HomeMy WebLinkAbout11.01 Trails at Santiago Creek 1 - Staff Report �°F °'��
��,.\��aa�o�arFa..,�
�'�� ����'a AGENDA ITEM
�24��:�qE'an.s,,ee�.��k°�
`b���' � September 24, 2019
TO: Honorable Mayor and Members of the City Council
THRU: Rick Otto, City Manager
FROM: William Crouch, mmunity Development Director
REVIEW: City Mana r Finance �� •
1. SUBJECT
General Plan Amendment No. 2018-0001, Zone Change No. 1286-18, Development
Agreement No. 0005-18, and Environmental Review No. 1857-18.
2. SUMMARY
The Applicant is requesting approval of a General Plan Amendment and Zone Change
on a 109.2 acre site (commonly referred to as the Sully Miller site), to allow for the
development of 128 single-family detached homes on 40.7 acres and leaving
approximately 68.5 acres for open space comprised of natural hillsides, re-established
grasslands, a restored Santiago Creek riparian corridor and a managed vegetation/fuel
modification zone. The Project includes adoption of the Trails at Santiago Creek Specific
Plan.
3. RECOMMENDED ACTION
1. Approval of Ordinance No. 07-19 of the City Council of the City of Orange approving
Zone Change No. 1286-18, changing the zoning from Sand and Gravel (S-G) and
Single Family Residential 8,000 square feet minimum (R-1-8) to Specific Plan (SP)
consisting of Single Family Residential R-1-8 and R-1-10, and Open Space, and
adopting the Trails at Santiago Creek Specific Plan on a site commonly referred to as
Sully Miller located at 6145 E. Santiago Canyon Road, previously identified as 6118
East Santiago Canyon Road.
2. Approval of Ordinance No. 08-19 of the City Council of the City of Orange approving
Development Agreement No. 0005-18 for the Trails at Santiago Creek Project, on a
site commonly referred to as Sully Miller located at 6145 E. Santiago Canyon Road,
previously identified as 6118 East Santiago Canyon Road.
3. Approval of Resolution No. 11187 of the City Council of the City of Orange (A)
Certifying the adequacy of Final Environmental Impact Report No. 1857-18 (SCH No.
2017031020), (B) Adopting Findings of Fact, (C) Adopting a Statement of Overriding
Considerations, (D) Adopting a Mitigation Monitoring and Reporting Program, (E)
Imposing other project related conditions for related project entitlements for the
ITEM � � 09/24/2019
construction of 128 new detached single-family residences and approximately 68.5
acres of open space on a site commonly referred to as Sully Miller, located at 6145 E.
Santiago Canyon Road, previously identified as 6118 East Santiago Canyon Road.
4. Approval of Resolution No. 11188 of the City Council of the City of Orange approving
General Plan Amendment No. 2018-0001, a request to change the general plan
designation of an approximately 109.2 acre site from Low Density Residential (LDR)
(approximately 15.4 acres), Resource Area (RA) (approximately 77.3 acres), and
Open Space (OS) (approximately 16.5 acres) to Low Density Residential (LDR)
(approximately 40.7 acres), and Open Space (OS) (approximately 68.5 acres) on a
site commonly.referred to as Sully Miller, located at 6145 E. Santiago Canyon Road,
previously identified as 6118 East Santiago Canyon Road.
4. FISCAL IMPACT
None.
5. STRATEGIC PLAN GOALS
Goal 3: Enhance and promote quality of life in the community.
a: Expand public use places and spaces
c: Support and enhance attractive, diverse living environments.
6. DISCUSSION AND BACKGROUND
Existing Project Site
The 109.2-acre project site contains disturbed, privately owned, undeveloped land that
previously supported mining activities and currently supports a sand and gravel operation.
There are currently sand and gravel stockpiles on the site. The project site is comprised
of 12 parcels and is bisected by Santiago Creek in an east-west direction. Approximately
40 acres between Santiago Creek and East Santiago Canyon Road contains remnants
of the mining operation and is the location of the ongoing sand and gravel operation. This
area is characterized by soil piles, berms, and unpaved roads.
Adjacent to East Santiago Canyon Road is an approximately 5-acre area that supports a
materials recycling operation that includes apparatus for the crushing of boulders, bricks,
rocks, and similar materials for recycling. Materials used for these operations originate
primarily from off-site sources, and the materials generated by these operations have
historically been used both on-site and transported off-site. Ancillary uses included
administration and maintenance buildings, caretaker residence, material testing
laboratory, driver's shack, rock crushing facilities, several aboveground and belowground
fuel storage tanks, and two hot-mix asphalt plants.
Proposed Project
The Project proposes a single-family detached residential neighborhood comprising 40.7
acres, located in the south-central and southwestern portions of the site abutting the
adjacent vacant County-owned parcel. The project proposes 128 units, equating to 3.1
dwelling unit per acre, which is reflective of residential lots in the existing surrounding
neighborhoods of Mabury Ranch, Jamestown, The Colony North, Creekside Ranch, and
Orange Park Acres at Orange Park Boulevard and East Santiago Canyon Road. The
Project includes three different single-family detached lot programs ranging in size from
8,000 square feet to 9,000 square feet (82 Lots); 9,200 square feet to 10,000 square feet
(17 Lots); and 10,000 square feet and greater (29 Lots).
ITEM 2 09/24/2019
The Project would concentrate the residential area on approximately 40.7 acres of the
site (37.3%), leaving approximately 68.5 acres as open space (62.7%). The proposed site
design aligns with the Orange Park Acres Plan concept of clustering and retaining open
space areas near residential clusters. Although the residential units are clustered, each
lot is being subdivided to meet the City's Single Family Residential R-1-8 or R-1-10
development standards. Consolidating the units to this portion of the project site will
enhance the equestrian and rural lifestyle of the area. Additionally, both the Development
Agreement (Attachment No. 17) and the Specific Plan (Attachment No. 18, Section 7.4
General Provisions) cap the number of residential units at 128, allowing for no more than
128 units to be built on the site.
The open space associated with the Project will be approximately 68.5 acres and will
comprise of natural hillsides, re-established grasslands, a restored Santiago Creek
riparian corridor, and a managed vegetation/fuel modification zone for fire protection
purposes. The amenities planned for these areas include the following:
• Multi-use trails providing public access to open space and the Santiago Creek
environs;
• Trail paseos for hiking and bicycling access;
• Expansion of, and connection to, the 1,269-acre Santiago Oaks Regional Park;
• Trailside rest-stops;
• Trailhead informational signage, shade shelters and kiosks and related amenities;
• Stormwater and flood control improvements;
• Managed vegetation and fuel modification; and
• Passive outdoor uses.
A variety of public multi-use recreation trails will traverse the project site, providing shared
use of hiking, biking, and horseback riding on decomposed granite trail surfaces
(Attachment No. 18, Exhibit 4.14). Along fihe north side of East Santiago Canyon Road,
in addition to the existing Class II bike lane, an off-street recreational trail will extend along
the entire length of the project site. This trail will provide continuity from the existing trail
that parallels the roadway east of the project site, with the intention of connecting to future
planned trails off-site to the west (provided by others). This 10-foot-wide trail will be
separated from East Santiago Canyon Road by a minimum 6-foot-wide landscaped
parkway measured from the back of curb within a minimum 18-foot-wide easement, per
the City of Orange Recreational Trail Master Plan (RTMP). Trail fencing between the trail
and the street shall also be consistent with the City of Orange RTMP and shall be placed
outside of the trail tread area. The fence will be in keeping with the existing equestrian
style fencing along East Santiago Canyon Road east of the project site. The trail system
will provide a critical linkage to Santiago Oaks Regional Park located to the east and
becomes an integral part of the City's and County's trail master plans via connectivity
opportunities.
The project site is comprised of three Planning Areas.
Planning Area A
Planning Area A consists of 40.2 acres (Attachment No. 18, Section 4.2.1) that
encompasses the greenway open space and Santiago Creek corridor. Its riparian and
wetland habitats provide an environment that supports both on-site live-in wildlife as well
as a movement corridor for regionally oriented wildlife. Off-site to the east, the Santiago
ITEM 3 09/24/2019
Creek open space corridor provides a link to Santiago Oaks Regional Park and the natural
open space beyond. Off-site to the west the Santiago Creek open space corridor
ultimately connects with the Santa Ana River corridor.
