Loading...
RES-10950 Tentative Tract Map ApprovalRESOLUTION NO. 10950 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ORANGE APPROVING TENTATIVE TRACT MAP NO. 0037 -15, MAJOR SITE PLAN REVIEW NO. 0840 -15, AND DESIGN REVIEW NO. 4831-15 TO ALLOW THE DEVELOPMENT OF 37 NEW SINGLE STORY ATTACHED TOWNHOMES ON A VACANT 4.02 ACRE TRIANGULAR- SHAPED PARCEL LOCATED ON THE SOUTH SIDE OF WASHINGTON AVENUE AT HAMLIN STREET. APPLICANT: THE OLSON COMPANY WHEREAS, Tentative Tract Map No. 0037 -15, Major Site Plan Review No. 0840 -15, and Design Review No. 4831 -15, all of which are collectively referred to herein as the "Project ", were filed by The Olson Company in accordance with the provisions of the City of Orange Municipal Code; and WHEREAS, Tentative Tract Map No. 0037 -15, Major Site Plan Review No. 0840 -15, and Design Review No. 4831 -15 were processed in the time and manner prescribed by state and local law; and WHEREAS, the Project is categorically exempt from the provisions of the California Environmental Quality Act per State CEQA Guidelines 15332 (Class 32 — In -fill Development Projects) based on the findings stated herein; and WHEREAS, various City Departments have reviewed Tentative Tract Map No. 0037 -15, Major Site Plan Review No. 0840 -15, and Design Review No. 4831 -15 and submitted conditions related to each Department and area of expertise; and WHEREAS, Design Review Committee reviewed the Project on May 4, 2016 and again on May 11, 2016, and recommended approval by a vote of 5 -0, subject to conditions which have been included in this Resolution; and WHEREAS, the Planning Commission conducted one duly advertised public hearing on June 6, 2016, at which time interested persons had an opportunity to testify either in support of, or opposition to, the Project and for the purpose of considering Tentative Tract Map No. 0037- 15, Major Site Plan Review No. 0840 -15, and Design Review No. 4831 -15, upon property described as follows: See attached Legal Description — Exhibit A; and WHEREAS, at the conclusion of the public hearing the Planning Commission recommended that the City Council approve the Project, by a vote of 5 in favor, none against, subject to the conditions included in this Resolution; and WHEREAS, the City Council conducted a duly advertised public hearing on July 12, 2016, for the purpose of considering the recommendation of the Planning Commission to approve Tentative Tract Map No. 0037 -15, Major Site Plan Review No. 0840 -15, and Design Review No. 4831 -15, for the Project. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Orange hereby approves Tentative Tract Map No. 0037 -15, Major Site Plan Review No. 0840 -15, and Design Review No. 4831 -15 to allow the construction of 37 new single story townhomes on a vacant 4.02 acre triangular- shaped parcel, based on the following findings: SECTION 1— ENVIRONMENTAL REVIEW The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) per State CEQA Guidelines 15332 (Class 32 — In -Fill Development), and public review is not required, because the project meets the following criteria: 1. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. The intended residential development use is a listed permitted use consistent with the intent of the land use designation. The site is zoned Residential Multiple Family with Single Story Overlay [R -3 (A)]. 2. The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses The project is in the City on a site that is approximately 4 acres and is entirely surrounded by residential uses to the north, south, east, and west of the project site. 3. The project site has no value as habitat for endangered, rare or threatened species. The site is void of any vegetation or landforms. The site is not native habitat and is mapped as grassland on the vegetation map for the Orange County Central - Coastal Natural Communities Conservation Plan. 4. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. The project has been evaluated and no significant effects have been identified in that: Traffic was analyzed and showed no impact. No significant traffic impacts at any of the study area intersections would occur as a result of project development. Additionally, during the City's development review process, the project applicant would be required to comply with the requirements of the City's Municipal Code, including payment of the transportation systems improvement program fee. Noise levels will fall below mandated levels for residents and surrounding properties. Typical noise from residential uses includes project - related traffic traveling to and from the project site, stationary noise sources such as air conditioning units, and occasional sources such as landscaping and trash collection activities. Reso. No. 10950 2 Air quality guidance thresholds of the South Coast Air Quality Management District would not be exceeded. The proposed project is not a regionally significant project that would warrant Intergovernmental Review by SCAG. A Preliminary Water Quality Management Plan has been approved. 