Loading...
App J - Traffic Impact Analysis ASMBLD Appendix J: Traffic Impact Analysis THIS PAGE INTENTIONALLY LEFT BLANK LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc i TABLE OF CONTENTS SECTION PAGE 1.0 Introduction .............................................................................................................................. 1 1.1 Study Area .............................................................................................................................. 2 2.0 Project Description .................................................................................................................. 4 2.1 Site Access ............................................................................................................................. 4 3.0 Existing Conditions .................................................................................................................. 5 3.1 Existing Street System ........................................................................................................... 5 3.2 Existing Traffic Volumes ....................................................................................................... 5 3.3 Existing Intersection Conditions ............................................................................................ 6 3.3.1 Intersection Capacity Utilization Method of Analysis (Signalized Intersections) .......... 6 3.3.2 Highway Capacity Manual Method of Analysis (Unsignalized Intersections) .............. 6 3.3.2.1 Two-Way Stop-Controlled Intersections .................................................................... 7 3.3.2.2 All-Way Stop-Controlled Intersections ....................................................................... 7 3.4 Volume to Capacity (V/C) Ratio Method of Analysis (Roadway Segments)........................ 7 3.5 Level of Service Criteria ........................................................................................................ 7 3.5.1 City of Orange Locations ................................................................................................ 7 3.5.2 City of Garden Grove Locations ..................................................................................... 8 3.6 Existing Level of Service Results .......................................................................................... 8 3.6.1 Intersections .................................................................................................................... 8 3.6.2 Roadway Segments ......................................................................................................... 8 4.0 Traffic Forecasting Methodology ......................................................................................... 15 5.0 Project Traffic Characteristics ............................................................................................. 16 5.1 Project Traffic Generation .................................................................................................... 16 5.2 Project Traffic Distribution and Assignment ....................................................................... 17 5.3 Existing Plus Project Traffic Conditions .............................................................................. 17 6.0 Future Traffic Conditions ..................................................................................................... 19 6.1 Ambient Traffic Growth....................................................................................................... 19 6.2 Cumulative Projects Traffic Characteristics ........................................................................ 19 6.3 Year 2021 Traffic Volumes.................................................................................................. 20 7.0 Traffic Impact Analysis Methodology ................................................................................. 26 7.1 Impact Criteria and Thresholds ............................................................................................ 26 7.1.1 City of Orange............................................................................................................... 26 7.1.2 City of Garden Grove.................................................................................................... 26 7.2 Traffic Impact Analysis Scenarios ....................................................................................... 27 8.0 Existing Plus Project Analysis .............................................................................................. 28 8.1 Intersections ......................................................................................................................... 28 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc ii TABLE OF CONTENTS (CONTIUNED) SECTION PAGE 8.1.1 Existing Plus Project Traffic Conditions ...................................................................... 28 8.2 Roadway Segments .............................................................................................................. 28 8.2.1 Existing Plus Project Traffic Conditions ...................................................................... 28 9.0 Year 2021 Plus Project Analysis ........................................................................................... 33 9.1 Intersections ......................................................................................................................... 33 9.1.1 Year 2021 Cumulative Traffic Conditions ................................................................... 33 9.1.2 Year 2021 Cumulative Plus Project Traffic Conditions ............................................... 33 9.2 Roadway Segments .............................................................................................................. 34 9.2.1 Year 2021 Cumulative Traffic Conditions ................................................................... 34 9.2.2 Year 2021 Cumulative Plus Project Traffic Conditions ............................................... 34 10.0 State of California (Caltrans) Methodology ........................................................................ 39 10.1 Impact Criteria and Thresholds ........................................................................................ 39 10.2 Highway Capacity Manual 6 Method of Analysis (Signalized Intersections) ................. 39 10.3 Existing Plus Project Traffic Conditions .......................................................................... 41 10.3.1 Existing Traffic Conditions........................................................................................... 41 10.3.2 Existing Plus Project Traffic Conditions ...................................................................... 41 10.4 Year 2021 Plus Project Traffic Conditions ....................................................................... 41 10.4.1 Year 2021 Cumulative Traffic Conditions ................................................................... 41 10.4.2 Year 2021 Cumulative Plus Project Traffic Conditions ............................................... 41 10.5 Recommended Improvements – Caltrans Analysis .......................................................... 42 11.0 Site Access and Internal Circulation Evaluation ................................................................ 45 11.1 Site Access Evaluation ..................................................................................................... 45 11.2 Internal Circulation Evaluation ........................................................................................ 45 12.0 Planned and Recommended Improvements ........................................................................ 47 12.1 Planned Improvements ..................................................................................................... 47 12.2 Recommended Improvements .......................................................................................... 47 12.2.1 Existing Plus Project Traffic Conditions ...................................................................... 47 12.2.2 Year 2021 Plus Project Traffic Conditions ................................................................... 47 13.0 Congestion Management Program (CMP) .......................................................................... 49 14.0 Summary Of Findings And Conclusions ............................................................................. 50 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc iii APPENDICES APPENDIX A. Traffic Study Scope of Work B. Existing Traffic Count Data C. Intersection Level of Service Calculation Worksheets D. Caltrans Intersection Level of Service Calculation Worksheets E. Project Driveways Level of Service Calculation Worksheets LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc iv LIST OF FIGURES SECTION—FIGURE # FOLLOWING PAGE 1–1 Vicinity Map .................................................................................................................... 3 2–1 Existing Aerial Site Plan ................................................................................................... 4 2–2 Proposed Site Plan ........................................................................................................... 4 3–1 Existing Roadway Conditions and Intersection Controls ........................................... 5 3–2 Existing AM Peak Hour Traffic Volumes ...................................................................... 6 3–3 Existing PM Peak Hour and Daily Traffic Volumes ..................................................... 6 5–1 Project Traffic Distribution Pattern – Sites A & B ...................................................... 18 5–2 Project Traffic Distribution Pattern – Site C ................................................................ 18 5–3 AM Peak Hour Project Traffic Volumes ...................................................................... 18 5–4 PM Peak Hour and Daily Project Traffic Volumes ..................................................... 18 5–5 Existing Plus Project AM Peak Hour Traffic Volumes ............................................... 18 5–6 Existing Plus Project PM Peak Hour and Daily Traffic Volumes .............................. 18 6–1 Location of Cumulative Projects .................................................................................... 25 6–2 AM Peak Hour Cumulative Projects Traffic Volumes ................................................ 25 6–3 PM Peak Hour and Daily Cumulative Projects Traffic Volumes ............................... 25 6–4 Year 2021 Cumulative AM Peak Hour Traffic Volumes ............................................ 25 6–5 Year 2021 Cumulative PM Peak Hour and Daily Traffic Volumes ........................... 25 6–6 Year 2021 Cumulative Plus Project AM Peak Hour Traffic Volumes ....................... 25 6–7 Year 2021 Cumulative Plus Project PM Peak Hour and Daily Traffic Volumes ...... 25 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc v LIST OF TABLES SECTION—TABLE # PAGE 3–1 Level of Service Criteria for Signalized Intersections...................................................... 9 3–2 Level of Service Criteria for Unsignalized Intersections (HCM 6 Methodology) ........ 10 3–3 Roadway Link Capacities ............................................................................................... 11 3–4 Existing Peak Hour Levels of Service ...................................................................... 12-13 3–5 Existing Roadway Segment Level of Service Summary ............................................... 14 5–1 Project Traffic Generation Forecast ................................................................................ 18 6–1 Location and Description of Cumulative Projects.................................................... 21-23 6–2 Cumulative Projects Traffic Generation Forecast .................................................... 24-25 8–1 Existing Plus Project Peak Hour Intersection Capacity Analysis ............................ 29-31 8–2 Existing Plus Project Roadway Segment Level of Service Summary ........................... 32 9–1 Year 2021 Peak Hour Intersection Capacity Analysis ............................................. 35-37 9–2 Year 2021 Roadway Segment Level of Service Summary ............................................ 38 10–1 Level of Service Criteria for Signalized Intersections (HCM 6 Methodology) ............. 40 10–2 Existing Plus Project Peak Hour Intersection Capacity Analysis – Caltrans ................. 43 10–3 Year 2021 Peak Hour Intersection Capacity Analysis – Caltrans .................................. 44 11–1 Project Driveway Peak Hour Levels of Service Summary ............................................ 46 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 1 TRAFFIC IMPACT ANALYSIS THE TERRACE APARTMENTS Orange, California August 7, 2018 1.0 INTRODUCTION This traffic impact analysis addresses the potential traffic impacts and circulation needs associated with the proposed The Terrace Apartments Project (hereinafter referred to as Project). The Project proposes to construct 167 apartment units within three buildings. The project site is generally located south of Chapman Avenue and east of Lewis Street in the City of Orange, California. This report documents the findings and recommendations of a traffic impact analysis conducted by Linscott, Law & Greenspan, Engineers (LLG) to determine the potential impacts associated with the Project. The traffic analysis evaluates the existing operating conditions at seventeen (17) key study intersections and nine (9) key roadway segments within the project vicinity, estimates the trip generation potential of the Project, and forecasts future operating conditions without and with the proposed Project. Where necessary, intersection improvements/mitigation measures are identified. This traffic report satisfies the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, the Caltrans Guide for the Preparation of Traffic Impact Studies, dated December 2002, where applicable, and is consistent with the requirements and procedures outlined in the most current Congestion Management Program (CMP) for Orange County. The Scope of Work for this traffic study, which is included in Appendix A, was developed in conjunction with City of Orange Traffic Engineering staff. The project site has been visited and an inventory of adjacent area roadways and intersections was performed. Existing traffic information has been collected at seventeen (17) key study intersections and nine (9) key roadway segments on a “typical” weekday for use in the preparation of intersection and roadway segment level of service calculations. Information concerning cumulative projects (planned and/or approved) in the vicinity of the proposed Project has been researched at the City of Orange, the City of Garden Grove, the City of Santa Ana and the City of Anaheim. Based on our research, there are fourteen (14) cumulative projects in the City of Orange, three (3) cumulative projects in the City of Garden Grove, six (6) cumulative projects in the City of Santa Ana, and twenty-five (25) cumulative projects in the City of Anaheim within the vicinity of the subject site. These forty-eight (48) planned and/or approved cumulative projects were considered in the cumulative traffic analysis for this project. This traffic report analyzes existing and future weekday daily, AM peak hour and PM peak hour traffic conditions for a near-term (Year 2021) traffic setting upon completion of the proposed Project. Daily and peak hour traffic forecasts for the Year 2021 horizon year have been projected by increasing existing traffic volumes by an annual growth rate of one percent (1.0%) per year and adding traffic volumes generated by forty-eight (48) cumulative projects. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 2 1.1 Study Area The seventeen (17) key study intersections and nine (9) key roadway segments selected for evaluation were determined based on coordination with City of Orange Traffic Engineering staff and application of the “51 or more peak hour trip threshold” criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. The intersections and roadway segments listed below provide local access to the study area and define the extent of the boundaries for this traffic impact investigation. The jurisdiction where each key study intersection/roadway segment is located is also identified with the following nomenclature utilized; (O) = City of Orange, (GG) = City of Garden Grove, and (C) = Caltrans. Key Study Intersections 1. State College Boulevard at Anaheim Way/I-5 NB Ramps (O/C) 2. State College Boulevard at I-5 SB Ramps (O/C) 3. Lewis Street at Chapman Avenue (O/GG) 4. Manchester Avenue at Chapman Avenue (O) 5. The City Drive at Chapman Avenue (O) 6. I-5 Ramps at Chapman Avenue (O/C) 7. Rampart Street at Chapman Avenue (O) 8. Manchester Avenue at City Boulevard West (O) 9. City Boulevard at City Boulevard West/The City Way (O) 10. City Boulevard East at The City Way (O) 11. The City Drive at The City Way/Dawn Way (O) 12. Lewis Street at Lampson Avenue/Metropolitan Drive (O/GG) 13. Entertainment Drive at City Boulevard West (O) 14. Entertainment Drive at Metropolitan Drive (O) 15. Designer Drive/SR-22 WB Ramps at Metropolitan Drive (O/C) 16. The City Drive at Metropolitan Drive (O) 17. The City Drive at SR-22 EB Ramps (O/C) Key Roadway Segments A. State College Boulevard, between I-5 SB Ramps and Chapman Avenue (O) B. Chapman Avenue, between Lewis Street and Manchester Avenue (O) C. Chapman Avenue, between Manchester Avenue and The City Drive (O) D. Chapman Avenue, between The City Drive and I-5 SB Ramps (O) E. Lewis St, between Chapman Ave and Lampson Ave/Metropolitan Dr (O/GG) F. The City Drive, between Chapman Avenue and The City Way/Dawn Way (O) G. The City Drive, between The City Way/Dawn Way and Metropolitan Dr (O) H. Metropolitan Drive, between Lewis Street and SR-22 WB Ramps (O) I. Metropolitan Drive, between SR-22 WB Ramps and The City Drive (O) LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 3 Figure 1-1 presents a Vicinity Map, which illustrates the general location of the proposed Project and depicts the study locations and surrounding street system. The Level of Service (LOS) investigations at these key locations were used to evaluate the potential traffic-related impacts associated with area growth, cumulative projects and the proposed Project. When necessary, this report recommends intersection improvements that may be required to accommodate future traffic volumes and restore/maintain an acceptable Level of Service and/or mitigate the impact of the project. Included in this Traffic Impact Analysis are:  Existing traffic counts,  Estimated project traffic generation/distribution/assignment,  Estimated cumulative project traffic generation/distribution/assignment,  Daily, AM and PM peak hour capacity analyses for existing conditions,  Daily, AM and PM peak hour capacity analyses for existing plus project conditions,  Daily, AM and PM peak hour capacity analyses for future (Year 2021) conditions without and with project traffic,  Caltrans Analysis,  Site Access Evaluation,  Recommended Improvements, and  Congestion Management Program (CMP) Analysis. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 4 2.0 PROJECT DESCRIPTION The project site is generally located south of Chapman Avenue and east of Lewis Street in the City of Orange, California. Figure 2-1 presents an aerial depiction of the existing site. Figure 2-2 presents the proposed site plan for the proposed Project, prepared by Van Tilburg, Banvard & Soderbergh, AIA. Review of the proposed site plan indicates that the project site currently has 441 apartment units within eight (8) buildings. The proposed Project will add three (3) 4-story apartment buildings (i.e. Sites A, B and C) with a total of 167 apartment units. Specifically, Site A and Site B consist of 48 apartment units each, and Site C consists of the remaining 71 apartment units. The proposed Project is expected to be completed by the Year 2021. 2.1 Site Access As shown in Figure 2-2, access to the Project site is currently provided and will continue to be provided via one (1) unsignalized, outbound only driveway (Project Driveway No. 1) and one (1) unsignalized, full-access driveway (Project Driveway No. 2) located along Lewis Street, and one (1) unsignalized, full-access driveway (Project Driveway No. 3) located along City Boulevard West. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 5 3.0 EXISTING CONDITIONS 3.1 Existing Street System Regional access to the site is provided via the Santa Ana (I-5) Freeway and the Garden Grove (SR- 22) Freeway. The principal local network of streets serving the proposed Project includes Chapman Avenue and Lewis Street. The following discussion provides a brief synopsis of these key area streets. The descriptions are based on an inventory of existing roadway conditions. Chapman Avenue is generally a six-lane, divided roadway oriented in the east-west direction in the vicinity of the Project. On-street parking is generally not permitted along this roadway within the vicinity of the project. The posted speed limit on Chapman Avenue is 40 miles per hour (mph) between Lewis Street and Manchester Avenue, 35 mph between Manchester Avenue and The City Drive and 40 mph east of The City Drive. Traffic signals control the study intersections of Chapman Avenue at Lewis Street, Manchester Avenue, The City Drive, the I-5 Freeway Ramps, and Rampart Street. Lewis Street is generally a four-lane, divided roadway oriented in the north-south direction. Lewis Street borders the Project site to the west and currently provides access to the site via one (1) unsignalized, outbound only driveway and one (1) unsignalized, full-access driveway. On-street parking is generally not permitted along this roadway within the vicinity of the project. The posted speed limit on Lewis Street is 45 mph north of Chapman Avenue and 40 mph south of Chapman Avenue. Traffic signals control the study intersections of Lewis Street at Chapman Avenue and Lampson Avenue/Metropolitan Drive. Figure 3-1 presents an inventory of the existing roadway conditions for the arterials and intersections evaluated in this report. This figure identifies the number of travel lanes for key arterials, as well as intersection configurations and controls for the key area study intersections. 3.2 Existing Traffic Volumes Seventeen (17) key study intersections and nine (9) key roadway segments have been identified as the locations at which to evaluate existing and future traffic operating conditions. Some portion of potential project-related traffic will pass through each of these intersections/roadway segments, and their analysis will reveal the expected relative impacts of the project. These key intersections and roadway segments were selected for evaluation based on coordination with City of Orange Traffic Engineering staff and application of the “51 or more peak hour trip threshold” criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. Existing daily, AM peak hour, and PM peak hour traffic volumes for the seventeen (17) key study intersections and nine (9) key roadway segments evaluated in this report were conducted by Transportation Studies Inc. in September 2017. Additionally, counts were conducted at the two (2) existing Project driveways along Lewis Street and the one (1) existing Project driveway along City Boulevard West. Figures 3-2 and 3-3 illustrate the existing AM and PM peak hour traffic volumes at the seventeen (17) key study intersections and the three (3) existing Project driveways evaluated LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 6 in this report, respectively. Figure 3-3 also presents the existing average daily traffic volumes for the nine (9) key roadway segments in the vicinity of the proposed Project. Appendix B contains the detailed peak hour count sheets for the key intersections and driveways evaluated in this report. Appendix B also contains the average daily traffic volumes for the key roadway segments. 3.3 Existing Intersection Conditions Existing AM and PM peak hour operating conditions for the seventeen (17) key study intersections were evaluated using the Intersection Capacity Utilization (ICU) methodology for signalized intersections and the methodology outlined in Chapter 20 of the HCM 6 for two-way stop-controlled intersections, and the methodology outlined in Chapter 21 of the HCM 6 for all-way stop-controlled intersections. 3.3.1 Intersection Capacity Utilization (ICU) Method of Analysis (Signalized Intersections) In conformance with City of Orange and City of Garden Grove requirements, existing AM and PM peak hour operating conditions for the key signalized study intersections were evaluated using the Intersection Capacity Utilization (ICU) method. The ICU technique is intended for signalized intersection analysis and estimates the volume to capacity (V/C) relationship for an intersection based on the individual V/C ratios for key conflicting traffic movements. The ICU numerical value represents the percent signal (green) time and thus capacity, required by existing and/or future traffic. It should be noted that the ICU methodology assumes uniform traffic distribution per intersection approach lane and optimal signal timing. Per City of Orange and City of Garden Grove requirements, the ICU calculations use a lane capacity of 1,700 vehicles per hour (vph) for through and all turn lanes. A clearance adjustment factor of 0.05 was added to each Level of Service calculation. The ICU value translates to a Level of Service (LOS) estimate, which is a relative measure of the intersection performance. The ICU value is the sum of the critical volume to capacity ratios at an intersection; it is not intended to be indicative of the LOS of each of the individual turning movements. The six qualitative categories of Level of Service have been defined along with the corresponding ICU value range and are shown in Table 3-1. 3.3.2 Highway Capacity Manual (HCM) Method of Analysis (Unsignalized Intersections) The HCM unsignalized methodology for stop-controlled intersections was utilized for the analysis of the unsignalized intersections. LOS criteria for unsignalized intersections differ from LOS criteria for signalized intersections as signalized intersections are designed for heavier traffic and therefore a greater delay. Unsignalized intersections are also associated with more uncertainty for users, as delays are less predictable, which can reduce users’ delay tolerance. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 7 3.3.2.1 Two-Way Stop-Controlled Intersections Two-way stop-controlled intersections are comprised of a major street, which is uncontrolled, and a minor street, which is controlled by stop signs. Level of service for a two-way stop-controlled intersection is determined by the computed or measured control delay. The control delay by movement, by approach, and for the intersection as a whole is estimated by the computed capacity for each movement. LOS is determined for each minor-street movement (or shared movement) as well as major-street left turns. The worst side street approach delay is reported. LOS is not defined for the intersection as a whole or for major-street approaches, as it is assumed that major-street through vehicles experience zero delay. The HCM control delay value range for two-way stop- controlled intersections are shown in Table 3-2. 3.3.2.2 All-Way Stop-Controlled Intersections All-way stop -controlled intersections require every vehicle to stop at the intersection before proceeding. Because each driver must stop, the decision to proceed into the intersection is a function of traffic conditions on the other approaches. The time between subsequent vehicle departures depends on the degree of conflict that results between the vehicles and vehicles on the other approaches. This methodology determines the control delay for each lane on the approach, computes a weighted average for the whole approach, and computes a weighted average for the intersection as a whole. Level of service (LOS) at the approach and intersection levels is based solely on control delay. The HCM control delay value range for all-way stop-controlled intersections are shown in Table 3-2. 3.4 Volume to Capacity (V/C) Ratio Method of Analysis (Roadway Segments) Existing daily operating conditions for the nine (9) key roadway segments have been investigated according to the daily volume-to-capacity (V/C) ratio of each link. The daily V/C relationship is used to estimate the LOS of the roadway segment with the volume based on the 24-hour traffic count data and the existing daily capacity based on the respective City’s classification of each roadway. The roadway link capacity of each street classification according to the City of Orange General Plan Circulation and Mobility Element is presented in Table 3-3, along with the six corresponding service levels and associated V/C ratios. 3.5 Level of Service Criteria 3.5.1 City of Orange Locations According to the City of Orange General Plan Circulation Element and stated in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, LOS D is the minimum acceptable condition that should be maintained during the morning and evening peak commute hours on all intersections and LOS D is the minimum acceptable condition that should be maintained on a daily basis on all roadway segments. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 8 3.5.2 City of Garden Grove Locations According to the City of Garden Grove, LOS D is the minimum acceptable condition that should be maintained during the morning and evening peak commute hours on all intersections and LOS D is the minimum acceptable condition that should be maintained on a daily basis on all roadway segments. 3.6 Existing Level of Service Results 3.6.1 Intersections Table 3-4 summarizes the existing peak hour service level calculations for the seventeen (17) key study intersections based on existing traffic volumes and current street geometry. Review of Table 3-4 indicates that one (1) of the seventeen (17) key study intersections currently operates at an unacceptable level of service during the AM peak hour. The intersection of Lewis Street at Chapman Avenue currently operates at unacceptable LOS E during the AM peak hour. The remaining sixteen (16) key study intersections currently operate at acceptable LOS D or better during the AM and PM peak hours. Appendix C presents the ICU/LOS and HCM/LOS calculations for the seventeen (17) key study intersections for the AM peak hour and PM peak hour. 3.6.2 Roadway Segments Table 3-5 summarizes the existing service level calculations for the nine (9) key roadway segments based on existing 24-hour traffic volumes and current roadway geometry. The first column (1) shows the number of lanes, the second column (2) shows the arterial classification and the third column (3) shows the existing LOS “E” capacity. The fourth column (4) shows the daily volume, V/C ratio and resulting level of service. Review of Table 3-5 indicates that all nine (9) key roadway segments currently operate at acceptable LOS D or better on a daily basis. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 9 TABLE 3-1 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS 1 Level of Service (LOS) Intersection Capacity Utilization Value (V/C) Level of Service Description A ≤ 0.60 EXCELLENT. No vehicle waits longer than one red light, and no approach phase is fully used. B 0.61 – 0.70 VERY GOOD. An occasional approach phase is fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. C 0.71 – 0.80 GOOD. Occasionally drivers may have to wait through more than one red light; backups may develop behind turning vehicles. D 0.81 – 0.90 FAIR. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E 0.91 – 1.00 POOR. Represents the most vehicles intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. F > 1.00 FAILURE. Backups from nearby locations or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches. Potentially very long delays with continuously increasing queue lengths. 1 Source: Transportation Research Board Circular 212 – Interim Materials on Highway Capacity. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 10 TABLE 3-2 LEVEL OF SERVICE CRITERIA FOR UNSIGNALIZED INTERSECTIONS (HCM 6 METHODOLOGY)2,3 Level of Service (LOS) Highway Capacity Manual (HCM) Delay Per Vehicle (seconds/vehicle) Level of Service Description A ≤ 10.0 Little or no delay B > 10.0 and ≤ 15.0 Short traffic delays C > 15.0 and ≤ 25.0 Average traffic delays D > 25.0 and ≤ 35.0 Long traffic delays E > 35.0 and ≤ 50.0 Very long traffic delays F > 50.0 Severe congestion 2 Source: Highway Capacity Manual 6, Chapter 20: Two-Way Stop-Controlled Intersections. The LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole. 3 Source: Highway Capacity Manual 6, Chapter 21: All-Way Stop-Controlled Intersections. For approaches and intersection-wide assessment, LOS is defined solely by control delay. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 11 TABLE 3-3 ROADWAY LINK CAPACITIES Facility Type Number of Lanes Level of Service Criteria With Associated Roadway Capacity Daily Values (VPD) Level of Service (LOS) A B C D E 4 F Principal 8-lanes divided 45,000 52,500 60,000 67,500 75,000 -- Major 6-lanes divided 33,900 39,400 45,000 50,600 56,300 -- Primary 4-lanes divided 22,500 26,300 30,000 33,800 37,500 -- Secondary 4-lanes undivided 14,400 16,800 19,200 21,600 24,000 -- Collector 2-lanes undivided 7,200 8,400 9,600 10,800 12,000 -- V/C Ratio ≤ 0.60 0.61-0.70 0.71-0.80 0.81-0.90 0.91-1.00 ≥ 1.00 Notes:  VPD = vehicles per day 4 Source: City of Orange General Plan; Circulation and Mobility. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 12 TABLE 3-4 EXISTING PEAK HOUR LEVELS OF SERVICE Key Intersection Time Period Jurisdiction Minimum Acceptable LOS Control Type ICU/HCM LOS 1. State College Boulevard at AM Orange/ Caltrans D 5 Phase 0.362 A Anaheim Way/I-5 NB Ramps PM Signal 0.615 B 2. State College Boulevard at AM Orange/ Caltrans D 2 Phase 0.475 A I-5 SB Ramps PM Signal 0.389 A 3. Lewis Street at AM Orange/ Garden Grove D 8 Phase 0.960 E Chapman Avenue PM Signal 0.836 D 4. Manchester Avenue at AM Orange D 6 Phase 0.590 A Chapman Avenue PM Signal 0.550 A 5. The City Drive at AM Orange D 8 Phase 0.738 C Chapman Avenue PM Signal 0.749 C 6. I-5 Ramps at AM Orange/ Caltrans D 4 Phase 0.563 A Chapman Avenue PM Signal 0.569 A 7. Rampart Street at AM Orange D 3 Phase 0.357 A Chapman Avenue PM Signal 0.453 A 8. Manchester Avenue at AM Orange D All-Way 9.1 s/v A City Boulevard West PM Stop 10.4 s/v B 9. City Boulevard at AM Orange D All-Way 9.1 s/v A City Blvd West/The City Way PM Stop 11.5 s/v B Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 13 TABLE 3-4 (CONTINUED) EXISTING PEAK HOUR LEVELS OF SERVICE Key Intersection Time Period Jurisdiction Minimum Acceptable LOS Control Type ICU/HCM LOS 10. City Boulevard East at AM Orange D All-Way 8.3 s/v A The City Way PM Stop 9.0 s/v A 11. The City Drive at AM Orange D 6 Phase 0.487 A The City Way/Dawn Way PM Signal 0.542 A 12. Lewis Street at AM Orange/ Garden Grove D 2 Phase 0.717 C Lampson Ave/Metropolitan Dr PM Signal 0.701 C 13. Entertainment Drive at AM Orange D All-Way 8.7 s/v A City Boulevard West PM Stop 10.2 s/v B 14. Entertainment Drive at AM Orange D All-Way 13.9 s/v B Metropolitan Drive PM Stop 25.2 s/v D 15. Designer Dr/SR-22 WB Ramps at AM Orange/ Caltrans D 4 Phase 0.457 A Metropolitan Drive PM Signal 0.546 A 16. The City Drive at AM Orange D 3 Phase 0.477 A Metropolitan Drive PM Signal 0.397 A 17. The City Drive at AM Orange/ Caltrans D 6 Phase 0.596 A SR-22 EB Ramps PM Signal 0.629 B Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 14 TABLE 3-5 EXISTING ROADWAY SEGMENT LEVEL OF SERVICE SUMMARY Key Roadway Segment Jurisdiction Min. Acc. LOS (1) No. of Existing Lanes (2) Arterial Classification (3) Existing Capacity at LOS “E” (4) Existing Traffic Conditions Daily Volume V/C Ratio LOS A. State College Blvd between I-5 SB Ramps and Chapman Ave Orange D 8D Principal 75,000 35,011 0.467 A B. Chapman Ave between Lewis St and Manchester Ave Orange D 6D Major 56,300 35,227 0.626 B C. Chapman Ave between Manchester Ave and The City Dr Orange D 6D Major 56,300 40,804 0.725 C D. Chapman Ave between The City Dr and I-5 SB Ramps Orange D 6D Major 56,300 48,463 0.861 D E. Lewis St between Chapman Ave and Lampson Ave Orange/ Garden Grove D 4D Secondary 24,000 18,293 0.762 C F. The City Dr between Chapman Ave and Dawn Way Orange D 8D Principal 75,000 38,115 0.508 A G. The City Dr between Dawn Way and Metropolitan Dr Orange D 8D Principal 75,000 18,589 0.248 A H. Metropolitan Dr between Lewis St and SR-22 WB Ramps Orange D 4D Primary 37,500 10,078 0.269 A I. Metropolitan Dr between SR-22 WB Ramps and The City Dr Orange D 4D Primary 37,500 18,836 0.502 A LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 15 4.0 TRAFFIC FORECASTING METHODOLOGY In order to estimate the traffic impact characteristics of the proposed Project, a multi-step process has been utilized. The first step is trip generation, which estimates the total arriving and departing traffic on a peak hour and daily basis. The traffic generation potential is forecast by applying the appropriate vehicle trip generation equations or rates to the project development tabulation. The second step of the forecasting process is trip distribution, which identifies the origins and destinations of inbound and outbound project traffic. These origins and destinations are typically based on demographics and existing/anticipated travel patterns in the study area. The third step is traffic assignment, which involves the allocation of project traffic to study area streets and intersections. Traffic assignment is typically based on minimization of travel time, which may or may not involve the shortest route, depending on prevailing operating conditions and travel speeds. Traffic distribution patterns are indicated by general percentage orientation, while traffic assignment allocates specific volume forecasts to individual roadway links and intersection turning movements throughout the study area. With the forecasting process complete and project traffic assignments developed, the impact of the proposed Project is isolated by comparing operational (LOS) conditions at selected key intersections using expected future traffic volumes with and without forecast project traffic. The need for site- specific and/or cumulative local area traffic improvements can then be evaluated and the significance of the project’s impacts identified. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 16 5.0 PROJECT TRAFFIC CHARACTERISTICS 5.1 Project Traffic Generation Traffic generation is expressed in vehicle trip ends, defined as one-way vehicular movements, either entering or exiting the generating land use. Generation equations and/or rates used in the traffic forecasting procedure are found in the 10th Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE) [Washington D.C., 2017]. Table 5-1 summarizes the trip generation rates used in forecasting the vehicular trips generated by the proposed Project and also presents the Project’s forecast peak hour and daily traffic volumes. It should be noted that due to the location of each individual project site within the entire project site boundary, two (2) site groups have been established and are reflected in Table 5-1. These site groups include Group 1, which consists of Sites A and B and Group 2, which consists of Site C. Review of the upper portion of Table 5-1 shows that the trip generation potential of the proposed Project was estimated using ITE Land Use 221: Multifamily (Mid-Rise, 3-10 floors) trip rates. Review of the middle portion of Table 5-1 indicates that Group 1 of the proposed Project (i.e. Sites A and B) is forecast to generate 418 daily trips, with 30 trips (8 inbound, 22 outbound) produced in the AM peak hour and 34 trips (21 inbound, 13 outbound) produced in the PM peak hour on a “typical” weekday. Review of the lower portion of Table 5-1 indicates that Group 2 of the proposed Project (i.e. Site C) is forecast to generate 309 daily trips, with 22 trips (6 inbound, 16 outbound) produced in the AM peak hour and 25 trips (15 inbound, 10 outbound) produced in the PM peak hour on a “typical” weekday. As shown at the bottom of Table 5-1, overall the proposed Project is forecast to generate 727 daily trips, with 52 trips (14 inbound, 38 outbound) produced in the AM peak hour and 59 trips (36 inbound, 23 outbound) produced in the PM peak hour on a “typical” weekday. Please note that the aforementioned overall project trip generation includes adjustments for mode split/internal capture. A twenty percent (20%), fifteen percent (15%) and twenty percent (20%) mode split/internal capture reduction has been applied to the daily, AM peak hour and PM peak hour project trip generation, respectively, to account for the numerous employment and entertainment/retail/restaurant opportunities located in the immediate vicinity of the proposed project site. The proposed 20%/15%/20% mode split/internal capture reductions are based on internal capture calculations prepared for the project utilizing the recommended methodology contained within the Trip Generation Handbook. The proposed project was analyzed with the existing adjacent office, medical office and retail/restaurant/entertainment uses in the area to develop internal capture reductions. Appendix C also contains the internal capture worksheets and, as shown, the calculated internal capture potential is measurably greater than what was utilized in the analysis. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 17 5.2 Project Traffic Distribution and Assignment Figures 5-1 and 5-2 illustrate the general, directional traffic distribution patterns for Sites A & B and Site C, respectively. Project traffic volumes both entering and exiting the project site have been distributed and assigned to the adjacent street system based on the following considerations:  directional flows on the freeways in the immediate vicinity of the project site (i.e. I-5 Freeway and SR-22 Freeway),  the site's proximity to major traffic carriers (i.e., Chapman Avenue, The City Drive, etc.),  expected localized traffic flow patterns based on adjacent street channelization and presence of traffic signals,  ingress/egress availability at the project site, and  input from City staff. The anticipated AM and PM peak hour project traffic volumes associated with the proposed Project (i.e. Sites A, B and C) are presented in Figures 5-3 and 5-4, respectively. Figure 5-4 also presents the daily project traffic volumes for the proposed Project. The traffic volume assignments presented in Figures 5-3 and 5-4 reflect the traffic distribution characteristics shown in Figures 5-1 and 5-2, and the traffic generation forecast presented in Table 5-1. 5.3 Existing Plus Project Traffic Conditions The existing plus project traffic conditions have been generated based upon existing conditions and the estimated project traffic. These forecast traffic conditions have been prepared pursuant to the California Environmental Quality Act (CEQA) guidelines, which require that the potential impacts of a Project be evaluated upon the circulation system as it currently exists. This traffic volume scenario and the related intersection capacity analyses will identify the roadway improvements necessary to mitigate the direct traffic impacts of the Project, if any. Figures 5-5 and 5-6 present projected AM and PM peak hour traffic volumes at the seventeen (17) key study intersections and three (3) Project driveways with the addition of the trips generated by the proposed Project to existing traffic volumes, respectively. Figure 5-6 also presents the existing plus project daily traffic volumes. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 18 TABLE 5-1 PROJECT TRAFFIC GENERATION FORECAST 5 ITE Land Use Code / Project Description Daily 2-Way AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Generation Factors:  221: Multifamily Housing (Mid-Rise, 3-10 floors) (TE/DU) 5.44 0.09 0.27 0.36 0.27 0.17 0.44 Generation Forecast:  Sites A and B (96 Apartment DU) 522 9 26 35 26 16 42 Mode Split/Internal Capture Reduction (20% daily / 15% AM / 20% PM)6 -104 -1 -4 -5 -5 -3 -8 Subtotal 418 8 22 30 21 13 34  Site C (71 Apartment DU) 386 7 19 26 19 12 31 Mode Split/Internal Capture Reduction (20% daily / 15% AM / 20% PM)6 -77 -1 -3 -4 -4 -2 -6 Subtotal 309 6 16 22 15 10 25 Total Traffic Generation Forecast 727 14 38 52 36 23 59 5 Source: Trip Generation, 10th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2017). 6 A twenty percent (20%), fifteen percent (15%), and twenty percent (20%) mode split/internal capture reduction has been applied to the daily, AM peak hour, and PM peak hour project trip generation, respectively, to account for the numerous employment and entertainment/retail/restaurant opportunities located in the immediate vicinity of the proposed project site. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 19 6.0 FUTURE TRAFFIC CONDITIONS 6.1 Ambient Traffic Growth Horizon year, background traffic growth estimates have been calculated using an ambient traffic growth factor. The ambient traffic growth factor is intended to include unknown and future cumulative projects in the study area, as well as account for regular growth in traffic volumes due to the development of projects outside the study area. The future growth in traffic volumes has been calculated at one percent (1.0%) per year. Applied to the Year 2017 existing traffic volumes, this factor results in a 4.0% growth in existing volumes to the near-term horizon year 2021. 6.2 Cumulative Projects Traffic Characteristics In order to make a realistic estimate of future on-street conditions prior to implementation of the proposed Project, the status of other known development projects (cumulative projects) in the vicinity of the proposed Project has been researched at the City of Orange, the City of Garden Grove, the City of Santa Ana, and the City of Anaheim. With this information, the potential impact of the proposed Project can be evaluated within the context of the cumulative impact of all ongoing development. Based on our research, there are fourteen (14) cumulative projects in the City of Orange, three (3) cumulative projects in the City of Garden Grove, six (6) cumulative projects in the City of Santa Ana, and twenty-five (25) cumulative projects in the City of Anaheim within the vicinity of the subject site that have either been built, but not yet fully occupied, or are being processed for approval. These forty-eight (48) cumulative projects have been included as part of the cumulative background setting. Table 6-1 provides a brief description for each of the forty-eight (48) cumulative projects. Figure 6- 1 graphically illustrates the location of the cumulative projects. These cumulative projects are expected to generate vehicular traffic, which may affect the operating conditions of the key study intersections and/or roadway segments. Table 6-2 presents the trip generation for the forty-eight (48) cumulative projects. As shown in Table 6-2, the forty-eight (48) cumulative projects are forecast to generate a total of 131,894 daily trips, with 8,285 trips (3,719 inbound and 4,566 outbound) forecast during the AM peak hour and 10,413 trips (5,593 inbound and 4,820 outbound) forecast during the PM peak hour. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 20 6.3 Year 2021 Traffic Volumes The AM and PM peak hour traffic volumes associated with the forty-eight (48) cumulative projects are presented in Figures 6-2 and 6-3, respectively. Figure 6-3 also presents the daily cumulative project traffic volumes. Figures 6-4 and 6-5 present the AM and PM peak hour cumulative traffic volumes (existing traffic + ambient growth traffic + cumulative project traffic) at the seventeen (17) key study intersections for the Year 2021, respectively. Figure 6-5 also presents the Year 2021 daily cumulative traffic volumes. Figures 6-6 and 6-7 illustrate the Year 2021 forecast AM and PM peak hour traffic volumes, with the inclusion of the trips generated by the proposed Project, respectively. Figure 6-7 also presents the Year 2021 daily cumulative plus project traffic volumes. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 21 TABLE 6-1 LOCATION AND DESCRIPTION OF CUMULATIVE PROJECTS 7 No. Description Location/Address Size City of Orange 1. 3800 Chapman Apartments 3800 Chapman Avenue 280 DU Apartments 2. City Plaza North and South of City Boulevard, adjacent to Entertainment Drive 335 DU Apartments 165 Room Hotel 3. City Parkway West Apartments Northeast corner of Lewis Street and City Parkway West 220 Apartments 4. 1725 West Katella Apartments 1725 West Katella Avenue 94 DU Apartments 5. Plaza Bible Church and School 671 Poplar Street 22,940 SF Church 350 Student School 6. Oakmo nt Senior Living 630 The City Drive South 98 DU Senior Adult Housing 7. AMLI Residential 3537 The City Way 334 Apartments 8. Town and Country Apartments and Townhomes Southeast corner of Town and Country Road and Lawson Way 653 DU Apartments 75 DU Townhomes 9. 999 Town and Country Apartments 999 Town and Country 250 Apartments 10. Eleven 10 West 1110 Town and Country Road 260 Apartments 11. Koll Center Parking Structure 3510 West Orangewood Avenue Net increase of 222 parking spaces 12. Marriott Dual Brand Hotel Southwest corner of Santa Ana River Channel and Chapman Avenue 300 Room Hotel 3,000 SF Restaurant 13. 7-11 Gas Station 2245 West Chapman Avenue 2,400 SF Convenience Store 14. Chick-fil-A Main Street Southwest corner of Main Street and Almond Avenue 4,563 SF Fast-Food Restaurant with Drive-Thru City of Garden Grove 15. Single Family Homes Northwest corner of Lewis Street and Garden Grove Boulevard 70 DU Single Family Homes 16. Site “C” Hotel and Restaurant Northeast corner of Harbor Boulevard and Twintree Lane 769 Room Hotel and 45,000 SF Restaurant 17. Nickelodeon Resort Northwest corner of Harbor Boulevard and Twintree Lane 60 DU Timeshare 500 Room Resort Hotel 5,703 SF Quality Restaurant City of Santa Ana 18. 2700 Main St. Apartments 2700 North Main Street 247 DU Apartments 19. Bristol-Memory Commercial Building 2702 North Bristol Street 6,900 SF Commercial 20. Discovery Science Center Expansion 2500 North Main Street 53,384 SF Commercial/Educational 21. Park View at Town and Country Manor 555 East Memory Lane 174 Apartments 7 Source: Cities of Orange, Garden Grove, Santa Ana and Anaheim Planning Departments staff. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 22 TABLE 6-1 (CONTINUED) LOCATION AND DESCRIPTION OF CUMULATIVE PROJECTS 8 No. Description Location/Address Size 22. The 301 301 East Jeanette Lane 182 Apartments 3,707 SF Commercial 23. The Academy Charter High School 1901 North Fairview Street 8 Apartments 110,500 SF High School City of Anaheim 24. Jefferson Platinum Triangle I & II Generally north of Katella Avenue and west of State College Boulevard 400 Apartments 25. Anaheim Apartment Communities Generally north of Katella Avenue and west of State College Boulevard 244 Apartments 26. A-Town Metro Southwest corner of State College Boulevard and Katella Avenue 1,746 Apartments 50,000 SF Commercial 27. LT Platinum Center` Northeast corner of State College Boulevard and Orangewood Avenue 405 Apartments 77,000 SF Office 583,000 SF Commercial 28. Jefferson Stadium Park Southwest corner of State College Boulevard and Gene Autry Way 1,079 Apartments 14,600 SF Commercial 29. The George Northeast corner of State College Boulevard and Orangewood Avenue 341 Apartments 30. Platinum Vista Generally north of Katella Avenue and east of Lewis Street 389 Apartments 31. Trumark Homes Generally north of Katella Avenue and east of Lewis Street 153 DU Townhomes 32. Hilton Garden Inn/ Home2 Suites by Hilton 1441 South Manchester Avenue 223 Room Hotel 33. Park Vue Inn 1570 South Harbor Boulevard 180 Room Hotel and 10,654 SF Commercial 34. Element Hotel 200 West Alro Way 174 Room Hotel 35. Luxury Hotel 1700 South Harbor Boulevard 580 Room Resort Hotel 36. Gardenwalk – Resort Hotel 300 West Disney Way 400 Room Resort Hotel 37. Gardenwalk – Westgate Timeshare 500 West Disney Way 399 Room Resort Hotel 38. Gardenwalk – JW Marriott 1775 South Clementine Street 466 Room Resort Hotel 39. Cambria Suites 1721 South Manchester Avenue 352 Room Hotel 15,000 SF Restaurant 8 Source: Cities of Orange, Garden Grove, Santa Ana and Anaheim Planning Departments staff. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 23 TABLE 6-1 (CONTINUED) LOCATION AND DESCRIPTION OF CUMULATIVE PROJECTS 9 No. Description Location/Address Size 40. Westin Anaheim Resort 1030 West Katella Avenue 613 Room Resort Hotel 41. Anaheim Convention Center Exp. 800 West Katella Avenue 200,000 SF Convention Center Exp. 42. Hampton Inn & Suites 100 West Katella Avenue 178 Room Hotel 43. Radison Blue Hotel 1601 South Anaheim Boulevard 330 Room Hotel 44. Industrial Building 1710-1730 South Anaheim Boulevard 143,000 SF Industrial 45. Manchester and Chapman Townhomes 2337-2415 South Manchester Avenue 120 DU Townhomes 46. Stadium Towers II 2400 East Katella Avenue 332,958 SF Office 47. Avanti Anaheim Boulevard Townhomes 100 West Cerritos Avenue 292 DU Townhomes 48. Self-Storage 1705 South State College Boulevard 31,812 SF Self-Storage 9 Source: Cities of Orange, Garden Grove, Santa Ana and Anaheim Planning Departments staff. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 24 TABLE 6-2 CUMULATIVE PROJECTS TRAFFIC GENERATION FORECAST 10 No. Cumulative Project Description Daily Two-Way AM Peak Hour PM Peak Hour In Out Total In Out Total 1. 3800 Chapman Apartments 11 1,490 25 97 122 90 49 139 2. City Plaza 12 3,130 80 152 232 158 107 265 3. City Parkway West Apartments 13 1,170 19 76 95 70 39 109 4. 1725 West Katella Apartments 14 365 2 37 39 29 3 32 5. Plaza Bible Church and School 15 690 181 147 328 32 34 66 6. Oakmont Senior Living 363 7 13 20 14 11 25 7. AMLI Residential 16 1,777 28 116 144 107 58 165 8. Town and Country Apartments and Townhomes 17 2,589 -198 255 57 238 -90 148 9. 999 Town and Country Apartments 18 1,742 26 108 134 105 58 163 10. Eleven 10 West 19 1,729 26 107 133 104 57 161 11. Koll Center Parking Structure 20 622 43 12 55 38 46 84 12. Marriott Dual Brand Hotel 2,811 98 70 168 102 95 197 13. 7-11 Gas Station 1,646 67 68 135 29 29 58 14. Chick-fil-A Main Street 21 1,612 47 46 93 38 36 74 15. Single Family Homes 661 13 39 52 43 26 69 16. Site “C” Hotel and Restaurant 22 8,256 271 176 447 348 269 617 17. Nickelodeon Resort23 4,937 131 55 186 117 148 265 18. 2700 Main St. Apartments 1,808 26 88 114 87 51 138 19. Bristol-Memory Commercial Building 234 3 2 5 8 9 17 20. Discovery Science Center Expansion 520 53 9 62 10 51 61 21. Park View at Town and Country Manor 1,274 18 62 80 61 36 97 10 Unless otherwise noted, Source: Trip Generation, 10th Editions, Institute of Transportation Engineers (ITE) [Washington, D.C. (2017)]. 11 Source: 3800 Chapman Apartments Traffic Impact Analysis, prepared by LLG Engineers. 12 Source: City Plaza Project Traffic Impact Analysis, prepared by LLG Engineers. 13 Source: City Parkway West Apartments Project Traffic Impact Analysis, prepared by LLG Engineers. 14 Source: 1725 West Katella Apartments Traffic Impact Analysis, prepared by LLG Engineers. 15 Source: Plaza Bible Church and School Project TIA Scope of Work, prepared by LLG Engineers. 16 Source: AMLI Uptown Orange Project Traffic Impact Analysis, prepared by LLG Engineers. 17 Source: Town and Country Apartments and Townhomes Traffic Impact Analysis, prepared by LLG Engineers. 18 Source: 999 Town & Country Apartments Project Traffic Impact Analysis, prepared by LLG Engineers. 19 Source: 1100 Town & Country Project Traffic Impact Analysis, prepared by LLG Engineers. 20 Source: Koll Center Parking Structure Focused Traffic Impact Assessment, prepared by LLG Engineers. 21 Source: Chick-fil-A Main Street Project Traffic Impact Analysis, prepared by LLG Engineers. 22 Source: Traffic Impact Analysis Report for The Garden Grove Site “C” Hotel and Restaurant, prepared by RK Engineering Group. 23 Source: Nickelodeon Resort Traffic Impact Scope of Work, prepared by LLG Engineers. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 25 TABLE 6-2 (CONTINUED) CUMULATIVE PROJECTS TRAFFIC GENERATION FORECAST 24 No. Cumulative Project Description Daily Two-Way AM Peak Hour PM Peak Hour In Out Total In Out Total 22. The 301 1,458 21 66 87 69 42 111 23. The Academy Charter High School25 686 107 52 159 25 29 54 24. Jefferson Platinum Triangle I & II 2,928 42 142 184 141 83 224 25. Anaheim Apartment Communities 1,786 26 86 112 86 51 137 26. A-Town Metro 14,480 211 634 845 677 427 1,104 27. LT Platinum Center` 23,522 426 342 768 861 921 1,782 28. Jefferson Stadium Park 8,394 122 387 509 399 242 641 29. The George 2,496 36 121 157 120 71 191 30. Platinum Vista 2,847 41 138 179 137 81 218 31. Trumark Homes 1,120 16 54 70 54 32 86 32. Hilton Garden Inn/Home2 Suites by Hilton 1,864 62 43 105 68 66 134 33. Park Vue Inn 1,867 55 39 94 68 67 135 34. Element Hotel 1,455 48 34 82 53 51 104 35. Luxury Hotel 2,378 134 52 186 102 136 238 36. Gardenwalk – Resort Hotel 1,640 92 36 128 71 93 164 37. Gardenwalk – Westgate Timeshare 1,636 92 36 128 71 93 164 38. Gardenwalk – JW Marriott 1,911 107 42 149 82 109 191 39. Cambria Suites 4,458 171 128 299 160 135 295 40. Westin Anaheim Resort 2,513 141 55 196 108 143 251 41. Anaheim Convention Center Exp. 1,948 200 32 232 37 193 230 42. Hampton Inn & Suites 1,488 50 34 84 55 52 107 43. Radison Blue Hotel 2,759 91 64 155 101 97 198 44. Industrial Building 709 88 12 100 12 78 90 45. Manchester and Chapman Townhomes 697 9 44 53 42 20 62 46. Stadium Towers II 3,243 332 54 386 61 322 383 47. Avanti Anaheim Boulevard Townhomes 2,137 31 103 134 103 61 164 48. Self-Storage 48 2 1 3 2 3 5 Total Cumulative Projects Trip Generation Forecast 131,894 3,719 4,566 8,285 5,593 4,820 10,413 24 Unless otherwise noted, Source: Trip Generation, 10th Editions, Institute of Transportation Engineers (ITE) [Washington, D.C. (2017)]. 25 Source: The Academy Charter high School Traffic Impact Analysis, prepared by Fehr and Peers. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 26 7.0 TRAFFIC IMPACT ANALYSIS METHODOLOGY The relative impact of the proposed Project during the AM peak hour/PM peak hour and on a daily basis was evaluated based on analysis of future operating conditions at the seventeen (17) key study intersections and nine (9) key roadway segments, without, then with the proposed Project. The previously discussed capacity analysis procedures were utilized to investigate the future volume-to- capacity relationships and service level characteristics at each study intersection and roadway segment. The significance of the potential impacts of the Project at each key intersection and key roadway segment was then evaluated using the following traffic impact criteria. 7.1 Impact Criteria and Thresholds 7.1.1 City of Orange Impacts to local and regional transportation systems located in the City of Orange are considered significant if: Intersections:  An unacceptable peak hour Level of Service (LOS) at any of the key intersections is projected. According to the City’s Circulation Element and stated in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, LOS D is the minimum acceptable condition that should be maintained during the morning and evening peak commute hours on all intersections; and  The project increases traffic demand at the study intersection by 1% of capacity (ICU increase ≥ 0.010), causing or worsening LOS E or LOS F (ICU > 0.900). Roadway Segments:  An unacceptable daily Level of Service (LOS) at any of the key roadway segments is projected. According to the City of Orange General Plan Circulation Element and stated in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007, LOS D is the minimum acceptable condition that should be maintained on a daily basis on all roadway segments; and  The project increases traffic demand at the roadway segment by 1% of capacity (V/C increase ≥ 0.010), causing or worsening LOS E or LOS F (V/C > 0.900). 7.1.2 City of Garden Grove Impacts to local and regional transportation systems located in the City of Garden Grove are considered significant if: Intersections:  An unacceptable peak hour Level of Service (LOS) at any of the key intersections is projected. According to the City of Garden Grove, LOS D is the minimum acceptable condition that should be maintained during the morning and evening peak commute hours on all intersections; and  The project increases traffic demand at the study intersection by 1% of capacity (ICU increase ≥ 0.010), causing or worsening LOS E or LOS F (ICU > 0.900). LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 27 Roadway Segments:  An unacceptable daily Level of Service (LOS) at any of the key roadway segments is projected. According to the City of Garden Grove, LOS D is the minimum acceptable condition that should be maintained on a daily basis on all roadway segments; and  The project increases traffic demand at the roadway segment by 1% of capacity (V/C increase ≥ 0.010), causing or worsening LOS E or LOS F (V/C > 0.900). 7.2 Traffic Impact Analysis Scenarios The following scenarios are those for which volume/capacity calculations have been performed at the seventeen (17) key study intersections and nine (9) key roadway segments for existing plus project and near-term (Year 2021) traffic conditions: (a) Existing Traffic Conditions; (b) Existing Plus Project Traffic Conditions; (c) Scenario (b) with Improvements, if necessary; (d) Near-Term (Year 2021) Cumulative Traffic Conditions, (e) Near-Term (Year 2021) Cumulative plus Project Traffic Conditions; and (f) Scenario (e) with Improvements, if necessary. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 28 8.0 EXISTING PLUS PROJECT ANALYSIS The following summarizes the “Existing Plus Project” level of service results for the seventeen (17) key study intersections and nine (9) key roadway segments. 8.1 Intersections Table 8-1 summarizes the peak hour level of service results at the seventeen (17) study intersections for existing plus project traffic conditions. The first column (1) of ICU/LOS and HCM/LOS values in Table 8-1 presents a summary of existing AM and PM peak hour traffic conditions (which were also presented in Table 3-4). The second column (2) lists existing plus project traffic conditions. The third column (3) shows the increase in ICU and/or Delay value due to the added peak hour project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. The fourth column (4) indicates the anticipated level of service with recommended improvements. 8.1.1 Existing Plus Project Traffic Conditions Review of Columns (2) and (3) of Table 8-1 indicates that traffic associated with the proposed Project will not significantly any of the seventeen (17) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. Although the intersection of Lewis Street at Chapman Avenue is forecast to operate at an unacceptable LOS E during the AM peak hour with the addition of Project traffic, the proposed Project is expected to add less than the allowable threshold to the ICU value. The remaining sixteen (16) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS D or better during the AM and PM peak hours with the addition of Project generated traffic to existing traffic. Appendix C also presents the existing plus project ICU/LOS and HCM/LOS calculations for the seventeen (17) key study intersections for the AM peak hour and PM peak hour. 8.2 Roadway Segments Table 8-2 summarizes the roadway segment level of service results at the nine (9) key roadway segments for existing plus project traffic conditions. The first column (1) shows the number of lanes, the second column (2) shows the arterial classification and the third column (3) shows the existing LOS “E” capacity. The fourth column (4) presents a summary of existing daily traffic conditions (which were also presented in Table 3-5). The fifth column (5) lists existing plus project daily traffic conditions. Column (5) also shows the increase in V/C ratio value due to the added daily project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. 8.2.1 Existing Plus Project Traffic Conditions Review of Column 5 of Table 8-2 indicates that traffic associated with the proposed Project will not significantly impact any of the nine (9) key roadway segments when compared to the LOS standards and significant impact criteria specified in this report. The nine (9) key roadway segments currently operate and are forecast to continue to operate at an acceptable service level on a daily basis with the addition of Project generated traffic to existing traffic. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 29 TABLE 8-1 EXISTING PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Existing Plus Project Traffic Conditions (3) Project Significant Impact (4) Existing Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 1. State College Boulevard at AM D 0.362 A 0.362 A 0.000 No -- -- Anaheim Way/I-5 NB Ramps PM 0.615 B 0.615 B 0.000 No -- -- 2. State College Boulevard at AM D 0.475 A 0.476 A 0.001 No -- -- I-5 SB Ramps PM 0.389 A 0.393 A 0.004 No -- -- 3. Lewis Street at AM D 0.960 E 0.963 E 0.003 No -- -- Chapman Avenue PM 0.836 D 0.836 D 0.000 No -- -- 4. Manchester Avenue at AM D 0.590 A 0.594 A 0.004 No -- -- Chapman Avenue PM 0.550 A 0.557 A 0.007 No -- -- 5. The City Drive at AM D 0.738 C 0.741 C 0.003 No -- -- Chapman Avenue PM 0.749 C 0.750 C 0.001 No -- -- 6. I-5 Ramps at AM D 0.563 A 0.566 A 0.003 No -- -- Chapman Avenue PM 0.569 A 0.572 A 0.003 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 30 TABLE 8-1 (CONTINUED) EXISTING PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Existing Plus Project Traffic Conditions (3) Project Significant Impact (4) Existing Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 7. Rampart Street at AM D 0.357 A 0.358 A 0.001 No -- -- Chapman Avenue PM 0.453 A 0.454 A 0.001 No -- -- 8. Manchester Avenue at AM D 9.1 s/v A 9.2 s/v A 0.1 s/v No -- -- City Boulevard West PM 10.4 s/v B 10.6 s/v B 0.2 s/v No -- -- 9. City Boulevard at AM D 9.1 s/v A 9.1 s/v A 0.0 s/v No -- -- City Blvd West/The City Way PM 11.5 s/v B 11.6 s/v B 0.1 s/v No -- -- 10. City Boulevard East at AM D 8.3 s/v A 8.3 s/v A 0.0 s/v No -- -- The City Way PM 9.0 s/v A 9.0 s/v A 0.0 s/v No -- -- 11. The City Drive at AM D 0.487 A 0.488 A 0.001 No -- -- The City Way/Dawn Way PM 0.542 A 0.543 A 0.001 No -- -- 12. Lewis Street at AM D 0.717 C 0.720 C 0.003 No -- -- Lampson Ave/Metropolitan Dr PM 0.701 C 0.701 C 0.000 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 31 TABLE 8-1 (CONTINUED) EXISTING PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Existing Plus Project Traffic Conditions (3) Project Significant Impact (4) Existing Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 13. Entertainment Drive at AM D 8.7 s/v A 8.7 s/v A 0.0 s/v No -- -- City Boulevard West PM 10.2 s/v B 10.3 s/v B 0.1 s/v No -- -- 14. Entertainment Drive at AM D 13.9 s/v B 14.0 s/v B 0.1 s/v No -- -- Metropolitan Drive PM 25.2 s/v D 25.5 s/v D 0.3 s/v No -- -- 15. Designer Dr/SR-22 WB Ramps at AM D 0.457 A 0.458 A 0.001 No -- -- Metropolitan Drive PM 0.546 A 0.547 A 0.001 No -- -- 16. The City Drive at AM D 0.477 A 0.478 A 0.001 No -- -- Metropolitan Drive PM 0.397 A 0.397 A 0.000 No -- -- 17. The City Drive at AM D 0.596 A 0.597 A 0.001 No -- -- SR-22 EB Ramps PM 0.629 B 0.631 B 0.002 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 32 TABLE 8-2 EXISTING PLUS PROJECT ROADWAY SEGMENT LEVEL OF SERVICE SUMMARY Key Roadway Segment Min. Acc. LOS (1) No. of Existing Lanes (2) Arterial Classification (3) Existing Capacity at LOS “E” (4) Existing Traffic Conditions (5) Existing Plus Project Traffic Conditions Daily Volume V/C Ratio LOS Daily Volume V/C Ratio LOS Inc. Adverse (Yes/No) A. State College Blvd between I-5 SB Ramps and Chapman Ave D 8D Principal 75,000 35,011 0.467 A 35,215 0.470 A 0.003 No B. Chapman Ave between Lewis St and Manchester Ave D 6D Major 56,300 35,227 0.626 B 35,464 0.630 B 0.004 No C. Chapman Ave between Manchester Ave and The City Dr D 6D Major 56,300 40,804 0.725 C 41,313 0.734 C 0.009 No D. Chapman Ave between The City Dr and I-5 SB Ramps D 6D Major 56,300 48,463 0.861 D 48,769 0.866 D 0.005 No E. Lewis St between Chapman Ave and Lampson Ave D 4D Secondary 24,000 18,293 0.762 C 18,602 0.775 C 0.013 No F. The City Dr between Chapman Ave and Dawn Way D 8D Principal 75,000 38,115 0.508 A 38,115 0.508 A 0.000 No G. The City Dr between Dawn Way and Metropolitan Dr D 8D Principal 75,000 18,589 0.248 A 18,641 0.249 A 0.001 No H. Metropolitan Dr between Lewis St and SR-22 WB Ramps D 4D Primary 37,500 10,078 0.269 A 10,161 0.271 A 0.002 No I. Metropolitan Dr between SR-22 WB Ramps and The City Dr D 4D Primary 37,500 18,836 0.502 A 18,875 0.503 A 0.001 No LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 33 9.0 YEAR 2021 PLUS PROJECT ANALYSIS The following summarizes the “Year 2021 Plus Project” level of service results for the seventeen (17) key study intersections and nine (9) key roadway segments. 9.1 Intersections Table 9-1 summarizes the peak hour level of service results at the seventeen (17) key study intersections for Year 2021 traffic conditions. The first column (1) of ICU/LOS and HCM/LOS values in Table 9-1 presents a summary of existing AM and PM peak hour traffic conditions (which were also presented in Table 3-4). The second column (2) lists projected cumulative traffic conditions (existing plus ambient traffic plus cumulative project traffic) based on existing intersection geometry, but without any traffic generated from the proposed Project. The third column (3) presents forecast Year 2021 near-term traffic conditions with the addition of Project traffic. The fourth column (4) shows the increase in ICU and/or Delay value due to the added peak hour project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. The fifth column (5) indicates the anticipated level of service with recommended improvements. 9.1.1 Year 2021 Cumulative Traffic Conditions An analysis of future (Year 2021) cumulative traffic conditions indicates that the addition of ambient traffic growth and cumulative project traffic will adversely impact one (1) of the seventeen (17) key study intersections. The remaining sixteen (16) key study intersections are forecast to continue to operate at acceptable levels of service during the AM and PM peak hours with the addition of ambient traffic growth and cumulative project traffic. The location forecast to operate at an adverse LOS is as follows: AM Peak Hour PM Peak Hour Key Intersection ICU LOS ICU LOS 3. Lewis Street at Chapman Avenue 1.065 F 0.981 E Please note that the level of service results for the intersection of Entertainment Drive/Metropolitan Drive (key study intersection #14) include improvements associated with the City Plaza cumulative project. The planned improvements are summarized in Section 12.1. 9.1.2 Year 2021 Cumulative Plus Project Traffic Conditions Review of Columns (3) and (4) of Table 9-1 indicates that traffic associated with the proposed Project will not significantly any of the seventeen (17) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. Although the intersection of Lewis Street at Chapman Avenue is forecast to operate at an unacceptable LOS E or F during the AM and/or PM peak hours with the addition of Project traffic, the proposed Project is expected to add less than the allowable threshold to the ICU value. The remaining sixteen (16) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS D or better during the AM and PM peak hours with the addition of Project generated traffic to Year 2021 cumulative traffic. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 34 Appendix C also presents the Year 2021 plus project ICU/LOS and HCM/LOS calculations for the seventeen (17) key study intersections. 9.2 Roadway Segments Table 9-2 summarizes the roadway segment level of service results at the nine (9) key roadway segments for Year 2021 traffic conditions. The first column (1) shows the number of lanes, the second column (2) shows the arterial classification and the third column (3) shows the existing LOS “E” capacity. The fourth column (4) presents a summary of projected Year 2021 cumulative daily traffic conditions. The fifth column (5) lists Year 2021 plus project daily traffic conditions. Column (5) also shows the increase in V/C ratio value due to the added daily project trips and indicates whether the traffic associated with the Project will have a significant impact based on the LOS standards and significant impact criteria defined in this report. 9.2.1 Year 2021 Cumulative Traffic Conditions An analysis of future (Year 2021) cumulative traffic conditions indicates that two (2) of the nine (9) key roadway segments are forecast to operate at unacceptable levels of service on a daily basis when compared to the LOS standards defined in this report. The remaining seven (7) key roadway segments are forecast to operate at an acceptable service level on a daily basis under Year 2021 cumulative traffic conditions (i.e. existing plus ambient traffic plus cumulative project traffic). The roadway segments operating at adverse levels of service are: Daily Key Roadway Segment Volume V/C Ratio LOS C. Chapman Avenue between Manchester Avenue and The City Drive 52,154 0.926 E D. Chapman Avenue between The City Drive and I-5 SB Ramps 57,389 1.019 F 9.2.2 Year 2021 Cumulative Plus Project Traffic Conditions Review of Column 5 of Table 9-2 indicates that traffic associated with the proposed Project will not significantly impact any of the nine (9) key roadway segments when compared to the LOS standards and significant impact criteria specified in this report. Although Roadway Segment C (i.e. Chapman Avenue between Manchester Avenue and The City Drive) and Rodway Segment D (i.e. Chapman Avenue between The City Drive and I-5 Southbound Ramps) are forecast to operate at an unacceptable LOS E and/or LOS F on a daily basis with the addition of Project traffic, the proposed Project is expected to add less than the allowable threshold to the V/C ratio. The remaining seven (7) key roadway segments currently operate and are forecast to continue to operate at an acceptable service level on a daily basis with the addition of Project generated traffic to Year 2021 cumulative traffic. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 35 TABLE 9-1 YEAR 2021 PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Year 2021 Cumulative Traffic Conditions (3) Year 2021 Cumulative Plus Project Traffic Conditions (4) Project Significant Impact (5) Year 2021 Cumulative Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 1. State College Boulevard at AM D 0.362 A 0.509 A 0.509 A 0.000 No -- -- Anaheim Way/I-5 NB Ramps PM 0.615 B 0.738 C 0.739 C 0.001 No -- -- 2. State College Boulevard at AM D 0.475 A 0.558 A 0.559 A 0.001 No -- -- I-5 SB Ramps PM 0.389 A 0.499 A 0.502 A 0.003 No -- -- 3. Lewis Street at AM D 0.960 E 1.065 F 1.068 F 0.003 No -- -- Chapman Avenue PM 0.836 D 0.981 E 0.988 E 0.007 No -- -- 4. Manchester Avenue at AM D 0.590 A 0.706 C 0.710 C 0.004 No -- -- Chapman Avenue PM 0.550 A 0.663 B 0.670 B 0.007 No -- -- 5. The City Drive at AM D 0.738 C 0.847 D 0.850 D 0.003 No -- -- Chapman Avenue PM 0.749 C 0.855 D 0.856 D 0.001 No -- -- 6. I-5 Ramps at AM D 0.563 A 0.646 B 0.649 B 0.003 No -- -- Chapman Avenue PM 0.569 A 0.659 B 0.663 B 0.004 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 36 TABLE 9-1 (CONTINUED) YEAR 2021 PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Year 2021 Cumulative Traffic Conditions (3) Year 2021 Cumulative Plus Project Traffic Conditions (4) Project Significant Impact (5) Year 2021 Cumulative Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 7. Rampart Street at AM D 0.357 A 0.412 A 0.413 A 0.001 No -- -- Chapman Avenue PM 0.453 A 0.511 A 0.512 A 0.001 No -- -- 8. Manchester Avenue at AM D 9.1 s/v A 9.5 s/v A 9.6 s/v A 0.1 s/v No -- -- City Boulevard West PM 10.4 s/v B 10.9 s/v B 11.1 s/v B 0.2 s/v No -- -- 9. City Boulevard at AM D 9.1 s/v A 9.3 s/v A 9.4 s/v A 0.1 s/v No -- -- City Blvd West/The City Way PM 11.5 s/v B 12.1 s/v B 12.2 s/v B 0.1 s/v No -- -- 10. City Boulevard East at AM D 8.3 s/v A 8.5 s/v A 8.5 s/v A 0.0 s/v No -- -- The City Way PM 9.0 s/v A 9.3 s/v A 9.3 s/v A 0.0 s/v No -- -- 11. The City Drive at AM D 0.487 A 0.539 A 0.540 A 0.001 No -- -- The City Way/Dawn Way PM 0.542 A 0.611 B 0.612 B 0.001 No -- -- 12. Lewis Street at AM D 0.717 C 0.790 C 0.793 C 0.003 No -- -- Lampson Ave/Metropolitan Dr PM 0.701 C 0.762 C 0.762 C 0.000 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 37 TABLE 9-1 (CONTINUED) YEAR 2021 PEAK HOUR INTERSECTION CAPACITY ANALYSIS Key Intersections Time Period Minimum Acceptable LOS (1) Existing Traffic Conditions (2) Year 2021 Cumulative Traffic Conditions (3) Year 2021 Cumulative Plus Project Traffic Conditions (4) Project Significant Impact (5) Year 2021 Cumulative Plus Project With Mitigation ICU/HCM LOS ICU/HCM LOS ICU/HCM LOS Increase Yes/No ICU/HCM LOS 13. Entertainment Drive at AM D 8.7 s/v A 9.7 s/v A 9.7 s/v A 0.0 s/v No -- -- City Boulevard West PM 10.2 s/v B 13.1 s/v B 13.2 s/v B 0.1 s/v No -- -- 14. Entertainment Drive at AM D 13.9 s/v B 0.430 A 26 0.431 A26 0.001 No -- -- Metropolitan Drive PM 25.2 s/v D 0.626 B 0.629 B 0.003 No -- -- 15. Designer Dr/SR-22 WB Ramps AM D 0.457 A 0.524 A 0.524 A 0.000 No -- -- at Metropolitan Drive PM 0.546 A 0.616 B 0.617 B 0.001 No -- -- 16. The City Drive at AM D 0.477 A 0.541 A 0.542 A 0.001 No -- -- Metropolitan Drive PM 0.397 A 0.456 A 0.457 A 0.001 No -- -- 17. The City Drive at AM D 0.596 A 0.682 B 0.684 B 0.002 No -- -- SR-22 EB Ramps PM 0.629 B 0.725 C 0.727 C 0.002 No -- -- Notes:  s/v = seconds per vehicle (delay)  BOLD ICU/LOS values indicate unacceptable service level 26 The LOS calculations for this intersection include improvements assumed as part of the City Plaza cumulative project. Refer to Section 12.1 (planned improvements). LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 38 TABLE 9-2 YEAR 2021 ROADWAY SEGMENT LEVEL OF SERVICE SUMMARY Key Roadway Segment Min. Acc. LOS (1) No. of Existing Lanes (2) Arterial Classification (3) Existing Capacity at LOS “E” (4) Year 2021 Cumulative Traffic Conditions (5) Year 2021 Cumulative Plus Project Traffic Conditions Daily Volume V/C Ratio LOS Daily Volume V/C Ratio LOS Inc. Adverse (Yes/No) A. State College Blvd between I-5 SB Ramps and Chapman Ave D 8D Principal 75,000 49,092 0.655 B 49,296 0.657 B 0.002 No B. Chapman Ave between Lewis St and Manchester Ave D 6D Major 56,300 45,962 0.816 D 46,199 0.821 D 0.005 No C. Chapman Ave between Manchester Ave and The City Dr D 6D Major 56,300 52,154 0.926 E 52,663 0.935 E 0.009 No D. Chapman Ave between The City Dr and I-5 SB Ramps D 6D Major 56,300 57,389 1.019 F 57,695 1.025 F 0.006 No E. Lewis St between Chapman Ave and Lampson Ave D 4D Secondary 24,000 21,136 0.881 D 21,445 0.894 D 0.013 No F. The City Dr between Chapman Ave and Dawn Way D 8D Principal 75,000 47,806 0.637 B 47,806 0.637 B 0.000 No G. The City Dr between Dawn Way and Metropolitan Dr D 8D Principal 75,000 26,407 0.352 A 26,459 0.353 A 0.001 No H. Metropolitan Dr between Lewis St and SR-22 WB Ramps D 4D Primary 37,500 11,690 0.312 A 11,773 0.314 A 0.002 No I. Metropolitan Dr between SR-22 WB Ramps and The City Dr D 4D Primary 37,500 22,367 0.596 A 22,406 0.597 A 0.001 No LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 39 10.0 STATE OF CALIFORNIA (CALTRANS) METHODOLOGY In conformance with the current Caltrans Guide for the Preparation of Traffic Impact Studies, existing and projected peak hour operating conditions at the five (5) state-controlled study intersections within the study area have been evaluated using the Highway Capacity Manual 6th Edition (HCM 6 for signalized intersections) operations method of analysis. These state-controlled locations include the following five (5) of the seventeen (17) key study intersections: 1. State College Boulevard at Anaheim Way/I-5 NB Ramps 2. State College Boulevard at I-5 SB Ramps 6. I-5 Ramps at Chapman Avenue 15. Designer Drive/SR-22 WB Ramps at Metropolitan Drive 17. The City Drive at SR-22 EB Ramps 10.1 Impact Criteria and Thresholds Consistent with the Caltrans Guide for the Preparation of Traffic Impact Studies, the following criteria has been utilized to determine project impacts at the aforementioned five (5) state-controlled study intersections.  Caltrans endeavors to maintain a target LOS at the transition between LOS “C” and LOS “D” on State highway facilities. However, Caltrans acknowledges that this may not always be feasible and recommends that the lead agency consult with Caltrans to determine the appropriate target LOS. Caltrans has established that LOS D is the operating standard for all Caltrans facilities. Caltrans has determined that all state owned facilities that operate below LOS D should be identified and improved to an acceptable LOS. The Caltrans Traffic Impact Study Guidelines dated December 2002 states that if an existing State-owned facility operates at less than the target LOS (i.e. LOS D); the existing service level should be maintained. 10.2 Highway Capacity Manual 6 (HCM 6) Method of Analysis (Signalized Intersections) Based on the HCM operations method of analysis, level of service for signalized intersections and approaches is defined in terms of control delay, which is a measure of the increase in travel time due to traffic signal control, driver discomfort, and fuel consumption. Control delay includes the delay associated with vehicles slowing in advance of an intersection, the time spent stopped on an intersection approach, the time spent as vehicles move up in the queue, and the time needed for vehicles to accelerate to their desired speed. LOS criteria for traffic signals are stated in terms of the control delay in seconds per vehicle. The LOS thresholds established for the automobile mode at a signalized intersection are shown in Table 10-1. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 40 TABLE 10-1 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS (HCM 6 METHODOLOGY)27 Level of Service (LOS) Control Delay Per Vehicle (seconds/vehicle) Level of Service Description A < 10.0 This level of service occurs when progression is extremely favorable and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay. B > 10.0 and < 20.0 This level generally occurs with good progression, short cycle lengths, or both. More vehicles stop than with LOS A, causing higher levels of average delay. C > 20.0 and < 35.0 Average traffic delays. These higher delays may result from fair progression, longer cycle lengths, or both. Individual cycle failures may begin to appear at this level. The number of vehicles stopping is significant at this level, though many still pass through the intersection without stopping. D > 35.0 and < 55.0 Long traffic delays At level D, the influence of congestion becomes more noticeable. Longer delays may result from some combination of unfavorable progression, long cycle lengths, or high v/c ratios. Many vehicles stop and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable. E > 55.0 and < 80.0 Very long traffic delays This level is considered by many agencies to be the limit of acceptable delay. These high delay values generally indicate poor progression, long cycle lengths and high v/c ratios. Individual cycle failures are frequent occurrences. F ≥ 80.0 Severe congestion This level, considered to be unacceptable to most drivers, often occurs with over saturation, that is, when arrival flow rates exceed the capacity of the intersection. It may also occur at high v/c ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also be major contributing factors to such delay levels. 27 Source: Highway Capacity Manual 6, Chapter 19: Signalized Intersections. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 41 10.3 Existing Plus Project Traffic Conditions Table 10-2 summarizes the peak hour Highway Capacity Manual level of service results at the five (5) state-controlled study intersections within the study area for Existing Plus Project traffic conditions. The first column (1) of HCM/LOS values in Table 10-2 presents a summary of existing traffic conditions. The second column (2) presents existing plus project traffic conditions based on existing intersection geometry. The third column (3) indicates whether the traffic associated with the Project will have a significant impact based on the significant impact criteria defined in this report. 10.3.1 Existing Traffic Conditions Review of column one (1) of Table 10-2 indicates that all of the state-controlled study intersections currently operate at an acceptable LOS C or better during the AM and PM peak hours. 10.3.2 Existing Plus Project Traffic Conditions Review of columns two (2) and three (3) of Table 10-2 indicates that traffic associated with the proposed Project will not significantly impact any of the five (5) state-controlled study intersections, when compared to the LOS standards specified in this report. The five (5) state-controlled study intersections are forecast to continue to operate at an acceptable LOS C or better with the addition of project generated traffic to existing traffic. 10.4 Year 2021 Plus Project Traffic Conditions Table 10-3 summarizes the peak hour Highway Capacity Manual level of service results at the five (5) state-controlled study intersections within the study area for the 2021 horizon year. The first column (1) of HCM/LOS values in Table 10-3 presents a summary of existing traffic conditions. The second column (2) presents Year 2021 cumulative traffic conditions based on existing intersection geometry, but without any Project generated traffic. The third column (3) presents future forecast traffic conditions with the addition of project traffic. The fourth column (4) indicates whether the traffic associated with the Project will have a significant impact based on the significant impact criteria defined in this report. 10.4.1 Year 2021 Cumulative Traffic Conditions An analysis of future (Year 2021) cumulative traffic conditions indicates that the addition of ambient traffic growth and cumulative projects traffic will not adversely impact any of the five (5) state- controlled study intersections. The five (5) state-controlled study intersections are forecast to continue to operate at acceptable LOS C or better during the AM and PM peak hours with the addition of ambient traffic growth and cumulative projects traffic. 10.4.2 Year 2021 Cumulative Plus Project Traffic Conditions Review of Columns (3) and (4) of Table 10-3 indicates that traffic associated with the proposed Project will not significantly impact any of the five (5) state-controlled study intersections, when compared to the LOS standards specified in this report. The five (5) state-controlled study intersections are forecast to continue to operate at acceptable LOS C or better with the addition of project generated traffic in the Year 2021. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 42 Appendix D presents the existing plus project and Year 2021 plus project HCM/LOS calculations for the five (5) state-controlled study intersections. 10.5 Recommended Improvements – Caltrans Analysis The results of the Caltrans analyses presented in Tables 10-2 and 10-3 indicate that the proposed Project will not significantly impact any of the five (5) state-controlled study intersections under “Existing Plus Project” and “Year 2021 Cumulative Plus Project” traffic conditions. As there are no significant impacts, no traffic mitigation measures are required or recommended for the five (5) state-controlled study intersections. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 43 TABLE 10-2 EXISTING PLUS PROJECT PEAK HOUR INTERSECTION CAPACITY ANALYSIS - CALTRANS Key Intersection Time Period (1) (2) (3) Existing Traffic Conditions Existing Plus Project Traffic Conditions Project Significant Impact HCM LOS HCM LOS Yes/No 1. State College Boulevard at AM 13.1 s/v B 13.1 s/v B No Anaheim Way/I-5 NB Ramps PM 26.7 s/v C 26.7 s/v C No 2. State College Boulevard at AM 16.9 s/v B 16.9 s/v B No I-5 SB Ramps PM 11.3 s/v B 11.4 s/v B No 6. I-5 Ramps at AM 19.6 s/v B 19.8 s/v B No Chapman Avenue PM 18.7 s/v B 18.9 s/v B No 15. Designer Dr/SR-22 WB Ramps at AM 19.7 s/v B 19.7 s/v B No Metropolitan Drive PM 26.7 s/v C 26.7 s/v C No 17. The City Drive at AM 26.1 s/v C 26.1 s/v C No SR-22 EB Ramps PM 28.1 s/v C 28.1 s/v C No Note: s/v = seconds per vehicle LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 44 TABLE 10-3 YEAR 2021 PEAK HOUR INTERSECTION CAPACITY ANALYSIS - CALTRANS Key Intersections Time Period (1) Existing Traffic Conditions (2) Year 2021 Cumulative Traffic Conditions (3) Year 2021 Cumulative Plus Project Traffic Conditions (4) Project Significant Impact HCM LOS HCM LOS HCM LOS Yes/No 1. State College Boulevard at AM 13.1 s/v B 14.6 s/v B 14.6 s/v B No Anaheim Way/I-5 NB Ramps PM 26.7 s/v C 29.5 s/v C 29.5 s/v C No 2. State College Boulevard at AM 16.9 s/v B 17.1 s/v B 17.1 s/v B No I-5 SB Ramps PM 11.3 s/v B 12.6 s/v B 12.7 s/v B No 6. I-5 Ramps at AM 19.6 s/v B 23.6 s/v C 23.8 s/v C No Chapman Avenue PM 18.7 s/v B 23.3 s/v C 23.6 s/v C No 15. Designer Dr/SR-22 WB Ramps at AM 19.7 s/v B 21.2 s/v C 21.2 s/v C No Metropolitan Drive PM 26.7 s/v C 29.2 s/v C 29.2 s/v C No 17. The City Drive at AM 26.1 s/v C 27.5 s/v C 27.5 s/v C No SR-22 EB Ramps PM 28.1 s/v C 29.6 s/v C 29.6 s/v C No Note: s/v = seconds per vehicle LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 45 11.0 SITE ACCESS AND INTERNAL CIRCULATION EVALUATION 11.1 Site Access Evaluation As shown previously in Figure 2-2, access to the Project site is currently provided and will continue to be provided via one (1) unsignalized, outbound only driveway (Project Driveway No. 1) and one (1) unsignalized, full-access driveway (Project Driveway No. 2) located along Lewis Street, and one (1) unsignalized, full-access driveway (Project Driveway No. 3) located along City Boulevard West. Table 11-1 summarizes the intersection operations at the project driveways for near-term (Year 2021) traffic conditions at completion and full occupancy of the proposed Project. The operations analysis for the project driveways is based on the Highway Capacity Manual 6th Edition (HCM 6) unsignalized methodology. Review of Table 11-1 shows that the three (3) project driveways are forecast to operate at acceptable LOS C or better during the AM and PM peak hours for Year 2021 traffic conditions. As such, project access will be adequate. Motorists entering and exiting the Project site will be able to do so comfortably, safely, and without undue congestion. Appendix E presents the level of service calculation worksheets for the Project driveways under Year 2021 Cumulative plus Project traffic conditions. 11.2 Internal Circulation Evaluation The on-site circulation layout of the proposed Project as illustrated in Figure 2-2 on an overall basis is adequate. Curb return radii have been confirmed and are generally adequate for small service/delivery (FedEx, UPS) trucks and trash trucks. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 46 TABLE 11-1 PROJECT DRIVEWAY PEAK HOUR LEVELS OF SERVICE SUMMARY Project Driveway Time Period Intersection Control Year 2021 Plus Project Traffic Conditions HCM LOS A. Lewis Street at AM One–Way 13.4 s/v B Project Driveway 1 PM Stop 15.7 s/v C B. Lewis Street at AM One–Way 12.6 s/v B Project Driveway 2 PM Stop 14.4 s/v B C. City Boulevard West at AM Two–Way 10.2 s/v B Project Driveway 3 PM Stop 10.4 s/v B Note: s/v = seconds per vehicle LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 47 12.0 PLANNED AND RECOMMENDED IMPROVEMENTS For those intersections and roadway segments where projected traffic volumes are expected to result in significant cumulative impacts, this report recommends traffic improvements that change the intersection and/or roadway segments geometry to increase capacity. These capacity improvements involve roadway widening and/or re-striping to reconfigure (add lanes) roadways to specific approaches of a key intersection and/or roadway segments. The identified improvements are expected to:  Address the impact of existing traffic, Project traffic and future non-project (ambient traffic growth and Cumulative) traffic, and  Improve Levels of Service to an acceptable range and/or to pre-project conditions. 12.1 Planned Improvements The following planned improvement is anticipated to be completed by the Year 2021 in conjunction with the construction of the City Plaza project, located on the north and south sides of City Boulevard, adjacent to Entertainment Drive, and has been included in the level of service calculations for Year 2021 Cumulative and Year 2021 Cumulative Plus Project traffic conditions:  Intersection No. 14 - Entertainment Drive at Metropolitan Drive: Install a two-phase traffic signal. 12.2 Recommended Improvements 12.2.1 Existing Plus Project Traffic Conditions The results of the intersection capacity analysis presented previously in Table 8-1 shows that the proposed Project will not significantly impact any of the seventeen (17) key study intersections under the “Existing Plus Project” traffic scenario. Given that there are no significant project impacts, no improvements are required under this traffic scenario. The results of the “Existing Plus Project” daily roadway segment analysis presented previously in Table 8-2 indicates that the proposed Project will not significantly impact any of the nine (9) key roadway segments. Given that there are no significant project impacts, no improvements are required under this traffic scenario. 12.2.2 Year 2021 Plus Project Traffic Conditions The results of the intersection capacity analysis presented previously in Table 9-1 shows that the proposed Project will not significantly impact any of the seventeen (17) key study intersections under the “Year 2021 Plus Project” traffic scenario. Given that there are no significant project impacts, no improvements are required under this traffic scenario. The results of the “Year 2021 Plus Project” daily roadway segment analysis presented previously in Table 9-2 indicates that the proposed Project will not significantly impact any of the nine (9) key roadway segments. Given that there are no significant project impacts, no improvements are required under this traffic scenario. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 48 While there are no significant traffic impacts, the intersection of Chapman Avenue at Lewis Street currently operates (AM only) and is forecast to operate at an unacceptable level of service during the AM and PM peak hours. Although no mitigation is required, the following improvement is forecast to return the adverse intersection to an acceptable level of service:  Chapman Avenue at Lewis Street: Restripe the southbound approach of Lewis Street to add an additional (second) southbound through lane. It should be noted that the current southbound shared through/right-turn lane is 24 feet wide, so no widening is required. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 49 13.0 CONGESTION MANAGEMENT PROGRAM (CMP) This analysis is consistent with the requirements and procedures outlined in the current Orange County Congestion Management Program (CMP). The CMP requires that a traffic impact analysis be conducted for any project generating 2,400 or more daily trips, or 1,600 or more daily trips for projects that directly access the CMP Highway System (HS). Per the CMP guidelines, this number is based on the desire to analyze any impacts that will be 3.0% or more of the existing CMP highway system facilities’ capacity. However, as noted in this traffic study, the proposed Project is expected to generate 727 daily trips, and thus does not meet the criteria required for a CMP traffic analysis. Therefore, it is concluded that the proposed Project will not have any significant traffic impacts on the Congestion Management Program Highway System. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 50 14.0 SUMMARY OF FINDINGS AND CONCLUSIONS  Project Description – The project site is generally located south of Chapman Avenue and east of Lewis Street in the City of Orange, California. The project site currently has 441 apartment units within eight (8) buildings. The proposed Project will add three (3) 4-story apartment buildings (i.e. Sites A, B and C) with a total of 167 apartment units. Specifically, Site A and Site B consist of 48 apartment units each, and Site C consists of the remaining 71 apartment units. The proposed Project is expected to be completed by the Year 2021. Access to the proposed Project is currently provided and will continue to be provided via one (1) unsignalized, outbound only driveway (Project Driveway No. 1) and one (1) unsignalized, full-access driveway (Project Driveway No. 2) located along Lewis Street, and one (1) unsignalized, full-access driveway (Project Driveway No. 3) located along City Boulevard West.  Study Scope – The seventeen (17) key study intersections and nine (9) key roadway segments selected for evaluation were determined based on coordination with City of Orange Traffic Engineering staff and application of the “51 or more peak hour trip threshold” criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. The jurisdiction where each key study intersection/roadway segment is located is also identified with the following nomenclature utilized; (O) = City of Orange, (GG) = City of Garden Grove, and (C) = Caltrans. Key Study Intersections 1. State College Boulevard at Anaheim Way/I-5 NB Ramps (O/C) 2. State College Boulevard at I-5 SB Ramps (O/C) 3. Lewis Street at Chapman Avenue (O/GG) 4. Manchester Avenue at Chapman Avenue (O) 5. The City Drive at Chapman Avenue (O) 6. I-5 Ramps at Chapman Avenue (O/C) 7. Rampart Street at Chapman Avenue (O) 8. Manchester Avenue at City Boulevard West (O) 9. City Boulevard at City Boulevard West/The City Way (O) 10. City Boulevard East at The City Way (O) 11. The City Drive at The City Way/Dawn Way (O) 12. Lewis Street at Lampson Avenue/Metropolitan Drive (O/GG) 13. Entertainment Drive at City Boulevard West (O) 14. Entertainment Drive at Metropolitan Drive (O) 15. Designer Drive/SR-22 WB Ramps at Metropolitan Drive (O/C) 16. The City Drive at Metropolitan Drive (O) 17. The City Drive at SR-22 EB Ramps (O/C) Key Roadway Segments A. State College Boulevard, between I-5 SB Ramps and Chapman Avenue (O) B. Chapman Avenue, between Lewis Street and Manchester Avenue (O) C. Chapman Avenue, between Manchester Avenue and The City Drive (O) D. Chapman Avenue, between The City Drive and I-5 SB Ramps (O) E. Lewis St, between Chapman Ave and Lampson Ave/Metropolitan Dr (O/GG) F. The City Drive, between Chapman Avenue and The City Way/Dawn Way (O) G. The City Drive, between The City Way/Dawn Way and Metropolitan Dr (O) H. Metropolitan Drive, between Lewis Street and SR-22 WB Ramps (O) I. Metropolitan Drive, between SR-22 WB Ramps and The City Drive (O) LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 51 Detailed peak hour level of service analyses were prepared for Existing Traffic Conditions, Existing Plus Project Traffic Conditions, Year 2021 Cumulative Traffic Conditions, and Year 2021 Cumulative Plus Project Traffic Conditions at these locations.  Existing Traffic Conditions – One (1) of the seventeen (17) key study intersections currently operates at an unacceptable level of service during the AM peak hour. The intersection of Lewis Street at Chapman Avenue currently operates at unacceptable LOS E during the AM peak hour. The remaining sixteen (16) key study intersections currently operate at acceptable LOS D or better during the AM and PM peak hours. All nine (9) key roadway segments currently operate at acceptable LOS D or better on a daily basis.  Project Trip Generation – The proposed Project is forecast to generate 727 daily trips, with 52 trips (14 inbound, 38 outbound) produced in the AM peak hour and 59 trips (36 inbound, 23 outbound) produced in the PM peak hour on a “typical” weekday. Please note that the aforementioned overall project trip generation includes adjustments for mode split/internal capture.  Cumulative Projects Traffic Characteristics – The forty-eight (48) cumulative projects are forecast to generate a total of 131,894 daily trips, with 8,285 trips (3,719 inbound and 4,566 outbound) forecast during the AM peak hour and 10,413 trips (5,593 inbound and 4,820 outbound) forecast during the PM peak hour.  Existing Plus Project Traffic Conditions – The proposed Project will not significantly any of the seventeen (17) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. Although the intersection of Lewis Street at Chapman Avenue is forecast to operate at an unacceptable LOS E during the AM peak hour with the addition of Project traffic, the proposed Project is expected to add less than the allowable threshold to the ICU value. The remaining sixteen (16) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS D or better during the AM and PM peak hours with the addition of Project generated traffic to existing traffic. The proposed Project will not significantly impact any of the nine (9) key roadway segments when compared to the LOS standards and significant impact criteria specified in this report. The nine (9) key roadway segments currently operate and are forecast to continue to operate at an acceptable service level on a daily basis with the addition of Project generated traffic to existing traffic.  Year 2021 Cumulative Plus Project Traffic Conditions – The proposed Project will not significantly any of the seventeen (17) key study intersections, when compared to the LOS standards and significant impact criteria specified in this report. Although the intersection of Lewis Street at Chapman Avenue is forecast to operate at an unacceptable LOS E or F during the AM and/or PM peak hours with the addition of Project traffic, the proposed Project is expected to add less than the allowable threshold to the ICU value. The remaining sixteen (16) key study intersections currently operate and are forecast to continue to operate at an acceptable LOS D or better during the AM and PM peak hours with the addition of Project generated traffic to Year 2021 cumulative traffic. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 52 The proposed Project will not significantly impact any of the nine (9) key roadway segments when compared to the LOS standards and significant impact criteria specified in this report. Although Roadway Segment C (i.e. Chapman Avenue between Manchester Avenue and The City Drive) and Rodway Segment D (i.e. Chapman Avenue between The City Drive and I-5 Southbound Ramps) are forecast to operate at an unacceptable LOS E and/or LOS F on a daily basis with the addition of Project traffic, the proposed Project is expected to add less than the allowable threshold to the V/C ratio. The remaining seven (7) key roadway segments currently operate and are forecast to continue to operate at an acceptable service level on a daily basis with the addition of Project generated traffic to Year 2021 cumulative traffic.  State of California (Caltrans) Methodology – The results of the “Existing Plus Project” and “Year 2021 Plus Project” traffic analyses using the State of California (Caltrans) Methodology indicate that the proposed Project will not significantly impact any of the five (5) state-controlled study intersections. As there are no significant impacts, no traffic mitigation measures are required or recommended for the five (5) state-controlled study intersections.  Site Access and Internal Circulation Evaluation – The project driveways are forecast to operate at acceptable LOS C or better during the AM and PM peak hours for Year 2021 traffic conditions. As such, project access will be adequate. Motorists entering and exiting the Project site will be able to do so comfortably, safely, and without undue congestion. The on-site circulation layout of the proposed Project on an overall basis is adequate. Curb return radii have been confirmed and are generally adequate for small service/delivery (FedEx, UPS) trucks and trash trucks.  Planned Improvements – The following planned improvement is anticipated to be completed by the Year 2021 in conjunction with the construction of the City Plaza project, located on the north and south sides of City Boulevard, adjacent to Entertainment Drive, and has been included in the level of service calculations for Year 2021 Cumulative and Year 2021 Cumulative Plus Project traffic conditions:  Intersection No. 14 - Entertainment Drive at Metropolitan Drive: Install a two-phase traffic signal.  Recommended Improvements (Intersections) – The results of the intersection capacity analysis presented previously in Tables 8-1 and 9-1 shows that the proposed Project will not significantly impact any of the seventeen (17) key study intersections under the “Existing Plus Project” and “Year 2021 Plus Project” traffic scenarios. Given that there are no significant project impacts, no improvements are required under this traffic scenario. While there are no significant traffic impacts, the intersection of Chapman Avenue at Lewis Street currently operates (AM only) and is forecast to operate at an unacceptable level of service during the AM and PM peak hours. Although no mitigation is required, the following improvement is forecast to return the adverse intersection to an acceptable level of service:  Chapman Avenue at Lewis Street: Restripe the southbound approach of Lewis Street to add an additional (second) southbound through lane. It should be noted that the current southbound shared through/right-turn lane is 24 feet wide, so no widening is required. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2.17.3882.1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 - The Terrace Apartments TIA, Orange 08-07-18.doc 53  Recommended Improvements (Roadway Segments) – The results of the daily roadway segment analysis presented previously in Tables 8-2 and 9-2 shows that the proposed Project will not significantly impact any of the nine (9) key roadway segments under the “Existing Plus Project” and “Year 2021 Plus Project” traffic scenarios. Given that there are no significant project impacts, no improvements are required under this traffic scenario.  Congestion Management Program (CMP) – The proposed Project will not have any significant traffic impacts on the Congestion Management Program Highway System. LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3882-1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Dividers.doc APPENDIX A TRAFFIC STUDY SCOPE OF WORK A-1 Mr. Doug Keys September 20, 2017 Page 2 N:\3800\2173882 - The Terrace Apartments, Orange\Letters\3882 Updated TIA Scope of Work 09-20-17.doc Key Study Intersections 1. State College Boulevard at Anaheim Way/I-5 NB Ramps (O) 2. State College Boulevard at I-5 SB Ramps (O) 3. Lewis Street at Chapman Avenue (O/GG) 4. Manchester Avenue at Chapman Avenue (O) 5. The City Drive at Chapman Avenue (O) 6. I-5 SB Ramps at Chapman Avenue (O) 7. Rampart Street at Chapman Avenue (O) 8. Manchester Avenue at City Boulevard West (O) 9. City Boulevard at City Boulevard West/The City Way (O) 10. City Boulevard East at The City Way (O) 11. The City Drive at The City Way/Dawn Way (O) 12. Lewis Street at Lampson Avenue/Metropolitan Drive (O/GG) 13. City Parkway at City Boulevard West (O) 14. City Parkway at Metropolitan Drive (O) 15. Designer Drive/SR-22 WB Ramps at Metropolitan Drive (O) 16. The City Drive at Metropolitan Drive (O) 17. The City Drive at SR-22 EB Ramps (O) A. Lewis Street at Project Driveway No. 1 (O/GG) B. Lewis Street at Project Driveway No. 2 (O/GG) C. Lewis Street at Project Driveway No. 3 (O/GG) D. City Boulevard at Project Driveway No. 4 (O) Key Roadway Segments A. State College Boulevard, between I-5 SB Ramps and Chapman Avenue (O) B. Chapman Avenue, between Lewis Street and Manchester Avenue (O) C. Chapman Avenue, between Manchester Avenue and The City Drive (O) D. Chapman Avenue, between The City Drive and I-5 SB Ramps (O) E. Lewis St, between Chapman Ave and Lampson Ave/Metropolitan Dr (O/GG) F. The City Drive, between Chapman Avenue and The City Way/Dawn Way (O) G. The City Drive, between The City Way/Dawn Way and Metropolitan Dr (O) H. Metropolitan Drive, between Lewis Street and SR-22 WB Ramps (O) I. Metropolitan Drive, between SR-22 WB Ramps and The City Drive (O) D. Traffic Counts: The traffic counts for the above listed seventeen (17) intersections and nine (9) roadway segments will be conducted on a Tuesday, Wednesday, or Thursday when local schools are in session. E. Project Traffic Generation: The trip generation potential of the Project will be estimated using ITE Land Use 220: Apartments rates and ITE Land Use 230: Residential Condominium/Townhouse rates contained in the 9th Edition of Trip Generation, published by the Institute of Transportation Engineers (ITE), A-2 Mr. Doug Keys September 20, 2017 Page 3 N:\3800\2173882 - The Terrace Apartments, Orange\Letters\3882 Updated TIA Scope of Work 09-20-17.doc [Washington, D.C., 2012]. The proposed Project is forecast to generate 1,027 daily trips, with 84 trips (17 inbound, 67 outbound) produced in the AM peak hour and 95 trips (62 inbound, 33 outbound) produced in the PM peak hour on a “typical” weekday. Please note that the aforementioned overall project trip generation includes adjustments for mode split/internal capture. A twenty percent (20%), fifteen percent (15%), and twenty percent (20%) mode split/internal capture reduction has been applied to the daily, AM peak hour, and PM peak hour project trip generation, respectively, to account for the numerous employment and entertainment/retail/restaurant opportunities located in the immediate vicinity of the proposed project site. See attached project traffic generation forecast – Table 5-1. It should also be noted that due to the proximity and location within the project site, four (4) site groups have been established and reflected in Table 5-1 as well as the project traffic distribution patterns described below in Section F. These groups include Group 1: Sites A and B, Group 2: Site C, Group 3: Sites D and E, and Group 4: Site F. F. Project Traffic Distribution Pattern: See the attached project traffic distribution patterns for Sites A & B, Site C, Sites D & E, and Site F, respectively – Figures 5-1, 5-2, 5-3, and 5-4. The traffic distribution patterns were developed based on the following considerations:  directional flows on the freeways in the immediate vicinity of the project site (i.e. I-5 Freeway and SR-22 Freeway),  the site's proximity to major traffic carriers (i.e., Chapman Avenue, The City Drive, etc.),  expected localized traffic flow patterns based on adjacent street channelization and presence of traffic signals,  input from City staff, and  ingress/egress availability at the project site. G. Year 2021 Cumulative Traffic:  Ambient Growth Rate: 1.0% per year.  Cumulative Projects: Obtain information regarding cumulative projects in the vicinity of the proposed project (i.e., 2-mile radius) from the City of Orange, City of Anaheim, City of Santa Ana, and City of Garden Grove. H. Analysis Scenarios: The following traffic analysis scenarios will be prepared for the proposed Project. (a) Existing Traffic Conditions; (b) Existing Plus Project Traffic Conditions; A-3 Mr. Doug Keys September 20, 2017 Page 4 N:\3800\2173882 - The Terrace Apartments, Orange\Letters\3882 Updated TIA Scope of Work 09-20-17.doc (c) Scenario (b) with Mitigation, if necessary; (d) Year 2021 Cumulative Traffic Conditions (Existing plus Ambient Growth plus Cumulative Projects); (e) Year 2021 Cumulative Plus Project Traffic Conditions, and (f) Scenario (e) with Mitigation, if necessary. The LOS calculations will be based on the ICU methodology for signalized intersections and the Highway Capacity Manual (HCM) methodology for unsignalized intersections. The Project’s potential impact will be based on the significant impact criteria outlined in the City of Orange Traffic Impact Analysis Guidelines, dated August 15, 2007. It should be noted that all Caltrans-controlled study intersections will also be analyzed utilizing the Highway Capacity Manual (HCM) methodology. I. Other Issues:  Evaluate Site Access and Internal Circulation. * * * * * * * * * * * We appreciate the opportunity to provide this scope of work. Should you have any questions, please call us at (949) 825-6175. Thank you. Approved by: ________________________________________ City of Orange Date A-4 A-5 A-6 A-7 N:\3800\2173882 - The Terrace Apartments, Orange\Letters\3882 Updated TIA Scope of Work 09-20-17.doc TABLE 5-1 PROJECT TRAFFIC GENERATION FORECAST 1 ITE Land Use Code / Project Description Daily 2-Way AM Peak Hour PM Peak Hour Enter Exit Total Enter Exit Total Generation Factors:  220: Apartments (TE/DU) 6.65 0.10 0.41 0.51 0.40 0.22 0.62  230: Residential Condominium/Townhouse (TE/DU) 5.81 0.07 0.37 0.44 0.35 0.17 0.52 Generation Forecast:  Sites A and B (96 Apartment DU) 638 10 39 49 39 21 60 Mode Split/Internal Capture Reduction (20% daily / 15% AM / 20% PM)2 -128 -2 -5 -7 -8 -4 -12 Subtotal 510 8 34 42 31 17 48  Site C (71 Apartment DU) 472 7 29 36 29 15 44 Mode Split/Internal Capture Reduction (20% daily / 15% AM / 20% PM)2 -94 -1 -4 -5 -6 -3 -9 Subtotal 378 6 25 31 23 12 35  Sites D and E (20 Townhome DU) 116 2 7 9 7 3 10 Mode Split/Internal Capture Reduction (20% daily / 15% AM / 20% PM)2 -23 0 -1 -1 -1 -1 -2 Subtotal 93 2 6 8 6 2 8  Site F (10 Townhome DU) 58 1 3 4 3 2 5 Mode Split/Internal Capture Reduction (20% daily / 15% AM / 20% PM)2 -12 0 -1 -1 -1 0 -1 Subtotal 46 1 2 3 2 2 4 Total Traffic Generation Forecast 1,027 17 67 84 62 33 95 1 Source: Trip Generation, 9th Edition, Institute of Transportation Engineers (ITE), Washington, D.C. (2012). 