Loading...
RES-11103 Master Fee Schedule For Room & Equpiment RentalsRESOLUTION NO. 11103 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ORANGE AMENDING THE MASTER SCHEDULE OF FEES AND CHARGES FOR VARIOUS SERVICES AND THE RENTAL OF ROOMS AND EQUIPMENT. WHEREAS, pursuant to Chapter 3.10 of the Orange Municipal Code, the City Council has established and maintained a Master Schedule of Fees and Charges, consisting of fees and charges for services provided by the City to persons using such services; and WHEREAS, in accordance with Chapter 3.10 of the Orange Municipal Code, the Master Schedule of Fees and Charges has been periodically amended and revised from time to time by the City Council; and WHEREAS, the Master Schedule of Fees and Charges includes fees for various services provided by the City, as well as fees for the rental of City facilities and equipment; and WHEREAS, pursuant to Government Code Section 50076 the amount the City may charge for specified services cannot exceed the estimated reasonable cost of providing the service; and WHEREAS, the City contracted with Matrix Consulting Group to complete a user fee study, to estimate the cost of providing services for which fees are charged and to provide recommendations on the updating of the Master Schedule of Fees and Charges; and WHEREAS, fees charged for the rental of City facilities and equipment are not subject to Government Code Section 50076. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Orange as follows: 1. The Master Schedule of Fees and Charges is hereby amended and Attachment "A" to this Resolution is hereby adopted, modifying the Master Schedule of Fees and Charges to provide for the inclusion of the amounts of fees for those listed in Attachment "A ". 2. The City Council finds that the fees set forth in Attachment "A" do not exceed the reasonable cost of services provided by the City in connection with the services provided and that the fees for the rental of City facilities are set at a rate to reasonably insure that the cost of the facilities and equipment rental is borne by those seeking to utilize such facilities and equipment. 3. The fees listed in Attachment "A" shall be effective July 1, 2018. 4. If the fees set forth in this Resolution or the application thereof to any person or circumstance is held to be unconstitutional or otherwise invalid by any court of competent jurisdiction, such invalidity shall not affect any other fee, charge, or rate, or application thereof, which can be implemented without the invalid fee, charge, or rate, or application thereof, and to this end the fees, charges and rates of this Resolution are declared to be severable. ADOPTED this 12th day of June 2018. Teresd E. Smith, Mayor, City of Orange ATTEST: Mary E. , City Clerk-, Cit o range STATE OF CALIFORNIA COUNTY OF ORANGE CITY OF ORANGE I, MARY E. MURPHY, City Clerk of the City of Orange, California, do hereby certify that the foregoing Resolution was duly and regularly adopted by the City Council of the City of Orange at a regular meeting thereof held on the 12th day of June 2017, by the following vote: AYES: COUNCILMEMBERS: Alvarez, Whitaker, Smith, Murphy, Nichols NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None ABSTAIN: COUNCILMEMBERS: None 4 Mary E. M , ity Clerk, Orange ATTACHMENT "A" MASTER SCHEDULE OF FEES AND CHARGES EFFECTIVE JULY 1, 2018 Behind this sheet.] MASTER SCHEDULE OF FEES AND CHARGES TABLE OF CONTENTS DEPARTMENT PAGE CITY CLERK 2 COMMUNITY DEVELOPMENT BUILDING DIVISION NEW CONSTRUCTION PLAN CHECK FEES 3 NEW CONSTRUCTION INSPECTION FEES 8 MECHANICAL, ELECTRICAL AND PLUMBING 13 MISCELLANEOUS FEES 15 PLANNING DIVISION 18 COMMUNITY SERVICES 19 FINANCE 24 FIRE 25 LIBRARY 30 POLICE 31 PUBLIC WORKS ENGINEERING DIVISION 33 MAINTENANCE DIVISION 34 TRAFFIC DIVISION 35 WATER DIVISION 36 1 MASTER SCHEDULE OF FEES AND CHARGES CITY CLERK 10 11 12 13 14 FEE/CHARGE Document Certification RATE 5.00 UNIT each NOTES Filing of Circulators of an Initiative 200.00 each Orange Municipal Code Book 544.00 each Orange Municipal Code Supplement 45.00 each 3 times per year Subpoena for Records 15.00 each Evidence Code Section 1563 Photocopy: Election - Related 0.10 per copy Black & White 0.15 per copy Color Copy 0.25 per copy Information Requests 73.00 per hour CD / DVD Copy 25.00 each Passport Processing 35.00 each Passport Photo 12.00 each Room Rental 110.00 1 per hour 10 11 12 13 14 MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Plan Check Fees 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 Construction Type Construction Type Construction Type IA, IB IIA, 1113, IIIA, 11113, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each IBC Project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * A -1 Assembly -Fixed Seating 500 738 36.9172 615 30.7644 492 24.6115 Theater, Concert Hall 2,500 1,477 17.7214 1,231 14.7678 985 11.8142 5,000 1,920 11.8142 1,600 9.8452 1,280 7.8762 10,000 2,511 2.9536 2,092 2.4613 1,674 1.9690 25,000 2,954 9.4586 2,461 7.8822 1,969 6.3058 50,000 5,318 10.6364 4,432 8.8637 3,545 7.0910 A -2 Assembly -Food & Drink 500 1,440 71.9896 1,200 59.9914 960 47.9931 Restaurant, Night Club, Bar 2,500 2,880 34.5730 2,400 28.8108 1,920 23.0486 5,000 3,744 23.0215 3,120 19.1846 2,496 15.3476 10,00 4,895 5.7576 4,079 4.7980 3,263 3.8384 25,000 5,759 18.4416 4,799_15.3680 3,839 12.2944 50,000 10,369 20.7383 8,641 17.2820 6,913 13.8256 A -3 Assembly - Worship, Amusement 500 1,661 83.0825 1,385 69.2354 1,108 55.3883 Arcade, Church, Community Hall 2,500 3,323 39.8595 2,769 33.2162 2,215 26.5730 5,000 4,320 26.5956 3,600 22.1630 2,880 17.7304 10,000 5,649 6.6410 4,708 5.5342 3,766 4.4273 25,000 6,646 21.2548 5,538 17.7123 4,430 14.1698 50,000 11,959 23.9184 9,966 19.9320 7,973 15.9456 A -4 Assembly - indoor Sport Viewing 500 1,329 66.4660 1,108 55.3883 886 44.3106 Arena, Skating Rink, Tennis Court 2,500 2,658 31.8876 2,215 26.5730 1,772 21.2584 5,000 3,456 21.2765 2,880 17.7304 2,304 14.1843 10,000 4,519 5.3128 3,766 4.4273 3,013 3.5419 25,000 5,31 17.0038 4,430 14.1698 3,544 11.3359 50,000 9,5671 19.1347 7,973 15.9456 6,378 12.7565 A -5 Assembly - Outdoor Activities 1,000 775 19.3827 646 16.1523 517 12.9218 Amusement Park, Bleacher, Stadium 5,000 1,551 9.2956 1,292 7.7463 1,034 6.1970 10,000 2,015 6.2106 1,679 5.1755 1,344 4.1404 20,000 2,636 1.5402 2,197 1.2835 1,758 1.0268 50,000 3,099 4.9739 2,582 4.1450 2,066 3.3160 100,000 5,585 5.5855 4,655 4.6546 3,724 3.7237 A A Occupancy Tenant Improvements 500 332 16.6138 277 13.8448 222 11.0759 2,500 7.9637 554 6.6365 443 5.3092 5,000 864 5.3137 720 4.4281 576 3.5425 10,000 1,129 1.3273 941 1.1061 753 0.8849 25,000 1,328 4.2537 1,107 3.5447 886 2.8358 50,000 2,3921 4.7837 1,993 3.9864 1,595 3.1891 B Business - Professional Office 1,000 1,440 35.9931 1,200 29.9943 960 23.9954 5,000 2,880 17.2865 2,400 14.4054 1,920 11.5243 10,000 3,744 11.5107 3,120 9.5923 2,496 7.6738 20,000 4,895 2.8901 4,079 2.4085 3,263 1.9268 50,000 5,762 9.2140 4,802 7.6784 3,841 6.1427 100,000 10,369 10.3692 8,641 8.6410 6,913 6.9128 B B Occupancy Tenant Improvements 150 1,163 193.8342 969 161.5285 775 129.2228 750 2,326 93.0507 1,938 77.5423 1,551 62.0338 1,500 3,024 62.0248 2,520 51.6873 2,016 41.3498 3 3,954 15.5017 3,295 12.9181 2,636 10.3344 7,500 4,652 49.6307 3,877 41.3589 3,101 33.087 15,000 8,374 55.8277 6,978 46.5231 5,583 37.2185 E Educational -Group Occupancy 1,000 2,603 65.0655 2,169 54.2213 1,735 43.3770 6+ persons, up to the 12th Grade 5,000 5,206 31.2434 4,338 26.0362 3,470 20.8289 10,000 6,768 20.8199 5,640 17.3499 4,512 13.8799 20,000 8,850 5.2004 7,375 4.3337 5,900 3.4670 50,000 10,410 16.6613 8,675 13.8845 6,940 11.1076 100,000 18,741 18.7406 15,617 15.6172 12,494 12.4937 MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Plan Check Fees 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 4 Construction Type Construction Type Construction Type IA, IB IIA,1113, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each IBC Project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * E E Occupancy Tenant Improvements 500 1,329 66.4517 1,10_8 55.3764 886 44.30,x. 2,500 2,658 31.9093 2,215 26.5911 1,772 21.27 5,000 3,456 21.2548 2,880 17.7123 2,304 14.1E 10,000 4,519 5.3228 3,766 4.4356 3,012 3.5 25 5,317 17.0011 4,431 14.1676 3,545 11.3: 50,000 9,567 19.1347 7,973 15.9456 6,378 12.71 F -1 Factory Industrial- Moderate Hazard 4,000 1,325 2.8784 1,104 2.3986 883 1.9189 20,000 1,785 2.3157 1,488 1.9298 1,190 1.5438 40,000 2,248 0.5762 1,874 0.4802 1,499 0.3841 80,000 2,479 0.8698 2,066 0.7248 1,653 0.5798 200,000 3,523 0.3914 2,935 0.3262 2,348 0.2609 400,000 4,305 1.0763 3,5881 0.8969 2,870 0.7176 F -2 Factory Industrial -Low Hazard 3,000 1,191 9.9173 992 8.2_644 794 6.6115 15,000 2,381 4.7565 1,984 3.9638 1,587 3.1710 30,000 3,094 3.1665 2,579 2.6387 2,063 2.1110 60,000 4,044 0.8063 3,370 0.6720 2, 696 0.5376 150,000 4,770 2.5277 3,975 2.1065 3,180 1.6852 300,000 8,562 2.8539 7,135 2.3783 5,708 1.9026 F F Occupancy Tenant Improvements 2,000 864 10.7959 720 8.9966 576 7.1973 10,000 1,728 5.1859 1,440 4.3216 1,152 3.4573 20,000 2,246 3.4464 1,872 2.8720 1,497 2.2976 40,000 2,935 0.8698 2,446 0.7248 1,957 0.5798 100,000 3,457 2.7615 2,881 2.3012 2,305 1.8410 200,000 6,219 3.1094 5,182 