Loading...
RES-11170 Measure M2 Seven-Year CIP_FY 2019-20 thru 2025-26RESOLUTION NO. 11170 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ORANGE TO APPROVE AND AUTHORIZE STAFF TO SUBMIT TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY THE MEASURE M2 SEVEN-YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEAR 2019-20 THROUGH 2025-26 TO COMPLY WITH MEASURE M2 ELIGIBILITY CRITERIA. WHEREAS, an annual submittal of Measure M2 eligibility documentation to the Orange County Transportation Authority (OCTA) is required to remain eligible to receive Measure M2 sales tax revenue funds; and WHEREAS, the submittal documentation requires the City Council approval of an updated Measure M2 Seven-Year Capital Improvement Program; and WHEREAS,the City's Measure M2 Seven-Year Capital Improvement Program for fiscal year 2019-20 through 2025-26 is a transportation planning and fiscal forecasting document used to guide future programming for transportation capital improvement projects; and WHEREAS,the Measure M2 Seven-Year Capital Improvement Program emphasizes projects that improve circulation,mitigate traffic congestion,and maintain the City's investment in existing transportation infrastructure; and WHEREAS, the Measure M2 Seven-Year Capital Improvement Program is consistent with the proposed citywide Capital Improvement Program budget and the City's General Plan; and WHEREAS, the City's M2 Seven-Year Capital Improvement Program includes 53 projects with a total preliminary projected budget requirement of$57,736,546 million over the seven-year period; and WHEREAS,the Measure M2 Seven-Year Capital Improvement Program projects are attached as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Orange hereby approves and authorizes staff to submit to OCTA the Measure M2 Seven-Year Capital Improvement Program for Fiscal Years 2019-20 through 2025-26 to comply with Measure M2 eligibility criteria. ADOPTED this l lth day of June 2019. Mark A. Murphy, Mayor, y range ATTEST: Pamela Coleman, City Clerk, City of Orange STATE OF CALIFORNIA ) COUNTY OF ORANGE ) CITY OF ORANGE I, PAMELA COLEMAN, City Clerk of the City of Orange, California, do hereby certify that the foregoing Resolution was duly and regularly adopted by the City Council of the City of Orange at a regular meeting thereof held on the l lth day of June,2019, by the following vote: AYES: COiJNCILMEMBERS: Alvarez, Murphy,Nichols, Monaco NOES: COLTNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None ABSTAIN: COUNCILMEMBERS: None Pamela Coleman, City Clerk, City of Orange 5/30/2019 Measure M Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange Project Name: ADA Imorovements-Access Ramos FUND NAME____P_ERCEN.T_ ESTIMAiED_COST___._P_ROJECTED_COST___NOTES_ s__ CDBG 100.00 1,750,000 1,900,621 Pro)ect Limits: Citywide Gas Tax 0.00 0 0 Project Number: N/A 1,750,000 1,900,621 Type of Work(TOVI: Pedestrian Tow oescr ptoon: Installation of ADA access ramps Project Description: This project will modify curbs at various locations throughout the City to Comply with American with Disability Act(ADA)regulations.This has been an ongoing project,funded with Community Development Block Grants(CDBG) LProiect Phase 19/20 20/21 21/22 22/23 23/24 24/25 25/26' Estimated Cost Proiected Cosf E 25,000 25,000 25,000 25,000 25,000 25,000 25,000 175,000 175,000 R 0 0 0 0 0 0 0 0 0 C/I 225,000 225,000 225,000 225,000 225,000 225,000 225,000 1,575,000 1,725,621 O&M 0 0 0 0 0 0 0 0 0 250,000 250,000 250,000 250,000 250,000 250,000 250,000 51,750,000 1,900,621 agency: Orange Pro)ect Name: Batavia Street/Taft Sianal Network Eutension FUNDJVAME__ PERCENT___ESIIMATED_COS.T_P_ROJECTED_CQST _.NOTES Impact Fees 100.00 170,000 174,636 TSIP Area"B"Design ProJect Limits: Taft Avenue from Shaffer ST to Main St and on Batavia St fr m Taft Ave to Fler.tr.her Ave 170,000 174,636 Project Number: TyPe of Work(Tovh: Traffic Signals Tow oescription: Interconnect tra c signals to improve coordination and communication Pro)ect oescrtptton: The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to Main Street and on Batavia Street from Taft Avenue to Fletcher Avenue ProiectPhase 19/20 20/21 21/22 22/23 23/24 24i25 25l26 Estimated Cost Proiected Cost E 0 17,000 0 0 0 0 0 17,000 17,000 R 0 0 0 0 0 0 0 0 0 C/I 0 153,000 0 0 0 0 0 153,000 157,636 O&M 0 0 0 0 0 0 0 0 0 So S o,000 So SO go So So S 7o,o0o S 77a,s3s 5/30/2019 Measure M 2 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019l2020 through 2025/2026 agency: Orange Pro)ect Name: Biennial Citv Traffic Sianal Coordination FUND_NAME P_ERCENT_ES7IMATED C.OST P_ROJECIED_CQST NOiES_ Gas Tax 0.00 0 0 ProJect Limits: City-WidB M2 LFS 100.00 285,000 312,070 Measure"M2"Turnback Project Number: 5032 285,000 312,070 rype of Work(rovh: Traffic Signals TOw oescrtption: Coordinate signals within project limits Pro)ect oescript on: This project will study traffic signals on the Citys major streets,count 8 analyze traffic flows,& provide appropriate traffic signal timing to minimize delay to drivers.Changes in traffic flows require updating at two year intervals Proiect Phase . 19/20 20/21 21i22 22/23 23/24 24/25 25/26 Estimated Gost Proiected Cost t_ E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 95,000 0 95,000 0 95,000 0 285,000 312,070 08M 0 0 0 0 0 0 0 0 0 SO 95,000 0 95,000 0 95,000 0 285,000 312,070 Agency: Orange t ProJect Name: Bridae Maintenance FUND NAME_ P_ERCENT ESIIMATED_COST___,PRQJECTED_CQSI—NO.T.ES__ __ Gas Tax 0.00 0 0 Project Limits: Various Locations City Wide Other 100.00 723,102 723,102 Caltrans BPMP Pro ect Number: 723,102 723,102 Type of Work(T011l: Bridge row oescr Ptton: Rehabilitation of existing pavemenUstructure Pro,ect oescriptton: A maintenance and retrofit plan are aready for implementation for 8 bridges located throught the City that require maintenance.The City is awaiting Caltrans approval for construction phase Proiect Phase 19I20 20/21 21/22 Y 22/23 V 23/24' 24/25 25/26 Estimated Cost Proiected Cost 1 E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 723,102 0 0 0 0 0 0 723,102 723,102 08M 0 0 0 0 0 0 0 0 0 723,102 0 0 0 0 0 0 723,102 723,102 5/30/2019 Measure M 3 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 nyency: Orange i ProJect Name: Cambridae Storm Drain and Street Imorovements FUNU NAME ___P_ERCENT ___ESTIMAT.ED_COS.T_ _=P_BOJECTED_CO.ST NO_T.ES.