5. The site can be adequately served by all required utilities and public services. All services exist to serve the site. No new additional City infrastructure or public services would be required as a result of the proposed project. SECTION 2 — FINDINGS General Plan: 1. The project must be consistent with the goals and policies stated within the City's General Plan. The project achieves multiple goals of the General Plan. The project implements Goal 1.0 of the Land Use Element of the General Plan by providing a range of housing to meet the diverse needs and lifestyles of residents. The new development reflects cohesive design standards, qualities, and features. The new development preserves the character and densities of the City. The Housing Element of the General Plan strives to meet the housing needs of the City's diverse population through housing production as one of its tools. The City encourages a variety of housing types and living environments in the City. The City strives to build upon its existing assets to create a living, active and diverse environment that complements all lifestyles that make Orange unique. The project is consistent with the land use designations for the residential district and the polices of the General Plan encouraging the development of a wide range of housing projects. Therefore, in order to implement the General Plan, the appropriate development standards to be applied to the proposed project are those set forth in Orange Municipal Code Section 17.14 pertaining to residential districts. Tentative Tract Map No. 0037 -15: 1. The requirements for the filing of subdivision maps shall be governed by the provisions of the Subdivision Map Act and the provisions of Title 16 of the Orange Municipal Code (OMC). All maps shall comply with the provisions of the Subdivision Map Act, the City Zoning Ordinance, Title 16 of the OMC, and any other ordinance, statute or law pertaining to the use, sale, leasing, or subdivision of land. The Tentative Tract Map 0037 -15, which is also known as Tentative Tract Map No. 17645, meets the finding requirements as evidenced by Public Works staff review and verification of the map for compliance with all provisions of the Subdivision Map Act, Title 16 of the Orange Municipal Code, and any other ordinance, statute or law pertaining to the use, sale, leasing or subdivision of land. In addition, the tract map contains the following characteristics: Reso. No. 10950 1. The proposed subdivision map is consistent with City of Orange General Plan as stated in the General Plan finding above. 2. The proposed subdivision complies with the development standards contained in the City's Zoning Ordinance. The project is consistent with the land use designations for the residential district. 3. The proposed residential uses are compatible with existing residential uses located in the vicinity of the subject site. The project design provides varied and articulated building elevations, and streetscape enhancements that provide an appealing environment. 4. The project is subject to conditions that will preserve the public welfare and insure that the project will not have an adverse impact on adjacent land use. 5. City departments have reviewed the project and found that City services are available and adequate to serve the needs of the tentative tract map. Sufficient public infrastructure, emergency services, and water supply are available to the project. 6. The proposed subdivision provides for safe and adequate vehicular and pedestrian circulation, both on and off -site. As depicted in the site plan layout and documentation. 7. With the tentative tract map, the site continues to maintain the same type of development possibilities under existing density and zoning limitations as the site currently has. 8. The site is physically suitable for the type of development and the proposed density of development. The property is zoned Residential Multiple Family [R -3 (A)] with a single story overlay. Major Site Plan Review No. 0840 -15: 1. The project design is compatible with surrounding development and neighborhoods. The project site is in an urbanized area of the City that is characterized by narrow residential streets, one and two story residential buildings, residential walls, fences, and landscaping. Surrounding land uses consist of single - and multiple - family residences and the Project has been designed to ensure compatibility with these uses. 2. The project conforms to City development standards and any applicable special design guidelines or specific plan requirements. The proposed development conforms to City development standards. The project design provides varied and articulated building elevations, and streetscape enhancements that provide an appealing environment. The new development preserves the character and densities of the neighborhood. Reso. No. 10950 4 3. The project provides for safe and adequate vehicular and pedestrian circulation, both on- and off -site. The proposed project incorporates streetscape improvements that reinforce the pedestrian environment and quality of the pedestrian experience in a manner that provides pedestrian safety. The vehicular access point has been designed to ensure safe circulation conditions. With adoption of Conditions of Approval the proposed project provides for safe and adequate circulation. 