RES-8183 Approving Zone Change No. 1146-93RESOLUTION NO, 8183
A RESOLUTION OP THB CITY COUNCIL OP THB
CITY OP ORANGB UPHOLDING THE RECOMMENDA-
TION OP THB PLANNING COMMISSION OP THE
CITY OP ORANGB AND APPROVING THB RECLAS-
SIPICATION OP PROPBRTY SITUATBD DIRECTLY
ADJACBNT TO AND NORTH OP SANTIAGO CREBIt
AND SOUTH OP MABURY AVENUB BBTWEEN LASSBN
AND ORANGB PARK BOULEVARDS,
ZOHB CHANGB 1146-
93 HANSON PROPERTIBS WEST.
INC,
RECITALS:After due pUblic hearings as required by law, theCityCounciloftheCityofOrangeconsideredarecommendationofthePlanningCommissionoftheCityofOrangerecommendingbyResolutionNo, PC 8-93, that certain propertysituateddirectlyadjacenttoandnorthofSantiagoCreekandsouthofMaburyAvenuebetweenLassenandOrangeParkBoulevardsbereclassifiedfromtheS-G District to the R-1-8 District and approved said recommendation afterfindinganddeterminingthehereinafterdescribedfacts, The real property whichisthesubjectofthereclassificationis
more particularly described as
follows:See Exhibit "A" attached,The City Council finds infavoroftheproposedresidentialuseofthesitealthoughitprecludesmineraldevelopment, as intended by the designationasaregionallysignificantaggregateresourcesectorbytheStateMiningandGeologyBoard,
based upon the following considerations:The entire 120 acreaggregateminingproperty, of which 12,6 acres forms theprojectsite, has been utilized for mineral extraction for morethan40yearsandtheextractionlifeismostlydepleted. On a regional scale, there are greater extracting
opportunities elsewhere in the County,The 12,6 acre projectsiteisphysicallyisolatedfromtherestoftheminingpropertybySantiagoCreek, thus
deferring
any possible mineral extraction opportunities,Furthermore, the 12,6 acresitehasnotbeenutilizedformineralextraction
due to its proximity to neighboring singlefamilyresidenceswhich, if such extraction activitieswheretooccur, would be impacted by noise and
dust associated with mineral extraction.Upon the public hearingbeforetheCityCouncil,
1. The irregular shaped project site is 12,6 acres in size and
consists of four parcels of land: a 9,6 acre parcel, and an
approximately 2,7 acre portion of a 15.6 acre parcel, which
are two of several parcels that form the SUlly-
Miller aggregate mining property: a 0,14 acre parcel known as Lot
B of Tract 9827: and the majority of a 0,18 acre parcel
known as Lot A of Tract 9827, The site is located
directly adjacent to and north of Santiago Creek and south of
Mabury Avenue between Lassen and Orange Park Boulevards,
It borders the residential neighborhood to the north
commonly referred to as Mabury
Ranch.2, The applicant proposes to develop the project site
for residential purposes and requests approval of the
following discretionary permits, The project also requires that
Tract 9827 be amended to allow Lots A and B to be part of
the development
site,A, General Plan Amendment 2-93 - to amend the Land
Use Element of the city's General Plan, changing
the project site's land use designation from Resource
Area to Low Density Residential, 2-6 dwelling
units
per acre,B. Zone Change 1146-93 - to change the site'
s zoning designation from S-G (Sand and Gravel
Extraction) to R-1-8 (Single Family
Residential, minimum lot size requirement of
8,000 square feet).C, Tentative Tract Map 14747 - to subdivide
the site into 25 residential parcels, ranging in
lot size from approximately 8,000 to 17,000 square
feet, and
3 lettered lots.D. Variance 1947-93 - to allow a reduction in
the 80 foot minimum lot frontage requirement of
the R-1-8 District,California Government Code Section
65358 allows the city to amend its General Plan Land Use Element
a maximum of 4 times a year. Orange Municipal Code
Section 17.06.050 permits change to zoning
classifications subject to public hearing before both the
Planning commission and City Council.Orange Municipal Code Chapter
16,08 sets forth regulations that pertain to the
processing of tentative tract maps,Orange Municipal Code Section 17,
92,020 allows the Planning Commission
to rule on variance applications,3, The project site slopes slightly
