Loading...
HomeMy WebLinkAboutAppendix 8-4_Hazardous Materials Documentation_Asbestos ReportRED Asbestos and Lead Identification Survey Proposed Chick-fil-A Restaurant No. 4003 Main & Almond FSU 202 South Main Street Orange, California Prepared for: Chick-fil-A, Inc. Irvine, California May 24 , 2017 Project No. 2E-1610014 Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street Orange, CA 92868 Presented to: Monica Sell Giles Engineering Associates, Inc. 1965 N. Main Street Orange, CA 92865 Inspection Date: May 10, 2017 Conducted by: Anthony M. De Arcos Certified Asbestos Consultant Certified Lead Inspector/Assessor Registered Environmental Property Assessor National Analytical Laboratories, Inc. 2201 Francisco Dr., Ste.140-261 El Dorado Hills, CA 95762 Office: (916) 361-0555 | Fax: (916) 361-0540 E-Mail: NAL1@NAL1.com | Web Page: www.NAL1.com 38085/38086 May 15, 2017 Monica Sell Giles Engineering Associates, Inc. 1965 N. Main Street Orange, CA 92865 RE: Asbestos and Lead Building Inspection/Survey – Demolition Project Future Chick Fil A 202 South Main Street Orange, CA 92868 Dear Ms. Sell, The following report is in regards to the building inspection conducted at the above address. Of the thirty four (34) suspected asbestos containing samples collected, two (2) were found to contain asbestos containing construction materials (ACCM). Of the thirty-three (33) Portable X-ray Fluorescent (XRF) lead shots collected at the site, combined into nine (9) suspected lead containing areas tested, two (2) were found to contain Lead Containing Material (LCM). Although the property was constructed in the early 1960’s, the interior of property was fully gutted and renovated in 2007. Anthony M. De Arcos, Certified Asbestos Consultant, Certified Lead Inspector/Assessor, and Registered Environmental Property Assessor, for National Analytical Laboratories, Inc. (N.A.L.), conducted the inspection on May 10, 2017. SUMMARY OF FINDINGS - Based on the asbestos sample results, the Gray-Black Mastic (~225 sf), Main and Lower Roofs, were found to contain ACCM. All square footage should be verified by contractor. Based on the lead sample results, the Multi-Colored Paint surfaces were found to contain LCM levels above the OSHA Limit of Detection. SECTION I: ASBESTOS INSPECTION - The inspection was completed according to the EPA’s Asbestos Containing Building Materials (ACBM) In-Schools Rule; 40 CFR 763.85 (Inspection and Re-Inspection). Currently, EPA regulations classify ACBM as materials containing more that 1-percent (1%) of asbestos. Cal- OSHA currently regulates asbestos to 1/10th of 1% (0.1%) and requires that a certified asbestos worker conduct this work. Upon completion of the visual inspection, the suspect asbestos bulk sample materials were collected in accordance with EPA and OSHA protocol. They were placed into new, air tight, Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street, Orange, CA May 15, 2017 Page 3 of 9 38085/38086 plastic bags, sealed, and identified with unique identification numbers. The bulk samples were transported to the laboratory under chain of custody protocol for analysis. Destructive sampling was conducted during the site visit, as the building is scheduled for demolition. If during the demolition work reveals any unforeseen suspect materials; the contractor shall stop work and contact the project manager for further testing. MicroTest Laboratories, Inc. located in Fair Oaks, California analyzed the bulk suspect asbestos containing samples utilizing Polarized Light Microscopy (PLM) Method. National Voluntary Laboratory Accreditation Program (NVLAP) Certification #200999-0 certifies MicroTest Laboratories, Inc. Although not all the rooms or materials throughout the site were sampled, the like materials that were not tested will be treated as homogeneous to the materials that were tested, and will be considered as containing ACCM or non-ACCM in accordance to the