Planning Area 8
Planning Area B consists of 28.2 acres (Attachment No. 18, Section 4.2.1) that
encompasses the grassland area located south of the Santiago Creek corridor. It has
been disturbed over the years due to commercial operations on the site and will be
restored as a natural grasslands interspersed with other plant communities and seasonal
wildflowers. Planning Area B also includes the Managed Vegetation/Fuel Modification
zone located north and east of Planning Area C and acts as a vegetative buffer between
the open space and residential neighborhood for fire protection purposes. This 130-foot-
wide buffer zone will be comprised of plantings compatible with on-site plant communities
while being responsive to fuel management policies. The Managed Vegetation/Fuel
Modification Zone(s) complies with fuel modification requirements specified by Section
320 of the Orange Fire Code (per Orange Municipal Code Section 15.32.020). Upon
dedication of the Specific Plan's open space in Planning Areas A and B to the City of
Orange, County of Orange, Homeowners Association (HOA), non-profit, or other entity,
the Applicant will retain an easement for fuel modification zone maintenance at the time
of final mapping.
Throughout the open space in Planning Areas A and B, a network of 10-foot-wide multi-
use recreation trails for public use will meander across the land providing public access
to the restored open space and the Santiago Creek environs. A bridge is proposed to be
located in the northeast portion of Planning Area A to provide trail access across Santiago
Creek. The Project's trail system will connect to the existing Santiago Creek Trail along �
the northern boundary of the project site. On the west side of the project site at Cannon
Street, trail access to the residential neighborhoods in Planning Area C will occur via a
number of trail paseos allowing for hiking and bicycling access, and via the passive Handy
Creek Linear Park as part of Trail F in Planning Area B accessible to the residents of the
development and the public.
Planning Area C
Planning Area C consists of 40.7 acres (Attachment No. 18, Section 4.2.2) encompassing
the project's residential neighborhoods. Development will be a present-day interpretation
of the existing surrounding neighborhoods, complimentary to and in character with them.
Similar materials will be used, and rooflines and roof styles will be comparable. Homes
will be designed to reinforce the pedestrian scale of the neighborhood by incorporating
second floor setbacks, covered front porches, and entryways that address the sidewalk
and reduce the scale of the homes. Building massing and setbacks will be in keeping with
surrounding neighborhoods. Residential development standards will be the standards
contained in the City of Orange Zoning Code, Chapter 7.14, Residential District, Section
17.14.070, General Requirements, Table 17.14.070, Residential Development Standards
R-1-8 and R-1-10.
Community Outreach
Since 2015, the Applicant has conducted outreach with representatives of the adjacent
neighborhoods, including the Orange Park Association, Mabury Ranch Homeowners
Association, and The Reserve Homeowners Association, in an attempt to determine
ITEM 4 09/24/2019
community priorities for the site. In 2015, in response to the outreach and as a good faith
gesture to encourage further constructive dialogue regarding the long-term land uses for
the property, the Applicant agreed to curtail and modify the current sand and gravel
operations on an interim basis. That limited use has continued over the past four years.
Also, in 2015, the City Council designated finro members of the Council to serve on a City
Council Ad Hoc Committee to engage with the applicant and members of the community
in the area. The Ad Hoc Committee conducted a series of ineetings with representatives
of Mabury Ranch, The Reserve, and Orange Park Acres to discuss opportunities and
constraints related to possible development of the site. Each association designated their
specific representative(s). While the meetings were open to the public, they were not
subject to the Brown Act as there were only two Council members present and no other
participants were appointed by the City. The meetings were intended to engage
stakeholders, to identify all issues related to the site, and to have an open dialog for all
parties involved. The last meeting of that group was in March 2018.
To formalize and ensure transparency for the entitlement process, with input from Orange
Park Association, Mabury Ranch Homeowners Association, and The Reserve
Homeowners Association, the City and the Applicant entered into a Pre-Development
Agreement (PDA) dated October 11, 2016 (Attachment No. 19, Appendix A). This
represented several months of ineetings and discussions with the community at large,
and numerous representatives from Orange Park Association, Mabury Ranch
Homeowners Association, and The Reserve Homeowners Association. An essential
component of the PDA and working agreement with community representatives was the
temporary suspension of all backfill and stockpiling operations at the Sully-Miller sand
and gravel operation, effective September 15, 2015. This agreement established general
parameters and set forth various development alternatives intended to guide the
processing of various requested land use approvals required for the project. The major
provisions of the agreement are as follows:
• Evaluate proposed alternatives for the project on approximately 109 acres with a
range of 25 to 50 acres available for residential units as set forth in Exhibit B of the
P DA.
• An obligation of the Applicant to submit an application for land use entitlement
approvals that include a General Plan Amendment, Zone Change, Major Site Plan
Review, Design Review, CEQA compliance, Development Agreement, Park Planning
and Development Committee consideration of project trails, and commitment by the
City to expeditiously process these entitlements while complying with all legal
requirements.
• Continue the cessation of the currently permitted operation of the sand and gravel
operation during the processing of the Project consistent with the June 12, 2015
memorandum submitted by the Applicant to the City, Mabury Ranch, The Reserve,
and Orange Park Acres (attached within the PDA). The Applicant will also commence
the interim remediation of the property, which will result in the lowering of the existing
sand and gravel material stockpiles on the project site; subject to the Applicant's right
to resume sand and gravel operations.
• Cooperation befinreen the Applicant and the City for the evaluation of easements and
the possible extension of the Santiago Creek Trail to the north side of the project site.
ITEM s 09/24/2019
On March 16, 2017, the City of Orange conducted a Scoping Meeting for the EIR. The
Project described in the NOP consisted of approximately 150 residential dwellings
configured within various development plan alternatives. The various land use scenarios
were based on the PDA. The most significant concerns expressed by the community at
the Scoping meeting pertained to traffic on East Santiago Canyon Road and Cannon
Road; the preservation of Santiago Creek as a greenway; open space; flooding; and,
elimination of the current sand and gravel operation.
Separate from the Ad Hoc Committee meetings, the Applicant's representative has been
meeting with stakeholders from the various neighborhood groups in the area whom the
Applicant considers to be a "Liaison Committee". In some cases, the Applicant has met
with the "Liaison Committee" as a group and sometimes he has meet with the members
individually. Nevertheless, this activity has been solely at his discretion in an effort to
reach a consensus with the community regarding the development proposal. Again, this
activity has been independent from the City Council Ad Hoc Committee meetings. The
Applicant also held Collaborative Group meetings, which was comprised of
representatives of Mabury Ranch, The Reserve, and Orange Park Acres. Various
members of the community suggested land use alternatives to the project who proposed
an alternative consisting of 40 acres with 8,000, 10,000, 15,000, and one-acre lots.
The extensive 4-year community outreach collaboration effort to address community
concerns as well as other matters related to the Applicant resulted in modifications,
reductions, and changes to the original proposal commitments as outlined in the
Development Agreement.
Environmental Impact Report
A Notice of Preparation (NOP) for the Project was issued on March 3, 2017. The NOP
describing the original concept for the project at 150 units and issues to be addressed in
the Environmental Impact Report (EIR) was distributed to the State Clearinghouse,
responsible agencies, and other interested parties for a 30-day public review period
extending from March 3, 2017, through April 3, 2017. The NOP identified the potential
for significant impacts on the environment related to the following topical areas:
Aesthetics, Light, and Glare, Agriculture Resources and Forestry Resources, Air
Quality, Biological Resources, Cultural Resources, Geology and Soils, Greenhouse
Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land
Use and Planning, Mineral Resources, Noise, Population and Housing, Public
Services, Recreation, Transportation and Traffic, Tribal Cultural Resources, and
Utilities and Service Systems.
The Draft Environmental Impact Report (DEIR) No. 1857-18 evaluated the environmental
impacts of the Project and its project alternatives, which was prepared in accordance with
the provisions of the California Environmental Quality Act (CEQA) per State CEQA
Guidelines Section 15070 et seq. and in conformance with the City of Orange Local CEQA
Guidelines. The 45-day public review period was initiated on February 23, 2018, and
ended on April 9, 2018. Staff received approximately 130 comment letters during the
public review period relative to the Draft EIR, that included comments related to air quality,
biological resources, greenhouse gas (GHG) emissions, hazardous materials, hydrology
and water quality, land use, traffic, and alternatives. Subsequently, the City prepared a
ITEM 6 09/24/2019
Recirculated Draft EIR(RDEIR) (Attachment No. 19)to replace the Draft EIR in its entirety
to address comments made on the technical analysis of the project. The RDEIR was
prepared in accordance with the provisions of CEQA per State CEQA Guidelines Section
15070 et seq. and in conformance with the City of Orange Local CEQA Guidelines. The
RDEIR was re-circulated from November 14, 2018 to December 31, 2018. Copies of the
document were available for public review at the City's three libraries, at City Hall, and on
the City's website.