from north to south with more significant
topographic changes along the proposed development boundary, created
by the incision of Santiago Creek, where portions of the
embankment experience
25 to 30 foot slopes,4, The site has recently been
cleared of most vegetation to allow for
temporary agricultural activities, A few eucalyptus and other common
trees are located
along
northern portion of the
site recreation trail,
along the creek bed,
5, The majority of the project site is part of the SUlly-
Miller aggregate mining property which generally encompasses
the approximately 120 acre area north of Santiago Canyon
Road and south of Mabury Avenue between Loma Street andOrangeParkBoulevard (see attached exhibit A), Although
this portion of the SUlly-Miller property has not been
mined, the sand and gravel extraction use was approved in 1950
when the property was under the juriSdiction of the CountyofOrange.Annexation to the city of Orange was initiated
through Pre-Zone Change #370, designating the zoning of the
property as S-G, Sand and Gravel Extraction
District, with final annexation occurring in January,
1965 (Annexation #228),The aggregate mining operation on the
property south of Santiago Creek was modified
through subsequent conditional use permit approvals to allow for the
replacement of two asphalt batch plants and the installation
of a concrete batch plant (
CUP #498 & #704),property bordering
an existing off-Native vegetation
exists within and 6. Lots A and B of Tract 9827 have beenrecentlyacquiredbytheapplicantfromtheStandardPacificdevelopmentcompanytobepartoftheprojectsite. These lots are
two of three lettered lots that were created through
the subdivision of Tract 9827, recorded in May, 1978. All
three lots, which total approximately .55 acres of land, are
located along the south side of Mabury Avenue and appear toberemnantparcelscreatedbythefinalalignmentdesignof
Mabury Avenue (see
attached exhibit B).7. A 50-foot wide easement traverses the
site from the northern central portion to the southeastern corner
of the site. The easement contains a high pressurewaterline, 9-feet in diameter, that is own andmaintainedbytheMunicipalWater
District of Orange County (MWDOC).8. Access to the site's
future residences will be provided through the
proposed extension of Yellowstone Boulevard south of MaburyAvenue. Yellowstone Boulevard and Mabury Avenue are local streets as designated
by the city's Master Plan of Streets and Highways and
are built to their ultimate planned right-of-way
widths of 68 feet and 66 feet,respectively, At this time, access to the site may also be gained fromthesouthviatheSully-Miller aggregate mining properties offSantiagoCanyonRoadbycrossingatanaturalfordin
the creek. Once the project is developed, however,
there will be no access from the south.9,
An improved recreational trail exists within the right-of-way of
Mabury Avenue and borders the project site's northern
boundary, The City'S Draft Master Plan of Recreational Trails refers to
the trail as #29 and designates it for use byequestrians, cyclists and hikers, Trail #29 is part of the
Santiago Creek trail system
and provides a linkage
10, The surrounding land uses include single family residences
zoned R-1-8 to the north, and the remaining
aggregate mining operations, which include a sand and gravel plant, a
hot mix asphalt plant, and a concrete and
asphalt recycling operation, zoned S-G to the south, east
and west
across Santiago Creek,11, The project site is adjacent to, but not
within the limits of, the orange Park Acres Plan and the
East Orange General Plan (1976 Amendment) areas. Santiago Creek
is the boundary for both of these land use plans, as depicted
in exhibit C,Future development proposals for the remainder
of the Sully-Miller property will be governed
by these plans,12. The applicant initiated the development
review process in December, 1991, with an application for
a general plan amendment and zone change. These
applications were placed on hold by the applicant pending
the decision to concurrently process a subdivision map.