____ ___—_ Gas Tax 38.89 0 0 Gas Tax Pro)ect imits: Cambridge Street from Maple Avenue to Palm Other 38.89 0 0 Capital Projects Avenue Project Number: OthO 22.22 0 0 Sanitation&Sewer 0 0 Type of work(TOV1: Safety rOw Description: Improve roadway drainage Project Descriptlon: C.O.P.Fund.Prev.FY1 S/19;This Prj.provides for the design and construction of 700 LF of 60"-72" reinforced concrete pipe with inlets and laterals in Cambridge St from Maple Ave to Palm Ave.This will protect the ex.street from storm water damage Proiect Phase 19120 20/21 21/22, 22/23 23/24 24/25 25l26: Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 p 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ngency: Orange Project Name: Cambridae Storm Drain Imorovements Ph 3 FUND_NI4ME P_ERCENT_____.ESTIMAIED_C.OST PROJEC;fED_C.OST NOTES,_e_ _. __ Other 25.00 857,962 866,184 Capital Projects ProJect Limits: Cambridge St from Maple Ave to Oakmont Ave Other 75.00 2,573,885 2,598,552 Grant Pro)ect Number: 3,437,847 3,464,736 Type of work(rovu): Other TOW Description: Oth@r Project oescr ptton: project will remove and replace a portion of the existing deficient drainage system on Cambridge Street and extend system to its ultimate condition per the Master Plan of Drainage.Including SVeet Repairs Proiect Phase 19/20 20/21 21/22 22l23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 156,774 0 0 0 0 0 0 156,774 156,774 R 0 0 0 0 0 0 0 0 0 C/I 2,631,601 $214,490 428,982 0 p 0 0 3,275,073 3,307,962 O&M 0 0 0 0 0 0 0 0 0 52,788,375 $214,490 428,982 0 0 0 0 53,431,847 3,464,736 5/30/2019 Measure M 4 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange ProJect Name: Cannon Street/Serrano Avenue Intersection FUND_NAME __.dP_ERCENT ESTIMATEDeCOST P_ROJECIED_C.O.S.T_NO:fES r Widenina M210E 7.00 0 0 Grants-Design Projea Lomits: Cannon Street at Serrano Avenue Impact Fees 2.33 0 0 TSIP Area"C" Pro ect Number: 18-ORNG-ICE-3906 Other 52.52 0 0 Unfunded-Construction Other 38.14 0 0 Unfunded-ROW Type of Work(TOVI: Intersection 0 0 TOW Description: Add right turn lane(s)to intersection Project Description: Carry Over FY19/20-This project will add a second dedicated right turn lane on northbound Cannon Street to eastbound Serrano Avenue.The project will also widen the northerly curb face on Serrano Avenue. Proiecf Phase - 9 2o 20 21 21l22 22/23 23/24 24l25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 p _ u R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 o o So So go So o ao a o Agency: Orange Pro ect Name: Catch Basin Screenina FUND_NAME_ PERCENI ESIIMAIED_C.OST_P_ROJECIED_COSI—_NQTES Other 100.00 0 0 Santiation 8 Sewer Project Llmits: City-Wide 0 0 Project Number: N/A Type of work(Tov1: Environmental Cleanup TOW Description: Oth2 Project Description: C.O.P.Fund.Prev.FY18/19;Install new SD facility including catch basin and pipes at various locations citywide.Env.regulations require cities to minimize pollutants entering the SD system.To be used as Match for Future OCTA grant for Water Quality Proiect Phase 19/20 20/21 2'1/22 22/23 23/24 24125 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 So o go o go So So So S o 5/30/2019 Measure M 5__ .. Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange ProJect Name: CDS BMP Installation on Collins Ave FUND NQME.PERCENT ___n_ESi1MAT.ED_COST PROJECTED COST_NOTES Other 20.00 0 0 Sanitation 8 Sewer Pro)ect umits: Colins Ave,100 ft west of Parker Street Unfunded 50.00 0 0 Pursuing M2 ECP-1,Tier 1 Project Number: 0 0 rype of work(To1lh: Environmental Cleanup row oescript on: Continuous Deflection Separator(CDS) Pro)ect oescriptton: Carry Over FY19/20-This project will install a Bio Clean Debris Separationg Baffle Box or equal on Collins Ave, approximatley 100 ft west of Parker Street.The project will aslo install 10 Connector pipe screens on Tustin Ave Proiect Phase 19/20 20/21 21/22 22i23 23/24 24/25 25/26 Estimated Cost . Proiected'Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Agency: Orange ProjectName: Chaoman&Cambridae LeftTum Sianal Modification FUND:NAME.._ __P_ERCENT,.__ESi1MATED_C.O.S.L_P_ROJEC.T.ED_CO.ST,,_N4IES Impact Fees 88.24 375,000 375,000 TSIP Area"B"-Construction Pro)ect umits: Chapman Ave and Cambridge St Intersection Impact Fees 11.76 50,000 50,000 TSIP Area"B"-Design ProJect Number: 425,000 425,000 7ype of work(To1n: Intersection row escription: Upgrade traffic signal equipment at intersection Pro)ect oescriptian: The project will provide for a protected left tum phase for the eastbound,westbound,northbound, and southbound approaches on Chapman Avenue at Cambridge Street. Proiect Phase 19/20 20/21 21/22 22/23 23124 24/25 25I26 Estimated Cost Proiected Cost E 50,000 0 0 0 0 0 0 50,000 50,000 R 0 0 0 0 0 0 0 0 0 C/I 375,000 0 0 0 0 0 0 375,000 375,000 08M 0 0 0 0 0 0 0 0 0 425,000 0 0 0 0 0 0 425,000 425,000 5/30/2019 Measure M 6 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 ayency: Orange Project Name: Cha man and Grand Left Tum Sianal Modification FUNU NAME_ FERCENT_ES71M9TED_C.QST P_ROJEC.T.EDCQST_NQTES Impact Fees 88.89 400,000 400,000 TSIP Area"B"-Construction Pro)ect imits: Chapman Ave and Grand St Intersection Impact Fees 11.11 50,000 50,000 TSIP Area"B"-Design ProJect Number: 450,000 450,000 Type of Work(TOVIn: Intersection TOW oescriptton: Add left turn lane(s)to intersection Pro7ect oescrlption: The project will provide for a protected left turn phase for the eastbound and westbound approaches on Chapman Avenue at Grand Street. The proposed signal modification will enhance the capacity and improve the traffic signal operation at the interser.tinn Proiect Phase 19/20 20/21 21/22 22/23 