Staff received approximately 306 written comment letter(s) during the RDEIR public
review period, of which approximately 96 letters were not CEQA related and
approximately 187 letters that lacked sufficient specificity and did not provide any
reasoning for the comments. The City prepared Response to Comments to address
environmental comments received during the public review period. The Response to
Comments includes a Master Responses to Comments, which provides a single
comprehensive response to similar comments about a particular topic. The topics
addressed in the Master Responses are Plan Consistency; Adequacy of the project
description, analysis of alternatives, dam safety and risk of failure, wildfire risk,
stewardship of open space, applicability of SurFace Mining and Reclamation Act
(SMARA), site environmental conditions, soil import/export quantities, and general
comments on the Project, general opposition to the proposal.
Pursuant to the CEQA Guidelines, comments received on the RDEIR during the review
period are included in the Final EIR (FEIR) (Attachment No. 20). Pursuant to CEQA
Guidelines Section 15088.5(fl(1), a summary of revisions made to the RDEIR is included
in the FEIR; also, pursuant to that Guideline, responses to comments are limited to
comments received on the RDEIR, although comments on the initial DEIR will be part of
the administrative record.
The CEQA Guidelines generally require a lead agency to evaluate and prepare a written
response to all comments on environmental issues received on the draft EIR. (Guidelines,
§ 15088(a), (d).) Such a response may take the form of a revision to the draft EIR.
(Guidelines, § 15088(d).) When a draft EIR is substantially revised and the entire
document is recirculated, however, the lead agency only needs to respond to comments
on the recirculated EIR, not those received during the earlier circulation period.
(Guidelines, § 15088.5 (fi� (1).) Instead, the agency need only provide a summary of the
revisions that were made to the previously circulated draft EIR. (Guidelines, § 15088.5
(g).) The RDEIR Introduction describes a summary of the revisions that were made to the
DEIR, including a full list of DEIR commenters and specific sections that were revised.
Table 1-2 and Table 1-3 in the Introduction provide a summary of key areas where the
document was revised to address pertinent and representative comments made during
the prior public review period.
General Plan Amendment
The City of Orange General Plan serves as the long-range blueprint for growth and
change in the City. The Land Use Element of the General P.lan in particular guides
physical development within the City's borders. The General Plan is considered a
"comprehensive" policy document in that it addresses the multi-disciplinary content
required by the State, as well as additional local issues related to cultural resources,
economic development, urban design, growth management, and infrastructure.
ITEM � 09/24/2019
The City of Orange General Plan designates portions of the project site as:
• Low Density Residential (LDR) (15.4 acres), which allows for conventional single-
family residential development characterized by individual single-family homes
constructed in subdivisions, or by custom units built on individual lots;
• Resource Area (RA) (77.3 acres), which allows for agricultural uses and continued
use of stream and river channels for aggregate mining. Passive and active
recreational uses are also permitted in the RA area. The RA area may serve as a
holding zone for future uses compatible with established and planned land uses in
surrounding areas;
• Open Space (OS) (16.5 acres), which may consist of steep hillsides, creeks, or
environmentally sensitive areas that should not be developed. Although designated
as permanent open space, most areas will not be developed as public parks with the
exception of river and creekside areas that promote connectivity of the City's trails
system. This category includes both privately held open spaces and public lands
(Attachment No. 18, Exhibit 2.1).
The RA land use designation reflects the current sand and gravel activities south of
Santiago Creek. The LDR designation applies to the portion of the site north of Santiago
Creek, adjacent to Mabury Avenue. The OS designation applies to a relatively narrow
strip running through the site from east to west and roughly following the alignment of
Santiago Creek. The Project involves the development of 128 dwelling units on
approximately 40.7 acres within the area currently designated RA and the preservation
of the remaining 68.5 acres (which overlap with the current RA and LDR designations) as
open space and recreation uses. Accordingly, the Applicant is proposing a General Plan
Amendment to change the RA designation to a combination of LDR, and OS; and the
LDR designation to OS. The area currently designated OS will remain OS (Attachment
No. 18, Exhibit 2.1).
East Orange General Plan and Orange Park Acres Plan
The project site is located within the boundaries of the East Orange General Plan and the
Orange Park Acres Plan. The Project also includes a General Plan Amendment that
would amend both the East Orange General Plan and Orange Park Acres plan to
incorporate the Project Specific Plan. The need for amending these plans is based on the
footprint and lot sizes of the proposed residential development as well as the footprint of
the open space and recreational amenities. The Project Specific Plan would create
vertical consistency with the General Plan by aligning the land use, open space, and trails
content of the three documents. It is important to note the legal status of these documents.
East Orange General Plan
The Project is consistent with the concepts identified of the East Orange General Plan.
The East Orange General Plan was adopted in 1976 and encompasses approximately
1,900 acres. When adopted, the East Orange General Plan was part of the Land Use
Element of the City's General Plan. The central theme of the East Orange General Plan
is the accommodation of residential development in the area balanced with the protection
of the environmental assets of East Orange. The East Orange General Plan envisions
commercial development, a variety of housing types, and an extensive open space
greenbelt network.
ITEM s 09/24/2019
The East Orange General Plan envisions the area as having an assortment of open space
categories including the Santiago Creek Greenbelt. Through the use of small trail
connections, it is intended that users of the trails systems in the area will be able to move
from and to Santiago Oaks Regional Park (Page 111). It is the intent of the East Orange
General Plan that the large open space areas in the north, including the project site, will
form the backbone of the open space network in East Orange.
While the East Orange General Plan does not outline goals and policies similar to
contemporary general plans, the project is consistent with concepts identified in the East
Orange General Plan. For example, the East Orange General Plan contains a concept
that where possible, new development should be compatible with existing residential
densities and should maintain continuity with architectural style, house size, and price
range. The project's residential area would have a density that is similar to or less dense
than most nearby residential areas, including the Jamestown neighborhood, which is
within the East Orange General Plan area.
The Project density of 3.1 dwelling units per acre is consistent with the medium low
density within the East Orange General Plan area located to the south. The East Orange
General Plan calls for new developments to be compatible with existing residential
densities, compatible with architectural style, and house size (Page 109).
The East Orange General Plan envisions an "assortment of open space categories."
Accordingly, the Project includes 68.5 acres of open park space, split into 40.2 acres of
Greenway Open Space/Santiago Creek Riparian Corridor and 28.3 acres of Grasslands
Open Space. Therefore, the Project includes 68.5 acres of open space/park uses
adjacent to, and partially within, the East Orange General Plan; creating more open space
than the 37 acres of the project site that are within the East Orange General Plan.
The East Orange General Plan references design of the Santiago Creek Greenbelt in the
project site area. The project would be consistent with the reference to the Greenbelt
because it includes a 40.2-acre Greenway Open Space/Santiago Creek Riparian
Corridor. The East Orange General Plan emphasizes pedestrian and equestrian
movements between neighborhoods. The project would include a multitude of trails to
connect the Project and existing community to existing and future trails and bike lanes.
The project would also provide a sidewalk for pedestrians along the frontage of East
Santiago Canyon Road where one does not currently exist. Lastly, the East Orange
General Plan envisions a trail system to include equestrian/hiking trails and bike trails.
The project would include a multitude of trails to connect the project and existing
community to existing and future trails and bicycle lanes for recreation and commuting
purposes.
Orange Park Acres Plan
The Orange Park Acres Plan was adopted on December 26, 1973, and applies to a
geographic area largely comprised of unincorporated County land. The 1973 Orange Park
Acres Plan is often referred to as "specific plan", however it was adopted by City
Resolution No. 3915 (Attachment No. 20, Section 4, Errata, as Appendix B) in December
1973, prior to the 1974 enactment of State specific plan law. Therefore, the City does not
consider the Orange Park Acres Plan a "specific plan" but rather a relevant community-
ITEM 9 09/24/2019
planning document that plays an important role in guiding and informing land use
decisions. The Orange Park Acres Plan serves as a valuable tool in guiding the future
development of the Orange Park Acres community. Over time, with the City's 1989 and
2010 General Plan Updates, as well as updates to Orange County planning documents,
the Orange Park Acres Plan has evolved as a Community Plan.
