Loading...
RES-11404 OCTA MEASURE M2 7-YEAR CIP FOR FISCAL YEARS 2022-23 THROUGH 2028-29RESOLUTION NO. 11404 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ORANGE APPROVING AND AUTHORIZING STAFF TO SUBMIT TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY THE MEASURE M2 SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2022-23 THROUGH 2028-29 TO COMPLY WITH MEASURE M2 ELIGIBILITY CRITERIA WHEREAS, an annual submittal of Measure M2 eligibility documentation to the Orange County Transportation Authority (OCTA) is required to remain eligible to receive Measure M2 sales tax revenue funds; and WHEREAS, the submittal documentation requires City Council approval of an updated Measure M2 Seven-Year Capital Improvement Program; and WHEREAS,the City's Measure M2 Seven-Year Capital Improvement Program for Fiscal Years 2022-23 through 2028-29 is a transportation planning and fiscal forecasting document used to guide future programming for transportation capital improvement projects; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program emphasizes projects that improve circulation, mitigate traffic congestion, and maintain the City's investment in existing transportation infrastructure; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program is consistent with the proposed citywide Capital Improvement Program budget and the City's General Plan;and WHEREAS, the City's M2 Seven-Year Capital Improvement Program includes 49 projects with a total preliminary projected budget requirement of$88,751,819 over the seven-year period; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program projects are attached as Exhibit "A." NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Orange hereby approves and authorizes staff to submit to OCTA the Measure M2 Seven-Year Capital Improvement Program for Fiscal Years 2022-23 through 2028-29 to comply with Measure M2 eligibility criteria. Remainder ofpage intentionally left blank; signatures on next page.] ADOPTED this 14th day of June 2022. jt a A Mark//11. urphy, Mayor, City o` Ilir ge I/ATTEST: r-4/14---C61,6"6 Pamela Coleman, City Clerk, City foOrange Attachment: OCTA FY 2022/23 —FY 2028/29 Capital Improvement Program STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ORANGE I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Resolution was duly and regularly adopted by the City Council of the City of Orange at a regular meeting thereof held on the 14th day of June 2022, by the following vote: AYES:COUNCILMEMBERS: Nichols, Monaco, Barrios, Dumitru, Tavoularis, Gutierrez, and Murphy NOES:COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None ABSTAIN: COUNCILMEMBERS: None Pamela Coleman, City Clerk, City o range I Resolution No. 11404 2 5/31/22,2:51 PM https://ocfundtrackenocta.net/CIP/reportjroject listing Orange County Transportation Authority FY 2022/23-FY 2028/29 Capital Improvement Program TIP ID CP-10975 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: ADA Improvements-Access Ramps Type of Work: Pedestrian Project Description Type of Work Description: Pedestrian- Installation of ADA access ramps Limits This project will modify curbs at various locations throughout the City to Comply with American with Disability Act(ADA)regulations.This has been an ongoing project,funded with Community Development Block Grants(CDBG). FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Citywide YEAR ESCALATED Project Notes 2023 Community Development $6,843 $0 $61,587 $0 $68,430 $70,278 Block Grant TSIP Citywide(287),CDBG(310)and Capital Community DevelopmentProjectFund(500).Carry Over. 2024 Bock Grant 14,000 $0 $126,000 $0 $140,000 $147,673 2024 Traffic Impact Fees $36,000 $0 $324,000 $0 $360,000 $379,732 2025 Traffic Impact Fees $18,000 $0 $162,000 $0 $180,000 $195,022 2025 Community Development $7,000 $0 $63,000 $0 $70,000 $75,842 Block Grant 2026 Community Development $7,000 $0 $63,000 $0 $70,000 $77,907 Block Grant 2026 Traffic Impact Fees $18,000 $0 $162,000 $0 $180,000 $200,332 2027 Traffic Impact Fees $18,000 $0 $162,000 $0 $180,000 $205,802 2027 Community Development $7,000 $0 $63,000 $0 $70,000 $80,034 Block Grant 2028 Community Development $7,000 $0 $63,000 $0 $70,000 $82,225 Block Grant 2028 Traffic Impact Fees $18,000 $0 $162,000 $0 $180,000 $211,436 2029 Traffic Impact Fees $18,000 $0 $162,000 $0 $180,000 $217,240 2029 Community Development $7,000 $0 $63,000 $0 $70,000 $84,482 Block Grant Totals:$181,843$0 $1,636,587$0 $1,818,430 $2,028,005 Last Revised:22-00-Submitted Total Programmed:$1,818,430 TIP ID CP-10976 IMPLEMENTING AGENCY Orange.City of Local Project Number:N/A Project Title Additional Project IDs: Batavia and Taft Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer StreetInterconnecttrafficsignalstoimprovecoordinationtoMainStreetandonBataviaStreetfromTaftAvenuetoFletcherAvenue. and communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Taft Avenue from Shaffer ST to Main St and on 2024 Traffic Impact Fees $20,000$0 $180,000 $0 $200,000$210,962 Batavia St from Taft Ave to Flectcher Ave Project Notes TSIP Citywide(287).Carry Over Totals: $20,000$0 $180,000 $0 $200,000 $210,962 Last Revised:22-00-Submitted Total Programmed:$200,000 TIP ID CP-11580 IMPLEMENTING AGENCY Orange.City of Local Project Number: Project Title Additional Project IDs: Type of Work: Road Maintenance Beverly Neighborhood Street Rehabilitation Project Description Type of Work Description: Road Maintenance- This project will rehabilitate the Beverly Drive Neighborhood.The work will consist of removing and Rehabilitation of roadway reconstructing badly damaged pavement,cold planing,AC cap,replacement of curb and gutter, sidewalk and ADA ramps. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Streets within the neighborhood of Eckhoff Street and Sycamore Avenue Project Notes Totals:$0 $0 $0 0 $0 $0 CDBG(310).