results. The location and results of suspect samples found to contain ACCM are as follows: Sample ID # Material Description Sample Location Category Results 202-30 Gray-Black Mastic Exterior Main & Lower Flat Roofs, Roof Penetrations, Various Areas I 3% Chrysotile 202-31 Gray-Black Mastic Main Roof, North End, West & East, HVAC Units, Patches & Repairs, Various Areas I 3% Chrysotile sf = Square Feet; Category I & II are non-friable/non-hazardous materials The Gray-Black Mastic is considered Category I, non-friable/non-hazardous material, which can be removed and disposed of at a non-hazardous waste facility. The following samples were non-asbestos containing materials: Sample ID # Material Description Sample Location Results 202-1 Seam Tape/Gray Mastic Lower South & Main Roofs, HVAC Round Ducts (-80 sf) None Detected 202-2 2'x4' Pin Hole-Tiny Fissure Acoustical Ceiling Tile Kitchen, South End, North Locker Room (-16 sf) None Detected 202-3 2'x4' Sheetrock Panel Kitchen & Southwest Storage Room (-600 sf) None Detected 202-4 Plaster Kitchen, North Storage Room, North Wall, East End (-4,300 sf) None Detected 202-5 Plaster Kitchen, North Storage Room, North Wall, Center None Detected 202-6 Plaster Kitchen, North Storage Room, North Wall, West End None Detected 202-7 Plaster Kitchen, North Storage Room, West Restroom, East Wall, None Detected Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street, Orange, CA May 15, 2017 Page 4 of 9 38085/38086 Sample ID # Material Description Sample Location Results 202-8 Plaster Kitchen, South Storage-Locker Room, North Wall None Detected 202-9 Sprayed-on Acoustic Overspray 2nd Floor, Pink Room, Attic Truss' Above Access Panel (-15 sf) None Detected 202-10 Sheetrock-Joint Compound Southeast Dining Room, Northwest Outside Corner None Detected 202-11 Sheetrock-Joint Compound Northwest Exit Corridor, South Wall None Detected 202-12 Sheetrock-Joint Compound Women's Restroom, North Stall, Ceiling Above Door (water damage) None Detected 202-13 Sheetrock-Joint Compound Kitchen, South Center Room, Outside Corner None Detected 202-14 Sheetrock-Joint Compound 2nd Floor, Pink Room, Bar Area, Outside Corner None Detected 202-15 Sheetrock-Joint Compound Lower Banquet Room, Northeast Seating Area, Soffit Ceiling None Detected 202-16 Carpet Yellow-Black Mastic South Waiting Room, Southeast Corner None Detected 202-17 1/2"x6" W ood Plank Floors Yellow-Black Mastic Interior 1st Floor, South End None Detected 202-18 Carpet Yellow Glue Northwest Exit Corridor None Detected 202-19 FRP Tan Mastic Kitchen, Storage & Restrooms None Detected 202-20 24" Tan Ceramic Tile Grout Northeast Dining Room, Concrete Floor None Detected 202-21 6" Red Ceramic Tile Grout Kitchen, Storage & Restroom Floors None Detected 202-22 Ceramic Tile Mortar Men & W omen Restrooms, Wall & Floor None Detected 202-23 6" Red Ceramic Tile Mortar Kitchen, Storage & Restrooms None Detected 202-24 24" Tan Ceramic Tile Mortar Northeast Dining Room None Detected 202-25 Mortar Exterior South Brick & Decorative Rock None Detected 202-26 Concrete Main Building, 1st & Lower Floors, 5 Hit Composite None Detected 202-27 Built-Up Brown Roofing Exterior Lower Flat Roofs (~640 sf) None Detected 202-28 Grout Men & W omen Restrooms, Wall & Floor None Detected 202-29A Brown Composition Roof Shingle Main Truss' Roof, Northwest Corner, Top Layer None Detected 202-29B Black Roof Felt Main Truss' Roof, Northwest Corner, 2nd Layer None Detected 202-29C Brown Composition Roof Shingle Main Truss' Roof, Northwest Corner, 3rd Layer None Detected 202-29D Black Roof Felt Main Truss' Roof, Northwest Corner, Bottom Layer None Detected sf = Square Feet Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street, Orange, CA May 15, 2017 Page 5 of 9 38085/38086 ASBESTOS RECOMMENDATION – Federal and state regulations require that anyone disturbing asbestos containing materials are properly trained certified and have the required