In september, 1992,the applicant circulated
three conceptual subdivision alternatives to the Mabury Homeowners
Association for their review and comment. Some of the early
issues that the applicant discussed with the
Mabury residents regarded whether the proposed development should
include homes that would front onto Mabury Avenue and if the
proposed access to the development would connect
directly with Yellowstone Boulevard, A tentative tract
map application was subsequently submitted to the City
in November, 1992.13. The applicant requests a change in the site'
s general plan land use and zoning designations,
which currently provide for sand and gravel extraction, in order to
allow for a single-family residential
subdivision consisting of 25 residential lots and 3 lettered lots,
As indicated on the proposed tract map, the residential lots
range in size from 8,600 square feet to 17,480 square
feet, The lettered lots provide for the street
circulation system, an emergency access, and a maintenance road within
an improved slope area
adjacent to Santiago Creek.14. Approximately 120,000 cubic yards
of import material is required to improve the area
for development, The lowest portion of the site will be
raised approximately 30 feet,and is the area surrounding lot
20, A manufactured, tiered slope (shown as Lot A) will be
created along the boundary between the development and Santiago
Creek, The slope area will contain a 20 foot wide maintenance road
at the base of the first 2:1 slope, with the
lower slope portions improved to channelize the creek's
flow, Two creek improvement alternatives are proposed; either using
stone rip rap or soil cement along the creek's edge.
Please refer to the tract map which includes a cross
section of each
proposed creek improvement alternative,15, Access to the residential
development will be provided through the extension of
Yellowstone Boulevard south of
Mabury Avenue. Shown as Lot C on the tract map, the
extended roadway creates an internal circulation systemconsistingof3cul-de-sacs (A, B, and C Streets)
that are to be designed to public street standards, constructed by the applicant and maintained by the City of
Orange, The cross section for the proposed streets details
36' wide roadways with 5'5" wide sidewalks and 6'1" parkwaystobecontainedwithina60' wide right-
of-way, The street entrance to the tract is shown to have
a 70' wide right-of-way to accommodatealandscaped, center median. Maintenance of the landscaped median and
the parkways will be the responsibility of the
future property owners through the
formation of a homeowners association,16, An emergency access (Lot B) will
be provided at the terminus of the cul-de-sac detailed
as Street A, This 20 foot wide emergency access links
to the 20 foot wide creek maintenance road and then toMaburyAvenue, It provides for a secondary access to Street
A, which exceeds 600 feet in length.17. The site is
located within an area designated as a
regionally significant aggregate resource sector (Sector J)by the State Mining
and Geology Board, The city's General PlanTechnicalReportdescribesSectorJascontainingapproximately16
percent of the known sand and gravel resources
with the region, Pursuant to Public Resources Code Section 2763,
the City must prepare a Statement of Findings specifyingthereasonsforpermittingalandusethatpreclUdes
mineral development to submit to the State Mining and Geology Boardfortheirreview, In making such a Statement ofFindings, the City of Orange should consider the
importance of potential mining opportunities to the market region as a wholeand
not just the importance to the City,18. Therequestedproposalinvolvestheredevelopmentofalimitedportionofanareadesignatedasasignificantaggregateresourcesector, Although the applicant's intent is
to eventually redevelop the entire property for
residential purposes, the subject proposal was initiated prior to
the an overall redevelopment proposal because of several factors unique
to the project site. The site's aggregate mining
opportunities, if any, are limited by the residential
development of the adjacent property to the north becausenoiseanddustimpactsassociatedwithminingwouldhavedeterredsuchopportunities. Furthermore, the site's proximity to existing residential development and it'sseparationviaSantiagoCreekfromthepropertyutilized
for sand and gravel operations, supported the proposal
to redevelop the area for residential purposes,19, The project site contains two
parcels, Lots A and B of Tract
9827, that are designated as non-
buildable sites,Traditionally, non-buildable restrictions are imposed to preserve
open space areas as means of
conservation, and to provide for recreational opportunities, visual relief,and/
or development buffering. The
serve such purposes. They are undeveloped parcels of land
that appear as remnant parcels created by the final
alignment design of Mabury Avenue. By amending Tract 9827,
the city will be removing the non-buildable restriction
to allow for the proposed development, Justification for
this action could also be supported by the recognition that
the proposed tract will provide an open space area adjacent
to Santiago