Therefore, the consistency of the Project with this Plan is evaluated in the RDEIR, but the
Orange Park Acres Plan does not control land use policy in the City in the same manner
as the policies in the City's 2010 General Plan or Zoning Ordinance. Furthermore, the
Supreme Court in Orange Citizens for Parks & Recreation v. Superior Court (2016) 2
Cal.Sth 141, 157-158, held that the designations and policies in the 2010 General Plan
control over any inconsistent provisions of the Orange Park Acres Plan.
The Orange Park Acres Plan lists on Page 96 a number of goals, objectives, and policies
were established and recommended for the Orange Park Acres community. Staff has
reviewed the Orange Park Acres Plan and finds that these stated policies are not
requirements or development standards, but rather are used to identify the general and
specific directions recommended by the Orange Park Acres Plan. However, these policies
are not zoning code requirements.
A prominent policy of the Orange Park Acres Plan in its residential designations is the
concept of "flatland clustering" (Page 106). The Orange Park Acres Plan (Page 115)
envisions "single-family attached and detached clusters referred to as "rural clusters"
within a greenbelt or open space context" for medium-low density residential areas. The
Project area encompasses approximately 109.2 acres, 68.5 acres of which would be
dedicated to open space, and approximately 40.7 acres of which would contain a
residential "cluster" of homes. The proposed site design would align with the Orange Park
Acres Plan concept of "clustering" and retaining open space areas near residential
"clusters." Although the residential units are "clustered" on approximately 40 acres, each
lot is being subdivided to meet the City's R-1-8 or R-1-10 development standards.
Although the Project includes development on lots smaller than 1-acre in size, as a whole
the project is consistent with the spirit of the Orange Park Acres Plan. A key objective of
the Orange Park Acres Plan is to foster compatible residential development within the
area both visually and functionally. The Project would comply because its residential area
has a similar density to nearby residential neighborhoods, including the following
neighborhoods located in the Orange Park Acres Plan area: Broadmoor Homes,
Leadership Housing Specific Plan, Pacesetter Homes, and a small portion of the
Jamestown neighborhood. The Orange Park Acres Plan envisions various areas to be
linked through a system of trails and streetscape landscaping. Additionally, the Project
includes a sidewalk for pedestrians along the frontage on East Santiago Canyon Road
where a sidewalk does not currently exist.
The Project includes 68.5 acres of open park space, split into 40.2 acres of Greenway
Open Space/Santiago Creek Riparian Corridor and 28.3 acres of Grasslands Open
Space, adjacent to, and partially within, the Orange Park Acres Plan. The project creates
more open space in the vicinity than the 39 acres of the project site that are within the
Orange Park Acres Plan. The Plan designates the project site as Open Space
(Attachment No. 18, Exhibit 2.3). The project site is located at the northwestern fringe of
ITEM io 09/24/2019
the Orange Park Acres Plan area, and represents approximately 3 percent of the overall
Orange Park Acres Plan area.
The proposed General Plan Amendment would change the current land use designations
for the Project site from Low Density Residential (LDR) (approximately 15.4 acres),
Resource Area (RA) (approximately 77.3 acres), and Open Space (OS) (approximately
16.5 acres) to Low Density Residential (LDR) (approximately 40.7 acres), and Open
Space (OS) (approximately 68.5 acres). The proposed project entitlements include this
General Plan Amendment, which governs over both the East Orange General Plan and
Orange Park Acres Plan, and the Rezoning to SP, which incorporates the Trails at
Santiago Creek Specific Plan. These entitlements create vertically consistent documents
that cover and include the proposed Project. The other project entitlements shall not take
effect unless this General Plan Amendment becomes effective
Zone Change and Specific Plan
Zone Change
The project site is currently zoned Sand and Gravel (S-G) and R-1-8 by the City of Orange
Zoning Code. The S-G land use designation reflects the previous surface mining activities
and the current sand and gravel operations that occur on the south side of Santiago
Creek. The R-1-8 zoning applies to the portion of the site north of Santiago Creek,
adjacent to Mabury Avenue (Attachment No. 18, Exhibit 2.2).
The Project involves adoption of the Project Specific Plan and associated development
of 128 dwelling units on 40.7 acres within the area designated S-G and the preservation
of the remaining acreage (which overlaps with the S-G and R-1-8 designations) as open
space and recreation uses. Accordingly, the Applicant is proposing to rezone the entire
site to Specific Plan consisting of Residential Single Family (R-1-8 (SP) and SP R-1-10
(SP)) and Open Space (OS (SP)) designations (Attachment No. 18, Exhibit 2.2).
These land use and zoning changes are necessary to allow the proposed development
on the site, and are consistent and compatible with the other surrounding residential land
use designations (Attachment No. 19, Table 3.10-2: General Plan Consistency Analysis).
Additionally, these changes further the community vision for the Santiago Creek open
space corridor. With adoption of the Zone Change and implementation of the Specific
Plan, the proposed zoning would be consistent with the proposed General Plan
designations for the site. The proposed development character would also be compatible
with existing surrounding development.
Specific Plan
The Project proposes a Specific Plan (Attachment No. 18) that would serve as zoning,
tailored specifically to the site to implement the City of Orange General Plan. It effectively
establishes a link between implementing policies of the General Plan and the individual
development proposals in a defined area. The Specific Plan has been crafted to conform
with the proposed amended General Plan designation proposed for the site. Any
subsequent development associated with the Project must be consistent with the Specific
Plan.
The Project Specific Plan proposes the transformation of a rock and concrete materials
recycling and backfilling operation to an environmentally enhanced, open space
ITEM �� 09/24/2019
environment and single-family detached residential neighborhood. Under the Specific
Plan, the majority of the project site (62.7 percent)will be utilized for the rehabilitation and
preservation of the natural greenway/open space and Santiago Creek environs, as well
as re-establishing open grasslands in areas that have been denuded by the project site's
history of commercial operations, totaling approximately 68.5 acres. Recreational trails
will provide public access to the enhanced revegetated interior of the site.
The proposed Project Specific Plan consists of development standards intended to
facilitate clustered development that maximizes open space opportunities on the site and
allows residential developmentthat is compatible and consistentwith existing surrounding
neighborhoods.
The Specific Plan calls for architectural styles for the single-family detached residences,
which represent a present-day interpretation of the existing surrounding neighborhoods.
To complement Orange Park Acres, materials and features will include primarily gable or
shed style roofs, stucco and/or wood/wood-like siding on facades, covered entries or front
porches with square posts and beams, primarily rectilinear window forms but occasional
arched feature window, corbels, beams or rafter tails, and accent materials of stone, brick
and occasionally a slate-like material. Entry monumentation, signage, and lighting will
reinforce this equestrian character in design interpretation and materials (stone, timbers,
and rustic metals). Edge treatments and any public landscape within Planning Area C will
utilize plant materials and be designed in character with the natural surroundings, i.e.
drifts and swaths of grasses and shrubs, vines, and accent plantings in informal/natural
patterns.
Residential development standards for the Specific Plan are intended to be applied in
concert with the standards contained in the City of Orange Zoning Code, Chapter 7.14,
Residential District, Section 17.14.070, General Requirements, Table 17.14.070,
Residential Development Standards R-1-8 and R-1-10. The Specific Plan caps the
number of residential units at 128, allowing for no more than 128 units to be built. The
Specific Plan and Development Agreement control the maximum number of units that
would be developed on the site. A request for additional units above the 128 units would
require amendments to the Specific Plan and Development Agreement that would need
to be approved by the City Council.Additional description of the purpose, intent, authority,
and format of the project Specific Plan is contained in Attachment No. 18.
Development Agreement
A Development Agreement (Attachment No. 17)will be entered into between Milan REX,
LLC, and the City of Orange for certain public benefits including the acquisition of
Ridgeline Golf Course, funding for equestrian and recreational purposes, funding for the
greenway rehabilitation/enhancements, funding for trail improvements, and circulation
improvements. In consideration of the public improvements to be provided by the Project,
the Development Agreement will provide the Applicant with vested rights to develop the
Project in accordance with the Development Agreement and the City's General Plan,
ordinances, polices, rules, and regulations, existing on the effective date of the Project
approval.
