Loading...
HomeMy WebLinkAboutAppendix F-2_Traffic APPENDIX F-2 Revised Traffic Reports LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc i TABLE OF CONTENTS SECTION PAGE 1.0 Introduction .............................................................................................................................. 1 1.1 Study Area .............................................................................................................................. 2 2.0 Project Description .................................................................................................................. 3 2.1 Site Access ............................................................................................................................. 3 3.0 Existing Conditions .................................................................................................................. 4 3.1 Existing Street System ........................................................................................................... 4 3.2 Existing Traffic Volumes ....................................................................................................... 4 3.3 Existing Intersection Conditions ............................................................................................ 5 3.3.1 Intersection Capacity Utilization Method of Analysis (Signalized Intersections) .......... 5 3.3.2 Highway Capacity Manual Method of Analysis (Unsignalized Intersections) .............. 5 3.3.2.1 Two-Way Stop-Controlled Intersections .................................................................... 6 3.3.2.2 All-Way Stop-Controlled Intersections ....................................................................... 6 3.4 Volume to Capacity (V/C) Ratio Method of Analysis (Roadway Segments)........................ 6 3.5 Level of Service Criteria ........................................................................................................ 6 3.6 Existing Level of Service Results .......................................................................................... 7 3.6.1 Intersections .................................................................................................................... 7 3.6.2 Roadway Segments ......................................................................................................... 7 4.0 Traffic Forecasting Methodology ......................................................................................... 13 5.0 Project Traffic Characteristics ............................................................................................. 14 5.1 Project Traffic Generation .................................................................................................... 14 5.2 Project Traffic Distribution and Assignment ....................................................................... 14 5.3 Existing Plus Project Traffic Conditions .............................................................................. 15 6.0 Future Traffic Conditions ..................................................................................................... 17 6.1 Ambient Traffic Growth....................................................................................................... 17 6.2 Cumulative Projects Traffic Characteristics ........................................................................ 17 6.3 Year 2021 Traffic Volumes.................................................................................................. 18 7.0 Traffic Impact Analysis Methodology ................................................................................. 21 7.1 Impact Criteria and Thresholds ............................................................................................ 21 7.2 Traffic Impact Analysis Scenarios ....................................................................................... 21 8.0 Existing Plus Project Analysis .............................................................................................. 22 8.1 Intersections ......................................................................................................................... 22 8.1.1 Existing Plus Project Traffic Conditions ...................................................................... 22 8.2 Roadway Segments .............................................................................................................. 22 8.2.1 Existing Plus Project Traffic Conditions ...................................................................... 22 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc ii TABLE OF CONTENTS (CONTINUED) SECTION PAGE 9.0 Year 2021 Plus Project Analysis ........................................................................................... 25 9.1 Intersections ......................................................................................................................... 25 9.1.1 Year 2021 Cumulative Traffic Conditions ................................................................... 25 9.1.2 Year 2021 Cumulative Plus Project Traffic Conditions ............................................... 25 9.2 Roadway Segments .............................................................................................................. 25 9.2.1 Year 2021 Cumulative Traffic Conditions ................................................................... 26 9.2.2 Year 2021 Cumulative Plus Project Traffic Conditions ............................................... 26 10.0 Site Access and Internal Circulation Evaluation ................................................................ 29 10.1 Site Access Evaluation ..................................................................................................... 29 10.2 Internal Circulation Evaluation ........................................................................................ 29 10.3 Drive-Through Queuing Analysis .................................................................................... 29 11.0 Recommended Improvements .............................................................................................. 37 11.1 Existing Plus Project Traffic Conditions .......................................................................... 37 11.2 Year 2021 Plus Project Traffic Conditions ....................................................................... 37 12.0 Congestion Management Program (CMP) .......................................................................... 38 13.0 Summary Of Findings And Conclusions ............................................................................. 39 APPENDICES APPENDIX A. Traffic Study Scope of Work B. Existing Traffic Count Data C. Intersection Level of Service Calculation Worksheets D. Project Driveways Level of Service Calculation Worksheets E. Drive-Through Queuing Study Data LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc iii LIST OF FIGURES SECTION—FIGURE # FOLLOWING PAGE 1–1 Vicinity Map .................................................................................................................... 2 2–1 Existing Site Aerial ........................................................................................................... 3 2–2 Proposed Site Plan ........................................................................................................... 3 3–1 Existing Roadway Conditions and Intersection Controls ........................................... 5 3–2 Existing AM Peak Hour Traffic Volumes ...................................................................... 5 3–3 Existing PM Peak Hour and Daily Traffic Volumes ..................................................... 5 5–1 Project Traffic Distribution Pattern .............................................................................. 16 5–2 AM Peak Hour Project Traffic Volumes ...................................................................... 16 5–3 PM Peak Hour and Daily Project Traffic Volumes ..................................................... 16 5–4 Existing Plus Project AM Peak Hour Traffic Volumes ............................................... 16 5–5 Existing Plus Project PM Peak Hour and Daily Traffic Volumes .............................. 16 6–1 Location of Cumulative Projects .................................................................................... 20 6–2 AM Peak Hour Cumulative Projects Traffic Volumes ................................................ 20 6–3 PM Peak Hour and Daily Cumulative Projects Traffic Volumes ............................... 20 6–4 Year 2021 Cumulative AM Peak Hour Traffic Volumes ............................................ 20 6–5 Year 2021 Cumulative PM Peak Hour and Daily Traffic Volumes ........................... 20 6–6 Year 2021 Cumulative Plus Project AM Peak Hour Traffic Volumes ....................... 20 6–7 Year 2021 Cumulative Plus Project PM Peak Hour and Daily Traffic Volumes ...... 20 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc iv LIST OF TABLES SECTION—TABLE # PAGE 3–1 Level of Service Criteria for Signalized Intersections...................................................... 8 3–2 Level of Service Criteria for Unsignalized Intersections (HCM 6 Methodology) .......... 9 3–3 Roadway Link Capacities ............................................................................................... 10 3–4 Existing Peak Hour Levels of Service ............................................................................ 11 3–5 Existing Roadway Segment Level of Service Summary ............................................... 12 5–1 Project Traffic Generation Forecast ................................................................................ 16 6–1 Location and Description of Cumulative Projects.......................................................... 19 6–2 Cumulative Projects Traffic Generation Forecast .......................................................... 20 8–1 Existing Plus Project Peak Hour Intersection Capacity Analysis .................................. 23 8–2 Existing Plus Project Roadway Segment Level of Service Summary ........................... 24 9–1 Year 2021 Peak Hour Intersection Capacity Analysis ................................................... 27 9–2 Year 2021 Roadway Segment Level of Service Summary ............................................ 28 10–1 Project Driveway Peak Hour Levels of Service Summary ............................................ 32 10–2 Drive-Through Lane Queuing Analysis Summary ........................................................ 33 10–3 Weekday Queuing Analysis Summary ........................................................................... 34 10–4 Friday Queuing Analysis Summary ............................................................................... 35 10–5 Saturday Queuing Analysis Summary............................................................................ 36 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 1 TRAFFIC IMPACT ANALYSIS CHICK-FIL-A MAIN STREET PROJECT Orange, California November 13, 2019 (Revision of April 10, 2018) 1.0 INTRODUCTION This traffic impact analysis addresses the potential traffic impacts and circulation needs associated with the proposed Chick-fil-A Main Street Project (hereinafter referred to as Project). The Project proposes to demolish the existing vacant structure on the site and construct a 4,527 square-foot (SF) Chick-fil-A restaurant with drive-through window. A total of 49 parking spaces will be provided on site. The Project site is generally located on the southwest quadrant of Main Street and Almond Avenue in the City of Orange, California. This report documents the findings and recommendations of a traffic impact analysis conducted by Linscott, Law & Greenspan, Engineers (LLG) to determine the potential impacts associated with the Project. The traffic analysis evaluates the existing operating conditions at five (5) key study intersections and four (4) key roadway segments within the project vicinity, estimates the trip generation potential of the Project, and forecasts future operating conditions without and with the proposed Project. Where necessary, intersection improvements/mitigation measures are identified. This traffic report satisfies the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, and is consistent with the requirements and procedures outlined in the most current Congestion Management Program (CMP) for Orange County. The Scope of Work for this traffic study, which is included in Appendix A, was developed in conjunction with City of Orange Traffic Engineering staff. The project site has been visited and an inventory of adjacent area roadways and intersections was performed. Existing traffic information has been collected at five (5) key study intersections and four (4) key roadway segments on a “typical” weekday for use in the preparation of intersection and roadway segment level of service calculations. Information concerning cumulative projects (planned and/or approved) in the vicinity of the proposed Project has been researched at the City of Orange. Based on our research, there are eleven (11) cumulative projects in the City of Orange within the vicinity of the subject site. These eleven (11) planned and/or approved cumulative projects were considered in the cumulative traffic analysis for this project. This traffic report analyzes existing and future weekday daily, AM peak hour and PM peak hour traffic conditions for a near-term (Year 2021) traffic setting upon completion of the proposed Project. Daily and peak hour traffic forecasts for the Year 2021 horizon year have been projected by increasing existing traffic volumes by an annual growth rate of one percent (1.0%) per year and adding traffic volumes generated by eleven (11) cumulative projects. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 2 1.1 Study Area The five (5) key study intersections and four (4) key roadway segments selected for evaluation were determined based on coordination with City of Orange Traffic Engineering staff and application of the “51 or more peak hour trip threshold” criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. The intersections and roadway segments listed below provide local access to the study area and define the extent of the boundaries for this traffic impact investigation. It should be noted that each key study intersection and roadway segment is located within the City of Orange. Key Study Intersections 1. Main Street at Chapman Avenue 2. Feldner Road at Almond Avenue 3. Main Street at Almond Avenue 4. Batavia Street at Almond Avenue 5. Main Street at Palmyra Avenue Key Roadway Segments A. Main Street, between Chapman Avenue and Almond Avenue B. Almond Avenue, between Feldner Road and Main Street C. Almond Avenue, between Main Street and Batavia Street D. Main Street, between Almond Avenue and Palmyra Avenue Figure 1-1 presents a Vicinity Map, which illustrates the general location of the proposed Project and depicts the study locations and surrounding street system. The Level of Service (LOS) investigations at these key locations were used to evaluate the potential traffic-related impacts associated with area growth, cumulative projects and the proposed Project. When necessary, this report recommends intersection and/or roadway segment improvements that may be required to accommodate future traffic volumes and restore/maintain an acceptable Level of Service and/or mitigate the impact of the project. Included in this Traffic Impact Analysis are:  Existing traffic counts,  Estimated project traffic generation/distribution/assignment,  Estimated cumulative project traffic generation/distribution/assignment,  Daily, AM and PM peak hour capacity analyses for existing conditions,  Daily, AM and PM peak hour capacity analyses for existing plus project conditions,  Daily, AM and PM peak hour capacity analyses for future (Year 2021) conditions without and with project traffic,  Site Access and Internal Circulation Evaluation,  Drive-Through Queuing Analysis  Recommended Improvements, and  Congestion Management Program (CMP) Analysis. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 3 2.0 PROJECT DESCRIPTION The Project site is generally located on the southwest quadrant of Main Street and Almond Avenue in the City of Orange, California. Figure 2-1 presents an aerial depiction of the existing site, which shows the existing vacant restaurant building to be demolished. Figure 2-2 presents the proposed site plan for the proposed Project, prepared by CRHO Architects. Review of the proposed site plan indicates that the proposed Project will consist of a 4,527 SF Chick-fil-A restaurant with drive-through window and drive-through queue storage of 21 vehicles. A total of 49 parking spaces will be provided on site and parking is restricted along both the Main Street and Almond Avenue Project frontages. The proposed Project is expected to be constructed and fully occupied by the Year 2021. 2.1 Site Access As shown in Figure 2-2, access to the Project site will be provided via one (1) unsignalized, outbound-only driveway located along Almond Avenue (Project Driveway No. 1) and one (1) unsignalized, right-turn in/right-turn out only driveway located along Main Street (Project Driveway No. 2). LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 4 3.0 EXISTING CONDITIONS 3.1 Existing Street System Regional access to the site is provided via the Santa Ana (I-5) Freeway, the Orange (SR-57) Freeway, and the Garden Grove (SR-22) Freeway. The principal local network of streets serving the proposed Project includes Chapman Avenue, Main Street and Almond Avenue. The following discussion provides a brief synopsis of these key area streets. The descriptions are based on an inventory of existing roadway conditions. Chapman Avenue is generally a six-lane, divided roadway west of Main Street, and generally a four-lane, divided roadway east of Main Street, oriented in the east-west direction. On-street parking is generally not permitted along this roadway within the vicinity of the project. The posted speed limit on Chapman Avenue is 40 miles per hour (mph). Traffic signals control the study intersections of Chapman Avenue at Main Street, Almond Avenue and Palmyra Avenue. Main Street is generally a four-lane, divided roadway north of Chapman Avenue and generally a six-lane, divided roadway south of Chapman Avenue, oriented in the north-south direction. Main Street borders the project site to the east and will provide access to the site via one (1) unsignalized, right-turn in/right-turn out only driveway. On-street parking is generally not permitted along this roadway within the vicinity of the project. The posted speed limit on Main Street is 35 mph north of Chapman Avenue and 40 mph south of Chapman Avenue. An OCTA bus stop is located along the west side of Main Street immediately south of the Project site. Almond Avenue is generally a two-lane, undivided roadway, oriented in the east-west direction. Almond Avenue borders the Project site to the north and will provide access to the site via one (1) unsignalized, outbound-only driveway. On-street parking is not permitted along both sides of this roadway along project frontage. However, parking is generally permitted along the remainder of Almond Avenue within the vicinity of the Project. The posted speed limit on Almond Avenue is 30 mph west of Main Street and 25 mph east of Main Street. A traffic signal controls the study intersection of Almond Avenue at Main Street. Figure 3-1 presents an inventory of the existing roadway conditions for the arterials and intersections evaluated in this report. This figure identifies the number of travel lanes for key arterials, as well as intersection configurations and controls for the key area study intersections. 3.2 Existing Traffic Volumes Five (5) key study intersections and four (4) key roadway segments have been identified as the locations at which to evaluate existing and future traffic operating conditions. Some portion of potential project-related traffic will pass through each of these intersections/roadway segments, and their analysis will reveal the expected relative impacts of the project. These key intersections and roadway segments were selected for evaluation based on coordination with City of Orange Traffic Engineering staff and application of the “51 or more peak hour trip threshold” criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 5 Existing daily, AM peak hour, and PM peak hour traffic volumes for the five (5) key study intersections and four (4) key roadway segments evaluated in this report were conducted by Transportation Studies Inc. in March 2018. Figures 3-2 and 3-3 illustrate the existing AM and PM peak hour traffic volumes at the five (5) key study intersections. Figure 3-3 also presents the existing average daily traffic volumes for the four (4) key roadway segments in the vicinity of the proposed Project. Appendix B contains the detailed peak hour count sheets for the key intersections evaluated in this report. Appendix B also contains the average daily traffic volumes for the key roadway segments. 