Creek,20, primary issues in the development of this tract relate
to Santiago Creek in regard to the proposed improvements,
and the maintenance and liability responsibilities,
The proposal requires the construction of creek improvements
in order to stabilize the creek's embankment and to
protect residents from a 100-year flood, The submitted
tract map details two creek improvement alternatives, It
is the City's preference to see rip rap used to improve
the channel rather than soil cement, However, the
improvements proposed must comply with the Orange County Flood
Control District design and construction standards given that it
is the City's intent for the facility to ultimately be
dedicated to the County through an irrevocable
maintenance easement,Improvements to the creek area also
require permitting through the State's Department of Fish and Game,
This State agency may have an improvement design preference
as well,As a condition of approval, the applicant will
be required to meet the requirements and obtain the
necessary permits from the
above agencies.The tract map indicates that the improved creek
may be dedicated to the County Flood Control District or
the city of Orange, It is staff's understanding
through discussion with the applicant's consultant that the County
does not want to accept a portion of the improved creek,
and prefers to wait until the entire segment of the creek
through the SUlly-Miller properties is improved
and offered for dedication, The city of Orange, thus, needs
to agree to accept responsibility for the
maintenance and liabilities during the interim, until the entire segment
can be improved and offered
to the County.21. The applicant is requesting a
residential land use designation of "Low Density (2-6
dwelling units per acre)",which is the same as that
of the adjacent residential development to the north. The
proposed density of the development is 1.98 units per
gross acre. The proposed development is therefore
compatible with the adjacent residential development in regard to
type and intensity of use and complies with
the requested density designation.22, The applicant is requesting
zoning designation of R-1-8,which is the same
as that of the adjacent residential development to the north
and thus provides for a natural extension of
the existing neighborhood. The R-1-8 District requires
that the minimum building site area for each single-family
residence shall be 8,000 square feet, and the minimum lot
frontage and depth shall
at the setback line, and 100 feet, respectively. All of the
proposed residential lots comply with the minimum buildingsiteareaandlotdepthrequirements. However, 18 of the 25lotsdonotprovidetherequiredminimumlotfrontage,
23, Variance 1947-93 has been requested in order to allowareductioninthe80footminimumlotfrontagerequirement,18 lots have reduced lot frontages, as measured atthesetbackline. They are as follows: Lots 2, 3, 4, 5, 6, 12,13, 15, 23, 24, and 25 have 70' of lot frontage (12.5% less than required); Lots 7, 11, and 19 have 72' of lotfrontage10% less than required); Lots 18 and 22 have 73' oflotfrontage (approx. 9% less than required); Lot 8 has 75' of lot frontage (6% less than required); and, Lot 16 has 77' of lot frontage (4% less than
required).The code does offer an administrative remedy forcul-de-sac lots and lots that require a 10 percentadjustmentinthelotfrontagerequirement, Staff, however, collectively presented the requested waivers asavarianceapplicationgiventhenumberof
reduced lot frontages,24, The zoning code currently requires lotfrontagestoincreaseproportionallywiththerequiredlotsize (i,e, 60' is required for Rl-6,000, 70' for Rl-7,000, and 80' for R1-8,000, etc,), which standardizes development tracts by creatinguniform, rectangular shaped lots. Traditional,grid-orientedneighborhoodsreflectthisapproachtozoningstandards, Inthecomprehensiveupdatetothezoningordinance, staffhasproposedrevisingthelotfrontagerequirementsto allowforvariety
in lot configurations and subdivision layouts,The lot configurationsdifferfromandoffermorevarietythanthetraditional, grid-oriented SUbdivisions as a result
of the proposed "cul-de-sac" circulation system. The proposedlotfrontagesrangefrom70' to 100', The proposed
reduction in frontage from the 80' requirement does not appeartohinderaccesstotheindividuallotsand
no detrimental impact is anticipated due tonarrowlotconfigurationsproposedbythissubdivision, The minimum lotfrontageproposedis70' which adequately provides foradrivewayaccessandafrontlandscape setbackarea,Furthermore, the narrower lot widths are compensated by increaSinglotdepths, which in turn provide for more usable
open space opportunities in the rear of theproperty.The proposed lot configurations were somewhat constrainedbyprovidingadirectextensionofYellowstoneBoulevardintothesite, This constraint may have been eliminated byoffsettingtheentrystreet, but such a solutionpresentedtrafficsafetyconcerns, Furthermore, a directextensionofYellowstoneprovidesabetterintegrationbetweentheexistingresidentialneighborhoodandtheproposeddevelopment, The applicant has informed staff that the
direct access was also
A similar variance request was included
proposal for Mabury Ranch (Tract 9319).