In an effort to address general community concerns and interests, related to traffic on
Santiago Canyon Road and Cannon Street, the preservation of Santiago Creek as a
ITEM �2 09/24/2019
greenway open space, flooding, and elimination of the current sand and gravel operation,
the Applicant is offering the following contributions for the purposes of public benefits
related to the development of the site, open space, and recreation.
• A maximum number of 128 single-family detached lots located in the southerly portion
of the property and will consist of housing types and lot sizes compatible with the
surrounding neighborhoods.
• Fund up to $1,000,000.00 for traffic improvements to widen Santiago Canyon Road
and restripe Cannon Road prior to the issuance of the first certificate of occupancy for
the Project.
• Fund up to a maximum of$4,100,000.00 in landscape and other improvements for the
Santiago Creek Greenway. Said Improvements are to be completed or funded prior
to the issuance of the 60th Certificate of Occupancy for the Project.
• Fund $1,000,000.00 to be used for local area-wide equestrian trail purposes prior to
the issuance of the first Certificate of Occupancy for the Project.
• Finance and fund the City's acquisition of the closed Ridgeline Country Club/Golf
. Course Property, which will provide the community an additional approximately 50
acres of public open space prior to the issuance of the first Certificate of Occupancy
for the Project.
• Provide $2,000,000.00 for equestrian and recreational purposes in the East Orange
Area as determined by the City prior to the issuance of the first Certificate of
Occupancy for the Project.
These contributions are memorialized in the proposed Development Agreement and
items further the broad community objectives of improving area traffic conditions, trail
linkages, and enhancement of and maximizing of the recreational and environmental
potential of Santiago Creek. This funding also supports retention of the equestrian
character of Orange Park Acres by addressing trails and the Ridgeline property.
Circulation
Existing pedestrian circulation in the project area is provided via existing public sidewalks
along the south side of East Santiago Canyon Road east of the project site, terminating
at the Mara Brandman Equestrian Center and resuming west of Nicky Way. There is no
public sidewalk on the north side of Santiago Canyon Road abutting the project site or
west of the site. There are existing public sidewalks on both the east and west sides of
Cannon Street.
Class II bike lanes (on-street bike lanes delineated by painted strips and other features)
exist along the north and south sides of East Santiago Canyon Road and the east and
west sides of Cannon Street. A public Recreation Trail currently exists along the north
side of East Santiago Canyon Road adjacent to the existing Reserve neighborhood to the
east of the project site. The Santiago Creek Bike Trail exists along the north boundary of
the site, extending from Cannon Street east to the easterly project boundary and further
on to Santiago Oaks Regional Park.
The Circulation Plan for the Project provides for the movement of vehicular traffic within
the development area while creating a comfortable environment for pedestrians,
bicyclists, and equestrians through the inclusion of both a regional and local on-site trail
system. The trail system provides internal connectivity within The Trails at Santiago
Creek, as well as the potential for external connections to the greater Orange community,
ITEM 13 09/24/2019
Santiago Oaks Regional Park, the existing regional trail system, and other off-site
destinations and amenities.
The influence of the project's natural open space surrounding the residential
neighborhood and the network of multi-use trails and amenities within the open space
further the quasi- rural equestrian character of the neighborhoods and integrate the
project with the equestrian circulation network. Residential/local streets will have curb
adjacent landscape parkways planted with street trees in character with the surrounding
natural environs. Pedestrian and bicycle connectivity from proposed the residential
neighborhoods to the surrounding open space and trail network will be via trail paseos
extending into existing neighborhoods as well as via Trail F, referred to as the "Handy
Creek Easement Linear Park".
Proposed access to the project will be provided via one proposed full access signalized
entry road, located directly opposite Nicky Way, along East Santiago Canyon Road. No
parking will be allowed along either side of the entry road. Sidewalks will be located on
each side of the entry road separated by a landscaped parkway. Implementation of the
Specific Plan and associated Project will fund up to $1,000,000.00 for traffic
improvements to widen Santiago Canyon Road and restripe Cannon Road.
Within the proposed residential neighborhood (Planning Area C), local streets will be
designed in accordance with the City of Orange 100 Series—Street Improvement
Standards, Standard Plan 106 Local Streets, Case I and Case II. Streets will have one
travel lane in each direction and sidewalks separated by a landscape parkway. Parallel
parking will be allowed on one or both sides of the street pending neighborhood design.
7. KEY ITEM DISCUSSION
The following items are being discussed, as these are the key items raised in the public
comments.
Item 1: Land Use Designations
Amendment to the City of Orange General Plan
The Project site is governed by the City's 2010 General Plan. The City's General Plan
designates the property as RA, OP, and LDR. The proposed General Plan Amendment
would re-designate Planning Area C (Attachment No. 18, Exhibit 4.5) from RA to LDR
(40.7 acres). The existing LDR parcel north of the creek, and the remaining RA lands
would be designated OS (68.5 acres).
The proposed residential development furthers the City's General Plan Land Use
Element, in that it fosters land use compatibility to a greater extent than the existing
activity on the site. The Project would redevelop a site previously used for surFace mining
activities to support up to 128 dwelling units and open space and recreation uses. The
Project would provide new housing opportunities, this is consistent with the goal of
meeting current, and future needs with a diverse and balanced mixed of land uses. The
Project helps to implement the open space and trail connectivity objectives of the General
Plan. The proposed land use changes and associated open space and trail improvements
further the implementation of the community-based Santiago Creek Vision Plan, and the
City's Master Plan of Recreational Trails, implementing the Natural Resources Element
ITEM 14 09/24/2019
with its incorporation of the extensive trail system and open space linkage. The Project
would provide acreage for open space and recreation use, including a greenway along
Santiago Creek. Within the greenway would be a trail network, which would allow public
access to the waterway.
The proposed General Plan Amendment is consistent with the East Orange General Plan
and the Orange Park Acres Plan, in that the Project furthers the vision of these
neighborhood plans and is consistent with the existing development of the surrounding
area. The residential component of the Project has a density of 3.1 dwelling units per acre
and is consistent with the medium low density within the East Orange General Plan area
located to the south. The proposed site design would align with the Orange Park Acres
Plan concept of"clustering" in order to retain open space areas. The proposed residential
units are "clustered" on approximately 40 acres, and the majority of the site (68.5 acres)
designated as open space linking to the Santiago Oaks Regional Park system and would
expanding the existing trail nefinrork.
Staff believes that the General Plan Amendment would further the objectives of the City's
General Plan given that the Project components implement various General Plan
elements.
Item 2: Density and Lot Size
The project and related Specific Plan proposes and caps development potential at 128
units, equating to 3.1 dwelling units per acre. This density is reflective of the density and
residential lot sizes in the surrounding neighborhoods of Mabury Ranch, The Colony
North, and Creekside Ranch, Orange Park Acres at Orange Park Boulevard and East
Santiago Canyon Road, and Jamestown.
The Mabury Ranch single-family neighborhood to the north of the site has a General Plan
designation of LDR and is similarly zoned R-1-8. The Reserve single-family neighborhood
that forms the eastern boundary of the site has a General Plan designation of Estate Low
Density (ESTR) and is zoned R-1-40 and has typical lot sizes of 20,000-44,000 square
feet. Surrounding residential uses to the east have typical lot sizes less than 10,000
square feet. The neighborhoods south of the project site are zoned R-1-8, R-1-10, R-1-
20, and R-1-40. The Jamestown neighborhood has a General Plan designation of LDR
and has typical lot sizes of 8,000-11,000 square feet. The Orange Park Acres
neighborhood has typical lot sizes of 50,000 square feet to 1 acre plus. The Eichler
Homes neighborhood to the southwest has a General Plan designation of LDR and typical
lot sizes of 7,600-12,000 square feet. The Colony-South neighborhood has a General
Plan designation of LDR and typical lot sizes of 7,000-10,000 square feet.
The proposed Project includes three different single-family detached lot programs ranging
in size from 8,000 to 9,000 square feet (82 Lots); 9,200 to 10,000 square feet (17 Lots);
and 10,000 square feet and greater(29 Lots). The largest lots are located in the east side
of Planning Area C adjacent to The Reserve. Each lot is being subdivided to meet the
City's R-1-8 or R-1-10 standards.
The Project's residential area would have a similar density and lot size to the nearby
communities of Jamestown, and Mabury Ranch. The density would be similar to
Broadmoor Homes, Leadership Housing Specific Plan, and Pacesetter Homes within the
ITEM 15 09/24/2019
Orange Park Acres area. The proposed residential density and lot size is in direct
response to the cluster concept described in the Orange Park Acres Plan, for the purpose
of retaining open space areas near residential clusters.