3.3 Existing Intersection Conditions Existing AM and PM peak hour operating conditions for the five (5) key study intersections were evaluated using the Intersection Capacity Utilization (ICU) methodology for signalized intersections and the methodology outlined in Chapter 20 of the HCM 6 for two-way stop-controlled intersections, and the methodology outlined in Chapter 21 of the HCM 6 for all-way stop-controlled intersections. 3.3.1 Intersection Capacity Utilization (ICU) Method of Analysis (Signalized Intersections) In conformance with City of Orange requirements, existing AM and PM peak hour operating conditions for the key signalized study intersections were evaluated using the Intersection Capacity Utilization (ICU) method. The ICU technique is intended for signalized intersection analysis and estimates the volume to capacity (V/C) relationship for an intersection based on the individual V/C ratios for key conflicting traffic movements. The ICU numerical value represents the percent signal (green) time and thus capacity, required by existing and/or future traffic. It should be noted that the ICU methodology assumes uniform traffic distribution per intersection approach lane and optimal signal timing. Per City of Orange requirements, the ICU calculations use a lane capacity of 1,700 vehicles per hour (vph) for through and all turn lanes. A clearance adjustment factor of 0.05 was added to each Level of Service calculation. The ICU value translates to a Level of Service (LOS) estimate, which is a relative measure of the intersection performance. The ICU value is the sum of the critical volume to capacity ratios at an intersection; it is not intended to be indicative of the LOS of each of the individual turning movements. The six qualitative categories of Level of Service have been defined along with the corresponding ICU value range and are shown in Table 3-1. 3.3.2 Highway Capacity Manual (HCM) Method of Analysis (Unsignalized Intersections) The HCM unsignalized methodology for stop-controlled intersections was utilized for the analysis of the unsignalized intersections. LOS criteria for unsignalized intersections differ from LOS criteria for signalized intersections as signalized intersections are designed for heavier traffic and therefore a greater delay. Unsignalized intersections are also associated with more uncertainty for users, as delays are less predictable, which can reduce users’ delay tolerance. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 6 3.3.2.1 Two-Way Stop-Controlled Intersections Two-way stop-controlled intersections are comprised of a major street, which is uncontrolled, and a minor street, which is controlled by stop signs. Level of service for a two-way stop-controlled intersection is determined by the computed or measured control delay. The control delay by movement, by approach, and for the intersection as a whole is estimated by the computed capacity for each movement. LOS is determined for each minor-street movement (or shared movement) as well as major-street left turns. The worst side street approach delay is reported. LOS is not defined for the intersection as a whole or for major-street approaches, as it is assumed that major-street through vehicles experience zero delay. The HCM control delay value range for two-way stop- controlled intersections is shown in Table 3-2. 3.3.2.2 All-Way Stop-Controlled Intersections All-way stop-controlled intersections require every vehicle to stop at the intersection before proceeding. Because each driver must stop, the decision to proceed into the intersection is a function of traffic conditions on the other approaches. The time between subsequent vehicle departures depends on the degree of conflict that results between the vehicles and vehicles on the other approaches. This methodology determines the control delay for each lane on the approach, computes a weighted average for the whole approach, and computes a weighted average for the intersection as a whole. Level of service (LOS) at the approach and intersection levels is based solely on control delay. The HCM control delay value range for all-way stop-controlled intersections is shown in Table 3-2. 3.4 Volume to Capacity (V/C) Ratio Method of Analysis (Roadway Segments) Existing daily operating conditions for the four (4) key roadway segments have been investigated according to the daily volume-to-capacity (V/C) ratio of each link. The daily V/C relationship is used to estimate the LOS of the roadway segment with the volume based on the 24-hour traffic count data and the capacity based on the City of Orange General Plan Circulation and Mobility Element street classifications. The roadway link capacity of each street classification according to the City of Orange General Plan Circulation and Mobility Element is presented in Table 3-3, along with the six corresponding service levels and associated V/C ratios. 3.5 Level of Service Criteria According to the City of Orange General Plan Circulation Element and stated in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, LOS D is the minimum acceptable condition that should be maintained during the morning and evening peak commute hours on all intersections and LOS D is the minimum acceptable condition that should be maintained on a daily basis on all roadway segments. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 7 3.6 Existing Level of Service Results 3.6.1 Intersections Table 3-4 summarizes the existing peak hour service level calculations for the five (5) key study intersections based on existing traffic volumes and current street geometry. Review of Table 3-4 indicates that all five (5) key study intersections currently operate at acceptable LOS D or better during the AM and PM peak hours. Appendix C presents the ICU/LOS and HCM/LOS calculations for the five (5) key study intersections for the AM peak hour and PM peak hour. 3.6.2 Roadway Segments Table 3-5 summarizes the existing service level calculations for the four (4) key roadway segments based on existing 24-hour traffic volumes and current roadway geometry. The first column (1) shows the number of lanes, the second column (2) shows the arterial classification and the third column (3) shows the existing LOS “E” capacity. The fourth column (4) shows the daily volume, V/C ratio and resulting level of service. Review of Table 3-5 indicates that all four (4) key roadway segments currently operate at acceptable LOS A on a daily basis. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 8 TABLE 3-1 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS 1 Level of Service (LOS) Intersection Capacity Utilization Value (V/C) Level of Service Description A ≤ 0.60 EXCELLENT. No vehicle waits longer than one red light, and no approach phase is fully used. B 0.61 – 0.70 VERY GOOD. An occasional approach phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. C 0.71 – 0.80 GOOD. Occasionally drivers may have to wait through more than one red light; backups may develop behind turning vehicles. D 0.81 – 0.90 FAIR. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E 0.91 – 1.00 POOR. Represents the most vehicles intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. F > 1.00 FAILURE. Backups from nearby locations or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches. Potentially very long delays with continuously increasing queue lengths. 1 Source: Transportation Research Board Circular 212 – Interim Materials on Highway Capacity. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 9 TABLE 3-2 LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS (HCM 6 METHODOLOGY)2,3 Level of Service (LOS) Highway Capacity Manual (HCM) Delay Per Vehicle (seconds/vehicle) Level of Service Description A ≤ 10.0 Little or no delay B > 10.0 and ≤ 15.0 Short traffic delays C > 15.0 and ≤ 25.0 Average traffic delays D > 25.0 and ≤ 35.0 Long traffic delays E > 35.0 and ≤ 50.0 Very long traffic delays F > 50.0 Severe congestion 2 Source: Highway Capacity Manual 6, Chapter 20: Two-Way Stop-Controlled Intersections. The LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole. 3 Source: Highway Capacity Manual 6, Chapter 21: All-Way Stop-Controlled Intersections. For approaches and intersection-wide assessment, LOS is defined solely by control delay. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 10 TABLE 3-3 ROADWAY LINK CAPACITIES Facility Type Number of Lanes Level of Service Criteria With Associated Roadway Capacity Daily Values (VPD) Level of Service (LOS) A B C D E 4 F Principal 8-lanes divided 45,000 52,500 60,000 67,500 75,000 -- Major 6-lanes divided 33,900 39,400 45,000 50,600 56,300 -- Primary 4-lanes divided 22,500 26,300 30,000 33,800 37,500 -- Secondary 4-lanes undivided 14,400 16,800 19,200 21,600 24,000 -- Collector 2-lanes undivided 7,200 8,400 9,600 10,800 12,000 -- V/C Ratio ≤ 0.60 0.61-0.70 0.71-0.80 0.81-0.90 0.91-1.00 ≥ 1.00 Notes:  VPD = vehicles per day  VPH = vehicles per hour 4 Source: City of Orange General Plan; Circulation and Mobility. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 11 TABLE 3-4 EXISTING PEAK HOUR LEVELS OF SERVICE Key Intersection Time Period Jurisdiction Minimum Acceptable LOS Control Type ICU/HCM LOS 1. Main Street at AM Orange D 8 Phase 0.654 B Chapman Avenue PM Signal 0.657 B 2. Feldner Road at AM Orange D All-Way 8.4 s/v A Almond Avenue PM Stop 8.6 s/v A 3. Main Street at AM Orange D 5 Phase 0.475 A Almond Avenue PM Signal 0.455 A 4. Batavia Street at AM Orange D All-Way 20.0 s/v C Almond Avenue PM Stop 18.0 s/v C 5. Main Street at AM Orange D 5 Phase 0.521 A Palmyra Avenue PM Signal 0.467 A Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS and HCM/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 12 TABLE 3-5 EXISTING ROADWAY SEGMENT LEVEL OF SERVICE SUMMARY Key Roadway Segment Jurisdiction Min. Acc. LOS (1) No. of Existing Lanes (2) Arterial Classification (3) Existing Capacity at LOS “E” (4) Existing Traffic Conditions Daily Volume V/C Ratio LOS A. Main Street between Chapman Ave and Almond Ave Orange D 6D Major 56,300 28,698 0.510 A B. Almond Avenue between Feldner Road and Main Street Orange D 2U Collector 12,000 2,453 0.204 A C. Almond Avenue between Main Street and Batavia Street Orange D 2U Collector 12,000 7,093 0.591 A D. Main Street between Almond Ave and Palmyra Ave Orange D 6D Major 56,300 28,578 0.508 A LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 13 4.0 TRAFFIC FORECASTING METHODOLOGY In order to estimate the traffic impact characteristics of the proposed Project, a multi-step process has been utilized. The first step is trip generation, which estimates the total arriving and departing traffic on a peak hour and daily basis. The traffic generation potential is forecast by applying the appropriate vehicle trip generation equations or rates to the project development tabulation. The second step of the forecasting process is trip distribution, which identifies the origins and destinations of inbound and outbound project traffic. These origins and destinations are typically based on demographics and existing/anticipated travel patterns in the study area. The third step is traffic assignment, which involves the allocation of project traffic to study area streets and intersections. Traffic assignment is typically based on minimization of travel time, which may or may not involve the shortest route, depending on prevailing operating conditions and travel speeds. Traffic distribution patterns are indicated by general percentage orientation, while traffic assignment allocates specific volume forecasts to individual roadway links and intersection turning movements throughout the study area. With the forecasting process complete and project traffic assignments developed, the impact of the proposed Project is isolated by comparing operational (LOS) conditions at selected key intersections using expected future traffic volumes with and without forecast project traffic. The need for site- specific and/or cumulative local area traffic improvements can then be evaluated and the significance of the project’s impacts identified. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 14 5.0 PROJECT TRAFFIC CHARACTERISTICS 5.1 Project Traffic Generation Traffic generation is expressed in vehicle trip ends, defined as one-way vehicular movements, either entering or exiting the generating land use. Generation equations and/or rates used in the traffic forecasting procedure are found in the 10th Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE) [Washington D.C., 2017]. Table 5-1 summarizes the trip generation rates used in forecasting the vehicular trips generated by the proposed Project and also presents the Project’s forecast peak hour and daily traffic volumes. As shown, the trip generation potential of the Project was estimated using ITE Land Use 934: Fast-Food Restaurant With Drive-Through trip rates. Review of Table 5-1 indicates that the proposed Project is forecast to generate 1,599 daily trips, with 93 trips (47 inbound, 46 outbound) produced in the AM peak hour and 74 trips (38 inbound, 36 outbound) produced in the PM peak hour on a “typical” weekday. Please note that the aforementioned overall project trip generation includes adjustments for pass-by per the Trip Generation Handbook, 3rd Edition, published by ITE (2014), to account for trips that are already in the everyday traffic stream on the adjoining streets (i.e. Main Street and Almond Avenue) and will stop as they pass by the project site as a matter of convenience on their path to another destination. Per the Trip Generation Handbook, a pass-by reduction factor of 49% and 50% is recommended for the AM and PM peak hours, respectively for fast-food restaurants with drive- through land uses. The daily pass-by percentage was estimated to be 25%. 5.2 Project Traffic Distribution and Assignment Figure 5-1 illustrates the general, directional traffic distribution pattern for the proposed Project. Project traffic volumes both entering and exiting the project site have been distributed and assigned to the adjacent street system based on the following considerations:  directional flows on the freeways in the immediate vicinity of the project site (i.e. I-5 Freeway, SR-57 Freeway, and SR-22 Freeway),  the site's proximity to major traffic carriers (i.e. Chapman Avenue, Main Street, etc.),  expected localized traffic flow patterns based on adjacent street channelization and presence of traffic signals, and  ingress/egress availability at the project site. The anticipated AM and PM peak hour project traffic volumes associated with the Project are presented in Figures 5-2 and 5-3, respectively. Figure 5-3 also presents the daily project traffic volumes for the Project. The traffic volume assignments presented in Figures 5-2 and 5-3 reflect the traffic distribution characteristics shown in Figure 5-1 and the traffic generation forecast presented in Table 5-1. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 15 5.3 Existing Plus Project Traffic Conditions The existing plus project traffic conditions have been generated based upon existing conditions and the estimated project traffic. These forecast traffic conditions have been prepared pursuant to the California Environmental Quality Act (CEQA) guidelines, which require that the potential impacts of a Project be evaluated upon the circulation system as it currently exists. This traffic volume scenario and the related intersection capacity analyses will identify the roadway improvements necessary to mitigate the direct traffic impacts of the Project, if any. Figures 5-4 and 5-5 present projected AM and PM peak hour traffic volumes at the five (5) key study intersections and two (2) Project driveways with the addition of the trips generated by the proposed Project to existing traffic volumes, respectively. Figure 5-5 also presents the existing plus project daily traffic volumes. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 16 TABLE 5-1 PROJECT TRAFFIC GENERATION FORECAST 5 ITE Land Use Code / Project Description Daily 2-Way AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Generation Factors:  934: Fast-Food Restaurant With Drive-Thru (TE/1000 SF) 470.95 20.50 19.69 40.19 16.99 15.68 32.67 Generation Forecast:  Chick-fil-A Restaurant With Drive-Thru (4,527 SF) 2,132 93 89 182 77 71 148 Pass-By (Daily: 25%, AM: 49%, PM: 50%)6 -533 -46 -43 -89 -39 -35 -74 Subtotal 1,599 47 46 93 38 36 74 Total Traffic Generation Forecast 1,599 47 46 93 38 36 74 Note:  TE/1000 SF = trip end per thousand square feet 5 Source: Trip Generation, 10th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2017). 6 Source: Trip Generation Handbook, 3rd Edition, published by ITE (2014). LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 17 6.0 FUTURE TRAFFIC CONDITIONS 6.1 Ambient Traffic Growth Horizon year, background traffic growth estimates have been calculated using an ambient traffic growth factor. The ambient traffic growth factor is intended to include unknown and future cumulative projects in the study area, as well as account for regular growth in traffic volumes due to the development of projects outside the study area. The future growth in traffic volumes has been calculated at one percent (1.0%) per year. Applied to the Year 2018 existing traffic volumes, this factor results in a 3.0% growth in existing volumes to the near-term horizon year 2021. 6.2 Cumulative Projects Traffic Characteristics In order to make a realistic estimate of future on-street conditions prior to implementation of the proposed Project, the status of other known development projects (cumulative projects) in the vicinity of the proposed Project has been researched at the City of Orange. With this information, the potential impact of the proposed Project can be evaluated within the context of the cumulative impact of all ongoing development. Based on our research, there are eleven (11) cumulative projects in the City of Orange within the vicinity of the subject site that have either been built, but not yet fully occupied, or are being processed for approval. These eleven (11) cumulative projects have been included as part of the cumulative background setting. Table 6-1 provides a brief description for each of the eleven (11) cumulative projects. Figure 6-1 graphically illustrates the location of the cumulative projects. These cumulative projects are expected to generate vehicular traffic, which may affect the operating conditions of the key study intersections and/or roadway segments. Table 6-2 presents the trip generation for the eleven (11) cumulative projects. As shown in Table 6- 2, the eleven (11) cumulative projects are forecast to generate a total of 16,634 daily trips, with 1,076 trips (133 inbound and 943 outbound) forecast during the AM peak hour and 1,321 trips (945 inbound and 376 outbound) forecast during the PM peak hour. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 18 6.3 Year 2021 Traffic Volumes The AM and PM peak hour traffic volumes associated with the eleven (11) cumulative projects are presented in Figures 6-2 and 6-3, respectively. Figure 6-3 also presents the daily cumulative project traffic volumes. Figures 6-4 and 6-5 present the AM and PM peak hour cumulative traffic volumes (existing traffic + ambient growth traffic + cumulative project traffic) at the five (5) key study intersections for the Year 2021, respectively. Figure 6-5 also presents the Year 2021 daily cumulative traffic volumes. Figures 6-6 and 6-7 illustrate the Year 2021 forecast AM and PM peak hour traffic volumes, with the inclusion of the trips generated by the proposed Project, respectively. Figure 6-7 also presents the Year 2021 daily cumulative plus project traffic volumes. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 19 TABLE 6-1 LOCATION AND DESCRIPTION OF CUMULATIVE PROJECTS 7 No. Description Location/Address Size City of Orange 1. 3800 Chapman Apartments 3800 Chapman Avenue 280 DU Apartments 2. Orange Art of Dentistry 2006 West Chapman Avenue 2,565 SF Dentist Office 3. Woody’s Diner 2145 West Chapman Avenue 3,400 SF Restaurant 4. 7-11 Gas Station 2245 West Chapman Avenue 2,400 SF Conv. Store and Gas Station 5. City Plaza 1 West City Boulevard 335 DU Apartments 165 Room Hotel 6. City Parkway West Apartments 500 & 600 City Parkway 220 Apartments 7. Town and Country Apartments and Townhomes 702 West Town and Country Road 653 DU Apartments 74 DU Townhomes 8. 