23/24 24l25 25/26 Estimated Cost Proiected Cost E 50,000 0 0 0 N 0 0 0 50,000 50,000 R 0 0 0 0 0 0 0 0 0 cn aoo,000 o o go go o o aoo,000 aoo,aoo O&M 0 0 0 0 p 0 0 0 0 450,000 0 0 0 0 0 0 450,000 S 450,000 Agency: Orange Pro)ect Name: Chaoman and Lemon Left Turn Sianal Modification FUND NAME_ __P_ERCENT _ESiIMATED_C9ST eROJECiEDC.O.ST NUTES Impact Fees 88.89 0 0 TSIP Area"B"-Construction Pro)ect imits: Chapman Ave and Lemon St Intersection Im act Fees 11.11 0p 0 TSIP Area"B"-Design Projeet Number: 0 0 Type of Work(TOVI: Inte section row Description: Upgrade traffic signal equipment at intersection aro(ect nescr ptton: Carry Over Project Funding Previous to FY18/19;The project will provide for traffic signal upgrades at the intersection to enhance the capacity and improve traffic signal operation at the intersection. Proiect Phase 19/20 20/21 21/22 22i23 23/24 24/25 25/26 Estimated Cost Proiected Cost r E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 cn o o o go go o go o o O&M 0 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 b 0 5/30/2019 Measure M Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange i Project Name: Chapman Ave&Batavia St Left Tum Signal FUND NAME______ _ PERCENT_ __ESTIMATED.CO.SL____P_ROJECTED_COS.L __NOTES______ _ ______ _ _ M dificatinn HSIP 89.99 0 0 HSIP Construction Pro7ect Limits: gatavia St and Chapman Ave Intersection HSIP 10.01 0 0 HSIP Design ProJect Number: 0 0 Type of Work(TOVI: IntefSeCtlOn TOW Descrfption: OthBf Pro7ect Description: Carry Over Project Funding Previous to FY18/19;The project will provide for a protected left tum phase for the northbound and southbound approaches on Batavia Street at Chapman Avenue to improve the operational e ciency and enhance safety. Proiect Phase 19/20 20/21 21122 22l23 23l24 24/25 25/26 Estimated Cost Proiected Cost g f ._e..m._...._..._.._....,_ m. e.....e.,i E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Agency: Orange 3 Project Name: Chapman Ave 8 Feldner Rd Left Tum Signal FUND NAME____ __P_ERCENT_____.ESTIMATED GQST__ __P_ROJECiED CO.ST _NOTES___ ___ __ _—__ _ __ Modification General Fund 0.00 0 0 aro)ect umits: Chapman Avenue and Feldner Road Intersection HSIP 83.90 0 0 HSIP(Construction) Project Number: HSIP 16.10 0 0 HSIP(Design) 0 0 Type of work(Tow): intersection row nescription: Upgrade traffic signal equipment at intersection Project Description: Carry Over Project Funding Previous to FY18/19;The project will provide for a protected left turn phase for the northbound and southbound approaches on Feldner Rd at Chapman Ave to improve operational efficiency and enhances safety. Pro ticePhase19/20 20/21 21l22 22/23 23/24 24/25 25J26 Estimated Cost Proiected Cost L_ E 0 0 0. 0 V 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5/30/2019 Measure M Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange ProJect Name: Chapman Ave&Flower ST Left Tum Signal FUNU NAME P_ERCENT ESTIMATED COST_P_ROJECIED_COST_NOTES Mndifiratinn HSIP 83.90 0 0 HSIP Construction Pro)ea umits: Flower St and Chapman Ave Intersection HSIP 16.10 0 0 HSIP Design ProJect Number: 0 0 Type of Work(TOYI: I t2 SBctiatl roW oescription: Upgrade traffic signal equipment at intersection Project Description: Carry Over Project Funding Previous to FY18/19;The project will provide for a protected left turn phase for the northbound and southbound approaches on Flower St at Chapman Ave to improve operational efficiency and enhance safety Proiect Phase 19/20 20/21 21/22 22/23 23/24 24/25 25l26 Estimated Cost Proiected Cost E 0 0 $0 $0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 p 0 0 0 0 So So so so go So o sa a o ayency: Orange ProJect Name: Chapman Ave&James St Left Tum Signal FUNDNAME_ PERCENT v_ESTIMAiED_C.OS?P_ROJECTED_CQST NOTES Mndification M2 LFS 10.00 0 0 Measure M2 Project umits: Chapman Ave&James St Intersection HSIP 90.00 0 0 Federal HSIP ProJect Number: N/A 0 0 Type of Work(TOYI: I tefSBctlOtl row escriptoon: Upgrade traffic signal equipment at intersection Project Descr ption: C.O.P.Fund.Prev.FY18/19;Installation of protected left turn phasing for the WB approach on Chapman Ave at James St.Improvements,when const.will improve the traffic flow 8 safety at the inter.for both vehicles&ped.by clearly defining RW Pro iect Phase 9 20 20/21 21/22 22/23 23/24 24 25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5/30/2019 Measure M 9 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 ayency: Orange Pro)ectName: ChaomanlTustinCriticallntersection FUND.NAME__ ___P_ERCENT ESTIMAT.ED_CO.ST ___PROJECTED_COST_._.NOTES.__ . _._—__ _____ __.u ._ M2 ICE 45.65 0 0 M2-CTFP Project Limits: Chapman Avenue and Tustin Street Intersection Impact Fees 54.35 0 0 TSIP Area"B" Project Number: 15-ORNG-ICE-3780(E-R),17-ORNG-ICE-3866(C) Other 0.00 0 0 0 0 Type of Work(TOUI: Intefsection Tow oescript on: Add right turn lane(s)to intersection ProJect oescription: Carry Over Project Funding Previous to FY18/19; Phase I improvements were completed in 2006/07. Phase II improvements were completed in 2011. This phase will add a right turn lane on South Tustin Street to westbound Chapman Avenue. rProiect Phase 19/20 20/21 21l22 22/23 23/24 24/25 25/26 Estimated Cost Projected Cost j E--- -- 0 ---- $O. _..._._..$O O 0..._. $ —__._ $0_ $0 _ -- $0 _ __ R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08 M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Agency: Orange Pro ect Name: Clinton Street Rehabilitation FUND_NAMEaa___ __P,ERCENT ____ESIIMATED COST TPROJECTED_C.OST.__NOIES_ __--.______..