Interface
Total Agency Interface Costs
$ 0.00
* Any fees from Third Parties for professional services are not included, and are negotiated and paid by the agency.
MaintStar, hc. 1 3510 Turtle Creek Btvd. Unit17B - Qatias, TX 75219 1' City of Orange I February 8, 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC .
telly of Orange
Statement of Work — Land Management Software and Deployment
City of Orange CA - Annual Hosting, Support and Updates
Annual Recurring Fee $ 39,500.00
Total Annual Fee $ 39,500.00
* Subject to 5% CPI Annual Increase
City of Orange CA -Total First Year Pricing
Total First Year Outlay
MaintStar LMS -Vendor Hosted Land Management
MaintStar LMS Total First Year Costs
$ 288,000.00
Two System Loyalty Discount
- $ 50,000.00
$ 238,000.00
9 MalntStar, Inc. 1 3510 Turtle Creek Blvd. Unit'17B Dallas, TX 75219 1 City of Orange 1 February 8, 2023-
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190EC"-
�t�y of Orange
Statement of Work —.Land Management Software and Deployment
City of Orange CA - Electronic Plan Review Module Software License
Software Licensing
MaintStar LMS - Electronic Plan Review Module
Electronic Plan Module
$ 35,000.00
Implementation Discount
- $ 1.0,000.00
Total Software Licensing Costs
$ 25,000.00
City of Orange CA - Annual Hosting, Support and Updates
Annual Recurring Fee $ 19,500.00
Total Annual Fee $ 19,500.00
* Subject to 5% CPI Annual Increase
City of Orange CA - Electronic Plan Review Module Total First Year Pricing
Total First Year Outlay MaintStar LMS - Electronic Plan Review Module
MaintStar EPR Module Total First Year Costs $ 44,500.00
MaintStar, Inc. 1 3510 Turtle Creek Blvd Unit 17B • Dallas, TX 75219 1 City of Orange I February 8 2023
DocuSign Envelope ID: 59EE652B-5784-40F0-923E-7BB4EE6190E �„Y Of Orange
Statement of Work — Land Management Software and Deployment
ATTACHMENT C — SIGN SHEET
PROJECT COSTS AND FEES
The estimated professional fees are based on the resource requirements forecast at the time of the quotes and
are subject to change because of changes in the project schedule, scope, or resource requirements for given
tasks/activities.
PAYMENT MILESTONES
• 50% due at project commencement
• 50% due at Go Live
• Optional training and services due after services rendered
• The on-line storage space will be unlimited for system data and attachments
ACCEPTANCE
MaintStar City of Orange
By By
Printed
Title
Date
Printed
Title
Date
MamtStar,,.lnc I 3510Turtle Creek Blvd Uti1t 17B Dallas, TX75219 I City of Orange I February 8, 2023