respiratory protection and medical surveillance. On-Site Observation should be conducted by N.A.L.’s Certified Asbestos Consultant or Certified Site Surveillance Technician to verify that the work plan/specification is being followed. Once a certified asbestos contractor has removed the ACCM, following EPA and OSHA requirements; at the minimum a visual inspection should be completed at the site prior to the demolition of the building. The clearance will confirm that the general contractor can reoccupy the work area(s), without concern for exposure to asbestos airborne fibers to their employees thus allowing the demolition work to be completed by the general contractor. SECTION II: LEAD INSPECTION - The lead suspect samples were collected according to the Housing Urban Development (HUD) Guidelines, the Environmental Protection Agency (EPA) and California Public Health Department (formally DHS), who regulate and require the abatement or in-place management of LBP hazards equal to or greater than 1.0 milligram per square centimeter (1.0 mg/cm2) of lead by XRF Analysis or more than 0.5% lead by weight by laboratory flame atomic absorption. The following regulation shall be adhered to because OSHA considers all surfaces to contain lead: OSHA’s 29 CFR 1926.62, California Occupational Safety and Health Standard, Title 8 (Cal/OSHA 8 CCR 1532.1). Upon completion of the visual inspection, suspect painted finishes and/or materials were sampled for potential lead content, in accordance with EPA and OSHA protocol. They were labeled with a unique identification number and analyzed. Justin S. Gardner, utilizing the Thermo Scientific Portable X-ray Fluorescent (XRF) analyzer, analyzed the lead samples. When a sample is measured using XRF, each element present in the sample emits its own unique fluorescent x-ray energy spectrum. By simultaneously measuring the fluorescent x-rays emitted by the different elements in the sample, we can rapidly determine the presence of lead in the sample. Although not all the rooms or materials (non-suspect) were sampled, the like materials that were not tested and their results will be treated as homogeneous and the materials will be treated as containing LCM throughout the site. Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street, Orange, CA May 15, 2017 Page 6 of 9 38085/38086 The locations and results of the suspect samples found to be LCM are as follows: Sample ID # Material Description Sample Location Component XRF #’s Mg/cm² 202-8L Multi-Colored Paint Exterior W indow Trim, Various Areas 24-29 0.5 LBP 202-9L Multi-Colored Paint Exterior W ood Siding, Rafter Tails & Overhangs, Various Areas 30-35 0.24 LCM Prior to the demolition work being completed and/or the transporting of the debris from the site, Health and Safety Code 25157.8 (AB 2784 National Resources) requires that all lead debris be sampled for Waste Characterization. This will assist the Contractor in making a determination of whether or not the material is to be considered Hazardous or Non-Hazardous Lead waste or general construction debris. The sequence of testing to be completed by the Contractor is as follows: i Total Threshold Limit concentration (TTLC) with a result of 50 mg/kg or more but less than 1,000 mg/kg of lead must be retested using the Soluble Threshold Limit concentration (STLC) method; i A STLC result of 5.0 mg/L or greater is considered California Hazardous Waste; i Total Characteristic Leaching Procedure (TCLP) testing shall only be accomplished when approved by the Owners Representative; This procedure shall be generally reserved for out-of-state shipments; and A TCLP result of 5.0 mg/L or more deems the waste Federal RCRA materials; and i The California hazardous waste threshold for total lead using STLC is 5 mg/L and i Lead paint that is intact on a surface does not permit the material to be classed as non- hazardous. Waste profiling shall be accomplished if the