2 A twenty percent (20%), fifteen percent (15%), and twenty percent (20%) mode split/internal capture reduction has been applied to the daily, AM peak hour, and PM peak hour project trip generation, respectively, to account for the numerous employment and entertainment/retail/restaurant opportunities located in the immediate vicinity of the proposed project site. A-8 ABCDA-9 A-10 A-11 A-12 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3882-1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Dividers.doc APPENDIX B EXISTING TRAFFIC COUNT DATA LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX B-I INTERSECTION COUNTS B-1 File Name : H1709042 Site Code : 00000000 Start Date : 9/26/2017 Page No : 1 City: ORANGE N-S Direction: STATE COLLEGE BOULEVARD E-W Direction: ANAHEIM WAY/I-5 NB RAMPS Groups Printed- Turning Movements STATE COLLEGE BOULEVARD Southbound I-5 NB RAMPS Westbound STATE COLLEGE BOULEVARD Northbound ANAHEIM WAY Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 3 253 1 64 22 16 43 145 7 0 0 0 554 07:15 5 355 2 68 24 17 38 135 5 0 0 0 649 07:30 7 347 7 74 34 25 49 139 13 0 0 0 695 07:45 4 368 2 85 33 28 62 180 12 0 0 0 774 Total 19 1323 12 291 113 86 192 599 37 0 0 0 2672 08:00 5 327 4 93 23 27 36 159 13 0 0 0 687 08:15 3 273 4 84 37 39 37 158 5 0 0 0 640 08:30 7 286 5 64 19 21 40 151 9 0 0 0 602 08:45 3 250 4 78 35 14 29 142 8 0 0 0 563 Total 18 1136 17 319 114 101 142 610 35 0 0 0 2492 *** BREAK *** 16:00 4 296 3 41 133 14 114 228 19 0 0 0 852 16:15 7 314 5 56 168 12 110 212 25 0 0 0 909 16:30 6 350 4 53 234 18 115 210 38 0 0 0 1028 16:45 1 326 2 53 238 16 84 240 36 0 0 0 996 Total 18 1286 14 203 773 60 423 890 118 0 0 0 3785 17:00 8 443 6 65 246 13 115 292 54 0 0 0 1242 17:15 6 354 5 54 233 19 104 287 57 0 0 0 1119 17:30 6 365 4 63 261 17 69 277 59 0 0 0 1121 17:45 1 343 2 72 224 8 95 233 35 0 0 0 1013 Total 21 1505 17 254 964 57 383 1089 205 0 0 0 4495 Grand Total 76 5250 60 1067 1964 304 1140 3188 395 0 0 0 13444 Apprch %1.4 97.5 1.1 32 58.9 9.1 24.1 67.5 8.4 0 0 0 Total %0.6 39.1 0.4 7.9 14.6 2.3 8.5 23.7 2.9 0 0 0 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-2 File Name : H1709042 Site Code : 00000000 Start Date : 9/26/2017 Page No : 2 City: ORANGE N-S Direction: STATE COLLEGE BOULEVARD E-W Direction: ANAHEIM WAY/I-5 NB RAMPS STATE COLLEGE BOULEVARD Southbound I-5 NB RAMPS Westbound STATE COLLEGE BOULEVARD Northbound ANAHEIM WAY Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 5 355 2 362 68 24 17 109 38 135 5 178 0 0 0 0 649 07:30 7 347 7 361 74 34 25 133 49 139 13 201 0 0 0 0 695 07:45 4 368 2 374 85 33 28 146 62 180 12 254 0 0 0 0 774 08:00 5 327 4 336 93 23 27 143 36 159 13 208 0 0 0 0 687 Total Volume 21 1397 15 1433 320 114 97 531 185 613 43 841 0 0 0 0 2805 % App. Total 1.5 97.5 1 60.3 21.5 18.3 22 72.9 5.1 0 0 0 PHF .750 .949 .536 .958 .860 .838 .866 .909 .746 .851 .827 .828 .000 .000 .000 .000 .906 STATE COLLEGE BOULEVARD ANAHEIM WAY I-5 NB RAMPS STATE COLLEGE BOULEVARD Right 21 Thru 1397 Left 15 InOut Total 933 1433 2366 Right320 Thru114 Left97 OutTotalIn200 531 731 Left 43 Thru 613 Right 185 Out TotalIn 1494 841 2335 Left0 Thru0 Right0 TotalOutIn178 0 178 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-3 File Name : H1709042 Site Code : 00000000 Start Date : 9/26/2017 Page No : 3 City: ORANGE N-S Direction: STATE COLLEGE BOULEVARD E-W Direction: ANAHEIM WAY/I-5 NB RAMPS STATE COLLEGE BOULEVARD Southbound I-5 NB RAMPS Westbound STATE COLLEGE BOULEVARD Northbound ANAHEIM WAY Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 8 443 6 457 65 246 13 324 115 292 54 461 0 0 0 0 1242 17:15 6 354 5 365 54 233 19 306 104 287 57 448 0 0 0 0 1119 17:30 6 365 4 375 63 261 17 341 69 277 59 405 0 0 0 0 1121 17:45 1 343 2 346 72 224 8 304 95 233 35 363 0 0 0 0 1013 Total Volume 21 1505 17 1543 254 964 57 1275 383 1089 205 1677 0 0 0 0 4495 % App. Total 1.4 97.5 1.1 19.9 75.6 4.5 22.8 64.9 12.2 0 0 0 PHF .656 .849 .708 .844 .882 .923 .750 .935 .833 .932 .869 .909 .000 .000 .000 .000 .905 STATE COLLEGE BOULEVARD ANAHEIM WAY I-5 NB RAMPS STATE COLLEGE BOULEVARD Right 21 Thru 1505 Left 17 InOut Total 1343 1543 2886 Right254 Thru964 Left57 OutTotalIn400 1275 1675 Left 205 Thru 1089 Right 383 Out TotalIn 1562 1677 3239 Left0 Thru0 Right0 TotalOutIn1190 0 1190 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-4 File Name : H1709043 Site Code : 00000000 Start Date : 9/26/2017 Page No : 1 City: ORANGE N-S Direction: STATE COLLEGE BOULEVARD E-W Direction: I-5 SB RAMPS Groups Printed- Turning Movements STATE COLLEGE BOULEVARD Southbound FRONTAGE ROAD Westbound STATE COLLEGE BOULEVARD Northbound I-5 SB RAMPS Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 40 220 0 0 0 0 0 199 0 107 38 9 613 07:15 71 312 0 0 0 0 0 171 0 160 46 9 769 07:30 57 310 1 0 0 0 1 193 0 206 65 12 845 07:45 50 340 0 0 0 0 0 222 0 199 84 9 904 Total 218 1182 1 0 0 0 1 785 0 672 233 39 3131 08:00 42 246 0 0 0 0 1 201 0 212 59 8 769 08:15 52 267 0 0 0 0 1 182 0 247 70 10 829 08:30 60 289 0 0 0 0 1 185 0 188 49 15 787 08:45 53 229 0 0 0 0 0 185 0 110 62 8 647 Total 207 1031 0 0 0 0 3 753 0 757 240 41 3032 *** BREAK *** 16:00 77 207 0 0 0 0 3 330 0 67 34 17 735 16:15 86 227 0 0 0 0 4 343 0 70 35 11 776 16:30 107 282 0 0 0 0 5 367 0 75 36 10 882 16:45 93 265 0 0 0 0 7 340 0 75 40 9 829 Total 363 981 0 0 0 0 19 1380 0 287 145 47 3222 17:00 138 294 0 0 0 0 7 441 0 60 42 14 996 17:15 96 315 0 0 0 0 8 423 0 136 53 15 1046 17:30 85 295 0 0 0 0 4 380 0 151 38 15 968 17:45 61 280 0 0 0 0 5 369 0 152 41 18 926 Total 380 1184 0 0 0 0 24 1613 0 499 174 62 3936 Grand Total 1168 4378 1 0 0 0 47 4531 0 2215 792 189 13321 Apprch %21.1 78.9 0 0 0 0 1 99 0 69.3 24.8 5.9 Total %8.8 32.9 0 0 0 0 0.4 34 0 16.6 5.9 1.4 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-5 File Name : H1709043 Site Code : 00000000 Start Date : 9/26/2017 Page No : 2 City: ORANGE N-S Direction: STATE COLLEGE BOULEVARD E-W Direction: I-5 SB RAMPS STATE COLLEGE BOULEVARD Southbound FRONTAGE ROAD Westbound STATE COLLEGE BOULEVARD Northbound I-5 SB RAMPS Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 57 310 1 368 0 0 0 0 1 193 0 194 206 65 12 283 845 07:45 50 340 0 390 0 0 0 0 0 222 0 222 199 84 9 292 904 08:00 42 246 0 288 0 0 0 0 1 201 0 202 212 59 8 279 769 08:15 52 267 0 319 0 0 0 0 1 182 0 183 247 70 10 327 829 Total Volume 201 1163 1 1365 0 0 0 0 3 798 0 801 864 278 39 1181 3347 % App. Total 14.7 85.2 0.1 0 0 0 0.4 99.6 0 73.2 23.5 3.3 PHF .882 .855 .250 .875 .000 .000 .000 .000 .750 .899 .000 .902 .874 .827 .813 .903 .926 STATE COLLEGE BOULEVARD I-5 SB RAMPS FRONTAGE ROAD STATE COLLEGE BOULEVARD Right 201 Thru 1163 Left 1 InOut Total 837 1365 2202 Right0 Thru0 Left0 OutTotalIn282 0 282 Left 0 Thru 798 Right 3 Out TotalIn 2027 801 2828 Left39 Thru278 Right864 TotalOutIn201 1181 1382 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-6 File Name : H1709043 Site Code : 00000000 Start Date : 9/26/2017 Page No : 3 City: ORANGE N-S Direction: STATE COLLEGE BOULEVARD E-W Direction: I-5 SB RAMPS STATE COLLEGE BOULEVARD Southbound FRONTAGE ROAD Westbound STATE COLLEGE BOULEVARD Northbound I-5 SB RAMPS Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 138 294 0 432 0 0 0 0 7 441 0 448 60 42 14 116 996 17:15 96 315 0 411 0 0 0 0 8 423 0 431 136 53 15 204 1046 17:30 85 295 0 380 0 0 0 0 4 380 0 384 151 38 15 204 968 17:45 61 280 0 341 0 0 0 0 5 369 0 374 152 41 18 211 926 Total Volume 380 1184 0 1564 0 0 0 0 24 1613 0 1637 499 174 62 735 3936 % App. Total 24.3 75.7 0 0 0 0 1.5 98.5 0 67.9 23.7 8.4 PHF .688 .940 .000 .905 .000 .000 .000 .000 .750 .914 .000 .914 .821 .821 .861 .871 .941 STATE COLLEGE BOULEVARD I-5 SB RAMPS FRONTAGE ROAD STATE COLLEGE BOULEVARD Right 380 Thru 1184 Left 0 InOut Total 1675 1564 3239 Right0 Thru0 Left0 OutTotalIn198 0 198 Left 0 Thru 1613 Right 24 Out TotalIn 1683 1637 3320 Left62 Thru174 Right499 TotalOutIn380 735 1115 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-7 File Name : H1709002 Site Code : 00003874 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: CHAPMAN AVENUE Groups Printed- Turning Movements LEWIS STREET Southbound CHAPMAN AVENUE Westbound LEWIS STREET Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left U-Turn Right Thru Left U-Turn Right Thru Left U-Turn Right Thru Left U-Turn Int. Total 07:00 16 72 12 0 6 89 41 0 43 63 16 0 31 386 16 2 793 07:15 13 102 20 1 14 98 67 2 58 71 13 1 49 398 16 1 924 07:30 6 126 13 0 16 112 91 1 61 74 15 0 53 327 25 1 921 07:45 9 166 12 0 17 120 109 4 45 90 13 0 52 286 25 3 951 Total 44 466 57 1 53 419 308 7 207 298 57 1 185 1397 82 7 3589 08:00 11 140 8 0 19 132 87 4 53 75 20 1 64 345 30 5 994 08:15 9 128 13 0 18 119 70 0 49 73 24 0 67 345 33 4 952 08:30 9 123 18 0 15 113 71 0 38 58 35 0 40 334 21 3 878 08:45 12 113 17 1 13 104 42 3 41 57 16 0 30 277 26 1 753 Total 41 504 56 1 65 468 270 7 181 263 95 1 201 1301 110 13 3577 16:00 18 73 15 0 35 253 42 2 66 106 35 0 23 213 32 3 916 16:15 19 70 22 0 26 298 48 2 79 111 34 0 16 238 23 4 990 16:30 19 69 24 0 49 289 70 4 70 121 33 1 28 227 27 2 1033 16:45 19 97 20 1 49 263 56 1 76 107 52 0 36 258 27 1 1063 Total 75 309 81 1 159 1103 216 9 291 445 154 1 103 936 109 10 4002 17:00 15 79 16 1 50 272 67 0 105 128 49 0 30 250 22 5 1089 17:15 21 94 20 0 60 329 73 2 114 161 49 0 25 245 26 3 1222 17:30 22 98 18 0 60 299 64 0 88 129 44 0 27 243 21 10 1123 17:45 29 65 22 0 52 269 58 6 86 130 44 0 26 224 36 1 1048 Total 87 336 76 1 222 1169 262 8 393 548 186 0 108 962 105 19 4482 Grand Total 247 1615 270 4 499 3159 1056 31 1072 1554 492 3 597 4596 406 49 15650 Apprch %11.6 75.6 12.6 0.2 10.5 66.6 22.3 0.7 34.3 49.8 15.8 0.1 10.6 81.4 7.2 0.9 Total %1.6 10.3 1.7 0 3.2 20.2 6.7 0.2 6.8 9.9 3.1 0 3.8 29.4 2.6 0.3 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-8 File Name : H1709002 Site Code : 00003874 Start Date : 9/7/2017 Page No : 2 LEWIS STREET Southbound CHAPMAN AVENUE Westbound LEWIS STREET Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Right Thru Left U-Turn App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 6 126 13 0 145 16 112 91 1 220 61 74 15 0 150 07:45 9 166 12 0 187 17 120 109 4 250 45 90 13 0 148 52 286 25 3 366 951 08:00 11 140 8 0 159 19 132 87 4 242 53 75 20 1 149 64 345 30 5 444 994 08:15 9 128 13 0 150 18 119 70 0 207 49 73 24 0 146 67 33 449 952 Total Volume 35 560 46 0 641 70 483 357 9 919 208 312 72 1 593 236 1303 113 13 1665 3818 % App. Total 5.5 87.4 7.2 0 7.6 52.6 38.8 1 35.1 52.6 12.1 0.2 14.2 78.3 6.8 0.8 PHF .795 .843 .885 .000 .857 .921 .915 .819 .563 .919 .852 .867 .750 .250 .988 .881 .944 .856 .650 .927 .960 LEWIS STREET CHAPMAN AVENUE CHAPMAN AVENUE LEWIS STREET Right 35 Thru 560 Left 46 U-Turn 0 InOut Total 495 641 1136 Right70 Thru483 Left357 U-Turn9 OutTotalIn1557 919 2476 Left 72 Thru 312 Right 208 U-Turn 1 Out TotalIn 1153 593 1746 Left113 Thru1303 Right236 U-Turn13 TotalOutIn590 1665 2255 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-9 File Name : H1709002 Site Code : 00003874 Start Date : 9/7/2017 Page No : 3 LEWIS STREET Southbound CHAPMAN AVENUE Westbound LEWIS STREET Northbound CHAPMAN AVENUE Eastbound Start Time Righ t Thru Left U- Turn App. Total Righ t Thru Left U- Turn App. Total Righ t Thru Left U- Turn App. Total Righ t Thru Left U- Turn App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 19 97 20 1 137 49 263 56 1 369 76 107 52 0 235 36 258 27 1 322 1063 17:00 15 79 16 1 111 50 272 67 0 389 105 128 49 0 282 30 250 22 5 307 1089 17:15 21 94 20 0 135 60 329 73 2 464 114 161 324 1222 17:30 22 98 138 10 Total Volume 77 368 74 2 521 219 1163 260 3 1645 383 525 194 0 1102 118 996 96 19 1229 4497 % App. Total PHF .875 .939 .925 .500 .944 .913 .884 .890 .375 .886 .840 .815 .933 .000 .850 .819 .965 .889 .475 .954 .920 LEWIS STREET CHAPMAN AVENUE CHAPMAN AVENUE LEWIS STREET Right 77 Thru 368 Left 74 U-Turn 2 InOut Total 840 521 1361 Right219 Thru1163 Left260 U-Turn3 OutTotalIn1453 1645 3098 Left 194 Thru 525 Right 383 U-Turn 0 Out TotalIn 746 1102 1848 Left96 Thru996 Right118 U-Turn19 TotalOutIn1434 1229 2663 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-10 File Name : H1709003 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: MANCHESTER AVENUE E-W Direction: CHAPMAN AVENUE Groups Printed- Turning Movements MANCHESTER AVENUE Southbound CHAPMAN AVENUE Westbound MANCHESTER AVENUE Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 9 43 41 7 141 47 30 2 4 10 400 8 742 07:15 19 73 60 8 171 64 36 1 6 17 394 8 857 07:30 15 91 68 5 192 73 37 1 6 23 342 4 857 07:45 10 106 62 12 214 97 49 3 11 28 321 12 925 Total 53 313 231 32 718 281 152 7 27 78 1457 32 3381 08:00 14 66 32 4 217 92 45 0 7 28 355 5 865 08:15 14 51 45 5 198 73 28 4 13 27 348 10 816 08:30 7 51 42 6 180 60 32 1 8 16 361 7 771 08:45 14 37 26 5 174 52 33 2 6 10 287 3 649 Total 49 205 145 20 769 277 138 7 34 81 1351 25 3101 *** BREAK *** 16:00 12 11 23 12 310 35 115 9 30 20 287 19 883 16:15 34 15 41 8 323 33 79 2 25 25 316 11 912 16:30 12 25 30 12 321 30 106 5 36 22 337 10 946 16:45 23 23 35 13 328 43 86 12 19 26 352 18 978 Total 81 74 129 45 1282 141 386 28 110 93 1292 58 3719 17:00 27 27 36 10 336 37 116 12 47 30 348 11 1037 17:15 25 18 28 10 385 41 104 7 35 20 337 16 1026 17:30 33 19 48 2 324 39 89 7 31 26 334 19 971 17:45 13 20 44 6 365 38 70 6 31 38 283 16 930 Total 98 84 156 28 1410 155 379 32 144 114 1302 62 3964 Grand Total 281 676 661 125 4179 854 1055 74 315 366 5402 177 14165 Apprch %17.4 41.8 40.9 2.4 81 16.6 73.1 5.1 21.8 6.2 90.9 3 Total %2 4.8 4.7 0.9 29.5 6 7.4 0.5 2.2 2.6 38.1 1.2 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-11 File Name : H1709003 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: MANCHESTER AVENUE E-W Direction: CHAPMAN AVENUE MANCHESTER AVENUE Southbound CHAPMAN AVENUE Westbound MANCHESTER AVENUE Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 19 73 60 152 8 171 64 243 36 1 6 43 17 394 8 419 857 07:30 15 91 68 174 5 192 73 270 37 1 6 44 23 342 4 369 857 07:45 10 106 62 178 12 214 97 323 49 3 11 63 28 321 12 361 925 08:00 14 66 32 112 4 217 92 313 45 0 7 52 28 355 5 388 865 Total Volume 58 336 222 616 29 794 326 1149 167 5 30 202 96 1412 29 1537 3504 % App. Total 9.4 54.5 36 2.5 69.1 28.4 82.7 2.5 14.9 6.2 91.9 1.9 PHF .763 .792 .816 .865 .604 .915 .840 .889 .852 .417 .682 .802 .857 .896 .604 .917 .947 MANCHESTER AVENUE CHAPMAN AVENUE CHAPMAN AVENUE MANCHESTER AVENUE Right 58 Thru 336 Left 222 InOut Total 63 616 679 Right29 Thru794 Left326 OutTotalIn1801 1149 2950 Left 30 Thru 5 Right 167 Out TotalIn 758 202 960 Left29 Thru1412 Right96 TotalOutIn882 1537 2419 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-12 File Name : H1709003 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: MANCHESTER AVENUE E-W Direction: CHAPMAN AVENUE MANCHESTER AVENUE Southbound CHAPMAN AVENUE Westbound MANCHESTER AVENUE Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 23 23 35 81 13 328 43 384 86 12 19 117 26 352 18 396 978 17:00 27 27 36 90 10 336 37 383 116 12 47 175 30 348 11 389 1037 17:15 25 18 28 71 10 385 41 436 104 7 35 146 20 337 16 373 1026 17:30 33 19 48 100 2 324 39 365 89 7 31 127 26 334 19 379 971 Total Volume 108 87 147 342 35 1373 160 1568 395 38 132 565 102 1371 64 1537 4012 % App. Total 31.6 25.4 43 2.2 87.6 10.2 69.9 6.7 23.4 6.6 89.2 4.2 PHF .818 .806 .766 .855 .673 .892 .930 .899 .851 .792 .702 .807 .850 .974 .842 .970 .967 MANCHESTER AVENUE CHAPMAN AVENUE CHAPMAN AVENUE MANCHESTER AVENUE Right 108 Thru 87 Left 147 InOut Total 137 342 479 Right35 Thru1373 Left160 OutTotalIn1913 1568 3481 Left 132 Thru 38 Right 395 Out TotalIn 349 565 914 Left64 Thru1371 Right102 TotalOutIn1613 1537 3150 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-13 File Name : H1709004 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: CHAPMAN AVENUE Groups Printed- Turning Movements THE CITY DRIVE Southbound CHAPMAN AVENUE Westbound THE CITY DRIVE Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left Right Thru Left U-Turn Right Thru Left Right Thru Left U-Turn Int. Total 07:00 61 239 39 18 165 51 1 51 123 11 29 389 36 0 1213 07:15 74 313 29 27 188 80 2 72 137 14 53 406 34 0 1429 07:30 87 409 52 25 224 90 0 101 158 23 42 365 41 1 1618 07:45 104 326 51 29 250 98 3 62 143 26 53 330 47 1 1523 Total 326 1287 171 99 827 319 6 286 561 74 177 1490 158 2 5783 08:00 99 319 49 25 216 99 1 85 171 22 34 354 55 0 1529 08:15 90 296 41 18 190 102 6 74 138 13 50 359 47 0 1424 08:30 63 336 42 14 162 84 2 67 120 21 58 334 44 1 1348 08:45 59 206 34 13 169 73 1 70 126 18 40 286 44 0 1139 Total 311 1157 166 70 737 358 10 296 555 74 182 1333 190 1 5440 *** BREAK *** 16:00 83 172 19 25 262 70 3 115 186 30 15 316 83 0 1379 16:15 82 188 23 28 268 58 1 115 201 34 23 337 85 1 1444 16:30 76 197 38 25 292 80 0 143 207 40 21 330 108 0 1557 16:45 90 237 30 25 269 74 0 158 238 33 16 379 78 0 1627 Total 331 794 110 103 1091 282 4 531 832 137 75 1362 354 1 6007 17:00 89 218 29 41 283 69 1 172 277 42 22 376 98 0 1717 17:15 106 287 27 38 310 81 0 159 281 30 20 372 102 1 1814 17:30 97 248 41 30 241 99 1 135 275 29 24 374 83 2 1679 17:45 92 221 28 29 271 76 0 125 225 32 16 328 79 0 1522 Total 384 974 125 138 1105 325 2 591 1058 133 82 1450 362 3 6732 Grand Total 1352 4212 572 410 3760 1284 22 1704 3006 418 516 5635 1064 7 23962 Apprch %22 68.6 9.3 7.5 68.7 23.4 0.4 33.2 58.6 8.2 7.1 78 14.7 0.1 Total %5.6 17.6 2.4 1.7 15.7 5.4 0.1 7.1 12.5 1.7 2.2 23.5 4.4 0 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-14 File Name : H1709004 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: CHAPMAN AVENUE THE CITY DRIVE Southbound CHAPMAN AVENUE Westbound THE CITY DRIVE Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 74 313 29 416 27 188 80 2 297 72 137 14 223 53 406 34 0 493 1429 07:30 87 409 52 548 25 224 90 0 339 101 282 42 365 41 1 449 1618 07:45 104 326 51 481 29 250 98 3 380 62 143 26 08:00 99 319 49 467 25 216 99 1 341 85 171 22 278 34 354 55 0 443 1529 Total Volume 364 1367 181 1912 106 878 367 6 1357 320 609 85 1014 182 1455 177 2 1816 6099 % App. Total 19 71.5 9.5 7.8 64.7 27 0.4 31.6 60.1 8.4 10 80.1 9.7 0.1 PHF .875 .836 .870 .872 .914 .878 .927 .500 .893 .792 .890 .817 .899 .858 .896 .805 .500 .921 .942 THE CITY DRIVE CHAPMAN AVENUE CHAPMAN AVENUE THE CITY DRIVE Right 364 Thru 1367 Left 181 InOut Total 892 1912 2804 Right106 Thru878 Left367 U-Turn6 OutTotalIn1956 1357 3313 Left 85 Thru 609 Right 320 Out TotalIn 1916 1014 2930 Left177 Thru1455 Right182 U-Turn2 TotalOutIn1327 1816 3143 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-15 File Name : H1709004 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: CHAPMAN AVENUE THE CITY DRIVE Southbound CHAPMAN AVENUE Westbound THE CITY DRIVE Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 90 237 30 357 25 269 74 0 368 158 238 33 429 16 379 78 0 473 1627 17:00 89 218 29 336 41 283 69 1 394 172 42 491 22 376 98 0 496 1717 17:15 106 287 27 420 38 310 81 0 429 159 281 30 470 20 372 102 1 495 1814 17:30 97 248 41 386 30 241 99 1 371 135 275 29 439 24 374 83 2 483 1679 Total Volume 382 990 127 1499 134 1103 323 2 1562 624 1071 134 1829 82 1501 361 3 1947 6837 % App. Total 25.5 66 8.5 8.6 70.6 20.7 0.1 34.1 58.6 7.3 4.2 77.1 18.5 0.2 PHF .901 .862 .774 .892 .817 .890 .816 .500 .910 .907 .953 .798 .931 .854 .990 .885 .375 .981 .942 THE CITY DRIVE CHAPMAN AVENUE CHAPMAN AVENUE THE CITY DRIVE Right 382 Thru 990 Left 127 InOut Total 1566 1499 3065 Right134 Thru1103 Left323 U-Turn2 OutTotalIn2252 1562 3814 Left 134 Thru 1071 Right 624 Out TotalIn 1395 1829 3224 Left361 Thru1501 Right82 U-Turn3 TotalOutIn1619 1947 3566 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-16 File Name : H1709005 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: I-5 SB RAMPS E-W Direction: CHAPMAN AVENUE Groups Printed- Turning Movements FRONTAGE ROAD Southbound CHAPMAN AVENUE Westbound I-5 SB RAMPS Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 0 0 40 0 143 41 12 0 85 146 312 0 779 07:15 1 0 58 0 169 43 27 0 116 149 378 0 941 07:30 0 2 57 0 179 28 21 0 146 169 373 0 975 07:45 2 1 81 0 224 21 23 0 146 101 340 0 939 Total 3 3 236 0 715 133 83 0 493 565 1403 0 3634 08:00 2 0 52 0 198 36 25 0 152 135 369 0 969 08:15 2 2 43 0 175 29 16 0 134 123 355 0 879 08:30 2 1 76 0 145 24 14 0 111 125 286 0 784 08:45 0 1 41 0 124 20 22 0 74 124 288 0 694 Total 6 4 212 0 642 109 77 0 471 507 1298 0 3326 *** BREAK *** 16:00 2 2 42 0 266 50 14 0 95 208 270 0 949 16:15 1 0 20 0 270 52 15 0 80 222 292 0 952 16:30 0 3 28 0 274 65 20 0 121 217 294 0 1022 16:45 3 1 41 0 237 54 26 0 123 226 357 0 1068 Total 6 6 131 0 1047 221 75 0 419 873 1213 0 3991 17:00 4 2 44 0 286 74 19 0 103 234 347 0 1113 17:15 3 1 49 0 291 53 11 0 121 261 294 0 1084 17:30 3 2 39 0 276 46 15 0 95 199 332 0 1007 17:45 1 6 45 0 273 31 22 0 113 183 300 0 974 Total 11 11 177 0 1126 204 67 0 432 877 1273 0 4178 Grand Total 26 24 756 0 3530 667 302 0 1815 2822 5187 0 15129 Apprch %3.2 3 93.8 0 84.1 15.9 14.3 0 85.7 35.2 64.8 0 Total %0.2 0.2 5 0 23.3 4.4 2 0 12 18.7 34.3 0 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-17 File Name : H1709005 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: I-5 SB RAMPS E-W Direction: CHAPMAN AVENUE FRONTAGE ROAD Southbound CHAPMAN AVENUE Westbound I-5 SB RAMPS Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 1 0 58 59 0 169 43 212 27 0 116 143 149 378 0 527 941 07:30 0 2 57 59 0 179 28 207 21 0 146 167 169 373 0 542 975 07:45 2 1 81 84 0 224 21 245 23 0 146 169 101 340 0 441 939 08:00 2 0 52 54 0 198 36 234 25 0 152 177 135 369 0 504 969 Total Volume 5 3 248 256 0 770 128 898 96 0 560 656 554 1460 0 2014 3824 % App. Total 2 1.2 96.9 0 85.7 14.3 14.6 0 85.4 27.5 72.5 0 PHF .625 .375 .765 .762 .000 .859 .744 .916 .889 .000 .921 .927 .820 .966 .000 .929 .981 FRONTAGE ROAD CHAPMAN AVENUE CHAPMAN AVENUE I-5 SB RAMPS Right 5 Thru 3 Left 248 InOut Total 0 256 256 Right0 Thru770 Left128 OutTotalIn1804 898 2702 Left 560 Thru 0 Right 96 Out TotalIn 685 656 1341 Left0 Thru1460 Right554 TotalOutIn1335 2014 3349 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-18 File Name : H1709005 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: I-5 SB RAMPS E-W Direction: CHAPMAN AVENUE FRONTAGE ROAD Southbound CHAPMAN AVENUE Westbound I-5 SB RAMPS Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:30 16:30 0 3 28 31 0 274 65 339 20 0 121 141 217 294 0 511 1022 16:45 3 1 41 45 0 237 54 291 26 0 123 149 226 357 0 583 1068 17:00 4 2 44 50 0 286 74 360 19 0 103 122 234 347 0 581 1113 17:15 3 1 49 53 0 291 53 344 11 0 121 132 261 294 0 555 1084 Total Volume 10 7 162 179 0 1088 246 1334 76 0 468 544 938 1292 0 2230 4287 % App. Total 5.6 3.9 90.5 0 81.6 18.4 14 0 86 42.1 57.9 0 PHF .625 .583 .827 .844 .000 .935 .831 .926 .731 .000 .951 .913 .898 .905 .000 .956 .963 FRONTAGE ROAD CHAPMAN AVENUE CHAPMAN AVENUE I-5 SB RAMPS Right 10 Thru 7 Left 162 InOut Total 0 179 179 Right0 Thru1088 Left246 OutTotalIn1530 1334 2864 Left 468 Thru 0 Right 76 Out TotalIn 1191 544 1735 Left0 Thru1292 Right938 TotalOutIn1566 2230 3796 Peak Hour Begins at 16:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-19 File Name : H1709044 Site Code : 00000000 Start Date : 9/26/2017 Page No : 1 City: ORANGE N-S Direction: RAMPART AVENUE E-W Direction: CHAPMAN AVENUE Groups Printed- Turning Movements RAMPART AVENUE Southbound CHAPMAN AVENUE Westbound DEAD END Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left U-Turn Int. Total 07:00 17 0 15 6 167 0 0 0 0 0 330 20 9 564 07:15 29 0 14 4 209 0 0 0 0 0 415 32 5 708 07:30 29 0 17 11 214 0 0 0 0 0 364 21 9 665 07:45 40 0 25 12 275 0 0 0 0 0 482 24 4 862 Total 115 0 71 33 865 0 0 0 0 0 1591 97 27 2799 08:00 20 0 15 12 256 0 0 0 0 0 356 35 3 697 08:15 20 0 11 9 205 0 0 0 0 0 363 28 5 641 08:30 18 0 10 10 192 0 0 0 0 0 323 17 5 575 08:45 18 0 12 11 206 0 0 0 0 0 324 26 6 603 Total 76 0 48 42 859 0 0 0 0 0 1366 106 19 2516 *** BREAK *** 16:00 15 0 14 24 356 0 0 0 0 0 230 19 8 666 16:15 31 0 15 19 396 0 0 0 0 0 244 11 8 724 16:30 47 0 9 24 305 0 0 0 0 0 272 18 11 686 16:45 36 0 7 15 339 0 0 0 0 0 318 38 4 757 Total 129 0 45 82 1396 0 0 0 0 0 1064 86 31 2833 17:00 46 0 15 17 362 0 0 0 0 0 288 25 11 764 17:15 29 0 11 24 457 0 0 0 0 0 332 29 9 891 17:30 22 0 18 21 352 0 0 0 0 0 309 28 11 761 17:45 29 0 16 22 328 0 0 0 0 0 296 29 3 723 Total 126 0 60 84 1499 0 0 0 0 0 1225 111 34 3139 Grand Total 446 0 224 241 4619 0 0 0 0 0 5246 400 111 11287 Apprch %66.6 0 33.4 5 95 0 0 0 0 0 91.1 6.9 1.9 Total %4 0 2 2.1 40.9 0 0 0 0 0 46.5 3.5 1 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-20 File Name : H1709044 Site Code : 00000000 Start Date : 9/26/2017 Page No : 2 City: ORANGE N-S Direction: RAMPART AVENUE E-W Direction: CHAPMAN AVENUE RAMPART AVENUE Southbound CHAPMAN AVENUE Westbound DEAD END Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 29 0 14 43 4 209 0 213 0 0 0 0 0 415 32 5 452 708 07:30 29 0 17 46 11 214 0 225 0 0 0 0 0 364 21 9 394 665 07:45 40 0 25 65 12 275 0 287 0 0 0 0 0 482 24 4 510 862 08:00 20 0 15 35 12 256 0 268 0 0 0 0 0 356 35 3 394 697 Total Volume 118 0 71 189 39 954 0 993 0 0 0 0 0 1617 112 21 1750 2932 % App. Total 62.4 0 37.6 3.9 96.1 0 0 0 0 0 92.4 6.4 1.2 PHF .738 .000 .710 .727 .813 .867 .000 .865 .000 .000 .000 .000 .000 .839 .800 .583 .858 .850 RAMPART AVENUE CHAPMAN AVENUE CHAPMAN AVENUE DEAD END Right 118 Thru 0 Left 71 InOut Total 151 189 340 Right39 Thru954 Left0 OutTotalIn1688 993 2681 Left 0 Thru 0 Right 0 Out TotalIn 0 0 0 Left112 Thru1617 Right0 U-Turn21 TotalOutIn1072 1750 2822 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-21 File Name : H1709044 Site Code : 00000000 Start Date : 9/26/2017 Page No : 3 City: ORANGE N-S Direction: RAMPART AVENUE E-W Direction: CHAPMAN AVENUE RAMPART AVENUE Southbound CHAPMAN AVENUE Westbound DEAD END Northbound CHAPMAN AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 36 0 7 43 15 339 0 354 0 0 0 0 0 318 38 4 360 757 17:00 46 0 15 61 17 362 0 379 0 0 0 0 0 288 25 11 324 764 17:15 29 0 11 40 24 457 0 481 0 0 0 0 0 332 29 9 370 891 17:30 22 0 18 40 21 352 0 373 0 0 0 0 0 309 28 11 348 761 Total Volume 133 0 51 184 77 1510 0 1587 0 0 0 0 0 1247 120 35 1402 3173 % App. Total 72.3 0 27.7 4.9 95.1 0 0 0 0 0 88.9 8.6 2.5 PHF .723 .000 .708 .754 .802 .826 .000 .825 .000 .000 .000 .000 .000 .939 .789 .795 .947 .890 RAMPART AVENUE CHAPMAN AVENUE CHAPMAN AVENUE DEAD END Right 133 Thru 0 Left 51 InOut Total 197 184 381 Right77 Thru1510 Left0 OutTotalIn1298 1587 2885 Left 0 Thru 0 Right 0 Out TotalIn 0 0 0 Left120 Thru1247 Right0 U-Turn35 TotalOutIn1643 1402 3045 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-22 File Name : H1709006 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: MANCHESTER AVENUE E-W Direction: CITY BOULEVARD WEST Groups Printed- Turning Movements MANCHESTER AVENUE Southbound CITY BOULEVARD WEST Westbound MANCHESTER AVENUE Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left U-Turn Right Thru Left Right Thru Left U-Turn Right Thru Left Int. Total 07:00 22 65 4 0 4 1 3 0 13 2 0 1 0 18 133 07:15 32 89 16 0 2 4 3 0 20 0 0 4 0 23 193 07:30 40 97 21 0 7 2 2 4 17 2 0 1 1 20 214 07:45 53 121 24 1 7 1 7 8 26 2 1 2 2 24 279 Total 147 372 65 1 20 8 15 12 76 6 1 8 3 85 819 08:00 42 111 8 0 4 0 9 1 26 0 1 3 0 18 223 08:15 37 92 13 2 2 1 2 1 24 2 0 2 3 11 192 08:30 30 66 7 0 5 4 4 0 19 1 1 0 0 21 158 08:45 28 50 7 0 5 2 4 0 13 0 1 2 1 13 126 Total 137 319 35 2 16 7 19 2 82 3 3 7 4 63 699 *** BREAK *** 16:00 17 38 4 0 6 2 1 4 58 1 1 4 1 57 194 16:15 17 49 5 1 4 0 0 2 47 0 0 0 1 27 153 16:30 22 49 5 2 12 4 4 0 67 1 0 2 0 39 207 16:45 27 59 6 2 8 2 3 2 59 0 1 1 0 30 200 Total 83 195 20 5 30 8 8 8 231 2 2 7 2 153 754 17:00 30 64 4 2 6 5 3 4 80 3 2 3 6 61 273 17:15 31 50 0 0 6 3 4 2 59 1 0 1 1 50 208 17:30 18 60 4 2 5 2 1 6 55 0 0 2 2 52 209 17:45 23 65 3 0 8 4 2 2 57 0 0 1 0 28 193 Total 102 239 11 4 25 14 10 14 251 4 2 7 9 191 883 Grand Total 469 1125 131 12 91 37 52 36 640 15 8 29 18 492 3155 Apprch %27 64.8 7.5 0.7 50.6 20.6 28.9 5.2 91.6 2.1 1.1 5.4 3.3 91.3 Total %14.9 35.7 4.2 0.4 2.9 1.2 1.6 1.1 20.3 0.5 0.3 0.9 0.6 15.6 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-23 File Name : H1709006 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: MANCHESTER AVENUE E-W Direction: CITY BOULEVARD WEST MANCHESTER AVENUE Southbound CITY BOULEVARD WEST Westbound MANCHESTER AVENUE Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 32 89 16 0 137 2 4 3 9 0 20 0 0 20 4 0 23 27 193 07:30 40 97 21 0 158 7 2 2 11 4 17 2 07:45 53 121 24 1 199 7 1 7 15 8 26 2 1 37 2 2 24 28 279 08:00 42 111 8 0 161 4 0 9 13 1 26 0 1 28 3 0 18 21 223 Total Volume 167 418 69 1 655 20 7 21 48 13 89 4 2 108 10 3 85 98 909 % App. Total 25.5 63.8 10.5 0.2 41.7 14.6 43.8 12 82.4 3.7 1.9 10.2 3.1 86.7 PHF .788 .864 .719 .250 .823 .714 .438 .583 .800 .406 .856 .500 .500 .730 .625 .375 .885 .875 .815 MANCHESTER AVENUE CITY BOULEVARD WEST CITY BOULEVARD WEST MANCHESTER AVENUE Right 167 Thru 418 Left 69 U-Turn 1 InOut Total 194 655 849 Right20 Thru7 Left21 OutTotalIn85 48 133 Left 4 Thru 89 Right 13 U-Turn 2 Out TotalIn 449 108 557 Left85 Thru3 Right10 TotalOutIn178 98 276 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-24 File Name : H1709006 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: MANCHESTER AVENUE E-W Direction: CITY BOULEVARD WEST MANCHESTER AVENUE Southbound CITY BOULEVARD WEST Westbound MANCHESTER AVENUE Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left U-Turn App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 27 59 6 2 94 8 2 3 13 2 59 0 1 62 1 0 30 31 200 17:00 30 64 4 2 100 6 5 3 14 4 80 3 2 89 3 6 61 70 273 17:15 31 50 0 0 81 6 3 4 13 2 59 1 0 62 1 1 50 52 208 17:30 18 60 4 2 84 5 2 1 8 6 Total Volume 106 233 14 6 359 25 12 11 48 14 253 4 3 274 7 9 193 209 890 % App. Total 29.5 64.9 3.9 1.7 52.1 25 22.9 5.1 92.3 1.5 1.1 3.3 4.3 92.3 PHF .855 .910 .583 .750 .898 .781 .600 .688 .857 .583 .791 .333 .375 .770 .583 .375 .791 .746 .815 MANCHESTER AVENUE CITY BOULEVARD WEST CITY BOULEVARD WEST MANCHESTER AVENUE Right 106 Thru 233 Left 14 U-Turn 6 InOut Total 471 359 830 Right25 Thru12 Left11 OutTotalIn37 48 85 Left 4 Thru 253 Right 14 U-Turn 3 Out TotalIn 251 274 525 Left193 Thru9 Right7 TotalOutIn122 209 331 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-25 File Name : h1709007 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: CITY BLVD W / CITY WAY Groups Printed- Turning Movements CITY BOULEVARD Southbound THE CITY WAY Westbound CITY BOULEVARD Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 4 7 20 6 7 4 3 4 3 0 9 3 70 07:15 10 15 27 10 18 3 4 2 0 1 18 3 111 07:30 11 16 42 12 15 11 6 9 2 0 22 3 149 07:45 12 14 34 16 29 7 11 12 4 4 20 17 180 Total 37 52 123 44 69 25 24 27 9 5 69 26 510 08:00 16 10 33 22 31 12 5 9 3 1 14 6 162 08:15 11 15 29 8 13 8 8 5 3 3 18 7 128 08:30 7 7 20 8 19 9 8 5 2 2 8 2 97 08:45 8 7 20 11 14 6 11 5 2 5 13 5 107 Total 42 39 102 49 77 35 32 24 10 11 53 20 494 *** BREAK *** 16:00 14 21 21 6 19 26 17 10 7 5 44 5 195 16:15 15 16 16 7 30 20 20 9 5 6 45 9 198 16:30 14 21 31 11 25 28 22 14 9 5 59 7 246 16:45 14 26 18 10 33 34 28 6 4 3 49 9 234 Total 57 84 86 34 107 108 87 39 25 19 197 30 873 17:00 30 25 27 16 37 25 28 12 8 6 92 13 319 17:15 20 15 27 12 45 32 20 8 7 8 56 13 263 17:30 28 20 33 18 62 35 24 9 8 3 67 11 318 17:45 24 28 21 10 33 21 25 11 10 7 47 5 242 Total 102 88 108 56 177 113 97 40 33 24 262 42 1142 Grand Total 238 263 419 183 430 281 240 130 77 59 581 118 3019 Apprch %25.9 28.6 45.5 20.5 48.1 31.4 53.7 29.1 17.2 7.8 76.6 15.6 Total %7.9 8.7 13.9 6.1 14.2 9.3 7.9 4.3 2.6 2 19.2 3.9 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-26 File Name : h1709007 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: CITY BLVD W / CITY WAY CITY BOULEVARD Southbound THE CITY WAY Westbound CITY BOULEVARD Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 11 16 42 69 12 15 11 38 6 9 2 17 0 22 3 25 149 07:45 12 14 34 60 16 29 7 52 11 12 4 27 4 20 17 41 180 08:00 16 10 33 59 22 31 12 65 5 9 3 17 1 14 6 21 162 08:15 11 15 29 55 8 13 8 29 8 5 3 16 3 18 7 28 128 Total Volume 50 55 138 243 58 88 38 184 30 35 12 77 8 74 33 115 619 % App. Total 20.6 22.6 56.8 31.5 47.8 20.7 39 45.5 15.6 7 64.3 28.7 PHF .781 .859 .821 .880 .659 .710 .792 .708 .682 .729 .750 .713 .500 .841 .485 .701 .860 CITY BOULEVARD CITY BOULEVARD WEST THE CITY WAY CITY BOULEVARD Right 50 Thru 55 Left 138 InOut Total 126 243 369 Right58 Thru88 Left38 OutTotalIn242 184 426 Left 12 Thru 35 Right 30 Out TotalIn 101 77 178 Left33 Thru74 Right8 TotalOutIn150 115 265 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-27 File Name : h1709007 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: CITY BLVD W / CITY WAY CITY BOULEVARD Southbound THE CITY WAY Westbound CITY BOULEVARD Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 30 25 27 82 16 37 25 78 28 12 8 48 6 92 13 111 319 17:15 20 15 27 62 12 45 32 89 20 8 7 35 8 56 13 77 263 17:30 28 20 33 81 18 62 35 115 24 9 8 41 3 67 11 81 318 17:45 24 28 21 73 10 33 21 64 25 11 10 46 7 47 5 59 242 Total Volume 102 88 108 298 56 177 113 346 97 40 33 170 24 262 42 328 1142 % App. Total 34.2 29.5 36.2 16.2 51.2 32.7 57.1 23.5 19.4 7.3 79.9 12.8 PHF .850 .786 .818 .909 .778 .714 .807 .752 .866 .833 .825 .885 .750 .712 .808 .739 .895 CITY BOULEVARD CITY BOULEVARD WEST THE CITY WAY CITY BOULEVARD Right 102 Thru 88 Left 108 InOut Total 138 298 436 Right56 Thru177 Left113 OutTotalIn467 346 813 Left 33 Thru 40 Right 97 Out TotalIn 225 170 395 Left42 Thru262 Right24 TotalOutIn312 328 640 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-28 File Name : H1709008 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: THE CITY WAY Groups Printed- Turning Movements CITY BOULEVARD Southbound THE CITY WAY Westbound CITY BOULEVARD Northbound THE CITY WAY Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 7 3 6 0 10 1 0 0 0 0 4 15 46 07:15 11 3 9 1 19 3 2 0 0 0 13 22 83 07:30 20 1 11 3 15 2 3 2 0 3 5 10 75 07:45 29 8 11 2 23 8 4 1 0 2 29 20 137 Total 67 15 37 6 67 14 9 3 0 5 51 67 341 08:00 29 5 4 2 31 6 1 0 0 3 15 21 117 08:15 21 6 7 1 18 4 1 0 0 1 15 21 95 08:30 28 4 4 6 13 6 1 0 0 0 10 10 82 08:45 19 3 9 3 10 2 1 0 0 1 16 9 73 Total 97 18 24 12 72 18 4 0 0 5 56 61 367 *** BREAK *** 16:00 17 5 7 3 25 8 9 2 1 0 31 22 130 16:15 10 8 10 3 25 13 11 3 0 0 28 11 122 16:30 25 4 3 2 24 13 13 2 0 1 35 12 134 16:45 25 3 6 1 19 19 8 2 0 1 27 17 128 Total 77 20 26 9 93 53 41 9 1 2 121 62 514 17:00 33 3 14 5 49 9 12 5 0 1 66 23 220 17:15 23 4 6 10 33 16 10 6 1 1 46 15 171 17:30 13 1 7 4 39 26 11 4 0 2 46 22 175 17:45 9 5 4 6 27 27 7 4 0 1 33 15 138 Total 78 13 31 25 148 78 40 19 1 5 191 75 704 Grand Total 319 66 118 52 380 163 94 31 2 17 419 265 1926 Apprch %63.4 13.1 23.5 8.7 63.9 27.4 74 24.4 1.6 2.4 59.8 37.8 Total %16.6 3.4 6.1 2.7 19.7 8.5 4.9 1.6 0.1 0.9 21.8 13.8 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-29 File Name : H1709008 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: THE CITY WAY CITY BOULEVARD Southbound THE CITY WAY Westbound CITY BOULEVARD Northbound THE CITY WAY Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 29 8 11 48 2 23 8 33 4 1 0 5 2 29 20 51 137 08:00 29 5 4 38 2 31 6 39 1 0 0 1 3 15 21 39 117 08:15 21 6 7 34 1 18 4 23 1 0 0 1 1 15 21 37 95 08:30 28 4 4 36 6 13 6 25 1 0 0 1 0 10 10 20 82 Total Volume 107 23 26 156 11 85 24 120 7 1 0 8 6 69 72 147 431 % App. Total 68.6 14.7 16.7 9.2 70.8 20 87.5 12.5 0 4.1 46.9 49 PHF .922 .719 .591 .813 .458 .685 .750 .769 .438 .250 .000 .400 .500 .595 .857 .721 .786 CITY BOULEVARD THE CITY WAY THE CITY WAY CITY BOULEVARD Right 107 Thru 23 Left 26 InOut Total 84 156 240 Right11 Thru85 Left24 OutTotalIn102 120 222 Left 0 Thru 1 Right 7 Out TotalIn 53 8 61 Left72 Thru69 Right6 TotalOutIn192 147 339 Peak Hour Begins at 07:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-30 File Name : H1709008 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: THE CITY WAY CITY BOULEVARD Southbound THE CITY WAY Westbound CITY BOULEVARD Northbound THE CITY WAY Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 33 3 14 50 5 49 9 63 12 5 0 17 1 66 23 90 220 17:15 23 4 6 33 10 33 16 59 10 6 1 17 1 46 15 62 171 17:30 13 1 7 21 4 39 26 69 11 4 0 15 2 46 22 70 175 17:45 9 5 4 18 6 27 27 60 7 4 0 11 1 33 15 49 138 Total Volume 78 13 31 122 25 148 78 251 40 19 1 60 5 191 75 271 704 % App. Total 63.9 10.7 25.4 10 59 31.1 66.7 31.7 1.7 1.8 70.5 27.7 PHF .591 .650 .554 .610 .625 .755 .722 .909 .833 .792 .250 .882 .625 .723 .815 .753 .800 CITY BOULEVARD THE CITY WAY THE CITY WAY CITY BOULEVARD Right 78 Thru 13 Left 31 InOut Total 119 122 241 Right25 Thru148 Left78 OutTotalIn262 251 513 Left 1 Thru 19 Right 40 Out TotalIn 96 60 156 Left75 Thru191 Right5 TotalOutIn227 271 498 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-31 File Name : H1709009 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: THE CITY WAY/DAWN WAY Groups Printed- Turning Movements THE CITY DRIVE Southbound DAWN WAY Westbound THE CITY DRIVE Northbound THE CITY WAY Eastbound Start Time Right Thru Left U-Turn Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 13 277 22 1 15 3 1 19 170 6 22 5 8 562 07:15 22 353 38 0 40 3 16 30 187 9 30 9 13 750 07:30 27 396 42 3 87 4 26 23 146 14 39 16 13 836 07:45 47 349 49 1 22 1 13 50 269 14 38 14 16 883 Total 109 1375 151 5 164 11 56 122 772 43 129 44 50 3031 08:00 32 267 69 2 37 2 13 62 204 17 30 17 12 764 08:15 20 351 54 0 31 2 11 49 176 7 27 7 12 747 08:30 22 348 54 0 47 2 11 37 148 9 19 9 15 721 08:45 21 183 53 0 33 3 14 43 141 14 17 8 16 546 Total 95 1149 230 2 148 9 49 191 669 47 93 41 55 2778 *** BREAK *** 16:00 42 193 14 0 76 5 25 15 203 4 27 6 42 652 16:15 44 202 5 2 75 2 21 8 220 12 29 2 53 675 16:30 55 224 11 0 86 2 24 6 259 14 44 1 68 794 16:45 58 239 13 1 94 2 24 5 245 14 33 2 55 785 Total 199 858 43 3 331 11 94 34 927 44 133 11 218 2906 17:00 58 244 7 0 95 7 26 2 348 14 44 5 103 953 17:15 65 290 11 0 73 6 9 4 274 22 42 5 60 861 17:30 82 264 12 2 69 4 22 5 241 18 47 4 74 844 17:45 56 206 16 0 36 2 19 7 240 18 27 7 59 693 Total 261 1004 46 2 273 19 76 18 1103 72 160 21 296 3351 Grand Total 664 4386 470 12 916 50 275 365 3471 206 515 117 619 12066 Apprch %12 79.3 8.5 0.2 73.8 4 22.2 9 85.9 5.1 41.2 9.4 49.5 Total %5.5 36.4 3.9 0.1 7.6 0.4 2.3 3 28.8 1.7 4.3 1 5.1 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-32 File Name : H1709009 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: THE CITY WAY/DAWN WAY THE CITY DRIVE Southbound DAWN WAY Westbound THE CITY DRIVE Northbound THE CITY WAY Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 07:15 22 353 38 0 413 40 3 16 59 30 187 9 226 30 9 13 52 750 07:30 27 396 42 3 468 87 4 26 117 23 146 14 183 39 16 13 68 836 07:45 47 349 49 1 446 22 1 13 36 50 269 14 333 38 14 16 68 883 08:00 32 267 69 2 370 37 2 13 52 62 17 17 12 59 764 Total Volume 128 1365 198 6 1697 186 10 68 264 165 806 54 1025 137 56 54 247 3233 % App. Total 7.5 80.4 11.7 0.4 70.5 3.8 25.8 16.1 78.6 5.3 55.5 22.7 21.9 PHF .681 .862 .717 .500 .907 .534 .625 .654 .564 .665 .749 .794 .770 .878 .824 .844 .908 .915 THE CITY DRIVE THE CITY WAY DAWN WAY THE CITY DRIVE Right 128 Thru 1365 Left 198 U-Turn 6 InOut Total 1046 1697 2743 Right186 Thru10 Left68 OutTotalIn419 264 683 Left 54 Thru 806 Right 165 Out TotalIn 1570 1025 2595 Left54 Thru56 Right137 TotalOutIn192 247 439 Peak Hour Begins at 07:15 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-33 File Name : H1709009 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: THE CITY WAY/DAWN WAY THE CITY DRIVE Southbound DAWN WAY Westbound THE CITY DRIVE Northbound THE CITY WAY Eastbound Start Time Right Thru Left U-Turn App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 58 239 13 1 311 94 2 24 120 5 17:00 58 244 7 0 309 95 7 26 128 2 348 14 364 44 5 103 152 953 17:15 65 290 11 0 366 73 6 9 88 4 274 22 17:30 82 264 12 2 360 69 4 22 95 5 241 18 264 47 4 74 125 844 Total Volume 263 1037 43 3 1346 331 19 81 431 16 1108 68 1192 166 16 292 474 3443 % App. Total 19.5 77 3.2 0.2 76.8 4.4 18.8 1.3 93 5.7 35 3.4 61.6 PHF .802 .894 .827 .375 .919 .871 .679 .779 .842 .800 .796 .773 .819 .883 .800 .709 .780 .903 THE CITY DRIVE THE CITY WAY DAWN WAY THE CITY DRIVE Right 263 Thru 1037 Left 43 U-Turn 3 InOut Total 1731 1346 3077 Right331 Thru19 Left81 OutTotalIn75 431 506 Left 68 Thru 1108 Right 16 Out TotalIn 1284 1192 2476 Left292 Thru16 Right166 TotalOutIn350 474 824 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-34 File Name : H1709010 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: LAMPSON / METROPOLITAN Groups Printed- Turning Movements LEWIS STREET Southbound METROPOLITAN DRIVE Westbound LEWIS STREET Northbound LAMPSON AVENUE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 22 112 28 14 8 4 24 120 6 25 81 47 491 07:15 34 73 29 24 25 11 11 153 13 22 99 71 565 07:30 44 124 47 35 20 15 29 173 29 23 109 70 718 07:45 76 127 30 57 21 34 17 204 35 37 77 68 783 Total 176 436 134 130 74 64 81 650 83 107 366 256 2557 08:00 46 127 36 47 25 29 19 149 9 59 67 71 684 08:15 29 124 38 50 17 14 22 156 5 38 97 63 653 08:30 19 111 17 50 9 14 25 122 11 25 63 50 516 08:45 12 78 20 33 15 12 23 120 9 14 46 35 417 Total 106 440 111 180 66 69 89 547 34 136 273 219 2270 *** BREAK *** 16:00 42 96 22 16 66 35 19 134 18 14 48 31 541 16:15 46 107 20 28 74 19 14 126 17 16 36 39 542 16:30 65 130 24 28 97 37 15 143 24 13 41 32 649 16:45 61 126 29 24 88 42 13 168 27 13 39 36 666 Total 214 459 95 96 325 133 61 571 86 56 164 138 2398 17:00 77 167 28 40 115 65 28 153 23 17 37 45 795 17:15 70 120 23 30 101 56 8 145 37 18 36 40 684 17:30 81 121 23 42 116 48 8 135 31 12 41 36 694 17:45 58 100 23 18 96 39 15 147 17 30 45 52 640 Total 286 508 97 130 428 208 59 580 108 77 159 173 2813 Grand Total 782 1843 437 536 893 474 290 2348 311 376 962 786 10038 Apprch %25.5 60.2 14.3 28.2 46.9 24.9 9.8 79.6 10.5 17.7 45.3 37 Total %7.8 18.4 4.4 5.3 8.9 4.7 2.9 23.4 3.1 3.7 9.6 7.8 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-35 File Name : H1709010 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: LAMPSON / METROPOLITAN LEWIS STREET Southbound METROPOLITAN DRIVE Westbound LEWIS STREET Northbound LAMPSON AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 44 124 47 215 35 20 15 70 29 173 29 231 23 109 70 202 718 07:45 76 127 30 233 57 21 34 112 17 204 35 256 37 77 68 182 783 08:00 46 127 36 209 47 25 29 101 19 149 9 177 59 67 71 197 684 08:15 29 124 38 191 50 17 14 81 22 156 5 183 38 97 63 198 653 Total Volume 195 502 151 848 189 83 92 364 87 682 78 847 157 350 272 779 2838 % App. Total 23 59.2 17.8 51.9 22.8 25.3 10.3 80.5 9.2 20.2 44.9 34.9 PHF .641 .988 .803 .910 .829 .830 .676 .813 .750 .836 .557 .827 .665 .803 .958 .964 .906 LEWIS STREET LAMPSON AVENUE METROPOLITAN DRIVE LEWIS STREET Right 195 Thru 502 Left 151 InOut Total 1143 848 1991 Right189 Thru83 Left92 OutTotalIn588 364 952 Left 78 Thru 682 Right 87 Out TotalIn 751 847 1598 Left272 Thru350 Right157 TotalOutIn356 779 1135 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-36 File Name : H1709010 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: LAMPSON / METROPOLITAN LEWIS STREET Southbound METROPOLITAN DRIVE Westbound LEWIS STREET Northbound LAMPSON AVENUE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 61 126 29 216 24 88 42 154 13 168 27 208 13 39 36 88 666 17:00 77 167 28 272 40 115 65 220 28 153 23 204 17 37 45 99 795 17:15 70 120 23 213 30 101 56 187 8 145 37 190 18 36 40 94 684 17:30 81 121 23 225 42 116 48 206 8 135 31 174 12 41 36 89 694 Total Volume 289 534 103 926 136 420 211 767 57 601 118 776 60 153 157 370 2839 % App. Total 31.2 57.7 11.1 17.7 54.8 27.5 7.3 77.4 15.2 16.2 41.4 42.4 PHF .892 .799 .888 .851 .810 .905 .812 .872 .509 .894 .797 .933 .833 .933 .872 .934 .893 LEWIS STREET LAMPSON AVENUE METROPOLITAN DRIVE LEWIS STREET Right 289 Thru 534 Left 103 InOut Total 894 926 1820 Right136 Thru420 Left211 OutTotalIn313 767 1080 Left 118 Thru 601 Right 57 Out TotalIn 805 776 1581 Left157 Thru153 Right60 TotalOutIn827 370 1197 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-37 File Name : h1709011 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: CITY PARKWAY SOUTH E-W Direction: CITY BOULEVARD WEST Groups Printed- Turning Movements DEAD END Southbound CITY BOULEVARD WEST Westbound CITY PARKWAY SOUTH Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 0 0 0 0 3 5 32 0 31 8 4 0 83 07:15 0 0 0 0 0 2 33 0 32 9 4 0 80 07:30 0 0 0 0 4 4 39 0 26 6 8 0 87 07:45 0 0 0 0 6 2 42 0 43 12 13 0 118 Total 0 0 0 0 13 13 146 0 132 35 29 0 368 08:00 0 0 0 0 5 4 53 0 48 14 7 0 131 08:15 0 0 0 0 10 1 45 0 47 13 8 0 124 08:30 0 0 0 0 8 3 38 0 42 18 3 0 112 08:45 0 0 0 0 5 2 53 0 33 16 8 0 117 Total 0 0 0 0 28 10 189 0 170 61 26 0 484 *** BREAK *** 16:00 0 0 0 0 5 34 9 0 12 51 7 0 118 16:15 0 0 0 0 10 32 15 0 20 33 7 0 117 16:30 0 0 0 0 11 43 17 0 12 49 6 0 138 16:45 0 0 0 0 8 39 9 0 23 41 5 0 125 Total 0 0 0 0 34 148 50 0 67 174 25 0 498 17:00 0 0 0 0 18 61 23 0 39 76 7 0 224 17:15 0 0 0 0 21 44 11 0 40 69 9 0 194 17:30 0 0 0 0 16 36 13 0 20 75 8 0 168 17:45 0 0 0 0 21 44 21 0 36 49 8 0 179 Total 0 0 0 0 76 185 68 0 135 269 32 0 765 Grand Total 0 0 0 0 151 356 453 0 504 539 112 0 2115 Apprch %0 0 0 0 29.8 70.2 47.3 0 52.7 82.8 17.2 0 Total %0 0 0 0 7.1 16.8 21.4 0 23.8 25.5 5.3 0 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-38 File Name : h1709011 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: CITY PARKWAY SOUTH E-W Direction: CITY BOULEVARD WEST DEAD END Southbound CITY BOULEVARD WEST Westbound CITY PARKWAY SOUTH Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 0 0 0 0 0 6 2 8 42 0 43 85 12 13 0 25 118 08:00 0 0 0 0 0 5 4 9 53 0 48 101 14 7 0 21 131 08:15 0 0 0 0 0 10 1 11 45 0 47 92 13 8 0 21 124 08:30 0 0 0 0 0 8 3 11 38 0 42 80 18 3 0 21 112 Total Volume 0 0 0 0 0 29 10 39 178 0 180 358 57 31 0 88 485 % App. Total 0 0 0 0 74.4 25.6 49.7 0 50.3 64.8 35.2 0 PHF .000 .000 .000 .000 .000 .725 .625 .886 .840 .000 .938 .886 .792 .596 .000 .880 .926 DEAD END CITY BOULEVARD WEST CITY BOULEVARD WEST CITY PARKWAY SOUTH Right 0 Thru 0 Left 0 InOut Total 0 0 0 Right0 Thru29 Left10 OutTotalIn209 39 248 Left 180 Thru 0 Right 178 Out TotalIn 67 358 425 Left0 Thru31 Right57 TotalOutIn209 88 297 Peak Hour Begins at 07:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-39 File Name : h1709011 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: CITY PARKWAY SOUTH E-W Direction: CITY BOULEVARD WEST DEAD END Southbound CITY BOULEVARD WEST Westbound CITY PARKWAY SOUTH Northbound CITY BOULEVARD WEST Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 0 0 0 0 0 18 61 79 23 0 39 62 76 7 0 83 224 17:15 0 0 0 0 0 21 44 65 11 0 40 51 69 9 0 78 194 17:30 0 0 0 0 0 16 36 52 13 0 20 33 75 8 0 83 168 17:45 0 0 0 0 0 21 44 65 21 0 36 57 49 8 0 57 179 Total Volume 0 0 0 0 0 76 185 261 68 0 135 203 269 32 0 301 765 % App. Total 0 0 0 0 29.1 70.9 33.5 0 66.5 89.4 10.6 0 PHF .000 .000 .000 .000 .000 .905 .758 .826 .739 .000 .844 .819 .885 .889 .000 .907 .854 DEAD END CITY BOULEVARD WEST CITY BOULEVARD WEST CITY PARKWAY SOUTH Right 0 Thru 0 Left 0 InOut Total 0 0 0 Right0 Thru76 Left185 OutTotalIn100 261 361 Left 135 Thru 0 Right 68 Out TotalIn 454 203 657 Left0 Thru32 Right269 TotalOutIn211 301 512 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-40 File Name : H1709012 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: CITY PARKWAY E-W Direction: METROPOLITIAN DRIVE Groups Printed- Turning Movements CITY PARKWAY Southbound METROPOLITAN DRIVE Westbound DRIVEWAY Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 0 0 9 48 32 0 0 1 0 0 97 23 210 07:15 3 1 5 37 63 2 1 0 0 0 119 8 239 07:30 0 0 11 59 79 1 0 0 0 1 168 21 340 07:45 3 0 15 67 115 1 0 0 0 0 108 18 327 Total 6 1 40 211 289 4 1 1 0 1 492 70 1116 08:00 2 1 15 67 105 3 0 0 0 0 98 12 303 08:15 3 0 11 75 98 3 1 0 0 1 106 33 331 08:30 3 1 17 61 86 6 1 0 0 0 68 24 267 08:45 5 0 16 59 71 0 1 0 0 0 55 29 236 Total 13 2 59 262 360 12 3 0 0 1 327 98 1137 *** BREAK *** 16:00 11 1 69 30 88 0 6 0 0 0 79 18 302 16:15 12 0 58 25 96 1 3 0 0 0 60 17 272 16:30 20 1 51 29 99 0 1 0 0 0 79 20 300 16:45 13 0 90 28 95 1 3 1 2 1 75 24 333 Total 56 2 268 112 378 2 13 1 2 1 293 79 1207 17:00 22 0 105 27 113 0 4 0 1 0 86 26 384 17:15 20 0 102 31 125 0 3 0 1 0 75 14 371 17:30 27 0 90 26 134 1 2 0 0 0 61 21 362 17:45 15 0 71 31 112 0 3 0 0 0 60 20 312 Total 84 0 368 115 484 1 12 0 2 0 282 81 1429 Grand Total 159 5 735 700 1511 19 29 2 4 3 1394 328 4889 Apprch %17.7 0.6 81.8 31.4 67.8 0.9 82.9 5.7 11.4 0.2 80.8 19 Total %3.3 0.1 15 14.3 30.9 0.4 0.6 0 0.1 0.1 28.5 6.7 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-41 File Name : H1709012 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: CITY PARKWAY E-W Direction: METROPOLITIAN DRIVE CITY PARKWAY Southbound METROPOLITAN DRIVE Westbound DRIVEWAY Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 0 0 11 11 59 79 1 139 0 0 0 0 1 168 21 190 340 07:45 3 0 15 18 67 115 1 183 0 0 0 0 0 108 18 126 327 08:00 2 1 15 18 67 105 3 175 0 0 0 0 0 98 12 110 303 08:15 3 0 11 14 75 98 3 176 1 0 0 1 1 106 33 140 331 Total Volume 8 1 52 61 268 397 8 673 1 0 0 1 2 480 84 566 1301 % App. Total 13.1 1.6 85.2 39.8 59 1.2 100 0 0 0.4 84.8 14.8 PHF .667 .250 .867 .847 .893 .863 .667 .919 .250 .000 .000 .250 .500 .714 .636 .745 .957 CITY PARKWAY METROPOLITAN DRIVE METROPOLITAN DRIVE DRIVEWAY Right 8 Thru 1 Left 52 InOut Total 352 61 413 Right268 Thru397 Left8 OutTotalIn533 673 1206 Left 0 Thru 0 Right 1 Out TotalIn 11 1 12 Left84 Thru480 Right2 TotalOutIn405 566 971 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-42 File Name : H1709012 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: CITY PARKWAY E-W Direction: METROPOLITIAN DRIVE CITY PARKWAY Southbound METROPOLITAN DRIVE Westbound DRIVEWAY Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 13 0 90 103 28 95 1 124 3 1 2 6 1 75 24 100 333 17:00 22 0 105 127 27 113 0 140 4 0 1 5 0 86 26 112 384 17:15 20 0 102 122 31 125 0 156 3 0 1 4 0 75 14 89 371 17:30 27 0 90 117 26 134 1 161 2 0 0 2 0 61 21 82 362 Total Volume 82 0 387 469 112 467 2 581 12 1 4 17 1 297 85 383 1450 % App. Total 17.5 0 82.5 19.3 80.4 0.3 70.6 5.9 23.5 0.3 77.5 22.2 PHF .759 .000 .921 .923 .903 .871 .500 .902 .750 .250 .500 .708 .250 .863 .817 .855 .944 CITY PARKWAY METROPOLITAN DRIVE METROPOLITAN DRIVE DRIVEWAY Right 82 Thru 0 Left 387 InOut Total 198 469 667 Right112 Thru467 Left2 OutTotalIn696 581 1277 Left 4 Thru 1 Right 12 Out TotalIn 3 17 20 Left85 Thru297 Right1 TotalOutIn553 383 936 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-43 File Name : H1709013 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: SR-22 WB RAMP/DESIGNER D E-W Direction: METROPOLITAN DRIVE Groups Printed- Turning Movements DESIGNER DRIVE Southbound METROPOLITAN DRIVE Westbound SR-22 WB RAMPS Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 2 0 0 7 18 60 72 13 64 11 95 1 343 07:15 3 0 0 2 18 56 101 7 89 16 113 0 405 07:30 1 0 0 8 15 70 114 18 119 13 164 0 522 07:45 3 0 0 5 30 73 140 35 146 16 101 2 551 Total 9 0 0 22 81 259 427 73 418 56 473 3 1821 08:00 3 0 0 5 29 55 204 15 154 10 105 0 580 08:15 2 0 0 3 24 57 175 7 142 8 103 0 521 08:30 2 0 0 1 22 54 164 12 131 8 83 0 477 08:45 2 0 0 3 23 45 136 12 102 16 58 0 397 Total 9 0 0 12 98 211 679 46 529 42 349 0 1975 *** BREAK *** 16:00 15 0 0 6 18 122 58 14 88 23 115 1 460 16:15 6 0 0 7 32 110 56 12 98 24 105 0 450 16:30 10 0 0 7 30 156 58 8 54 20 123 1 467 16:45 10 0 0 5 36 137 42 12 90 37 126 1 496 Total 41 0 0 25 116 525 214 46 330 104 469 3 1873 17:00 10 0 0 4 46 159 39 20 80 52 146 1 557 17:15 9 0 0 6 39 179 45 18 108 41 138 1 584 17:30 8 0 0 5 42 149 84 13 109 30 127 0 567 17:45 12 0 0 7 30 107 60 18 107 30 95 2 468 Total 39 0 0 22 157 594 228 69 404 153 506 4 2176 Grand Total 98 0 0 81 452 1589 1548 234 1681 355 1797 10 7845 Apprch %100 0 0 3.8 21.3 74.9 44.7 6.8 48.5 16.4 83.1 0.5 Total %1.2 0 0 1 5.8 20.3 19.7 3 21.4 4.5 22.9 0.1 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-44 File Name : H1709013 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: SR-22 WB RAMP/DESIGNER D E-W Direction: METROPOLITAN DRIVE DESIGNER DRIVE Southbound METROPOLITAN DRIVE Westbound SR-22 WB RAMPS Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 1 0 0 1 8 15 70 93 114 18 119 251 13 164 0 177 522 07:45 3 0 0 3 5 30 73 108 140 35 146 321 16 101 2 119 551 08:00 3 0 0 3 5 29 55 89 204 15 154 373 10 105 0 115 580 08:15 2 0 0 2 3 24 57 84 175 7 142 324 8 103 0 111 521 Total Volume 9 0 0 9 21 98 255 374 633 75 561 1269 47 473 2 522 2174 % App. Total 100 0 0 5.6 26.2 68.2 49.9 5.9 44.2 9 90.6 0.4 PHF .750 .000 .000 .750 .656 .817 .873 .866 .776 .536 .911 .851 .734 .721 .250 .737 .937 DESIGNER DRIVE METROPOLITAN DRIVE METROPOLITAN DRIVE SR-22 WB RAMPS Right 9 Thru 0 Left 0 InOut Total 98 9 107 Right21 Thru98 Left255 OutTotalIn1106 374 1480 Left 561 Thru 75 Right 633 Out TotalIn 302 1269 1571 Left2 Thru473 Right47 TotalOutIn668 522 1190 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-45 File Name : H1709013 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: SR-22 WB RAMP/DESIGNER D E-W Direction: METROPOLITAN DRIVE DESIGNER DRIVE Southbound METROPOLITAN DRIVE Westbound SR-22 WB RAMPS Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 10 0 0 10 5 36 137 178 42 12 90 144 37 126 1 164 496 17:00 10 0 0 10 4 46 159 209 39 20 80 139 52 146 1 199 557 17:15 9 0 0 9 6 39 179 224 45 18 108 171 41 138 1 180 584 17:30 8 0 0 8 5 42 149 196 84 13 109 206 30 127 0 157 567 Total Volume 37 0 0 37 20 163 624 807 210 63 387 660 160 537 3 700 2204 % App. Total 100 0 0 2.5 20.2 77.3 31.8 9.5 58.6 22.9 76.7 0.4 PHF .925 .000 .000 .925 .833 .886 .872 .901 .625 .788 .888 .801 .769 .920 .750 .879 .943 DESIGNER DRIVE METROPOLITAN DRIVE METROPOLITAN DRIVE SR-22 WB RAMPS Right 37 Thru 0 Left 0 InOut Total 86 37 123 Right20 Thru163 Left624 OutTotalIn747 807 1554 Left 387 Thru 63 Right 210 Out TotalIn 784 660 1444 Left3 Thru537 Right160 TotalOutIn587 700 1287 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-46 File Name : h1709014 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: METROPOLITAN DRIVE Groups Printed- Turning Movements THE CITY DRIVE Southbound DEAD END Westbound THE CITY DRIVE Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 59 201 0 0 0 0 0 191 25 150 0 44 670 07:15 67 305 0 0 0 0 0 221 14 163 0 58 828 07:30 87 337 0 0 0 0 0 238 15 185 0 69 931 07:45 69 208 0 0 0 0 0 316 24 172 0 60 849 Total 282 1051 0 0 0 0 0 966 78 670 0 231 3278 08:00 65 302 0 0 0 0 0 278 25 181 0 120 971 08:15 59 275 0 0 0 0 0 248 24 166 0 109 881 08:30 57 303 0 0 0 0 0 181 18 152 0 94 805 08:45 52 159 0 0 0 0 0 163 18 121 0 85 598 Total 233 1039 0 0 0 0 0 870 85 620 0 408 3255 *** BREAK *** 16:00 108 187 0 0 0 0 0 179 24 140 0 38 676 16:15 127 167 0 0 0 0 0 218 23 127 0 34 696 16:30 158 205 0 0 0 0 0 212 29 129 0 51 784 16:45 153 209 0 0 0 0 0 268 35 139 0 28 832 Total 546 768 0 0 0 0 0 877 111 535 0 151 2988 17:00 178 250 0 0 0 0 0 309 46 140 0 31 954 17:15 162 228 0 0 0 0 0 288 41 158 0 36 913 17:30 158 202 0 0 0 0 0 278 48 150 0 58 894 17:45 103 180 0 0 0 0 0 280 37 125 0 36 761 Total 601 860 0 0 0 0 0 1155 172 573 0 161 3522 Grand Total 1662 3718 0 0 0 0 0 3868 446 2398 0 951 13043 Apprch %30.9 69.1 0 0 0 0 0 89.7 10.3 71.6 0 28.4 Total %12.7 28.5 0 0 0 0 0 29.7 3.4 18.4 0 7.3 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-47 File Name : h1709014 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: METROPOLITAN DRIVE THE CITY DRIVE Southbound DEAD END Westbound THE CITY DRIVE Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 87 337 0 424 0 0 0 0 0 238 15 253 185 0 69 254 931 07:45 69 208 0 277 0 0 0 0 0 316 24 340 172 0 60 232 849 08:00 65 302 0 367 0 0 0 0 0 278 25 303 181 0 120 301 971 08:15 59 275 0 334 0 0 0 0 0 248 24 272 166 0 109 275 881 Total Volume 280 1122 0 1402 0 0 0 0 0 1080 88 1168 704 0 358 1062 3632 % App. Total 20 80 0 0 0 0 0 92.5 7.5 66.3 0 33.7 PHF .805 .832 .000 .827 .000 .000 .000 .000 .000 .854 .880 .859 .951 .000 .746 .882 .935 THE CITY DRIVE METROPOLITAN DRIVE DEAD END THE CITY DRIVE Right 280 Thru 1122 Left 0 InOut Total 1438 1402 2840 Right0 Thru0 Left0 OutTotalIn0 0 0 Left 88 Thru 1080 Right 0 Out TotalIn 1826 1168 2994 Left358 Thru0 Right704 TotalOutIn368 1062 1430 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-48 File Name : h1709014 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: METROPOLITAN DRIVE THE CITY DRIVE Southbound DEAD END Westbound THE CITY DRIVE Northbound METROPOLITAN DRIVE Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 153 209 0 362 0 0 0 0 0 268 35 303 139 0 28 167 832 17:00 178 250 0 428 0 0 0 0 0 309 46 355 140 0 31 171 954 17:15 162 228 0 390 0 0 0 0 0 288 41 329 158 0 36 194 913 17:30 158 202 0 360 0 0 0 0 0 278 48 326 150 0 58 208 894 Total Volume 651 889 0 1540 0 0 0 0 0 1143 170 1313 587 0 153 740 3593 % App. Total 42.3 57.7 0 0 0 0 0 87.1 12.9 79.3 0 20.7 PHF .914 .889 .000 .900 .000 .000 .000 .000 .000 .925 .885 .925 .929 .000 .659 .889 .942 THE CITY DRIVE METROPOLITAN DRIVE DEAD END THE CITY DRIVE Right 651 Thru 889 Left 0 InOut Total 1296 1540 2836 Right0 Thru0 Left0 OutTotalIn0 0 0 Left 170 Thru 1143 Right 0 Out TotalIn 1476 1313 2789 Left153 Thru0 Right587 TotalOutIn821 740 1561 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-49 File Name : H1709045 Site Code : 00000000 Start Date : 9/26/2017 Page No : 1 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: SR-22 EB RAMPS Groups Printed- Turning Movements THE CITY DRIVE Southbound DRIVEWAY Westbound THE CITY DRIVE Northbound SR-22 EB RAMPS Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 105 201 4 0 1 0 0 130 64 8 0 81 594 07:15 193 221 12 3 1 0 4 155 82 13 4 67 755 07:30 203 279 17 1 4 0 1 155 73 8 4 78 823 07:45 176 270 39 1 0 0 2 177 50 10 4 126 855 Total 677 971 72 5 6 0 7 617 269 39 12 352 3027 08:00 148 253 21 1 0 1 4 142 36 17 4 114 741 08:15 212 220 25 0 1 0 4 166 35 20 7 98 788 08:30 169 221 19 2 3 0 2 146 35 24 4 88 713 08:45 75 202 11 1 1 1 2 100 21 24 4 113 555 Total 604 896 76 4 5 2 12 554 127 85 19 413 2797 *** BREAK *** 16:00 135 180 4 8 11 1 1 126 55 22 1 74 618 16:15 142 155 7 5 10 2 1 138 59 33 1 75 628 16:30 158 230 1 6 13 3 0 166 51 24 0 79 731 16:45 127 192 3 6 9 0 2 172 48 28 1 97 685 Total 562 757 15 25 43 6 4 602 213 107 3 325 2662 17:00 159 249 2 18 34 8 1 204 64 45 0 100 884 17:15 163 218 2 5 21 3 0 220 44 31 1 117 825 17:30 174 226 0 10 16 7 4 211 51 38 0 133 870 17:45 155 205 2 2 12 1 2 198 55 30 1 88 751 Total 651 898 6 35 83 19 7 833 214 144 2 438 3330 Grand Total 2494 3522 169 69 137 27 30 2606 823 375 36 1528 11816 Apprch %40.3 56.9 2.7 29.6 58.8 11.6 0.9 75.3 23.8 19.3 1.9 78.8 Total %21.1 29.8 1.4 0.6 1.2 0.2 0.3 22.1 7 3.2 0.3 12.9 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-50 File Name : H1709045 Site Code : 00000000 Start Date : 9/26/2017 Page No : 2 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: SR-22 EB RAMPS THE CITY DRIVE Southbound DRIVEWAY Westbound THE CITY DRIVE Northbound SR-22 EB RAMPS Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 203 279 17 499 1 4 0 5 1 155 73 229 8 4 78 90 823 07:45 176 270 39 485 1 0 0 1 2 177 50 229 10 4 126 140 855 08:00 148 253 21 422 1 0 1 2 4 142 36 182 17 4 114 135 741 08:15 212 220 25 457 0 1 0 1 4 166 35 205 20 7 98 125 788 Total Volume 739 1022 102 1863 3 5 1 9 11 640 194 845 55 19 416 490 3207 % App. Total 39.7 54.9 5.5 33.3 55.6 11.1 1.3 75.7 23 11.2 3.9 84.9 PHF .871 .916 .654 .933 .750 .313 .250 .450 .688 .904 .664 .922 .688 .679 .825 .875 .938 THE CITY DRIVE SR-22 EB RAMPS DRIVEWAY THE CITY DRIVE Right 739 Thru 1022 Left 102 InOut Total 1059 1863 2922 Right3 Thru5 Left1 OutTotalIn132 9 141 Left 194 Thru 640 Right 11 Out TotalIn 1078 845 1923 Left416 Thru19 Right55 TotalOutIn938 490 1428 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-51 File Name : H1709045 Site Code : 00000000 Start Date : 9/26/2017 Page No : 3 City: ORANGE N-S Direction: THE CITY DRIVE E-W Direction: SR-22 EB RAMPS THE CITY DRIVE Southbound DRIVEWAY Westbound THE CITY DRIVE Northbound SR-22 EB RAMPS Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 17:00 17:00 159 249 2 410 18 34 8 60 1 204 64 269 45 0 100 145 884 17:15 163 218 2 383 5 21 3 29 0 220 44 264 31 1 117 149 825 17:30 174 226 0 400 10 16 7 33 4 211 51 266 38 0 133 171 870 17:45 155 205 2 362 2 12 1 15 2 198 55 255 30 1 88 119 751 Total Volume 651 898 6 1555 35 83 19 137 7 833 214 1054 144 2 438 584 3330 % App. Total 41.9 57.7 0.4 25.5 60.6 13.9 0.7 79 20.3 24.7 0.3 75 PHF .935 .902 .750 .948 .486 .610 .594 .571 .438 .947 .836 .980 .800 .500 .823 .854 .942 THE CITY DRIVE SR-22 EB RAMPS DRIVEWAY THE CITY DRIVE Right 651 Thru 898 Left 6 InOut Total 1306 1555 2861 Right35 Thru83 Left19 OutTotalIn15 137 152 Left 214 Thru 833 Right 7 Out TotalIn 1061 1054 2115 Left438 Thru2 Right144 TotalOutIn948 584 1532 Peak Hour Begins at 17:00 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-52 File Name : H1709015 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: PROJECT DRIVEWAY A Groups Printed- Turning Movements LEWIS STREET Southbound PROJECT DRIVEWAY A Westbound LEWIS STREET Northbound DRIVEWAY Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 24 146 0 6 0 2 0 130 7 3 0 8 326 07:15 38 182 1 1 0 1 0 147 7 1 0 0 378 07:30 49 241 0 2 0 3 0 158 8 0 0 1 462 07:45 63 263 0 2 0 1 0 177 2 0 0 1 509 Total 174 832 1 11 0 7 0 612 24 4 0 10 1675 08:00 21 245 0 3 0 2 0 149 1 0 0 1 422 08:15 31 233 0 4 0 3 0 144 3 2 0 3 423 08:30 22 195 0 2 0 1 0 142 5 0 0 3 370 08:45 13 173 0 3 0 1 0 109 4 0 0 0 303 Total 87 846 0 12 0 7 0 544 13 2 0 7 1518 *** BREAK *** 16:00 4 136 0 3 0 0 0 206 0 7 0 17 373 16:15 10 141 0 0 0 0 0 215 2 9 0 15 392 16:30 6 169 0 0 0 2 0 214 3 9 0 13 416 16:45 7 179 0 0 0 0 0 226 1 10 0 20 443 Total 27 625 0 3 0 2 0 861 6 35 0 65 1624 17:00 16 172 0 1 0 0 0 270 3 13 0 13 488 17:15 8 161 0 1 0 1 0 269 2 12 0 14 468 17:30 4 183 0 3 0 2 0 254 3 11 0 20 480 17:45 5 158 0 1 0 0 0 206 2 3 0 6 381 Total 33 674 0 6 0 3 0 999 10 39 0 53 1817 Grand Total 321 2977 1 32 0 19 0 3016 53 80 0 135 6634 Apprch %9.7 90.2 0 62.7 0 37.3 0 98.3 1.7 37.2 0 62.8 Total %4.8 44.9 0 0.5 0 0.3 0 45.5 0.8 1.2 0 2 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-53 File Name : H1709015 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: PROJECT DRIVEWAY A LEWIS STREET Southbound PROJECT DRIVEWAY A Westbound LEWIS STREET Northbound DRIVEWAY Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 49 241 0 290 2 0 3 5 0 158 8 166 0 0 1 1 462 07:45 63 263 0 326 2 0 1 3 0 177 2 179 0 0 1 1 509 08:00 21 245 0 266 3 0 2 5 0 149 1 150 0 0 1 1 422 08:15 31 233 0 264 4 0 3 7 0 144 3 147 2 0 3 5 423 Total Volume 164 982 0 1146 11 0 9 20 0 628 14 642 2 0 6 8 1816 % App. Total 14.3 85.7 0 55 0 45 0 97.8 2.2 25 0 75 PHF .651 .933 .000 .879 .688 .000 .750 .714 .000 .887 .438 .897 .250 .000 .500 .400 .892 LEWIS STREET DRIVEWAY PROJECT DRIVEWAY A LEWIS STREET Right 164 Thru 982 Left 0 InOut Total 645 1146 1791 Right11 Thru0 Left9 OutTotalIn0 20 20 Left 14 Thru 628 Right 0 Out TotalIn 993 642 1635 Left6 Thru0 Right2 TotalOutIn178 8 186 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-54 File Name : H1709015 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: PROJECT DRIVEWAY A LEWIS STREET Southbound PROJECT DRIVEWAY A Westbound LEWIS STREET Northbound DRIVEWAY Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 7 179 0 186 0 0 0 0 0 226 1 227 10 0 20 30 443 17:00 16 172 0 188 1 0 0 1 0 270 3 273 13 0 13 26 488 17:15 8 161 0 169 1 0 1 2 0 269 2 271 12 0 14 26 468 17:30 4 183 0 187 3 0 2 5 0 254 3 257 11 0 20 31 480 Total Volume 35 695 0 730 5 0 3 8 0 1019 9 1028 46 0 67 113 1879 % App. Total 4.8 95.2 0 62.5 0 37.5 0 99.1 0.9 40.7 0 59.3 PHF .547 .949 .000 .971 .417 .000 .375 .400 .000 .944 .750 .941 .885 .000 .838 .911 .963 LEWIS STREET DRIVEWAY PROJECT DRIVEWAY A LEWIS STREET Right 35 Thru 695 Left 0 InOut Total 1091 730 1821 Right5 Thru0 Left3 OutTotalIn0 8 8 Left 9 Thru 1019 Right 0 Out TotalIn 744 1028 1772 Left67 Thru0 Right46 TotalOutIn44 113 157 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-55 File Name : H1709016 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: PROJECT DRIVEWAY B Groups Printed- Turning Movements LEWIS STREET Southbound PROJECT DRIVEWAY B Westbound LEWIS STREET Northbound DEAD END Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 0 147 0 0 0 0 2 139 0 0 0 0 288 07:15 0 186 1 0 0 0 0 156 0 0 0 0 343 07:30 0 250 1 1 0 0 2 163 0 0 0 0 417 07:45 0 257 2 2 0 1 0 175 0 0 0 0 437 Total 0 840 4 3 0 1 4 633 0 0 0 0 1485 08:00 0 245 2 0 0 0 0 151 0 0 0 0 398 08:15 0 243 2 0 0 1 2 148 0 0 0 0 396 08:30 0 197 0 0 0 0 0 145 0 0 0 0 342 08:45 0 166 2 1 0 0 1 113 0 0 0 0 283 Total 0 851 6 1 0 1 3 557 0 0 0 0 1419 *** BREAK *** 16:00 0 144 1 0 0 0 1 203 0 0 0 0 349 16:15 0 134 3 2 0 0 2 219 0 0 0 0 360 16:30 0 187 2 2 0 0 1 211 0 0 0 0 403 16:45 0 189 1 0 0 0 1 229 0 0 0 0 420 Total 0 654 7 4 0 0 5 862 0 0 0 0 1532 17:00 0 186 0 0 0 0 2 292 0 0 0 0 480 17:15 0 170 3 1 0 0 3 253 0 0 0 0 430 17:30 0 193 4 0 0 0 5 259 0 0 0 0 461 17:45 0 156 5 2 0 0 2 202 0 0 0 0 367 Total 0 705 12 3 0 0 12 1006 0 0 0 0 1738 Grand Total 0 3050 29 11 0 2 24 3058 0 0 0 0 6174 Apprch %0 99.1 0.9 84.6 0 15.4 0.8 99.2 0 0 0 0 Total %0 49.4 0.5 0.2 0 0 0.4 49.5 0 0 0 0 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-56 File Name : H1709016 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: PROJECT DRIVEWAY B LEWIS STREET Southbound PROJECT DRIVEWAY B Westbound LEWIS STREET Northbound DEAD END Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 07:30 0 250 1 251 1 0 0 1 2 163 0 165 0 0 0 0 417 07:45 0 257 2 259 2 0 1 3 0 175 0 175 0 0 0 0 437 08:00 0 245 2 247 0 0 0 0 0 151 0 151 0 0 0 0 398 08:15 0 243 2 245 0 0 1 1 2 148 0 150 0 0 0 0 396 Total Volume 0 995 7 1002 3 0 2 5 4 637 0 641 0 0 0 0 1648 % App. Total 0 99.3 0.7 60 0 40 0.6 99.4 0 0 0 0 PHF .000 .968 .875 .967 .375 .000 .500 .417 .500 .910 .000 .916 .000 .000 .000 .000 .943 LEWIS STREET DEAD END PROJECT DRIVEWAY B LEWIS STREET Right 0 Thru 995 Left 7 InOut Total 640 1002 1642 Right3 Thru0 Left2 OutTotalIn11 5 16 Left 0 Thru 637 Right 4 Out TotalIn 997 641 1638 Left0 Thru0 Right0 TotalOutIn0 0 0 Peak Hour Begins at 07:30 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-57 File Name : H1709016 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: LEWIS STREET E-W Direction: PROJECT DRIVEWAY B LEWIS STREET Southbound PROJECT DRIVEWAY B Westbound LEWIS STREET Northbound DEAD END Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 0 189 1 190 0 0 0 0 1 229 0 230 0 0 0 0 420 17:00 0 186 0 186 0 0 0 0 2 292 0 294 0 0 0 0 480 17:15 0 170 3 173 1 0 0 1 3 253 0 256 0 0 0 0 430 17:30 0 193 4 197 0 0 0 0 5 259 0 264 0 0 0 0 461 Total Volume 0 738 8 746 1 0 0 1 11 1033 0 1044 0 0 0 0 1791 % App. Total 0 98.9 1.1 100 0 0 1.1 98.9 0 0 0 0 PHF .000 .956 .500 .947 .250 .000 .000 .250 .550 .884 .000 .888 .000 .000 .000 .000 .933 LEWIS STREET DEAD END PROJECT DRIVEWAY B LEWIS STREET Right 0 Thru 738 Left 8 InOut Total 1034 746 1780 Right1 Thru0 Left0 OutTotalIn19 1 20 Left 0 Thru 1033 Right 11 Out TotalIn 738 1044 1782 Left0 Thru0 Right0 TotalOutIn0 0 0 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-58 File Name : H1709017 Site Code : 00000000 Start Date : 9/7/2017 Page No : 1 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: PROJECT DRIVEWAY C Groups Printed- Turning Movements CITY BOULEVARD Southbound DEAD END Westbound CITY BOULEVARD Northbound PROJECT DRIVEWAY C Eastbound Start Time Right Thru Left Right Thru Left Right Thru Left Right Thru Left Int. Total 07:00 4 6 0 0 0 0 0 15 0 10 0 17 52 07:15 7 12 0 0 0 0 0 21 0 12 0 19 71 07:30 6 17 0 0 0 0 0 12 3 14 0 17 69 07:45 6 34 0 0 0 0 0 20 3 13 0 21 97 Total 23 69 0 0 0 0 0 68 6 49 0 74 289 08:00 5 16 0 0 0 0 0 19 4 12 0 18 74 08:15 6 27 0 0 0 0 0 14 8 9 0 10 74 08:30 9 25 0 0 0 0 0 11 4 11 0 17 77 08:45 4 20 0 0 0 0 0 10 2 10 0 11 57 Total 24 88 0 0 0 0 0 54 18 42 0 56 282 *** BREAK *** 16:00 14 23 0 0 0 0 0 23 4 2 0 8 74 16:15 5 23 0 0 0 0 0 8 8 5 0 5 54 16:30 14 28 0 0 0 0 0 12 6 4 0 5 69 16:45 13 30 0 0 0 0 0 11 10 5 0 5 74 Total 46 104 0 0 0 0 0 54 28 16 0 23 271 17:00 19 49 0 0 0 0 0 25 5 3 0 7 108 17:15 18 29 0 0 0 0 0 19 12 4 0 8 90 17:30 16 15 0 0 0 0 0 26 5 4 0 8 74 17:45 19 15 0 0 0 0 0 15 9 2 0 14 74 Total 72 108 0 0 0 0 0 85 31 13 0 37 346 Grand Total 165 369 0 0 0 0 0 261 83 120 0 190 1188 Apprch %30.9 69.1 0 0 0 0 0 75.9 24.1 38.7 0 61.3 Total %13.9 31.1 0 0 0 0 0 22 7 10.1 0 16 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-59 File Name : H1709017 Site Code : 00000000 Start Date : 9/7/2017 Page No : 2 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: PROJECT DRIVEWAY C CITY BOULEVARD Southbound DEAD END Westbound CITY BOULEVARD Northbound PROJECT DRIVEWAY C Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 6 34 0 40 0 0 0 0 0 20 3 23 13 0 21 34 97 08:00 5 16 0 21 0 0 0 0 0 19 4 23 12 0 18 30 74 08:15 6 27 0 33 0 0 0 0 0 14 8 22 9 0 10 19 74 08:30 9 25 0 34 0 0 0 0 0 11 4 15 11 0 17 28 77 Total Volume 26 102 0 128 0 0 0 0 0 64 19 83 45 0 66 111 322 % App. Total 20.3 79.7 0 0 0 0 0 77.1 22.9 40.5 0 59.5 PHF .722 .750 .000 .800 .000 .000 .000 .000 .000 .800 .594 .902 .865 .000 .786 .816 .830 CITY BOULEVARD PROJECT DRIVEWAY C DEAD END CITY BOULEVARD Right 26 Thru 102 Left 0 InOut Total 130 128 258 Right0 Thru0 Left0 OutTotalIn0 0 0 Left 19 Thru 64 Right 0 Out TotalIn 147 83 230 Left66 Thru0 Right45 TotalOutIn45 111 156 Peak Hour Begins at 07:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-60 File Name : H1709017 Site Code : 00000000 Start Date : 9/7/2017 Page No : 3 City: ORANGE N-S Direction: CITY BOULEVARD E-W Direction: PROJECT DRIVEWAY C CITY BOULEVARD Southbound DEAD END Westbound CITY BOULEVARD Northbound PROJECT DRIVEWAY C Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:45 16:45 13 30 0 43 0 0 0 0 0 11 10 21 5 0 5 10 74 17:00 19 49 0 68 0 0 0 0 0 25 5 30 3 0 7 10 108 17:15 18 29 0 47 0 0 0 0 0 19 12 31 4 0 8 12 90 17:30 16 15 0 31 0 0 0 0 0 26 5 31 4 0 8 12 74 Total Volume 66 123 0 189 0 0 0 0 0 81 32 113 16 0 28 44 346 % App. Total 34.9 65.1 0 0 0 0 0 71.7 28.3 36.4 0 63.6 PHF .868 .628 .000 .695 .000 .000 .000 .000 .000 .779 .667 .911 .800 .000 .875 .917 .801 CITY BOULEVARD PROJECT DRIVEWAY C DEAD END CITY BOULEVARD Right 66 Thru 123 Left 0 InOut Total 109 189 298 Right0 Thru0 Left0 OutTotalIn0 0 0 Left 32 Thru 81 Right 0 Out TotalIn 139 113 252 Left28 Thru0 Right16 TotalOutIn98 44 142 Peak Hour Begins at 16:45 Turning Movements Peak Hour Data North Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 B-61 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX B-II ROADWAY SEGMENT COUNTS B-62 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::STATE COLLEGE BOULEVARDLocation Date::I-5 SB RAMPS & CHAPMAN AVESegment 09/26/17 :LL&GClient Interval Combined Day:NB SB Tuesday Begin PMAMPMAMPMAM 12:00 140 223 852 33 115 244 937 255 1,7894646779 12:15 183 30 21232 39562 12:30 208 22 25530 46352 12:45 238 30 22632 46462 01:00 74 174 799 16 57 229 964 131 1,7632040336 01:15 200 19 25023 45042 01:30 223 12 24915 47227 01:45 202 10 23616 43826 02:00 45 217 906 14 51 205 872 96 1,778942223 02:15 216 11 20610 42221 02:30 218 16 22316 44132 02:45 255 10 23810 49320 03:00 60 256 1,021 19 69 236 1,047 129 2,0681049229 03:15 224 12 23014 45426 03:30 280 12 27118 55130 03:45 261 26 31018 57144 04:00 126 304 1,312 8 119 320 1,490 245 2,8021662424 04:15 320 26 34019 66045 04:30 360 37 42635 78672 04:45 328 48 40456 732104 05:00 260 408 1,579 34 306 426 2,092 566 3,6713483468 05:15 430 58 55860 988118 05:30 372 90 55662 928152 05:45 369 124 552104 921228 06:00 648 326 1,204 122 819 444 1,345 1,467 2,549128770250 06:15 301 141 330134 631275 06:30 300 202 291192 591394 06:45 277 354 280194 557548 07:00 847 196 757 388 2,356 210 834 3,203 1,591199406587 07:15 194 594 222182 416776 07:30 182 668 210222 392890 07:45 185 706 192244 377950 08:00 828 132 593 581 2,199 170 574 3,027 1,167226302807 08:15 156 579 140214 296793 08:30 159 622 138188 297810 08:45 146 417 126200 272617 09:00 563 144 562 316 1,010 136 461 1,573 1,023152280468 09:15 164 252 100151 264403 09:30 137 240 111136 248376 09:45 117 202 114124 231326 10:00 524 121 418 214 853 104 334 1,377 752130225344 10:15 126 197 94102 220299 10:30 96 240 74144 170384 10:45 75 202 62148 137350 11:00 671 72 241 205 888 54 189 1,559 430154126359 11:15 60 194 50176 110370 11:30 55 241 51170 106411 11:45 54 248 34171 88419 Totals 4,786 10,244 8,842 11,139 13,628 21,383 Split%47.9 64.9 52.135.1 Day Totals 19,981 35,01115,030 Day Splits 42.9 57.1 Peak Hour 07:30 05:00 07:15 05:15 07:30 05:00 Volume 906 1,579 2,549 2,110 3,440 3,671 Factor 0.93 0.92 0.90 0.95 0.91 0.93 Printed :9/29/2017Data File :D1709048* B-63 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::CHAPMAN AVENUELocation Date::LEWIS ST TO MANCHESTER AVESegment 09/07/17 :LL&GClient Interval Combined Day:EB WB Thursday Begin PMAMPMAMPMAM 12:00 102 258 1,007 42 142 197 849 244 1,8563345575 12:15 244 39 22023 46462 12:30 260 34 19628 45662 12:45 245 27 23618 48145 01:00 79 224 956 23 107 205 850 186 1,8062342946 01:15 249 28 20620 45548 01:30 233 30 20921 44251 01:45 250 26 23015 48041 02:00 70 246 1,180 15 72 224 913 142 2,0931847033 02:15 316 18 23422 55040 02:30 302 23 24218 54441 02:45 316 16 21312 52928 03:00 87 293 1,235 13 64 309 1,180 151 2,4151260225 03:15 321 18 27417 59535 03:30 326 13 25824 58437 03:45 295 20 33934 63454 04:00 256 284 1,277 17 69 336 1,465 325 2,7423762054 04:15 324 16 36845 69261 04:30 306 17 41083 716100 04:45 363 19 35191 714110 05:00 479 374 1,410 24 161 384 1,640 640 3,0507275896 05:15 380 38 471114 851152 05:30 340 44 396144 736188 05:45 316 55 389149 705204 06:00 1,090 326 1,163 60 385 368 1,408 1,475 2,571166694226 06:15 334 98 350212 684310 06:30 263 108 346306 609414 06:45 240 119 344406 584525 07:00 1,644 248 893 148 827 286 975 2,471 1,868416534564 07:15 231 180 244469 475649 07:30 202 242 235397 437639 07:45 212 257 210362 422619 08:00 1,511 195 700 229 788 186 715 2,299 1,415420381649 08:15 174 212 182399 356611 08:30 175 188 181364 356552 08:45 156 159 166328 322487 09:00 991 134 587 184 669 132 632 1,660 1,219275266459 09:15 148 158 172248 320406 09:30 162 178 172250 334428 09:45 143 149 156218 299367 10:00 874 108 436 168 675 110 449 1,549 885224218392 10:15 128 159 123218 251377 10:30 104 170 98240 202410 10:45 96 178 118192 214370 11:00 878 74 259 180 728 92 300 1,606 559192166372 11:15 81 170 74204 155374 11:30 58 178 73242 131420 11:45 46 200 61240 107440 Totals 8,061 11,103 4,687 11,376 12,748 22,479 Split%49.4 36.8 50.663.2 Day Totals 16,063 35,22719,164 Day Splits 54.4 45.6 Peak Hour 06:45 04:45 07:30 05:00 07:15 04:45 Volume 1,688 1,457 940 1,640 2,556 3,059 Factor 0.90 0.96 0.91 0.87 0.98 0.90 Printed :9/11/2017Data File :D1709003 B-64 