999 Town and Country Apartments 999 Town and Country Road 262 DU Apartments 9. Eleven10 Apartment Homes 1110 Town and Country Road 260 DU Apartments 10. The Terrace Apartments SEC of Chapman Avenue and Lewis Street 167 DU Apartments 28 DU Townhomes 11. Marriott Dual Brand Hotel 3000 West Chapman Avenue 300 Room Hotel 3,000 SF Restaurant 7 Source: City of Orange Planning Department staff. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 20 TABLE 6-2 CUMULATIVE PROJECTS TRAFFIC GENERATION FORECAST 8 No. Cumulative Project Description Daily Two-Way AM Peak Hour PM Peak Hour In Out Total In Out Total 1. 3800 Chapman Apartments 9 1,490 25 97 122 90 49 139 2. Orange Art of Dentistry 89 5 2 7 3 6 9 3. Woody’s Diner 286 17 14 31 11 8 19 4. 7-11 Gas Station 749 18 18 36 20 20 40 5. City Plaza 10 3,130 80 152 232 158 107 265 6. City Parkway West Apartments 11 1,170 19 76 95 70 39 109 7. Town and Country Apartments and Townhomes12 2,589 -198 255 57 238 -90 148 8. 999 Town and Country Apartments 13 1,742 26 108 134 105 58 163 9. Eleven10 Apartment Homes 14 1,729 26 107 133 104 57 161 10. The Terrace Apartments 15 849 17 44 61 42 27 69 11. Marriott Dual Brand Hotel 2,811 98 70 168 104 95 199 Total Cumulative Projects Trip Generation Forecast 16,634 133 943 1,076 945 376 1,321 8 Unless otherwise noted, Source: Trip Generation, 10th Edition, Institute of Transportation Engineers (ITE) [Washington, D.C. (2017)]. 9 Source: 3800 Chapman Apartments Traffic Impact Analysis, prepared by LLG Engineers. 10 Source: City Plaza Project Traffic Impact Analysis, prepared by LLG Engineers. 11 Source: City Parkway West Apartments Project Traffic Impact Analysis, prepared by LLG Engineers. 12 Source: Town and Country Apartments and Townhomes Traffic Impact Analysis, prepared by LLG Engineers. 13 Source: 999 Town & Country Apartments Project Traffic Impact Analysis, prepared by LLG Engineers. 14 Source: 1100 Town & Country Project Traffic Impact Analysis, prepared by LLG Engineers. 15 Source: The Terrace Apartments Traffic Impact Analysis, prepared by LLG Engineers. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 21 7.0 TRAFFIC IMPACT ANALYSIS METHODOLOGY The relative impact of the proposed Project during the AM peak hour/PM peak hour and on a daily basis was evaluated based on analysis of future operating conditions at the five (5) key study intersections and four (4) key roadway segments, without, then with the proposed Project. The previously discussed capacity analysis procedures were utilized to investigate the future volume-to- capacity relationships and service level characteristics at each study intersection and roadway segment. The significance of the potential impacts of the Project at each key intersection and key roadway segment was then evaluated using the following traffic impact criteria. 7.1 Impact Criteria and Thresholds Impacts to local and regional transportation systems located in the City of Orange are considered significant if: Intersections:  An unacceptable peak hour Level of Service (LOS) at any of the key intersections is projected. According to the City’s Circulation Element and stated in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, LOS D is the minimum acceptable condition that should be maintained during the morning and evening peak hours on all intersections; and  The project increases traffic demand at the study intersection by 1% of capacity (ICU increase ≥ 0.010), causing or worsening LOS E or LOS F (ICU > 0.900). Roadway Segments:  An unacceptable daily Level of Service (LOS) at any of the key roadway segments is projected. According to the City of Orange General Plan Circulation Element and stated in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, LOS D is the minimum acceptable condition that should be maintained on a daily basis on all roadway segments; and  The project increases traffic demand at the roadway segment by 1% of capacity (V/C increase ≥ 0.010), causing or worsening LOS E or LOS F (V/C > 0.900). 7.2 Traffic Impact Analysis Scenarios The following scenarios are those for which volume/capacity calculations have been performed at the five (5) key study intersections and four (4) key roadway segments for existing plus project and near-term (Year 2021) traffic conditions: (a) Existing Traffic Conditions; (b) Existing Plus Project Traffic Conditions; (c) Scenario (b) with Improvements, if necessary; (d) Near-Term (Year 2021) Cumulative Traffic Conditions, (e) Near-Term (Year 2021) Cumulative plus Project Traffic Conditions; and (f) Scenario (e) with Improvements, if necessary. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 22 8.0 EXISTING PLUS PROJECT ANALYSIS The following summarizes the “Existing Plus Project” level of service results for the five (5) key study intersections and four (4) key roadway segments. 8.1 Intersections Table 8-1 summarizes the peak hour level of service results at the five (5) key study intersections for existing plus project traffic conditions. The first column (1) of ICU/LOS and HCM/LOS values in Table 8-1 presents a summary of existing AM and PM peak hour traffic conditions (which were also presented in Table 3-4). The second column (2) lists existing plus project traffic conditions. The third column (3) shows the increase in ICU and/or Delay value due to the added peak hour project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. 8.1.1 Existing Plus Project Traffic Conditions Review of Columns (2) and (3) of Table 8-1 indicates that traffic associated with the proposed Project will not significantly impact any of the five (5) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five (5) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS during the AM and PM peak hours with the addition of Project generated traffic to existing traffic. Appendix C also presents the existing plus project ICU/LOS and HCM/LOS calculations for the five (5) key study intersections for the AM peak hour and PM peak hour. 8.2 Roadway Segments Table 8-2 summarizes the roadway segment level of service results at the four (4) key roadway segments for existing plus project traffic conditions. The first column (1) shows the number of lanes, the second column (2) shows the arterial classification and the third column (3) shows the existing LOS “E” capacity. The fourth column (4) presents a summary of existing daily traffic conditions (which were also presented in Table 3-5). The fifth column (5) lists existing plus project daily traffic conditions. Column (5) also shows the increase in V/C ratio value due to the added daily project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. 8.2.1 Existing Plus Project Traffic Conditions Review of Column 5 of Table 8-2 indicates that traffic associated with the proposed Project will not significantly impact any of the four (4) key roadway segments when compared to the LOS standards and significant impact criteria specified in this report. The four (4) key roadway segments currently operate and are forecast to continue to operate at an acceptable service level on a daily basis with the addition of Project generated traffic to existing traffic. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 23 TABLE 8-1 EXISTING PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Existing Plus Project Traffic Conditions (3) Project Significant Impact (4) Existing Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 1. Main Street at AM D 0.654 B 0.669 B 0.015 No -- -- Chapman Avenue PM 0.657 B 0.660 B 0.003 No -- -- 2. Feldner Road at AM D 8.4 s/v A 8.4 s/v A 0.0 s/v No -- -- Almond Avenue PM 8.6 s/v A 8.7 s/v A 0.1 s/v No -- -- 3. Main Street at AM D 0.475 A 0.510 A 0.035 No -- -- Almond Avenue PM 0.455 A 0.465 A 0.010 No -- -- 4. Batavia Street at AM D 20.0 s/v C 20.4 s/v C 0.4 s/v No -- -- Almond Avenue PM 18.0 s/v C 18.3 s/v C 0.3 s/v No -- -- 5. Main Street at AM D 0.521 A 0.523 A 0.002 No -- -- Palmyra Avenue PM 0.467 A 0.472 A 0.005 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS and HCM/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 24 TABLE 8-2 EXISTING PLUS PROJECT ROADWAY SEGMENT LEVEL OF SERVICE SUMMARY Key Roadway Segment Min. Acc. LOS (1) No. of Existing Lanes (2) Arterial Classification (3) Existing Capacity at LOS “E” (4) Existing Traffic Conditions (5) Existing Plus Project Traffic Conditions Daily Volume V/C Ratio LOS Daily Volume V/C Ratio LOS Inc. Adverse (Yes/No) A. Main Street between Chapman Avenue and Almond Avenue D 6D Major 56,300 28,698 0.510 A 29,537 0.525 A 0.015 No B. Almond Avenue between Feldner Road and Main Street D 2U Collector 12,000 2,453 0.204 A 2,973 0.248 A 0.044 No C. Almond Avenue between Main Street and Batavia Street D 2U Collector 12,000 7,093 0.591 A 7,253 0.604 B 0.013 No D. Main Street between Almond Avenue and Palmyra Avenue D 6D Major 56,300 28,578 0.508 A 30,017 0.533 A 0.025 No LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 25 9.0 YEAR 2021 PLUS PROJECT ANALYSIS The following summarizes the “Year 2021 Plus Project” level of service results for the five (5) key study intersections and four (4) key roadway segments. 9.1 Intersections Table 9-1 summarizes the peak hour level of service results at the five (5) key study intersections for Year 2021 traffic conditions. The first column (1) of ICU/LOS and HCM/LOS values in Table 9-1 presents a summary of existing AM and PM peak hour traffic conditions (which were also presented in Table 3-4). The second column (2) lists projected cumulative traffic conditions (existing plus ambient traffic plus cumulative project traffic) based on existing intersection geometry, but without any traffic generated from the proposed Project. The third column (3) presents forecast Year 2021 near-term traffic conditions with the addition of Project traffic. The fourth column (4) shows the increase in ICU and/or Delay value due to the added peak hour project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. 9.1.1 Year 2021 Cumulative Traffic Conditions An analysis of future (Year 2021) cumulative traffic conditions indicates that the addition of ambient traffic growth and cumulative project traffic will not adversely impact any of the five (5) key study intersections. The five (5) key study intersections are forecast to continue to operate at acceptable levels of service during the AM and PM peak hours with the addition of ambient traffic growth and cumulative project traffic. 9.1.2 Year 2021 Cumulative Plus Project Traffic Conditions Review of Columns (3) and (4) of Table 9-1 indicates that traffic associated with the proposed Project will not significantly impact any of the five (5) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five (5) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS D or better during the AM and PM peak hours with the addition of Project generated traffic to Year 2021 cumulative traffic. Appendix C also presents the Year 2021 plus project ICU/LOS and HCM/LOS calculations for the five (5) key study intersections. 9.2 Roadway Segments Table 9-2 summarizes the roadway segment level of service results at the four (4) key roadway segments for Year 2021 traffic conditions. The first column (1) shows the number of lanes, the second column (2) shows the arterial classification and the third column (3) shows the existing LOS “E” capacity. The fourth column (4) presents a summary of projected Year 2021 cumulative daily traffic conditions. The fifth column (5) lists Year 2021 plus project daily traffic conditions. Column (5) also shows the increase in V/C ratio value due to the added daily project trips and indicates LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 26 whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. 9.2.1 Year 2021 Cumulative Traffic Conditions An analysis of future (Year 2021) cumulative traffic conditions indicates that the addition of ambient traffic growth and cumulative project traffic will not adversely impact any of the four (4) key roadway segments on a daily basis under Year 2021 Cumulative traffic conditions (i.e. existing plus ambient traffic plus cumulative project traffic). The four (4) key roadway segments currently operate and are forecast to continue to operate at acceptable level of service on a daily basis with the addition of ambient traffic growth and cumulative project traffic. 9.2.2 Year 2021 Cumulative Plus Project Traffic Conditions Review of Column 5 of Table 9-2 indicates that traffic associated with the proposed Project will not significantly impact any of the four (4) key roadway segments on a daily basis under Year 2021 Cumulative Plus Project traffic conditions. The four (4) key roadway segments currently operate and are forecast to continue to operate at an acceptable level of service on a daily basis with the addition of Project generated traffic to Year 2021 cumulative traffic. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 27 TABLE 9-1 YEAR 2021 PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Year 2021 Cumulative Traffic Conditions (3) Year 2021 Cumulative Plus Project Traffic Conditions (4) Project Significant Impact (5) Year 2021 Cumulative Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 1. Main Street at AM D 0.654 B 0.673 B 0.687 B 0.014 No -- -- Chapman Avenue PM 0.657 B 0.708 C 0.711 C 0.003 No -- -- 2. Feldner Road at AM D 8.4 s/v A 8.4 s/v A 8.5 s/v A 0.1 s/v No -- -- Almond Avenue PM 8.6 s/v A 8.7 s/v A 8.7 s/v A 0.0 s/v No -- -- 3. Main Street at AM D 0.475 A 0.487 A 0.522 A 0.035 No -- -- Almond Avenue PM 0.455 A 0.472 A 0.482 A 0.010 No -- -- 4. Batavia Street at AM D 20.0 s/v C 22.2 s/v C 22.7 s/v C 0.5 s/v No -- -- Almond Avenue PM 18.0 s/v C 19.6 s/v C 20.0 s/v C 0.4 s/v No -- -- 5. Main Street at AM D 0.521 A 0.535 A 0.537 A 0.002 No -- -- Palmyra Avenue PM 0.467 A 0.484 A 0.489 A 0.005 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS and HCM/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 28 TABLE 9-2 YEAR 2021 ROADWAY SEGMENT LEVEL OF SERVICE SUMMARY Key Roadway Segment Min. Acc. LOS (1) No. of Existing Lanes (2) Arterial Classification (3) Existing Capacity at LOS “E” (4) Year 2021 Cumulative Traffic Conditions (5) Year 2021 Cumulative Plus Project Traffic Conditions Daily Volume V/C Ratio LOS Daily Volume V/C Ratio LOS Inc. Adverse (Yes/No) A. Main Street between Chapman Avenue and Almond Avenue D 6D Major 56,300 30,963 0.550 A 31,802 0.565 A 0.015 No B. Almond Avenue between Feldner Road and Main Street D 2U Collector 12,000 2,527 0.211 A 3,047 0.254 A 0.043 No C. Almond Avenue between Main Street and Batavia Street D 2U Collector 12,000 7,306 0.609 B 7,466 0.622 B 0.013 No D. Main Street between Almond Avenue and Palmyra Avenue D 6D Major 56,300 30,698 0.545 A 32,137 0.571 A 0.026 No LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 29 10.0 SITE ACCESS AND INTERNAL CIRCULATION EVALUATION 10.1 Site Access Evaluation As shown previously in Figure 2-2, access to the Project site will be provided via one (1) unsignalized, outbound-only driveway located along Almond Avenue (Project Driveway No. 1) and one (1) unsignalized, right-turn in/right-turn out only driveway located along Main Street (Project Driveway No. 2). Table 10-1 summarizes the intersection operations at the proposed project driveways for near-term (Year 2021) traffic conditions at completion and full occupancy of the proposed Project. The operations analysis for the Project driveways is based on the Highway Capacity Manual 6th Edition (HCM 6) unsignalized methodology. Review of Table 10-1 shows that the two (2) proposed project driveways are forecast to operate at acceptable LOS C or better during the AM and PM peak hours for Year 2021 traffic conditions. As such, project access will be adequate. Motorists entering and exiting the project site will be able to do so comfortably, safely, and without undue congestion. Appendix D presents the level of service calculation worksheets for the project driveways under Year 2021 Cumulative plus Project traffic conditions. 10.2 Internal Circulation Evaluation The on-site circulation layout of the proposed Project as illustrated in Figure 2-2 on an overall basis is adequate. Curb return radii have been confirmed and are generally adequate for small service/delivery (FedEx, UPS) trucks and trash trucks. 10.3 Drive-Through Queuing Analysis To confirm the adequacy of storage provided for the proposed drive-through lane, which consists of 21 vehicles, the results of drive-through queuing observations conducted at five (5) existing comparative Chick-fil-A restaurants were utilized. The five (5) locations consisted of the following:  Chick-fil-A Tustin, located at 2889 Park Avenue  Chick-fil-A Orange, located at 2575 N. Tustin Street  Chick-fil-A Irvine, located at 6428 Irvine Boulevard  Chick-fil-A Laguna Hills, located at 24011 El Toro Road  Chick-fil-A Corona, located at 3555 Grand Oaks Drive-through queuing observations were conducted at each of the five (5) locations on a weekday during the morning, mid-day and evening service periods, generally between the hours of 7:00 AM and 9:00 AM, 11:00 AM and 2:00 PM, and 4:00 PM and 7:00 PM. Saturday queuing observations were also collected between 11:30 AM and 2:30 PM and 4:00 PM and 10:00 PM at only the Laguna Hills site and the Corona site. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 30 Table 10-2 summarizes the results of the drive-through queuing analysis summary for the proposed Project. Column one (1) presents the study sites and column two (2) presents the study site locations. Column three (3) presents the observed 85th percentile queue, the observed 95th percentile queue and the observed maximum queue for each site. Column four (4) compares the 85th percentile queue for each site to the proposed drive-through lane storage and indicates whether or not the proposed drive-through lane will provide adequate storage. It should be noted that the 85th percentile queue is generally utilized when designing/sizing the length of the proposed drive-through lane. Review of column 3 of Table 10-2 indicates that the five (5) study sites experienced an 85th percentile queue range between 6 vehicles and 13 vehicles. As shown in column 4 of Table 10-2, the proposed Project will provide storage for up to 21 vehicles within the proposed drive-through lane without encroaching into the drive aisle. Therefore, the 85th percentile expected queues can be accommodated without interfering with internal circulation or causing congestion to the drive aisle. It should be further noted that the proposed 21 vehicle storage drive-through lane can also accommodate the observed 95th percentile queues and the observed maximum queues of the five (5) study sites. To further confirm the adequacy of storage provided for the proposed drive-through lane, existing queuing observations were also conducted at the following two (2) existing stand-alone Chick-fil-A restaurants.  