2.5912 4,146 2.0729 H -1 High Hazard Group H -1 1,000 1,163 29.0781 969 24.2317 775 19.3854 Pose a detonation hazard 5,000 2,326 13.9615 1,938 11.6346 1,551 9.3076 10,000 3,024 9.2956 2,520 7.7463 2,016 6.1970 20,000 3,954 2.3284 3,295 1.9404 2,636 1.5523 50,000 4,652 7.438 3,877 6.1986 3,102 4.95 100,000 8,371 8.3714 6,976 6.9762 5,581 5.5810 H -2 High Hazard Group H -2 2,000 1,174 14.6772 978 12.2310 783 9.7848 Pose a deflagration hazard 10,000 2,348 7.0451 1,957 5.8709 1,566 4.6967 20,000 3,053 4.6967 2,544 3.9139 2,035 3.1311 40,000 3,992 1.1742 3,327 0.9785 2,661 0.7828 100,000 4,697 3.7617 3,914 3.1348 3,131 2.5078 200,000 8,458 4.2292 7,049 3.5243 5,639 2.8195 H -3 High Hazard Group H -3 1,000 1,121 28.0396 935 23.3663 748 18.6930 Readily support combustion 5,000 2,243 13.4677 1,869 11.2231 8.9785 10,000 2,916 8.9694 2,430 7.4745 1,944 5.9796 20,000 3,813 2.2378 3,178 1.8649 2,542 1.4919 50,000 4,485 7.1755 3,737 5.9796 2,990 4.7837 100,000 8,072 8.0725 6,727 6.7271 5,382 5.3816 H -4 High Hazard Group H -4 1,000 1,396 34.8937 1,163 29.0781 930 23.2625 Pose health hazards 5,000 2,791 16.7538 2,326 13.9615 1,861 11.1692 10,000 3,629 11.1547 3,024 9.2956 2,419 7.43 -° 20,000 4,745 2.7941 3,954 2.3284 3,163 1.8E 50,000 5,583 8.9259 4,652 7.4383 3,722 5.9E 100,000 10,046 10.0457 8,371 8.3714 6,697 6.6S H -5 High Hazard Group H -5 1,000 1,396 34.8937 1,163 29.0781 930 23.26 Semiconductor Fabrication, R &D 5,000 2,791 16.7538 2,326 13.9615 1,861 11.169-' 10,000 3,629 11.1547 3,024 9.2956 2,419 7.4364 20,000 4,745 2.7941 3,954 2.3284 3,163 1.8627 50,000 5,583 8.9259 4,652 7.4383 3,722 5.9506 1 100,000 10,046 10.0457 8,371 8.3714 6,697 6.6972 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 4 MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Plan Check Fees 10 11 12 13 14 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 53 54 55 56 57 158 159 160 161 162 Construction Type Construction Type Construction Type IA, IB RA, IIB, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each IBC Project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * H H Occupancy Tenant Improvements 1,000 687 17.1723 572 14.3103 458 11.4482 5,000 1,374 8.2301 1,145 6.8584 916 5.4867 10,000 1,785 5.5012 1,488 4.5844 1,190 3.6675 20,000 2,335 1.3662 1,946 1.1385 1,557 0.9108 50,000 2,745 4.4032 2,288 3.6693 1,830 2.9354 100,0001 4,947 4.9468 4,122 4.1223 3,298 3.2978 1 -1 Institutional -7+ persons, ambulatory 1,000 1,839 45.9695 1,3 1,226 30.6464 5,000 3,677 22.0593 3,065 2,452 14.706218.3827 10,000 4,780 14.7098 3,984 12.2582 3,187 9.8065 20,000 6,251 3.6784 5,210 3.0653 4,168 2.4522 50,000 7,355 11.7744 6,129 9.8120 4,903 7.8496 100,000 13 242 13.2421 11,035 11.0351 8,828 8.8281 1 -2 Institutional -6+ persons, non - ambulatory 1,000 2,298 57.4619 1,915 47.8849 1,532 38.3079 5,000 4,597 27.5741 3,831 22.9784 3,065 18.3827 10,000 5,976 18.3873 4,980 15.3227 3,984 12.2582 20,000 7,814 4.5980 6,512 3.8316 5,210 3.0653 50,000 9,194 14.7180 7,661 12.2650 6,129 9.8120 100,000 16,553 16.5526 13,794 13.7939 11,035 11.0351 1 -3 Institutional -6+ persons, restrained 1,000 2,243 56.0757 1,869 46.7298 1,495 37.3838 5,000 4,486 26.9082 3,738 22.4235 2,991 17.9388 10,000 5,831 17.9524 4,860 14.9603 3,888 11.9683 20,000 7,627 4.4756 6,356 3.7297 5,084 2.9838 50,000 8,969 14.3510 7,475 11.9592 5,980 9.5674 100,000 16,145 16.1449 13,454 13.4541 10,763 10.7633 1 -4 Institutional -6+ persons, day care 1,000 1,689 42.2343 1,408 35.1953 1,126 28.1562 5,000 3,378 20.2763 2,815 16.8969 2,252 13.5175 10,000 4,392 13.5085 3,660 11.2571 2,928 9.0056 20,000 5,743 3.3703 4,786 2.8086 3,829 2.2469 50,000 6,754 10.8176 5,629 9.0147 4,503 7.2118 100,000 12,1631 12.1631 10,136 10.1359 8,109 8.1087 I I Occupancy Tenant Improvements 500 687 34.3338 572 2 8.6115 458 22.8892 2,500 1,373 16.4928 1,145 13.7440 916 10.9952 5,000 1,786 10.9916 1,488 9.1597 1,190 7.3277 10,000 2,335 2.7506 1,946 2.2922 1,557 1.8337 25,000 2,748 8.7954 2,290 1,832 5.86367.3295 50,000 4,947 9.8935 4,122 8.2446 3,298 6.5957 L Labs (California ONLY)2,000 2,038 25.4731 1,698 21.2276 1,359 16.9821 10,000 4,076 12.2310 3,397 10.1925 2,717 8.1540 20,000 5,299 8.1431 4,416 6.7859 3,533 5.4288 40,000 6,928 2.0439 5,773 1.7033 4,618 1.3626 100,000 8,154 6.5232 6,795 5.4360 5,436 4.3488 200,000 14,677 7.3386 12,231 6.1155 9,785 4.8924 M Mercantile - Retail or wholesale store 500 554 27.6896 461 23.0747 369 18.4598 2,500 1,108 13.2910 923 11.0759 738 8.8607 5,000 1,440 8.8743 1,200 7.395 960 5.9162 10,000 1,884 2.2106 1,570 1.8422 1,256 1.4738 25,000 2,215 7.0940 1,846 5.9117 1,477 4.7293 50,000 3,989 7.9773 3,324 6.6478 2,659 5.3182 M M Occupancy Tenant Improvements 200 332 41.5310 277 34.6092 222 27.6874 1,000 665 19.9501 554 16.6251 443 13.3001 2,000 864 13.2774 720 11.0645 576 8.8516 4,000 1,130 3.3250 941 2.7709 753 2.2167 10,000 1,329 10.6274 1,108 8.8562 886 7.0849 20,000 2,392 11.9592 1,993 9.9660 1,595 7.9728 MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Plan Check Fees 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 Construction Type Construction Type Construction Type IA, IB 11A, 1111113, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each IBC Project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * R -1 Residential- Transient 2,000 5,431 6.1665 4,525 5.1387 3,620 4.11 Boarding Houses, Hotels, Motels 10,000 5,924 9.8799 4,937 8.2333 3,949 6.5E 20,000 6,912 4.9332 5,760 4_.1110 4,608 3.2E 40,000 7,899 4.1178 6,582 3.4315 5,266 2.7-4 100,000 10,369 4.4439 8,641 3.7033 6, 913 2.9E 200,000 14,813 7.4066 12,344 6.1721 9,875 4.9 &w- R -2 Residential- Permanent, 2+ Dwellings 1,500 5,431 8.2220 4,525 6.8516 3,620 5.4813 Apartment, Dormitory, Timeshare 7,500 5,924 13.1823 4,937 10.9853 3,949 8.7882 15,000 6,913 6.5640 5,760 5.4700 4,608 4.3760 30,000 7,897 5.4858 6,581 4.5715 5,265 3.6572 75,000 10,366 5.9388 8,638 4.9490 6,911 3.9592 150,000 14,820 9.8799 12,350 8.2333 9,880 6.5866 R -3 Dwellings- Custom Homes 1,500 1,584 14.4054 1,320 12.0045 1,056 9.6036 2,500 1,728 287836 1,440 23.9864 1,152 19.1891 3,500 2,016 28.7904 1,680 23.9920 1,344 19.1936 4,500 2,304 35.9999 1,920 29.9999 1,536 23.9999 6,500 3,024 37.0444 2,520 3 0.8703 2,016 24.6963 10,000 4,320 43.2026 3,600 36.0022 2,880 28.8017 R -3 Dwellings - Models, First Master Plan 1,500 1,584 14.4054 1,320 12.0045 1,056 9.6036 2,500 1,728 28.7836 1,440 23.9864 1,152 19.1891 3,500 2,016 28.7904 1,680 23.9920 1,344 19.1936 4,500 2,304 35.9999 1,920 29.9999 1,536 23.9999 6,500 3,024 37.0444 2,520 30.8703 2,016 24.6963 10,000 4,320 43.2026 3,600 36.0022 2,880 28.8017 R -3 Dwellings- Production Phase 1,500 792 7.2027 660 6.0023 528 4.8018 of Master Plan (repeats)2,500 864 14.3918 720 11.9932 576 9.5945 3,500 1,008 14.42 840 12.02_15 672 9.6172 4,500 1,152 18.0068 960 15.0056 7 12.0045 6,500 1,512 18.4902 1,2 15.4085 1,008 12.3268 10,000 2,159 21.5945 1,800 17.9954 1,440 14.3963 R -4 Residential- Assisted Living (6 -16 persons)1,500 3,394 5.1472 2,828 4.2893 2,263 3.4315 7,500 3,703 8.2219 3,086 6.8516 2,469 5.4813 15,000 4,320 4.1178 3,600 3.4315 2,880 2.7452 30,000 4,937 3.4337 4,114 2.8615 3,291 2.2892 75,000 6,482 3.6965 5,402 3.0804 4,322 2.4643 150,000 9,255 6.1699 7,712 5.1416 6,170 4.1132 R R Occupancy Tenant Improvements 500 566 2.5651 471 2.1376 377 1.7101 2,500 617 4.1314 514 3.4428 411 2.7542 5,000 720 2.0385 600 1.6988 480 1.3590 10,000 822 1.7214 685 1.4345 5 48 1.1476 25,000 1,080 1.8482 900 1.5402 720 1.2322 50,000 1,542 3.0849 1,285 2.5708 1,028 2.0566 S -1 Storage - Moderate Hazard, Repair Garage 500 1,063 53.1614 886 44.3011 709 35.4409 Motor Vehicles (not High Hazard)2,500 2,127 25.5275 1,772 21.2729 1,418 17.0183 5,000 2,765 17.0038 2,304 14.1698 1,843 11.33' " 10,000 3,615 4.2582 3,012 3.5485 2,410 2.82 25,000 4,254 13.6009 3,545 11.3341 2,836 9.06 50,000 7,6541 15.3078 6,378 12.7565 5,103 10.20 S -2 Storage -Low Hazard, Parking Garages 1,000 1,595 1,329 33.2253 1,063 26.58 Open or Enclosed 5,000 3,190 39.8703 19.1347 2,658 15.9456 2,127 12.75E - b 10,000 4,147 12.7637 3,455 10.6364 2,764 8.5092 20,000 5,423 3.1964 4,519 2.6636 3,615 2.1309 50,000 6,382 10.1979 5,318 8.4983 4,255 6.7986 100,000 11,481 11.4808 9,567 9.5674 7,654 7.6539 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Plan Check Fees 917 8 9 0 2 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. Construction Type Construction Type Construction Type IA, IB IIA, 116, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for @ Each @ Each @ Each IBC Project Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * S S Occupancy Tenant Improvements 500 609 30.4586 508 25.3822 406 20.3057 2,500 1,218 14.6228 1,015 12.1857 812 9.7486 5,000 1,584 9.7440 1,320 8.1200 1,056 6.4960 10,000 2,071 2.4326 1,726 2.0272 1,381 1.6217 25,000 2,436 7.8143 2,030 6.5119 1,624 5.2095 50,0001 4,390 8.7791 3,658 7.3160 2,9261 5.8528 U Accessory- Private Garage 200 166 20.7655 138 17.3046 111 13.8437 1,000 332 9.9615 277 8.3012 222 6.6410 2,000 432 6.6455 360 5.5379 288 4.4303 4,000 565 1.6625 471 1.3854 377 1.1083 10,000 665 5.3137 554 4.4281 443 3.54 20,000 1,196 5.9796 997 797 3.98644.9830 R -3 Residential Room Addition 50 566 25.7157 471 21.4297 377 17.1438 250 617 41.1505 514 34.2921 411 27.4337 500 720 20.5753 600 17.1461 480 13.7168 1,000 823 17.1461 