Staff believes that as evidenced by the surrounding neighborhoods, the proposed density
and lot sizes are compatible. For these reasons stated above, the proposed density is
consistent with the neighborhood densities and is consistent with the East Orange
General Plan and the Orange Park Acres Plan.
Item 3: SurFace Mining and Reclamation Act(SMARA)
The project site was used primarily for surface mining of sand and gravel, aggregates
mining, and ancillary uses from 1919 through 1975. Evidence of the past mining operation
remain on approximately 40 acres befinreen Santiago Creek and East Santiago Canyon
Road. This area is characterized by soil piles, berms, and unpaved roads. An
approximately 5-acre area near East Santiago Canyon Road supports a materials
recycling operation that includes apparatus for crushing boulders, bricks, rocks, and
similar materials for recycling. Materials used for these operations originated primarily
from off-site sources. The materials generated by these operations have historically been
used both on-site and transported off-site. Ancillary uses included administration and
maintenance buildings, caretaker residence, material testing laboratory, driver's shack,
rock crushing facilities, several aboveground and belowground fuel storage tanks, and
two hot-mix asphalt plants.
The Surface Mining and Reclamation Act (SMARA) provides guidelines for the
classification and designation of mineral lands. The California Geological Survey has
produced a report and a Mineral Land Classification Map. The Classification Map
designates areas where important Production Consumption deposits occur, and are
categorized in Mineral Resource Zones (MRZs).
The project site is located within Mineral Resource Zone 2 for aggregate as designated
by the State Mining and Geology Board. However, surface mining on the project site
ceased prior to January 1, 1976. Under SMARA, a mining reclamation plan is required
only for post-1975 mining operations. As such, a mining reclamation plan under SMARA
is not required for the project site. This issue was fully evaluated in 2003 by the State
Office of Mine Reclamation (OMR) and by the City. It was at that time the OMR and the
City determined that SMARA did not apply to the site (Attachment No. 19, Appendix M).
Further, SMARA applies to surface mining, and does not apply to grading projects that
are moving earth from one place to another. Therefore, grading activities for the project
pursuant to the Sand and Gravel Extraction District (SG) zone is not subject to SMARA.
Nevertheless, at the May 14, 2019 Orange City Council meeting, the Orange Park
Association Board submitted a letter (Attachment 6) reaffirming the Orange Park
Association Board's belief that the provisions of SMARA apply to the project site. In
particular, Orange Park Association relied on the advice of a State Mining and Geology
(SMG) staff member who opined that the City must comply with the California Public
Resources Code (PRC) prior to approving a project on the Trails project site. Specifically
the SMG staff member cited the City's need to comply with PRC 2762(d).
ITEM 16 09/24/2019
In response, on June 6, 2019, the City Attorney contacted Jeffrey Schmidt, Executive
Officer for the State Mining and Geology Board (Board). Mr. Schmidt requested a letter
of explanation from the City and stated that in most instances the Executive Officer, in
consultation with the State Geologist, is responsible for responding on behalf of the
Board. Accordingly, the City Attorney sent a letter to the Executive Officer, copying two
Acting State Geologists, seeking a determination from the Board regarding the
applicability of PRC 2762(d)(1) (Attachment 7).
Subsequently, on June 19, 2019, the City Attorney received an email communication from
the Executive Officer (Attachment 8) affirming that ". . . the Board feels that the Trails at
Santiago Creek Project, . . . is not subject to this provision." This most recent
communication from the State confirms the City's position that SMARA and provisions
contained in the PRC are not applicable to the project site.
Item 4: Villa Park Landfill
The Villa Park Landfill site located immediately adjacent to the west of the project site
was originally a sand and gravel mine until 1962 when the site was repurposed as a
landfill. The Villa Park Landfill was operated by Orange County (OC) Waste & Recycling
as a Class III municipal solid waste landfill from 1962 to 1966. The landfill property is
approximately 18 acres, of which approximately 11 acres were used for waste disposal.
The landfill was closed in 1966 in accordance with closure regulations in effect at the
time. OC Waste & Recycling has since been implementing post-closure monitoring and
maintenance of the Villa Park Landfill.
The Villa Park Landfill is not equipped with an engineered artificial liner or with a leachate
collection and removal system because this landfill predates regulatory requirements for
these measures. An active gas collection system has been installed at the site to control,
collect, and flare landfill gas generated in the buried refuse. Groundwater monitoring,
vadose zone perimeter gas probe monitoring, and site maintenance is conducted by OC
Waste & Recycling on a regular basis.
Tait Environmental Services conducted a Phase II Environmental Site Assessment (ESA)
of the project site that evaluated potential exposure of the proposed development to
hazardous materials from the past land use activities and the neighboring landfill. Tait
Environmental Services found that there was the potential for (1) vapor intrusion of
Trichloroethylene (fCE) and methane into future dwelling units and (2) elevated levels of
Total Petroleum Hydrocarbons in the soil. To reduce any potential risks associated with
hazardous materials on the project site, Mitigation Measures HAZ-2a to HAZ-2c
contained in the RDEIR will be required where vapor intrusion has the potential to occur
and will reduce impacts to a level of less than..significant. These measures will apply to:
1) any occupied structures within 1,000 feet of the landfill boundary; and/or 2) structural
systems to prevent gas-related hazards are required to be reviewed and approved by the
County of Orange Health Care Agency/Local Enforcement Agency. These measures
require a supplemental Phase II ESA to be prepared and appropriate measures to be
taken to remediate any hazardous conditions to the satisfaction of the California
Department of Toxic Substance Control, with final confirmation by the City prior to the
issuance of building permits.
ITEM �� 09/24/2019
Item 5: Dam Safety and Risk of Failure
Villa Park Dam is located approximately 1.5 miles upstream of the project site and is
owned and operated by the Orange County Flood Control District. The dam was
completed in 1963 and is used for flood control purposes; it does not store water for
municipal use. Villa Park Dam is an earth/rock-fill structure that has a capacity of 15,600
acre-feet. The Orange County Operational Area Emergency Action Plan Dams/Reservoir
Failure Annex indicates that it would take a dam failure flood wave 105 minutes to reach
the project site from Villa Park Dam.
Santiago Dam is located 5 miles upstream of the project site. The dam was completed in
1931 and impounds Irvine Lake. Santiago Dam is an earth/rock-fill structure that is 136
feet tall and 1,425 feet long. The dam is designed to contain up to a 50-year flood and
withstand a 500-year flood event of over 30,000 cubic feet per second. The Orange
County Operational Area Emergency Action Plan Dams/Reservoir Failure Annex
indicates that it would take a dam failure flood wave 255 minutes to reach the project site
from Santiago Dam.
The California Department of Water Resources Division of Safety of Dams oversees dam
safety and requires local dam operators to maintain records concerning maintenance,
operation, staffing, and engineering and geologic investigations that pertain to their
facilities. Division of Safety of Dams personnel have the ability to inspect dams for safety
and require operators to implement corrective measures if deficiencies are found.
Additionally, the Division of Safety of Dams oversees alteration and repair of dams.
Serrano Water District that owns and operates Santiago Dam and Orange County Flood
Control District that owns and operates Villa Park Dam are responsible for compliance
with State laws that pertain to the safety of the facilities.
The United States Army Corps of Engineers National Inventory of Dams conducts
inspections on dams. During its last inspection in 2018, the Santiago Creek Dam received
a rating of satisfactory, likewise; Villa Park Dam also received an assessment rating of
satisfactory. The California Division of Safety of Dams' "satisfactory" condition
assessment indicates that no existing or potential dam safety deficiencies are recognized.
The 100-year flood hazard areas within the project site overlap with the Santiago Creek
channel. The Project would establish a greenway along the creek corridor and, thus,
would not alter the existing 100-year flood hazard areas. Furthermore, the proposed
residential uses would be located outside of the 100-year flood hazard areas. The areas
mapped as 500-year flood hazard areas mostly coincide with areas proposed for open
space and recreation, however; approximately 15 acres of the residential area overlaps
with this 500-year flood hazard area. Federal regulations allow for residential uses in this
area. In the interests of promoting awareness about the potential for dam failure and
making future residents aware of evacuation procedures, Mitigation Measure HYD-5
contained in the RDEIR requires the Applicant to prepare and implement an emergency
evacuation plan prior to the issuance of building permits. With the implementation of
mitigation, impacts would be less than significant.