Chick-fil-A Long Beach, 4401 Pacific Coast Highway  Chick-fil-A Venice, located at 4050 Lincoln Boulevard Drive-through queuing observations were conducted at the two (2) locations on two weekdays during the mid-day and evening service periods, generally between the hours of 11:00 AM and 2:00 PM and 5:00 PM and 8:00 PM. Saturday queuing observations were also collected between 11:00 AM and 2:00 PM and 6:00 PM and 9:00 PM. The queuing observations for the Long Beach Chick- fil-A were conducted by Transportation Studies Inc. (TSI) on Thursday April 25, 2019, Friday April 26, 2019 and Saturday April 27, 2019. The queuing observations for the Venice Chick-fil-A were conducted by City Traffic Counters on Wednesday February 20, 2019, Friday February 22, 2019 and Saturday February 23, 2019. The vehicular queues observed at the two (2) sites were recorded at 5- minute intervals. Tables 10-3, 10-4 and 10-5 summarize the Queue Frequency that was observed at the two sites for weekday (Wednesday/Thursday), weekday (Friday) and weekend (Saturday) peak periods, respectively. Our evaluation of this data indicates that on average during the weekday (Wednesday/Thursday) peak periods, an average queue of 10 vehicles in the drive-through lane can be expected, with an 85th percentile queue of approximately 15 vehicles, a 95th percentile queue of approximately 17 vehicles and a max queue of approximately 20 vehicles. Similarly, our evaluation of this data indicates that on average during the weekday (Friday) peak periods, an average queue of 10 vehicles in the drive-through lane can be expected, with an 85th percentile queue of approximately LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 31 14 vehicles, a 95th percentile queue of approximately 15 vehicles and a max queue of approximately 18 vehicles. In addition, our evaluation of this data also indicates that on average during the weekend (Saturday) peak periods, an average queue of 8 vehicles in the drive-through lane can be expected, with an 85th percentile queue of approximately 13 vehicles, a 95th percentile queue of approximately 15 vehicles and a max queue of approximately 19 vehicles. It should be noted that the 85th percentile queue is generally utilized when designing/sizing the length of the proposed drive-through lane. In conclusion, the two (2) study sites experienced an 85th percentile queue range between 13 vehicles and 15 vehicles. As stated previously, the proposed Project will provide storage for up to 21 vehicles within the proposed drive-through lane without encroaching into the drive aisle. Therefore, the 85th percentile expected queues can be accommodated without interfering with internal circulation or causing congestion to the drive aisles. It should be further noted that the proposed 21 vehicle storage drive-through lane can also accommodate the observed 95th percentile queues (i.e. queue range between 15 vehicles and 17 vehicles) and the maximum queue of 20 vehicles. Even though it is anticipated that the proposed drive-through lane will accommodate all potential queues on site; Chick-fil-A staff will implement the following program, on an as-needed basis during their peak operating times, to further ensure that vehicles will not queue back onto the public streets. The program consists of the following as provided by Chick-fil-A management staff:  “Our restaurants are staffed so that if the drive-thru queuing begins stacking onto the street, team members go out and assist with ordering via Chick-fil-A’s iPad ordering system. Our operators use the iPad ordering during our peak hours of 11:30 am to 1:30 pm and any additional time when needed. The iPad ordering system allows team members to take orders, receive payment, and assist with traffic movement within the parking lot. Based on data from our other comparable stores, the iPad ordering system increases the CFA drive thru speed of service by 30% than the typical speaker box. Putting people forward in the drive-through is one of our biggest competitive advantages in the market because it personally connects our team members with our valued guest. We want to continue this momentum by building a platform to supporting current and future innovations that increase capacity and put our people forward to care for our guest in every interaction. Our customers enjoy the face to face ordering over the standard drive-thru experience.” Appendix E presents the drive-through queuing study data for the five (5) existing comparative sites and the two (2) existing stand-alone sites. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 32 TABLE 10-1 PROJECT DRIVEWAY PEAK HOUR LEVELS OF SERVICE SUMMARY Project Driveway Time Period Intersection Control Year 2021 Plus Project Traffic Conditions HCM LOS A. Project Driveway No. 1 at AM One–Way 9.8 s/v A Almond Avenue PM Stop 9.3 s/v A B. Main Street at AM One–Way 19.2 s/v C Project Driveway No. 2 PM Stop 15.4 s/v C Note: s/v = seconds per vehicle LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 33 TABLE 10-2 DRIVE-THROUGH LANE QUEUING ANALYSIS SUMMARY (1) Study Site (2) Location (3) Number of Vehicles Observed In The Drive-Through Lane (4) Proposed Project 85th Percentile 95th Percentile Maximum Drive-Through Lane Storage Adequate For 85th Percentile (Yes/No) Chick-fil-A (City of Tustin) 2889 Park Avenue, Tustin, CA 6 13 15 21 Yes Chick-fil-A (City of Orange) 2575 N. Tustin Street, Orange, CA 11 14 15 21 Yes Chick-fil-A (City of Irvine) 6428 Irvine Boulevard, Irvine, CA 8 10 12 21 Yes Chick-fil-A (City of Laguna Hills) 24011 El Toro Road, Laguna Hills, CA 11 14 17 21 Yes Chick-fil-A (City of Corona) 3555 Grand Oaks, Corona, CA 13 13 16 21 Yes LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 34 TABLE 10-3 WEEKDAY QUEUING ANALYSIS SUMMARY16 Queue Length (Vehicles) Queue Frequency of Vehicles Observed Cumulative Site #1 4401 Pacific Coast Hwy, Long Beach, CA Site #2 4050 Lincoln Blvd, Venice, CA Total Frequency Percentage 0 0 0 0 0 0.0% 1 0 3 3 3 2.1% 2 0 9 9 12 8.5% 3 0 4 4 16 11.3% 4 0 7 7 23 16.2% 5 4 8 12 35 24.6% 6 4 7 11 46 32.4% 7 3 4 7 53 37.3% 8 2 4 6 59 41.5% 9 4 5 9 68 47.9% 10 6 5 11 79 55.6% 11 9 5 14 93 65.5% 12 10 1 11 104 73.2% 13 4 2 6 110 77.5% 14 7 2 9 119 83.8% 15 7 1 8 127 89.4% 16 5 0 5 132 93.0% 17 3 1 4 136 95.8% 18 2 0 2 138 97.2% 19 2 0 2 140 98.6% 20 2 0 2 142 100.0% Total 74 68 142 -- -- Average 12.0 7.0 10.0 -- -- 85th Percentile 16.0 11.0 15.0 -- -- 95th Percentile 18.0 14.0 17.0 -- -- Max 20.0 17.0 20.0 -- -- 16 Source: Queuing surveys at Site #1 were conducted every 5 minutes, between the hours of 11:00AM to 2:00PM and 5:00PM to 8:00PM, by Transportation Studies, Inc. on Thursday, April 25, 2019. Queuing surveys at Site #2 were conducted every 5 minutes, between the hours of 11:00AM to 2:00PM and 5:00PM to 7:30PM, by City Traffic Counters on Wednesday, February 20, 2019. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 35 TABLE 10-4 FRIDAY QUEUING ANALYSIS SUMMARY 17 Queue Length (Vehicles) Queue Frequency of Vehicles Observed Cumulative Site #1 4401 Pacific Coast Hwy, Long Beach, CA Site #2 4050 Lincoln Blvd, Venice, CA Total Frequency Percentage 0 0 0 0 0 0.0% 1 0 3 3 3 2.0% 2 0 2 2 5 3.4% 3 1 7 8 13 8.8% 4 2 9 11 24 16.2% 5 0 8 8 32 21.6% 6 0 8 8 40 27.0% 7 3 5 8 48 32.4% 8 3 8 11 59 39.9% 9 8 4 12 71 48.0% 10 9 7 16 87 58.8% 11 6 6 12 99 66.9% 12 9 1 10 109 73.6% 13 10 4 14 123 83.1% 14 11 1 12 135 91.2% 15 8 1 9 144 97.3% 16 1 0 1 145 98.0% 17 2 0 2 147 99.3% 18 1 0 1 148 100.0% Total 74 74 148 -- -- Average 12.0 7.0 10.0 -- -- 85th Percentile 15.0 11.0 14.0 -- -- 95th Percentile 15.0 13.0 15.0 -- -- Max 18.0 15.0 18.0 -- -- 17 Source: Queuing surveys at Site #1 were conducted every 5 minutes, between the hours of 11:00AM to 2:00PM and 5:00PM to 8:00PM, by Transportation Studies, Inc. on Friday, April 26, 2019. Queuing surveys at Site #2 were conducted every 5 minutes, between the hours of 11:00AM to 2:00PM and 5:00PM to 8:00PM, by City Traffic Counters on Friday, February 22, 2019. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 36 TABLE 10-5 SATURDAY QUEUING ANALYSIS SUMMARY 18 Queue Length (Vehicles) Queue Frequency of Vehicles Observed Cumulative Site #1 4401 Pacific Coast Hwy, Long Beach, CA Site #2 4050 Lincoln Blvd, Venice, CA Total Frequency Percentage 0 0 0 0 0 0.0% 1 0 1 1 1 0.7% 2 1 1 2 3 2.0% 3 2 4 6 9 6.1% 4 2 10 12 21 14.2% 5 0 16 16 37 25.0% 6 3 11 14 51 34.5% 7 5 9 14 65 43.9% 8 7 10 17 82 55.4% 9 12 7 19 101 68.2% 10 8 4 12 113 76.4% 11 6 0 6 119 80.4% 12 5 1 6 125 84.5% 13 10 0 10 135 91.2% 14 2 0 2 137 92.6% 15 6 0 6 143 96.6% 16 2 0 2 145 98.0% 17 1 0 1 146 98.6% 18 1 0 1 147 99.3% 19 1 0 1 148 100.0% Total 74 74 148 -- -- Average 10.0 6.0 8.0 -- -- 85th Percentile 14.0 9.0 13.0 -- -- 95th Percentile 16.0 10.0 15.0 -- -- Max 19.0 12.0 19.0 -- -- 18 Source: Queuing surveys at Site #1 were conducted every 5 minutes, between the hours of 11:00AM to 2:00PM and 6:00PM to 9:00PM, by Transportation Studies, Inc. on Saturday, April 27, 2019. Queuing surveys at Site #2 were conducted every 5 minutes, between the hours of 11:00AM to 2:00PM and 6:00PM to 9:00PM, by City Traffic Counters on Saturday, February 23, 2019. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 37 11.0 RECOMMENDED IMPROVEMENTS For those intersections and roadway segments where projected traffic volumes are expected to result in significant cumulative impacts, this report recommends traffic improvements that change the intersection and/or roadway segments geometry to increase capacity. These capacity improvements involve roadway widening and/or re-striping to reconfigure (add lanes) roadways to specific approaches of a key intersection and/or roadway segments. The identified improvements are expected to:  Address the impact of existing traffic, Project traffic and future non-project (ambient traffic growth and Cumulative) traffic, and  Improve Levels of Service to an acceptable range and/or to pre-project conditions. 11.1 Existing Plus Project Traffic Conditions The results of the “Existing Plus Project” intersection capacity analysis and daily roadway segment analysis presented previously in Table 8-1 and Table 8-2, respectively, indicates that the proposed Project will not significantly impact any of the five (5) key study intersections or the four (4) key roadway segments. Given that there are no significant project impacts, no improvements are required under Existing Plus Project traffic conditions. 11.2 Year 2021 Plus Project Traffic Conditions The results of the “Year 2021 Cumulative Plus Project” intersection capacity analysis and daily roadway segment analysis presented previously in Table 9-1 and Table 9-2, respectively, indicates that the proposed Project will not significantly impact any of the five (5) key study intersections or the four (4) key roadway segments. Given that there are no significant project impacts, no improvements are required under Year 2021 Cumulative Plus Project traffic conditions. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 38 12.0 CONGESTION MANAGEMENT PROGRAM (CMP) This analysis is consistent with the requirements and procedures outlined in the current Orange County Congestion Management Program (CMP). The CMP requires that a traffic impact analysis be conducted for any project generating 2,400 or more daily trips, or 1,600 or more daily trips for projects that directly access the CMP Highway System (HS). Per the CMP guidelines, this number is based on the desire to analyze any impacts that will be 3.0% or more of the existing CMP highway system facilities’ capacity. However, as noted in this traffic study, the proposed Project is expected to generate 1,599 daily trips, and thus does not meet the criteria required for a CMP traffic analysis. Therefore, it is concluded that the proposed Project will not have any significant traffic impacts on the Congestion Management Program Highway System. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 39 13.0 SUMMARY OF FINDINGS AND CONCLUSIONS  Project Description – The Project site is generally located on the southwest quadrant of Main Street and Almond Avenue in the City of Orange, California. The proposed Project proposes to demolish the existing vacant structure on the site and construct a 4,527 SF Chick-fil-A restaurant with drive-through window and drive-through queue storage of 21 vehicles. A total of 49 parking spaces will be provided on site and parking is restricted along both the Main Street and Almond Avenue Project frontages. The proposed Project is expected to be constructed and fully occupied by the Year 2021. Access to the Project site will be provided via one (1) unsignalized, outbound-only driveway located along Almond Avenue (Project Driveway No. 1) and one (1) unsignalized, right-turn in/right-turn out only driveway located along Main Street (Project Driveway No. 2).  Study Scope – The five (5) key study intersections and four (4) key roadway segments selected for evaluation were determined based on coordination with City of Orange Traffic Engineering staff and application of the “51 or more peak hour trip threshold” criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. The intersections and roadway segments listed below provide local access to the study area and define the extent of the boundaries for this traffic impact investigation. It should be noted that each key study intersection and roadway segment is located within the City of Orange. Key Study Intersections 1. Main Street at Chapman Avenue 2. Feldner Road at Almond Avenue 3. Main Street at Almond Avenue 4. Batavia Street at Almond Avenue 5. Main Street at Palmyra Avenue Key Roadway Segments A. Main Street, between Chapman Avenue and Almond Avenue B. Almond Avenue, between Feldner Road and Main Street C. Almond Avenue, between Main Street and Batavia Street D. Main Street, between Almond Avenue and Palmyra Avenue Detailed peak hour level of service analyses were prepared for Existing Traffic Conditions, Existing Plus Project Traffic Conditions, Year 2021 Cumulative Traffic Conditions, and Year 2021 Cumulative Plus Project Traffic Conditions at these locations.  Existing Traffic Conditions – All five (5) key study intersections currently operate at acceptable LOS D or better during the AM and PM peak hours. All four (4) key roadway segments currently operate at acceptable LOS A on a daily basis. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 40  Project Trip Generation – The proposed Project is forecast to generate 1,599 daily trips, with 93 trips (47 inbound, 46 outbound) produced in the AM peak hour and 74 trips (38 inbound, 36 outbound) produced in the PM peak hour on a “typical” weekday.  Cumulative Projects Traffic Characteristics – The eleven (11) cumulative projects are forecast to generate a total of 16,634 daily trips, with 1,076 trips (133 inbound and 943 outbound) forecast during the AM peak hour and 1,321 trips (945 inbound and 376 outbound) forecast during the PM peak hour.  Existing Plus Project Traffic Conditions – The proposed Project will not significantly impact any of the five (5) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five (5) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS during the AM and PM peak hours with the addition of Project generated traffic to existing traffic. The proposed Project will not significantly impact any of the four (4) key roadway segments when compared to the LOS standards and significant impact criteria specified in this report. The four (4) key roadway segments currently operate and are forecast to continue to operate at an acceptable service level on a daily basis with the addition of Project generated traffic to existing traffic.  Year 2021 Cumulative Plus Project Traffic Conditions – The proposed Project will not significantly impact any of the five (5) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. The five (5) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS D or better during the AM and PM peak hours with the addition of Project generated traffic to Year 2021 cumulative traffic. The proposed Project will not significantly impact any of the four (4) key roadway segments on a daily basis under Year 2021 Cumulative Plus Project traffic conditions. The four (4) key roadway segments currently operate and are forecast to continue to operate at an acceptable level of service on a daily basis with the addition of Project generated traffic to Year 2021 cumulative traffic.  Site Access and Internal Circulation Evaluation – The proposed project driveways are forecast to operate at acceptable LOS C or better during the AM and PM peak hours for Year 2021 traffic conditions. As such, project access will be adequate. Motorists entering and exiting the Project site will be able to do so comfortably, safely, and without undue congestion. The on-site circulation layout of the proposed Project on an overall basis is adequate. Curb return radii have been confirmed and are generally adequate for small service/delivery (FedEx, UPS) trucks and trash trucks.  Drive-Through Queuing Analysis – The five (5) study sites experienced an 85th percentile queue range between 6 vehicles and 13 vehicles. The proposed Project will provide storage for up to 21 vehicles within the proposed drive-through lane without encroaching into the drive aisle. Therefore, the 85th percentile expected queues can be accommodated without interfering with LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.18.3939.1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 - Chick-fil-A Main Street TIA, Orange 11-13-19.doc 41 internal circulation or causing congestion to the drive aisle. It should be further noted that the proposed 21 vehicle storage drive-through lane can also accommodate the observed 95th percentile queues and the observed maximum queues of the five (5) study sites. In addition, the two (2) stand-alone sites experienced an 85th percentile queue range between 13 vehicles and 15 vehicles. The proposed Project will provide storage for up to 21 vehicles within the proposed drive-through lane without encroaching into the drive aisle. Therefore, the 85th percentile expected queues can be accommodated without interfering with internal circulation or causing congestion to the drive aisles. It should be further noted that the proposed 21 vehicle storage drive-through lane can also accommodate the observed 95th percentile queues (i.e. queue range between 15 vehicles and 17 vehicles) and the maximum queue of 20 vehicles. Even though it is anticipated that the proposed drive-through lane will accommodate all potential queues on site; Chick-fil-A staff will implement the following program, on an as-needed basis during their peak operating times, to further ensure that vehicles will not queue back onto the public streets. The program consists of the following as provided by Chick-fil-A management staff:  “Our restaurants are staffed so that if the drive-thru queuing begins stacking onto the street, team members go out and assist with ordering via Chick-fil-A’s iPad ordering system. Our operators use the iPad ordering during our peak hours of 11:30 am to 1:30 pm and any additional time when needed. The iPad ordering system allows team members to take orders, receive payment, and assist with traffic movement within the parking lot. Based on data from our other comparable stores, the iPad ordering system increases the CFA drive thru speed of service by 30% than the typical speaker box. Putting people forward in the drive-through is one of our biggest competitive advantages in the market because it personally connects our team members with our valued guest. We want to continue this momentum by building a platform to supporting current and future innovations that increase capacity and put our people forward to care for our guest in every interaction. Our customers enjoy the face to face ordering over the standard drive- thru experience.”  Existing Plus Project Recommended Improvements – The proposed Project will not significantly impact any of the five (5) key study intersections or the four (4) key roadway segments. Given that there are no significant project impacts, no improvements are required under Existing Plus Project traffic conditions.  Year 2021 Cumulative Plus Project Recommended Improvements – The proposed Project will not significantly impact any of the five (5) key study intersections or the four (4) key roadway segments. Given that there are no significant project impacts, no improvements are required under Year 2021 Cumulative Plus Project traffic conditions.  Congestion Management Program (CMP) – The proposed Project will not have any significant traffic impacts on the Congestion Management Program Highway System. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-18-3939-1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Dividers.doc APPENDIX A TRAFFIC STUDY SCOPE OF WORK A-1 Mr. Doug Keys March 2, 2018 Page 2 N:\3900\2183939 - Chick-fil-A Main Street, Orange\Letters\3939 TIA Scope of Work 03-02-18.doc 5. Main Street at Palmyra Avenue A. Project Driveway No. 1 at Almond Avenue B. Main Street at Project Driveway No. 2 Key Roadway Segments A. Main Street, between Chapman Avenue and Almond Avenue B. Almond Avenue, between Feldner Road and Main Street C. Almond Avenue, between Main Street and Batavia Street D. Main Street, between Almond Avenue and Palmyra Avenue D. Traffic Counts: The traffic counts for the above listed five (5) key study intersections and four (4) key roadway segments will be conducted on a Tuesday, Wednesday, or Thursday when local schools are in session. E. Project Traffic Generation: The trip generation potential of the Project will be estimated using ITE Land Use 934: Fast-Food Restaurant With Drive-Through rates contained in the 10th Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE), [Washington, D.C., 2017]. The proposed Project is forecast to generate 1,612 daily trips, with 93 trips (47 inbound, 46 outbound) produced in the AM peak hour and 74 trips (38 inbound, 36 outbound) produced in the PM peak hour on a “typical” weekday. See attached project traffic generation forecast – Table 5-1. Please note that the aforementioned overall project trip generation includes adjustments for pass-by as recommended by ITE. The pass-by reduction factors that will be utilized in the traffic impact analysis report, which are summarized in the footnotes of Table 5-1, are based on information published in the Trip Generation Handbook, 3rd Edition, published by ITE (2014). F. Project Traffic Distribution Pattern: See attached project traffic distribution pattern – Figure 5-1. The trip distribution pattern was developed based on the following considerations:  directional flows on the freeways in the immediate vicinity of the project site (i.e. I-5 Freeway and SR-22 Freeway),  the site's proximity to major traffic carriers (i.e. Main Street),  expected localized traffic flow patterns based on adjacent street channelization and presence of traffic signals, and  ingress/egress availability at the project site. A-2 Mr. Doug Keys March 2, 2018 Page 3 N:\3900\2183939 - Chick-fil-A Main Street, Orange\Letters\3939 TIA Scope of Work 03-02-18.doc G. Year 2020 Cumulative Traffic:  Ambient Growth Rate: 1.0% per year.  