686 14.2884 549 11.4307 2,500 1,080 18.4960 900 15.4133 720 12.3307 I 1 5,0001 1,542 30.8493 1,285 25.7078 1,028 20.5662 SHELL BUILDINGS All Shell Buildings 1,000 443 11.0759 369 9.2299 295 7.3839 5,000 886 5.3273 7 4.43 591 3.5515 10,000 1,152 3.5443 4960 768 2.36282.9536 20,000 1,507 0.8843 1,256 0.7369 1,005 0.5895 50,000 1,772 2.8267 1,477 2.3556 1,181 1.8845 i 100,000 3,185 3.1855 2,655 2.6546 2,124 2.1237 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Inspection Fees 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 Construction Type Construction Type Construction Type IA, IB IIA, 1113, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for Project @ Each @ Each @ Each IBC Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf A -1 Assembly -Fixed Seating 500 3,349 167.4288 2,790 139.5240 2,232 111.61 Theater, Concert Hall 2,500 6,697 133.9430 5,581 111.6192 4,465 89.29 5,000 10,046 200.9146 8,371 167.4288 6,697 133.94 10,000 20,091 44.6447 16,743 37.2039 13,394 29.76 25,000 26,788 13.3997 22,323 11.1665 17,859 8.93 50,0001 30,138 60.2762 25,115 50.2302 20,092 40.18,, A -2 Assembly -Food & Drink 500 5,023 251.1432 4,186 209.2860 3,349 167.4288 Restaurant, Night Club, Bar 2,500 10,046 200.9146 8,371 167.4288 6 133.9430 5,000 15,069 301.3718 12,557 251.1432 10,046 200.9146 10,000 30,137 66.9670 25,114 55.8058 20,091 44.6447 25,000 40,182 20.0996 33,485 1 6.7497 26 13.3997 50,0001 45,207 90.4143 37,673 75.3452 30,138 60.2762 A -3 Assembly - Worship, Amusement 500 5,023 251.1432 4,186 209.2860 3,349 167.4288 Arcade, Church, Community Hall 2,500 10,046 200.9146 8,371 167.4288 6,697 133.9430 5,000 15,069 301.3718 12,557 251.1432 10,046 200.9146 10,000 30,137 66.9670 25,114 55.8058 20,091 44.6447 25,000 40,182 20.0996 33,485 16.7497 26,788 13.3997 50,000 45,207 90.4143 37,673 75.3452 30,138 60.2762 A -4 Assembly- Indoor Sport Viewing 500 4,018 200.9146 3,349 167.4288 2,679 133.9430 Arena, Skating Rink, Tennis Court 2,500 8,037 160.7316 6,697 133.9430 107.1544 5,000 12,055 241.0975 10,046 200.9146 5,358 8,037 160.7316 10,000 24,110 53.5736 20,091 44.6447 16,073 35.7157 25,000 32,146 16.0797 26,788 13.3997 21,431 10.7198 50,000 36,166 72.3314 30,138 60.2762 24,110 48.2209 A -5 Assembly - Outdoor Activities 1,000 6,279 156.9645 5,232 130.8038 4,186 104.6430 Amusement Park, Bleacher, Stadium 5,000 12,557 125.5716 10,464 104.6430 8,371 83.7144 10,000 18,836 188.3574 15,696 156.9645 12,557 125.5716 20,000 37,671 41.8572 31,393 34.8810 25,114 27.9048 50,000 50,229 12.5572 41,857 10.4643 33,486 8.3714 100,000 56,507 56.5072 47,089 47.0894 37,671 37.6715 A A Occupancy Tenant Improvements 500 1,758 87.9035 1,465 73.2529 1,172 58.6023 2,500 3,516 70.3283 2,930 58.6069 2,344 46.8855 5,000 5,274 105.4856 4,395 87.9047 3,516 70.3237 10,000 10,549 23.4473 8,790 19.5394 7,032 15.63 25,000 14,066 7.0124 11,721 5.8437 9,37 4.6750 50,000 15,819 31.6375 13,182 26.3646 10,546 21.0917 B Business - Professional Office 1,000 3,767 94.1787 3,139 78.4823 2,511 62.7858 5,000 7,534 75.3430 6,279 62.7858 5,023 50.2286 10,000 11,301 113.0144 9,418 94.1787 7,534 75.3430 20,000 22,603 25.1098 18,836 20.9248 15,069 16.7399 50,000 30,136 7.5425 25,113 6.2854 20,091 5.0283 100,000 33,907 33.9071 28,256 28.2559 22,605 22.6047 B B Occupancy Tenant Improvements 150 251 41.8572 209 34.8810 167 27.9048 750 502 33.4858 419 27.9048 335 22.3238 1,500 753 50.2286 628 41.8572 502 33.48 " 3,000 1,507 11.1574 1,256 9.2978 1,005 7.43 7,500 2,009 3.3567 1,674 2.7973 1,339 2.23 15,000 2,261 15.0713 1,884 12.5594 1,507 10.04 E Educational -Group Occupancy 1,000 2,511 62.7858 2,093 52.3215 1,674 41.85 6+ persons, up to the 12th Grade 5,000 5,023 50.2286 4,186 41.8572 3,349 33.489u 10,000 7,534 75.3430 6,279 62.7858 5,023 50.2286 20,000 15,069 16.7474 12,557 13.9562 10,046 11.1649 50,000 20,093 5.0147 16,744 4.1789 13,395 3.3431 I 1 100,0001 22,600 22.60021 18,8331 18.83351 15,067 15.0668 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Inspection Fees 55 56 57 58 59 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 104 105 106 107 108 N Construction Type Construction Type Construction Type IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for Project @ Each @ Each @ Each IBC Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * E E Occupancy Te nant Improvements 500 992 49.5797 826 41.3164 661 33.0531 2,500 1,983 39.6692 1,653 33.0577 1,322 26.4461 5,000 2,975 59.4970 2,479 49.5809 1,983 39.6647 10,000 5,950 13.2231 4 11.0192 3,966 8.8154 25,000 7,933 3.9547 6,611 3.2956 5,289 2.6365 50,000 8,922 17.8437 7,435 14.8697 5,948 11.8958 F -1 Factory Industrial- Moderate Hazard 4,000 1,284 1.9923 1,070 1.6602 856 1.3282 20,000 1,603 2.2288 1,335 1.8573 1,068 1.4858 40,000 2,048 1.1416 1,707 0.9513 1,366 0.7610 80,000 2,505 0.5581 2,087 0.4651 1,670 0.3721 200,000 3,175 0.5436 2,646 0.4530 2,116 0.3624 400,000 4,262 1.0655 3,552 0.8879 2,841 0.7103 F -2 Factory Industrial -Low Hazard 3,000 645 5.3647 537 4.4705 430 3.5764 15,000 1,288 4.2944 1,0 3 .5787 859 2.8630 30,000 1,932 6.4417 1,610 5.3681 1,288 4.2944 60,000 3,865 1.4360 3,221 1.1967 2,577 0.9573 150,000 5,157 0.4213 4,298 0.3511 3,438 0.2809 300,0001 5,789 1.9298 4,824 1.6082 3,860 1.2865 F F Occupancy Tenant Improvements 2,000 448 5.6072 374 4.6727 299 3.7382 10,000 897 4.4901 747 3.7418 598 2.9934 20,000 1,346 6.7298 1,122 5.6081 897 4.4865 40,000 2,692 1.4931 2,243 1.2442 1,795 0.9954 100,000 3,588 0.4566 2,990 0.3805 2,392 0.3044 200,000 4,044 2.0222 3,370 1.6852 2,696 1.3481 H -1 High Hazard Group H -1 1,000 422 10.5368 351 8.7807 281 7.0245 Pose a detonation hazard 5,000 843 8.4349 703 7.0291 562 5.6232 10,000 1,265 12.6478 1,054 10.5398 843 8.4318 20,000 2,530 2.8177 2,108 2.3481 1,686 1.8784 50,000 3,375 0.8426 2,812 0.7022 2,250 0.5617 100,000 3,796 3.7961 3,163 3.1635 2,531 2.5308 H -2 High Hazard Group H -2 2,000 506 6.3275 422 5.2729 337 4.2183 Pose a deflagration hazard 10,000 1,012 5.0555 843 4.2129 675 3.3703 20,000 1,518 7.5887 1,265 6_.3239 1,012 5.0591 40,000 3,035 1.6815 2,530 1.4013 2,024 1.1210 100,000 4,044 0.5001 3,370 0.4168 2,696 0.3334 200,000 4,544 2.2722 3,787 1.8935 3,030 1.5148 H -3 High Hazard Group H -3 1,000 632 15.8052 527 13.1710 422 10.5368 Readily support combustion 5,000 1,265 12.6523 1,054 10.5436 843 8.4349 10,000 1,897 18.9716 1,581 15.8097 1,265 12.6478 20,000 3,794 4.2265 3,162 3.5221 2,530 2.8177 50,000 5,062 1.2639 4,219 1.0532 3,375 0.8426 100,000 5,694 5.6942 4,745 4.7452 3,796 3.7961 H -4 High Hazard Group H-4 1,000 506 12.6441 422 10.5368 337 8.4294 Pose health hazards 5,000 1,012 10.1218 843 8.4349 674 6.7479 10,000 1,518 15.1773 1,265 12.6478 1,012 10.1182 20,000 3,035 3.3812 2,530 2.8177 2,024 2.2541 50,000 4,050 1.0111 3,375 0.8426 2,700 0.6741 100,000 4,555 4.5554 3,796 3.7961 3,037 3.0369 H -5 High Hazard Group H -5 1,000 506 12.6441 422 10.5368 337 8.4294 Semiconductor Fabrication, R &D 5,000 1,012 10.1218 843 8.4349 674 6.7479 10,000 1,518 15.1773 1,265 12.6478 1,012 10.1182 20,000 3,035 3.3812 2,530 2.8177 2,024 2.2541 50,000 4 ,050 1.0111 3,375 0.8426 2,700 0.6741 100,000 4,555 4.5554 3,796 3.7961 3,037 3.0369 N MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Inspection Fees 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 IM Construction Type Construction Type Construction Type IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for Project @ Each @ Each @ Each IBC Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * H H Occupancy Tenant Improvements 1,000 412 10.2876 343 8.5730 274 6.85 5,000 823 8.2192 686 6.8494 549 5.47 10,000 1,234 12.3397 1,028 10.2831 823 8.22 20,000 2,468 2.7542 2,057 2.2952 1,645 1.83 50,000 3,294 0.8263 2,745 0.6886 2,196 0.55 100,000 3,707 3.7074 3,089 3.0895 2,472 2.47; 1 -1 Institutional -7+ persons, ambulatory 1,000 633 15.8160 527 13.1800 422 10.5440 5,000 1,266 12.6550 1,055 10.5458 844 8.4367 10,000 1,898 18.9825 1,582 15.8188 1,266 12.6550 20,000 3,797 4.2147 3,164 3.5123 2,531 2.8098 50,000 5,061 1.2720 4,217 1.0600 3,374 0.8480 100,000 5,697 5.6969 4,747 4.7474 3,798 3.7980 1 -2 Institutional -6+ persons, non - ambulatory 1,000 791 19.7701 659 16.4750 527 13.1800 5,000 1,582 15.8188 1,318 13.1823 1,055 10.5458 10,000 2,373 23.7281 1,977 19.7735 1,582 15.8188 20,000 4,746 5.2684 3,955 4.3903 3,164 3.5123 50,000 6,326 1.5900 5,272 1.3250 4,217 1.0600 100,000 7,121 7.1212 5,934 5.9343 4,747 4.7474 1 -3 Institutional -6+ persons, restrained 1,000 791 19.770_1 659 16.4750 527 13.1800 5,000 1,582 15.8188 1,318 13.1823 1,055 10.5458 10,000 2,373 23.7281 1,977 19.7735 1 1582 15.8188 20,000 4,746 5.2684 3,955 4.3903 3,164 3.5123 50,000 6,326 1.5900 5,272 1.3250 4 217 1.0600 100,0001 7,121 7.1212 5,934 5.9343 4,747 4.7474 1 -4 Institutional -6+ persons, day care 1,000 791 19.7701 659 16.4750 527 13.1800 5,000 1,582 15.8188 1,318 13.1823 1,055 10.5458 10,000 2,373 23.7281 1,977 19.7735 1,582 15.8188 20,000 4,746 5.2684 3,955 4.3903 3,164 3.5123 50,000 6,326 1.5900 5,272 1.3250 4,217 1.0600 100,000 7,121 7.1212 5,934 5.9343 4,747 4.7474 1 1 Occupancy Tenant Improvements 500 468 23.4101 390 19.5084 312 15.6068 2,500 936 18.7107 780 15.5923 624 12.4738 5,000 1,404 28.0824 1,170 23.4020 936 18.7216 10,000 2,808 6.2478 2,340 5.2065 1,872 4.1652 25,000 3,745 1.8700 3,121 1.5583 2,497 1.2467 50,000 