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 https://ocfundtracker.octa.net/C1P/report_project listing 1/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report project listing TIP ID CP-10977 IMPLEMENTING AGENCY Orange,City of Local Project Number.5032 Project Title Additional Project IDs: Biennial Traffic Signal Coordination Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- This project will study traffic signals on the City's major streets,count&analyze traffic flows,&provide Coordinate signals within project limits appropriate traffic signal timing to minimize delay to drivers.Changes in traffic flows require updating at two year intervals. Limits FISCAL FUND TYPE TOTALENGROWCON/IMP O&M TOTAL City-Wide YEAR ESCALATED Project Notes 2023 Measure M2 Local 0 $0 $95,000 $0 $95,000 $97,850 Fairshare Measure"M2"Tumback Was"Biennial City Traffic M2 LocalasureSignalCoordination"-Carry Over 2025 Me Me s ure 0 $0 $95,000 $0 $95,000 $103,809 Fai2027MeasureM2Local0 $0 $95,000 $0 $95,000 $110,131 Fairshare 2029 Measure M2 Local 0 $0 $95,000 $0 $95,000 $116,838 Fairshare Totals:$0 $0 $380,000 $0 $380,000 $428,628 Last Revised:22-00-Submitted Total Programmed:$380,000 TIP ID CP-11578 IMPLEMENTING AGENCY Orange,City of Local Project Number:19-ORNG-STS-3933 Project Title Additional Project IDs: Bus Stop Enhancements at Various Locations Type of Work: Bus Stops Project Description Type of Work Description: Bus Stops- This project will enhance existing bus stops at five locations with new bus shelters with solar panels, Installation of ramps and benches/shelters eight-foot benches,five-foot benches,and trash receptacles.This project will be funded by the OCTA Comprehensive Transpo Funding Program. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Citywide Project Notes Totals: $0 $0 $0 0 $0 $0 TSIP Citywide(287)&Reimbursable Capital Projects(550).Carry Over. Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11581 IMPLEMENTING AGENCY Orange.City of Local Project Number. Project Title Additional Project IDs: Cambridge St Infrastructure Improvement Type of Work: Other Project Description This project will upsize the existing 18"RCP storm drain line from Palm Avenue to Walnut Avenue to Type of Work Description: Other-Other alleviate the localized flooding issue on Cambridge Street.Other improvements include roadway pavement,concrete,sewer and water lines. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cambridge Street from Palm Avenue to Walnut Avenue Project Notes Totals:$0 $0 $0 0 $0 $0 Sanitation&Sewer(220),Gas Tax(272),Capital Projects(500),Sewer Construction(520),and Water(600).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 https://ocfundtracker.octa.neUCIP/report_project listing 2/16 ti 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report.project listing TIP ID CP-11795 IMPLEMENTING AGENCY Orange,City of Local Project Number:21-ORNG-ACE-3994 Project Title Additional Project IDs: Cannon Street Bridge Widening Type of Work: Road Widening Project Description Type of Work Description: Road Widening-Add This project will widen portions of Cannon Street from Santiago Canyon Road to Serrano Avenue to 1 lane to existing roadway in project limits add a third northbound thru lane. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cannon Street from Santiago Canyon Road to Serrano Avenue Project Notes Totals:$0 $0 $0 0 $0 $0 TSIP Citywide(287)&Reimbursable Capital Project(550).Use to be"Cannon Street Widening".Carry over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP--3472 IMPLEMENTING AGENCY Orange,City of Local Project Number:18-ORNG-ICE-3906 Project Title Additional Project IDs: 18-ORNG-ICE-3906 Cannon and Serrano Intersection Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-Add This project will add a second dedicated right turn lane on northbound Cannon Street unto eastbound right turn lane(s)to Intersection Serrano Avenue,to accommodate the Increase In right turn movements. Limits FISCAL TOTALFUNDTYPEENGROWCONIIMPO&M TOTAL Cannon Street and Serrano Ave Intersections YEAR ESCALATED Project Notes 2023 Measure M2 Local 0 $0 $842,419 $0 $842,419$867,692 M2(263),TSIP Citywide(287)&Reimbursable Fairshare Capital Projects(550).Carry Over Totals:$0 $0 $842,419 $0 $842,419$867,692 Last Revised:22-00-Submitted Total Programmed:$842,419 TIP ID CP-10983 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Chapman&Cambridge Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-The project will provide for a protected left turn phase for the eastbound,westbound,northbound,and Upgrade traffic signal equipment at intersection southbound approaches on Chapman Avenue at Cambridge Street. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Ave and Cambridge St Intersection Project Notes TSIP Citywide(287).Carry Over Totals:$0 $0 $0 0 $0 $0 Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11579 IMPLEMENTING AGENCY Orange.City of Local Project Number:20-ORNG-ECP-3987 Project Title Additional Project IDs: Chapman Avenue BioClean Installation Type of Work: Environmental Cleanup Project Description Type of Work Description: Environmental This project will install a BioClean Debris Separating Baffle Box(DSBB)or equal on Chapman Cleanup-Continuous Deflection Separator(CDS) Avenue.The project will also install thirteen connector pipe screens(CPS). Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Avenue and Eckhoff Street for DSBB. Citywide for CPS. Project Notes Totals:$0 $0 $0 0 $0 $0 Sanitation and Sewer(220),Tier 1 Reimbursable Capital Project(550).