Cumulative Projects: Obtain information regarding cumulative projects in the vicinity of the proposed project (i.e., 2-mile radius) from the City of Orange, City of Anaheim, City of Santa Ana, and the City of Garden Grove. H. Analysis Scenarios: The following traffic analysis scenarios will be prepared for the proposed Project. (a) Existing Traffic Conditions; (b) Existing Plus Project Traffic Conditions; (c) Scenario (b) with Mitigation, if necessary; (d) Year 2020 Cumulative Traffic Conditions (Existing plus Ambient Growth plus Cumulative Projects); (e) Year 2020 Cumulative Plus Project Traffic Conditions, and (f) Scenario (e) with Mitigation, if necessary. The LOS calculations will be based on the ICU methodology for signalized intersections and the Highway Capacity Manual 6 (HCM 6) methodology for unsignalized intersections. The Project’s potential impact will be based on the significant impact criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. I. Other Issues:  Evaluate Site Access and Internal Circulation (including drive-through queuing). * * * * * * * * * * * We appreciate the opportunity to provide this scope of work. Should you have any questions, please call us at (949) 825-6175. Thank you. Approved by: ________________________________________ City of Orange Date A-3 A-4 A-5 A-6 N:\3900\2183939 - Chick-fil-A Main Street, Orange\Letters\3939 TIA Scope of Work 03-02-18.doc TABLE 5-1 PROJECT TRAFFIC GENERATION FORECAST 1 ITE Land Use Code / Project Description Daily 2-Way AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Generation Factors:  934: Fast-Food Restaurant With Drive-Thru (TE/1000 SF) 470.95 20.50 19.69 40.19 16.99 15.68 32.67 Generation Forecast:  Chick-fil-A Restaurant With Drive-Thru (4,563 SF) 2,149 93 90 183 77 72 149 Pass-By (Daily: 25%, AM: 49%, PM: 50%)2 -537 -46 -44 -90 -39 -36 -75 Subtotal 1,612 47 46 93 38 36 74 Total Traffic Generation Forecast 1,612 47 46 93 38 36 74 1 Source: Trip Generation, 10th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2017). 2 Source: Trip Generation Handbook, 3rd Edition, published by ITE (2014). A-7 A-8 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-18-3939-1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Dividers.doc APPENDIX B EXISTING TRAFFIC COUNT DATA LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Sub-Dividers.doc APPENDIX B-I INTERSECTION COUNTS B-1 File Name : H1803004 Site Code : 00000000 Start Date : 3/7/2018 Page No : 1 City: ORAANGE N-S Direction: MAIN STREET E-W Direction: CHAPMAN AVENUE Groups Printed- Turning Movements MAIN STREET Southbound CHAPMAN AVENUE Westbound MAIN STREET Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 30 155 15 12 75 36 22 88 30 74 94 27 658 07:15 21 197 26 16 99 65 23 79 29 87 112 26 780 07:30 30 196 13 19 101 65 30 125 59 85 135 37 895 07:45 49 187 33 21 113 58 31 150 57 125 154 40 1018 Total 130 735 87 68 388 224 106 442 175 371 495 130 3351 08:00 44 195 20 18 139 67 28 86 67 89 115 29 897 08:15 31 196 26 17 120 47 28 89 45 104 112 28 843 08:30 28 160 25 16 89 64 31 65 59 96 132 36 801 08:45 28 150 18 10 83 40 29 70 38 79 117 18 680 Total 131 701 89 61 431 218 116 310 209 368 476 111 3221 *** BREAK *** 16:00 48 145 38 15 166 29 64 130 123 47 131 32 968 16:15 45 139 36 15 158 41 39 160 125 59 103 27 947 16:30 46 148 29 16 161 41 50 177 111 53 135 45 1012 16:45 42 153 31 13 158 38 41 158 115 40 140 38 967 Total 181 585 134 59 643 149 194 625 474 199 509 142 3894 17:00 61 174 39 15 178 45 49 175 127 47 152 33 1095 17:15 42 154 42 22 198 43 52 187 134 55 146 31 1106 17:30 59 131 30 17 173 30 56 161 128 60 143 33 1021 17:45 47 142 28 19 134 44 42 164 114 75 138 42 989 Total 209 601 139 73 683 162 199 687 503 237 579 139 4211 Grand Total 651 2622 449 261 2145 753 615 2064 1361 1175 2059 522 14677 Apprch %17.5 70.4 12.1 8.3 67.9 23.8 15.2 51.1 33.7 31.3 54.8 13.9 Total %4.4 17.9 3.1 1.8 14.6 5.1 4.2 14.1 9.3 8 14 3.6 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-2 File Name : H1803004 Site Code : 00000000 Start Date : 3/7/2018 Page No : 2 City: ORAANGE N-S Direction: MAIN STREET E-W Direction: CHAPMAN AVENUE MAIN STREET Southbound CHAPMAN AVENUE Westbound MAIN STREET Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 30 196 13 239 19 101 65 185 30 125 59 214 85 135 37 257 895 07:45 49 187 33 269 21 113 58 192 31 150 57 238 125 154 40 319 1018 08:00 44 195 20 259 18 139 67 224 28 86 67 181 89 115 29 233 897 08:15 31 196 26 253 17 120 47 184 28 89 45 162 104 112 28 244 843 Total Volume 154 774 92 1020 75 473 237 785 117 450 228 795 403 516 134 1053 3653 % App. Total 15.1 75.9 9 9.6 60.3 30.2 14.7 56.6 28.7 38.3 49 12.7 PHF .786 .987 .697 .948 .893 .851 .884 .876 .944 .750 .851 .835 .806 .838 .838 .825 .897 MAIN STREET CHAPMAN AVENUE CHAPMAN AVENUE MAIN STREET Right 154 Thru 774 Left 92 InOut Total 659 1020 1679 Right75 Thru473 Left237 OutTotalIn725 785 1510 Left 228 Thru 450 Right 117 Out TotalIn 1414 795 2209 Left134 Thru516 Right403 TotalOutIn855 1053 1908 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-3 File Name : H1803004 Site Code : 00000000 Start Date : 3/7/2018 Page No : 3 City: ORAANGE N-S Direction: MAIN STREET E-W Direction: CHAPMAN AVENUE MAIN STREET Southbound CHAPMAN AVENUE Westbound MAIN STREET Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 61 174 39 274 15 178 45 238 49 175 127 351 47 152 33 232 1095 17:15 42 154 42 238 22 198 43 263 52 187 134 373 55 146 31 232 1106 17:30 59 131 30 220 17 173 30 220 56 161 128 345 60 143 33 236 1021 17:45 47 142 28 217 19 134 44 197 42 164 114 320 75 138 42 255 989 Total Volume 209 601 139 949 73 683 162 918 199 687 503 1389 237 579 139 955 4211 % App. Total 22 63.3 14.6 8 74.4 17.6 14.3 49.5 36.2 24.8 60.6 14.6 PHF .857 .864 .827 .866 .830 .862 .900 .873 .888 .918 .938 .931 .790 .952 .827 .936 .952 MAIN STREET CHAPMAN AVENUE CHAPMAN AVENUE MAIN STREET Right 209 Thru 601 Left 139 InOut Total 899 949 1848 Right73 Thru683 Left162 OutTotalIn917 918 1835 Left 503 Thru 687 Right 199 Out TotalIn 1000 1389 2389 Left139 Thru579 Right237 TotalOutIn1395 955 2350 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-4 File Name : H1803005 Site Code : 00000000 Start Date : 3/7/2018 Page No : 1 City: ORANGE N-S Direction: FELDNER ROAD E-W Direction: ALMOND AVENUE Groups Printed- Turning Movements FELDNER ROAD Southbound ALMOND AVENUE Westbound FELDNER ROAD Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 3 17 5 4 6 1 6 16 4 4 8 2 76 07:15 2 25 5 8 10 2 5 22 2 2 15 1 99 07:30 1 18 14 5 8 7 9 17 7 6 17 3 112 07:45 2 25 12 6 23 10 16 20 7 8 20 3 152 Total 8 85 36 23 47 20 36 75 20 20 60 9 439 08:00 1 26 7 8 15 7 6 12 5 4 11 3 105 08:15 2 15 11 5 13 5 2 19 2 5 9 3 91 08:30 0 16 8 10 10 1 2 17 2 2 9 1 78 08:45 0 9 4 5 5 2 1 15 4 1 12 3 61 Total 3 66 30 28 43 15 11 63 13 12 41 10 335 *** BREAK *** 16:00 2 25 7 12 15 4 1 22 10 5 8 1 112 16:15 1 16 3 7 15 10 2 36 5 4 10 3 112 16:30 1 28 9 6 14 6 2 36 6 3 12 1 124 16:45 2 27 9 11 16 6 5 29 9 1 8 2 125 Total 6 96 28 36 60 26 10 123 30 13 38 7 473 17:00 1 31 7 13 21 8 2 36 8 2 10 2 141 17:15 1 16 7 8 19 5 5 25 5 5 6 2 104 17:30 0 29 8 12 19 7 3 32 6 4 11 3 134 17:45 5 28 6 9 22 6 3 22 5 0 9 3 118 Total 7 104 28 42 81 26 13 115 24 11 36 10 497 Grand Total 24 351 122 129 231 87 70 376 87 56 175 36 1744 Apprch %4.8 70.6 24.5 28.9 51.7 19.5 13.1 70.5 16.3 21 65.5 13.5 Total %1.4 20.1 7 7.4 13.2 5 4 21.6 5 3.2 10 2.1 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-5 File Name : H1803005 Site Code : 00000000 Start Date : 3/7/2018 Page No : 2 City: ORANGE N-S Direction: FELDNER ROAD E-W Direction: ALMOND AVENUE FELDNER ROAD Southbound ALMOND AVENUE Westbound FELDNER ROAD Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 2 25 5 32 8 10 2 20 5 22 2 29 2 15 1 18 99 07:30 1 18 14 33 5 8 7 20 9 17 7 33 6 17 3 26 112 07:45 2 25 12 39 6 23 10 39 16 20 7 43 8 20 3 31 152 08:00 1 26 7 34 8 15 7 30 6 12 5 23 4 11 3 18 105 Total Volume 6 94 38 138 27 56 26 109 36 71 21 128 20 63 10 93 468 % App. Total 4.3 68.1 27.5 24.8 51.4 23.9 28.1 55.5 16.4 21.5 67.7 10.8 PHF .750 .904 .679 .885 .844 .609 .650 .699 .563 .807 .750 .744 .625 .788 .833 .750 .770 FELDNER ROAD ALMOND AVENUE ALMOND AVENUE FELDNER ROAD Right 6 Thru 94 Left 38 InOut Total 108 138 246 Right27 Thru56 Left26 OutTotalIn137 109 246 Left 21 Thru 71 Right 36 Out TotalIn 140 128 268 Left10 Thru63 Right20 TotalOutIn83 93 176 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-6 File Name : H1803005 Site Code : 00000000 Start Date : 3/7/2018 Page No : 3 City: ORANGE N-S Direction: FELDNER ROAD E-W Direction: ALMOND AVENUE FELDNER ROAD Southbound ALMOND AVENUE Westbound FELDNER ROAD Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 2 27 9 38 11 16 6 33 5 29 9 43 1 8 2 11 125 17:00 1 31 7 39 13 21 8 42 2 36 8 46 2 10 2 14 141 17:15 1 16 7 24 8 19 5 32 5 25 5 35 5 6 2 13 104 17:30 0 29 8 37 12 19 7 38 3 32 6 41 4 11 3 18 134 Total Volume 4 103 31 138 44 75 26 145 15 122 28 165 12 35 9 56 504 % App. Total 2.9 74.6 22.5 30.3 51.7 17.9 9.1 73.9 17 21.4 62.5 16.1 PHF .500 .831 .861 .885 .846 .893 .813 .863 .750 .847 .778 .897 .600 .795 .750 .778 .894 FELDNER ROAD ALMOND AVENUE ALMOND AVENUE FELDNER ROAD Right 4 Thru 103 Left 31 InOut Total 175 138 313 Right44 Thru75 Left26 OutTotalIn81 145 226 Left 28 Thru 122 Right 15 Out TotalIn 141 165 306 Left9 Thru35 Right12 TotalOutIn107 56 163 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-7 File Name : H1803006 Site Code : 00000000 Start Date : 3/7/2018 Page No : 1 City: ORANGE N-S Direction: MAIN STREET E-W Direction: ALMOND AVENUE Groups Printed- Turning Movements MAIN STREET Southbound ALMOND AVENUE Westbound MAIN STREET Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left U-Turn Right Thru Left Right Thru Left U-Turn Right Thru Left Int. Total 07:00 7 252 5 0 8 3 11 8 137 5 2 12 11 5 466 07:15 2 323 8 0 5 9 17 11 132 4 4 8 15 4 542 07:30 2 330 17 0 16 12 17 11 195 4 2 8 24 7 645 07:45 8 321 24 0 35 30 25 24 189 0 3 12 53 5 729 Total 19 1226 54 0 64 54 70 54 653 13 11 40 103 21 2382 08:00 0 326 11 0 28 30 42 14 167 6 2 8 28 2 664 08:15 15 326 5 1 20 15 13 9 156 8 4 13 8 3 596 08:30 4 305 2 0 14 6 14 5 160 7 3 8 11 1 540 08:45 7 250 3 0 10 11 9 12 114 7 1 10 8 3 445 Total 26 1207 21 1 72 62 78 40 597 28 10 39 55 9 2245 *** BREAK *** 16:00 5 205 2 0 19 19 15 14 298 6 2 6 7 2 600 16:15 5 229 7 1 18 21 18 20 305 9 4 6 10 2 655 16:30 13 216 6 0 20 8 17 15 291 12 3 7 11 4 623 16:45 6 222 15 0 16 13 17 21 310 7 2 9 9 6 653 Total 29 872 30 1 73 61 67 70 1204 34 11 28 37 14 2531 17:00 12 213 9 2 23 22 21 23 318 17 2 7 12 3 684 17:15 9 243 12 1 24 25 15 26 366 10 0 9 13 3 756 17:30 6 229 10 3 27 25 22 20 328 13 0 10 9 3 705 17:45 9 237 13 0 15 22 24 21 317 16 2 10 11 3 700 Total 36 922 44 6 89 94 82 90 1329 56 4 36 45 12 2845 Grand Total 110 4227 149 8 298 271 297 254 3783 131 36 143 240 56 10003 Apprch %2.4 94.1 3.3 0.2 34.4 31.3 34.3 6 90 3.1 0.9 32.6 54.7 12.8 Total %1.1 42.3 1.5 0.1 3 2.7 3 2.5 37.8 1.3 0.4 1.4 2.4 0.6 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-8 File Name : H1803006 Site Code : 00000000 Start Date : 3/7/2018 Page No : 2 City: ORANGE N-S Direction: MAIN STREET E-W Direction: ALMOND AVENUE MAIN STREET Southbound ALMOND AVENUE Westbound MAIN STREET Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 2 330 17 0 349 16 12 17 45 11 195 4 2 212 8 24 7 39 645 07:45 8 321 24 0 353 35 30 25 90 24 216 12 53 5 70 729 08:00 0 326 11 0 337 28 30 42 100 14 167 6 2 189 8 28 2 38 664 08:15 15 326 5 1 347 20 15 13 48 9 156 8 4 177 13 8 3 24 596 Total Volume 25 1303 57 1 1386 99 87 97 283 58 707 18 11 794 41 113 17 171 2634 % App. Total 1.8 94 4.1 0.1 35 30.7 34.3 7.3 89 2.3 1.4 24 66.1 9.9 PHF .417 .987 .594 .250 .982 .707 .725 .577 .708 .604 .906 .563 .688 .919 .788 .533 .607 .611 .903 MAIN STREET ALMOND AVENUE ALMOND AVENUE MAIN STREET Right 25 Thru 1303 Left 57 U-Turn 1 InOut Total 823 1386 2209 Right99 Thru87 Left97 OutTotalIn228 283 511 Left 18 Thru 707 Right 58 U-Turn 11 Out TotalIn 1441 794 2235 Left17 Thru113 Right41 TotalOutIn130 171 301 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-9 File Name : H1803006 Site Code : 00000000 Start Date : 3/7/2018 Page No : 3 City: ORANGE N-S Direction: MAIN STREET E-W Direction: ALMOND AVENUE MAIN STREET Southbound ALMOND AVENUE Westbound MAIN STREET Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 12 213 9 2 236 23 22 21 66 23 318 17 2 360 7 12 3 22 684 17:15 9 243 12 1 265 24 25 15 64 26 366 10 0 402 9 13 3 25 756 17:30 6 229 10 3 248 27 25 22 74 20 328 13 0 361 10 9 3 22 705 17:45 9 237 13 0 259 15 22 24 61 21 317 16 2 356 10 11 3 24 700 Total Volume 36 922 44 6 1008 89 94 82 265 90 1329 56 4 1479 36 45 12 93 2845 % App. Total 3.6 91.5 4.4 0.6 33.6 35.5 30.9 6.1 89.9 3.8 0.3 38.7 48.4 12.9 PHF .750 .949 .846 .500 .951 .824 .940 .854 .895 .865 .908 .824 .500 .920 .900 .865 1.00 .930 .941 MAIN STREET ALMOND AVENUE ALMOND AVENUE MAIN STREET Right 36 Thru 922 Left 44 U-Turn 6 InOut Total 1430 1008 2438 Right89 Thru94 Left82 OutTotalIn179 265 444 Left 56 Thru 1329 Right 90 U-Turn 4 Out TotalIn 1040 1479 2519 Left12 Thru45 Right36 TotalOutIn186 93 279 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-10 File Name : H1803007 Site Code : 00000000 Start Date : 3/7/2018 Page No : 1 City: ORANGE N-S Direction: BATAVIA STREET E-W Direction: ALMOND AVENUE Groups Printed- Turning Movements BATAVIA STREET Southbound ALMOND AVENUE Westbound BATAVIA STREET Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 4 75 2 3 9 3 0 52 7 16 11 1 183 07:15 1 118 3 5 17 8 2 35 7 13 23 7 239 07:30 4 114 2 9 31 5 7 52 12 16 27 3 282 07:45 3 98 1 8 54 9 5 59 20 30 44 10 341 Total 12 405 8 25 111 25 14 198 46 75 105 21 1045 08:00 2 120 1 10 19 14 2 67 9 22 48 9 323 08:15 2 96 3 7 26 6 2 53 12 10 15 3 235 08:30 3 108 2 6 20 8 1 57 8 9 10 2 234 08:45 2 67 2 4 17 7 5 49 13 8 18 2 194 Total 9 391 8 27 82 35 10 226 42 49 91 16 986 *** BREAK *** 16:00 9 86 7 9 32 13 6 79 16 9 16 7 289 16:15 2 82 7 14 28 9 3 99 12 12 24 5 297 16:30 3 101 4 7 25 12 3 71 13 14 20 7 280 16:45 2 85 12 6 28 6 3 75 14 10 20 7 268 Total 16 354 30 36 113 40 15 324 55 45 80 26 1134 17:00 0 92 5 9 32 10 5 87 18 13 33 2 306 17:15 7 80 5 11 33 9 6 73 16 15 31 11 297 17:30 4 78 8 4 37 6 4 82 16 10 30 8 287 17:45 5 65 6 12 22 8 9 88 22 13 23 3 276 Total 16 315 24 36 124 33 24 330 72 51 117 24 1166 Grand Total 53 1465 70 124 430 133 63 1078 215 220 393 87 4331 Apprch %3.3 92.3 4.4 18 62.6 19.4 4.6 79.5 15.9 31.4 56.1 12.4 Total %1.2 33.8 1.6 2.9 9.9 3.1 1.5 24.9 5 5.1 9.1 2 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-11 File Name : H1803007 Site Code : 00000000 Start Date : 3/7/2018 Page No : 2 City: ORANGE N-S Direction: BATAVIA STREET E-W Direction: ALMOND AVENUE BATAVIA STREET Southbound ALMOND AVENUE Westbound BATAVIA STREET Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 1 118 3 122 5 17 8 30 2 35 7 44 13 23 7 43 239 07:30 4 114 2 120 9 31 5 45 7 52 12 71 16 27 3 46 282 07:45 3 98 1 102 8 54 9 71 5 59 20 84 30 44 10 84 341 08:00 2 120 1 123 10 19 14 43 2 67 9 78 22 48 9 79 323 Total Volume 10 450 7 467 32 121 36 189 16 213 48 277 81 142 29 252 1185 % App. Total 2.1 96.4 1.5 16.9 64 19 5.8 76.9 17.3 32.1 56.3 11.5 PHF .625 .938 .583 .949 .800 .560 .643 .665 .571 .795 .600 .824 .675 .740 .725 .750 .869 BATAVIA STREET ALMOND AVENUE ALMOND AVENUE BATAVIA STREET Right 10 Thru 450 Left 7 InOut Total 274 467 741 Right32 Thru121 Left36 OutTotalIn165 189 354 Left 48 Thru 213 Right 16 Out TotalIn 567 277 844 Left29 Thru142 Right81 TotalOutIn179 252 431 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-12 File Name : H1803007 Site Code : 00000000 Start Date : 3/7/2018 Page No : 3 City: ORANGE N-S Direction: BATAVIA STREET E-W Direction: ALMOND AVENUE BATAVIA STREET Southbound ALMOND AVENUE Westbound BATAVIA STREET Northbound ALMOND AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 0 92 5 97 9 32 10 51 5 87 18 110 13 33 2 48 306 17:15 7 80 5 92 11 33 9 53 6 73 16 95 15 31 11 57 297 17:30 4 78 8 90 4 37 6 47 4 82 16 102 10 30 8 48 287 17:45 5 65 6 76 12 22 8 42 9 88 22 119 13 23 3 39 276 Total Volume 16 315 24 355 36 124 33 193 24 330 72 426 51 117 24 192 1166 % App. Total 4.5 88.7 6.8 18.7 64.2 17.1 5.6 77.5 16.9 26.6 60.9 12.5 PHF .571 .856 .750 .915 .750 .838 .825 .910 .667 .938 .818 .895 .850 .886 .545 .842 .953 BATAVIA STREET ALMOND AVENUE ALMOND AVENUE BATAVIA STREET Right 16 Thru 315 Left 24 InOut Total 390 355 745 Right36 Thru124 Left33 OutTotalIn165 193 358 Left 72 Thru 330 Right 24 Out TotalIn 399 426 825 Left24 Thru117 Right51 TotalOutIn212 192 404 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-13 File Name : H1803008 Site Code : 00000000 Start Date : 3/7/2018 Page No : 1 City: ORANGE N-S Direction: MAIN STREET E-W Direction: PALMYRA AVENUE Groups Printed- Turning Movements MAIN STREET Southbound PALMYRA AVENUE Westbound MAIN STREET Northbound PALMYRA AVENUE Eastbound Start Time Right Thru Left U-Turn Right Thru Left Right Thru Left U-Turn Right Thru Left Int. Total 07:00 8 264 2 1 1 3 6 2 127 17 2 11 5 16 465 07:15 12 315 5 1 2 1 2 4 131 18 3 19 5 19 537 07:30 5 326 3 1 3 4 3 2 182 23 3 18 7 29 609 07:45 14 325 5 1 8 9 7 11 234 33 2 17 8 36 710 Total 39 1230 15 4 14 17 18 19 674 91 10 65 25 100 2321 08:00 20 344 5 1 1 3 5 5 160 22 0 27 7 19 619 08:15 9 336 3 0 2 11 5 10 141 24 5 21 1 19 587 08:30 6 314 3 2 1 6 4 5 161 26 4 26 4 13 575 08:45 9 254 7 3 5 11 12 14 121 12 3 30 4 19 504 Total 44 1248 18 6 9 31 26 34 583 84 12 104 16 70 2285 *** BREAK *** 16:00 17 219 6 4 4 5 6 7 304 20 1 21 3 18 635 16:15 9 230 4 4 5 9 9 3 319 13 3 15 3 16 642 16:30 20 207 4 5 10 14 6 6 306 15 2 16 6 24 641 16:45 23 217 2 4 10 5 6 5 282 14 9 30 5 19 631 Total 69 873 16 17 29 33 27 21 1211 62 15 82 17 77 2549 17:00 19 241 0 3 10 15 11 8 348 12 1 23 2 36 729 17:15 15 229 3 3 7 9 5 9 331 12 1 21 3 17 665 17:30 23 224 2 2 6 6 9 6 354 10 2 17 4 24 689 17:45 10 235 7 4 6 6 9 11 296 17 1 14 7 28 651 Total 67 929 12 12 29 36 34 34 1329 51 5 75 16 105 2734 Grand Total 219 4280 61 39 81 117 105 108 3797 288 42 326 74 352 9889 Apprch %4.8 93.1 1.3 0.8 26.7 38.6 34.7 2.6 89.7 6.8 1 43.4 9.8 46.8 Total %2.2 43.3 0.6 0.4 0.8 1.2 1.1 1.1 38.4 2.9 0.4 3.3 0.7 3.6 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-14 File Name : H1803008 Site Code : 00000000 Start Date : 3/7/2018 Page No : 2 City: ORANGE N-S Direction: MAIN STREET E-W Direction: PALMYRA AVENUE MAIN STREET Southbound PALMYRA AVENUE Westbound MAIN STREET Northbound PALMYRA AVENUE Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 5 326 3 1 335 3 4 3 10 2 182 23 3 210 18 7 29 54 609 07:45 14 325 5 1 345 8 9 7 24 11 234 33 280 17 8 36 61 710 08:00 20 344 5 1 370 1 3 5 9 5 160 22 0 187 27 7 19 53 619 08:15 9 336 3 0 348 2 11 5 18 10 141 24 5 180 21 1 19 41 587 Total Volume 48 1331 16 3 1398 14 27 20 61 28 717 102 10 857 83 23 103 209 2525 % App. Total 3.4 95.2 1.1 0.2 23 44.3 32.8 3.3 83.7 11.9 1.2 39.7 11 49.3 PHF .600 .967 .800 .750 .945 .438 .614 .714 .635 .636 .766 .773 .500 .765 .769 .719 .715 .857 .889 MAIN STREET PALMYRA AVENUE PALMYRA AVENUE MAIN STREET Right 48 Thru 1331 Left 16 U-Turn 3 InOut Total 834 1398 2232 Right14 Thru27 Left20 OutTotalIn67 61 128 Left 102 Thru 717 Right 28 U-Turn 10 Out TotalIn 1434 857 2291 Left103 Thru23 Right83 TotalOutIn177 209 386 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-15 File Name : H1803008 Site Code : 00000000 Start Date : 3/7/2018 Page No : 3 City: ORANGE N-S Direction: MAIN STREET E-W Direction: PALMYRA AVENUE MAIN STREET Southbound PALMYRA AVENUE Westbound MAIN STREET Northbound PALMYRA AVENUE Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 19 241 0 3 263 10 15 11 36 8 348 12 1 369 23 2 36 61 729 17:15 15 229 3 3 250 7 9 5 21 9 331 12 1 353 21 3 17 41 665 17:30 23 224 2 2 251 6 6 9 21 6 354 10 2 372 17 4 24 45 689 17:45 10 235 7 4 256 6 6 9 21 11 17 7 28 49 651 Total Volume 67 929 12 12 1020 29 36 34 99 34 1329 51 5 1419 75 16 105 196 2734 % App. Total 6.6 91.1 1.2 1.2 29.3 36.4 34.3 2.4 93.7 3.6 0.4 38.3 8.2 53.6 PHF .728 .964 .429 .750 .970 .725 .600 .773 .688 .773 .939 .750 .625 .954 .815 .571 .729 .803 .938 MAIN STREET PALMYRA AVENUE PALMYRA AVENUE MAIN STREET Right 67 Thru 929 Left 12 U-Turn 12 InOut Total 1463 1020 2483 Right29 Thru36 Left34 OutTotalIn62 99 161 Left 51 Thru 1329 Right 34 