Loading...
07-01-2020 DRC MinutesAPPROVED BY THE DESIGN REVIEW COMMITTEE ON JULY 15, 2020 Page 1 of 3 FINAL MINUTES CITY OF ORANGE July 1, 2020 DESIGN REVIEW COMMITTEE 5:30 p.m. STAFF PRESENT VIA GOTOMEETING TELECONFERENCE: Marissa Moshier, Historic Preservation Planner Jessica Wang, Administrative Specialist Simonne Fannin, Recording Secretary REGULAR SESSION 1. OPENING: 1.1 CALL TO ORDER: Chair Skorpanich called the meeting to order at 5:35 p.m. 1.2 FLAG SALUTE: Committee Member Imboden led the flag salute. 1.3 ROLL CALL: PRESENT: Committee Members McDermott, McCormack, Skorpanich, Fox and Imboden. 1.4 PUBLIC PARTICIPATION: Opportunity for members of the public to address the Design Review Committee (DRC) on matters not listed on the Agenda. There were no public comments received. 2. CONSENT CALENDAR: 2.1 APPROVAL OF MINUTES: June 17, 2020 A motion was made to approve the June 17, 2020 minutes as emended to staff. MOTION: Imboden SECOND: Fox AYES: McCormack, Skorpanich, McDermott, Imboden, and Fox NOES: None ABSTAIN: None MOTION CARRIED DESIGN REVIEW COMMITTEE MINUTES July 1, 2020 Page 2 of 3 3. AGENDA ITEMS: Continued Items: NONE New Agenda Items: 3.1 DESIGN REVIEW NO. 5010-20 – NIXON RESIDENCE  A proposal to construct a 306 square foot addition to a single-family residence, open the enclosed atrium in the residence, demolish a detached two -car garage, and construct a 810 square foot two-car garage and pool room.  1065 N. Granada Drive, Eichler Fairhills Historic District  Staff Contact: Marissa Moshier, 714-744-7243, mmoshier@cityoforange.org  DRC Action: Final Determination Committee Member Imboden recused himself from this item because his firm is affiliated with this project and left the meeting Marissa Moshier, Historic Preservation Planner, provided an overview of the project consistent with the staff report. James and Bethany Nixon, homeowners, spoke on behalf of the project. The Committee had questions and comments on the following:  The detached garage is unusual and not typical of other Eichler homes.  A Committee Member asked about restoring the driveway and garage to its original configuration.  Importance of the structural support and aesthetics of the cantilevered beam that is proposed to be replaced. The Committee would like to have a structural engineer evaluate it and return to the DRC for review if it needs replacement at a larger size.  Compatibility of the addition and new detached garage.  Replacement of windows and framing; the Committee would like to condition that the dual pane system windows on the front façade should have wood stops to match the original windows. It was clarified that a note on the window schedule in the plans states that the windows would have wood stops  Landscape in the front, when developed, should be balanced with the hardscape; the Committee suggested avoiding a desert landscape that employs too many hard surfaces.  Some Committee members agreed with removing trees in order to allow installation of a pool. A motion was made to recommend approval to the Planning Commission, Design Review No. 5010-20 - Nixon Residence, based on the findings and conditions in the staff report with the additional conditions as follows:  The direction of the arrows on page 7 where the 'existing versus additions' arrows are shown on the lower corner of the drawing shall be corrected. DESIGN REVIEW COMMITTEE MINUTES July 1, 2020 Page 3 of 3  If the beam replacement results in the need for a larger beam, the revision will return to the DRC for review; or, the applicant may change the plan to allow for a beam that matches the size that is being replaced, which could include adding a post in the original location between the living and kitchen area. MOTION: Fox SECOND: McCormack AYES: McCormack, Skorpanich, McDermott, and Fox NOES: None ABSTAIN: Imboden MOTION CARRIED 4. ADJOURNMENT: 6:34 PM The next regular meeting is scheduled for Wednesday, July 15, 2020, at 5:30 p.m. via various teleconference locations.