allowed a reduction in lot frontage for
388 residential parcels,
25. Orange Municipal Code section 17.92.020 lists the following
criteria for the approval of variance requests:
in the master tract
Variance 1424
12% of the proposed
A, That any variance granted shall be subject to such
conditions as will assure that the adjustments thereby
authorized shall not constitute a grant of special
privileges inconsistent with the limitations upon other
properties in the vicinity and zone in which the
subject property is situated,
B, That because of special circumstances applicable to the
subject property, including size, shape, topography,
location or surroundings, the strict application of the
zoning ordinance is found to deprive the subject
property of privileges enjoyed by other properties in
the vicinity and under identical zoning classification,
26, The importation of 120,000 cubic yards of fill material will
require approximately 8,000 truck trips to the project site,
Grading and hauling operations may have an impact on nearby
residences from blowing dust, noise and increased truck
traffic. The applicant has indicated that the hauling
trucks will access the site from the south by traveling
along Santiago Canyon Road, entering the SUlly-
Miller aggregate mining property and crossing the ford in
Santiago Creek, In accordance with the City'S Manual of
Grading,this haul operation will require City Council
approval,27. The residential development of the site will alter
the scenic views of the adjacent residents to the north
looking southward. As discussed in the Negative Declaration,
the proposed pad elevations are slightly lower than
the elevations of the existing residences along Mabury
Avenue and the proposed construction of 1 and 2 story homes
will impact views, The R-1-8 development
standards may lessened that impact by regulating a structure's
maximum height and placement on the
property, Furthermore, proposed development standards contained in the updated
draft of the comprehensive zoning ordinance, if adopted,
will regulate a structure's bulk and mass in relationship
to lot size.28. The tract map shows lots 1-8 and
21-25 with frontage along the proposed cul-
de-sac street system and Mabury Avenue.The applicant has
indicated that no homes will front onto Mabury Avenue, which
is in response to concerns expressed to the applicant
by the Mabury residents, To further support this concern, staff
has included a condition that the access rights to Mabury Avenue will
be dedicated to the city as a requirement of
the final map approval, Furthermore, it is likely that
the development will include a perimeter wall along
the Mabury frontage, adjacent to the existing
recreational (equestrian) trail. Staff
condition that all perimeter walls shall be reviewed by theCommunityDevelopmentDepartment.
29. The Environmental Review Board reviewed the project severaltimesthroughouttheapplicationprocess. The proposedextensionofYellowstoneBoulevardsouth, it's intersectionwithMaburyAvenue (including the equestrian trail), and thesubdivision's proposed circulation system were issues ofconcernthatwereresolvedthroughthereviewprocessbyrevisingthetractmaporconditioningitsapproval, ThedesignofYellowstoneattheentrancetothesitewasrevisedtoincludealandscapedmediansimilartotheexistingmediansinYellowstonenorthofthesite,Inclusion of this design feature acts to tie the newdevelopmentwiththeexistingneighborhood, as does thedirectextensionofYellowstonesouthofMabury.
Staff has noted that the cross section for proposed streetsA, B, and C details a sidewalk directly adjacent to thestreetcurbandthenaparkway, The existing designs ofMaburyandYellowstoneincludeparkwaysbetweenthecurb andsidewalk, This feature should be continued throughout thenewdevelopment, and therefore, staff has added condition 14requiringtheconstructiondetailtobemodified
accordingly, and to comply with public street minimumstandardsforsidewalkandparkwaywidths.