U-Turn 5 Out TotalIn 1038 1419 2457 Left105 Thru16 Right75 TotalOutIn154 196 350 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-16 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Sub-Dividers.doc APPENDIX B-II ROADWAY SEGMENT COUNTS B-17 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::MAIN STREETLocation Date::CHAPMAN AVE TO ALMOND AVESegment 03/07/18 :LL&GClient Interval Combined Day:NB SB Wednesday Begin PMAMPMAMPMAM 12:00 89 280 1,076 35 93 246 892 182 1,9682552660 12:15 296 16 20427 50043 12:30 262 22 20817 47039 12:45 238 20 23420 47240 01:00 42 280 1,031 10 49 227 821 91 1,8521050720 01:15 284 14 2047 48821 01:30 232 13 21211 44424 01:45 235 12 17814 41326 02:00 40 262 1,055 6 25 208 824 65 1,8791547021 02:15 262 9 1908 45217 02:30 271 4 21615 48719 02:45 260 6 2102 4708 03:00 51 268 1,131 8 36 249 944 87 2,0751451722 03:15 296 8 24213 53821 03:30 310 8 22714 53722 03:45 257 12 22610 48322 04:00 105 338 1,316 8 86 214 924 191 2,2401755225 04:15 308 10 24614 55424 04:30 328 30 23632 56462 04:45 342 38 22842 57080 05:00 267 378 1,423 34 224 276 1,027 491 2,4503765471 05:15 362 38 25350 61588 05:30 363 72 23482 597154 05:45 320 80 26498 584178 06:00 469 298 1,012 99 689 240 822 1,158 1,83482538181 06:15 278 144 20292 480236 06:30 228 184 192125 420309 06:45 208 262 188170 396432 07:00 734 206 746 278 1,383 170 532 2,117 1,278134376412 07:15 208 354 124144 332498 07:30 164 361 130222 294583 07:45 168 390 108234 276624 08:00 662 128 489 370 1,295 95 382 1,957 871190223560 08:15 139 348 91166 230514 08:30 108 318 102150 210468 08:45 114 259 94156 208415 09:00 704 98 346 166 644 90 310 1,348 656179188345 09:15 106 164 90165 196329 09:30 75 162 72179 147341 09:45 67 152 58181 125333 10:00 749 76 262 176 671 59 203 1,420 465168135344 10:15 62 169 54183 116352 10:30 62 170 44188 106358 10:45 62 156 46210 108366 11:00 953 61 175 180 764 39 131 1,717 306198100378 11:15 32 172 34199 66371 11:30 48 187 31286 79473 11:45 34 225 27270 61495 Totals 4,865 10,062 5,959 7,812 10,824 17,874 Split%56.3 55.1 43.744.9 Day Totals 13,771 28,69814,927 Day Splits 52.0 48.0 Peak Hour 11:00 04:45 07:15 05:00 07:30 05:00 Volume 953 1,445 1,475 1,027 2,281 2,450 Factor 0.83 0.96 0.95 0.93 0.91 0.94 Printed :3/12/2018Data File :D1803010* B-18 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::ALMOND AVENUELocation Date::FELDNER RD TO MAIN STSegment 03/07/18 :LL&GClient Interval Combined Day:WB EB Wednesday Begin PMAMPMAMPMAM 12:00 5 27 106 3 6 20 78 11 1843476 12:15 25 0 191 441 12:30 28 2 221 503 12:45 26 1 170 431 01:00 6 16 63 0 3 12 64 9 1272282 01:15 15 1 131 282 01:30 16 1 170 331 01:45 16 1 223 384 02:00 2 18 82 0 1 14 73 3 1551321 02:15 28 0 180 460 02:30 21 1 201 412 02:45 15 0 210 360 03:00 0 31 98 1 3 22 65 3 1630531 03:15 20 2 60 262 03:30 24 0 140 380 03:45 23 0 230 460 04:00 3 39 128 2 8 12 69 11 1971513 04:15 29 2 192 484 04:30 34 3 220 563 04:45 26 1 160 421 05:00 11 51 179 2 20 18 83 31 2623695 05:15 40 6 224 6210 05:30 48 8 192 6710 05:45 40 4 242 646 06:00 26 37 96 10 61 16 63 87 15945314 06:15 24 16 223 4619 06:30 18 8 1513 3321 06:45 17 27 106 2733 07:00 89 17 67 22 152 10 36 241 103152737 07:15 16 23 916 2539 07:30 17 42 1216 2958 07:45 17 65 542 22107 08:00 99 18 44 22 80 10 41 179 85282850 08:15 4 20 932 1352 08:30 9 20 1313 2233 08:45 13 18 926 2244 09:00 59 15 40 14 60 8 20 119 60142328 09:15 5 16 412 928 09:30 8 17 216 1033 09:45 12 13 617 1830 10:00 39 6 23 8 49 6 13 88 36111219 10:15 7 14 29 923 10:30 4 10 39 719 10:45 6 17 210 827 11:00 57 4 12 12 59 0 12 116 2414426 11:15 6 9 314 923 11:30 1 22 412 534 11:45 1 16 517 633 Totals 396 938 502 617 898 1,555 Split%60.3 55.9 39.744.1 Day Totals 1,119 2,4531,334 Day Splits 54.4 45.6 Peak Hour 07:30 05:00 07:00 05:00 07:30 05:00 Volume 118 179 152 83 267 262 Factor 0.70 0.88 0.58 0.86 0.62 0.95 Printed :3/12/2018Data File :D1803011 B-19 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::ALMOND AVENUELocation Date::MAIN ST TO BATAVIA AVESegment 03/07/18 :LL&GClient Interval Combined Day:EB WB Wednesday Begin PMAMPMAMPMAM 12:00 15 118 304 0 6 99 342 21 64672177 12:15 77 2 1163 1935 12:30 51 4 752 1266 12:45 58 0 523 1103 01:00 4 40 201 0 3 36 179 7 3800760 01:15 37 0 552 922 01:30 49 0 422 912 01:45 75 3 460 1213 02:00 1 76 212 5 7 48 206 8 41801245 02:15 54 0 641 1181 02:30 42 2 520 942 02:45 40 0 420 820 03:00 2 44 184 0 3 53 241 5 4250970 03:15 24 1 710 951 03:30 58 2 490 1072 03:45 58 0 682 1262 04:00 8 38 230 0 5 81 288 13 51801190 04:15 62 2 520 1142 04:30 56 1 572 1133 04:45 74 2 986 1728 05:00 15 93 340 1 9 156 660 24 1,00032494 05:15 83 0 1620 2450 05:30 84 6 1926 27612 05:45 80 2 1506 2308 06:00 83 54 170 8 80 130 388 163 558418412 06:15 36 18 9620 13238 06:30 42 34 8615 12849 06:45 38 20 7644 11464 07:00 442 31 108 28 287 70 207 729 3154010168 07:15 31 46 4264 73110 07:30 20 89 54104 74193 07:45 26 124 41234 67358 08:00 154 31 89 144 286 39 136 440 2256670210 08:15 22 58 3828 6086 08:30 18 46 3226 5072 08:45 18 38 2734 4572 09:00 115 12 48 38 121 16 84 236 132372875 09:15 22 22 2222 4444 09:30 8 24 2826 3650 09:45 6 37 1830 2467 10:00 119 18 41 38 144 14 62 263 103213259 10:15 8 38 2432 3270 10:30 6 36 1524 2160 10:45 9 32 942 1874 11:00 231 2 17 36 173 16 43 404 60401876 11:15 10 48 1038 2086 11:30 4 44 1159 15103 11:45 1 45 694 7139 Totals 1,189 1,944 1,124 2,836 2,313 4,780 Split%40.7 48.6 59.351.4 Day Totals 3,960 7,0933,133 Day Splits 44.2 55.8 Peak Hour 07:15 05:00 07:30 05:00 07:15 05:00 Volume 468 340 415 660 871 1,000 Factor 0.50 0.91 0.72 0.86 0.61 0.91 Printed :3/12/2018Data File :D1803012* B-20 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::MAIN STREETLocation Date::ALMOND AVE TO PALMYRA AVESegment 03/07/18 :LL&GClient File:D1803013 Interval Combined Day:NB SB Wednesday Begin PMAMPMAMPMAM 12:00 76 279 1,092 36 94 256 912 170 2,0042453560 12:15 291 16 21222 50338 12:30 242 24 20014 44238 12:45 280 18 24416 52434 01:00 38 262 1,056 9 48 228 833 86 1,889949018 01:15 278 14 2107 48821 01:30 253 13 2139 46622 01:45 263 12 18213 44525 02:00 35 251 1,045 8 29 183 790 64 1,8351143419 02:15 279 9 1857 46416 02:30 265 6 21013 47519 02:45 250 6 2124 46210 03:00 40 274 1,148 9 37 254 950 77 2,0981152820 03:15 279 9 2269 50518 03:30 309 9 24011 54920 03:45 286 10 2309 51619 04:00 91 326 1,315 11 98 230 958 189 2,2731655627 04:15 324 16 25014 57430 04:30 318 33 23823 55656 04:45 347 38 24038 58776 05:00 227 366 1,445 37 238 264 1,020 465 2,4653263069 05:15 376 42 25238 62880 05:30 352 80 23769 589149 05:45 351 79 26788 618167 06:00 418 295 1,048 104 696 242 836 1,114 1,88469537173 06:15 300 151 20880 508231 06:30 238 204 194129 432333 06:45 215 237 192140 407377 07:00 709 197 695 279 1,308 178 544 2,017 1,239141375420 07:15 176 343 124136 300479 07:30 161 333 128190 289523 07:45 161 353 114242 275595 08:00 636 128 462 348 1,253 107 402 1,889 864167235515 08:15 122 336 96156 218492 08:30 105 315 105170 210485 08:45 107 254 94143 201397 09:00 720 109 323 164 661 87 301 1,381 624185196349 09:15 82 172 84166 166338 09:30 69 165 70195 139360 09:45 63 160 60174 123334 10:00 741 80 251 170 713 63 212 1,454 463163143333 10:15 53 193 58191 111384 10:30 59 184 43182 102366 10:45 59 166 48205 107371 11:00 988 64 162 180 756 39 128 1,744 290211103391 11:15 26 176 31233 57409 11:30 41 190 32258 73448 11:45 31 210 26286 57496 Totals 4,719 10,042 5,931 7,886 10,650 17,928 Split%56.0 55.7 44.044.3 Day Totals 13,817 28,57814,761 Day Splits 51.7 48.3 Peak Hour 11:00 05:00 07:15 05:00 07:30 05:00 Volume 988 1,445 1,377 1,020 2,125 2,465 Factor 0.86 0.96 0.98 0.96 0.89 0.98 Printed :3/12/2018Data File :D1803013 B-21 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-18-3939-1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Dividers.doc APPENDIX C INTERSECTION LEVEL OF SERVICE CALCULATION WORKSHEETS LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Sub-Dividers.doc APPENDIX C-I EXISTING TRAFFIC CONDITIONS C-1 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.654Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 7547323740351613415477492117450228Total Analysis Volume [veh/h] 19118591011293439194232911357Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 7547323740351613415477492117450228Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7547323740351613415477492117450228Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes C-2 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.654Intersection V/C BIntersection LOS 0.000.140.140.170.150.080.090.230.050.000.130.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings C-3 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.176Volume to Capacity (v/c): ALevel Of Service: 8.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 27562620631069438367121Total Analysis Volume [veh/h] 71475163224109185Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 27562620631069438367121Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 27562620631069438367121Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes C-4 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with AIntersection LOS 8.36Intersection Delay [s/veh] AAAAApproach LOS 8.318.218.588.28Approach Delay [s/veh] 12.0010.0415.9214.0095th-Percentile Queue Length [ft] 0.480.400.640.5695th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.140.120.180.16Degree of Utilization, x 787784783809Capacity per Entry Lane [veh/h] Lanes Intersection Settings C-5 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.475Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 9987974111317251303585870729Total Analysis Volume [veh/h] 25222410284632615151777Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 9987974111317251303585870729Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9987974111317251303585870729Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes C-6 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.475Intersection V/C AIntersection LOS 0.110.110.060.090.090.010.260.260.030.030.140.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings C-7 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.786Volume to Capacity (v/c): CLevel Of Service: 20.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 321213681142291045071621348Total Analysis Volume [veh/h] 8309203673113245312Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 321213681142291045071621348Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 321213681142291045071621348Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes C-8 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with CIntersection LOS 20.02Intersection Delay [s/veh] BCDCApproach LOS 13.7515.1627.7515.68Approach Delay [s/veh] 40.9160.51187.5068.7695th-Percentile Queue Length [ft] 1.642.427.502.7595th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.360.460.790.50Degree of Utilization, x 523545594557Capacity per Entry Lane [veh/h] Lanes Intersection Settings C-9 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.521Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 14272083231034813311928717112Total Analysis Volume [veh/h] 47521626123335717928Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 14272083231034813311928717112Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 14272083231034813311928717112Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes C-10 Scenario 1: 1 AM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.521Intersection V/C AIntersection LOS 0.040.040.010.120.120.060.270.270.010.150.150.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings C-11 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.657Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 73683162237579139209601139199687503Total Analysis Volume [veh/h] 18171415914535521503550172126Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 73683162237579139209601139199687503Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 73683162237579139209601139199687503Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes C-12 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.657Intersection V/C BIntersection LOS 0.000.200.100.000.170.080.120.180.080.020.200.15V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings C-13 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.209Volume to Capacity (v/c): ALevel Of Service: 8.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 447526123594103311512228Total Analysis Volume [veh/h] 1119739212684317Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 447526123594103311512228Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 447526123594103311512228Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes C-14 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with AIntersection LOS 8.63Intersection Delay [s/veh] AAAAApproach LOS 8.628.138.658.78Approach Delay [s/veh] 16.845.9716.1319.6895th-Percentile Queue Length [ft] 0.670.240.650.7995th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.180.070.180.21Degree of Utilization, x 785758774788Capacity per Entry Lane [veh/h] Lanes Intersection Settings C-15 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.455Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 899482364512369225090132960Total Analysis Volume [veh/h] 22242191139231132333215Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 899482364512369225090132960Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 899482364512369225090132960Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes C-16 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.455Intersection V/C AIntersection LOS 0.110.110.050.050.050.010.190.190.030.050.260.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings C-17 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.709Volume to Capacity (v/c): CLevel Of Service: 18.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 3612433511172416315242433072Total Analysis Volume [veh/h] 931813296479668318Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3612433511172416315242433072Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3612433511172416315242433072Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes C-18 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with CIntersection LOS 18.02Intersection Delay [s/veh] BBCCApproach LOS 13.5113.3617.9422.23Approach Delay [s/veh] 40.8940.14100.01144.3995th-Percentile Queue Length [ft] 1.641.614.005.7895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.360.360.600.71Degree of Utilization, x 534538589601Capacity per Entry Lane [veh/h] Lanes Intersection Settings C-19 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.467Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2936347516105679292434132956Total Analysis Volume [veh/h] 79919426172326933214Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2936347516105679292434132956Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2936347516105679292434132956Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes C-20 Scenario 2: 2 PM Existing Chick-fil-A Main Street, Orange Version 5.00-05 Generated with 0.467Intersection V/C AIntersection LOS 0.060.060.020.120.120.060.200.200.010.270.270.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings C-21 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Sub-Dividers.doc APPENDIX C-II EXISTING PLUS PROJECT TRAFFIC CONDITIONS C-22 0.669Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 7547324641551613415478192126457233Total Analysis Volume [veh/h] 19118621041293439195233211458Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 7547324641551613415478192126457233Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7547324641551613415478192126457233Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-23 0.669Intersection V/C BIntersection LOS 0.000.140.140.180.150.080.090.230.050.000.130.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal Group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-24 0.177Volume to Capacity (v/c): ALevel Of Service: 8.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 34582620651069438367121Total Analysis Volume [veh/h] 91575163224109185Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 34582620651069438367121Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 34582620651069438367121Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-25 AIntersection LOS 8.40Intersection Delay [s/veh] AAAAApproach LOS 8.358.248.628.32Approach Delay [s/veh] 13.0810.3316.0314.1095th-Percentile Queue Length [ft] 0.520.410.640.5695th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.150.120.180.16Degree of Utilization, x 790782778804Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-26 0.510Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 99821074511849251331585869560Total Analysis Volume [veh/h] 2521271130126333151517415Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 99821074511849251331585869560Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 99821074511849251331585869560Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-27 0.510Intersection V/C AIntersection LOS 0.110.110.060.100.100.030.270.270.030.030.140.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-28 0.794Volume to Capacity (v/c): CLevel Of Service: 20.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 321233681144311245071621348Total Analysis Volume [veh/h] 8319203683113245312Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 321233681144311245071621348Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 321233681144311245071621348Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-29 CIntersection LOS 20.44Intersection Delay [s/veh] BCDCApproach LOS 13.9115.4428.5415.85Approach Delay [s/veh] 41.9062.70192.1869.6095th-Percentile Queue Length [ft] 1.682.517.692.7895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.370.470.790.50Degree of Utilization, x 519542590553Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-30 0.523Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 14272083231034813432628729112Total Analysis Volume [veh/h] 47521626123367718228Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 14272083231034813432628729112Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 14272083231034813432628729112Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-31 0.523Intersection V/C AIntersection LOS 0.040.040.010.120.120.060.270.270.020.150.150.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-32 0.660Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 73683170247579139209607139206692507Total Analysis Volume [veh/h] 18171436214535521523552173127Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 73683170247579139209607139206692507Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 73683170247579139209607139206692507Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-33 0.660Intersection V/C BIntersection LOS 0.000.200.100.000.170.080.120.180.080.020.200.15V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal Group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-34 0.211Volume to Capacity (v/c): ALevel Of Service: 8.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 497726123794103311512228Total Analysis Volume [veh/h] 1219739212684317Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 497726123794103311512228Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 497726123794103311512228Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-35 AIntersection LOS 8.66Intersection Delay [s/veh] AAAAApproach LOS 8.678.168.698.81Approach Delay [s/veh] 17.816.2216.2319.8095th-Percentile Queue Length [ft] 0.710.250.650.7995th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.190.080.180.21Degree of Utilization, x 786756771784Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-36 0.465Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 899090404937369455090131886Total Analysis Volume [veh/h] 222323101299236132333022Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 899090404937369455090131886Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 899090404937369455090131886Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-37 0.465Intersection V/C AIntersection LOS 0.110.110.050.050.050.020.190.190.030.050.260.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-38 0.714Volume to Capacity (v/c): CLevel Of Service: 18.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 3612633511192618315242433072Total Analysis Volume [veh/h] 932813307579668318Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3612633511192618315242433072Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3612633511192618315242433072Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-39 CIntersection LOS 18.30Intersection Delay [s/veh] BBCCApproach LOS 13.6613.5718.2622.62Approach Delay [s/veh] 41.8741.72102.38146.6195th-Percentile Queue Length [ft] 1.671.674.105.8695th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.370.370.610.71Degree of Utilization, x 531535586597Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-40 0.472Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2936347516105679382934133956Total Analysis Volume [veh/h] 79919426172357933514Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2936347516105679382934133956Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2936347516105679382934133956Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-41 0.472Intersection V/C AIntersection LOS 0.060.060.020.120.120.060.200.200.020.270.270.