Based on the conditions of the dams, state maintenance programs, flood zone areas in
relation to the development footprint, and proposed Mitigation Measures, Staff believes
that the Project is acceptable with respect to dam safety and flood risk.
ITEM �s 09/24/2019
Item 6: Open Space
It is the intent of The Project to provide a recreational trail system that avails the open
space areas and the Santiago Creek environs to the Orange community and general
public at large, and becomes an integral part of the City's and County's trail master plans
via connectivity opportunities. As part of the Project, the long-term care, maintenance,
and stewardship of the open space grasslands and trails is intended to be overseen by a
conservancy, OC Parks, the project homeowners association, a non-profit, landscape
maintenance district, or another similar entity as specified in the proposed Development
Agreement.
As a result, the Santiago Oaks Regional Park can be expanded and amenities added as
part of the entitlements for the proposed Project (Attachment No. 18, Exhibit 6.23). The
City of Orange and OC Parks had initial discussions beginning in July 2018, related to the
long-term stewardship of the Santiago Creek Greenway and Grasslands Open Space
area. On April 1, 2019, as the development kept moving forward, the City of Orange
Community Development Director sent a letter to the Director of OC Parks requesting to
discuss the potential stewardship of the Santiago Creek Greenway and Grasslands Open
Space area (Attachment 9). In response, OC Parks, the City of Orange, and the Applicant
met on May 15, 2019, in which OC Parks expressed interest in the long-term stewardship
of the Santiago Creek Greenway and Grasslands Open Space area and would be
requesting additional information from City staff and the Applicant should the
development process move forward. On June 25, 2019, City staff received
correspondence from OC Parks expressing an interest in the Santiago Creek Greenway
and Grasslands Open Space areas (Attachment 10). However, OC Parks also indicated
in their letter that they did not have sufficient information to make a recommendation to
the County Board of Supervisors. This was not surprising to City staff as it was expected
that OC Parks would be asking for additional information before a recommendation could
be made based on the May 15, 2019 meeting with OC Parks.
The Applicant and City staff will continue to work together for long-term stewardship of
the Santiago Creek Greenway and Grasslands Open Space areas. No commitment has
been made by OC Parks for long-term stewardship of the open space grasslands and
trails as part of this Project. In the event that OC Parks will not provide management and
maintenance for the open space grasslands and trails, the Applicant has proposed
alternative solutions including the Project's homeowners association, landscape
maintenance district, a non-profit, or another similar entity.
Santiago Creek Corridor Plans
The uses within the open space planning areas are compatible with and reflective of uses
as described in the Santiago Creek Vision Plan (2018), Santa Ana River, Santiago Creek
Greenbelt Plan (1971), and the Santa Ana River/Santiago Creek Greenbelt
Implementation Plan (1976). Other documents that guided proposed uses and/or trails
included the City of Orange General Plan Circulation and Mobility Section, the East
Orange General Plan (1975), the Orange Park Acres Plan (1973), and the Riding and
Hiking Trails Map of Orange Park Acres and Vicinity.
The Santiago Creek Greenway Alliance supports the Creek, Trails, and Open Space
(Attachment 11) components of the project, but takes no position on the housing
ITEM 19 09/24/2019
component of the project. The Santiago Creek Greenway Alliance believes that the trail
system and open space components are supportive of their vision for the Santiago Creek
Trail and Greenway. In addition, according to the Santiago Creek Greenway Alliance,
� open space grasslands and trails should be cared for and maintained by OC Parks as
part of the regional park system, in order to ensure that the habitat will be properly
managed for public benefit.
As outlined in the Project Benefits of the Specific Plan, approximately $4,100,000.00 in
landscape and other improvements for the Santiago Creek Greenway will be funded, as
part of the Project. Further, the implementation of the Specific Plan and associated
Project will provide $2,000,000.00 for equestrian and recreational purposes in the East
Orange Area as determined by the City prior to the issuance of the first Certificate of
Occupancy for the Project. ,
Staff believes that the Project implements long standing community interest in trail and
greenway enhancements along this easternmost stretch of the Santiago Creek corridor.
Item 7: Fuel Modification
Fuel modification is defined by controlling the types, density, and moisture content of
plants. A fuel modification plan consists of a strip of land where combustible vegetation
has been removed and/or modified in order to provide a reasonable level of protection to
structures from wildland fires. Fuel modification zones are to be designed, as per the
Orange Fire Code, Section 320 (per Orange Municipal Code Section 15.32.020). The
intent of these zones is to create breaks between wildland areas and structures
(specifically homes). The Project is in a Climate and Topographic Very High Fire Hazard
Zone as defined in O.M.C. Section 15.36.010. Fuel modification zones shall also comply
with the vegetation clearance requirements prescribed in the California Public Resource
Code 4291 California Government Code Section 51182. Within the project site, a 150'
fuel modification zone has been established along the northern and eastern edge of
� Planning Area C.
If the Specific Plan's open space in Planning Areas A and B is dedicated to the City of
Orange, County of Orange, or other entity, the Applicant will retain an easement for fuel
modification zone maintenance at the time of final mapping. Therefore, staff believes the
project takes the necessary measures needed to protect the proposed development form
wildland fire hazards to the extent possible. �
Item 8: Transportation/Traffic
Traffic movement on East Santiago Canyon Road and through intersections in the vicinity
of the Project is less than desirable at peak hours. The current average vehicle trips on
East Santiago Canyon Road between Cannon Street and Orange Park Boulevard are
32,400. The existing trip generation potential of the existing materials recycling and
backfilling operation based on existing counts totals 686 daily trips. The Project has the
potential for 1,228 daily vehicle trips; this represents a net increase of 542 daily trips over
the existing truck activity generated by the site. Although there would be an increase in
traffic generated by the Project, the traffic would consist of passenger vehicles rather than
the current rock crushing operations traffic generated by heavy-trucks.
ITEM 20 09/24/2019
Based on the City of Orange Traffic Impact Analysis (TIA) Guidelines (50 peak-hour trips)
and County of Orange Congestion Management Plan (CMP) criteria (3 percent average
daily traffic [ADT] increase) the project will not be in conflict with the CMP, including, but
not limited to level of service standards and travel demand rneasures, or other standards
for designated roads or highways. The project proposes several improvements to the
surrounding roadways and intersections, thus ensuring increased capacity and adequate
traffic flow in the area. These capacity improvements involve roadway widening and/or
re-striping to reconfigure (add lanes) to specific approaches of key intersections. The
Project will fund up to $1,000,000.00 for traffic improvements to widen Santiago Canyon
Road and restripe Cannon Road prior to the issuance of the first certificate of occupancy
for the Project.
However, the project contributes to pre-existing deficient conditions at the intersection of
Orange Park Boulevard/East Santiago Canyon Road. Therefore, the Applicant is
proposing Mitigation Measure TRANS-2, which would pay for their fair share fees to
restripe the northbound approach of Orange Park Boulevard at East Santiago Canyon
Road to provide one exclusive left-turn lane and one shared left-turn/right-turn lane.
Despite the fair share contribution provided through Mitigation Measure TRANS-2
mitigating the Project's impacts at Orange Park Boulevard/East Santiago Canyon Road,
impacts would be significant and unavoidable as the Orange Park Boulevard/East
Santiago Canyon Road intersection is not listed in the City of Orange Master Plan of
Arterial Highways, or any similar plans. The Applicant's fair share responsibility for these
improvements is 18.2 percent.
Staff believes that although the project will generate a net increase of 542 daily trips,
given the fact that the project will not trigger any impacts based on the City's TIA
Guidelines of 50 peak-hour trips and the Project's improvements to the existing
transportation system, the projects impacts will not be significant.
. Item 9: Significant and Unavoidable Impacts
Although most potential Project impacts have been substantially avoided or mitigated, as
described in the Findings of Fact, complete mitigation is not feasible for Air Quality and
Transportation and Traffic impacts. The City finds that the following impacts would have
a significant impact under CEQA that cannot be reduced to a level of less than significant,
despite implementation of design features and mitigation measures.
• AIR-1: The project may conflict with or obstruct implementation of the applicable air
quality plan.
• AIR-2: The project may violate any air quality standard or contribute substantially to
an existing or projected air quality violation.
• AIR-3: The project may result in a cumulatively considerable net increase of any
criteria pollutant for which the project region is non-attainment under an applicable
federal or state ambient air quality standard.