4,213 8.4258 3,511 7.0215 2,809 5.6172 L Labs (California ONLY)2,000 4,018 50.2286 3,349 41.8572 2,679 33.4858 10,000 8,037 40.1829 6,697 33.4858 5,358 26.7886 20,000 12,055 60.2744 10,046 50.2286 8,037 40.1829 40,000 24,110 13.3979 20,091 11.1649 16,073 8.9320 100,000 32,149 4.0118 26,790 3.3431 21,432 2.6745 200,000 36,160 18.0801 30,134 15.0668 24,107 12.0534 M Mercantile - Retail or wholesale store 500 1,005 50.2354 837 41.8629 670 33.4903 2,500 2,009 40.1720 1,674 33.4767 1,340 26.7814 5,000 3,014 60.2717 2,511 50.2264 2 40.18 10,000 6,027 13.3862 5,023 11.1551 4,018 8.92• 25,000 8,035 4.0362 6,696 3.3635 5,357 2.69 50,000 9,044 18.0883 7,537 15.0736 6,029 12.05 M M Occupancy Tenant Improvements 200 502 62.7858 419 52.3215 335 41.85 1,000 1,005 50.2286 837 41.8572 670 33.485o 2,000 1,507 75.3430 1,256 62.7858 1,005 50.2286 4,000 3,014 16.7474 2,511 13.9562 2,009 11.1649 10,000 4,019 5.0147 3,349 4.1789 2,679 3.3431 20,000 4,520 22.6002 3,767 18.8335 3,0131 15.0668 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 IM MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Inspection Fees 463 64 65 66 57 X68 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 07 08 09 10 11 212 213 214 215 216 11 Construction Type Construction Type Construction Type IA, IB IIA, IIB, IIIA, 1118, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for Project @ Each @ Each @ Each IBC Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *I Size 100 sf * R -1 Residential- Transient 2,000 8,037 25.1143 6,697 20.9286 5,358 16.7429 B oarding Ho uses, Hotels, Motels 10,000 50.2286 8,371 41.8 6,697 33.4858 20,000 15,069 15.0577 10,046 10.038512,557 12.5481 40,000 18,080 6.6953 15,067 5.5795 12,053 4.463 100,000 22,097 8.0453 14,732 5.363518,414 6.7044 200,000 30,143 15.0713 25,119 12.5594 20,095 10.0475 R -1 Residential- Transient, Phased Permit 2,000 20 0.2528 17 0.2106_13 0.1685 Boarding Houses, Hotels, Motels 10,000 40 0.2066 34 0.1721 27 0.1377 20,000 61 0.3044 51 0.2537 41 0.2029 40,000 122 0.0689 101 0.0574 81 0.0459 100,000 163 0.0109 136 0.0091 109 0.0072 200,000 174 0.0870 145 0.0725 116 0.0580 R -2 Residential- Permanent, 2+ Dwellings 1,500 8,037 33.4858 6,697 27.9048 5,358 22.3238 Apartment, Dormitory, Timeshare 7,500 10,046 66.9715 8,371 55.8096 6,697 44.6477 15,000 15,069 20.0860 12,557 16.7384 10,046 13.3907 30,000 18,081 8.9241 15,068 7.4367 12,054 5.9494 75,000 22,097 10.7089 18,414 8.9241 14,732 7.1393 150,000 30,129 20.0860 25,108 16.7384 20,086 13.3907 R -2 Residential- Permanent, 2 +, Phased 1,500 257 1.0682 214 0.8901 171 0.7121 Apartment, Dormitory, Timeshare 7,500 321 2.1527 268 1.7939 214 1.4351 15,000 483 0.6306 402 0.5255 322 0.4204 30,000 577 0.2935 481 0.2446 385 0.1957 75,000 709 0.3370 591 0.2809 473 0.2247 150,000 962 0.6414 802 0.5345 641 0.4276 R -3 Dwellings- Custom Homes 1,500 1,206 30.1222 1,005 2 804 20.0815 2,500 1,507 75.3498 1,256 62.7915 1,005 50.2332 3,500 2,260 45.1935 1,884 37.6613 1,507 30.1290 4,500 2,712 30.1494 2,260 25.1245 1,808 20.0996 6,500 3,315 34.4235 2,763 28.6862 2,210 22.9490 10,000 4,520 45.2003 3,767 37.6670 3,013 30.1336 R -3 Dwellings - Models, First Master Plan 1,500 1,206 30.1222 1,005 25.1019 804 20.0815 2,500 1,507 75.3498 1,256 62.7915 1,005 50.2332 3,500 2,260 45.1935 1,884 37.6613 1,507 30.1290 4,500 2,712 30.1494 2,260 25.1245 1,808 20.0996 6,500 3,315 34.4235 2,763 28.6862 2,210 22.9490 10,0001 4,520 45.2003 3,767 37.6670 3,013 30.1336 R -3 Dwellings- Production Phase 1,500 1,206 30.1222 1,005 25.1019 804 20.0815 of Master Plan (repeats)2,500 1,507 75.3498 1,256 62.7915 1,005 50.2332 3,500 2,260 45.1935 1,884 37.6613 1,507 30.1290 4,500 2,712 30.1494 2,260 25.1245 1,808 20.0996 6,500 3,315 34.4235 2,763 28.6862 2,210 22.9490 10,000 4,520 45.2003 3,767 37.6670 3,013 30.1336 R -4 Residential - Assisted Living (6 -16 persons)1,500 8,037 33.4858 6,697 27.9048 5,358 22.3238 7,500 10,046 66.9715 8,371 55.8096 6,697 44.6477 15,000 15,069 20.0860 12,557 16.7384 10,046 13.3907 30,000 18,081 8.9241 15,068 7.4367 12,054 5.9494 75,000 22,097 10.7089 18,414 8.9241 14,732 7.1393 150,000 30,129 20.0860 25,108 16.7384 20,086 13.3907 R R Occupancy Tenant Improvements 500 804 10.0498 670 8.3748 536 6.6999 2,500 1,005 20.0996 837 16.7497 670 13.3997 5,000 1 6.0340 1,256 5.0283 1,005 4.0226 10,000 1,809 2.6636 1,507 2.2197 1,206 1.7758 25,000 2,208 3.2344 1,840 2.6954 1,472 2.1563 50,000 3,017 6.0340 2,514 5.0283 2,011 4.0226 11 MASTER SCHEDULE OF FEES AND CHARGES Community Development - Building Division New Construction Inspection Fees 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. 12 Construction Type Construction Type Construction Type IA, IB IIA, 11113, IIIA, IIIB, IV VA, VB Base Cost Cost for Base Cost Cost for Base Cost Cost for Project @ Each @ Each @ Each IBC Size Threshold Additional Threshold Additional Threshold Additional Class IBC Occupancy Type Threshold Size 100 sf *Size 100 sf *Size 100 sf * S -1 Storage- Moderate Hazard, Repair Garage 500 1,005 50.2286 837 41.8572 670 33.48 Motor Vehicles (not High Hazard)2,500 2,009 40.1829 1,674 33.4858 1,339 26.78 5,000 3,014 60.2744 2,511 50.2286 2,009 40.18 10,000 6,027 13.3979 5,023 11.1649 4,018 8.93 25,000 8,037 4.0118 6,698 3.3431 5,358 2.67 50,0001 9,040 18.0801 7,533 15.0668 6,027 12.05., S -2 Storage -Low Hazard Parking Garages 1,000 4,822 120.5515 4,018 100.4595 3,215 80 Open or Enclosed 5,000 9,644 96.4455 8,037 80.3713 6,429 64.2970 10,000 14,466 144.6628 12,055 120.5524 9,644 96.4419 20,000 28,933 32.1376 24,110 26.7814 19,288 21.4251 50,000 38,574 9.6543 32,145 8.0453 25,716 6.4362 100,000 43,401 43.4010 36,168 36.1675 28,934 28.9340 S S Occupancy Tenant Improvements 500 502 25.1177 419 20.9314 335 16.7451 2,500 1,005 20.0996 837 16.7497 670 13.3997 5,000 1,507 30.1426 1,256 25.1189 1,005 20.0951 10,000 3,014 6.6999 2,512 5.5832 2,010 4.4666 25,000 4,019 1.9977 3,349 1.6648 2,679 1.3318 50,000 4,519 9.0374 3,766 7.5311 3,012 6.0249 U Accessory- Private Garage 200 552 69.0066 460 57.5055 368 46.0044 1,000 1,104 55.2026 920 46.0022 736 36.8017 2,000 1,656 82.8039 1,380 69.0032 1,104 55.2026 4,000 3,312 18.4099 2,760 15.3416 2,208 12.2733 10,000 4,417 5.5175 3,681 4.5980 2,945 3.6784 20,000 4,969 24.8425 4,140 20.7021 3,312 16.5617 SHELL BUILDINGS All Shell Buildings 1,000 603 15.0740 502 12.5617 402 10.0494 5,000 1,206 12.0462 1,005 10.0385 804 8.0308 10,000 1,808 18.0801 1,507 15.0668 1,205 12.0534 20,000 3,616 4.0190 3,013 3.3492 2,411 2.6793 50,000 4,822 1.2068 4,018 1.0057 3,214 0.8045 100,000 5,4251 5.42511 4,521 4.52091 3,617 3.6168 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. 12 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY DEVELOPMENT - BUILDING DIVISION - MECHANICAL, ELECTRICAL, PLUMBING FEE/CHARGE Inspection outside of normal business hours RATE 155.00 UNIT per hour NOTES 3 hour minimum Re- inspection fees during business hours 104.00 per hour 3 hour minimum Inspection for which no fee is indicated 282.00 per hour 3 hour minimum Plan review for changes, additions, and revisions to plan 103.00 per hour 1 hour minimum Change of Occupancy, requiring new C. of 0.43.00 per hour 1/2 hour minimum Security Plan Check 205.00 per hour 2 hour minimum Alternate Materials or Methods Request 51.00 each 1/2 hour minimum Records Research 43.00 each 1/2 hour minimum ELECTRICAL: Service or Panel: 600V - 200 amp 104.00 each 200 -1,000 amp 104.00 each 1,000+ amps 188.00 each Outlets - per item 9.00 per item Lights - per item 9.00 per item Switches - per item 9.00 per item Power Equipment: Up to 1 HP or to lkva 47.00 each Over 1 HP 94.00 each Sign & Circuit (electrical portion only)104.00 each Temporary Power - (main pole of equipment)47.00 Temporary Power - distance poles 47.00 per pole Busways 94.00 each Factory Wired Appliance 47.00 each Private street Light 104.00 each Issuance Fee 43.00 each Plan Review - 1/2 hr min 51.00 each Inspection of Solar Panel System - 1/2 hr min.47.00 each Inspection of items not listed - 1/2 hr min 47.00 each Re- inspection fee - 1/2 hr min 47.00 each PLUMBING: Water Closet 47.00 each Urinal 47.00 each Bathtub (including shower head)94.00 each Shower Stall 94.00 each Kitchen Sink 47.00 each Dishwasher 47.00 each Garbage Disposal 47.00 each Clothes Washer 47.00 each Water Heater 89.00 each Sewer (new, add, alter, repair)94.00 each Water Softener 47.00 each Clothes Dryer 94.00 each Gas Piping 19.00 per outlet Miscellaneous Fixtures 94.00 each Lawn Sprinklers 47.00 each Industrial Waste Receptors 94.00 leach 1 2 3 4 5 6 7 8 9 1C 11 12 13 14 15 16 17 18 19 2C 21 22 23 24 25 26 27 28 29 3C 31 32 33 34 35 36 37 38 39 4C 41 42 43 44 45 46 47 13 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY DEVELOPMENT - BUILDING DIVISION - MECHANICAL, ELECTRICAL, PLUMBING FEE/CH Drainage Piping (alter, repair) RATE 47.00 UNIT each NOTES Drinking Fountain 47.00 each Roof Drainage System 94.00 each Cesspool 94.00 each Septic Tank 266.00 each Backflow Devices - per device 94.00 each Solar Systems (plumbing portion)151.00 each Issuance Fee 40.00 each Plan Review 57.00 per hour 1/2 hour minimum Inspection of Solar Panel System 47.00 per hour 1/2 hour minimum Inspection of items not listed 47.00 per hour 1/2 hour minimum Re- inspection fee 47.00 per hour 1/2 hour minimum MECHANICAL: Heater - less than 100,000 BTU 94.00 each Heater - greater than 100,000 BTU 141.00 each Air Conditioner: 0- 100,000 BTU 94.00 each 100,000- 1,000,000 BTU 141.00 each 1,000,000+ BTU 188.00 each Air Handler - 10,000 CFM or less 94.00 each Air Handler - over 10,000 CFM 141.00 each Evaporative Cooler 70.00 each Ventilation Fan 47.00 each Fans 47.00 each Grease Hoods 188.00 each Mechanical Firebox (metal Fireplace)94.00 each Registers (inlet or outlet)10.00 each Issuance Fee 43.00 each Plan Review - 1/2 hr min 43.00 per hour 1/2 hour minimum Inspection of Solar Panel System - 1/2 hr min.47.00 per hour 1/2 hour minimum Inspection of Items not listed - 1/2 hr min 47.00 per hour 1/2 hour minimum Re- inspection fee - 1/2 hr min 47.00 per hour 1/2 hour minimum Pool/Spa 188.00 each Kitchen / Bathroom Remodel (less than 500 sq. ft.)521.00 each Technology Fee - % of Valuation 0.04%of valuation Code Compliance Fees: Special Promotion (Banner) Permit 50.00 each Special Event Application / Permit 500.00 each Violation & Reinspection Fee 299.00 leach 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 14 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY DEVELOPMENT - BUILDING DIVISION - MISCELLANEOUS FEES FEE/CH RATE UNIT NOTES Antenna - Telecom Facility Cellular /Mobile Phone, free - standing 282.00 each Cellular /Mobile Phone, attached to building 282.00 each Arbor /Trellis 282.00 each Awning /Canopy (supported by building)160.00 each Balcony addition 255.00 each Carport 449.00 each Chimney Repair 160.00 each Close Existing Openings Interior wall 135.00 each Exterior wall 156.00 each Covered Porch 228.00 each Deck (wood)228.00 each Deck Railing 157.00 each Demolition (up to 3,000 sf) Commercial 219.00 each Residential 201.00 each Disabled Access Compliance Inspection 257.00 each Door New door (non structural)150.00 each New door (structural shear wall /masonry)150.00 each Fence Over 6 ft. in height 150.00 each Each addl 100 If 17.00 each Fireplace Masonry 294.00 each Pre - Fabricated /Metal 219.00 each Flag pole (over 20 feet in height)219.00 each Foundation Repair 303.00 each Garage (detached) Wood frame up to 1,000 sf 387.00 each Masonry up to 1,000 sf 462.00 each Modular Structures Partition - Commercial, Interior (up to 30 If)103.00 each Additional partition 39.00 each Partition - Residential, Interior (up to 30 If)103.00 each Additional partition 39.00 each Patio Cover Wood frame 228.00 each Metal frame 228.00 each Other fra me 207.00 each Additional patio 90.00 each Enclosed, wood frame 241.00 each Enclosed, metal frame 241.00 each Enclosed, other frame 250.00 each Additional enclosed patio 90.00 each Photovoltaic System Residential 280.00 leach 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 15 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY DEVELOPMENT - BUILDING DIVISION - MISCELLANEOUS FEES 49 5C 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 8C 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 16 FEE/CHARGE Commercial, up to 10 kilowatts RATE 485.00 UNIT each NOTES Commercial, each additional 1 kilowatt 52.00 each Pile Foundation Cast in Place Concrete (first 10 piles)523.00 each Additional Piles (increments of 10)523.00 each Driven (steel, pre- stressed concrete)523.00 each Additional Piles (increments of 10)523.00 each Product Review 109.00 each Re -roof Residential 230.00 each Multi - Family Dwelling 640.00 each Commercial 740.00 each Commercial Addition 381.00 each Retaining Wall (concrete or masonry) Standard (up to 50 If)345.00 each Additional retaining wall 52.00 each Special Design, 3 -10' high (up to 50 If)376.00 each Additional retaining wall 52.00 each Special Design, over 10' high (up to 50 If)392.00 each Additional retaining wall 52.00 each Gravity /Crib Wall, 0 -10' high (up to 50 If)176.00 each Additional Gravity /Crib Wall 52.00 each Gravity /Crib Wall, over 10' high (up to 50 If)280.00 each Additional Gravity /Crib Wall 52.00 each Roof Structure Replacement 193.00 each Additional roof structure replacement 39.00 each Sauna -steam 155.00 each Siding Stone and Brick Veneer (interior or exterior)130.00 each All Other 150.00 each Additional siding 52.00 each Signs Directional 194.00 each Ground /Roof /Projecting Signs 148.00 each Master Plan Sign Check 0.00 each Rework of any existing Ground Sign 123.00 each Other Sign 123.00 each Wall /Awning Sign, Non - Electric 176.00 each Wall, Electric 176.00 each Skylight Less than 10 sf 77.00 each Greater than 10 sf or structural 130.00 each Stairs -First Flight 155.00 each Each additional flight 43.00 each Storage Racks 0 -8' high (up to 100 If)105.00 each each additional 100 If 52.00 leach over 8' high (up to 100 If)155.00 leach 49 5C 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 8C 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 16 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY DEVELOPMENT - BUILDING DIVISION - MISCELLANEOUS FEES 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 FEE/CH RATE UNIT NOTES each additional 100 If 52.00 each Supplemental Plan Check Fee (after 3rd review)109.00 each Supplemental Inspection Fee 100.00 each Swimming Pool /Spa Vinyl -lined (up to 800 sf)464.00 each Fiberglass 485.00 each Gunite (up to 800 sf)485.00 each Additional pool (over 800 sf)209.00 each Commercial pool (up to 800 sf)519.00 each Commercial pool (over 800 sf)519.00 each Spa or Hot Tub (Pre- fabricated)204.00 each Window or Sliding Glass Door Replacement 98.00 each New Window (non structural)123.00 each New window (structural shear wall /masonry)280.00 each Bay Window (structural)280.00 each 17 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY DEVELOPMENT - PLANNING DIVISION FEE/CHARGE Sober Living Permit Fee RATE 1,586.00 UNIT each NOTES Mills Act Program: Original Application Fee 1,000.00 each Inspection /Annual Report 30.00 each Zone Clearance, Over the Counter Review 30.00 each Staff resarch, information requests - per hour 100.00 per hour Temporary Use Permit (recurring)200.00 each Temporary Use Permit (non- recurring uses)500.00 each Zoning Verification Letter 200.00 each Outdoor Dining Permits Initial 353.00 each Renewal 104.00 each Business License Review General Plan Update 0.05%of valuation DEPOSIT -BASED FEES: Administrative Design Review 500.00 deposit Billed at actual cost Design Review, Histroic Districts Commercial 4,000.00 deposit Billed at actual cost Residential 1,500.00 deposit Billed at actual cost Signs and Sign Programs 500.00 deposit Billed at actual cost Design Review, Outside Histroic Districts 1,000.00 deposit Billed at actual cost CUP / Variance - Zoning 3,000.00 deposit Billed at actual cost CUV / Variance - Planning Commission 3,000.00 deposit Billed at actual cost Major Site Plan Review 15,000.00 deposit Billed at actual cost Tentative Tract Map 2,000.00 deposit Billed at actual cost Zone Change Applications 10,000.00 deposit Billed at actual cost Negative Declaration 6,000.00 deposit Billed at actual cost Mitigation Monitoring 3,000.00 deposit Billed at actual cost General Plan Amendment 10,000.00 deposit Billed at actual cost Environmental Impact Report 10,000.00 deposit Billed at actual cost Appeals to City Council or Planning Commission 1,000.00 deposit Billed at actual cost Planning Commission Modification to CUP, Major Site Plan or Variance 3,000.00 deposit Billed at actual cost Minor Site Plan Review - Staff 1,000.00 deposit Billed at actual cost Pre - Application Review 500.00 deposit Billed at actual cost Administrative Adjustments 1,000.00 deposit Billed at actual cost Time Extension 1,000.00 deposit Billed at actual cost 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 18 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY SERVICES FEE/CH FILMING FEES: RATE UNIT NOTES Application Fees 40.00 each Citywide (Excludes Plaza District)208.00 each Plaza District Motion 444.00 each Plaza District Still 208.00 each Parks 218.00 each Preparation and Strike Days 50%daily use rate Additional Staff Time Charged Hourly in Excess of Two Hours actual cost Police Officer actual cost COMMUNITY SERVICES FEES: Aquatic Programs: Recreational Swim 3.00 each Recreation Swim Pass 30.00 each 15 sessions Group lessons 45.00 per participant 9 lessons Swim lessons, private 30.00 each Aqua Aerobics Class 34.00 each Kids Rule the Pool 7.00 each Life Guard Training Class 169.00 each Water Safety Instructor Class 169.00 each City Special Events - 3rd of July 3rd of July Celebration, general public pre -sale 7.00 each 3rd of July Celebration, general public day of event 7.00 each 3rd of July Celebration, non - profit pre -sale 4.50 each 3rd of July Celebration, children under 2 0.00 each Day Camp - Resident 105.00 each Day Camp - Non - Resident 125.00 each Basketball League 246.00 perseason Basketball League - Deposit 150.00 deposit Open Gym 2.00 per session Party Equipment Permit Fee 30.00 each Moon Bounce Permit 30.00 each Special Event Permit 60.00 each Refund Processing Fee 10.00 each Booth Participation Fee - Third of July 100.00 each Booth Participation Fee - Tree Lighting and Treats in the Streets 25.00 each Landscape & Irrigation Permit & Plan Check 782.00 each FACILITY RENTALS Pool Rentals Groups 1 -150 People Deposit 150.00 deposit Non - Orange Based Business 435.00 per hour Orange Based Business 375.00 per hour Non - Resident 185.00 per hour Resident, Non- Profit 165.00 per hour Groups 151 -200 People Deposit 225.00 deposit F c 1C 17 12 13 14 1E 1E 17 1E 15 2C 21 22 22 24 2E 2E 27 2E 2S 3C 39 32 3? 