paint contains more than 350 ppm by Flame AAS. Exception: Metals that are coated with paint are to be recycled. The following painted surfaces were found to be less than (<) the OSHA’s Limit of Detection: Sample ID # Material Description Sample Location/Component XRF #’s Mg/cm² 202-1L Brown-White Paint Interior Door Components, Various Areas 3-5 <0.02 202-2L White-Brown Paint Interior Trim & Baseboard, Various Areas 6-8 <0.02 202-3L Tan-White Paint Interior Sheetrock Walls 9-11 <0.02 202-4L Brown Paint Northeast Dining & Entry East Wall 12-14 <0.02 202-5L 6" Red Ceramic Tile Kitchen Floors, Over Concrete 15-17 <0.02 202-6L 24" Tan Ceramic Tile Northeast Dining Floor 18-20 <0.02 202-7L 6" Tan Cove Base Ceramic Tile Men's, Women's & Kitchen Walls 21-23 <0.04 Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street, Orange, CA May 15, 2017 Page 7 of 9 38085/38086 LEAD RECOMMENDATION - In order to stabilize the current lead conditions, N.A.L. recommends Lead Certified Workers certified by The California Department of Public Health or/a EPA certified Renovator, Repair and Painting (RRP) designation, conduct in-place management work of the LCM surfaces scheduled for demolition. The Contractor shall be required to abate/remove all loose and flaky LBM debris from the building by bagging or burrito wrapping loose flaky paint, prior to the removal of the debris from the work area(s), and subsequently the site. Once the abatement, in-place management, and/or prep work is completed and the areas are stabilized, the existing surfaces will be in good condition and not create a health or safety concern to the workers conducting the general construction work at the site. A Scope of Work, and/or specifications, should be utilized to conduct the lead work at the site. Included at the end of this report are site photographs, laboratory analytical results, chain of custody forms, and asbestos sample location map. If you have any questions regarding this report or if we can be of further assistance, please contact our office. Reviewed and submitted by: Anthony M. De Arcos Certified Asbestos Consultant DOSH #92-0261 Certified Lead Inspector/Assessor CDPH #2406 Registered Environmental Property Assessor REPA #938322039 Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street, Orange, CA May 15, 2017 Page 8 of 9 38085/38086 Photograph # 1 202 South Main Street, Orange Date of Inspection: May 10, 2017 Subject: Photograph # 2 202 South Main Street, Orange Date of Inspection: May 10, 2017 Subject: Asbestos and Lead Building Inspection/Survey Future Chick Fil A 202 South Main Street, Orange, CA May 15, 2017 Page 9 of 9 38085/38086 Photograph # 3 202 South Main Street, Orange Date of Inspection: May 10, 2017 Subject: Photograph # 4 202 South Main Street, Orange Date of Inspection: May 10, 2017 Subject: IndexReading NoTime InspectorSite Side Room Color Substrate Component PbC Units DurationDepth Index 1 2 2017-05-1215:38 JG CALIBRATE 1.70 +/- 0.50 mg/ cm ^2 1.08 1.23 2 3 2017-05-1215:41 JG 202S MAINST INTERIOR BROWN-WHITE WOOD DOOR 0.00 +/- 0.02 mg/ cm ^2 1.07 1.00 3 4 2017-05-1215:41 JG 202S MAINST INTERIOR BROWN-WHITE WOOD DOOR 0.00 +/- 0.02 mg/ cm ^2 1.07 1.00 4 5 2017-05-1215:41 JG 202S MAINST INTERIOR BROWN-WHITE WOOD DOOR 0.00 +/- 0.02 mg/ cm ^2 1.07 1.00 5 6 2017-05-1215:42 JG 202S MAINST INTERIOR WHITE-BROWN WOOD TRIM-BASEBOARD 0.00 +/- 0.02 mg/ cm ^2 1.08 1.00 6 7 2017-05-1215:43 JG 202S MAINST INTERIOR WHITE-BROWN WOOD TRIM-BASEBOARD 0.00 +/- 0.02 mg/ cm ^2 1.08 1.00 7 8 2017-05-1215:43 JG 202S MAINST INTERIOR WHITE-BROWN WOOD TRIM-BASEBOARD 0.00 +/- 0.02 mg/ cm ^2 1.07 1.00 8 9 2017-05-1215:44 JG 202S MAINST INTERIOR TAN DRYWALL WALL 0.00 +/- 0.02 mg/ cm ^2 1.07 1.00 9 10 2017-05-1215:44 JG 202S MAINST INTERIOR TAN DRYWALL WALL 0.00 +/- 0.02 mg/ cm ^2 1.08 1.00 10 11 2017-05-1215:44 JG 202S MAINST INTERIOR TAN DRYWALL WALL 0.00 +/- 0.02 mg/ cm ^2 1.08 1.00 11 12 2017-05-1215:46 JG 202S MAINST