___; CDBG 100.00 171,083 171,083 Pro)ect Limits: linton Street from Walnut Avenue to Palm Avenue 177,083 171,083 Project Number: Type of work(Tow): Road Maintenance Tow oescr ptton: Rehabilitation of roadway Pro)ect Descrlptlon: This project will rehabilitate Clinton Street from Walnut Avenue to Palm Avenue The rehabilitation will consist of removing and reconstructing badly damaged pavement,cold planing,and capping the roadway. Proiect Phase 19l20 20/21 21/22 22/23` 23/24- 24l25 25/26 — Estimated Cost Proiected Cost _ Y I E 28,514 0 0 0 0 0 0 28,514 28,514 R 0 0 0 0 0 0 0 0 0 C/I 142,569 0 0 0 0 0 0 142,569 142,569 O&M 0 0 0 0 0 0 0 0 0 5177,083 0 0 0 0 0 SO 171,083 171,083 5/30/2019 Measure M o Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 ayency: Orange ProJect Name: East Palmvra Avenue Rehabilitation FUND_NAME P_EBCEN7 ESTJMAiED_CQST P_RQJECIED_CQST_NOTES_ —_—_ Gas Tax 100.00 0 0 Gas Tax Pro)ect umits: palmyra Avenue from Grand Street to Cambridge Street 0 0 ProJect Number: Type of work(roV: Road Maintenance Tow nescription: Rehabilitation of roadway Project nescription: Carry Over Project Funding Previous to FY18/19; This project will rehabilitate Palmyra Ave from Grand St to Cambridge St by removing and reconstructing locally damaged pavement along with cold planning and capping the rest of the roadway. Project Phase 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 o go o o go so go o a o Agency: Orange Pra)ect Name: Garden Grove Blvd Regional Tra c Signal FUNU NAME P_ERCENT ESIIMAiED_COST PROJECIED_CQS.T___NOiES Svnr.hronizatinn Proier.t M2 TSSP 100.00 0 0 TSSP Area"B"Construction ProJect umits: Garden Grove Blvd,from Lewis St to The City Dr. 0 0 Projeot Number: 18-OCTA-TSP-3897 ryPe of work(rov: Traffic Signals roW escription: Interconnect traffic signals to improve coordination and communication Pro)ect escriptian: Carry Over-The Garden Grove Blvd T.S. Synchronization Corridor is a multi-jurisdictional project between Valley View St.t in Garden Grove and Bristol St in Santa Ana.In Orange,there are two traffic signals a located at Lewis St. and at The City Dr. ProiectPhase 9 20 20121 21l22 22/23 23/24 24/25 25/26` Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 ^ $0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 So o So o go o o So S o 5/30/2019 Measure M _ Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 agency: Orange I Project Name: Glassell and Palmvra Sianal Install FUND NAME P_ERCENI__ESTIMATEDCOST P_ROJECTED_C.OST.NOTES i„. Other 100.00 369,100 400,868 Grant Project umits, Glassell St at Palmyra Ave 369,100 400,868 Project Number: Type of Work(TOVI: Tlaffic SIgf181S row oescripNon: Install new traffic signal and equipment Project nescriptoon: project will provide for the installation of a traffic signal at the intersection of Glassell St and Palmyra Ave.Work includes installation of signal poles, associated equipment,and ADA ramps Proiect Phase 19/20 20/21 21l22 22/23 23/24 24l25 25l26 Estimated CosY° Proiected Cost E 0 0 30,000 0 0 0 0 30,000 30,000 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 339,100 0 0 0 339,100 370,868 08M 0 0 0 0 0 0 0 0 0 0 0 30,000 339,100 0 0 0 369,100 3 400,868 Agency: Orange Project Name: Glassell St and Collins Ave Left Tum Phasing FUND_NQME __PERCENT ESIIMATED C.O.ST PROJECTED COST,_NOTES Modifir,ation HSIP 85.00 0 0 HSIP Construction Pro)ect Llmits: GlasselUCollins Intersection HSIP 15.00 0 0 HSIP Design ProJect Number: 0 0 Type of Work(TONn: IfltefSeCtlOf1 row nescription: Upgrade traffic signal equipment at intersection aroject Descr ptton: Carry Over Project Funding Previous to FY18/19;The project will provide for a protected left tum phase for the northbound and southbound approaches on Glassell at Collins Ave. i Project Phase 19l20 20/21 21/22 22i23 23/24 24/25 • 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/1 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 ao So so o go So So so g o 5/30/2019 Measure M 12 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange Pro)ect Name: Glassell St and Meats Ave Left Tum Phasing FUND_NAME_.._PERCEN7'ESiIMATED_C.QST P_ROJECTED C9ST_NOIES Modification General Fund 0.00 0 0 Pro]ect umits: Glassell/Meats Intersection HSIP 85.00 0 0 HSIP Construction ProJect Number: HSIP 15.00 0 0 HSIP Design 0 0 rype of work(Tolll: Intersection row nescription: Upgrade traffic signal equipment at intersection Pro)ect oescription: Carry Over Project Funding Previous to FY18/19;The project will provide for a protected left turn phase for the northbound and southbound approaches on Glassell St at Meats Ave. Proiect Phase 19l20— 20/21 2'I/22 22/23 23/24 24125 25/26 Estimated Cost Proiected Gost 3 E 0 0 0 0 p 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 0, 0 0 0 0 SO 0 0 0 Agency: Orange Pro)ect Name: Glassell Street&Walnut Ave Left Tum Signal FUND NAME____,__P_ERCEN.T__. ____ESTIMATED_C.OST P f20JECTED CQST NOTES__ Mndifir.atinn M2 LFS 10.00 0 0 TSIP Measure M2 Pro ect umits: Glassell Street&Walnut Ave Intersection HSIP 90.00 0 0 Federal HSIP ProJect Number: N/A 0 0 Type of Work(TOVI: Intersection Tow escription: Upgrade traffic signal equipment at intersection Project Description: C.O.P.Fund.Prev.FY18/19;Installation of protected left turn phasing for the NB&SB approaches on Glassell St.at Walnut Ave.Project will also restripe Walnut Ave to provide a left turn lane,8 protected left tum phasing on both WB&EB approaches Proiect Phase 19/20 20/21 -" 21I22 22i23 • 23/24 24/25 25/26 Estimated Cost Proiected Cost i E 0 0 0 0 0 0 j $ 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 So So o So go So go So a o 5/30/2019 Measure M 3 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Ayency: Orange ProJect Name: Glassell Street Sianal Network Extension FUND_NAME_ P.ERCENT ESTIMAT.ED_C.OST PROJECIED COST NOI'ES__ Y, Impact Fees 100.00 130,000 130,000 TSIP Area"B"-Design ProJect Limits: Taft Avenue from Shaffer St to Glassell Stt and on Glassell St from Taft Ave to Linr.oln Ave 130,000 130,000 Project Number: Type of Work(TOV1: Traffic Signals 7ow Descriptlon: Interconnect traffic signals to improve coordination and communication Project Description: The project will extend the existing City's Traffic Signal Network along Taft Avenue from Shaffer Street to Glassell Street and on Glassell Street from Taft Avenue to Lincoln Avenue. Project Phase 19/20 20l21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 13,000 0 0 0 0 0 0 13,000 13,000 R 0 0 0 0 0 0 0 0 0 C/I 117,000 0 0 0 0 0 0 117,000 117,000 O&M 0 0 0 0 0 0 0 0 0 130,000 0 0 0 0 0 0 130,000 3130,000 agency: Orange ProJect Name: Installation of Accessible Pedestrian Sionals FUND_NAME " -- _ .