4. City services are available and adequate to serve the project. A review of the project with all City Departments concludes that City services will be available and adequate. 5. The project has been designed to fully mitigate or substantially minimize adverse environmental effects. No environmental effects have been identified for the project. The Orange Municipal Code will adequately manage construction and use regulation needs of the project. Design Review No. 4831 -15: 1. In the Old Towne Historic District, the proposed work conforms to the prescriptive standards and design criteria referenced and /or recommended by the DRC or other reviewing body for the project (OMC 17.10.070. G.1). The project is not located in the Old Towne Historic District; therefore, this Finding does not apply. 2. In any National Register Historic District, the proposed work complies with the Secretary of the Interior's standards and guidelines (OMC 17.10.07. G. 2). The project is not located in the National Register Historic District; therefore, this Finding does not apply. 3. The project design upholds community aesthetics through the use of an internally consistent, integrated design theme and is consistent with all adopted specific plans, applicable design standards, and their required findings. This finding is fulfilled as determined by the Design Review Committee when, on May 11, 2016, the Committee reviewed the project and recommended approval of the project subject to conditions of approval. The existing community is characterized by a variety of architectural styles, ages of buildings, various types of residential development, and sizes. The project would be designed in a modern interpretation of the Spanish architectural style that would incorporate specific architectural features, details and materials that complement the community aesthetics while creating an internally balanced design. There is no specific plan for the site. Reso. No. 10950 5 4. For infill residential development, as specified in the City of Orange Infill Residential Design Guidelines, the new structure(s) or addition are compatible with the scale, massing, orientation, and articulation of the surrounding development and will preserve or enhance existing neighborhood character (OMC 17.10.07. G. 4). The Infill Residential Design Guidelines apply to small scale subdivisions of four (4) lots or less, because of its size, consisting of 37 single story attached townhomes, the proposed project is not considered infill residential development as defined by the City's Infill Residential Design Guidelines; therefore, this Finding does not apply. SECTION 3 — CONDITIONS OF APPROVAL BE IT FURTHER RESOLVED that the following conditions are required with the approval of the Project: 1. The applicant shall comply with all federal, state, and local laws, including all City regulations. Violation of any of those laws in connection with the use will be cause for revocation of this permit. 2. Applicant shall defend, indemnity, and hold harmless the City of Orange, its officers, agents, and employees from any claim, action, or proceeding against the City, its officers, agents, or employees to attack, set aside, void, or annul an approval of the Planning Commission or City Council concerning this subdivision, which action is brought within the time period provided for in Government Code Section 66499.37. The City shall promptly notify the applicant of any such claim, action, or proceeding and shall cooperate fully in the defense. This condition is imposed pursuant to Government Code Section 66474.9(b). 3. These conditions shall be reprinted on the cover sheet or first page of construction plans, including grading plans. 4. The project shall conform in substance and be maintained in general conformance with plans and exhibits date labeled June 6, 2016 including any modifications required by conditions of approval, and as recommended for approval by the Planning Commission and City Council. Any future expansion in area or in the nature and operation of the use approved by Tentative Tract Map No. 0037 -15, Major Site Plan No. 0840 -15, and Design Review No. 4831 -15, shall require an application for a new or amended Site Plan Review. 5. Except as otherwise provided herein, this project is approved as a precise plan. After any application has been approved, if changes are proposed regarding the location or alteration of any use or structure, a changed plan may be submitted to the Community Development Director for approval. If the Community Development Director determines that the proposed change complies with the provisions and the spirit and intent of the approval action, and that the action would have been the same for the changed plan as for the approved plan, the Community Development Director may approve the changed plan without requiring a new public hearing. 