30, The Municipal Water District of Orange County (MWDOC) ownsandmaintainsthehighpressurewaterlinethattraversesthesite, Potential future maintenance and repairactivitiesmayimpactpropertyownersandmayimpede accesstoresidenceswithinthetractdevelopment; lots 1, 12, 13,and 16 would appear to be the most impacted by suchactivities, MWDOC retains the right to remove anyfacilitiesorimprovements (such as roads, driveways andlandscaping) constructed within their easement inconjunctionwithmaintenancetothepipeline. Furthermore,removal and replacement of such facilities and improvementswillbeattheexpenseofthehomeowner's association,except in the case of public improvements such as publicroadsandsidewalks,
31. Previous development proposals along the creek haveexperienceddifficultyinconnectingtothecity'S sewersystembecausetheresidentialpadsweredesignedatlowerelevationsthantheexistingsewersystem. In response tothecity'S preference for gravity fed sewer lines ratherthantheinstallationofsewerpumps, the applicant hasdesignedtheSubdivisionaccordingly. Lots 13 and 14 havethelowestpadelevationsofthetract, that of 422,5 feet,The Mabury/Yellowstone sewer connection is at 413.26 feet,and therefore positive flows can be accomplished for theentiretract,
NOW, THEREFORE, BE IT RESOLVED by the City Council of theCityofOrangethattherecommendationofthePlanningCommissionbeupheldandthatZoneChange1146-93 reclassifying the
subject 9 Reso No.
property to the R-1-8 District be approved for
the
following reasons:1. The propoaed zoning classification is the same
as that of the adjeoent residential development to the north,
and thus provides fer a natural extension of the
existing neighborhood,2, The proposed zoning classification serves
to implement a residential density that is the same as
the surrounding properties to
the north,ADOPTED this 18th day
of
May ATTEST:
9hgH~ Q ~~.??'/City Clerk f thVCitY
of Orange I hereby certify that the foregoing Resolution was
duly and regularly adopted by the City Council of the City of orange
at a regular meeting thereof held on the ~ of Mav ,
1993, by the
following
vote:
AYES:
NOES:ABSENT:COUNCIL MEMBERS: SPURGEON, BARRERA. MAYOR BEYER,
COONTZ, MURPHY COUNCIL
MEMBERS: NONE COUNCIL
MEMBERS:
NONE c ~ ~t-,-?d-~4'. of ~
dY~//C~~ Cler~hE\:~ iWo
Orange Reso No. 8183 SSH:
dg
LEGAL
DESCRIPTION IN
lHE STATE OF CALIFORNIA, COUNTY OF ORANGE, CITY OF ORANGE, AND IS DESCRIBED AS FOL,
lOWS:PI1()
POSEDTRACT NO. 14747 BEING A SUBDIVISION OF A PORTION OF:BE~'
I\ININGAT THE NORTHEAST CORNER OF A TRACT OF LAND CONVEYED TO HENRY SNYDER BY DE
IllECORDED IN BOOK 77, PAGE 22 OF DEEDS, RECORDS OF LOS ANGELES COUNTY, CAlIFOR-NI
THENCE SOUTH 83 DEGREES WEST 952.71 FEET; THENCE SOUTH 509 FEET; THENCE NORTH 83
EGREES EAST 760 FEET TO THE EAST BOUNDARY OF SAID SNYDER'S LAND; THENCE NORTH 19 DE
REES 45' EAST 566.03 FEET TO THE POINT OF BEGINNING, AlliN TOWNSHIP 4 SOUTH, RANGE 9
V. ST, SAN BERNARDINO BASE AND MERIDIAN.EXqPTlNG
THEREFROM ANY PORTION LYING WITHIN TRACT NO, 9827.BE
INNING AT A SYCAMORE TREE MARKED "Y. M.., THE SAME BEGINNING THE SOUTHEAST COR-NE
OF A TRACT OF LAND CONVEYED TO VICTOR MONTGOMERY BY JONATHAN WATSON BY DEE
RECORDED AUGUST 12, 1875 IN BOOK 38, PAGE 326 OF DEEDS, RECORDS OF LOS ANGELES CO
NTY, CALIFORNIA, AND RUNNING THENCE NORTH 19-3/4 DEGREES EAST 17.87 CHAINS TO A
DIT H LEADING FROM THE SANTIAGO CREEK; THENCE, ALONG THE CENTER OF SAID DITCH,
SO TH 83 DEGREES WEST 18.50 CHAINS; THENCE NORTH 55-1/2 DEGREES WEST 8
CHAINS;THE CE SOUTH 84 DEGREES WEST 7.86 CHAINS; THENCE SOUTN 61-3/4 DEGREESWEST
9.50 CH INS; THENCE, LEAVING THE LINE OF SAID
DITCH, SOUTH 45-1 2 DEGREES EAST 8.78 CHAINS; THENCE NORTH 55-3/4 DEGREES EAST
5.89 CHAINS; THENCE SO TH 35-1.12 DEGREES EAST 15.09 CHAINS TO THE
NORTH BOUNDARY OF THE CARPENTER TRA T; THENCE, ALONG SAID NORTH BOUNDARY, NORTH 85 DEGREES
EAST 15 CHAINS TO
THE POI T OF BEGINNING.EXC~PTlNG THEREFROM, THAT
PORTION THEREOF DESCRIBED AS FOLLOWS:BEG NNING AT THE NORTHEAST CORNER OF A TRACT OF LAND
CONVEYED TO HENRY SNYDER BY DEE RECORDED JANUARY 6, 1881 IN BOOK 77, PAGE 22 OF
DEEDS, RECORDS OF LOS ANGELES CO~NTY' CALIFORNIA; THENCESOUTH 83 DEGREES WEST 14.