34 3E 3E 37 3E 3S 4C 4] 42 43 44 45 4E 19 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY SERVICES FEE/CHARGE RATE UNIT NOTES Non - Orange Based Business 765.00 per hour Orange Based Business 705.00 per hour Non - Resident 255.00 per hour Resident, Non - Profit 235.00 per hour Green / Open Space Fee: Groups 1 -50 People Deposit 50.00 deposit Non - Orange Based Business 120.00 per hour Orange Based Business 90.00 per hour Non - Resident 40.00 per use Resident, Non - Profit 30.00 per use Groups 51 -100 People Deposit 75.00 deposit Non - Orange Based Business 150.00 per hour Orange Based Business 120.00 per hour Non - Resident 50.00 per use Resident, Non - Profit 40.00 per use Groups 101 -200 People Deposit 150.00 deposit Non - Orange Based Business 225.00 per hour Orange Based Business 195.00 per hour Non- Resident 75.00 per use Resident, Non - Profit 65.00 per use Groups 201 or More People Deposit 250.00 deposit Non - Orange Based Business 330.00 per hour Orange Based Business 300.00 per hour Non - Resident 110.00 per use Resident, Non- Profit 100.00 per use Band Shells Deposit 50.00 deposit Non - Resident 55.00 per hour Resident 35.00 per hour Orange -Based Business 70.00 per hour Non Orange -Based Business 110.00 per hour Community Garden Deposit 100.00 deposit Non- Resident 100.00 per year Resident 75.00 per year Facilities - Handy, Hart, El Camino, Ambriz, Killefer, and Grijalva Building A Deposit 75.00 deposit Non - Orange Based Business 150.00 per hour Orange Based Business 90.00 per hour Non - Resident 50.00 per hour Resident, Non - Profit 30.00 per hour Approved City of Orange Youth Sports Non - Profit Organizations (monitored monthly use)0.00 each 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 20 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY SERVICES 9- 9z 95 9E 97 9E 9S 10( 101 102 10. 104 105 10E 107 10E 105 11C 111 112 113 114 115 11E 117 11E 115 12C 121 122 123 124 125 12E 127 12E 125 13C 131 132 133 134 135 13E 137 13E 13S 14C FEE/CH RATE UNIT NOTES Facilities - Olive & Schafer Deposit 75.00 deposit Non - Orange Based Business 180.00 per hour Orange Based Business 120.00 per hour Non - Resident 60.00 per hour Resident, Non - Profit 40.00 per hour Picnic Areas: Groups 1 -50 People Deposit 50.00 deposit Non - Orange Based Business 240.00 first 5 hours Non - Orange Based Business 60.00 each add'I hr. Orange Based Business 180.00 first 5 hours Orange Based Business 45.00 each add'I hr. Non - Resident 80.00 first 5 hours Non - Resident 20.00 each add'I hr. Resident 60.00 first 5 hours Resident 15.00 each add'I hr. Groups 51 -100 People Deposit 100.00 deposit Non - Orange Based Business 300.00 first 5 hours Non - Orange Based Business 75.00 each add'I hr. Orange Based Business 240.00 first 5 hours Orange Based Business 60.00 each add'I hr. Non - Resident 100.00 first 5 hours Non - Resident 25.00 each add'I hr. Resident 80.00 first 5 hours Resident 20.00 each add'I hr. Groups 101 -200 People Deposit 150.00 deposit Non - Orange Based Business 450.00 first 5 hours Non - Orange Based Business 112.00 each add'I hr. Orange Based Business 390.00 first 5 hours Orange Based Business 97.00 each add'I hr. Non - Resident 150.00 first 5 hours Non - Resident 37.00 each add'I hr. Resident 130.00 first 5 hours Resident 32.00 each add'I hr. Groups 201 or more Deposit 250.00 deposit Non - Orange Based Business 660.00 first 5 hours Non - Orange Based Business 165.00 each add'I hr. Orange Based Business 600.00 first 5 hours Orange Based Business 150.00 each add'I hr. Non- Resident 220.00 first 5 hours Non - Resident 55.00 each add'I hr. Resident 200.00 first 5 hours Resident 50.00 each add'I hr. All Purpose Courts: 21 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY SERVICES 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 16C 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 FEE/CHARGE Lighted RATE UNIT NOTES Non - Resident - per hour 15.00 per hour 2 hour minimum Resident - per hour 10.00 per hour 2 hour minimum Approved City of Orange Youth Sports Non - Profit Organizations 4.00 per hour 2 hour minimum Non - Lighted Non - Resident 15.00 per hour 2 hour minimum Resident 10.00 per hour 2 hour minimum Approved City of Orange Youth Sports Non - Profit Organizations 2.00 per hour 2 hour minimum Athletic Fields: Lighted Deposit 50.00 per hour 2 hour minimum Non - Orange Based Business 135.00 per hour 2 hour minimum Orange Based Business 75.00 per hour 2 hour minimum Non - Resident, Non - Resident Non - Profit 45.00 per hour 2 hour minimum Resident, Resident Non- Profit 25.00 per hour 2 hour minimum Approved City of Orange Youth Sports Non - Profit Organizations 250.00 deposit Approved City of Orange Youth Sports Non - Profit Organizations 9.50 per hour 2 hour minimum Non - Lighted Deposit 50.00 deposit Non - Orange Based Business 105.00 per hour 2 hour minimum Orange Based Business 45.00 per hour 2 hour minimum Non - Resident, Non - Resident Non - Profit 35.00 per hour 2 hour minimum Resident, Resident Non - Profit 20.00 per hour 2 hour minimum Approved City of Orange Youth Sports Non - Profit Organizations 2.00 per hour 2 hour minimum Sports Center at Grijalva Park: Gymnasium Deposit 100.00 deposit Non - Orange Based Business 175.00 per hour Orange Based Business 150.00 per hour Non - Resident, Non - Resident Non - Profit 95.00 per hour Resident, Resident Non - Profit 65.00 per hour Deposit - multi use 250.00 deposit Approved City of Orange Travel Ball / Club / Competitive Youth Sports Non - Profit 65.00 per hour Approved City of Orange Recreation Based Youth Sports Non - Profit 45.00 per hour Classroom A Deposit 40.00 deposit Non - Orange Based Business 50.00 per hour Orange Based Business 40.00 per hour Non - Resident, Non - Resident Non - Profit 30.00 per hour Resident, Resident Non - Profit 20.00 per hour Classroom B 22 MASTER SCHEDULE OF FEES AND CHARGES COMMUNITY SERVICES 182 183 184 185 186 187 188 189 19C 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 21C 211 212 213 214 215 216 217 218 219 220 221 222 223 FEE/CH RATE UNIT NOTES Deposit 40.00 deposit Non - Orange Based Business 50.00 per hour Orange Based Business 40.00 per hour Non - Resident, Non - Resident Non - Profit 30.00 per hour Resident, Resident Non - Profit 20.00 per hour Classroom AB Deposit 75.00 deposit Non - Orange Based Business 100.00 per hour Orange Based Business 80.00 per hour Non - Resident, Non - Resident Non - Profit 60.00 per hour Resident, Resident Non- Profit 40.00 per hour Dance Room Deposit 75.00 deposit Non - Orange Based Business 100.00 per hour Orange Based Business 80.00 per hour Non - Resident, Non - Resident Non- Profit 60.00 per hour Resident, Resident Non - Profit 40.00 per hour Senior Citizen Center: Large Banquet Room Deposit 500.00 deposit Non - Orange Based Business 600.00 1st 5 hours Non - Orange Based Business 120.00 each add'I hr. Orange Based Business 600.00 1st 5 hours Orange Based Business 120.00 each add'I hr. Non - Resident 600.00 1st 5 hours Non - Resident 120.00 each add'I hr. Resident 500.00 1st 5 hours Resident 100.00 each add'I hr. Meeting Rooms: Deposit 75.00 deposit Non - Orange Based Business 50.00 per hour Orange Based Business 50.00 per hour Non - Resident, Non - Resident Non - Profit 50.00 per hour Resident, Resident Non - Profit 30.00 per hour Cancellations (excluding Senior Center large banquet room): 30 Days Prior to Event Full refund less $10.00 29 to 14 Days Prior to Event Full refund less $50.00 13 Days Prior to Event or Fewer Forfeit Rental Fee Cancellations (Senior Center large banquet room): Written, 60 Days Prior to Event Full refund less $10.00 Written, 59 to 45 Days Prior to Event Full refund less $100.00 44 Days Prior to Event or Fewer Forfeit Rental Fee 23 MASTER SCHEDULE OF FEES AND CHARGES FINANCE FEE/CH RATE UNIT NOTES Returned Check Charge -1st check 25.00 each Returned Check Charge - subsequent check 35.00 each Accounts Receivable Delinquent Penalty The Finance Director or his designee shall have the authority to waive a penalty fee on a case by case basis when appropriate.) After 30 Days 20% outstanding balance After 60 Days 30% outstanding balance Business Licenses: New Business License Application 56.00 each Annual Renewal Processing Fee: Paper 26.00 each Online 11.00 each Duplicate Certificate 10.00 each Change of Location 10.00 each Massage Permit - includes material + inspection 199.00 each Initial Regulatory Permit Application 75.00 each Secondhand Dealer Renewal Permit 30.00 each Police Regulatory Permit Review 15.00 each Delinquent Penalty 25%per month Not to exceed 100% Non - compliance Penalty: After 90 Days for Renewals 50.00 each After 45 Days for New Applicants 50.00 each 10 11 12 13 14 15 16 17 18 19 20 21 24 MASTER SCHEDULE OF FEES AND CHARGES FIRE FEE/CH RATE UNIT NOTES Paramedic Services Annual Paramedic Subscription Program 48.00 per year Basic Life Support (BLS)405.00 per call Advanced Life Support (ALS)508.00 per call Transport Fees 1,013.84 each Oxygen 85.91 each Mileage 17.52 per mile Basic Medical Supplies 