6. All construction activities shall conform to the City's Noise Ordinance, OMC Section 8.24, and shall be further limited to Monday through Saturday, 7:00 AM to 8:00 PM. No construction activities shall be permitted on Sundays or federal holidays. Reso. No. 10950 6 7. Fire access roadways shall be designed, constructed, and maintained to support the imposed loads of OFD fire apparatus with a total weight of 68,000 pounds. Apparatus weight is distributed as 46,000 pounds on tandem rear axles and 22,000 pounds on the front axle. The surface shall be designed, constructed, and maintained to provide all- weather driving capabilities. A letter or statement, wet - stamped and signed by a registered engineer, shall be provided on the plans certifying that any new roadway meets this 68,000 - pound, all - weather requirement. Road base without an appropriate topping or binding material does not satisfy the all - weather requirement. CFC 503.2.5. 8. If desired by the developer, each townhouse unit can have individual address number assignment. Address numbers shall be even numbers ranging from 2700 to 2898 East Washington Avenue. 9. An approved Grading Plan from Public Works Department shall be required. The Grading Plan shall include phased Erosion and Sediment Control Plans and any Site Demolition Plan, if required. 10. The contractor shall obtain a Grading Permit from Public Works Department prior to start of any site demolition, clearing and grubbing, and grading. 11. The street lights on Washington Avenue fronting the development property shall be designed with 150 feet interval. It shall be measured from the first street light located adjacent to the tract entrance. 12. On -site private sidewalks shall have a minimum width of 5 feet. 13. Prior to any and all work within the public right -of -way, an encroachment permit shall be required including but not limited to construction of sidewalks, driveways, and utility laterals. 14. Site grading shall consider alleviating local flooding that is of concern to neighbors on South Espanita Street and at the east end of East Via Lardo Avenue. 15. All utility lines from public street and easement, including power line and telecommunication line, shall be constructed underground. 16. The project applicant shall maintain all structural, treatment, and low impact development BMPs at the frequency specified in the approved WQMP. Upon transfer of ownership or management responsibilities for the project site, the applicant shall notify the City of Orange Public Works Department of the new person(s) or entity responsible for maintenance of the BMPs. 17. The City Water Division shall not be responsible for the occurrence of and the related consequences for construction delays, Certificate of Occupancy deferment and or financial impacts due to the applicant's failure to file a Water Division application prior to building permit issuance and or by electing to defer the filing of the application and water improvement plan submittal and or a failure follow the conditions. 18. A minimum of fourteen - calendar days prior to public water construction, the applicant's Engineer of Record shall prepare and provide product material submittals consistent with the approved water improvement plans as approved by the Water Division, for all proposed public water system facilities to the Water Division for review and approval. Reso. No. 10950 7 19. During construction, all hot taps required on existing City mains to provide water service to any lot, parcel, or subdivision shall be performed by City crews at the developer's expense in accordance with the fee schedule established by resolution of the city council. 20. Prior to City approval of the landscape plans, the applicant shall review the approved Water Quality Management Plan to ensure the proposed landscape plans are consistent with the project grading plans and that they show the proposed storm water infiltration devices and other treatment BMPs affecting landscaping areas. A copy of the proposed landscape plans shall be submitted to the Public Works Surface Water Quality Section for review and comment. 21. Prior to approval of the water improvement plan, the applicant shall satisfy all water main connection, plan check, and inspection charges as determined by the Water Division. 22. Prior to approval of the grading permit, the applicant will need to prepare and submit a Final Water Quality Management Plan (WQMP) with for review and approval by the Public Works Department that: Prioritizes the use of Low Impact Development principles as follows: preserves natural features; minimizes runoff and reduces impervious surfaces; and utilizes infiltration of runoff as the method of pollutant treatment. Infiltration BMPs to be considered include the use of permeable materials such as concrete and concrete pavers, infiltration trenches, infiltration planters, and other infiltration BMPs as applicable, Incorporates the applicable Routine Source and Structural Control BMPs as defined in the Drainage Area Management Plan (DAMP), Maintains the hydrologic characteristics of the site by matching time of concentration, runoff, velocity, volume and hydrograph for a 2 -year storm event, Minimizes the potential increase in downstream erosion and avoids downstream impacts to physical structures, aquatic and riparian habitat, Generally describes the long -term operation and maintenance requirements for structural and Treatment Control BMPs, Identifies the entity or employees that will be responsible for long -term operation, maintenance, repair and or replacement of the structural and Treatment Control BMPs and the training that qualifies them to operate and maintain the BMPs, Describes the mechanism for funding the long -term operation and maintenance of all structural and Treatment Control BMPs, Includes a copy of the forms to be used in conducting maintenance and inspection activities, Meets recordkeeping requirements (forms to be kept for 5 years), Includes a copy of the form to be submitted annually by the project owner to the Public Works Department that certifies that the project's structural and treatment BMPs are being inspected and maintained in accordance with the project's WQMP. Reso. No. 10950 8 23. Prior to the issuance of a grading permit (including grubbing, clearing, surface mining or paving permits as appropriate) the applicant shall demonstrate that coverage has been obtained under the State's General Permit for Stormwater Discharges Associated with Construction Activity (General Construction Permit) by providing a copy of the Notice of Intent (NOI) submitted to the State Water Resources Control Board and a copy of the subsequent notification of the issuance of a Waste Discharge Identification (WDID) Number or other proof of filing. A copy of the current SWPPP required by the General Permit shall be kept at the project site and be available for review by City representatives upon request. 24. Prior to issuance of grading permits, a copy of the flood plain study requested by Orange County Flood Control District shall be on file with the City. 25. Prior to issuance of grading permits, a CLOMR shall be accepted, or waived by FEMA. 26. Prior to issuance of grading permits, an Encroachment Permit from Orange County Flood Control District is required for storm drain outlet leading directly to the flood control channel. 27. Prior to issuance of grading permits, all building floor elevation shall be at least one -foot above the 100 -year floodplain elevation. 28. Prior to issuance of grading permits, all public infrastructures, including street sections, sidewalk, driveway apron, and utilities shall comply with City of Orange Standard Plans and Specifications and also conform to current ADA sidewalk access requirements, access ramps, and existing ramps. 29. Prior to issuance of grading permits, the grading plan submitted for review shall include phased Erosion and Sediment Control Plans and any Site Demolition Plan, if required. All grading and improvements on the subject property shall be made in accordance with the Manual of Grading and Standard Plans and Specifications to the satisfaction of the Public Works Director. 30. Prior to the issuance of grading permits, the contractor shall obtain approval from Public Works Department prior to start of any site demolition, clearing and grubbing work. 31. Plans submitted during building plan check, shall comply with the California Fire Code as amended by the City and as frequently amended and in effect at the time of application for Building Permit. 32. Plans submitted during plan check shall show that the water improvement plans are consistent with the fire suppression plans and or fire master plan. The applicant's consultant preparing the water improvement plans shall coordinate their plans with the consultant preparing the fire suppression plans and or fire master plan so that their designs concur. Residential fire suppression services shall be stand -alone services per City standards. 33. Prior to issuance of the building permit, the new site lighting plan showing both the lighting and tree locations plus a photometric study showing how the lights are shielded and details of the shielding come back to the Design Review Committee for approval. 34. Prior to the issuance of building permits, the applicant shall demonstrate to the satisfaction of the Community Development Director that all new mechanical equipment throughout the Reso. No. 10950 9 development shall be acoustically shielded and architecturally screened from view from adjacent streets and adjacent properties. 35. Prior to the issuance of building permits, the applicant shall submit three (3) sets of final landscape, lighting and irrigation plans for review and approval to the Community Development and Community Services Department. 36. Prior to the issuance of building permits, the final landscape plan shall include a note that a fully automated irrigation system will be provided. 37. Prior to the issuance of building permits, City required irrigation and landscape inspection notes shall be placed on the final landscape plan, to the satisfaction of the Community Services Director. 