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-42 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Sub-Dividers.doc APPENDIX C-III YEAR 2021 CUMULATIVE TRAFFIC CONDITIONS C-43 0.673Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 7751523642856715417378995144487275Total Analysis Volume [veh/h] 19129591071423943197243612269Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 7751523642856715417378995144487275Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7751523642856715417378995144487275Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-44 0.673Intersection V/C BIntersection LOS 0.000.150.140.170.170.090.100.230.060.000.140.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal Group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-45 0.182Volume to Capacity (v/c): ALevel Of Service: 8.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 28582721651069739377322Total Analysis Volume [veh/h] 71575163224109186Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 28582721651069739377322Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 28582721651069739377322Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-46 AIntersection LOS 8.43Intersection Delay [s/veh] AAAAApproach LOS 8.388.268.658.35Approach Delay [s/veh] 12.5910.4716.5914.6295th-Percentile Queue Length [ft] 0.500.420.660.5895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.140.120.180.16Degree of Utilization, x 782780778805Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-47 0.487Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 102901004211618261341606081530Total Analysis Volume [veh/h] 26232511295733515152048Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 102901004211618261341606081530Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 102901004211618261341606081530Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-48 0.487Intersection V/C AIntersection LOS 0.110.110.060.090.090.010.270.270.040.040.160.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-49 0.826Volume to Capacity (v/c): CLevel Of Service: 22.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 331253783146301046471621949Total Analysis Volume [veh/h] 8319213783116245512Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 331253783146301046471621949Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 331253783146301046471621949Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-50 CIntersection LOS 22.17Intersection Delay [s/veh] BCDCApproach LOS 14.3615.9931.9616.60Approach Delay [s/veh] 44.4165.92213.0574.9395th-Percentile Queue Length [ft] 1.782.648.523.0095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.380.490.830.52Degree of Utilization, x 510533582545Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-51 0.535Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 14282185241064913702029826115Total Analysis Volume [veh/h] 47521627123435720729Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 14282185241064913702029826115Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 14282185241064913702029826115Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-52 0.535Intersection V/C AIntersection LOS 0.040.040.010.130.130.060.280.280.010.170.170.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-53 0.708Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 75742189282626157231641143206709540Total Analysis Volume [veh/h] 19186477115739581603652177135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 75742189282626157231641143206709540Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 75742189282626157231641143206709540Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-54 0.708Intersection V/C CIntersection LOS 0.000.220.110.010.180.090.140.190.080.010.210.16V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal Group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-55 0.217Volume to Capacity (v/c): ALevel Of Service: 8.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 457727123694106321512629Total Analysis Volume [veh/h] 1119739212784327Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 457727123694106321512629Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 457727123694106321512629Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-56 AIntersection LOS 8.70Intersection Delay [s/veh] AAAAApproach LOS 8.708.178.728.86Approach Delay [s/veh] 17.546.1316.8020.5695th-Percentile Queue Length [ft] 0.700.250.670.8295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.190.080.180.22Degree of Utilization, x 781753771784Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-57 0.472Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 9297843746123710345293139462Total Analysis Volume [veh/h] 23242191239259132334916Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 9297843746123710345293139462Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9297843746123710345293139462Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-58 0.472Intersection V/C AIntersection LOS 0.110.110.050.050.050.010.210.210.030.050.270.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-59 0.746Volume to Capacity (v/c): CLevel Of Service: 19.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 3712834531212516324252534074Total Analysis Volume [veh/h] 932913306481668519Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3712834531212516324252534074Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3712834531212516324252534074Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-60 CIntersection LOS 19.64Intersection Delay [s/veh] BBCCApproach LOS 14.1113.9719.4324.89Approach Delay [s/veh] 44.3643.85111.01163.1595th-Percentile Queue Length [ft] 1.771.754.446.5395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.380.380.630.75Degree of Utilization, x 521525577589Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-61 0.484Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 30373577161086910412535139458Total Analysis Volume [veh/h] 89919427172606934915Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 30373577161086910412535139458Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 30373577161086910412535139458Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-62 0.484Intersection V/C AIntersection LOS 0.060.060.020.120.120.060.220.220.010.280.280.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-63 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Sub-Dividers.doc APPENDIX C-IV YEAR 2021 CUMULATIVE PLUS PROJECT TRAFFIC CONDITIONS C-64 0.687Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 7751524544056715417379695153494280Total Analysis Volume [veh/h] 19129611101423943199243812470Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 7751524544056715417379695153494280Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7751524544056715417379695153494280Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-65 0.687Intersection V/C BIntersection LOS 0.000.150.140.180.170.090.100.230.060.000.150.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal Group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-66 0.183Volume to Capacity (v/c): ALevel Of Service: 8.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 35602721671069739377322Total Analysis Volume [veh/h] 91575173224109186Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 35602721671069739377322Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 35602721671069739377322Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-67 AIntersection LOS 8.47Intersection Delay [s/veh] AAAAApproach LOS 8.428.308.698.39Approach Delay [s/veh] 13.7010.7716.7114.7395th-Percentile Queue Length [ft] 0.550.430.670.5995th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.160.130.180.17Degree of Utilization, x 786777774799Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-68 0.522Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 102851104612150261369606080361Total Analysis Volume [veh/h] 2621281230137342151520115Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 102851104612150261369606080361Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 102851104612150261369606080361Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-69 0.522Intersection V/C AIntersection LOS 0.110.110.060.100.100.030.270.270.040.040.160.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-70 0.834Volume to Capacity (v/c): CLevel Of Service: 22.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 331273783148321246471621949Total Analysis Volume [veh/h] 8329213783116245512Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 331273783148321246471621949Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 331273783148321246471621949Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-71 CIntersection LOS 22.70Intersection Delay [s/veh] BCDCApproach LOS 14.5416.3132.9916.80Approach Delay [s/veh] 45.5068.35218.5475.9095th-Percentile Queue Length [ft] 1.822.738.743.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.390.500.830.53Degree of Utilization, x 507530579541Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-72 0.537Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 14282185241064913822729838115Total Analysis Volume [veh/h] 47521627123467721029Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 14282185241064913822729838115Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 14282185241064913822729838115Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-73 0.537Intersection V/C AIntersection LOS 0.040.040.010.130.130.060.280.280.020.170.170.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-74 0.711Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: Main Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 130.00100.00225.00205.00100.00150.00130.00100.00190.00215.00100.00145.00Pocket Length [ft] 101101101102No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 75742197292626157231647143213714544Total Analysis Volume [veh/h] 19186497315739581623653179136Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 75742197292626157231647143213714544Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 75742197292626157231647143213714544Base Volume Input [veh/h] Chapman AvenueChapman AvenueMain StreetMain StreetName Volumes Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-75 0.711Intersection V/C CIntersection LOS 0.000.220.120.010.180.090.140.190.080.010.210.16V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 1,45,82,7Auxiliary Signal Groups 447883061225Signal Group OverlapPermissProtecteOverlapPermissProtectePermissPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-76 0.218Volume to Capacity (v/c): ALevel Of Service: 8.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 2: Feldner Road at Almond Avenue Intersection Level Of Service Report NoNoNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Intersection Setup 0000Pedestrian Volume [ped/h] 507927123894106321512629Total Analysis Volume [veh/h] 13207310212784327Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 507927123894106321512629Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 507927123894106321512629Base Volume Input [veh/h] Almond AvenueAlmond AvenueFeldner RoadFeldner RoadName Volumes Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-77 AIntersection LOS 8.74Intersection Delay [s/veh] AAAAApproach LOS 8.758.218.768.90Approach Delay [s/veh] 18.536.3816.9020.6995th-Percentile Queue Length [ft] 0.740.260.680.8395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.200.080.190.22Degree of Utilization, x 781750767780Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-78 0.482Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Main Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.0045.00100.00100.0045.00100.00100.0085.0085.00100.00100.00Pocket Length [ft] 001001001101No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 9293924150373710575293138388Total Analysis Volume [veh/h] 232323101399264132334622Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 9293924150373710575293138388Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9293924150373710575293138388Base Volume Input [veh/h] Almond AvenueAlmond AvenueMain StreetMain StreetName Volumes Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-79 0.482Intersection V/C AIntersection LOS 0.110.110.050.050.050.020.210.210.030.050.270.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-80 0.751Volume to Capacity (v/c): CLevel Of Service: 20.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 4: Batavia Street at Almond Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Intersection Setup 0000Pedestrian Volume [ped/h] 3713034531232718324252534074Total Analysis Volume [veh/h] 933913317581668519Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3713034531232718324252534074Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3713034531232718324252534074Base Volume Input [veh/h] Almond AvenueAlmond AvenueBatavia StreetBatavia StreetName Volumes Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-81 CIntersection LOS 19.98Intersection Delay [s/veh] BBCDApproach LOS 14.2814.2019.8325.39Approach Delay [s/veh] 45.4545.59113.76165.8395th-Percentile Queue Length [ft] 1.821.824.556.6395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.390.390.640.75Degree of Utilization, x 518523573584Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-82 0.489Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: Main Street at Palmyra Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.0085.00100.00100.0065.00Pocket Length [ft] 000000001001No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 30373577161086910503035140458Total Analysis Volume [veh/h] 89919427172638935115Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 30373577161086910503035140458Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 30373577161086910503035140458Base Volume Input [veh/h] Palmyra AvenuePalmyra AvenueMain StreetMain StreetName Volumes Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-83 0.489Intersection V/C AIntersection LOS 0.060.060.020.120.120.060.220.220.020.280.280.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal Group PermissPermissPermissPermissPermissPermissPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with C-84 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-18-3939-1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Dividers.doc APPENDIX D PROJECT DRIVEWAY LEVEL OF SERVICE CALCULATION WORKSHEETS LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Sub-Dividers.doc APPENDIX D-I YEAR 2021 CUMULATIVE PLUS PROJECT TRAFFIC CONDITIONS D-1 0.019Volume to Capacity (v/c): BLevel Of Service: 10.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 6: Project Driveway No. 1 at Almond Avenue Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Almond AvenueAlmond AvenueProject Driveway No. 1Name Intersection Setup 000Pedestrian Volume [ped/h] 140001783813Total Analysis Volume [veh/h] 350045103Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 140001783813Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 140001783813Base Volume Input [veh/h] Almond AvenueAlmond AvenueProject Driveway No. 1Name Volumes Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-2 BIntersection LOS 1.35d_I, Intersection Delay [s/veh] AAAApproach LOS 0.000.009.76d_A, Approach Delay [s/veh] 0.000.000.000.005.055.0595th-Percentile Queue Length [ft/ln] 0.000.000.000.000.200.2095th-Percentile Queue Length [veh/ln] AAABMovement LOS 0.000.000.000.009.4610.63d_M, Delay for Movement [s/veh] 0.000.000.000.000.040.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-3 0.131Volume to Capacity (v/c): CLevel Of Service: 19.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 7: Main Street at Project Driveway No. 2 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project Driveway No. 2Main StreetMain StreetName Intersection Setup 000Pedestrian Volume [ped/h] 3809314639240Total Analysis Volume [veh/h] 100233662310Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 3809314639240Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3809314639240Base Volume Input [veh/h] Project Driveway No. 2Main StreetMain StreetName Volumes Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-4 CIntersection LOS 0.29d_I, Intersection Delay [s/veh] CAAApproach LOS 19.220.000.00d_A, Approach Delay [s/veh] 11.110.000.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.440.000.000.000.000.0095th-Percentile Queue Length [veh/ln] CAAAMovement LOS 19.220.000.000.000.000.00d_M, Delay for Movement [s/veh] 0.130.000.000.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 7: 7 AM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-5 0.016Volume to Capacity (v/c): BLevel Of Service: 10.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 6: Project Driveway No. 1 at Almond Avenue Intersection Level Of Service Report NoNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach Almond AvenueAlmond AvenueProject Driveway No. 1Name Intersection Setup 000Pedestrian Volume [ped/h] 19200983011Total Analysis Volume [veh/h] 48002583Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 19200983011Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19200983011Base Volume Input [veh/h] Almond AvenueAlmond AvenueProject Driveway No. 1Name Volumes Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-6 BIntersection LOS 1.16d_I, Intersection Delay [s/veh] AAAApproach LOS 0.000.009.33d_A, Approach Delay [s/veh] 0.000.000.000.003.693.6995th-Percentile Queue Length [ft/ln] 0.000.000.000.000.150.1595th-Percentile Queue Length [veh/ln] AAABMovement LOS 0.000.000.000.008.9610.34d_M, Delay for Movement [s/veh] 0.000.000.000.000.030.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane FreeFreeStopPriority Scheme Intersection Settings Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-7 0.080Volume to Capacity (v/c): CLevel Of Service: 15.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 7: Main Street at Project Driveway No. 2 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project Driveway No. 2Main StreetMain StreetName Intersection Setup 000Pedestrian Volume [ped/h] 30077113815630Total Analysis Volume [veh/h] 80192853910Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 30077113815630Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Growth Factor 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 30077113815630Base Volume Input [veh/h] Project Driveway No. 2Main StreetMain StreetName Volumes Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-8 CIntersection LOS 0.16d_I, Intersection Delay [s/veh] CAAApproach LOS 15.390.000.00d_A, Approach Delay [s/veh] 6.460.000.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.260.000.000.000.000.0095th-Percentile Queue Length [veh/ln] CAAAMovement LOS 15.390.000.000.000.000.00d_M, Delay for Movement [s/veh] 0.080.000.000.010.020.