NEDINING BROWN DRYWALL WALL 0.00 +/- 0.02 mg/ cm ^2 1.71 1.00 12 13 2017-05-1215:46 JG 202S MAINST NEDINING BROWN DRYWALL WALL 0.00 +/- 0.02 mg/ cm ^2 1.28 1.00 13 14 2017-05-1215:47 JG 202S MAINST NEDINING BROWN DRYWALL WALL 0.00 +/- 0.02 mg/ cm ^2 1.07 1.00 14 15 2017-05-1215:48 JG 202S MAINST KITCHEN RED CERAMIC TILE FLOOR 0.00 +/- 0.02 mg/ cm ^2 2.03 1.00 15 16 2017-05-1215:48 JG 202S MAINST KITCHEN RED CERAMIC TILE FLOOR 0.00 +/- 0.02 mg/ cm ^2 2.25 1.00 16 17 2017-05-1215:48 JG 202S MAINST KITCHEN RED CERAMIC TILE FLOOR 0.00 +/- 0.02 mg/ cm ^2 1.71 1.00 17 18 2017-05-1215:49 JG 202S MAINST NEDINING BEIGE CERAMIC TILE FLOOR 0.01 +/- 0.05 mg/ cm ^2 1.07 1.63 18 19 2017-05-1215:49 JG 202S MAINST NEDINING BEIGE CERAMIC TILE FLOOR 0.00 +/- 0.02 mg/ cm ^2 1.07 1.00 19 20 2017-05-1215:50 JG 202S MAINST NEDINING BEIGE CERAMIC TILE FLOOR 0.00 +/- 0.02 mg/ cm ^2 1.92 1.00 20 21 2017-05-1215:51 JG 202S MAINST MENS RR TAN CERAMIC TILE COVEBASE 0.01 +/- 0.03 mg/ cm ^2 1.08 1.00 21 22 2017-05-1215:51 JG 202S MAINST MENS RR TAN CERAMIC TILE COVEBASE 0.01 +/- 0.04 mg/ cm ^2 1.07 1.25 22 23 2017-05-1215:51 JG 202S MAINST MENS RR TAN CERAMIC TILE COVEBASE 0.01 +/- 0.04 mg/ cm ^2 1.08 1.34 23 24 2017-05-1215:53 JG 202S MAINST EXWINDOW WHITE WOOD TRIM 0.50 +/- 0.30 mg/ cm ^2 3.13 1.00 24 25 2017-05-1215:53 JG 202S MAINST EXWINDOW WHITE WOOD TRIM 0.50 +/- 0.30 mg/ cm ^2 3.12 1.00 25 26 2017-05-1215:53 JG 202S MAINST EXWINDOW WHITE WOOD TRIM 0.00 +/- 0.02 mg/ cm ^2 2.77 1.00 26 27 2017-05-1215:54 JG 202S MAINST EXWINDOW WHITE WOOD TRIM 0.00 +/- 0.02 mg/ cm ^2 2.25 1.00 27 28 2017-05-1215:54 JG 202S MAINST EXWINDOW WHITE WOOD TRIM 0.00 +/- 0.02 mg/ cm ^2 3.75 1.00 28 29 2017-05-1215:56 JG 202S MAINST EXWINDOW WHITE WOOD TRIM 0.01 +/- 0.02 mg/ cm ^2 6.24 2.93 29 30 2017-05-1215:59 JG 202S MAINST EXTERIOR MULTI COLORED WOOD SIDING-OVERHANG 0.24 +/- 0.12 mg/ cm ^2 3.01 1.72 30 31 2017-05-1216:00 JG 202S MAINST EXTERIOR MULTI COLORED WOOD SIDING-OVERHANG 0.10 +/- 0.06 mg/ cm ^2 3.86 2.52 31 32 2017-05-1216:00 JG 202S MAINST EXTERIOR MULTI COLORED WOOD SIDING-OVERHANG 0.01 +/- 0.02 mg/ cm ^2 3.97 1.61 32 33 2017-05-1216:00 JG 202S MAINST EXTERIOR MULTI COLORED WOOD SIDING-OVERHANG 0.11 +/- 0.09 mg/ cm ^2 2.48 1.50 33 34 2017-05-1216:01 JG 202S MAINST EXTERIOR MULTI COLORED WOOD SIDING-OVERHANG 0.10 +/- 0.16 mg/ cm ^2 0.75 1.03 Page 1of 2 05/12/1713:15:23 IndexReading NoTime InspectorSite Side Room Color Substrate Component PbC Units DurationDepth Index 34 35 2017-05-1216:01 JG 202S MAINST EXTERIOR MULTI COLORED WOOD SIDING-OVERHANG 0.25 +/- 0.15 mg/ cm ^2 2.80 2.15 35 36 2017-05-1216:09 JG CALIBRATE 4.40 +/- 3.30 mg/ cm ^2 0.21 1.42 Page 2of 2 05/12/1713:15:23 Page Login # 1 of 1 38086 NAL LOG-IN RECORD Ph: 916.361.0555 Fx: 916.361.0540 National Analytical Laboratories, Inc. Job Site/Job #: Client#-Lot# 1103 / 186 Future Chick-Fil A: Date 5/11/2017 Giles Engineering Associates, Inc. 202 South Main Street Sampling Date: 5/10/2017 Phone Number Orange, CA 92868 Sampling Time 10:00:00 AM FAX Number Type Of Work: Lead BI Contact Monica Sell No. of Samples 9 E-Mail Address Turnaround: 6 hours Chain of Custody Information Released By Signature Date/ Time Received By Signature Date/ Time Due: 05/11/17 0830 Released By Signature Date/ Time Received By Signature Date/ Time At: Num. Sample ID# Location/Description 1 202-1L Interior Door Components, Various Areas \ Brown-White Paint 2 202-2L Interior Trim & Baseboard, Various Areas \ White-Brown Paint 3 202-3L Interior Sheetrock Walls \ Tan-White Paint 4 202-4L Northeast Dining & Entry East Wall \ Brown Paint 5 202-5L Kitchen Floors, Over Concrete \ 6" Red Ceramic Tile 6 202-6L Northeast Dining Room \ 24" Tan Ceramic Tile 7 202-7L Men's, Women's & Kitchen Walls \ 6" Tan Cove Base Ceramic Tile 8 202-8L Exterior W indow Trim, Various Areas \ Multi-Colored Paint 9 202-9L Exterior W ood Siding, Rafter Tails & Overhangs, Various Areas \ Multi-Colored Paint 9- 14-