__P_ERCENT_ES.T,IMATED_COST QROJECTED CQST N9TES__ HSIP 15.00 0 0 HSIP Design Pro)ect Limits: City Wide HSIP 85.00 0 0 HSIP Construction Project Number: 0 0 Type of work(T0111: Pedestrian TOW Description: Othe Project Descr ptlon: Carry Over Project Funding Previous to FY18/19;The project will provide for the upgrade of outdated Accessible Pedestrian Signals(APS)at 12 intersections citywide.These intersections are in close proximity to medical facilities. Proiect Phase 19l20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cosf E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 So So so So go So so so a o eisoizo s Measure M 14 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscai Years 2019/2020 through 2025/2026 ayency: Orange ProJect Name: Installation of Pedestrian Countdown Signals UND NAME_ P_ERCENT ESTIMAiED_C.OST_P_ROJECIED_C.OST NOTFS_.. " Citvwide HSIP 15.00 0 0 HSIP Design Project umits: City Wide HSIP 85.00 0 0 HSIP Construction Project Number: 0 0 Type of work(Tov1: Pedestrian TOW Description: Oth2 Project oescr ptton: Carry Over Project Funding.Previous to FY18/19; The project will provide for the upgrade of outdated Pedestrian Countdown Signals(PCS)at 33 intersections citywide.These intersections are located at arterials with high tra c and ped. vnlumes. Proiect Phase 19/20 20/21 Y 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost k J E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0 0 Agency: Orange Pro)ect Name: Katella Avenue Sianal Network Extension FUND_NAME`_PERCENT_ESTIMAiED_COSI_,PROJECIED_CQST.v._NIOTES_ j Impact Fees 16.84 133,053 133,053 TSIP Area"B"-Design ProJect Llmits: Katella Ave from Tustin St to Santiago Blvd.and on Im act Fees 83.16 656,947 Santiaao 81vd from Katella Aveto Meats Ave P 656,947 TSIP Area"B"-Construction ProJect Number: 790,000 790,000 Type ofwork(To1nq: Traffic Signals Tow Descript on: Interconnect tra c signals to improve coordination and communication Project oescr ption: The project will extend the existing City's Traffic Signal Network along Katella Avenue.The installation of F/O lines will enable the City's TMC to communicate with the traffic signals to improve traffic signal operations and traffic flow. Proiect Phase 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 p 0 0 0 0 C!I 790,000 0 0 0 p 0 0 790,000 790,000 O&M 0 0 0 0 0 0 0 0 0 790,000 0 0 0 0 0 0 790,000 790,000 5/30/2019 Measure M 15 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange Pro)ect Name: Katella Sianal Svnchronization FUND_NAME P_ERCENT_—.ESTIMATED_COST P_RQJECTE0.00$T__.NQTES Impact Fees 20.00 0 0 TSIP Area"B"-Construction Pro)ect Llmtts: Katella Ave from Struck Ave.and Santiago Canyon M2 TSSP 80.00 0 0 TSSP Grant Rd./Jamhoree Rd. Project Number: 18-OCTA-TSP-3894 0 0 Type of work(TOV1: Traffic Signals 7ow Description: Interconnect traffic signals to improve coordination and communication vroJect oescription: Carry Over-As part of an ongoing project,the Katella Ave.Traffic Signal Synchronization Corridor is a multijurisdictional project between the I-605 on-ramp in Los Alamitos and Jamboree Rd./Santiago Canyon Rd. Proiect Phase 19/20 20/21 21/22 22/23 23/24 24l25 25J26 Estimated Cost Proiected Cosf E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 ao o o So go So So so 5 0 Agency: Orange l Pro)ect Name: Katella/Batavia Sianal Network Extension FUND NAME PERCENT E$T.IMAT.ED_COST P_ROJECTED_C.QST NQTES Impact Fees 100.00 140,000 140,000 TSIP Area"B"-Design Project Limits: Katella Ave from Main St to Struck and Batavia St 140,000 740,000 frnm Katella tn Palm Ave Project Number: Type of Work(T01M1: T affic Signals Tow Description: Interconnect traffic signals to improve coordination and communication Project Descr ption: The project will extend the existing City's Traffic Signal Network along Katella Avenue from Main Street to Struck Street and on Batavia Street from Katella Avenue to Palm Avenue. Proiect Phase 19/20 20/21 21/22 22/23 23l24 24/25 25l26 Estimated Cost Proiected Cost E 0 0 140,000 0 0 0 0 140,000 140,000 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 SO 0 5140,000 0 0 0 0 5140,000 140,000 5/30/2019 Measure M s Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Qrange ProJect Name: Katella/Struck Traffic Sianal Modifications FUND_NAME P_ERCENT .ESTIMA.T.ED_C.OST_,_._P_ROJECTED_C.OST NO.TES Impact Fees 0.00 0 0 TSIP Area"B"-Construction ProJect Limits: Katella Ave at Struck Ave Impact Fees 0.00 0 0 TSIP Area"B"-Design Pro)ect Number: Other 100.00 120,000 120,000 Grant 120,000 120,000 Type of work(Tov: Intersection Tow oescription: Upgrade traffic signal equipment at intersection Pro)ect Descr ption: The Project will modify the Katella Ave and W Struck Ave intersection to add a fourth leg and renovate the aging signal equipment. Proiect Phase 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 $0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 120,000 0 0 0 0 0 0 120,000 120,000 08M 0 0 0 0 0 0 0 0 0 5120,000 0 0 0 0 0 0 3720,000 120,000 Agency: Orange R— i ProJect Name: Main Street Sional Svnchronization FUND_NiAME P_ERCENT ESIIMATED_COS.T_._P_ROJECIED COST NOTE$v_ 1 Impact Fees 100.00 0 0 TSIP Area"B"-Construction ProJect Limits: Main Street from CHOC Court and Taft Avenue 0 ' 0 Projeet Number: Type of Work(TOVI: T 2 C Sigf781S row nescriptton: Interconnect tra c signals to improve coordination and communication Pro)ect oescription: Carry Over-The Main Street Traffic Signal Synchronization Corridor is a multi-jurisdictional project between Culver Drive in Irvine and Taft Avenue in Orange.In Orange,the corridor is between CHOC Court and Taft Avenue,and includes 12 Proiect Phase 9 20 20/21 21/22 22i23 23124 24/25 25126 Estimated Cost Proiected Cost , E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5/30/2019 Measure M _ Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange I Pro)ect Name: Ma le Neiahborhood Street Rehabilitation FUND_NAME____PERCENT ESTIMATED_C_QST__P_ROJECTED_COST N07'ES CDBG 100.00 0 0 Pro ect Llmlts: Maple Neighborhood Street 0 0 Project Number: Type of Work(To1n: Road Maintenance row nescription: Rehabilitation of roadway Pro)ect nescr ption: C.O.FY19/20-This project will rehabilitate the Maple Neighborhood.The rehabilitation will consist of removing and reconstructing badly damaged pavement and cold planing and capping the roadway,replacement of sidewalks,curb&gutter, and ADA Ramns. Proiect Phase 19/20 20/21 21/22 22/23 23/24. 