38. Prior to the issuance of building permits, final landscaping plans for the project shall be designed to comply with the City's Water Efficient Landscape Guidelines as described in Section IX et al of the City of Orange Landscape Standards and Specifications. 39. Prior to the issuance of building permits, construction plans shall show that all structures shall comply with the requirements of Municipal Code (Chapter 15.52 Building Security Standards), which relates to the use of specific hardware, doors, windows, lighting, etc. Ord. No. 7 -79). Architect drawings shall include sections of the Ordinance that apply under Security Notes." An "Approved Products List 1/08" of hardware, windows, etc. is available upon request. 40. Prior to the issuance of building permits, security and design measures that employ Defensible Space concepts shall be utilized in development and construction plans. These measures incorporate the concepts of Crime Prevention through Environmental Design OPTED), which involves consideration such as placement and orientation of structures, access, and visibility of common areas, placement of doors, windows, addressing, and landscaping. 41. Prior to the issuance of building permits, the applicant shall cause to be prepared a Final Map in substantial compliance with the tentative tract map and conditions of approval, to the satisfaction of the Public Works Director. A final tract map shall be recorded within 24 months after tentative approval and prior to the sale or lease of any parcel. 42. Prior to issuance of building permits, the applicant shall review the approved Water Quality Management Plan (WQMP) and grading plan to ensure the structure's downspouts or drainage outlet locations are consistent with those documents. Copies of the building or architectural plans specifically showing the downspouts and drainage outlets shall be submitted to the Public Works Department for review. 43. Prior to the issuance of a building permit, the applicant shall submit a water improvement plan to the Water Division for proposed water mains, fire hydrants, domestic water services, fire suppression services, landscape services, and or any other proposed improvements or relocations affecting the public water system appurtenances for review and approval. All of the on -site water systems shall be privately owned and maintained. The improvement plan is required to be submitted directly to the Water Division located at 189 S. Water Street for review and approval. The applicant shall be responsible for the costs associated with the proposed improvements. Reso. No. 10950 10 44. Prior to building permit issuance, construction documents shall show that the water improvement plans are consistent with the fire suppression plans and or fire master plan. The applicant's consultant preparing the water improvement plans shall coordinate their plans with the consultant preparing the fire suppression plans and or fire master plan so that their designs concur. 45. Prior to building permit issuance, the Water Division shall approve the type and location of all back flow prevention devices. 46. Prior to building permit issuance, construction documents shall show that the installation of new water mains and new supply lines in the vicinity of pipelines conveying sewage, storm drainage and or hazardous fluids is done per the Water Division's Standard Number 113. 47. Prior to building permit issuance, construction documents shall show that a six foot (6') minimum horizontal clearance and a one foot (1') minimum vertical clearance would be maintained between City water mains, laterals, services, meters, fire hydrants and all other utilities except those identified in the Water Division's Standard Number 113. 48. Prior to building permit issuance, construction documents shall show that a minimum twenty -foot (20') separation will be maintained from the public water system facilities to the proposed /existing buildings and structures per the City of Orange Location Of Underground Utilities Standard and as approved by the Water Division. 49. Prior to building permit issuance, construction documents shall show that an eight -foot (8') minimum clearance is provided between City water mains, and signs, trees or other substantial shrubs, bushes, or plants. 50. Prior to building permit issuance, construction documents shall show that the minimum separation requirements are met and that each of the various designer's plan sets match. The applicant's consultant preparing the improvement and utility plans shall coordinate their plans with the consultants preparing the landscape, architectural, surface water quality, fire master and or fire suppression plans so that their designs are consistent. 51. Prior to building permit issuance, construction documents shall show that permanent signs, awnings, surface water quality features such as, but not limited to, infiltration planters, basins, pervious pavement or other structures are not installed over the city's water mains, laterals, services, meters, detector checks and or back flow prevention devices and fire hydrants. 