33.91 each Late Fees for Haz Mat Disclosure After 30 days 20% annual disclosure fee Incomplete form submittal after 30 days 20% annual disclosure fee After 45 days Additional 30% annual disclosure fee Incomplete form submittal after 45 days Additional 30% annual disclosure fee Hazardous Materials Specialist consultation charge for failure to disclose 60.00 each Penalty for failure to comply with precautions against fire and the spread of fire 350.00 each False Alarms Excess of 1 alarm in any 30 day period 174.00 each Excess of 2 alarms in any 6 month period 174.00 each Failure to Notify of Testing or Work on System 174.00 each Valid Code Complaint (billed to violator)actual cost Apartment Units 3 or more 28.00 per unit ANNUAL FIRE PERMITS: Inspections: Waste Handling - Including Wrecking Yards, Junk Yards, and Waste Material Handling 237.00 each Open Burning - Excluding Recreational Fires 178.00 each Open Flames & Candles 178.00 each Cellulose Nitrate Film in Group A Occupancy 35.00 each Combustible Fiber Storage or Handling in Excess of 100 Cubic Feet 158.00 each Cryogenics Fluids Not Requiring Hazardous Materials Disclosure 35.00 each Dry Cleaning 158.00 each Dust Producing Operation - Combustible Dust 79.00 each Repair Garages - Includes Associated Fuel Dispensing 39.00 each High Piled Storage in Excess of 500 Square Feet 118.00 each Lumber Yard or Woodworking Plant 197.00 each Magnesium - Melting, Casting, Heat - Treating or Grinding an Amount in Excess of 10 Pounds 72.00 each Organic Coatings - Production in Excess of 1 Gallon per Day 107.00 each 1 2 3 4 5 6 7 8 9 1C 11 12 13 14 15 16 17 18 1s 2C 21 22 23 24 25 26 27 28 2s 3C 31 32 33 34 35 36 25 MASTER SCHEDULE OF FEES AND CHARGES FIRE 37 3E 3S 4C 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 26 Ovens, Industrial Baking or Dry RATE 79.00 UNIT each NOTES Tank Vehicles 35.00 each Temporary Membrane Structures and Tents 178.00 each Hot Work; or Cutting or Welding 39.00 each Explosives - Explosive Materials, Fireworks or Pyrotechnic Special Effects 263.00 per hour 2 hour minimum Flammable or Combustible / Liquid Pipeline Operation / Excavation 248.00 per hour 2 hour minimum High Rise Building - Less than 75 Ft. in Height 1,190.00 each High Rise Building 1,428.00 each Mall Buildings, Covered or Open - Placement of Fixtures, Displays or Equipment; Display of Liquid or Gas -Fired Eqiupment; or Use of Open -Flame or Flame- Producing Equipment Temporary Kiosks 119.00 each Open flame / flame producing devices 119.00 each Parade Floats 33.00 each Places of Assembly 158.00 each Spraying or Dipping - Utilization of Flammable or Combustible Liquids or Combustible Powder 79.00 each Tire Rebuilding Plant 72.00 each Care Facilities: 7 -99 Occupants 268.00 each 100 -199 occupants 357.00 each 200+ occupants 387.00 each New Facility Inspection Fee:0.00 25 clients or less 357.00 each 26+ clients 387.00 each Hospitals & Convalescent:0.00 1 -99 beds 268.00 each 100 -199 beds 394.00 each 200+ beds 427.00 each Day Care Facilities 178.00 each General Use Permits 125.00 per hour Fireworks Display - min 2 hours 263.00 per hour 2 hour minimum Spill Response: Up to 5 gallons 753.00 each Over 5 gallons actual cost After Hours Work Fire Safety Specialist 178.00 per hour 2 hour minimum After Hours Work Hazardous Materials Specialist 205.00 per hour 2 hour minimum After Hours Work Fire Captain 259.00 per hour 2 hour minimum Re- inspection Fee for Rejected Prevention Division Inspection 151.00 each Report Fees 43.00 each Non - Criminal Cause & origin Investigators Report 150.001 per hour Non - Criminal Misc. Investigators Report 150.001 per hour Non - Criminal SFD Investigators Report 150.001 per hour 37 3E 3S 4C 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 26 MASTER SCHEDULE OF FEES AND CHARGES 91.14 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 10C 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 FEE/CH RATE UNIT NOTES Non - Criminal Commercial Occupancy Investigators Report 150.00 per hour Standby Time Hazardous Materials Specialist 124.00 per hour 2 hour minimum Change Contents 429.00 per hour 2 hour minimum Store, Handle, Use Sell 429.00 per hour Review RMMP Plans 131.00 per hour Hazardous Materials - Disclosure Fees: 1 material 208.00 each 2 -4 materials 332.00 each 5 -9 materials 455.00 each 10 -15 materials 517.00 each 16 -20 materials 610.00 each 21 -25 materials 765.00 each 26 -30 materials 858.00 each 31 -44 materials 951.00 each 45+ materials 1,075.00 each Underground Tanks: 1 tank 539.00 each 2 tanks 663.00 each 3 tanks 787.00 each 4 tanks 911.00 each 5 tanks 1,035.00 each Class I or II liquids Removal 248.00 each To install, alter, remove, abandon, or temporarily place out of service 124.00 each To change type of contents to a material other than designed for - 2 hour min - per hour 124.00 per hour 2 hour minimum Plan Check Hazmat Fee 137.00 per hour Existing Tank Monitoring System Restart 547.00 each Aerosol Products - Level 2 or 3 in excess of 500 pounds 118.00 each Amusement Building 328.00 each Aviation Facility 355.00 each Carbon Dioxide System Exceeding 100 pounds of CO2 Used in Beverage Dispensing Application 118.00 each Carnival or Fair 263.00 per hour 2 hour minimum Compressed Gas Not Requiring Hazardous Materials Disclosure 118.00 each Exhibits & Trade Shows - Min 2 hours 263.00 per hour 2 hour minimum Flammable & Combustible Liquids 118.00 each Floor Finishing - in Excess of 350 Sq. Ft. Using Class I or II liquids 131.00 each Fruit & Crop Ripening - Using Ethylene Gas 118.00 each Fumigation & Insecticidal Fogging 66.00 each Hazardous Materials Not Requiring Hazardous Materials Disclosure 118.00 each Hazardous Production Materials Facility 263.00 each Liquid or Gas - Fueled Vehicle(s) in an Assembly Building 131.00 each 27 MASTER SCHEDULE OF FEES AND CHARGES FIRE 117 118 119 12C 121 122 123 124 125 126 127 128 129 13C 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 28 FEE/CHARGE Liquid Propane Gas Not Requiring Hazardous Materials Disclosure RATE 118.00 UNIT each NOTES Miscellaneous Combustible Storage in Excess of 2,500 Cubic Feet 118.00 each Open Flame or Torch - Removal of Paint or Use within a Wildfire Risk Area 66.00 each Private Fire Hydrant - Use or Removal from Service (1 hour min)131.00 per hour 1 hour minimum Pyrotechnic Special Effects Material - Use or Handling (1 hour min)131.00 per hour 1 hour minimum Pyroxylin Plastics - Storage or Handling in Excess of 25 Pounds; or Assembly or Manufacture of Products containing Pyroxylin Plastics 237.00 each Refrigeration Equipment Regulated by CFC Ch. 6 118.00 each Rooftop Heliport 118.00 each Storage of Scrap Tires & Tire Byproducts - Exterior Storage Exceeding 2,500 Cubic Feet; or Indoor Storage of Any Amount 237.00 each Wood Products - Storage of Chips, Hogged Material, Lumber or Plywood in Excess of 200 Cubic Feet 118.00 each Activity Related to Motion Picture, Television, or Commercial Production - Change of Building Use or Occupancy; Attendance of Live Audience; Wrap Party; Use of Pyrotechnic Special Effect; Open Flame; Use of Flammable or Combustible Liquid or Gas;131.00 each 2nd and subsequent Re- Inspection for Same Violation.247.00 each FIRE CONSTRUCTION PERMITS: Fire Protection Systems: New: 1 -5 devices 744.00 each 6 -15 devices 929.00 each 16 -30 devices 1,239.00 each 31 -50 devices 1,735.00 each 50+ devices - per device 57.00 per device Modifications: 1 -5 devices 496.00 each 6 -15 devices 558.00 each 16 -30 devices 806.00 each 31 -50 devices 1,026.00 each 50+ devices - per device 57.00 per device Fire Sprinklers - 13 / 13D / 13R: New Construction: Up to 50 Heads 1,115.00 each 50 -100 Heads 1,549.00 each Each additional 50 heads or portion thereof 248.00 each Tenant Improvements / Modifications: Up to 50 Heads I 620.00 each 28 MASTER SCHEDULE OF FEES AND CHARGES FIRE 15C 151 152 153 154 155 15E 157 158 159 16C 161 162 163 164 165 16E 167 168 169 17C 171 172 173 174 175 17E 177 178 17S 18C 181 182 183 184 185 FEE/CH RATE UNIT NOTES 50 -100 Heads 806.00 each Each additional 50 heads or portion thereof 248.00 each Preaction Fire Sprinklers: New Construction: Up to 50 Heads 1,641.00 each 50 -100 Heads 1,915.00 each Each additional 50 heads or portion thereof 274.00 each Tenant Improvements / Modifications: Up to 50 Heads 889.00 each 50 -100 Heads 1,231.00 each Each additional 50 heads or portion thereof 274.00 each Underground Private Fire Service Line 1,425.00 each Hood Suppression Systesm 496.00 each Spray Booths 620.00 each Clean Agent Systems 957.00 each Smoke Control Systems 2,231.00 each Fire Pumps 1,368.00 each Standpipe System 752.00 each High Piled Storage 744.00 each Dry Cleaning 547.00 each Dust Production 684.00 each Industrial Ovens 684.00 each High Rise Building - Base (includes 6 floors)2,736.00 each High Rise Building - per additional floor 274.00 each Temporary Membrane Structures and Tents 616.00 each Ta n ks: Underground Tanks: First Tank 1,983.00 each Each additional tank 410.00 each Aboveground Tanks: First Tank 744.00 each Each additional tank 274.00 each Fuel Modifications 867.00 each Special Events Application 103.00 each Miscellaneous Plan Review - per hour 137.00 each Miscellaneous Services and Materials actual cost 29 MASTER SCHEDULE OF FEES