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] Flared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 8: 8 PM 2021 Cumulative + Project Chick-fil-A Main Street, Orange Version 7.00-06 Generated with D-9 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-18-3939-1 Chick-fil-A Main Street, Orange N:\3900\2183939 - Chick-fil-A Main Street, Orange\Report\3939 Dividers.doc APPENDIX E DRIVE-THROUGH QUEUING STUDY DATA Time Queue Time Queue Time Queue 7:00 1 11:00 2 4:00 2 7:05 3 11:05 3 4:05 1 7:10 1 11:10 2 4:10 2 7:15 1 11:15 3 4:15 0 7:20 3 11:20 2 4:20 1 7:25 0 11:25 2 4:25 1 7:30 0 11:30 1 4:30 1 7:35 3 11:35 1 4:35 0 7:40 1 11:40 8 4:40 1 7:45 2 11:45 6 4:45 2 7:50 4 11:50 6 4:50 0 7:55 0 11:55 5 4:55 0 8:00 1 12:00 4 5:00 0 8:05 1 12:05 2 5:05 2 8:10 2 12:10 3 5:10 0 8:15 3 12:15 4 5:15 3 8:20 2 12:20 7 5:20 5 8:25 0 12:25 12 5:25 2 8:30 1 12:30 15 5:30 1 8:35 0 12:35 15 5:35 5 8:40 0 12:40 13 5:40 5 8:45 0 12:45 13 5:45 4 8:50 2 12:50 10 5:50 2 8:55 2 12:55 10 5:55 3 9:00 0 1:00 12 6:00 1 Average 1.32 Average 6.44 Average 1.76 85%3 85%12.4 85%3.4 95%3 95%14.6 95%5 Max 4 Max 15 Max 5 Average 85% 95% Max 15.0 Chick‐Fil‐A Drive‐Through Lane Queuing Observations Table 1 December 7, 2010 ‐ Tustin, CA 3.2 5.9 12.3 E-1 Time Queue Time Queue Time Queue 7:00 1 11:00 0 4:00 2 7:05 1 11:05 3 4:05 0 7:10 0 11:10 7 4:10 2 7:15 2 11:15 5 4:15 4 7:20 0 11:20 3 4:20 3 7:25 0 11:25 4 4:25 5 7:30 2 11:30 3 4:30 5 7:35 2 11:35 4 4:35 3 7:40 2 11:40 5 4:40 2 7:45 5 11:45 9 4:45 1 7:50 5 11:50 12 4:50 2 7:55 2 11:55 15 4:55 0 8:00 0 12:00 14 5:00 3 8:05 2 12:05 12 5:05 3 8:10 2 12:10 11 5:10 0 8:15 1 12:15 12 5:15 2 8:20 3 12:20 15 5:20 4 8:25 3 12:25 15 5:25 5 8:30 1 12:30 13 5:30 3 8:35 1 12:35 10 5:35 6 8:40 4 12:40 14 5:40 7 8:45 3 12:45 11 5:45 4 8:50 1 12:50 13 5:50 5 8:55 3 12:55 9 5:55 5 9:00 2 1:00 10 6:00 6 Average 1.92 Average 9.16 Average 3.28 85%3 85%14 85%5 95%4.8 95%15 95%6 Max 5 Max 15 Max 7 Average 85% 95% Max 15.0 Table 2 Chick‐Fil‐A Drive‐Through Lane Queuing Observations April 17, 2012 ‐ Orange, CA 4.8 10.9 14.0 E-2 Time Queue Time Queue Time Queue 7:00 1 11:00 1 4:00 3 7:05 1 11:05 2 4:05 2 7:10 2 11:10 0 4:10 4 7:15 0 11:15 1 4:15 1 7:20 1 11:20 3 4:20 5 7:25 3 11:25 3 4:25 7 7:30 2 11:30 3 4:30 4 7:35 1 11:35 1 4:35 3 7:40 3 11:40 1 4:40 3 7:45 0 11:45 1 4:45 5 7:50 1 11:50 6 4:50 5 7:55 2 11:55 4 4:55 2 8:00 1 12:00 5 5:00 0 8:05 1 12:05 8 5:05 4 8:10 2 12:10 8 5:10 7 8:15 3 12:15 7 5:15 8 8:20 1 12:20 10 5:20 8 8:25 2 12:25 8 5:25 10 8:30 3 12:30 10 5:30 9 8:35 6 12:35 12 5:35 12 8:40 5 12:40 10 5:40 8 8:45 2 12:45 10 5:45 9 8:50 0 12:50 5 5:50 7 8:55 0 12:55 7 5:55 7 9:00 2 1:00 7 6:00 8 Average 1.8 Average 5.32 Average 5.64 85%3 85%10 85%8.4 95%4.6 95%10 95%9.8 Max 6 Max 12 Max 12 Average 85% 95% Max 12.0 Table 3 Chick‐Fil‐A Drive‐Through Lane Queuing Observations April 19, 2012 ‐ Irvine, CA 4.3 8.0 10.0 E-3 Time(Sat. 1/21/17)QueueTime(Tues. 1/31/17)QueueTime(Tues. 1/31/17)QueueTime(Tues. 1/31/17)QueueTime(Fri. 11/17/17)QueueTime(Fri. 11/17/17)QueueTime(Fri. 11/17/17)QueueTime(Fri. 11/17/17)QueueTime(Sat. 11/18/17)QueueTime(Sat. 11/18/17)QueueTime(Mon. 11/20/17)QueueTime(Mon. 11/20/17)QueueTime(Mon. 11/20/17)Queue11:3077:00111:0064:0037:00411:0084:0057:0064:0087:0067:00411:0074:00711:3597:05511:0554:055‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11:4087:10411:1074:104‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11:4567:15111:1584:1547:15411:1574:1557:1554:1587:1587:15411:1574:15611:5057:20111:2084:203‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11:5547:25111:2584:255‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:0057:30211:30104:3057:301011:3074:30117:3074:3097:3057:30611:3094:30812:0547:35111:3594:355‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:1057:40211:40104:403‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:1547:45011:4574:4557:451011:45104:4597:4544:4547:4577:45511:45104:45512:2057:50011:5084:505‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:25107:55211:5594:557‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:30118:00112:0085:0058:00312:00145:0098:0065:0048:0068:00612:00115:00612:3598:05412:0575:057‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:4088:10212:10105:106‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:45118:15112:1595:1578:15312:15125:1568:1565:1578:1568:15412:15105:15912:50118:20112:2085:2010‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:55148:25012:2585:2511‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:00128:30012:3095:3008:30512:30135:3098:3065:3088:3048:30512:30165:3091:05118:35412:35115:3511‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:10108:40212:40125:4013‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:15108:45712:4595:45138:45412:45135:4598:4565:4598:4568:45412:45155:45111:2078:50412:5085:5014‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:25118:55612:55105:5514‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:309‐‐‐‐1:00116:0013‐‐‐‐1:00146:0089:0046:0099:006‐‐‐‐1:00176:00121:358‐‐ ‐‐1:05106:0511‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:409‐‐ ‐‐1:10136:1011‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:459‐‐ ‐‐1:1596:1511‐‐ ‐‐1:15126:15109:1536:1589:156‐‐‐‐1:15156:15131:508‐‐ ‐‐1:2066:2011‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:5510‐‐‐‐1:2566:2511‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐2:0012‐‐ ‐‐1:3026:3010‐‐ ‐‐1:30166:3099:3026:3059:302‐‐‐‐1:30116:3062:0512‐‐ ‐‐1:3566:359‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐2:1011‐‐ ‐‐1:4056:406‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐2:159‐‐‐‐1:4536:458‐‐‐‐1:45146:4579:4536:4549:452‐‐‐‐1:45146:45102:208‐‐‐‐1:5026:509‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐2:259‐‐ ‐‐1:5566:557‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Average8.64Average2.17Average7.86Average7.83Average5.38Average11.67Average8.0833Average4.83Average6.9167Average5.3333Average4.75Average11.83Average8.585%1185%485%1085%1185%9.7585%1485%9.3585%685%985%6.3585%5.9585%15.3585%11.3595%1295%5.8595%11.2595%13.2595%1095%14.995%10.4595%6.4595%995%7.4595%695%16.4595%12.45Max14Max7Max13Max14Max10Max16Max11Max7Max9Max8Max6Max17Max13Average85%95%Max17.0Laguna Hills, CaliforniaTable 4Chick‐Fil‐A Drive‐Through Lane Queuing Observations7.311.013.5E-4 Time(Sat. 1/21/17)QueueTime(Thur. 1/26/17)QueueTime(Thur. 1/26/17)QueueTime(Thur. 1/26/17)QueueTime(Fri. 11/17/17)QueueTime(Fri. 11/17/17)QueueTime(Fri. 11/17/17)QueueTime(Fri. 11/17/17)QueueTime(Sat. 11/18/17)QueueTime(Sat. 11/18/17)QueueTime(Mon. 11/20/17)QueueTime(Mon. 11/20/17)QueueTime(Mon. 11/20/17)Queue11:3037:00211:0094:00117:00911:00104:00127:00124:0077:00127:00411:0074:00711:3597:05111:05104:058‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11:40107:10211:1084:104‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11:45107:15111:1544:1527:151111:15124:15137:15134:15157:15117:15411:15134:15811:50137:20511:20104:202‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐11:55127:25811:2594:253‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:0057:30711:3094:3037:30811:30124:30127:30114:30107:30137:30411:30124:30712:0597:35411:35114:354‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:10117:40511:40104:404‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:15117:45311:45124:4567:45811:45134:45117:45104:4597:45117:45511:45104:45712:20127:50511:50124:507‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:25107:55311:55124:557‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:3098:00212:00135:0068:00512:00145:00128:00125:00118:00108:00612:00115:00912:3588:05412:05145:057‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:4098:10712:1095:105‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:45138:15512:15115:1588:15912:15165:15168:15125:15138:1568:15812:15125:15912:50128:20312:20135:209‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐12:55128:25212:25115:2512‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:00108:30412:30125:30138:301112:30145:30138:30115:30138:3068:30512:30125:3071:05128:35312:35105:3512‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:10128:40312:40105:4012‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:1598:45612:45105:45118:45812:45105:45158:4595:45128:4588:45612:45125:45111:20108:50412:50125:5011‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:25118:55312:55125:5513‐‐‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:309‐‐‐‐1:00156:0012‐‐‐‐1:00116:00139:0076:00149:007‐‐‐‐1:00126:00131:357‐‐ ‐‐1:05106:0513‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐1:10146:1012‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐1:15136:1513‐‐ ‐‐1:15106:15149:1566:15129:158‐‐‐‐1:15106:1512‐‐‐‐‐‐ ‐‐1:20126:2011‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:25106:2512‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐1:30106:3010‐‐ ‐‐1:30136:30119:3036:30119:305‐‐‐‐1:30116:3010‐‐‐‐‐‐ ‐‐1:3586:359‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐1:4086:4013‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐1:4566:4513‐‐‐‐1:45116:45129:4546:45139:453‐‐‐‐1:45136:4513‐‐‐‐‐‐‐‐1:5066:5012‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ ‐‐1:5586:5511‐‐ ‐‐ ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Average9.92Average3.83Average10.36Average8.92Average8.63Average12.17Average12.833Average9.17Average11.667Average8.3333Average5.25Average11.25Average9.416785%1285%5.5585%12.7585%12.7585%10.985%1485%14.3585%1285%13.3585%11.3585%685%12.3585%12.3595%12.7595%795%1495%1395%1195%14.995%15.4595%12.4595%14.4595%12.4595%7.395%1395%13Max13Max8Max15Max13Max11Max16Max16Max13Max15Max13Max8Max13Max13Average85%95%Max16.0Corona, CaliforniaTable 5Chick‐Fil‐A Drive‐Through Lane Queuing Observations9.213.013.0E-5 E-6 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 11:00 AM 2 5 2 Order Takers Outside 11:05 AM 2 5 3 Order Takers Outside 11:10 AM 0 6 3 Order Takers Outside 11:15 AM 4 12 3 Order Takers Outside 11:20 AM 2 11 3 Order Takers Outside 11:25 AM 2 9 3 Order Takers Outside 11:30 AM 2 6 3 Order Takers Outside 11:35 AM 4 7 3 Order Takers Outside 11:40 AM 5 13 3 Order Takers Return Inside 11:45 AM 3 11 11:50 AM 4 12 11:55 AM 5 10 12:00 PM 4 12 12:05 PM 6 11 12:10 PM 5 15 12:15 PM 5 14 12:20 PM 5 15 12:25 PM 10 15 12:30 PM 6 16 12:35 PM 5 12 12:40 PM 6 15 12:45 PM 6 16 12:50 PM 1 9 12:55 PM 4 12 1:00 PM 10 17 1:05 PM 10 19 1:10 PM 6 14 1:15 PM 11 18 1:20 PM 8 16 1:25 PM 8 15 1:30 PM 6 15 1:35 PM 7 17 1:40 PM 7 16 Max Queue Queuing Observations Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Thursday April 25, 2019 E-7 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 1:45 PM 4 12 1:50 PM 4 12 1:55 PM 5 14 2:00 PM 5 13 5:00 PM 12 20 5:05 PM 6 14 5:10 PM 4 10 5:15 PM 4 12 5:20 PM 3 11 1 Order Taker Outside 5:25 PM 5 13 5:30 PM 4 11 2 Order Takers Outside 5:35 PM 3 9 5:40 PM 1 6 5:45 PM 2 5 5:50 PM 6 10 5:55 PM 4 10 6:00 PM 5 13 6:05 PM 4 11 6:10 PM 2 7 6:15 PM 1 5 6:20 PM 3 8 3 Order Takers Outside 6:25 PM 2 7 6:30 PM 5 11 6:35 PM 2 6 6:40 PM 6 14 6:45 PM 6 14 6:50 PM 8 16 6:55 PM 10 18 7:00 PM 4 11 7:05 PM 4 12 7:10 PM 2 8 7:15 PM 3 10 7:20 PM 3 10 Max Queue Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Thursday April 25, 2019 Queuing Observations E-8 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 7:25 PM 12 19 7:30 PM 13 20 7:35 PM 10 17 7:40 PM 3 9 7:45 PM 5 14 7:50 PM 5 12 7:55 PM 4 11 8:00 PM 8 15 Max 20 Sum 896 Queuing Observations Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Thursday April 25, 2019 Max Queue E-9 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 11:00 AM 3 3 2 Order Takers Outside 11:05 AM 1 4 11:10 AM 3 7 3 Order Takers Outside 11:15 AM 6 9 11:20 AM 5 10 11:25 AM 5 12 11:30 AM 6 14 11:35 AM 7 15 11:40 AM 2 9 11:45 AM 7 12 11:50 AM 4 13 11:55 AM 6 14 12:00 PM 8 14 12:05 PM 6 13 12:10 PM 6 11 12:15 PM 7 14 12:20 PM 6 14 12:25 PM 6 13 12:30 PM 6 14 12:35 PM 7 12 12:40 PM 5 13 12:45 PM 6 13 12:50 PM 5 13 12:55 PM 5 10 1:00 PM 5 12 1:05 PM 4 10 1:10 PM 5 12 1:15 PM 7 15 1:20 PM 9 15 1:25 PM 7 15 1:30 PM 6 15 1:35 PM 8 16 1:40 PM 6 14 Queuing Observations Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Friday April 26, 2019 Max Queue E-10 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 1:45 PM 5 12 1:50 PM 5 12 1:55 PM 3 10 2:00 PM 7 14 5:00 PM 5 12 5:05 PM 4 11 5:10 PM 0 7 5:15 PM 6 10 5:20 PM 5 13 5:25 PM 6 11 5:30 PM 2 7 5:35 PM 3 4 5:40 PM 2 8 5:45 PM 2 9 5:50 PM 3 8 5:55 PM 4 8 6:00 PM 3 11 6:05 PM 3 10 6:10 PM 9 17 6:15 PM 10 18 6:20 PM 8 15 6:25 PM 4 12 6:30 PM 8 15 6:35 PM 9 17 6:40 PM 6 14 6:45 PM 1 9 6:50 PM 7 13 6:55 PM 6 14 7:00 PM 4 11 7:05 PM 1 10 7:10 PM 3 9 7:15 PM 3 9 7:20 PM 2 10 Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Friday April 26, 2019 Max Queue Queuing Observations E-11 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 7:25 PM 4 13 7:30 PM 3 9 7:35 PM 3 10 7:40 PM 8 15 7:45 PM 5 14 7:50 PM 5 13 7:55 PM 1 11 8:00 PM 3 9 Max 18 Sum 864 Max Queue Queuing Observations Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Friday April 26, 2019 E-12 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 11:00 AM 4 8 11:05 AM 1 7 11:10 AM 8 10 11:15 AM 8 13 11:20 AM 7 11 11:25 AM 4 12 11:30 AM 5 10 11:35 AM 1 7 11:40 AM 3 8 11:45 AM 5 10 11:50 AM 0 6 11:55 AM 8 8 12:00 PM 2 10 12:05 PM 3 9 12:10 PM 4 9 12:15 PM 9 13 12:20 PM 5 9 12:25 PM 5 10 12:30 PM 3 11 12:35 PM 5 9 12:40 PM 3 8 12:45 PM 6 10 12:50 PM 4 12 12:55 PM 7 9 1:00 PM 7 13 1:05 PM 6 14 1:10 PM 4 11 1:15 PM 4 9 1:20 PM 3 7 1:25 PM 2 6 1:30 PM 3 10 1:35 PM 4 11 1:40 PM 2 9 Queuing Observations Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Saturday April 27, 2019 Max Queue E-13 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 1:45 PM 1 9 1:50 PM 4 9 1:55 PM 4 12 2:00 PM 1 9 6:00 PM 8 15 6:05 PM 10 16 6:10 PM 5 12 6:15 PM 0 7 6:20 PM 0 3 6:25 PM 1 2 6:30 PM 1 4 6:35 PM 1 4 6:40 PM 1 3 6:45 PM 2 6 6:50 PM 2 8 6:55 PM 4 10 7:00 PM 1 7 7:05 PM 3 8 7:10 PM 2 8 7:15 PM 4 11 7:20 PM 3 9 7:25 PM 5 12 7:30 PM 5 13 7:35 PM 8 17 7:40 PM 4 15 7:45 PM 3 13 7:50 PM 10 19 7:55 PM 7 15 8:00 PM 6 13 8:05 PM 7 13 8:10 PM 6 13 8:15 PM 8 15 8:20 PM 4 11 Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Saturday April 27, 2019 Max Queue Queuing Observations E-14 Beginning Order Board Entire Street Time Back # Drive Thru Overflow Notes 8:25 PM 7 14 8:30 PM 3 9 8:35 PM 8 13 8:40 PM 8 16 8:45 PM 5 13 8:50 PM 10 18 8:55 PM 6 15 9:00 PM 8 15 Max 19 Sum 773 Max Queue Queuing Observations Chick-fil-A (4401 Pacific Coast Highway, Long Beach) Saturday April 27, 2019 E-15 E-16 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 WEDNESDAY, FEBRUARY 20, 2019 WEEKDAY MID-DAY ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES AM 11:00 1 0 4 11:05 6 0 1 11:10 2 3 4 11:15 5 1 5 11:20 4 1 5 11:25 3 2 2 11:30 4 2 3 11:35 4 2 2 11:40 2 0 2 11:45 6 0 1 11:50 0 1 4 11:55 5 1 2 PM 12:00 7 2 4 12:05 3 2 8 2 ORDER TAKERS ARRIVE OUTSIDE 12:10 8 3 6 2 ORDER TAKERS OUTSIDE 12:15 8 3 10 12:18PM-12:22PM Drive Thru 2 ORDER TAKERS OUTSIDE 12:20 8 10 17 2 ORDER TAKERS OUTSIDE 12:25 3 5 11 2 ORDER TAKERS OUTSIDE 12:30 6 0 5 2 ORDER TAKERS OUTSIDE 12:35 7 0 5 2 ORDER TAKERS OUTSIDE E-17 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 WEDNESDAY, FEBRUARY 20, 2019 WEEKDAY MID-DAY ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 12:40 8 1 5 2 ORDER TAKERS OUTSIDE 12:45 5 6 7 2 ORDER TAKERS OUTSIDE 12:50 1 4 11 2 ORDER TAKERS OUTSIDE 12:55 6 0 1 2 ORDER TAKERS OUTSIDE 1:00 4 5 6 2 ORDER TAKERS OUTSIDE 1:05 11 4 8 2 ORDER TAKERS OUTSIDE 1:10 6 5 11 1:11PM-1:12PM Drive Thru 2 ORDER TAKERS OUTSIDE 1:15 7 7 12 2 ORDER TAKERS OUTSIDE 1:20 5 7 14 2 ORDER TAKERS OUTSIDE 1:25 10 3 9 2 ORDER TAKERS OUTSIDE 1:30 6 7 14 1:30PM-1:32PM Drive Thru 2 ORDER TAKERS OUTSIDE 1:35 7 2 9 2 ORDER TAKERS OUTSIDE 1:40 5 3 6 2 ORDER TAKERS OUTSIDE 1:45 6 3 5 2 ORDER TAKERS OUTSIDE 1:50 6 1 5 2 ORDER TAKERS RETURN INSIDE 1:55 5 2 4 2:00 7 1 3 TOTAL ARRIVAL:197 E-18 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 WEDNESDAY, FEBRUARY 20, 2019 WEEKDAY EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 5:00 4 1 2 5:05 1 1 2 5:10 3 2 2 5:15 4 0 2 5:20 6 2 4 5:25 6 3 5 5:30 5 4 6 5:35 4 5 10 5:36PM-5:40PM Drive Thru 5:40 2 4 6 5:45 5 4 6 5:50 4 5 9 5:55 3 6 10 6:00 4 3 8 6:05 2 3 7 6:10 2 0 3 6:15 4 1 2 E-19 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 WEDNESDAY, FEBRUARY 20, 2019 WEEKDAY EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 6:20 6 2 3 6:25 5 2 4 6:30 7 3 6 6:35 4 3 9 6:40 4 8 13 6:45 5 4 10 6:50 6 4 11 6:55 5 4 10 6:56PM-7:00PM Drive Thru 1 ORDER TAKER ARRIVES OUTSIDE 7:00 6 8 15 1 ORDER TAKER OUTSIDE 7:05 4 6 13 1 ADDITIONAL ORDER TAKER ARRIVES 7:10 5 2 7 2 ORDER TAKERS OUTSIDE 7:15 5 2 9 2 ORDER TAKERS OUTSIDE 7:20 4 5 11 2 ORDER TAKERS OUTSIDE 7:25 4 2 8 2 ORDER TAKERS OUTSIDE 7:30 5 0 7 2 ORDER TAKERS OUTSIDE TOTAL ARRIVAL:134 E-20 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 FRIDAY, FEBRUARY 22, 2019 WEEKDAY MID-DAY ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES AM 11:00 3 1 7 11:05 5 1 6 11:10 4 1 5 11:15 4 1 5 11:20 3 2 6 11:25 5 1 2 11:30 8 2 4 11:35 3 5 10 11:40 4 3 9 11:45 5 2 6 11:50 8 0 5 11:55 1 3 8 PM 12:00 6 0 4 12:05 2 4 8 2 ORDER TAKERS ARRIVE OUTSIDE 12:10 5 0 4 2 ORDER TAKERS OUTSIDE 12:15 6 0 5 2 ORDER TAKERS OUTSIDE 12:20 7 1 4 12:24 - 12:26 - Drive Thru 2 ORDER TAKERS OUTSIDE 12:25 7 5 10 2 ORDER TAKERS OUTSIDE 12:30 6 6 12 2 ORDER TAKERS OUTSIDE 12:35 11 5 11 12:37 - 12:39 - Drive Thru 2 ORDER TAKERS OUTSIDE E-21 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 FRIDAY, FEBRUARY 22, 2019 WEEKDAY MID-DAY ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 12:40 5 6 13 12:40 - 12:46 - Drive Thru 2 ORDER TAKERS OUTSIDE 12:45 6 5 11 2 ORDER TAKERS OUTSIDE 12:50 6 2 8 2 ORDER TAKERS OUTSIDE 12:55 7 3 6 2 ORDER TAKERS OUTSIDE 1:00 10 2 8 2 ORDER TAKERS OUTSIDE 1:05 5 6 8 1 ORDER TAKER RETURNS INSIDE 1:10 7 2 5 1 ORDER TAKER OUTSIDE 1:15 8 5 7 1:17 - 1:18 - Drive Thru 1 ADDITIONAL ORDER TAKER ARRIVES 1:20 5 7 13 2 ORDER TAKERS OUTSIDE 1:25 3 7 14 2 ORDER TAKERS OUTSIDE 1:30 9 2 6 2 ORDER TAKERS OUTSIDE 1:35 7 3 10 2 ORDER TAKERS OUTSIDE 1:40 9 1 4 1:42 - 1:44 - Drive Thru 2 ORDER TAKERS OUTSIDE 1:45 8 7 11 2 ORDER TAKERS OUTSIDE 1:50 6 7 13 1:50 - 1:55 - Drive Thru 2 ORDER TAKERS OUTSIDE 1:55 4 9 15 2 ORDER TAKERS OUTSIDE 2:00 7 2 9 2 ORDER TAKERS OUTSIDE TOTAL ARRIVAL:215 E-22 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 FRIDAY, FEBRUARY 22, 2019 WEEKDAY EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 5:00 6 2 4 5:05 5 7 8 5:10 4 6 1 1 ORDER TAKER ARRIVES OUTSIDE 5:15 2 3 3 1 ORDER TAKER OUTSIDE 5:20 4 2 3 1 ORDER TAKER RETURNS INSIDE 5:25 5 1 2 5:30 3 1 3 5:35 7 0 1 5:40 2 3 4 5:45 5 1 3 5:50 7 1 4 5:55 8 7 10 6:00 2 6 10 6:05 5 5 6 1 ORDER TAKER ARRIVES OUTSIDE 6:10 4 5 10 1 ORDER TAKER OUTSIDE 6:15 6 3 8 1 ADDITIONAL ORDER TAKER ARRIVES E-23 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 FRIDAY, FEBRUARY 22, 2019 WEEKDAY EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 6:20 2 6 13 2 ORDER TAKERS OUTSIDE 6:25 5 2 5 1 ORDER TAKER RETURNS INSIDE 6:30 4 0 3 1 ORDER TAKER OUTSIDE 6:35 6 2 5 1 ORDER TAKER OUTSIDE 6:40 2 3 6 1 ORDER TAKER OUTSIDE 6:45 5 0 1 1 ORDER TAKER OUTSIDE 6:50 4 3 4 1 ORDER TAKER OUTSIDE 6:55 3 1 3 1 ORDER TAKER OUTSIDE 7:00 4 1 3 1 ORDER TAKER OUTSIDE 7:05 6 4 7 1 ORDER TAKER OUTSIDE 7:10 6 5 7 1 ADDITIONAL ORDER TAKER ARRIVES 7:15 3 3 5 1 ORDER TAKER RETURNS INSIDE 7:20 7 2 7 1 ORDER TAKER OUTSIDE 7:25 1 6 10 1 ORDER TAKER OUTSIDE 7:30 6 7 11 1 ORDER TAKER OUTSIDE 7:35 5 5 9 7:35 - 7:39 - Drive Thru 1 ORDER TAKER OUTSIDE E-24 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 FRIDAY, FEBRUARY 22, 2019 WEEKDAY EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 7:40 3 7 9 7:41- 7:43 - Drive Thru 1 ORDER TAKER OUTSIDE 7:45 8 5 8 1 ORDER TAKER OUTSIDE 7:50 3 7 11 1 ORDER TAKER OUTSIDE 7:55 4 5 11 1 ORDER TAKER OUTSIDE 8:00 6 3 6 1 ORDER TAKER OUTSIDE TOTAL ARRIVAL:168 E-25 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 SATURDAY, FEBRUARY 23, 2019 WEEKEND MID-DAY ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES AM 11:00 5 2 3 11:05 4 1 4 11:10 4 3 5 11:15 4 2 6 11:20 5 2 6 11:25 5 3 8 11:30 3 1 5 11:35 7 0 1 11:40 3 2 5 11:45 6 3 5 11:50 2 5 7 11:55 5 2 6 12:00 7 4 7 PM 12:05 5 6 9 2 ORDER TAKERS ARRIVE OUTSIDE 12:10 3 5 8 2 ORDER TAKERS OUTSIDE 12:15 2 3 8 1 ORDER TAKER RETURNS INSIDE 12:20 3 1 4 1 ORDER TAKER OUTSIDE 12:25 5 1 2 1 ORDER TAKER OUTSIDE 12:30 5 2 3 1 ORDER TAKER OUTSIDE 12:35 6 5 8 1 ORDER TAKER OUTSIDE E-26 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 SATURDAY, FEBRUARY 23, 2019 WEEKEND MID-DAY ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 12:40 9 4 8 1 ORDER TAKER OUTSIDE 12:45 4 5 9 1 ORDER TAKER OUTSIDE 12:50 5 2 8 1 ORDER TAKER OUTSIDE 12:55 4 4 7 1 ORDER TAKER OUTSIDE 1:00 5 3 6 1 ORDER TAKER OUTSIDE 1:05 5 4 8 1 ORDER TAKER OUTSIDE 1:10 7 0 4 1 ORDER TAKER OUTSIDE 1:15 6 1 5 1 ORDER TAKER OUTSIDE 1:20 8 3 5 1 ORDER TAKER OUTSIDE 1:25 6 4 10 1 ORDER TAKER OUTSIDE 1:30 5 4 9 1 ADDITIONAL ORDER TAKER ARRIVES 1:35 3 4 7 2 ORDER TAKERS OUTSIDE 1:40 7 0 6 2 ORDER TAKERS OUTSIDE 1:45 7 3 9 2 ORDER TAKERS OUTSIDE 1:50 6 3 9 1 ORDER TAKER RETURNS INSIDE 1:55 6 4 8 1:57 - 1:58 - Drive Thru 1 ADDITIONAL ORDER TAKER ARRIVES 2:00 4 4 9 2 ORDER TAKERS OUTSIDE TOTAL ARRIVAL:186 E-27 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 SATURDAY, FEBRUARY 23, 2019 WEEKEND EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 6:00 6 6 10 1 ORDER TAKER OUTSIDE 6:05 3 5 10 1 ORDER TAKER OUTSIDE 6:10 6 4 10 1 ORDER TAKER OUTSIDE 6:15 5 4 9 1 ORDER TAKER OUTSIDE 6:20 2 7 12 1 ORDER TAKER OUTSIDE 6:25 3 2 5 1 ORDER TAKER RETURNS INSIDE 6:30 5 3 7 6:35 1 3 6 6:40 4 6 5 6:45 4 1 5 6:50 4 2 4 6:55 4 2 3 7:00 6 2 7 7:05 6 3 6 7:10 4 3 6 7:15 2 2 6 E-28 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 SATURDAY, FEBRUARY 23, 2019 WEEKEND EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 7:20 3 0 4 7:25 8 1 3 7:30 5 3 7 7:35 4 1 4 7:40 6 3 5 7:45 2 4 6 7:50 3 3 5 7:55 2 3 7 8:00 6 2 5 8:05 2 1 4 8:10 6 2 6 8:15 1 1 4 8:20 7 1 4 8:25 8 2 5 8:30 3 2 8 8:35 4 3 8 E-29 VENICE CHICK-fil-A 4050 LINCOLN BLVD VENICE, CA 90292 SATURDAY, FEBRUARY 23, 2019 WEEKEND EVENING ARRIVAL RATE MAX QUEUE BEGINNING TOTAL #ORDER BOARD ENTIRE STREET TIME OF CARS BACK #DRIVE THRU OVERFLOW NOTES PM 8:40 5 1 5 8:45 2 5 7 8:50 5 1 4 8:55 4 3 5 9:00 3 1 5 TOTAL ARRIVAL:154 E-30