52. Prior to approval of the water improvement plan, the applicant shall satisfy all water main connection, plan check, and inspection charges as determined by the Water Division. A deposit for plan check and inspection fees is required to be posted concurrently with filing the Water Division application and submission of plans for review. 53. Prior to approval of the water improvement plan, the applicant shall satisfy all water construction bond requirements for the installation of the public water system improvements as determined by the Water Division. 54. Prior to approval of the Final Map, the applicant shall pay any applicable fees for the processing of the final map, as established at the time the map is filed. 55. Prior to recordation of the Final Map, a copy of the project's CC &Rs shall be provided to the Public Works Department for review and approval that includes requirements for Reso. No. 10950 maintenance and funding of the project's structural and treatment water quality best management practices as approved by the City in the project's WQMP. 56. Prior to recordation of Final Tract Map, the transfer of ownership of the additional Washington Avenue alley property must be completed. The transfer of title is subjected to the completion of certain public infrastructures outlined in a separate document. The required improvements related to the property transfer must either be completed or a bond posted in -lieu of completion of construction. 57. Prior to the issuance of a Certificate of Occupancy and /or completion of a final inspection of any dwelling unit, a homeowner's association shall be formed. The association shall be responsible for the maintenance of all common areas, private utilities, and sanitary sewer system. 58. Prior to issuance of Certificate of Occupancy, the applicant shall schedule a light reading inspection with the Crime Prevention Bureau. The lighting shall be tested and confirmed to determine if the lighting meets or exceeds the exterior boundary standards. The applicant shall use shielding so as to ensure that the light standards meet the requirements of OMC Section 17.12.030 for the areas beyond the property's exterior boundaries; light spillage or pollution to surrounding residential areas shall not exceed a maintained minimum of 0.5 foot - candle. 59. Prior to the issuance of a Certificate of Occupancy, the applicant shall demonstrate that monuments associated with the Final Map are set based on a field survey. 60. Prior to the issuance of a Certificate of Occupancy, the applicant shall demonstrate the following to the Public Works Department: That all structural best management practices (BMPs) described in the Project WQMP have been constructed and installed in conformance with the approved plans and specifications That applicant is prepared to implement all non - structural BMPs described in the Project WQMP That an adequate number of copies of the project's approved final Project WQMP are available for the future occupiers 61. Prior to the issuance of certificates for use of occupancy or final signoff by the Public Works Department, the applicant shall demonstrate to the satisfaction of Public Works, that the preparer of the WQMP has reviewed the BMP maintenance requirements in Section V of the WQMP with the responsible person and that a copy of the WQMP has been provided to that person. A certification letter from the WQMP preparer may be used to satisfy this condition. 62. Prior to the issuance of a Certificate of Occupancy, the applicant shall be responsible for the installation of necessary fire hydrants and fire suppression services as determined by the Fire Department and Water Division. 63. Prior to the issuance of a Certificate of Occupancy, the applicant shall furnish and install individual pressure regulators on the private side of new services where the incoming pressure exceeds eighty pounds per square inch. Reso. No. 10950 12 Prior to issuance of building permits, the applicant shall pay all applicable development fees, including but not limited to: City sewer connection, Orange County Sanitation District Connection Fee, Transportation System Improvement Program, Fire Facility, Police Facility, Park Acquisition, Library, Sanitation District, School District, and Eastern Foothill Transportation Corridor, as required. Tentative Tract Map No. 0037 -15, Major Site Plan Review No. 0840 -15, and Design Review No. 4831 -15 shall become void if not vested within two years from the date of approval. Time extensions may be granted for up to one year, pursuant to OMC Section 17.08.060. ADOPTED this 12th day of July, 2016. ATTEST: Mary E y, City Clerk, Citk STATE OF CALIFORNIA COUNTY OF ORANGE CITY OF ORANGE ) C) //— a, --'-) g - a - Teresa/E. Smith, Mayor, City of Orange I, MARY E. MURPHY, City Clerk of the City of Orange, California, do hereby certify that the foregoing Resolution was duly and regularly adopted by the City Council of the City of Orange at a regular meeting thereof held on the 12th day of July, 2016, by the following vote: AYES:COUNCILMEMBERS:Alvarez, Whitaker, Smith, Murphy NOES:COUNCILMEMBERS:None ABSENT:COUNCILMEMBERS:Nichols ABSTAIN:COUNCILMEMBERS:None Mary E. , City Clerk, d" Orange Reso. No. 10950 13