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 https://ocfundtracker.octa.net/CIP/report_project listing 3/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report_project_Iisting TIP ID CP-11319 IMPLEMENTING AGENCY Orange,City of Local Project Number. Project Title Additional Project IDs: Chapman and Batavia Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection- Left turn Phase for NB and SB,Chapman Ave and Batavia St Upgrade traffic signal equipment at intersection Limits FISCAL TOTALFUNDTYPEENGROWCON/IMP O&M TOTAL Chapman Ave and Batavia St Intersection YEAR ESCALATED Project Notes 2023 Measure M2 Local $10,000 $0 $90,000 $0 $100,000$102,700 HSIP,Pending E76 for Construction M2(263)& Fairshare Reimbursable Capital Projects(550).Carry Over Totals:$10,000$0 $90,000 $0 $100,000 $102,700 Last Revised:22-00-Submitted Total Programmed:$100,000 TIP ID CP-10984 IMPLEMENTING AGENCY Orange,City of Local Project Number.N/A Project Title Additional Project IDs: Chapman and Grand Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-Add left The project will provide for a protected left turn phase for the eastbound and westbound approaches turn lane(s)to intersection on Chapman Avenue at Grand Street.The proposed signal modification will enhance the capacity and improve the traffic signal operation at the intersec Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Chapman Ave and Grand St Intersection 2023 Traffic Impact Fees $0 $0 $0 0 $0 $0 Project Notes TSIP Citywide(287).Carry Over Totals:$0 $0 $0 0 $0 $0 Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11325 IMPLEMENTING AGENCY Orange.City of Local Project Number: Project Title Additional Project IDs: Citywide Sidewalk Assessment Type of Work: Pedestrian Project Description Type of Work Description: Pedestrian- Identify the condition of 550 miles of sidewalk,ADA access ramps,and maintenance needs.Integrate Installation of ADA access ramps GIS as part of data collection. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Wide 2023 Other $50,000 $0 $450,000 $0 $500,000 $513,500 Project Notes 2024 Other $50,000 $0 $450,000 $0 $500,000 $527,405 Gas Tax 2105(272)&Capital Projects(500). 2025 Other $50,000 $0 $450,000 $0 $500,000 $541,727 Carry Over 2026 Other $50,000 $0 $450,000 $0 $500,000 $556,479 2027 Other $50,000 $0 $450,000 $0 $500,000 $571,673 2028 Other $50,000 $0 $450,000 $0 $500,000 $587,324 2029 Other $50,000 $0 $450,000 $0 $500,000 $603,443 Totals:$350,000$0 $3,150,000 $0 $3,500,000 $3,901,551 Last Revised:22-00-Submitted Total Programmed:$3,500,000 TIP ID CP-11877 IMPLEMENTING AGENCY Orange.City of Local Project Number.12982 Project Title Additional Project IDs: Corp Yard Renovations Type of Work: Other Project Description Renovation of the City's Corporation Yard,which includes improving space allocation,enhancing paths Type of Work Description: Other-Other of travel and safety,maximizing equipment and vehicle storage,and redistributing storage areas for Police,Community Services,and Public Works. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED 637 W Struck Ave,Orange,CA 92867 2023 Other $415,000$0 $3,735,000 $0 $4,150,000 $4,262,050 Project Notes 2023 Gas Tax $30,000 $0 $270,000 $0 $300,000 $308,100 Sanitation and Sewer(220),Gas Tax Maintenance 270),Gas Tax Construction(271),&Capital Projects(500). Totals:$445,000 $0 $4,005,000 $0 $4,450,000 $4,570,150 Last Revised:22-00-Submitted Total Programmed:$4,450,000 https://ocfundtracker.octa.net/CIP/report_project_listing 4/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/reportproject_listing TIP ID CP-11583 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project IDs: East Walnut Ave Infrastructure Improvement Type of Work: Safety Project Description Type of Work Description: Safety-Improve This project will construct a new 48"RCP storm drain line on Walnut Ave from Cambridge St to roadway drainage California St to alleviate the localized flooding issues.In addition,AC pavement and concrete will be Improved from Cambridge St to Tustin St. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Walnut Avenue from Cambridge Street to Tustin Street Project Notes Totals:$0 $0 $0 0 $0 $0 Sanitation&Sewer(220),Measure"M2"Traffic Imprvmnt(263),Sewer Construction(520)& Water(600)Utility Operations Previously named Walnut Ave Infrastructure improvement"Carry Over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11321 IMPLEMENTING AGENCY Orange,City of Local Project Number:18-OCTA-TSP-3897 Project Title Additional Project IDs: Garden Grove Blvd Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- Multi-jurisdictional project between Valley View Street in Garden Grove and Bristol Street in SantaInterconnecttrafficsignalstoimprovecoordinationAna.In Orange the corridor is Garden Grove Blvd from Lewis Street to The City Driveandcommunications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Garden Grove Boulevard,located at Lewis Street shared with Garden Grove)and at The City Drive Project Notes Totals:$0 $0 $0 0 $0 $0 TSIP Citywide(287).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-10996 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Glassell Street Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer StreetInterconnecttrafficsignalstoimprovecoordinationtoGlassellStreetandonGlassellStreetfromTaftAvenuetoLincolnAvenue.and communications Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Taft Avenue from Shaffer St to Glassell St and on 2024 Traffic Impact Fees $0 $0 $740,000 $0 $740,000 $785,066 Glassell St from Taft Ave to Lincoln Ave Project Notes TSIP Citywide(287).Carry Over Totals:$0 $0 $740,000 $0 $740,000 $785,066 Last Revised:22-00-Submitted Total Programmed:$740,000 TIP ID CP-11332 IMPLEMENTING AGENCY Orange.City of Local Project Number: Project Title Additional Project IDs: Glassell and Collins Left Turn Signal Modification Type of Work: Intersection Project Description Type of Work Description: Intersection- Left Turn Phase for NB and SB on Glassell St at Collins AveUpgradetrafficsignalequipmentatintersection Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Glassell St at Collins Ave Project Notes Totals:$0 $0 $0 0 $0 $0 Reimbursable Capital Projects(550).HSIP, Pending E76 for Construction.Carry Over Last Revised:22-00-Submitted Total Programmed:$0 https://ocfundtracker.octa.net/CIP/report.project listing 5/16 5/31/22,2:51 PM httpsl/ocfundtracker.octa.net/CIP/report project listing TIP ID CP-10993 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Glassell and Palmyra Signal Install Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- Project will provide for the installation of a traffic signal at the intersection of Glassell St and Palmyra Install new traffic signals and equipment Ave.Work includes installation of signal poles,associated equipment,and ADA ramps. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Glassell St at Palmyra Ave Project Notes Totals:$0 $0 $0 0 $0 $0 Reimbursable Capital Projects(550).Carry Over Last Revised:22-00-Submitted Total Programmed:$0, TIP ID CP-11886 IMPLEMENTING AGENCY Orange,City of Local Project Number 30165 Project Title Additional Project IDs: Grand St Parking Lot Improvement Type of Work: Other Project Description Type of Work Description: Other-Other Demolish the existing Fire Station No.1 Building and construct a new at-grade parking lot to improve capacity and circulation. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Near 300 E.Chapman Avenue,Orange,CA 92866 Project Notes Totals: $0 $0 ,$0 0 $0 $0 Capital Bond Proceeds(553)&City Trf:Merged 2008 Tax Exempt Bonds(954). Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11003 IMPLEMENTING AGENCY Orange,City of Local Project Number N/A Project Title Additional Project IDs: Katella Ave Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Katella Avenue.The installation Interconnect traffic signals to improve coordination of F/O lines will enable the City's TMC to communicate with the traffic signals to improve traffic signal and communications operations and traffic flow. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Katella Ave from Tustin St to Santiago Blvd.and 2023 Traffic Impact Fees $45,000$0 $405,000 $0 $450,000 $462,150 on Santiago Blvd from Katella Aveto Meats Ave. Project Notes TSIP Citywide(287).Carry Over Totals: $45,000$0 $405,000 $0 $450,000 $462,150 Last Revised:22-00-Submitted Total Programmed:$450,000 TIP ID CP-11322 IMPLEMENTING AGENCY Orange.City of Local Project Number.18-OCTA-TSP-3894 Project Title Additional Project IDs: Katella Ave Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The Katella Avenue Traffic Signal Synchronization Corridor is a multi jurisdictional project,being led by Interconnect traffic signals to improve coordination OCTA.In Orange,the corridor is between Struck Avenue and Santiago Canyon Road/Jamboree Road and communications and includes 19 traffic signals. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Struck Avenue and Santiago Canyon Road/Jamboree Road Totals: $0 $0 $0 0 $0 $0 Project Notes TSIP Citywide(287)Carry Over Last Revised:22-00-Submitted Total Programmed:$0 https://ocfundtracker.octa.net/CIP/report_project listing 6/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report_project listing TIP ID CP-11582 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project IDs: Katella Ave Street Rehabilitation Type of Work: Road Maintenance Project Description Type of Work Description Road Maintenance- This project is the rehabilitation of Katella Avenue,including pavement surfacing,replacement of Reconstruction of roadway broken curb and gutter,reconstruction of ADA ramps,adjusting utility covers to grade,restriping and landscaping improvements. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Katella Avenue from SR-55 to Harding Street Project Notes Totals:$0 $0 $0 0 $0 $0 Measure"M2"Traffic Improvement(263).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11007 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Katella and Batavia Signal Network Extension Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The project will extend the existing City's Traffic Signal Network along Katella Avenue from Main StreetInterconnect,traffic signals to improve coordination to Struck Street and on Batavia Street from Katella Avenue to Palm Avenue. and communications Limits FISCAL YEAR FUND TYPR ENG ROW CON/IMP 08NII TOTAL TOTAL ESCALATED Katella Ave from Main St to Struck and Batavia St 2024 Traffic Impact Fees $0 $0 $950,000 $0 $950,000 $1,007,855 from Katella to Palm Ave Project Notes TSIP Citywide(287).Carry Over Totals:$0 $0 $950,000 $0 $950,000 $1,007,855 Last Revised:22-00-Submitted Total Programmed:$950,000 TIP ID CP-11577 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project IDs: Local Roadway Safety Plan Type of Work: Safety Project Description Type of Work Description: Safety-Other This project will develop a Local Road Safety Plan(LRSP)that will define goals,objectives,and strategies to reduce accidents on local roads. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Citywide Project Notes M2 Traffic Improvements(263)and Reimbursable Totals:$0 $0 $0 0 $0 $0 Capital Projects(550).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11315 IMPLEMENTING AGENCY Orange.City of Local Project Number:18-OCTA-TSP-3901 Project Title Additional Project IDs: Main Street Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- Traffic Signal Synchronization Project is a multi-jurisdictional project.The corridor is between CHOC Interconnect traffic signals to improve coordination Court and Taft Avenue and includes 12 traffic signals.This Project will be led by OCTA The and communications programmed funds represent a 20%fair share contribution Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Maint St,between CHOC Court and Taft Avenue and includes 12 traffic signals Project Notes Totals:$0 $0 $0 0 $0 $0 TSIP Citywide(287).