• TRANS-2: The project may conflict with an applicable plan, ordinance, or policy
establishing measures of effectiveness for the perFormance of the circulation system
under Year 2022 Traffic Conditions.
The City, after balancing the specific economic, legal, social, technological, and other
benefits of the proposed Project, has determined that the unavoidable adverse
environmental impact identified above may be considered acceptable due to the following
ITEM 2� 09/24/2019
specific considerations that outweigh the unavoidable, adverse environmental impact of
the Project. The Statement of Overriding Considerations are listed below, each of which
standing alone is sufficient to support approval of the Project.
• The Project provides 128 single-family housing units in the City of Orange, which will
assist the City in meeting its fair-share housing allocation imposed by the Southern
California Association of Governments. The Project will locate residential units on the
southern portion of the site, thereby preserving the majority of the site for open space,
recreation, and greenway uses.
• The Project provides approximately 68.5 acres of open space and recreation,
including open space improvements, which will increase recreational opportunities in
the City. On the Property, 12.6 acres that are currently zoned low density residential
will be rezoned to open space as part of the Project. The Project will enhance and
protect the Santiago Creek corridor and will provide a network of interconnected trails
that provide access to Santiago Creek and Santiago Oaks Regional Park. Trails will
be preserved and will be open to the public. The Development Agreement specifies
that the Applicant will contribute $4.1 million to construct greenway improvements for
Santiago Creek, $1 million for trail improvements in East Orange, and $2 million for
equestrian and recreational purposes.
• The Project, pursuant to the Development Agreement, provides funding for the
community's acquisition of the Ridgeline property, which will provide the community
with an additional approximately 50 acres of open space.
• The Project is consistent with the goals and policies of the City's General Plan, the
Orange Park Acres Plan, and the East Orange Plan.
• Project implementation would eliminate the sand and gravel operation on the property
and abate potentially hazardous soil conditions on the Property.
• Project implementation would provide a circulation system that minimizes adverse
effects on local residential neighborhoods. Project implementation would improve
local circulation by widening East Santiago Canyon Road and restriping Cannon
Road. .
• Project implementation would generate revenue to the City of Orange as a result of
property taxes and related�fees from the proposed residential development. The
revenue could be used by the City to provide public services and facilities, including
fire and police protection and other amenities and services available to the residents
of the City. Project implementation would result in school impact fees to the City to
fund capital improvements to school facilities. Further, Project implementation will
provide the City with fair share fees to restripe the northbound approach of Orange
Park Boulevard at East Santiago Canyon Road to provide one exclusive left-turn lane
and one shared left-turn/right-turn lane.
• Project implementation would slow, reduce, and meter the volume of runoff leaving
the site.
For these reasons, staff believes that the Statement of Overriding Considerations, which
have balanced the benefits of the Project against its significant unavoidable adverse
environmental impacts support the request for the Findings of Fact.
Orange Park Association Board
The Applicant provided written correspondence to the Orange Park Association Board
(Board) on March 15, 2019 (Attachment 12), in accordance with City Council Resolution
10081. With the official notification, the Board had until April 1, 2019 to provide a written
ITEM 22 09/24/2019
recommendation to the Planning Commission. The Board President requested an
extension in order to allow enough time to have a Board meeting to discuss the proposal.
The Community Development Director gave an extension until April 15, 2019. The Board
met on April 8, 2019, staff received correspondence from the Board President on April
19, 2019, (Attachment 13) indicating that the Board unanimously recommends to the
Planning Commission that the project be rejected. The stated reasons for the
recommendation to reject the project include: (1)the site is not consistent with the Orange
Park Acres Plan (based on current and future land use). The Orange Park Acres Plan
currently calls for open space on the area proposed for homes; (2) the property owner
has not complied with SMARA requirements; (3) contaminants exist on the site; (4)
additional traffic during and after project buildout; (5) difficulty evacuating residents in
case of flood or fire; (6) proximity to the landfill area; (7) the biological analysis in the
RDEIR is out of date; (8) the project provides no reclamation plan for restoring Santiago
Creek. The correspondence does not include any type of analysis on the reasoning as to
why they believe the project does not comply with the Orange Park Acres Plan.
City of Villa Park
Throughout the environmental review process, the City of Villa Park has made numerous
comments on the DEIR and the RDEIR, related to possible impacts to the City of Villa
Park. On July 2, 2019, the City of Villa Park submitted a letter (Attachment 14) to the City
of Orange related to the Project, indicating that the Applicant had meet with the City of
Villa Park. The letter states that the Applicant reached out to the City of Villa Park in an
effort to determine what measures, if any, could be taken and may be implemented to
help mitigate the perceived impacts to the City of Villa Park. In working with the Applicant,
the City of Villa Park has identified nine "proposed conditions" that have been mutually
agreed to by both parties. The City of Villa Park has respectfully requested that the City
of Orange adopt them as part of the approval of the project. With the nine requested
conditions that have been agreed to by the Applicant, the City of Villa Park is supportive
of moving forward with the proposed Project.
, Planning Commission Hearings
On July 15, 2019 and on August 5, 2019, the Planning Commission conducted public
hearings for the proposed Project. The Commission considered the entire record,
including the staff report (Attachment No. 2), memorandums (Attachment No. 4), all
testimony, and such additional information offered at the public hearing as reflected in the
Planning Commission minutes (Attachment No. 5). The Commission as a whole
commented on topics such as applicability of the General Plan in relation to the East
Orange General Plan and the Orange Park Acres Plan, applicability of SMARA, dam
safety, fire and flood issues, adequacy of traffic, enhancement of the open space,
concurrence with the environmental documents, and the findings. The Commission
adopted Resolution No. PC 07-19, Resolution No. PC 08-19, Resolution No. PC 09-19,
and Resolution No. PC 10-19 (Attachment 3) recommending approval to the City Council
by a vote of 4-1.
Conclusion
With the implementation of the approvals described above, the development will be
consistent with the objectives, policies, general land uses, and programs specified in the
2010 General Plan. Further, the site will be transformed from a sand and gravel operation
that is no longer compatible with the surrounding land uses to a development that will
ITEM 23 09/24/2019
provide 128 dwelling units on 40.7 acres and 68.5 acres that will comprise of natural
hillsides, re-established grasslands, a restored Santiago Creek riparian corridor, and a
managed vegetation/fuel modification zone.
The General Plan Housing Element calls for the City to encourage the production of infill
housing, and recognizes the ongoing long-term demand for increased housing inventory
in the community to serve a variety of citizens through providing diversified housing types "
and costs. The residential planning area will abide by the City of Orange Zoning Code
Development Standards for R-1-8 and R-1-10 (Single-Family Residential) development.
The largest lots are located in the east side of Planning Area C adjacent to The Reserve
and more distant large lot development of Orange Park Acres.
The Natural Resources Element calls for the City to provide recreational uses and the
protection of natural resources and features in open space areas by promoting
development of additional open spaces and access points adjacent to waterways and
planned trails. Public improvements in the form of the acquisition of Ridgeline Golf
Course, funding for equestrian and recreational purposes, funding for the greenway,
funding for trail improvements, and circulation improvements are outlined in the
Development Agreement.
8. ATTACHMENTS
1. City Counicl Draft Ordinance and Resolutions
2. Planning Commission Staff Report dated July 15, 2019
3. Planning Commission Resolution Nos. PC 7-19, PC 8-19, PC 9-19, and PC 10-19
4. Planning Commission Memorandums dated July 11, 2019, July 15, 2019, August
2, and Agust 5, 2019
5. Planning Commission Minutes dated July 15, 2019, and August 5, 2019
6. Orange Park Association Letter on SMARA dated May 14, 2019
7. City of Orange Letter addr.essed to the California Mining and Geology Board
dated June 6, 2019
8. State Mining and Geology Board Response to the City of Orange dated June 19,
2019
9. City of Orange Memorandum to OC Parks dated April 1, 2019
10. OC Parks Memorandum to the City of Orange date June 25, 2019
11. Santiago Creek Greenway Alliance received April 8, 2018
12. Elfend and Associates Inc. Letter to the Orange Park Association dated March 15,
2019
13. Orange Park Association Letter on Its Review of the Project dated April 19, 2019
14. City of Villa Park Letter dated July 2, 2019
15. Public Correspondence dated between August 6, 2019 through September 15,
2019
16. Mitigation Monitoring and Reporting Program
17. Development Agreement
18. Specific Plan
19. Recirculated Draft Environmental Impact Report
20. Final Draft Environmental Impact Report