AND CHARGES LIBRARY f c 1C 11 12 1: 14 1E 1E 17 1E 15 2C 21 22 23 24 25 2E 27 2E 29 3C 31 32 33 34 35 36 37 38 39 30 FEE/CHARGE Lost Library Card RATE 2.00 UNIT each NOTES Inter - library loan 2.00 each Processing Fees Damaged & Lost Materials 5.00 each Local History Reproduction Commercial Use + Processing Fee 60.00 each Personal Use 0.00 each Printing & Photocopying Black & White 0.15 per copy Color 0.35 per copy Extended Use Books, Magazines, CDs 0.25 per day DVDs 1.00 per day Inter - library loan 1.00 per day Laptop 10.00 per hour Holds not picked up 0.50 per item Facility Rentals El Modena Community Room, Orange Public Library & History Center Room A, Orange Public Library & History Center Room B, Rotary Room, Taft Community Room Non - Profit in Orange 40.00 per hour 2.5 hour minimum Non - Profit outside of Orange 45.00 per hour 2.5 hour minimum For Profit in Orange 55.00 per hour 2.5 hour minimum For Profit outside of Orange 65.00 per hour 2.5 hour minimum Orange Public Library & History Center Room A & B Non - Profit in Orange 65.00 per hour 2.5 hour minimum Non - Profit outside of Orange 70.00 per hour 2.5 hour minimum For Profit in Orange 75.00 per hour 2.5 hour minimum For Profit outside of Orange 80.00 per hour 2.5 hour minimum Equipment Rental TV /VCR Deposit 100.00 deposit Non - Profit in Orange 20.00 each Non - Profit Outside of Orange 25.00 each For Profit in Orange 30.00 each For Profit Outside of Orange 35.00 each Microphone Deposit 100.00 deposit Non - Profit in Orange 20.00 each Non - Profit Outside of Orange 25.00 each For Profit in Orange 30.00 each For Profit Outside of Orange 35.00 each f c 1C 11 12 1: 14 1E 1E 17 1E 15 2C 21 22 23 24 25 2E 27 2E 29 3C 31 32 33 34 35 36 37 38 39 30 MASTER SCHEDULE OF FEES AND CHARGES POLICE FEE/CHARGE RATE UNIT NOTES Retail Establishment Inspection- Firearms Initial Inspection 221.00 each Annual Inspection 88.00 each Other Fees Reports - Basic 24.00 each Reports - Redacted 41.00 each Extensive Reports (more than 75 pages)82.00 each Copies of Citations - per citation 6.00 each Photos on DVD 46.00 per DVD Immigration Clearance Letter 27.00 each Fingerprints (livescan)31.00 each Vehicle ID Verification - per vehicle 73.00 each Citation Validation 27.00 each OMC / CVC Tow Release 190.00 each Vehicle Repossession 14.00 each Private Property Impound 18.00 each Civil Subpoena 15.00 each Witness Fee 275.00 deposit per day Per Gov't Code 68096.1, billed at actual cost Bike License: New Bike License 4.00 each Renewal Bike License 2.00 each ABC License (Alcoholic Beverage License); fee includes costs to conduct background investigation required by the ABC Dept and to process the application New ABC License Application 7,500.00 deposit Billed at actual cost Renewal ABC License Application 53.00 each Massage Operator Testing Service Background Information 91.00 each Testing Cost (initial or retake)91.00 each Tow Truck Driver ID Card Fee 63.00 each On Street Parking of Oversized Vehicles Annual Permit / Sole Means of Transportation 15.00 per year Seven -Day Visitor Permit 27.00 each 30 -day Impound Release 239.00 each Business Parking Permit 30.00 each Residential Parking Permit Single - Family (up to 5 permits per household)30.00 each Duplex (Up to 4 permits per household)30.00 each 3+ Units / Apartments (Up to 3 permits per household)30.00 each Landlord Permit (Up to 1 permits per household)29.00 each Chapman Parking Permit 30.00 per student, per year Purge Letter 27.00 each U -Visa Nonimmigrant status certification 190.00 leach OPM Background Check 27.00 leach 1 2 3 4 5 6 7 E 9 1C 11 12 13 14 15 16 17 12 19 2C 21 22 23 24 25 2E 27 2E 2S 3C 31 32 33 34 35 3E 37 3E 3S 4C 41 4i 31 MASTER SCHEDULE OF FEES AND CHARGES POLICE FEE/CHARGE Re- inspection Fee (upon 3rd inspection) RATE 97.00 UNIT 1 per hour NOTES Tow Truck Driver ID Card Fee - Renewal 54.00 each 2nd Appeal of Citation 86.00 each Business License Review 151.00 each FINES: Parking Fines 65.00 each Handicapped Fine 300.00 each Commercial Vehicle in Residential Areas 100.00 each Seventy -Two Hour Parking 150.00 each Party Calls / Noise Disturbance actual cost False Alarms: 1st False Alarm 0.00 each 2nd False Alarm 0.00 each 3rd False Alarm 150.00 each 4th False Alarm 200.00 each 5th False Alarm 200.00 each 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 32 MASTER SCHEDULE OF FEES AND CHARGES PUBLIC WORKS - ENGINEERING DIVISION FEE/CH RATE UNIT NOTES DEVELOPMENT SERVICES: Lot Line Adjustment 1,812.00 each Certificate of Compliance 1,812.00 each Certificate of Correction / Amended Map 1,812.00 each Process Grading Application 168.00 each Encroachment Permits: Process Encroachment Application 140.00 each Driveways - non - arterial 399.00 each Driveways - arterial 797.00 each Sidewalk 344.00 each Streetwork /Trench Repair: 0 -100 feet 630.00 each 101 -300 feet 911.00 each 301 -500 feet 1,490.00 each 501 -1000 feet 2,170.00 each 1,001 -1,500 feet 2,736.00 each 1,501 -2,000 feet 3,207.00 each Minor Encroachment Permit 231.00 each Utility Lateral for house connection on residential streets 689.00 each Fire Service Connection 1,354.00 each ENGINEERING SERVICES: Flood Zone Written Notice 204.00 each Street Addressing 498.00 each Summary Abandonment 1,300.00 each Full Abandonment 1,300.00 each Quit Claims 1,300.00 each Simple Research & CD Prep 95.00 each Map Sheets 63.00 each Sewer Frontage Charges - per I.f.69.00 per linear foot Irregularly shaped lots will be evaluated on a case by case basis DEPOSIT -BASED FEES: Tract Development 10,000.00 deposit Billed at actual cost Tract or Parcel Map (Map Only)2,000.00 deposit Billed at actual cost Non - Priority Water Quality Management Plan (WQMP) Review 500.00 deposit Billed at actual cost Priority Water Quality Management Plan (WQMP) Review 1,000.00 deposit Billed at actual cost Grading Plan Review & Inspection 3,000.00 deposit Billed at actual cost Large Encroachment Projects or Streetwork / Trenchwork 2,001 ft. or greater 5,000.00 deposit Billed at actual cost Extensive Research 500.00 deposit Billed at actual cost 1 2 4 5 E 7 F c 1C 11 12 13 14 15 1E 17 1E 1S 2C 21 22 23 24 25 2E 27 2E 29 3C 31 32 33 34 35 36 37 33 MASTER SCHEDULE OF FEES AND CHARGES PUBLIC WORKS - MAINTENANCE DIVISION FEE/CHARGE Initial Inspection & Application - Mail Carriers, Newspaper Racks, Drop Off Boxes, Recycling Bins, etc. RATE 100.00 UNIT NOTES Renewal Inspection - all boxes 45.30 each Removal of Abandoned Shopping Cart 36.00 each Banner Installation & Removal 200.00 each Graffitti Removal: 0 -50 sq. ft.110.00 up to 50 sq ft. Each addl sq. ft.0.57 add'I sq. ft. Old Towne Plaza Sidewalk Cleaning 0.86 each Tree Removal 37.00 per inch Tree Planting 255.00 per 24 in box Itree 10 11 34 MASTER SCHEDULE OF FEES AND CHARGES PUBLIC WORKS - TRAFFIC DIVISION Neighborhood Permit Parking Program Application RATE 1,000.00 UNIT each NOTES Neighborhood Permit Parking Program Processing Fee 1,500.00 each Transportation Permit Per Trip 16.00 each Annual 90.00 each DEPOSIT -BASED FEES: Transportation Demand Management Review and Development Fee 500.00 deposit Billed at actual cost Traffic Commission Appeal 500.00 deposit Billed at actual cost TSIP Appeal Fee 500.00 deposit Billed at actual cost Street Name Change 1,000.00 deposit Billed at actual cost10 35 MASTER SCHEDULE OF FEES AND CHARGES PUBLIC WORKS - WATER DIVISION FEE/CHARGE RATE UNIT NOTES FLAT FEES: Plan Check & Inspection Fee Water Service, no on -site water facilities 399.00 each Broken Curb Stop 186.00 each Pull Water Meter 136.00 each Utility Account Establishment 50.00 per account As of Last Read Establishment Fee 20.00 per account Reconnection Fee - during business hours 70.00 each After Hours Reconnection Surcharge 50.00 each Meter Testing 177.00 deposit Billed at actual cost Research Fee 23.00 each Monitoring Well Permit 106.00 per application Returned Payment Processing Charge 25.00 each Service Call / Door Hanger 35.00 each Delinquent Surcharge 30.00 each Backflow Prevention Inspection 118.00 each Water Collection Delinquent Penalty (After 25 Days)10% outstanding balance City Sanitation Services Delinquent Penalty (After 25 Days)10% outstanding balance DEPOSIT -BASED FEES: Plan Check & Inspection Fees: Small Development, no on -site water pipeline 2,000.00 deposit Billed at actual cost New development with on -site piepline 4,000.00 deposit Billed at actual cost Metered Services (complete installation by city) 3/4"3,500.00 deposit Billed at actual cost 1 4,000.00 deposit Billed at actual cost 15"4,500.00 deposit Billed at actual cost 2"5,000.00 deposit Billed at actual cost Hot Taps by City (Trench Excavation by contractor) 4" Laterals 2,600.00 deposit Billed at actual cost 6" Laterals 3,200.00 deposit Billed at actual cost 8" Laterals 4,200.00 deposit Billed at actual cost 10" Laterals 5,000.00 deposit Billed at actual cost 12" Laterals 5,800.00 deposit Billed at actual cost Construction Meter Charges Daily Rental Fee 2.75 per day 2 1/2" Meter Installation Charge 1,500.00 deposit Billed at actual cost 4" Meter Installation Charge 3,000.00 deposit Billed at actual cost 6" Meter Installation Charge 5,000.00 deposit Billed at actual cost 1 2 3 4 5 E 7 8 9 1C 11 12 13 14 15 1E 17 1E 19 2C 21 22 23 24 2E 2E 2i 2E 2S 3C 31 32 32 34 35 3E 37 3E 36