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 https://ocfundtracker.octa.net/CIP/report_project_listing 7/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report_project listing TIP ID CP-11029 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Minor Traffic Control Devices Type of Work: Safety Project Description Type of Work Description: Safety-Traffic This project will provide minor traffic control devices such as signage,striping and other related traffic calming such as bulbout,chokers,speed hump,etc. calming devices as directed by the Traffic Commission and City Traffic Engineer. Limits FISCAL FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL City-Wide YEAR ESCALATED Project Notes 2023 Measure M2 Local $8,000 $0 $42,000 $0 $50,000 $51,260 Fairshare Traffic Improvements-Measure"M2"(263)& Capital Projects(500).Carry Over 2023 Other 22,500 $0 $202,500 $0 $225,000 $231,075 2024 Other 24,000 $0 $126,000 $0 $150,000 $157,6731112024MeasureM2Local $8,000 $0 $42,000 $0 $50,000 $52,558 Fairshare 2025 Other 24,000 $0 $126,000 $0 $150,000 $161,684 2025 Measure M2 Local $8,000 $0 $42,000 $0 $50,000 $53,895 Fairshare 2026 Other 24,000 $0 $126,000 $0 $150,000 $165,814 2026 Measure M2 Local $8,000 $0 $42,000 $0 $50,000 $55,271 Fairshare 2027 Measure M2 Local $8,000 $0 $42,000 $0 $50,000 $56,690 Fairshare 2027 Other 24,000 $0 $126,000 $0 $150,000 $170,069 2028 Measure M2 Local $8,000 $0 $42,000 $0 $50,000 $58,150 Fairshare 2028 Other 24,000 $0 $126,000 $0 $150,000 $174,451 2029 Measure M2 Local $8,000 $0 $42,000 $0 $50,000 $59,655 Fairshare 2029 Other 24,000 $0 $126,000 $0 $150,000 $178,964 Totals:$222,500$0 $1,252,500 $0 $1,475,000 $1,627,209 Last Revised:22-00-Submitted Total Programmed:$1,475,000 TIP ID CP-11878 IMPLEMENTING AGENCY Orange,City of Local Project Number:14997 Project Title Additional Project IDs: Municipal Parking Lot Maintenance Type of Work: Other Project Description This project rehabilitates municipal parking lots every seven years and any maintenance issues Type of Work Description: Other-Other annually.Work consists of slurry sealing,crack filling,removing and replacing defective AC paving, striping,AC overlays,misc,delineation,etc. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations Throughout the City 2023 Other $0 $0 $0 20,000 $20,000 $20,000 Project Notes 2024 Other $0 $0 $0 20,000 $20,000 $20,000 Gas Tax Construction(271)and Capital Projects 2025 Other $0 $0 $0 20,000 $20,000 $20,000 500). 2026 Other $0 $0 $0 20,000 $20,000 $20,000 2027 Other $0 $0 $0 20,000 $20,000 $20,000 2028 Other $0 $0 $0 20,000 $20,000 $20,000 2029 Other $0 $0 $0 20,000 $20,000 $20,000 Totals:$0 $0 $0 140,000 $140,000 $140,000 Last Revised:22-00-Submitted Total Programmed:$140,000 I https://ocfundtracker.octa.net/CIP/report_project_listing 8/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report_project listing TIP ID CP-11035 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Old Towne Street Lighting Type of Work: Safety Project Description Type of Work Description: Safety-Improve The project will focus on installing new acorn streetlights in Old Towne.Shaffer Street between lighting of roadway Chapman Avenue and Maple Avenue was selected to enhance safety for high pedestrian use near the Orange Public Library&History Center. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Old Towne Project Notes 2023 Other 25,000 $0 $252,998 $0 $277,998 $285,588 Capital Projects(500).Carry Over Totals:$25,000 $0 $252,998 $0 $277,998 $285,588 Last Revised:22-00-Submitted Total Programmed:$277,998 TIP ID CP-11326 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project IDs: Orange Community Shuttle Feasibility Study Type of Work: Transit Project Description This project will explore opportunities and benefits for a new community shuttle service.The service Type of Work Description: Transit-New Service could provide an alternative to driving while connecting key destinations such as the Outlets,medical corridor,Old Towne,and Chapman University. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City Wide Project Notes Totals:$0 $0 $0 0 $0 $0 M2(263)&Reimbursable Capital Projects(550). Carry Over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11885 IMPLEMENTING AGENCY Orange,City of Local Project Number:20397 Project Title Additional Project IDs: Parker Street Restriping Type of Work: Other Project Description This project will provide for the ultimate roadway configuration as the City builds out and adjacent Type of Work Description: Other-Other parcels potentially redevelop.By reorganizing the existing paved roadway,this will provide features necessary to best serve various road users. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Parker Street from La Vets Avenue to South City 2027 Other $10,000 $0 $90,000 $0 $100,000 $114,335 Limit Project Notes Reimbursable Capital Projects(550). Totals:$10,000 $0 $90,000 $0 $100,000 $114,335 Last Revised:22-00-Submitted Total Programmed:$100,000 https://ocfundtracker.octa.net/CIP/report project listing 9/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report_project listing TIP ID CP-11048 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Pavement Management Program(PMP) Type of Work: Road Maintenance Project Description Type of Work Description: Road Maintenance- The City's PMP identifies the condition for 320 miles of streets and identifies maintenance needs of Rehabilitation of roadway this roadway system requiring$6 million annually for slurry sealing,asphalt overlay and reconstructions. Limits FISCAL FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL City-Wide YEAR SCALATED Project Notes 2023 Measure M2 Local $240,000 $0 $2,160,000 $0 $2,400,000 $2,464,800 Fairshare Traffic Improvement Measure"M2"(263),Gas Tax LocalMaintenance(270),RMRA(274),Capital Projects 2023 Local Streetsappor andnments $291,000 $0 $2,619,000 $0 $2,910,000 $2,988,570I500)and Reimbursable Capital Projects(550). Carry Over. 2023 Other 60,000 $0 $540,000 $0 $600,000 $616,200 2023 Gas Tax 12,000 $0 $108,000 $0 $120,000 $123,240 2024 Gas Tax 7,000 $0 $693,000 $0 $700,000 $742,204 2024 Local Streets and $27,000 $0 $2,703,000 $0 $2,730,000 $2,894,613 Roads apportionments 2024 Measure M2 Local $21,200 $0 $2,098,800 $0 $2,120,000 $2,247,817 Fairshare 2024 Other 10,000 $0 $90,000 $0 $100,000 $105,481 2025 Measure M2 Local $21,700 $0 $2,148,300 $0 $2,170,000 $2,369,205 Fairshare 2025 Local Streets and $28,000 $0 $2,802,000 $0 $2,830,000 $3,089,821 Roads apportionments 2025 Other 10,000 $0 $90,000 $0 $100,000 $108,345 2025 Gas Tax 7,000 $0 $693,000 $0 $700,000 $764,260 2026 Measure M2 Local $21,200 $0 $2,098,800 $0 $2,120,000 $2,383,418 Fairshare 2026 Gas Tax 7,000 $0 $693,000 $0 $700,000 $786,978 2026 Local Streets and $29,300 $0 $2,900,700 $0 $2,930,000 $3,294,063 Roads apportionments 2026 Other 10,000 $0 $90,000 $0 $100,000 $111,296 2027 Other 10,000 $0 $90,000 $0 $100,000 $114,335 2027 Gas Tax 7,000 $0 $693,000 $0 $700,000 $810,377 2027 Measure M2 Local $21,200 $0 $2,098,800 $0 $2,120,000 $2,454,284 Fairshare 2027 Local Streets and $29,300 $0 $2,900,700 $0 $2,930,000 $3,392,006 Roads apportionments 2028 Other 10,000 $0 $90,000 $0 $100,000 $117,465 2028 Gas Tax 7,000 $0 $693,000 $0 $700,000 $834,478 2028 Local Streets and $29,300 $0 $2,900,700 $0 $2,930,000 $3,492,887 Roads apportionments 2028 Measure M2 Local $21,200 $0 $2,098,800 $0 $2,120,000 $2,527,277 Fairshare 2029 Measure M2 Local $21,200 $0 $2,098,800 $0 $2,120,000 $2,602,459 Fairshare 2029 Other 10,000 $0 $90,000 $0 $100,000 $120,689 2029 Local Streets and $P9,300 $0 $2,900,700 $0 $2,930,000. $3,596,795 Roads apportionments 2029 Gas Tax 7,000 $0 $693,000 $0 $700,000 $859,303 Totals:$1,004,900 $0 $39,875,100$0 $40,880,000$46,012,666 Last Revised:22-00-Submitted Total Programmed:$40,880,000 I https://ocfundtracker.octa.net/CIP/report_project listing 10/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report project listing TIP ID CP-11049 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Pavement Management Program(PMP)Survey Type of Work: Road Maintenance Project Description Windshield field surveys of the City's pavement are conducted every four years to determineTypeofWorkDescription: Road Maintenance- Studies or PMP updates pavement condition indexes for each segment.These surveys are conducted as a requirement for numerous grant programs,OCTA bi-annual reports,and overall PMP Limits FISCAL FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL City-Wide YEAR ESCALATED Project Notes 2023 Measure M2 Local $70,000 $0 $0 $0 $70,000 $70,000 Fairshare Traffic Improvement-Measure"M2"(263)&TSIP Measure M2 LocalCitywide(287)Carry Over 2025 Fairshare 70,000 $0 $0 $0 $70,000 $70,000 2027 Measure M2 Local $70,000 $0 $0 $0 $70,000 $70,000 Fairshare 2029 Measure M2 Local $70,000 $0 $0 $0 $70,000 $70,000 Fairshare Totals:$280,000$0 $0 $0 $280,000 $280,000 Last Revised:22-00-Submitted Total Programmed:$280,000 TIP ID CP-11327 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project[Ds: Prospect and Spring Right Turn Lane Modification Type of Work: Intersection Project Description Type of Work Description: Intersection-Add This project will add a dedicated right-turn lane on the exit to Grijalva Park to southbound Prospect right turn lane(s)to intersection Avenue.Construction is expected to commence in early 2021. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Spring St at Prospect Ave Project Notes Totals:$0 $0 $0 0 $0 $0 TSIP Citywide(287).Carry Over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11576 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project IDs: Quiet Zone Maintenance Type of Work: Safety Project Description This project will provide for the annual Quiet Zone and Safe Railroad Crossing maintenance Type of Work Description: Safety-Other agreement with Southern California Regional Rail Authority and any related maintenance or improvements necessary for compliance. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Citywide 2023 Other $0 $0 $0 50,000 $50,000 $50,000 Project Notes 2024 Other $0 $0 $0 50,000 $50,000 $50,000 Capital Projects(500).Carry Over 2025 Other $0 $0 $0 50,000 $50,000 $50,000 2026 Other $0 $0 $0 50,000 $50,000 $50,000 2027 Other $0 $0 $0 50,000 $50,000 $50,000 2028 Other $0 $0 $0 50,000 $50,000 $50,000 2029 Other $0 $0 $0 50,000 $50,000 $50,000 Totals:$0 $0 $0 350,000 $350,000 $350,000 Last Revised:22-00-Submitted Total Programmed:$350,000 https://ocfundtracker.acta.net/CIP/report project listing 11/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report project listing TIP ID CP-11052 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Santiago Bike Trail Phase IV Type of Work: Bikeways Project Description Type of Work Description: Bikeways-New bike This project is the final phase of the Santiago Creek Bike Trail alignment In the Master Bikeway Plan. route Construction of the multi-purpose trail will connect the existing bike trail west of Cannon St. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Cannon to Windes Project Notes Totals:$0 $0 $0 0 $0 $0 Capital Projects(500)&Reimbursable Capital Projects(550).Grants-Construction.Grants- Engineering and Env.-This was the"Santiago Creek Multipurpose Trail Extension"Carry Over Last Revised:22-00-Submitted Total Programmed:$0 TIP ID CP-11051 IMPLEMENTING AGENCY Orange,City of Local Project Number.N/A Project Title Additional Project IDs: Santiago Canyon Road Multi-Purpose Trail Type of Work: Bikeways Project Description Construction of a multipurpose trail adjacent to Santiago Canyon Rd connecting the ex.trail at the Type of Work Description: Bikeways-Planning Reserve neighborhood to Cannon Street.The trail would be constructed of decomposed granite,and would allow for pedestrians equestrians,and bicycles Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Santiago Canyon Rd-Orange Park Blv to Cannon 2024 Other 75,000 $0 $0 0 $75,000 $75,000 Street. 