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::CHAPMAN AVENUELocation Date::MANCHESTER TO THE CITY DRIVESegment 09/07/17 :LL&GClient Interval Combined Day:EB WB Thursday Begin PMAMPMAMPMAM 12:00 124 306 1,198 34 126 260 1,019 250 2,2173956673 12:15 288 40 22535 51375 12:30 306 27 26230 56857 12:45 298 25 27220 57045 01:00 89 260 1,182 26 105 274 995 194 2,1772753453 01:15 294 29 23223 52652 01:30 312 28 24625 55853 01:45 316 22 24314 55936 02:00 82 298 1,353 16 70 250 1,059 152 2,4122454840 02:15 367 22 25022 61744 02:30 332 14 25223 58437 02:45 356 18 30713 66331 03:00 95 343 1,558 19 73 292 1,216 168 2,7741563534 03:15 394 13 28022 67435 03:30 419 20 30624 72544 03:45 402 21 33834 74055 04:00 259 402 1,740 17 96 368 1,489 355 3,2293577052 04:15 444 18 38948 83366 04:30 432 30 36480 796110 04:45 462 31 36896 830127 05:00 519 472 1,834 38 261 424 1,639 780 3,47390896128 05:15 470 57 429119 899176 05:30 462 74 390150 852224 05:45 430 92 396160 826252 06:00 1,141 400 1,385 110 645 342 1,348 1,786 2,733164742274 06:15 382 148 346240 728388 06:30 304 165 346330 650495 06:45 299 222 314407 613629 07:00 1,792 283 1,034 224 1,259 296 995 3,051 2,029444579668 07:15 252 320 238483 490803 07:30 254 329 234460 488789 07:45 245 386 227405 472791 08:00 1,682 214 774 310 1,080 192 711 2,762 1,485463406773 08:15 182 303 178445 360748 08:30 192 230 178404 370634 08:45 186 237 163370 349607 09:00 1,178 172 679 216 837 180 647 2,015 1,326330352546 09:15 168 209 158288 326497 09:30 174 194 168294 342488 09:45 165 218 141266 306484 10:00 1,034 130 489 181 807 123 456 1,841 945251253432 10:15 127 204 108279 235483 10:30 126 209 137278 263487 10:45 106 213 88226 194439 11:00 1,094 104 318 222 915 99 323 2,009 641266203488 11:15 86 208 86251 172459 11:30 72 245 74275 146520 11:45 56 240 64302 120542 Totals 9,089 13,544 6,274 11,897 15,363 25,441 Split%53.2 40.8 46.859.2 Day Totals 18,171 40,80422,633 Day Splits 55.5 44.5 Peak Hour 07:15 04:45 07:15 05:00 07:15 04:45 Volume 1,811 1,866 1,345 1,639 3,156 3,477 Factor 0.94 0.99 0.87 0.96 0.98 0.97 Printed :9/11/2017Data File :D1709004* B-65 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::CHAPMAN AVENUELocation Date::THE CITY DR TO I-5 SB RAMPSSegment 09/07/17 :LL&GClient Interval Combined Day:EB WB Thursday Begin PMAMPMAMPMAM 12:00 196 450 1,597 34 126 278 1,157 322 2,7546472898 12:15 394 32 27850 67282 12:30 418 32 30048 71880 12:45 335 28 30134 63662 01:00 107 362 1,628 23 91 292 1,053 198 2,6813265455 01:15 450 27 24626 69653 01:30 380 25 27033 65058 01:45 436 16 24516 68132 02:00 95 434 1,854 18 77 260 1,081 172 2,9351969437 02:15 497 13 27029 76742 02:30 472 23 25826 73049 02:45 451 23 29321 74444 03:00 108 502 2,175 22 103 321 1,257 211 3,4321882340 03:15 547 22 28624 83346 03:30 594 31 31632 91063 03:45 532 28 33434 86662 04:00 294 497 2,222 28 161 354 1,490 455 3,7123485162 04:15 487 27 35366 84093 04:30 555 47 39294 947141 04:45 683 59 391100 1,074159 05:00 570 758 2,602 39 327 426 1,702 897 4,304921,184131 05:15 710 68 442136 1,152204 05:30 626 84 406158 1,032242 05:45 508 136 428184 936320 06:00 1,321 504 1,684 140 783 410 1,570 2,104 3,254193914333 06:15 427 186 394285 821471 06:30 394 202 416409 810611 06:45 359 255 350434 709689 07:00 2,141 358 1,321 238 1,251 300 986 3,392 2,307527658765 07:15 330 302 246536 576838 07:30 357 323 230554 587877 07:45 276 388 210524 486912 08:00 1,961 288 960 334 1,149 198 751 3,110 1,711536486870 08:15 236 313 176538 412851 08:30 214 260 204494 418754 08:45 222 242 173393 395635 09:00 1,439 245 939 254 904 164 640 2,343 1,579401409655 09:15 266 216 160374 426590 09:30 223 190 162336 385526 09:45 205 244 154328 359572 10:00 1,329 206 686 206 877 135 497 2,206 1,183307341513 10:15 185 207 116322 301529 10:30 155 248 130368 285616 10:45 140 216 116332 256548 11:00 1,488 141 400 230 982 98 331 2,470 731370239600 11:15 104 216 91314 195530 11:30 84 300 86376 170676 11:45 71 236 56428 127664 Totals 11,049 18,068 6,831 12,515 17,880 30,583 Split%59.1 38.2 40.961.8 Day Totals 19,346 48,46329,117 Day Splits 60.1 39.9 Peak Hour 07:30 04:45 07:30 05:00 07:30 04:45 Volume 2,152 2,777 1,358 1,702 3,510 4,442 Factor 0.97 0.92 0.88 0.96 0.96 0.94 Printed :9/11/2017Data File :D1709005* B-66 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::LEWIS STREETLocation Date::CHAPMAN TO LAMPSONSegment 09/07/17 :LL&GClient Interval Combined Day:NB SB Thursday Begin PMAMPMAMPMAM 12:00 60 104 514 9 39 97 429 99 9431020119 12:15 114 14 11219 22633 12:30 138 9 11617 25426 12:45 158 7 10414 26221 01:00 28 148 500 7 27 98 381 55 8811124618 01:15 112 7 864 19811 01:30 114 7 987 21214 01:45 126 6 996 22512 02:00 21 144 597 1 13 78 406 34 1,00362227 02:15 139 4 1043 2437 02:30 159 4 1025 2619 02:45 155 4 1227 27711 03:00 32 190 707 2 21 146 525 53 1,23273369 03:15 184 4 1216 30510 03:30 174 4 12610 30014 03:45 159 11 1329 29120 04:00 74 212 845 6 35 126 574 109 1,4191133817 04:15 186 4 13813 32417 04:30 232 13 15022 38235 04:45 215 12 16028 37540 05:00 175 330 1,077 13 112 179 749 287 1,8262350936 05:15 260 32 18630 44662 05:30 249 31 20055 44986 05:45 238 36 18467 422103 06:00 455 263 976 46 316 155 536 771 1,51266418112 06:15 241 64 17592 416156 06:30 250 78 104157 354235 06:45 222 128 102140 324268 07:00 771 202 630 173 801 82 347 1,572 977160284333 07:15 165 160 95186 260346 07:30 155 208 76220 231428 07:45 108 260 94205 202465 08:00 592 92 358 242 804 69 245 1,396 603172161414 08:15 102 188 65148 167336 08:30 93 196 56142 149338 08:45 71 178 55130 126308 09:00 396 94 285 130 380 170 377 776 662112264242 09:15 80 81 8796 167177 09:30 66 80 7598 141178 09:45 45 89 4590 90179 10:00 376 58 172 66 278 84 338 654 510124142190 10:15 49 69 14864 197133 10:30 34 69 8084 114153 10:45 31 74 26104 57178 11:00 387 40 105 66 329 26 98 716 2039466160 11:15 23 66 2590 48156 11:30 31 86 24107 55193 11:45 11 111 2396 34207 Totals 3,367 6,766 3,155 5,005 6,522 11,771 Split%57.5 48.4 42.551.6 Day Totals 8,160 18,29310,133 Day Splits 55.4 44.6 Peak Hour 07:15 05:00 07:30 05:00 07:15 05:00 Volume 783 1,077 898 749 1,653 1,826 Factor 0.89 0.82 0.86 0.94 0.89 0.90 Printed :9/15/2017Data File :D1709006 B-67 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::THE CITY DRIVELocation Date::CHAPMAN AVE TO DAWN WAYSegment 09/07/17 :LL&GClient Interval Combined Day:NB SB Thursday Begin PMAMPMAMPMAM 12:00 226 358 1,396 28 88 204 806 314 2,20272562100 12:15 378 30 21578 593108 12:30 350 16 18246 53262 12:45 310 14 20530 51544 01:00 96 326 1,416 17 45 222 785 141 2,2012654843 01:15 352 12 19316 54528 01:30 368 11 20636 57447 01:45 370 5 16418 53423 02:00 66 420 1,499 11 48 189 743 114 2,2421060921 02:15 361 16 17221 53337 02:30 375 10 17017 54527 02:45 343 11 21218 55529 03:00 59 346 1,594 10 72 192 834 131 2,4281453824 03:15 398 14 20716 60530 03:30 416 20 20816 62436 03:45 434 28 22713 66141 04:00 105 406 1,868 12 92 225 1,029 197 2,8971163123 04:15 448 23 23620 68443 04:30 497 24 26236 75960 04:45 517 33 30638 82371 05:00 234 691 2,376 22 207 290 1,301 441 3,6772698148 05:15 626 50 35550 981100 05:30 549 61 34860 897121 05:45 510 74 30898 818172 06:00 644 404 1,489 108 592 274 1,034 1,236 2,523134678242 06:15 334 110 252121 586231 06:30 393 138 270174 663312 06:45 358 236 238215 596451 07:00 1,078 393 1,368 279 1,541 217 756 2,619 2,124218610497 07:15 369 378 172243 541621 07:30 330 472 169319 499791 07:45 276 412 198298 474710 08:00 1,175 270 925 484 1,598 128 472 2,773 1,397404398888 08:15 266 390 128271 394661 08:30 201 422 110234 311656 08:45 188 302 106266 294568 09:00 968 250 966 216 788 96 431 1,756 1,397208346424 09:15 278 200 99266 377466 09:30 206 209 112250 318459 09:45 232 163 124244 356407 10:00 1,079 202 674 170 644 110 398 1,723 1,072234312404 10:15 208 152 108278 316430 10:30 130 150 88285 218435 10:45 134 172 92282 226454 11:00 1,120 126 396 145 667 89 327 1,787 723284215429 11:15 96 146 82259 178405 11:30 94 176 88274 182450 11:45 80 200 68303 148503 Totals 6,850 15,967 6,382 8,916 13,232 24,883 Split%64.2 48.2 35.851.8 Day Totals 15,298 38,11522,817 Day Splits 59.9 40.1 Peak Hour 07:30 04:45 07:30 05:00 07:30 04:45 Volume 1,292 2,383 1,758 1,301 3,050 3,682 Factor 0.80 0.86 0.91 0.92 0.86 0.94 Printed :9/11/2017Data File :D1709007 B-68 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::THE CITY DRIVELocation Date::DAWN WAY TO METROPOLITAN DRSegment 09/07/17 :LL&GClient Interval Combined Day:NB SB Thursday Begin PMAMPMAMPMAM 12:00 85 68 270 42 146 206 636 231 9061527457 12:15 72 54 18329 25583 12:30 69 20 16316 23236 12:45 61 30 8425 14555 01:00 47 63 265 24 73 90 336 120 6011515339 01:15 67 17 988 16525 01:30 67 20 7616 14336 01:45 68 12 728 14020 02:00 33 68 279 18 57 98 395 90 674516623 02:15 72 15 997 17122 02:30 58 10 1068 16418 02:45 81 14 9213 17327 03:00 62 76 315 10 69 110 471 131 7861218622 03:15 70 13 11012 18025 03:30 86 26 11622 20248 03:45 83 20 13516 21836 04:00 97 69 312 12 61 112 573 158 8851518127 04:15 90 12 12716 21728 04:30 78 22 16228 24050 04:45 75 15 17238 24753 05:00 261 80 366 16 115 209 826 376 1,1922828944 05:15 87 26 22344 31070 05:30 100 37 21060 31097 05:45 99 36 184129 283165 06:00 713 110 400 72 435 155 732 1,148 1,132142265214 06:15 92 83 204144 296227 06:30 90 114 182180 272294 06:45 108 166 191247 299413 07:00 933 92 342 250 1,314 177 679 2,247 1,021216269466 07:15 88 314 164232 252546 07:30 84 408 174262 258670 07:45 78 342 164223 242565 08:00 384 67 250 376 1,299 149 526 1,683 776169216545 08:15 66 276 14068 206344 08:30 67 380 11167 178447 08:45 50 267 12680 176347 09:00 239 68 253 154 613 115 477 852 73062183216 09:15 58 147 13257 190204 09:30 51 146 10958 160204 09:45 76 166 12162 197228 10:00 219 59 233 152 563 148 409 782 64256207208 10:15 64 121 11260 176181 10:30 56 134 6756 123190 10:45 54 156 8247 136203 11:00 251 60 193 176 671 76 311 922 50463136239 11:15 47 136 7663 123199 11:30 40 174 7557 115231 11:45 46 185 8468 130253 Totals 3,324 3,478 5,416 6,371 8,740 9,849 Split%35.3 62.0 64.738.0 Day Totals 11,787 18,5896,802 Day Splits 36.6 63.4 Peak Hour 06:45 05:30 07:15 05:00 07:15 05:00 Volume 957 401 1,440 826 2,326 1,192 Factor 0.91 0.91 0.88 0.93 0.87 0.96 Printed :9/11/2017Data File :D1709008 B-69 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::METROPOLITAN DRIVELocation Date::LEWIS ST TO SR-22 WB RAMPSSegment 09/07/17 :LL&GClient Interval Combined Day:EB WB Thursday Begin PMAMPMAMPMAM 12:00 15 68 298 11 32 62 215 47 513513016 12:15 74 7 474 12111 12:30 82 5 503 1328 12:45 74 9 563 13012 01:00 9 70 273 5 21 55 264 30 53701255 01:15 69 5 731 1426 01:30 69 8 624 13112 01:45 65 3 744 1397 02:00 6 69 293 4 15 72 258 21 55141418 02:15 68 3 532 1215 02:30 78 4 630 1414 02:45 78 4 700 1484 03:00 20 76 319 3 12 96 354 32 67311724 03:15 72 1 731 1452 03:30 77 0 887 1657 03:45 94 8 9711 19119 04:00 65 105 364 4 19 98 426 84 7901420318 04:15 75 2 9712 17214 04:30 94 4 12520 21924 04:45 90 9 10619 19628 05:00 143 123 372 10 57 130 561 200 9332225332 05:15 80 15 15328 23343 05:30 80 13 16446 24459 05:45 89 19 11447 20366 06:00 273 82 323 35 135 127 419 408 7425320988 06:15 92 26 11268 20494 06:30 71 28 9774 168102 06:45 78 46 8378 161124 07:00 563 62 232 38 286 87 277 849 509130149168 07:15 57 58 66135 123193 07:30 67 74 63180 130254 07:45 46 116 61118 107234 08:00 420 66 194 117 374 54 210 794 404110120227 08:15 44 92 56140 100232 08:30 38 98 4990 87188 08:45 46 67 5180 97147 09:00 283 36 149 80 219 39 176 502 3258275162 09:15 33 50 4168 74118 09:30 40 45 5484 94129 09:45 40 44 4249 8293 10:00 193 20 86 44 171 50 156 364 242457089 10:15 19 42 4552 6494 10:30 20 41 3044 5085 10:45 27 44 3152 5896 11:00 236 15 41 40 185 26 66 421 107464186 11:15 9 40 1062 19102 11:30 14 54 1764 31118 11:45 3 51 1364 16115 Totals 2,226 2,944 1,526 3,382 3,752 6,326 Split%46.5 40.7 53.559.3 Day Totals 4,908 10,0785,170 Day Splits 51.3 48.7 Peak Hour 07:00 04:30 07:45 05:00 07:30 05:00 Volume 563 387 423 561 947 933 Factor 0.78 0.79 0.90 0.86 0.93 0.92 Printed :9/11/2017Data File :D1709009* B-70 Transportation Studies, Inc. 2640 Walnut Avenue, Suite L Tustin, CA. 92780 ORANGESite::METROPOLITAN DRIVELocation Date::SR-22 WB RAMPS TO CITY DRIVESegment 09/07/17 :LL&GClient Interval Combined Day:EB WB Thursday Begin PMAMPMAMPMAM 12:00 71 162 687 26 64 116 382 135 1,0693127857 12:15 177 14 8620 26334 12:30 172 16 9010 26226 12:45 176 8 9010 26618 01:00 31 176 694 5 31 94 361 62 1,0551027015 01:15 162 10 1025 26415 01:30 182 6 9110 27316 01:45 174 10 746 24816 02:00 28 162 674 10 20 114 379 48 1,053827618 02:15 160 4 678 22712 02:30 188 2 1029 29011 02:45 164 4 963 2607 03:00 51 167 703 3 20 98 479 71 1,1821026513 03:15 180 6 11318 29324 03:30 180 5 14012 32017 03:45 176 6 12811 30417 04:00 95 178 696 4 30 138 699 125 1,3951831622 04:15 172 9 16920 34129 04:30 174 7 19232 36639 04:45 172 10 20025 37235 05:00 255 179 756 15 59 238 843 314 1,5992941744 05:15 196 10 22638 42248 05:30 218 14 22988 447102 05:45 163 20 150100 313120 06:00 543 188 680 32 166 152 503 709 1,183125340157 06:15 177 32 129114 306146 06:30 161 40 118136 279176 06:45 154 62 104168 258230 07:00 1,060 148 571 84 411 86 403 1,471 974198234282 07:15 137 96 122228 259324 07:30 140 118 104314 244432 07:45 146 113 91320 237433 08:00 1,177 135 445 96 362 87 275 1,539 720417222513 08:15 120 88 67292 187380 08:30 82 96 69254 151350 08:45 108 82 52214 160296 09:00 595 86 395 62 270 90 374 865 769160176222 09:15 94 68 102164 196232 09:30 104 72 82131 186203 09:45 111 68 100140 211208 10:00 562 77 324 47 245 82 197 807 521139159186 10:15 80 57 46153 126210 10:30 83 73 39128 122201 10:45 84 68 30142 114210 11:00 560 63 185 71 317 28 108 877 29312491195 11:15 46 76 30146 76222 11:30 46 80 30144 76224 11:45 30 90 20146 50236 Totals 5,028 6,810 1,995 5,003 7,023 11,813 Split%57.6 28.4 42.471.6 Day Totals 6,998 18,83611,838 Day Splits 62.8 37.2 Peak Hour 07:30 04:45 07:15 04:45 07:30 04:45 Volume 1,343 765 423 893 1,758 1,658 Factor 0.81 0.88 0.90 0.94 0.86 0.93 Printed :9/15/2017Data File :D1709010* B-71 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3882-1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Dividers.doc APPENDIX C INTERSECTION LEVEL OF SERVICE CALCULATION WORKSHEETS LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX C-I EXISTING TRAFFIC CONDITIONS C-1 0.362Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 320114970002113971518561343Total Analysis Volume [veh/h] 802924000534944615311Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 320114970002113971518561343Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 320114970002113971518561343Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-2 0.362Intersection V/C AIntersection LOS 0.090.030.060.000.000.000.010.210.010.000.090.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-3 0.475Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000864278392011164037980Total Analysis Volume [veh/h] 000216701050291012000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 000864278392011164037980Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000864278392011164037980Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-4 0.475Intersection V/C AIntersection LOS 0.000.000.000.250.160.020.000.170.000.090.090.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-5 0.960Volume to Capacity (v/c): ELevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 704833662361303126355604620831273Total Analysis Volume [veh/h] 18121925932632914012527818Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 704833662361303126355604620831273Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 704833662361303126355604620831273Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-6 0.960Intersection V/C EIntersection LOS 0.040.140.220.300.300.070.350.350.030.120.180.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-7 0.590Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 297943269614122958336222167530Total Analysis Volume [veh/h] 7199822435371584564218Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 297943269614122958336222167530Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 297943269614122958336222167530Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-8 0.590Intersection V/C AIntersection LOS 0.020.160.100.300.300.020.120.120.130.000.000.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-9 0.738Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 1068783731821455179364136718132060985Total Analysis Volume [veh/h] 2722093463644591342458015221Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1068783731821455179364136718132060985Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1068783731821455179364136718132060985Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-10 0.738Intersection V/C CIntersection LOS 0.060.170.110.080.290.050.160.270.050.080.090.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-11 0.563Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 07701285541460050251960560Total Analysis Volume [veh/h] 01933213936501063240140Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 07701285541460050251960560Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07701285541460050251960560Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-12 0.563Intersection V/C AIntersection LOS 0.000.150.040.240.240.000.000.000.070.060.000.16V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-13 0.357Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 39954161713311871Total Analysis Volume [veh/h] 10239404333018Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 39954161713311871Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 39954161713311871Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-14 0.357Intersection V/C AIntersection LOS 0.150.150.240.080.070.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-15 0.211Volume to Capacity (v/c): ALevel Of Service: 9.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 20721103851674187013896Total Analysis Volume [veh/h] 525312142105183222Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 20721103851674187013896Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 20721103851674187013896Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-16 AIntersection LOS 9.11Intersection Delay [s/veh] AAAAApproach LOS 8.919.639.069.00Approach Delay [s/veh] 2.843.361.070.180.1812.6219.818.918.918.99.396.566.770.8095th-Percentile Queue Length [ft] 0.110.130.040.010.010.500.790.760.760.760.380.260.270.0395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.040.010.000.000.150.210.200.200.200.110.080.080.01Degree of Utilization, x 657559712633633586791686686686626632614567Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-17 0.227Volume to Capacity (v/c): ALevel Of Service: 9.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 5812610468105138Total Analysis Volume [veh/h] 153226172635Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5812610468105138Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5812610468105138Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-18 AIntersection LOS 9.10Intersection Delay [s/veh] AAAApproach LOS 8.669.169.40Approach Delay [s/veh] 10.8111.9211.0311.9611.8921.6595th-Percentile Queue Length [ft] 0.430.480.440.480.480.8795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.130.140.130.140.140.23Degree of Utilization, x 727667667621764609Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-19 0.134Volume to Capacity (v/c): ALevel Of Service: 8.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 118524669721072326710Total Analysis Volume [veh/h] 3216217182767200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 118524669721072326710Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 118524669721072326710Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-20 AIntersection LOS 8.29Intersection Delay [s/veh] AAAAApproach LOS 8.278.628.047.62Approach Delay [s/veh] 1.064.934.932.984.184.289.5911.541.271.273.210.710.1195th-Percentile Queue Length [ft] 0.040.200.200.120.170.170.380.460.050.050.130.030.0095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.010.060.060.040.050.050.110.130.020.020.040.010.00Degree of Utilization, x 793688688628708693633799693693633751656Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-21 0.487Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 18610681375654128136520416580654Total Analysis Volume [veh/h] 4731734141432341514120214Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 18610681375654128136520416580654Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18610681375654128136520416580654Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-22 0.487Intersection V/C AIntersection LOS 0.110.050.040.060.020.030.220.220.120.140.140.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-23 0.717Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 18983921573502721955021518768278Total Analysis Volume [veh/h] 47212339886849126382217120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 18983921573502721955021518768278Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18983921573502721955021518768278Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-24 0.717Intersection V/C CIntersection LOS 0.110.050.050.300.300.160.210.210.090.230.230.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-25 0.267Volume to Capacity (v/c): ALevel Of Service: 8.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 29105731178180Total Analysis Volume [veh/h] 731484545Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 29105731178180Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 29105731178180Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-26 AIntersection LOS 8.69Intersection Delay [s/veh] AAAApproach LOS 8.167.928.94Approach Delay [s/veh] 4.198.9819.1226.8595th-Percentile Queue Length [ft] 0.170.360.761.0795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.050.110.200.27Degree of Utilization, x 737820870674Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-27 0.564Volume to Capacity (v/c): BLevel Of Service: 13.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Pedestrian Volume [ped/h] 26839782480848152100Total Analysis Volume [veh/h] 679921120212013000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 26839782480848152100Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 26839782480848152100Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-28 BIntersection LOS 13.91Intersection Delay [s/veh] CBBBApproach LOS 15.0212.8611.5110.09Approach Delay [s/veh] 73.1987.7250.8150.8913.791.329.800.1595th-Percentile Queue Length [ft] 2.933.512.032.040.550.050.390.0195th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.510.560.420.420.160.020.120.00Degree of Utilization, x 658597580580537519447510Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-29 0.457Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 219825547475090063375561Total Analysis Volume [veh/h] 5256412119020015819140Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 219825547475090063375561Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 219825547475090063375561Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-30 0.457Intersection V/C AIntersection LOS 0.040.040.080.000.140.000.010.000.000.110.190.17V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-31 0.477Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 7043582801122108088Total Analysis Volume [veh/h] 176907028127022Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 7043582801122108088Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7043582801122108088Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-32 0.477Intersection V/C AIntersection LOS 0.180.110.000.220.210.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-33 0.596Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3515519416739102210211640194Total Analysis Volume [veh/h] 11014510418525626316049Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515519416739102210211640194Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515519416739102210211640194Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-34 0.596Intersection V/C AIntersection LOS 0.000.000.000.100.100.120.000.300.060.130.130.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 1: 1 AM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-35 0.615Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 25496457000211505173831089205Total Analysis Volume [veh/h] 6424114000537649627251Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 25496457000211505173831089205Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25496457000211505173831089205Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-36 0.615Intersection V/C BIntersection LOS 0.070.280.030.000.000.000.010.220.010.000.160.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-37 0.389Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 00049917462380118402416130Total Analysis Volume [veh/h] 000125441695296064030Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00049917462380118402416130Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00049917462380118402416130Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-38 0.389Intersection V/C AIntersection LOS 0.000.000.000.150.100.040.000.170.000.190.190.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-39 0.836Volume to Capacity (v/c): DLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 21911632631189961157736876383525194Total Analysis Volume [veh/h] 552916630249291992199613149Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 21911632631189961157736876383525194Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 21911632631189961157736876383525194Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-40 0.836Intersection V/C DIntersection LOS 0.130.340.150.220.220.070.260.260.040.230.310.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-41 0.550Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3513731601021371641088714739538132Total Analysis Volume [veh/h] 9343402634316272237991033Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3513731601021371641088714739538132Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3513731601021371641088714739538132Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-42 0.550Intersection V/C AIntersection LOS 0.020.270.050.290.290.040.060.060.090.070.020.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-43 0.749Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 13411033258215013643829901276241071134Total Analysis Volume [veh/h] 34276812137591962483215626834Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 13411033258215013643829901276241071134Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13411033258215013643829901276241071134Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-44 0.749Intersection V/C CIntersection LOS 0.080.220.100.010.290.110.120.190.040.270.160.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-45 0.569Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 0108824693812920100169760468Total Analysis Volume [veh/h] 02726223532303042190117Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0108824693812920100169760468Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0108824693812920100169760468Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-46 0.569Intersection V/C AIntersection LOS 0.000.210.070.260.260.000.010.000.050.040.000.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-47 0.453Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 771510124715513351Total Analysis Volume [veh/h] 19378312393313Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 771510124715513351Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 771510124715513351Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-48 0.453Intersection V/C AIntersection LOS 0.230.230.180.090.080.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-49 0.341Volume to Capacity (v/c): BLevel Of Service: 10.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 2512117919310623320142537Total Analysis Volume [veh/h] 6332248275854632Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2512117919310623320142537Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2512117919310623320142537Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-50 BIntersection LOS 10.40Intersection Delay [s/veh] ABABApproach LOS 9.2512.009.4410.64Approach Delay [s/veh] 3.163.370.770.560.5637.5613.811.111.111.12.8221.6922.020.9995th-Percentile Queue Length [ft] 0.130.130.030.020.021.500.550.450.450.450.110.870.880.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.040.010.010.010.340.160.130.130.130.040.230.230.01Degree of Utilization, x 617534687612612567675597597597551588581537Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-51 0.374Volume to Capacity (v/c): BLevel Of Service: 11.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 5629035982190108Total Analysis Volume [veh/h] 147390214827Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5629035982190108Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5629035982190108Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-52 BIntersection LOS 11.50Intersection Delay [s/veh] BBBApproach LOS 10.9812.1611.15Approach Delay [s/veh] 28.5030.0241.1643.1132.0219.5095th-Percentile Queue Length [ft] 1.141.201.651.721.280.7895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.280.290.360.370.300.21Degree of Utilization, x 620595609591625518Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-53 0.150Volume to Capacity (v/c): ALevel Of Service: 9.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 251487851917578133140191Total Analysis Volume [veh/h] 637201481920381050Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 251487851917578133140191Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 251487851917578133140191Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-54 AIntersection LOS 9.03Intersection Delay [s/veh] AAAAApproach LOS 9.079.278.648.50Approach Delay [s/veh] 2.629.639.6311.2513.0513.1510.669.240.790.794.244.662.5895th-Percentile Queue Length [ft] 0.100.390.390.450.520.530.430.370.030.030.170.190.1095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.030.110.110.130.150.150.130.110.010.010.050.060.03Degree of Utilization, x 739647647595657653599709626626578682602Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-55 0.542Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 33119811661629226310374616110868Total Analysis Volume [veh/h] 83520424736625912427717Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 33119811661629226310374616110868Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 33119811661629226310374616110868Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-56 0.542Intersection V/C AIntersection LOS 0.190.060.050.080.010.090.190.190.030.170.170.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-57 0.701Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 1364202116015315728953410357601118Total Analysis Volume [veh/h] 341055315383972134261415030Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1364202116015315728953410357601118Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1364202116015315728953410357601118Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-58 0.701Intersection V/C CIntersection LOS 0.080.250.120.130.130.090.240.240.060.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-59 0.363Volume to Capacity (v/c): BLevel Of Service: 10.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 761852693268135Total Analysis Volume [veh/h] 19466781734Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 761852693268135Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 761852693268135Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-60 BIntersection LOS 10.23Intersection Delay [s/veh] BABApproach LOS 10.859.7710.13Approach Delay [s/veh] 41.6141.548.0223.0195th-Percentile Queue Length [ft] 1.661.660.320.9295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.360.360.100.24Degree of Utilization, x 718831702567Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-61 0.869Volume to Capacity (v/c): DLevel Of Service: 25.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Pedestrian Volume [ped/h] 11246721297858203871214Total Analysis Volume [veh/h] 2811710742121097301Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 11246721297858203871214Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11246721297858203871214Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-62 DIntersection LOS 25.16Intersection Delay [s/veh] CBEBApproach LOS 21.4714.5638.8811.64Approach Delay [s/veh] 96.86103.9436.4636.4918.8413.85223.583.0595th-Percentile Queue Length [ft] 3.874.161.461.460.750.558.940.1295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.600.620.340.340.200.160.870.04Degree of Utilization, x 484467444444417522446433Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-63 0.546Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 201636241605400370021063387Total Analysis Volume [veh/h] 541156401350900531697Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 201636241605400370021063387Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 201636241605400370021063387Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-64 0.546Intersection V/C AIntersection LOS 0.050.050.180.000.160.000.020.000.000.000.130.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-65 0.397Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 5871536518891143170Total Analysis Volume [veh/h] 1473816322228643Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5871536518891143170Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5871536518891143170Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-66 0.397Intersection V/C AIntersection LOS 0.120.050.150.170.220.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-67 0.629Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 358319144243865189867833214Total Analysis Volume [veh/h] 92153611101632252220854Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 358319144243865189867833214Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 358319144243865189867833214Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-68 0.629Intersection V/C BIntersection LOS 0.020.060.010.110.110.130.000.260.000.160.160.13V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 2: 2 PM Existing The Terrace Apartments, Orange Version 6.00-01 Generated with C-69 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX C-II EXISTING PLUS PROJECT TRAFFIC CONDITIONS C-70 0.362Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 320114970002113971519561443Total Analysis Volume [veh/h] 802924000534944915411Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 320114970002113971519561443Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 320114970002113971519561443Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-71 0.362Intersection V/C AIntersection LOS 0.090.030.060.000.000.000.010.210.010.000.090.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-72 0.476Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 000868278392011164038080Total Analysis Volume [veh/h] 000217701050291012020Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 000868278392011164038080Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000868278392011164038080Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-73 0.476Intersection V/C AIntersection LOS 0.000.000.000.260.160.020.000.170.000.100.100.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-74 0.963Volume to Capacity (v/c): ELevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 704843702361303126355604621931274Total Analysis Volume [veh/h] 18121935932632914012557819Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 704843702361303126355604621931274Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 704843702361303126355604621931274Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-75 0.963Intersection V/C EIntersection LOS 0.040.140.220.300.300.070.350.350.030.130.180.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-76 0.594Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 297983329614232958336222182531Total Analysis Volume [veh/h] 7200832435671584564618Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 297983329614232958336222182531Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 297983329614232958336222182531Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-77 0.594Intersection V/C AIntersection LOS 0.020.160.100.300.300.020.120.120.130.000.000.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-78 0.741Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 1068843731821471189368136718132060985Total Analysis Volume [veh/h] 2722193463684792342458015221Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1068843731821471189368136718132060985Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1068843731821471189368136718132060985Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-79 0.741Intersection V/C CIntersection LOS 0.060.170.110.080.290.060.160.270.050.080.090.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-80 0.566Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 07721285641467050251960564Total Analysis Volume [veh/h] 01933214136701063240141Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 07721285641467050251960564Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07721285641467050251960564Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-81 0.566Intersection V/C AIntersection LOS 0.000.150.040.240.240.000.000.000.070.060.000.17V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-82 0.358Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 39956162413311871Total Analysis Volume [veh/h] 10239406333018Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 39956162413311871Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 39956162413311871Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-83 0.358Intersection V/C AIntersection LOS 0.150.150.240.080.070.