24/25 25l26 Estimated Cost Proiected Cost i E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Agency: O ange ProJect Name: Meats Avenue and SR 55 Interchanae Studv FUND NAME. P_ERCENT,ES;fIMATED_CQST___P_BQJECTED_C.UST_N07ES__ M2 FAST 0.00 0 0 M2-CTFP Pro)ect umits: Lincoln Ave./SR 55 interchange to Katella Ave./SR 55 Gas Tax 0.00 0 0 interchanae Pro)ect Number: 11-ORNG-FST-3540(Eng Phase) Impact Fees 100.00 325,000 325,000 TSIP Area"B" 325,000 325,000 Type of Work(TOVIn: Inte Change row nescription: New interchange between street and freeway Project Description: This project will study a tight diamond interchange at SR 55 and Meats Avenue.The objectives are to reduce peak hour traffic at adjacent freeway interchanges and improve circulation on Tustin St. and Santiago Bivd.-Canceled Project ProiectPhase 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost i E 325,000 0 0 0 0 0 0 325,000 325,000 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 325,000 0 0 0 0 0 0 325,000 325,000 5l30/2019 Measure M 18 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange ProJect Name: Minor Traffic Control Devices EUND_NAME PERCENT,_.._ESTIMATED GQST P_ROJECIED CQST_NOT.ES M2 LFS 40.00 350,000 378,116 Measure"M2"Tumback Pro)ect imits: City-Wide Other 60.00 525,000 567,174 CapitalProjects ProJect Number: N/A 875,000 945,290 ryPe of work(Tovu: Safety Tow oescription: Traffic calming such as bulbout,chokers,speed hump,etc. Pro)ect uescripUon: This project will provide minor traffic control devices such as signage,striping and other related traffic calming devices as directed by the Traffic Commission and City Traffic Engineer. Proiect Phase 19l20 20l21 21/22 22/23 23/24 24/25 25l26 Estimated Cost Proiected Cost E 20,000 20,000 20,000 20,000 20,000 20,000 20,000 140,000 140,000 R 0 0 0 0 0 0 0 0 0 C/I 105,000 105,000 105,000 105,000 105,000 105,000 105,000 735,000 805,290 O&M 0 0 0 0 0 0 0 0 0 725,000 125,000 125,000 125,000 125,000 125,000 125,000 5875,000 3 945,290 Agency: Orange Pro ect Name: Old Town Sidewaik Reolacement Standard FUNU NAME_PERCENT__.___ESTIMATED GQST_PROJECTED_CQST,N9TES. M2 LFS 100.00 10,000 10,000 Measure"M2"Turnback ProJect Limits: Orange Plaza 10,000 10,000 PraJect Number: Type of Work(TOW): AdtY IflIStfBtlOf1 Tow oescription: Transportation planning/engineering studies Pro)ect oescription: This project will study and develop a streetscape standard for Old Towne that wili include the replacements of brick sidewalk and other amenities in the public right-of-way on Glassell Street and Chapman Ave. Pro iect Phase 9 20 20/21 21/22 22/23 23/24 24/25 25l26 Estimated.Cost Proiected Cost i E 10,000 0 0 0 0 0 0 10,000 10,000 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 10,000 0 0 0 0 0 0 10,000 10,000 5/30l2019 Measure M 19.. Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 ayency: Orange i ProJect Name: Old Towne Street Liahtina FUNU NAME _tiP_ERCENT.._ESTIMATED_COS___P_ROJECIED CQST_NOTES v Other 100.00 277,998 293,562 Capital Projects Project Limits: Old Towne 277,998 293,562 ProJect Number: 17061 Type of Work(TOV1: T B C Sign81S Tow nescription: Install new traffic signal and equipment Project oescriptton: p an to replace of 28 concrete cobra head street lights in Old Towne located on Chapman Ave and Glassell St with Old Towne St light standards, related sidewalk improvements,installation of a new traffic signal at Grand St and E Chapman Ave. Proiect Phase . 19/20 20/21 21122 22/23 23/24 24/25 25l26 Estimated Cost Proiected Cost E 0 0 25,000 0 0 0 0 25,000 25,000 R 0 0 0 0 0 0 0 0 0 C/I 0 0 252,998 0 0 0 0 252,998 268,562 08 M 0 0 0 0 0 0 0 0 0 0 0 277,998 0 0 SO 0 277,998 293,562 Agency: Orange i Pro)ect Name: Olive Street Rehabilitation FUND_NAME P_ERCENT_ESTIMATED_C.OST PROJECTED_COS,T_NOTES_ CDBG 100.00 99,246 99,246 Pro)ect Limits: Olive Street from Almond Avenue to La Veta Avenue 99,246 99,246 ProJect Number: Type of Work(roW): Road Maintenance row oescriptton: Rehabilitation of roadway aro)ect oescr pUon: project will rehabilitate Olive Street from Culver Avenue to La Veta Avenue.The rehabilitation will consist of removing and reconstructing badly damaged pavement,cold planing,and capping the roadway. Proiect Phase 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 15,246 0 0 0 0 0 0 15,246 15,246 R 0 0 0 0 0 0 0 0 0 C/I 84,000 0 0 0 0 0 0 84,000 84,000 08M 0 0 0 0 0 0 0 0 0 399,246 0 0 0 0 0 0 99,246 99,246 5l30/2019 Measure M 20 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange r-- Pro]ect Name: Palm Avenue Street Rehabilitation FUNO NAME_____ P_ERCENT_._TESTIMATED_COST_P_ROJECTED_COS.T__._,.NO.TES_______._ __— CDBG 100.00 0 0 Project Limits: palm Ave from MilfordSt to Handy St.0 0 ProJect Number: Type of Work(70111: Road Maintenance Tow oescriptton: Rehabilitation of roadway Pro ect nescriptoon: C.O.FY19/20-This project will rehab.and widen Palm Ave to its ultimate condition.The rehabilitation will consist of removing and reconstructing badly damaged pavement and cold planing and capping the roadway,replacement of sidewalks,C&G,&ADA Ramns. Proiect Phase 19/20 20/21 21%22 22/23 23/24 24/25 25I26 Estimated Cost - Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/l 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Agency: Orange Pro)ect Name: Pavement Manaaement Proaram(PMPI FUND_NAME _PERCENT_ESTIMATED CQST_P_ROJECTED_COS.T_dNOTES` Gas Tax 16.15 7,093,975 7,780,518 Pro)ect Limits: City-Wide M2 LFS 45.53 20,000,000 21,935,568 Measure"M2"Turnback Projea Number: N/A Other 0.18 80,000 87,742 Capital Projects LSR 38.13 16,749,538 18,370,531 SB-1 7ype of work(Tow): Road Maintenance 43,923,513 48,174,360 Tow Description: Rehabilitation of roadway Project Description: The City's PMP identifies the condition for 320 miles of streets and identifies maintenance needs of this roadway system requiring$6 million annually for slurry sealing,asphalt overlay and reconstructions. Proiect Phase 19 20 20/21 21122 22/23 Y 23/24 24125 s 25%26 Estimated Cost 'Proiected Cost u , ] E 50,000^ $50,000 50,000 50,000 50,000 50,000 $50,000 350,000 350,000 R 0 0 0 0 0 0 0 0 0 C/I 5,473,513 $6,350,000 $6,350,000 $6,350,000 $6,350,000 $6,350,000 $6,350,000 43,573,513 47,824,360 O&M 0 0 0 0 0 0 0 0 0 5,523,513 $6,400,000 $6,400,000 $6,400,000 $6,400,000 $6,400,000 $6,400,000 43,923,513 48,174,360 5/30/2019 Measure M 2. Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange Pro)ect Name: Pavement Manaaement Proaram fPMPI Survev FUNU N9ME_P_ERCENT_—__ES.T.IMAiED COST_P_ROJECTED C.OST `NOTES J M2 LFS 100.00 210,000 210,000 Measure"M2"Tumback ProJect Limits: Clty-WidO 210,000 210,000 Project Number: N/A Type of work(To111: Road Maintenance row oescriptton: Studies or PMP updates Project Description: rindshield field surveys of the City's pavement are conducted every four years to determine pavement condition indexes for each segment.These surveys are conducted as a requirement for numerous grant programs,OCTA bi-annual reports,and overall PMP. Proiect Phase 19l20 20/21 21l22 22l23 23124 24/25 25/26 Estimated Cost Proiected Cost E 0 70,000 0 70,000 6 $ 0 70,000 0 210,000 210,000 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 0 70,000 0 70,000 0 70,000 0 210,000 3 210,000 Agency: Orange Project Name: Radar Feedback Sians:La Veta.Collins&Chanman FUND_NAME__P_ERCENT _ESTIMAiED_COST 2ROJECTED CQST NOTES___ HSIP 86.69 0 0 HSIP Construction ProJect Limits: Various locations HSIP 13.31 0 0 HSIP Design Project Number: 0 0 Type of Work(TOVI: Sefety Tow oescription: Signage installation and/or replacement Praject oescr pt on: Carry Over-Funding.Prev.FY18/19;The install.of radar feedback signs on segments of 3 arterials with a hist.of speed related acc.:La Veta Ave-Flower St to Bedford St;Collins Ave-Wanda Rd to Bond Ave;& Chapman Ave-Jamboree Rd to Orange Park Blvd. Proiect Phase 19 20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 '0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0 S 0 sisoizo s Measure M 22 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange Pro ect Name: Sacramento Neiahborhood Street Rehabilitation FUND NAME P_EBCEN7 •ESiIMATED COS.L_-PROJEC.T.ED_COST NOIES _ CDBG 100.00 0 0 ProJect umits: Sacramento Neighborhood Street General Fund 0.00 0 0 ProJect Number: 0 0 Type of work(Tow): Road Maintenance Tow oescription: Rehabilitation of roadway Project Descriptlon: Carry Over-This project will rehabilitate the Sacramento Neighborhood.The rehabilitation will consist of removing and reconstructing badly damaged pavement and cold planing and capping the roadway,replacement of sidewalks,curb&gutter, and ADA Ramns. Proiect Phase 19/20 20l21 21122 22/23 23124 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 ao so o So o o o o o ayeney: Orange ProJect Name: Sacramento St Neiahborhood Phase 2 FUND_NAME __d_P_ERCENT ESTIMATED CO.ST.PRQJECTED CQST_.NOIES CDBG 100.00 271,893 271,893 ProJect Limits: Sacramento Street Neighborhood 271,893 271,893 ProJect Number: Type of work(Tovlq: Road Maintenance row uescrtption: Rehabilitation of roadway Project oescription: project will rehabilitate the Sacramento St Neighborhood.The project limits are Sacramento St from Mt Vernon Ave to the south end.Rehabilitation will consist of removing and reconstructing badly damaged pavement,cold planing,and capping the roadway. Proiect Phase 9 20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 45,315 0 0 0 0 0 0 45,315 45,315 R 0 0 0 0 0 0 0 0 0 C/I 226,578 0 0 0 0 0 0 226,578 226,578 08M 0 0 0 0 0 0 0 0 0 271,893 0 0 0 0 0 0 277,893 277,893 5/30/2019 Measure M 23 . . . Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange I ProJect Name: Santiaao Canvon Road Multi-Puroose Trail FUND_NAME P_ERCENT,__ESTIMATED_C.OST P_ROJECIED_COSL NOTES_ Unfunded 100.00 825,000 920,115 Grant Pro ect umits: Santiago Canyon Rd-Orange Park Blv to Cannon Street. 825,000 920,115 ProJect Number: Type of Work(TO{M1: Bik2w8yS TOW Description: pl8nning Project nescription: Construction of a multipurpose trail adjacent to Santiago Canyon Rd connecting the ex.trail at the Reserve neighborhood to Cannon Street.The trail would be constructed of decomposed granite,and would ailow for pedestrians equestrians,and hICVCIP.S. Proiect Phase 19/20 20/21 21/22 22/23 23i24 24/25 25/26 ' Estimated Cost Proiected Cost E 0 0 0 75,000 0 0 0 75,000 75,000 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 750,000 0 0 750,000 845,115 O&M 0 0 0 0 0 0 0 0 0 0 0 0 75,000 750,000 0 0 825,000 S 9z0,115 Agency: Orange Pro)ect Name: Santiaao Creek Multiouroose Trail Extension FUND_NAME,___P_ERCENT,ESi1MATED GOST_ .