435 CHAINS ALONG THE NORTH lIN OF SAID SNYDER'S LAND; THENCE SOUTH 11.515 CHAINS;
THENCE NORTH 83 DEGREES EAST 10. 2 CHAINS TO THE EAST BOUNDARY OF SAID SNYDER'S LAND;
THENCE NORTH 19-3/4 DE-GRE S EAST 12.796
CHAINS TO THE POINT OF BEGINNING.AL~ EXCEPTING THEREFROM, ANY PORTION INCLUDED IN
THE LAND DESCRIBED IN THE DEED TO . E. FARNSWORTH AND OTHERS, RECORDED JANUARY 6, 1920
IN BOOK
355, PAGE 98 OF DEE S.ALSO EXCEPTING THEREFROM, ANY PORTION INCLUDED IN
THE LAND DESCRIBED IN THE DEED TO <;:HARLES W. MORROW AND WIFE, RECORDED DECEMBER 17, 1929
IN BOOK 338, PAGE 106 OF OFFICIAL RECORDS, AND IN THE DEED TO LEROY
F. ROBINSON AND WIFE, RECORDED DECEMBER 17,1929 IN BOOK
338, PAGE 115 OF OFFICIAL RCORDS.ALSO EXCEPTING THEREFROM,
THAT PORTION THEREOF DESCRIBED AS FOLOWS:BEGINNING AT THE SOUTHEAST CORNER OF THE LAND
CONVEYED TO A. B. HEINSBERGEN AND WIFE BY DEED RECORDED APRIL 27,1935 IN BOOK 748,
PAGE
222 OF OFFICIAL RECORDS, AND RUnNING THENCE NORTH 19 DEGREES 45' EAST AlONG THE EASTERLY
LINE OF SAID LAND, 334.88 FEE TO THE SOUTHEAST CORNER OF THE
LAND CONVEYED TO SULLY -MILLER CONTRACTING CO PANY; THENCE SOUTHERL Y ALONG THE SOUTHERLY
EXTENSION
OF THE WESTERLY LINE OF SAI1' LAST MENTIONED LAND, 268 FEET, MORE OR LESS, TO
THE SOUTHERLY LINE OF SAID LAND CO VEYED TO HEINSBERGEN; THENCE NORTH 85
DEGREES EAST ALONG SAID SOUTHERLY LINE,550 EEl, MORE OR
LESS, TO THE POINT OF BEGINNING.ALsq EXCEPTING THEREFROM, THAT PORTION OF SAID
LAND DESCRIBED IN THE DEEED TO STAfjlDARD.PAClFIC CORP., RECORDED AUGUST 20, 1976 IN
BOOK 11858,
PAGE 164 OF OFFICIAL RE01>RDS.LOT I'B" & A PORTION OF LOT "A" OF TRACT NO. 9827, AS SHOWN
ON A MAP RECORDED IN BOOK 432, rAGES 1 TO S, BOTH INClUSIVE, OF
MISCEllANEOUS
MAPS, RECORDS OF ORANGE