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-84 0.222Volume to Capacity (v/c): ALevel Of Service: 9.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 207211031021734187013896Total Analysis Volume [veh/h] 525312643105183222Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 207211031021734187013896Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 207211031021734187013896Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-85 AIntersection LOS 9.24Intersection Delay [s/veh] AAAAApproach LOS 8.979.909.179.11Approach Delay [s/veh] 2.873.391.070.180.1815.6721.119.219.219.29.506.676.890.8195th-Percentile Queue Length [ft] 0.110.140.040.010.010.630.850.770.770.770.380.270.280.0395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.040.010.000.000.170.220.210.210.210.110.080.080.01Degree of Utilization, x 650554711632632586780678678678619622604559Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-86 0.230Volume to Capacity (v/c): ALevel Of Service: 9.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 5912610469108140Total Analysis Volume [veh/h] 153226172735Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5912610469108140Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5912610469108140Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-87 AIntersection LOS 9.13Intersection Delay [s/veh] AAAApproach LOS 8.699.199.43Approach Delay [s/veh] 10.9012.0411.1412.0912.3022.0895th-Percentile Queue Length [ft] 0.440.480.450.480.490.8895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.130.140.130.140.140.23Degree of Utilization, x 725665665620763608Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-88 0.134Volume to Capacity (v/c): ALevel Of Service: 8.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 118624671721072326710Total Analysis Volume [veh/h] 3226218182767200Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 118624671721072326710Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 118624671721072326710Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-89 AIntersection LOS 8.30Intersection Delay [s/veh] AAAAApproach LOS 8.288.628.047.63Approach Delay [s/veh] 1.065.005.002.984.314.409.5911.561.271.273.210.710.1195th-Percentile Queue Length [ft] 0.040.200.200.120.170.180.380.460.050.050.130.030.0095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.010.060.060.040.050.060.110.130.020.020.040.010.00Degree of Utilization, x 792687687628708693631798692692632750655Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-90 0.488Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 18610681395654128136520416580655Total Analysis Volume [veh/h] 4731735141432341514120214Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 18610681395654128136520416580655Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 18610681395654128136520416580655Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-91 0.488Intersection V/C AIntersection LOS 0.110.050.040.070.020.030.220.220.120.140.140.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-92 0.720Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 19083931573502721955021548768278Total Analysis Volume [veh/h] 48212339886849126392217120Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 19083931573502721955021548768278Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 19083931573502721955021548768278Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-93 0.720Intersection V/C CIntersection LOS 0.110.050.050.300.300.160.210.210.090.230.230.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-94 0.269Volume to Capacity (v/c): ALevel Of Service: 8.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 29106031178181Total Analysis Volume [veh/h] 731584545Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 29106031178181Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 29106031178181Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-95 AIntersection LOS 8.71Intersection Delay [s/veh] AAAApproach LOS 8.177.938.96Approach Delay [s/veh] 4.199.3219.1627.0995th-Percentile Queue Length [ft] 0.170.370.771.0895th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.050.110.200.27Degree of Utilization, x 736821869674Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-96 0.567Volume to Capacity (v/c): BLevel Of Service: 14.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Pedestrian Volume [ped/h] 26839882483849154100Total Analysis Volume [veh/h] 6710021121212014000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 26839882483849154100Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 26839882483849154100Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-97 BIntersection LOS 14.01Intersection Delay [s/veh] CBBBApproach LOS 15.1412.9511.5610.10Approach Delay [s/veh] 73.9588.5951.5851.6513.831.4810.250.1595th-Percentile Queue Length [ft] 2.963.542.062.070.550.060.410.0195th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.510.570.420.420.160.020.120.00Degree of Utilization, x 655594579578535518446508Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-98 0.458Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 219925551477090063375561Total Analysis Volume [veh/h] 5256413119020015819140Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 219925551477090063375561Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 219925551477090063375561Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-99 0.458Intersection V/C AIntersection LOS 0.040.040.080.000.140.000.010.000.000.110.190.17V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-100 0.478Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 7063582801124108189Total Analysis Volume [veh/h] 177907028127022Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 7063582801124108189Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 7063582801124108189Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-101 0.478Intersection V/C AIntersection LOS 0.180.110.000.220.210.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-102 0.597Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3515519418741102410211640194Total Analysis Volume [veh/h] 11014510518525626316049Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515519418741102410211640194Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515519418741102410211640194Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-103 0.597Intersection V/C AIntersection LOS 0.000.000.000.100.100.120.000.300.060.130.130.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 3: 3 AM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-104 0.615Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 25496457000211506173891089205Total Analysis Volume [veh/h] 6424114000537749727251Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 25496457000211506173891089205Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25496457000211506173891089205Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-105 0.615Intersection V/C BIntersection LOS 0.070.280.030.000.000.000.010.220.010.000.160.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-106 0.393Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 00050817462380118502416200Total Analysis Volume [veh/h] 000127441695296064050Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00050817462380118502416200Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00050817462380118502416200Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-107 0.393Intersection V/C AIntersection LOS 0.000.000.000.150.100.040.000.170.000.190.190.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-108 0.836Volume to Capacity (v/c): DLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 21911642741199971157736876390525195Total Analysis Volume [veh/h] 552916930249291992199813149Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 21911642741199971157736876390525195Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 21911642741199971157736876390525195Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-109 0.836Intersection V/C DIntersection LOS 0.130.340.160.220.220.070.260.260.040.230.310.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-110 0.557Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3513841751031378641088714740438133Total Analysis Volume [veh/h] 93464426345162722371011033Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3513841751031378641088714740438133Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3513841751031378641088714740438133Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-111 0.557Intersection V/C AIntersection LOS 0.020.270.050.290.290.040.060.060.090.070.020.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-112 0.750Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 13411183258215103713929901276241071134Total Analysis Volume [veh/h] 34280812137893982483215626834Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 13411183258215103713929901276241071134Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 13411183258215103713929901276241071134Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-113 0.750Intersection V/C CIntersection LOS 0.080.220.100.010.300.110.120.190.040.270.160.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-114 0.572Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 0109524694412960100169760477Total Analysis Volume [veh/h] 02746223632403042190119Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0109524694412960100169760477Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0109524694412960100169760477Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-115 0.572Intersection V/C AIntersection LOS 0.000.210.070.260.260.000.010.000.050.040.000.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-116 0.454Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 771517125115513351Total Analysis Volume [veh/h] 19379313393313Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 771517125115513351Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 771517125115513351Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-117 0.454Intersection V/C AIntersection LOS 0.230.230.180.090.080.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-118 0.360Volume to Capacity (v/c): BLevel Of Service: 10.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 2512117920312223320142537Total Analysis Volume [veh/h] 6332251315854632Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2512117920312223320142537Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2512117920312223320142537Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-119 BIntersection LOS 10.56Intersection Delay [s/veh] ABABApproach LOS 9.3212.319.5510.78Approach Delay [s/veh] 3.203.410.780.560.5640.6716.511.211.211.22.8422.0622.391.0095th-Percentile Queue Length [ft] 0.130.140.030.020.021.630.660.450.450.450.110.880.900.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.040.010.010.010.360.180.130.130.130.040.230.230.01Degree of Utilization, x 610528684609609564670592592592548580574531Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-120 0.376Volume to Capacity (v/c): BLevel Of Service: 11.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 5929035984192109Total Analysis Volume [veh/h] 157390214827Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5929035984192109Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5929035984192109Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-121 BIntersection LOS 11.56Intersection Delay [s/veh] BBBApproach LOS 11.0312.2311.21Approach Delay [s/veh] 28.8730.4841.6143.6232.5919.7895th-Percentile Queue Length [ft] 1.151.221.661.741.300.7995th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.280.290.360.380.310.21Degree of Utilization, x 619594607589623516Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-122 0.151Volume to Capacity (v/c): ALevel Of Service: 9.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 251517851927578133140191Total Analysis Volume [veh/h] 638201481920381050Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 251517851927578133140191Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 251517851927578133140191Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-123 AIntersection LOS 9.04Intersection Delay [s/veh] AAAAApproach LOS 9.089.298.658.51Approach Delay [s/veh] 2.629.869.8611.2613.1413.2410.679.250.790.794.254.672.5895th-Percentile Queue Length [ft] 0.100.390.390.450.530.530.430.370.030.030.170.190.1095th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.030.120.120.130.150.150.130.110.010.010.050.060.03Degree of Utilization, x 739647647594657652598707625625577681601Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-124 0.543Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 33119811671629226310374616110871Total Analysis Volume [veh/h] 83520424736625912427718Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 33119811671629226310374616110871Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 33119811671629226310374616110871Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-125 0.543Intersection V/C AIntersection LOS 0.190.060.050.080.010.090.190.190.030.170.170.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-126 0.701Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 1394202116015315728953410558601118Total Analysis Volume [veh/h] 351055315383972134261515030Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1394202116015315728953410558601118Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1394202116015315728953410558601118Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-127 0.701Intersection V/C CIntersection LOS 0.080.250.120.130.130.090.240.240.060.190.190.07V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-128 0.365Volume to Capacity (v/c): BLevel Of Service: 10.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 761852713268137Total Analysis Volume [veh/h] 19466881734Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 761852713268137Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 761852713268137Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-129 BIntersection LOS 10.27Intersection Delay [s/veh] BABApproach LOS 10.879.8110.17Approach Delay [s/veh] 41.7342.078.0323.4895th-Percentile Queue Length [ft] 1.671.680.320.9495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.360.370.100.24Degree of Utilization, x 716830701567Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-130 0.874Volume to Capacity (v/c): DLevel Of Service: 25.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Pedestrian Volume [ped/h] 11347021299868303881214Total Analysis Volume [veh/h] 2811810752221097301Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 11347021299868303881214Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 11347021299868303881214Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-131 DIntersection LOS 25.52Intersection Delay [s/veh] CBEBApproach LOS 21.7914.6539.5511.67Approach Delay [s/veh] 98.78106.0436.9737.0019.1814.11226.643.0795th-Percentile Queue Length [ft] 3.954.241.481.480.770.569.070.1295th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.610.630.340.340.210.160.870.04Degree of Utilization, x 483466442442416520444432Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-132 0.547Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 201656241625410370021063389Total Analysis Volume [veh/h] 541156411350900531697Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 201656241625410370021063389Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 201656241625410370021063389Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-133 0.547Intersection V/C AIntersection LOS 0.050.050.180.000.160.000.020.000.000.000.130.11V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-134 0.397Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 5881536518901146172Total Analysis Volume [veh/h] 1473816322328743Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5881536518901146172Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5881536518901146172Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-135 0.397Intersection V/C AIntersection LOS 0.120.050.150.170.220.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-136 0.631Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 358319144244265390067835214Total Analysis Volume [veh/h] 92153611111632252220954Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 358319144244265390067835214Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 358319144244265390067835214Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-137 0.631Intersection V/C BIntersection LOS 0.020.060.010.120.120.130.000.260.000.170.170.13V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 4: 4 PM Existing + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-138 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX C-III YEAR 2021 CUMULATIVE TRAFFIC CONDITIONS C-139 0.509Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 4801191120002220741632188545Total Analysis Volume [veh/h] 1203028000651948022111Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 4801191120002220741632188545Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4801191120002220741632188545Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-140 0.509Intersection V/C AIntersection LOS 0.140.040.070.000.000.000.010.310.010.000.130.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-141 0.558Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 0009493374149715550312060Total Analysis Volume [veh/h] 0002378410124389013020Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0009493374149715550312060Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0009493374149715550312060Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-142 0.558Intersection V/C AIntersection LOS 0.000.000.000.280.200.020.000.230.000.140.140.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-143 1.065Volume to Capacity (v/c): FLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 747674212501518131365864829532894Total Analysis Volume [veh/h] 191921056338033914712748224Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 747674212501518131365864829532894Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 747674212501518131365864829532894Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-144 1.065Intersection V/C FIntersection LOS 0.040.230.250.350.350.080.370.370.030.170.190.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-145 0.706Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 30111234510617763065349270197545Total Analysis Volume [veh/h] 82788627444816876849111Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 30111234510617763065349270197545Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 30111234510617763065349270197545Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-146 0.706Intersection V/C CIntersection LOS 0.020.220.100.370.370.020.120.120.160.000.000.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-147 0.847Volume to Capacity (v/c): DLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 143101543221816483915431592246421772117Total Analysis Volume [veh/h] 3625410855412981363986210519329Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 143101543221816483915431592246421772117Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 143101543221816483915431592246421772117Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-148 0.847Intersection V/C DIntersection LOS 0.080.200.130.090.320.120.200.310.070.120.110.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-149 0.646Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 095716865817140503091410599Total Analysis Volume [veh/h] 02394216542901077350150Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 095716865817140503091410599Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 095716865817140503091410599Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-150 0.646Intersection V/C BIntersection LOS 0.000.190.050.280.280.000.000.000.090.080.000.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-151 0.412Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 411224196813812374Total Analysis Volume [veh/h] 10306492353119Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 411224196813812374Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 411224196813812374Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-152 0.412Intersection V/C AIntersection LOS 0.190.190.290.080.070.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-153 0.228Volume to Capacity (v/c): ALevel Of Service: 9.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 217261038817444773311306Total Analysis Volume [veh/h] 527312244112188332Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 217261038817444773311306Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 217261038817444773311306Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-154 AIntersection LOS 9.45Intersection Delay [s/veh] AAAAApproach LOS 9.179.829.439.40Approach Delay [s/veh] 3.333.921.090.180.1813.4121.921.321.321.310.110.9011.460.8195th-Percentile Queue Length [ft] 0.130.160.040.010.010.540.880.860.860.860.410.440.460.0395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.050.010.000.000.150.230.220.220.220.120.130.130.01Degree of Utilization, x 633542696620620576763665665665608631604559Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-155 0.241Volume to Capacity (v/c): ALevel Of Service: 9.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 6014313071109144Total Analysis Volume [veh/h] 153633182736Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 6014313071109144Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6014313071109144Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-156 AIntersection LOS 9.34Intersection Delay [s/veh] AAAApproach LOS 8.899.399.66Approach Delay [s/veh] 12.4013.5913.3914.4112.7723.4595th-Percentile Queue Length [ft] 0.500.540.540.580.510.9495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.140.150.150.160.150.24Degree of Utilization, x 712658660619745597Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-157 0.143Volume to Capacity (v/c): ALevel Of Service: 8.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 1510025694751112944790Total Analysis Volume [veh/h] 42562241928711220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1510025694751112944790Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1510025694751112944790Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-158 AIntersection LOS 8.51Intersection Delay [s/veh] AAAAApproach LOS 8.468.808.318.10Approach Delay [s/veh] 1.496.046.043.195.885.9810.3012.421.641.645.710.850.9595th-Percentile Queue Length [ft] 0.060.240.240.130.240.240.410.500.070.070.230.030.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.020.070.070.040.070.070.120.140.020.020.070.010.01Degree of Utilization, x 768669669613686675617778677677620715639Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-159 0.539Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 193107115958781451648212172101760Total Analysis Volume [veh/h] 4831840152036412534325415Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 193107115958781451648212172101760Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 193107115958781451648212172101760Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-160 0.539Intersection V/C AIntersection LOS 0.110.050.040.080.030.020.260.260.120.170.170.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-161 0.790Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2061011081713723022125411919673794Total Analysis Volume [veh/h] 52252743937653135482418424Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2061011081713723022125411919673794Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2061011081713723022125411919673794Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-162 0.790Intersection V/C CIntersection LOS 0.120.060.060.320.320.180.220.220.110.250.250.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-163 0.326Volume to Capacity (v/c): ALevel Of Service: 9.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 376513042234205Total Analysis Volume [veh/h] 91633115951Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 376513042234205Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 376513042234205Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-164 AIntersection LOS 9.67Intersection Delay [s/veh] AABApproach LOS 9.228.9410.06Approach Delay [s/veh] 13.1321.0730.6635.3395th-Percentile Queue Length [ft] 0.530.841.231.4195th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.150.220.290.33Degree of Utilization, x 681778797629Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-165 0.430Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3354308253698281160100Total Analysis Volume [veh/h] 8410821134257040000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3354308253698281160100Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3354308253698281160100Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-166 0.430Intersection V/C AIntersection LOS 0.230.230.000.160.160.060.020.020.090.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-167 0.524Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2214729983605090066778611Total Analysis Volume [veh/h] 6377521151020016720153Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2214729983605090066778611Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2214729983605090066778611Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-168 0.524Intersection V/C AIntersection LOS 0.050.050.090.000.180.000.010.000.000.110.200.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-169 0.541Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 80541934812961230114Total Analysis Volume [veh/h] 2011058732430829Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 80541934812961230114Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 80541934812961230114Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-170 0.541Intersection V/C AIntersection LOS 0.200.120.000.250.240.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-171 0.682Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3515820474837119810611754223Total Analysis Volume [veh/h] 11015511920930027318956Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515820474837119810611754223Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515820474837119810611754223Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-172 0.682Intersection V/C BIntersection LOS 0.000.000.000.110.110.140.000.350.060.150.150.13V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 5: 5 AM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-173 0.738Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 644100380000222249184861552213Total Analysis Volume [veh/h] 161251200006562512238853Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 644100380000222249184861552213Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 644100380000222249184861552213Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-174 0.738Intersection V/C CIntersection LOS 0.190.300.050.000.000.000.010.330.010.000.230.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-175 0.499Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 00064122064691164102521850Total Analysis Volume [veh/h] 0001605516173410065460Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00064122064691164102521850Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00064122064691164102521850Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-176 0.499Intersection V/C AIntersection LOS 0.000.000.000.190.130.040.000.240.000.260.260.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-177 0.981Volume to Capacity (v/c): ELevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 235146441613613251228038679430549213Total Analysis Volume [veh/h] 59366104343313120972010813753Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 235146441613613251228038679430549213Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 235146441613613251228038679430549213Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-178 0.981Intersection V/C EIntersection LOS 0.140.430.240.290.290.070.270.270.050.250.320.13V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-179 0.663Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3618161871191766671149017142340150Total Analysis Volume [veh/h] 94544730442172923431061038Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3618161871191766671149017142340150Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3618161871191766671149017142340150Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-180 0.663Intersection V/C BIntersection LOS 0.020.360.060.370.370.040.060.060.100.070.020.09V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-181 0.855Volume to Capacity (v/c): DLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2201274406118169558064812471947061338171Total Analysis Volume [veh/h] 55319102304241451623124917733543Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2201274406118169558064812471947061338171Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2201274406118169558064812471947061338171Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-182 0.855Intersection V/C DIntersection LOS 0.130.250.120.020.330.170.210.240.060.300.200.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-183 0.659Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 013512871026154201002151120541Total Analysis Volume [veh/h] 03387225738603054280135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 013512871026154201002151120541Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 013512871026154201002151120541Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-184 0.659Intersection V/C BIntersection LOS 0.000.260.080.300.300.000.010.000.060.070.000.16V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-185 0.511Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 801856156616113853Total Analysis Volume [veh/h] 20464392403513Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 801856156616113853Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 801856156616113853Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-186 0.511Intersection V/C AIntersection LOS 0.280.280.230.090.080.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-187 0.363Volume to Capacity (v/c): BLevel Of Service: 10.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 2612277920111027721242887Total Analysis Volume [veh/h] 7372250286956722Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2612277920111027721242887Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2612277920111027721242887Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-188 BIntersection LOS 10.94Intersection Delay [s/veh] ABABApproach LOS 9.8112.549.9111.41Approach Delay [s/veh] 4.445.160.800.570.5741.2015.114.114.114.13.0727.5828.211.0295th-Percentile Queue Length [ft] 0.180.210.030.020.021.650.610.570.570.570.121.101.130.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.060.060.010.010.010.360.170.160.160.160.040.270.280.01Degree of Utilization, x 580503666596596554649576576576534571561521Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-189 0.409Volume to Capacity (v/c): BLevel Of Service: 12.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 5832638985198112Total Analysis Volume [veh/h] 158297215028Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5832638985198112Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5832638985198112Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-190 BIntersection LOS 12.14Intersection Delay [s/veh] BBBApproach LOS 11.6212.9011.61Approach Delay [s/veh] 33.9735.6947.4349.6435.3221.0395th-Percentile Queue Length [ft] 1.361.431.901.991.410.8495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.320.330.400.410.330.22Degree of Utilization, x 605585596579607505Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-191 0.173Volume to Capacity (v/c): ALevel Of Service: 9.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 421788152157881224142301Total Analysis Volume [veh/h] 11452015420206101180Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 421788152157881224142301Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 421788152157881224142301Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-192 AIntersection LOS 9.28Intersection Delay [s/veh] AAAAApproach LOS 9.309.608.888.73Approach Delay [s/veh] 4.6412.2112.2112.0415.4515.5611.469.911.371.375.825.024.1395th-Percentile Queue Length [ft] 0.190.490.490.480.620.620.460.400.050.050.230.200.1795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.060.140.140.140.170.170.130.120.020.020.070.060.05Degree of Utilization, x 719632632582639635585691613613568668593Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-193 0.611Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 34420841821732029813264817143187Total Analysis Volume [veh/h] 86521464807533212435822Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 34420841821732029813264817143187Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 34420841821732029813264817143187Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-194 0.611Intersection V/C BIntersection LOS 0.200.060.050.080.010.090.240.240.030.210.210.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-195 0.762Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 1734502287517517131958312472644138Total Analysis Volume [veh/h] 431135719444380146311816135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1734502287517517131958312472644138Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1734502287517517131958312472644138Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-196 0.762Intersection V/C CIntersection LOS 0.100.260.130.150.150.100.270.270.070.210.210.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-197 0.521Volume to Capacity (v/c): BLevel Of Service: 13.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 8824731543137206Total Analysis Volume [veh/h] 226279113452Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 8824731543137206Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 8824731543137206Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-198 BIntersection LOS 13.12Intersection Delay [s/veh] BBBApproach LOS 14.5312.6412.23Approach Delay [s/veh] 75.6668.5720.0945.9495th-Percentile Queue Length [ft] 3.032.740.801.8495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.520.490.210.39Degree of Utilization, x 643728642528Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-199 0.626Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 227525213341099904771214Total Analysis Volume [veh/h] 57131108427250119301Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 227525213341099904771214Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 227525213341099904771214Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-200 0.626Intersection V/C BIntersection LOS 0.220.220.000.100.100.060.060.000.280.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-201 0.616Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 212566751866420380024666465Total Analysis Volume [veh/h] 56416947161010006217116Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 212566751866420380024666465Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 212566751866420380024666465Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-202 0.616Intersection V/C BIntersection LOS 0.080.080.200.000.190.000.020.000.000.000.160.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-203 0.456Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 68019674910511370217Total Analysis Volume [veh/h] 1704918726334354Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 68019674910511370217Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 68019674910511370217Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-204 0.456Intersection V/C AIntersection LOS 0.140.060.160.210.270.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-205 0.725Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 36862015125197201088671025237Total Analysis Volume [veh/h] 92253811301802722225659Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 36862015125197201088671025237Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 36862015125197201088671025237Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-206 0.725Intersection V/C CIntersection LOS 0.020.060.010.130.130.150.000.320.000.200.200.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 6: 6 PM 2021 Cumulative The Terrace Apartments, Orange Version 6.00-01 Generated with C-207 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX C-IV YEAR 2021 CUMULATIVE PLUS PROJECT TRAFFIC CONDITIONS C-208 0.509Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 4801191120002220741633188645Total Analysis Volume [veh/h] 1203028000651948322211Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 4801191120002220741633188645Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4801191120002220741633188645Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-209 0.509Intersection V/C AIntersection LOS 0.140.040.070.000.000.000.010.310.010.000.130.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-210 0.559Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 0009533374149715550312160Total Analysis Volume [veh/h] 0002388410124389013040Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0009533374149715550312160Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0009533374149715550312160Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-211 0.559Intersection V/C AIntersection LOS 0.000.000.000.280.200.020.000.230.000.140.140.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-212 1.068Volume to Capacity (v/c): FLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 747684252501518131365864830632895Total Analysis Volume [veh/h] 191921066338033914712778224Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 747684252501518131365864830632895Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 747684252501518131365864830632895Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-213 1.068Intersection V/C FIntersection LOS 0.040.230.250.350.350.080.370.370.030.180.190.