2025 Other 0 $0 $750,000 $0 $750,000 $819,545 Project Notes Reimbursable Capital Projects(550).Carry Over Totals:$75,000 $0 $750,000 $0 $825,000 $894,545 Last Revised:22-00-Submitted Total Programmed:$825,000 TIP ID CP-11887 IMPLEMENTING AGENCY Orange,City of Local Project Number:30194 Project Title Additional Project IDs: Santiago Canyon Road Rehabilitation Project Type of Work: Road Maintenance Project Description Type of Road Maintenance- The work will include pavement rehabilitation,replacement of failed pavement areas,damagedTypeofWorkDescription: of roadway sidewalk and curb and gutter,removal and construction of existing ADA ramps to conform to federal Rehabiliguidelines and restriping the roadway. Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL Santiago Canyon Road from Newport Boulevard YEAR ESCALATED to Jamboree Road 2023 Local Streets and Roads $50,000$0 $527,943 $0 $577,943 $593,781 Project Notes apportionments RMRA(274)&Reimbursable Capital Projects 2023 Other 40,000$0 $363,299 $0 $403,299 $414,198 550). Totals:$90,000 $0 $891,242 $0 $981,242$1,007,979 Last Revised:22-00-Submitted Total Programmed:$981,242 https://ocfundtracker.octa.net/CIP/report_project listing 12/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report project_listing TIP ID CP-11880 IMPLEMENTING AGENCY Orange,City of Local Project Number:15509 Project Title Additional Project IDs: Sewer Cleaning&Video Type of Work: Other Project Description The State's Waste Discharge Elimination(WDR)requires the City to complete a condition assessment Type of Work Description: Other-Other of its entire 300+mile sewer line system and develop a rehab and replacement plan.Additional contract services are needed to comply with WDR. Limits FISCAL YEAR FUND TYPE ENG ROW CONIIMP O&M TOTAL TOTAL ESCALATED 111 Various Locations Throughout the City 2023 Other $0 $0 $0 $500,000 $500,000 $500,000 Project Notes 2024 Other $0 $0 $0 $500,000 $500,000 $500,000 Sanitation and Sewer(220) 2025 2026 Other $0 $0 $0 $500,000 $500,000 $500,000 Other $0 $0 $0 $500,000 $500,000 $500,000 2027 Other $0 $0 $0 $500,000 $500,000 $500,000 2028 Other $0 $0 $0 $500,000 $500,000 $500,000 2029 Other $0 $0 . $0 $500,000 $500,000 $500,000 Totals:$0 $0 $0 $3,500,000 $3,500,000 $3,500,000 Last Revised:22-00-Submitted Total Programmed:$3,500,000 TIP ID CP-11879 IMPLEMENTING AGENCY Orange,City of Local Project Number:15508 Project Title Additional Project IDs: Sewer Line Maintenance&Replacement Type of Work: Other Project Description Type of Work Description: Other-Other This project annually fixes hot spots due to root intrusion,offset joints,and damaged sewer mains.It also replaces both hydraulically and structurally deficient sewer mains. Limits FISCAL FUND TOTALENGROWCON/IMP O&M TOTAL Various Locations Throughout the City YEAR TYPE ESCALATED Project Notes 2023 Other $220,000 $0 $1,980,000 $0 $2,200,000 $2,259,400 Sewer Construction(520).2024 Other $220,000 $0 $1,980,000 $0 $2,200,000 $2,320,582 2025 Other $220,000 $0 $1,980,000 $0 $2,200,000 $2,383,599 2026 Other $220,000 $0 $1,980,000 $0 $2,200,000 $2,448,507 2027 Other $220,000 $0 $1,980,000 $0 $2,200,000 $2,515,363 2028 Other $220,000 $0 $1,980,000 $0 $2,200,000 $2,584,224 2029 Other $220,000 $0 $1,980,000 $0 $2,200,000 $2,655,150 Totals:$1,540,000 $0 $13,860,000$0 $15,400,000 $17,166,825 Last Revised:22-00-Submitted Total Programmed:$15,400,000 TIP ID CP-11882 IMPLEMENTING AGENCY Orange,City of Local Project Number:20430 Project Title Additional Project IDs: Storm Drain Improvements Type of Work: Other Project Description Type of Work Description: Other-Other This project replaces existing deficient drainage systems and constructs new storm drain lines as needed per the Master Plan of Drainage to alleviate localized flooding. Limits FISCAL YEAR FUND TYPE ENG ROW CONIIMP O&M TOTAL TOTAL ESCALATED Various Locations Throughout the City 2023 Other $50,000 $0 $450,000 $0 $500,000 $513,500 Project Notes 2024 Other $50,000 $0 $450,000 $0 $500,000 $527,405 Sanitation and Sewer(220). 2025 Other $50,000 $0 $450,000 $0 $500,000 $541,727 2026 Other $50,000 $0 $450,000 $0 $500,000 $556,479 2027 Other $50,000 $0 $450,000 $0 $500,000 $571,673 2028 Other $50,000 $0 $450,000 $0 $500,000 $587,324 2029 Other $50,000 $0 $450,000 $0 $500,000 $603,443 Totals:$350,000 $0 $3,150,000 $0 $3,500,000 $3,901,551 Last Revised:22-00-Submitted Total Programmed:$3,500,000 https://ocfundtracker.octa.net/CIP/report_project listing 13/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report_project listing TIP-ID CP-11881 IMPLEMENTING AGENCY Orange,City of Local Project Number:20374 Project Title Additional Project IDs: Streetlight Pole Replacement Program Type of Work: Other Project Description Type of Work Description: Other-Other This program will biannually replace 40 existing steel streetlight poles with City standard LED- retrofitted concrete poles and underground overhead wires. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various locations throughout the City 2023 Other $25,000 $0 $225,000 $0 $250,000 $256,750 Project Notes 2024 Other $30,000 $0 $270,000 $0 $300,000 $316,443 Capital Project(500). 2025 Other $30,000 $0 $270,000 $0 $300,000 $325,036 2026 Other $30,000 $0 $270,000 $0 $300,000 $333,887 2027 Other $30,000 $0 $270,000 $0 $300,000 $343,004 2028 Other $30,000 $0 $270,000 $0 $300,000 $352,394 2029 Other $30,000 $0 $270,000 $0 $300,000 $362,066 Totals:$205,000 $0 $1,845,000 $0 $2,050,000 $2,289,580 Last Revised:22-00-Submitted Total Programmed:$2,050,000 TIP ID CP-10979 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Structural Evaluation of City Bridges Type of Work: Bridge Project Description Type of Work Description: Bridge- A maintenance and retrofit plan are ready for implementation for 8 bridges located throughout the City Rehabilitation of existing pavement/structure that require maintenance.The City Is awaiting Caltrans approval for construction phase. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Various Locations City Wide 2025 State 0 $0 $2,000,000 $0 $2,000,000 $2,185,454 Project Notes Caltrans BPMP,Pending E76-$1,665,715.00 Totals:$0 $0 $2,000,000 $0 $2,000,000 $2,185,454Was"Bridge Maintenance"Gas Tax Maintenance 270),Gas Tax 2105(272)&Reimbursable Capital Projects(550).Carry Over Last Revised:22-00-Submitted Total Programmed:$2,000,000 TIP ID CP-11884 IMPLEMENTING AGENCY Orange.City of Local Project Number.20500 Project Title Additional Project IDs: Sycamore and Palmyra Neighborhoods Street Rehabilitation Type of Work: Road Maintenance Project Description Type of Work Description Road Maintenance- This project will rehabilitate streets in the Sycamore and Palmyra Neighborhoods.Work includes cold Rehabilitation of roadway planing,AC overlay installation,slurry seal,reconstruction of sidewalks,curb and gutters,driveways and cross gutters. Limits FISCAL FUND TYPE ENG ROW CON/IMP Q M TOTAL TOTAL Sycamore Avenue,Holly Street,Ash Street,YEAR ESCALATED Palmyra Avenue,Flower Street,and Lilac Lane 2023 Community Development $60,000$0 $569,530 $0 $629,530 $646,616 Project Notes Block Grant CDBG(310)&Capital Projects(500). Totals:$60,000$0 $569,530 $0 $629,530 $646,616 Last Revised:22-00-Submitted Total Programmed:$629,530 httpsJ/ocfundtracker.octa.net/CIP/report.,project listing 14/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/report_project_listing TIP ID CP-11055 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Traffic Signal Controller Changeout Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- The City maintains 156 traffic signals,most of which contain older controllers.Nearly 2/3 of the Replace and upgrade traffic signals and equipment controllers have been updated or replaced to allow for better coordination with the City'sTransportationManagementCenter. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED City-Wide 2023 Gas Tax $0 $0 $70,000 $0 $70,000 $72,100 Project Notes 2024 Gas Tax $0 $0 $70,000 $0 $70,000 $74,263 Gas Tax Maintenance(270),Gas Tax(272)and 2025 Gas Tax $0 $0 $70,000 $0 $70,000 $76,491 Capital Projects Fund(500).Carry Over 2026 Gas Tax $0 $0 $70,000 $0 $70,000 $78,786 2027 Gas Tax $0 $0 $70,000 $0 $70,000 $81,149 2028 Gas Tax $0 $0 $70,000 $0 $70,000 $83,584 2029 Gas Tax $0 $0 $70,000 $0 $70,000 $86,091 Totals:$0 $0 $490,000 $0 $490,000 $552,464 lLast Revised:22-00-Submitted Total Programmed:$490,000 TiP ID CP-11056 IMPLEMENTING AGENCY Orange,City of Local Project Number:N/A Project Title Additional Project IDs: Traffic Signal Equipment Painting Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- This project provides for the painting of traffic signal equipment at approx 25 intersections w/in the Ci .The Replace and upgrade traffic signals and equipment buttons&paintcabinets)o has n the greatiy deteriorated. equipmentty's traffic signal signal and pedestrian heads,pedestrian push Limits FISCAL TOTAL FUND TYPE ENG ROW CON/IMP O&M TOTAL City-Wide YEAR ESCALATED Project Notes 2023 Measure M2 Local 0 $0 $45,000 $0 $45,000 $46,350 TSIP CitywideFalrshare287)&Traffic Improvements- Measure'M2"(263).Carry Over 2024 Measure M2 Local Fairshare 0 $0 $45,000 $0 $45,000 $47,740 2025 Measure M2 Local 0 $0 $45,000 $0 $45,000 $49,173 Fairshare 2026 Measure M2 Local 0 $0 $45,000 $0 $45,000 $50,648 Falrshare 2027 Measure M2 Local 0 $0 $45,000 $0 $45,000 $52,167 Fairshare 2028 Measure M2 Local 0 $0 $45,000 $0 $45,000 $53,732 Fairshare 2029 Measure M2 Local 0 $0 $45,000 $0 $45,000 $55,344 Fairshare Totals:$0 $0 $315,000 $0 $315,000 $355,154 Last Revised:22-00-Submitted Total Programmed:$315,000 TIP ID CP-11323 IMPLEMENTING AGENCY Orange.City of Local Project Number:20-ORNG-TSP-3976 Project Title Additional Project IDs: Tustin St Signal Synchronization Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- A multi-jurisdictional project between First Street in Tustin and Wabash Avenue in Yorba Linda.25 of Interconnect traffic signals to improve coordination the signals are within the City of Orange.This Project will be led by City of Orange and primarily and communications funded through Measure M2. Limits FISCALL YEARFUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Tustin Street Project Notes Totals:$0 $0 $0 0 $0 $0 TSIP B-Carry Over Reimbursable Capital Projects Carry Over for FY21/22.Funding reflected in prior years.includes$2,766,833 from M2 TSSP. Last Revised:22-00-Submitted Total Programmed:$0 https://ocfundtracker.octa.net/CIP/report_project listing 15/16 5/31/22,2:51 PM https://ocfundtracker.octa.net/CIP/reportj,roject_listing TIP ID CP-11883 IMPLEMENTING AGENCY Orange,City of Local Project Number:20485 Project Title Additional Project IDs: Tustin Street BioClean Installation Type of Work: Other. Project Description Type of Work Description Other-Other This project will install a BioClean Separating Baffle Box or equal on Tustin Street north of Santiago Creek Bridge. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Tustin Street near 445 S Tustin St,Orange,CA 2023 Other 50,000 $0 $577,200 $0 $627,200 $644,516 92866 and Various Location Throughout the City. Project Notes Sanitation and Sewer(220)and Reimbursable Totals:$50,000 $0 $577,200 $0 $627,200 $644,516 Capital Projects(550).Project X Tier 1 Fund. Last Revised:22-00-Submitted Total Programmed:$627,200 TIP ID CP-11320 IMPLEMENTING AGENCY Orange,City of Local Project Number: Project Title Additional Project IDs: Tustin and La Veta'Taffic Signal Upgrade Type of Work: Traffic Signals Project Description Type of Work Description: Traffic Signals- Traffic signal upgrades at the Intersection to enhance the capacity and improve traffic signal operation Replace and upgrade traffic signals and equipment at the Intersection. Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED Tustin St at La Veta Ave Project Notes TSIP Citywide(287).Carry Over Totals:$0 $0 $0 0 $0 $0 Last Revised:22-00-Submitted Total Programmed:$0 16/16https://ocfundtracker.octa.net/CIP/report project_listing