__P_ROJECIED COST NOI'ES.e., Other 22.00 97,532 97,532 Capital Projects Project umits: Cannon to Windes Unfunded 0.00 0 0 Grants-Construction Pro)ect Number: Unfunded 78.00 345,793 345,793 Grants-Engineering and Env. 443,325 443,325 Type of Work(TOVI: Bikeways TOW Descrlption: NeW bik2 rOUte Pro]ect escr ptton: This project is the final phase of the Santiago Creek Bike Trail alignment in the Master Bikeway Plan. Construction of the multi-purpose trail will connect the existing bike trail west of Cannon St. Project Phase 19(20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 443,325 0 0 0 0 0 0 443,325 443,325 R 0 0 0 0 0 0 0 0 0 C/I 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 443,325 0 0 0 0 0 0 5443,325 S 443,325 5/30/2019 Measure M 24 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Ageney: Orange Pro ea Name: Shaffer Street Rehabilitaton FUND_NAME P_ERCENT ESTIMATED_C.OST PROJEC.TED_C.O.S2____NQTES CDBG 100.00 96,232 96,232 Pro ect imtts: Shaffer Street-La Veta Avenue to Hart Park 96,232 96,232 ProJect Number: Type of work(7oVl: Road Maintenance row oescr ptoon: Reconstruction of roadway Project oescrlption: project will rehabilitate Shaffer Street-La Veta Avenue to Hart Park.The rehabilitation will consist of removing and reconstructing badly damaged pavement,cold planing,and capping the roadway. Proiect Phase 19 20 20/21 21l22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost i E 12,298 0 0 0 0 0 0 12,298 12,298 R 0 0 0 0 p 0 0 0 0 C/I 83,934 0 0 0 0 0 0 83,934 83,934 O&M 0 0 0 0 0 0 0 0 0 396,232 0 0 0 0 0 0 596,232 96,232 Agency: Orange Pro]ect Name: Street Liaht Pole Reolacement FUND-NAME i --P_ERCENT___ESTIMAT.ED_C.QST__P_ROJECTED C05T_NOTES Other 100.00 840,000 920,331 Capital Projects ProJect Limits: City Wide 840,000 920,331 ProJect Number: Type of Work(T0111: Saf2ty Tow oescription: Improve lighting of roadway Project Descriptlon: The Clty's acquisition of Southem Califomia Edison owned street lights calls for a street light pole replacement program.The program will replace 10 street light steel poles with concrete type Proiecf Phase 19120 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 p 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 120,000 120,000 120,000 120,000 120,000 120,000 120,000 840,000 920,331 08M 0 0 0 0 0 0 0 0 0 3120,000 120,000 120,000 120,000 120,000 120,000 120,000 5840,000 920,331 5/30l2019 Measure IIA _ 25 , Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange Project Name: Traffic Sianal Controller and TMC Uoarades EUND NAME __P_ERCENT ESTIMATED_CQST P_RQJECTED_COST NOTES d Gas Tax 100.00 490,000 536,860 Project Limits: City-Wide 490,000 536,860 Project Number: N/A rype of Work(TOW): Traffic Signals Tow nescriptton: Replace and upgrade tra c signals and equipment ProJect oescr ptton: The City maintains 156 traffic signals,most of which contain older controllers.Nearly 2/3 of the controllers have been updated or replaced to allow for better coordination with the City's Transportation Management Center. Proiect Phase 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 70,000 70,000 70,000 70,000 70,000 70,000 70,000 490,000 536,860 O&M 0 0 0 0 0 0 0 0 0 70,000 70,000 70,000 70,000 70,000 70,000 70,000 490,000 S 536,860 Agency: Orange Pro ect Name: Traffic Sianal Eauioment Paintina FUND_NAME..____P_ERCENT ESIIMATEDCQST__PROJECiED_C.OST NOiES Impact Fees 0.00 0 0 TSIP Area"B" Pro)ect Llmlts: City-Wide M2 LFS 100.00 315,000 345,124 Measure"M2"Turnback Project Number: N/A 315,000 345,724 Type of Work(7ov: Traffic Signals row nescripeon: Replace and upgrade traffic signals and equipment Pro,ect escr ptian: This project provides for the painting of traffic signal equipment at approx 25 intersections w/in the City. The paint on the City's traffic signal equipment(signal and pedestrian heads,pedestrian push buttons 8 cabinets)has greatiy deteriorated. Proiect Phase 19120 20/21 21/22 22/23 23/24 24/25 25/26 Estimated CosY Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 45,000 45,000 45,000 45,000 45,000 45,000 45,000 315,000 345,124 O&M 0 0 0 0 0 0 0 0 0 45,000 45,000 45,000 45,000 45,000 45,000 45,000 5315,000 345,124 5/30/2019 Measure M 26 Seven Year Capital Improvement Program(Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange ProJect Name: Tularosa Neiahborhood Street Rehabilitation FUND_N 4ME P_ERCENT_ESIIMATED_C.QST_._.—P_F OJECTED COST NO:CES CDBG 100.00 0 0 Pro ect umlts: Tulrosa Neighborhood 0 0 Project Number: rype of wark('rov: Road Maintenance Tow oescriptton: Reconstruction of roadway ProJect oescriptoan: C.O.P.Funding Previous to FY18/19;This project will rehabilitate Tularosa Neighborhood St from La Veta Ave to the 22 Fwy and will include Tularosa Ave from West End to Fashion Park St,Fashion Park St from Tularosa Ave to Fairway Dr,and more Proiect Phase 9 20 20/21 21l22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/1 0 0 0 0 0 0 0 0 0 O&M 0 0 0 0 0 0 0 0 0 a So o o go so So ao a o Agency: Orange Pra)ect Name: Tustin and La Veta Tra c Sianal Uoarade FUND_NAME_ P_ERCENT ESIIMATED_C.OST_P_ROJECIED_COST NOTES_ Impact Fees 83.33 0 0 TSIP Area"B"-Construction ProJect umits: Tustin St and La Veta Ave Intersection Impact Fees 16.67 0 0 TSIP Area"B"-Design ProJect Number: 0 0 Type of Work(TOVIn: I te S2CtiOn Tow escr ption: Upgrade tra c signal equipment at intersection aroject oescr ptoon: Carry Over Project Funding Previous to FY18/19;The project will provide for traffic signal upgrades at the intersection to enhance the capacity and improve traffic signal operation at the intersection. fProiect Phase 19/20 _ A 20l21 21/22 22/23 23/24 24i25 25/26 Estimated Cosfi Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C!I 0 0 0 0 0 0 0 0 0 08M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5/30/2019 Measure M 2 Seven Year Capital Improvement Program (Sorted by Project Name) Fiscal Years 2019/2020 through 2025/2026 Agency: Orange r—.---- --- Pro ect Name: TustiNMeats Intersection Riaht Tum Lane Addition EUND_NAME____PERCENT__ESTIMATED_COS.T___P_ROJEC'fED_COST NOTES_._i M210E 75.00 712,500 712,500 CTFP Pro)ect umtts: Tustin/Meats Intersection Impact Fees 25.00 237,500 237,500 ' TSIP Area"B"-will carryover from FY 15/16 Project Number: 15-ORNG-3782 E,16-ORNG-3813 R,17-ORNG-3865 C to FY 17/18 Unfunded 0.00 0 0 Type of work(Tovl: Intersection 950,000 950,000 7oW Descriptlon: Add right turn lane(s)to intersection Pro'ect oescr ptoon: This project will add a dedicated right turn lane on northbound Tustin Street to eastbound Meats Avenue. Proiect Phase 19/20 20/21 21/22 22/23 23/24 24/25 25/26 Estimated Cost Proiected Cost E 0 0 0 0 0 0 0 0 0 R 0 0 0 0 0 0 0 0 0 C/I 950,000 0 0 0 0 0 0 950,000 950,000 O&M 0 0 0 0 0 0 0 0 0 950,000 0 0 0 0 0 0 950,000 S 950,000