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-214 0.710Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 30111635110617873065349270212546Total Analysis Volume [veh/h] 82798827447816876853112Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 30111635110617873065349270212546Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 30111635110617873065349270212546Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-215 0.710Intersection V/C CIntersection LOS 0.020.220.100.370.370.020.120.120.160.000.000.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-216 0.850Volume to Capacity (v/c): DLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 143102143221816644015471592246421772117Total Analysis Volume [veh/h] 36255108554161001373986210519329Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 143102143221816644015471592246421772117Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 143102143221816644015471592246421772117Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-217 0.850Intersection V/C DIntersection LOS 0.080.200.130.090.330.120.200.310.070.120.110.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-218 0.649Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 095916866817210503091410603Total Analysis Volume [veh/h] 02404216743001077350151Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 095916866817210503091410603Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 095916866817210503091410603Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-219 0.649Intersection V/C BIntersection LOS 0.000.190.050.280.280.000.000.000.090.080.000.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-220 0.413Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 411226197513812374Total Analysis Volume [veh/h] 10307494353119Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 411226197513812374Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 411226197513812374Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-221 0.413Intersection V/C AIntersection LOS 0.190.190.290.080.070.04V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-222 0.239Volume to Capacity (v/c): ALevel Of Service: 9.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 2172610310518044773311306Total Analysis Volume [veh/h] 527312645112188332Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2172610310518044773311306Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2172610310518044773311306Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-223 AIntersection LOS 9.59Intersection Delay [s/veh] ABAAApproach LOS 9.2310.109.559.53Approach Delay [s/veh] 3.373.961.100.180.1816.5623.221.721.721.710.211.1011.670.8395th-Percentile Queue Length [ft] 0.130.160.040.010.010.660.930.870.870.870.410.440.470.0395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.040.050.010.000.000.180.240.230.230.230.120.130.140.01Degree of Utilization, x 627537694620620575753657657657602621594550Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-224 0.245Volume to Capacity (v/c): ALevel Of Service: 9.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 6114313072112146Total Analysis Volume [veh/h] 153633182837Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 6114313072112146Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6114313072112146Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-225 AIntersection LOS 9.37Intersection Delay [s/veh] AAAApproach LOS 8.919.429.69Approach Delay [s/veh] 12.5013.7113.5114.5613.2123.9195th-Percentile Queue Length [ft] 0.500.550.540.580.530.9695th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.140.160.150.160.150.24Degree of Utilization, x 711655657617744597Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-226 0.143Volume to Capacity (v/c): ALevel Of Service: 8.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 1510125696751112944790Total Analysis Volume [veh/h] 42562241928711220Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1510125696751112944790Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1510125696751112944790Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-227 AIntersection LOS 8.52Intersection Delay [s/veh] AAAAApproach LOS 8.478.818.328.10Approach Delay [s/veh] 1.496.116.113.196.016.1110.3112.441.641.645.720.850.9595th-Percentile Queue Length [ft] 0.060.240.240.130.240.240.410.500.070.070.230.030.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.020.080.080.040.070.080.120.140.020.020.070.010.01Degree of Utilization, x 768669669612686675617776676676619715639Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-228 0.540Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 193107116158781451648212172101761Total Analysis Volume [veh/h] 4831840152036412534325415Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 193107116158781451648212172101761Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 193107116158781451648212172101761Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-229 0.540Intersection V/C AIntersection LOS 0.110.050.040.080.030.020.260.260.120.170.170.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-230 0.793Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2071011091713723022125411949673794Total Analysis Volume [veh/h] 52252743937653135492418424Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2071011091713723022125411949673794Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2071011091713723022125411949673794Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-231 0.793Intersection V/C CIntersection LOS 0.120.060.060.320.320.180.220.220.110.250.250.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-232 0.328Volume to Capacity (v/c): ALevel Of Service: 9.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 376513342234206Total Analysis Volume [veh/h] 91633115952Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 376513342234206Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 376513342234206Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-233 AIntersection LOS 9.69Intersection Delay [s/veh] AABApproach LOS 9.238.9710.09Approach Delay [s/veh] 13.1521.5430.7335.6495th-Percentile Queue Length [ft] 0.530.861.231.4395th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.150.230.290.33Degree of Utilization, x 680778795628Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-234 0.431Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3354318253998291162100Total Analysis Volume [veh/h] 8410821135257041000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3354318253998291162100Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3354318253998291162100Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-235 0.431Intersection V/C AIntersection LOS 0.230.230.000.160.160.060.020.020.100.000.000.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-236 0.524Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2214829987607090066778611Total Analysis Volume [veh/h] 6377522152020016720153Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2214829987607090066778611Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2214829987607090066778611Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-237 0.524Intersection V/C AIntersection LOS 0.050.050.090.000.180.000.010.000.000.110.200.18V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-238 0.542Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 80741934812981231115Total Analysis Volume [veh/h] 2021058732530829Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 80741934812981231115Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 80741934812981231115Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-239 0.542Intersection V/C AIntersection LOS 0.200.120.000.250.240.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-240 0.684Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3515820476839120010611754223Total Analysis Volume [veh/h] 11015511921030027318956Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515820476839120010611754223Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515820476839120010611754223Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-241 0.684Intersection V/C BIntersection LOS 0.000.000.000.110.110.140.000.350.060.150.150.13V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-242 0.739Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 644100380000222250184921552213Total Analysis Volume [veh/h] 161251200006563512338853Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 644100380000222250184921552213Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 644100380000222250184921552213Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-243 0.739Intersection V/C CIntersection LOS 0.190.300.050.000.000.000.010.330.010.000.230.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-244 0.502Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 00065022064691164202521920Total Analysis Volume [veh/h] 0001635516173411065480Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00065022064691164202521920Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00065022064691164202521920Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-245 0.502Intersection V/C AIntersection LOS 0.000.000.000.190.130.040.000.240.000.260.260.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-246 0.988Volume to Capacity (v/c): ELevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 3: Lewis Street at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 235146542713713261228038679437549214Total Analysis Volume [veh/h] 59366107343323120972010913754Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 235146542713713261228038679437549214Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 235146542713713261228038679437549214Base Volume Input [veh/h] Chapman AvenueChapman AvenueLewis StreetLewis StreetName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-247 0.988Intersection V/C EIntersection LOS 0.140.430.250.290.290.070.270.270.050.260.320.13V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag Auxiliary Signal Groups 047083061025Signal group PermissPermissProtectePermissPermissProtectePermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-248 0.670Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 4: Manchester Avenue at Chapman Avenue Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 3618272021201773671149017143240151Total Analysis Volume [veh/h] 94575130443172923431081038Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3618272021201773671149017143240151Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3618272021201773671149017143240151Base Volume Input [veh/h] Chapman AvenueChapman AvenueManchester AvenueManchester AvenueName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-249 0.670Intersection V/C BIntersection LOS 0.020.360.060.370.370.040.060.060.100.070.020.09V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead------Lead / Lag 2,7Auxiliary Signal Groups 047083060220Signal group PermissPermissProtectePermissPermissProtecteSplitSplitSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-250 0.856Volume to Capacity (v/c): DLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 5: The City Drive at Chapman Avenue Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2201289406118170458765812471947061338171Total Analysis Volume [veh/h] 55322102304261471653124917733543Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2201289406118170458765812471947061338171Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2201289406118170458765812471947061338171Base Volume Input [veh/h] Chapman AvenueChapman AvenueThe City DriveThe City DriveName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-251 0.856Intersection V/C DIntersection LOS 0.130.250.120.020.330.170.210.240.060.300.200.05V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead--Lead--Lead--LeadLead / Lag 5,83,62,7Auxiliary Signal Groups 047883661225Signal group PermissPermissProtecteOverlapPermissProtecteOverlapPermissProtecteOverlapPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-252 0.663Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 013582871032154601002151120550Total Analysis Volume [veh/h] 03407225838703054280138Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 013582871032154601002151120550Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 013582871032154601002151120550Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-253 0.663Intersection V/C BIntersection LOS 0.000.270.080.300.300.000.010.000.060.070.000.16V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-254 0.512Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 7: Rampart Street at Chapman Avenue Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach Chapman AvenueChapman AvenueRampart StreetName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 801863157016113853Total Analysis Volume [veh/h] 20466393403513Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 801863157016113853Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 801863157016113853Base Volume Input [veh/h] Chapman AvenueChapman AvenueRampart StreetName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-255 0.512Intersection V/C AIntersection LOS 0.290.290.230.090.080.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ---Lead-LeadLead / Lag Auxiliary Signal Groups 048301Signal group PermissivePermissivePermissiveProtectedSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-256 0.383Volume to Capacity (v/c): BLevel Of Service: 11.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 8: Manchester Avenue at City Boulevard West Intersection Level Of Service Report NoYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Intersection Setup 0000Pedestrian Volume [ped/h] 2612277921112627721242887Total Analysis Volume [veh/h] 7372253326956722Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2612277921112627721242887Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2612277921112627721242887Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestManchester AvenueManchester AvenueName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-257 BIntersection LOS 11.12Intersection Delay [s/veh] ABBBApproach LOS 9.8912.8810.0211.57Approach Delay [s/veh] 4.495.210.800.570.5744.6018.014.314.314.33.0928.0628.691.0395th-Percentile Queue Length [ft] 0.180.210.030.020.021.780.720.570.570.570.121.121.150.0495th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.060.070.010.010.010.380.200.160.160.160.040.280.280.01Degree of Utilization, x 573499663593593551643572572572530564555515Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-258 0.412Volume to Capacity (v/c): BLevel Of Service: 12.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 9: City Boulevard at City Boulevard West/The City Way Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruThruLeftRightLeftTurning Movement Lane Configuration WestboundEastboundSouthboundApproach The City WayCity Boulevard WestCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 6132638987200113Total Analysis Volume [veh/h] 158297225028Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 6132638987200113Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 6132638987200113Base Volume Input [veh/h] The City WayCity Boulevard WestCity BoulevardName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-259 BIntersection LOS 12.21Intersection Delay [s/veh] BBBApproach LOS 11.6812.9811.67Approach Delay [s/veh] 34.4036.2347.9450.2335.9521.3195th-Percentile Queue Length [ft] 1.381.451.922.011.440.8595th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.320.330.400.410.330.22Degree of Utilization, x 604583595577606504Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-260 0.174Volume to Capacity (v/c): ALevel Of Service: 9.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 10: City Boulevard East at The City Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach The City WayThe City WayCity Boulevard EastCity Boulevard EastName Intersection Setup 0000Pedestrian Volume [ped/h] 421818152167881224142301Total Analysis Volume [veh/h] 11452015420206101180Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 421818152167881224142301Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 421818152167881224142301Base Volume Input [veh/h] The City WayThe City WayCity Boulevard EastCity Boulevard EastName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-261 AIntersection LOS 9.29Intersection Delay [s/veh] AAAAApproach LOS 9.319.618.898.73Approach Delay [s/veh] 4.6512.4512.4512.0515.5615.6611.479.921.371.375.835.024.1395th-Percentile Queue Length [ft] 0.190.500.500.480.620.630.460.400.050.050.230.200.1795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.060.140.140.140.170.170.130.120.020.020.070.060.05Degree of Utilization, x 719632632582638635584690612612567668592Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-262 0.612Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 11: The City Drive at The City Way/Dawn Way Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Dawn WayThe City WayThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 34420841831732029813264817143190Total Analysis Volume [veh/h] 86521464807533212435823Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 34420841831732029813264817143190Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 34420841831732029813264817143190Base Volume Input [veh/h] Dawn WayThe City WayThe City DriveThe City DriveName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-263 0.612Intersection V/C BIntersection LOS 0.200.060.050.080.010.090.240.240.030.210.210.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag 5,8Auxiliary Signal Groups 040880061025Signal group SplitSplitSplitOverlapSplitSplitPermissPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-264 0.762Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 12: Lewis Street at Lampson Avenue/Metropolitan Drive Intersection Level Of Service Report YesYesYesYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 1764502287517517131958312673644138Total Analysis Volume [veh/h] 441135719444380146321816135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 1764502287517517131958312673644138Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1764502287517517131958312673644138Base Volume Input [veh/h] Metropolitan DriveLampson AvenueLewis StreetLewis StreetName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-265 0.762Intersection V/C CIntersection LOS 0.100.260.130.150.150.100.270.270.070.210.210.08V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-266 0.522Volume to Capacity (v/c): BLevel Of Service: 13.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: All-way stopControl Type: Intersection 13: Entertainment Drive at City Boulevard West Intersection Level Of Service Report NoNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] ThruLeftRightThruRightLeftTurning Movement Lane Configuration WestboundEastboundNorthboundApproach City Boulevard WestCity Boulevard WestEntertainment DriveName Intersection Setup 000Pedestrian Volume [ped/h] 8824731743137208Total Analysis Volume [veh/h] 226279113452Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 8824731743137208Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 8824731743137208Base Volume Input [veh/h] City Boulevard WestCity Boulevard WestEntertainment DriveName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-267 BIntersection LOS 13.18Intersection Delay [s/veh] BBBApproach LOS 14.5812.7212.29Approach Delay [s/veh] 75.9369.4620.1246.7195th-Percentile Queue Length [ft] 3.042.780.801.8795th-Percentile Queue Length [veh] Movement, Approach, & Intersection Results 0.520.500.210.39Degree of Utilization, x 642726641527Capacity per Entry Lane [veh/h] Lanes Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-268 0.629Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 14: Entertainment Drive at Metropolitan Drive Intersection Level Of Service Report NoYesYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 2285282133611010004781214Total Analysis Volume [veh/h] 57132108428250120301Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2285282133611010004781214Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2285282133611010004781214Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveEntertainment DriveEntertainment DriveName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-269 0.629Intersection V/C BIntersection LOS 0.220.220.000.100.100.060.060.000.280.010.010.00V/C, Movement V/C Ratio Movement, Approach, & Intersection Results ------------Lead / Lag Auxiliary Signal Groups 040080060020Signal group PermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissPermissControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-270 0.617Volume to Capacity (v/c): BLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 212586751886430380024666467Total Analysis Volume [veh/h] 56516947161010006217117Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 212586751886430380024666467Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 212586751886430380024666467Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-271 0.617Intersection V/C BIntersection LOS 0.080.080.200.000.190.000.020.000.000.000.160.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-272 0.457Volume to Capacity (v/c): ALevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 16: The City Drive at Metropolitan Drive Intersection Level Of Service Report YesNoYesCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Metropolitan DriveThe City DriveThe City DriveName Intersection Setup 000Bicycle Volume [bicycles/h] 000Pedestrian Volume [ped/h] 68119674910521373219Total Analysis Volume [veh/h] 1704918726334355Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 68119674910521373219Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 68119674910521373219Base Volume Input [veh/h] Metropolitan DriveThe City DriveThe City DriveName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-273 0.457Intersection V/C AIntersection LOS 0.140.060.160.210.270.06V/C, Movement V/C Ratio Movement, Approach, & Intersection Results -Lead---LeadLead / Lag 3,53,6Auxiliary Signal Groups 336625Signal group OverlapSplitOverlapPermissivePermissiveProtectedControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-274 0.727Volume to Capacity (v/c): CLevel Of Service: -Delay (sec / veh): 15 minutesAnalysis Period: ICU 1Analysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000Pedestrian Volume [ped/h] 36862015125237221090671027237Total Analysis Volume [veh/h] 92253811311812732225759Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 36862015125237221090671027237Total Hourly Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 36862015125237221090671027237Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-275 0.727Intersection V/C CIntersection LOS 0.020.060.010.130.130.150.000.320.000.200.200.14V/C, Movement V/C Ratio Movement, Approach, & Intersection Results --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 5.00Lost time [s] 100Cycle Length [s] Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with C-276 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX C-V INTERNAL CAPTURE WORKSHEETS C-277 C-278 C-279 C-280 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3882-1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Dividers.doc APPENDIX D CALTRANS INTERSECTION LEVEL OF SERVICE CALCULATION WORKSHEETS LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX D-I EXISTING TRAFFIC CONDITIONS D-1 0.383Volume to Capacity (v/c): BLevel Of Service: 13.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 320114970002113971518561343Total Analysis Volume [veh/h] 802924000534944615311Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 320114970002113971518561343Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 320114970002113971518561343Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-2 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 03600000441004410Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-3 158.259.9264.8063.285.45105.6917.6236.0221.5095th-Percentile Queue Length [ft/ln] 6.332.402.592.530.224.230.701.440.8695th-Percentile Queue Length [veh/ln] 87.9133.2936.0035.163.0358.729.7920.0111.9550th-Percentile Queue Length [ft/ln] 3.521.331.441.410.122.350.390.800.4850th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesCritical Lane Group DCCCAADADLane Group LOS 40.2034.7334.7034.734.856.1549.364.5642.52d, Delay for Lane Group [s/veh] 0.780.270.270.270.020.300.380.130.28X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.190.580.540.560.030.175.940.060.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.11k, delay calibration 37.0234.1534.1634.174.815.9843.424.5141.57d1, Uniform Delay [s] 41224926926110734586394742156c, Capacity [veh/h] 281317021837178115896792178167923459s, saturation flow rate [veh/h] 0.110.040.040.040.010.210.010.090.01(v / s)_i Volume / Saturation Flow Rate 0.150.150.150.150.680.680.020.700.04g / C, Green / Cycle 1313131361612634g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-4 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]42.52 4.56 0.00 49.36 6.15 4.85 0.00 0.00 0.00 34.73 34.72 40.20 Movement LOS D A D A A C C D d_A, Approach Delay [s/veh]7.05 6.58 0.00 38.02 Approach LOS A A A D d_I, Intersection Delay [s/veh]13.07 Intersection LOS B Intersection V/C 0.383 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.801 2.541 Crosswalk LOS F F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]889 889 0 711 d_b, Bicycle Delay [s]13.89 13.89 45.00 18.69 I_b,int, Bicycle LOS Score for Intersection 1.830 2.151 4.132 1.998 Bicycle LOS A B D A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-5 0.525Volume to Capacity (v/c): BLevel Of Service: 16.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 000864278392011164037980Total Analysis Volume [veh/h] 000216701050291012000Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 000864278392011164037980Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000864278392011164037980Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-6 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-7 335.97196.4224.13131.4468.4466.0995th-Percentile Queue Length [ft/ln] 13.447.860.975.262.742.6495th-Percentile Queue Length [veh/ln] 215.58110.3013.4173.0238.0236.7250th-Percentile Queue Length [ft/ln] 8.624.410.542.921.521.4750th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoCritical Lane Group CCBBAALane Group LOS 29.7022.5419.2910.789.909.77d, Delay for Lane Group [s/veh] 0.870.420.060.310.150.17X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.540.430.040.210.310.10d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 27.1722.1119.2510.579.589.67d1, Uniform Delay [s] 992659628379210413792c, Capacity [veh/h] 281318701781679218646792s, saturation flow rate [veh/h] 0.310.150.020.170.090.09(v / s)_i Volume / Saturation Flow Rate 0.350.350.350.560.560.56g / C, Green / Cycle 323232505050g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-8 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 9.80 9.90 0.00 10.78 0.00 19.29 22.54 29.70 0.00 0.00 0.00 Movement LOS A A B B C C d_A, Approach Delay [s/veh]9.80 10.78 27.67 0.00 Approach LOS A B C A d_I, Intersection Delay [s/veh]16.87 Intersection LOS B Intersection V/C 0.525 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.530 1.697 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 1.824 2.040 3.508 4.132 Bicycle LOS A B D D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-9 0.694Volume to Capacity (v/c): BLevel Of Service: 19.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 07701285541460050251960560Total Analysis Volume [veh/h] 01933213936501063240140Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 07701285541460050251960560Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07701285541460050251960560Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-10 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 06512053000190036Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 120Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-11 86.9243.32221.88221.88210.003.1585.7554.65180.0095th-Percentile Queue Length [ft/ln] 3.481.738.888.888.400.133.432.197.2095th-Percentile Queue Length [veh/ln] 48.2924.07128.82128.82120.131.7547.6430.36100.0050th-Percentile Queue Length [ft/ln] 1.930.965.155.154.810.071.911.214.0050th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group ACCCBCCCCLane Group LOS 9.9929.8520.6720.6718.6626.1829.9822.1525.97d, Delay for Lane Group [s/veh] 0.310.450.720.720.680.030.660.280.76X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.071.092.072.070.450.061.910.451.65d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.120.120.110.110.110.110.11k, delay calibration 9.9328.7518.6018.6018.2026.1228.0721.7024.33d1, Uniform Delay [s] 25172865575571785176383339737c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.150.040.250.250.240.000.070.060.16(v / s)_i Volume / Saturation Flow Rate 0.490.080.350.350.350.110.110.210.21g / C, Green / Cycle 325232323771414g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 666666666666666666C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-12 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]25.97 0.00 22.15 29.98 0.00 26.18 0.00 18.66 20.67 29.85 9.99 0.00 Movement LOS C C C C B C C A d_A, Approach Delay [s/veh]25.41 29.91 19.46 12.82 Approach LOS C C B B d_I, Intersection Delay [s/veh]19.62 Intersection LOS B Intersection V/C 0.694 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]49.50 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.575 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 817 1017 d_b, Bicycle Delay [s]60.00 60.00 21.00 14.50 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.390 2.054 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-13 0.492Volume to Capacity (v/c): BLevel Of Service: 19.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 219825547475090063375561Total Analysis Volume [veh/h] 5256412119020015819140Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 219825547475090063375561Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 219825547475090063375561Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-14 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0351916160100045450Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-15 37.9239.35120.839.57222.5311.9967.87170.75171.3495th-Percentile Queue Length [ft/ln] 1.521.574.830.388.900.482.716.836.8595th-Percentile Queue Length [veh/ln] 21.0721.8667.135.32129.296.6637.7194.8695.1950th-Percentile Queue Length [ft/ln] 0.840.872.690.215.170.271.513.793.8150th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesYesNoNoCritical Lane Group CCDADEABBLane Group LOS 20.6520.6338.273.5639.1655.134.0813.7413.80d, Delay for Lane Group [s/veh] 0.100.100.580.040.810.400.300.340.35X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.070.071.220.072.8211.100.371.001.03d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 20.5820.5737.063.4936.3444.033.7112.7512.78d1, Uniform Delay [s] 5906274391153584222102932921c, Capacity [veh/h] 175818703459158935601589281318011781s, saturation flow rate [veh/h] 0.030.030.070.030.130.010.220.180.18(v / s)_i Volume / Saturation Flow Rate 0.330.330.130.730.160.010.750.520.52g / C, Green / Cycle 30301165151674747g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-16 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]13.78 13.74 4.08 0.00 0.00 55.13 0.00 39.16 3.56 38.27 20.64 20.65 Movement LOS B B A E D A D C C d_A, Approach Delay [s/veh]8.94 55.13 35.95 32.66 Approach LOS A E D C d_I, Intersection Delay [s/veh]19.70 Intersection LOS B Intersection V/C 0.492 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 34.67 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.766 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]911 0 267 689 d_b, Bicycle Delay [s]13.34 45.00 33.80 19.34 I_b,int, Bicycle LOS Score for Intersection 3.653 4.132 1.990 1.868 Bicycle LOS D D A A ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-17 0.610Volume to Capacity (v/c): CLevel Of Service: 26.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 3515519416739102210211640194Total Analysis Volume [veh/h] 11014510418525626316049Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515519416739102210211640194Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515519416739102210211640194Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-18 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 010003800363302926Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-19 4.438.8060.92258.04257.24305.93139.50104.9198.08241.6195th-Percentile Queue Length [ft/ln] 0.180.352.4410.3210.2912.245.584.203.929.6695th-Percentile Queue Length [veh/ln] 2.464.8933.85155.72155.12192.2477.5058.2954.49143.4150th-Percentile Queue Length [ft/ln] 0.100.201.356.236.207.693.102.332.185.7450th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group EEDDDBEAAELane Group LOS 56.2357.9941.9552.0452.0615.5059.649.449.2655.83d, Delay for Lane Group [s/veh] 0.130.230.230.830.830.510.780.190.190.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.634.310.516.476.500.929.520.380.208.81d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 53.6053.6741.4445.5645.5614.5950.129.069.0647.02d1, Uniform Delay [s] 2326234264263201313111482205227c, Capacity [veh/h] 1589185515891788178135601781185435601781s, saturation flow rate [veh/h] 0.000.000.030.120.120.290.060.120.120.11(v / s)_i Volume / Saturation Flow Rate 0.010.010.150.150.150.570.070.620.620.13g / C, Green / Cycle 22161616628686814g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-20 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.83 9.32 9.44 59.64 15.50 0.00 52.05 52.04 41.95 57.99 57.99 56.23 Movement LOS E A A E B D D D E E E d_A, Approach Delay [s/veh]20.00 19.51 50.91 57.40 Approach LOS B B D E d_I, Intersection Delay [s/veh]26.05 Intersection LOS C Intersection V/C 0.610 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.775 0.000 2.309 1.996 Crosswalk LOS C F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]455 582 618 109 d_b, Bicycle Delay [s]32.84 27.65 26.25 49.16 I_b,int, Bicycle LOS Score for Intersection 2.024 2.487 2.368 1.574 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 9: 9 AM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-21 0.699Volume to Capacity (v/c): CLevel Of Service: 26.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 25496457000211505173831089205Total Analysis Volume [veh/h] 6424114000537649627251Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 25496457000211505173831089205Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25496457000211505173831089205Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-22 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 05600000421004412Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-23 103.1271.5627.443.6314.15280.7624.19185.24134.1995th-Percentile Queue Length [ft/ln] 4.1310.8625.101.750.5711.230.977.415.3795th-Percentile Queue Length [veh/ln] 57.30165.9452.924.247.86172.9313.44102.9174.5550th-Percentile Queue Length [ft/ln] 2.296.6418.120.970.316.920.544.122.9850th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesNoNoYesCritical Lane Group CCDCBCEBELane Group LOS 23.9527.4244.6722.4517.2322.3359.5216.9156.15d, Delay for Lane Group [s/veh] 0.240.510.920.090.030.500.410.320.81X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.120.6411.720.060.080.596.530.265.97d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.260.110.500.500.110.500.11k, delay calibration 23.8326.7732.9522.3917.1521.7452.9816.6550.17d1, Uniform Delay [s] 10476336966637083024413367254c, Capacity [veh/h] 281317021870178115896792178167923459s, saturation flow rate [veh/h] 0.090.190.340.030.010.220.010.160.06(v / s)_i Volume / Saturation Flow Rate 0.370.370.370.370.450.450.020.500.07g / C, Green / Cycle 4141414149492558g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-24 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]56.15 16.91 0.00 59.52 22.33 17.23 0.00 0.00 0.00 22.45 38.87 23.95 Movement LOS E B E C B C D C d_A, Approach Delay [s/veh]23.13 22.67 0.00 35.16 Approach LOS C C A D d_I, Intersection Delay [s/veh]26.69 Intersection LOS C Intersection V/C 0.699 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.305 2.672 Crosswalk LOS F F B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]727 691 0 945 d_b, Bicycle Delay [s]22.27 23.56 55.00 15.29 I_b,int, Bicycle LOS Score for Intersection 2.093 2.196 4.132 2.611 Bicycle LOS B B D B ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-25 0.406Volume to Capacity (v/c): BLevel Of Service: 11.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00049917462380118402416130Total Analysis Volume [veh/h] 000125441695296064030Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00049917462380118402416130Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00049917462380118402416130Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-26 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-27 228.30148.4649.4077.2091.2787.3795th-Percentile Queue Length [ft/ln] 9.135.941.983.093.653.4995th-Percentile Queue Length [veh/ln] 133.5482.4827.4442.8950.7148.5450th-Percentile Queue Length [ft/ln] 5.343.301.101.722.031.9450th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesCritical Lane Group DCCAAALane Group LOS 36.9231.4329.025.095.465.22d, Delay for Lane Group [s/veh] 0.830.440.160.250.250.28X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.100.760.200.130.480.14d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 33.8230.6728.824.964.985.08d1, Uniform Delay [s] 599398379474012884740c, Capacity [veh/h] 281318701781679218466792s, saturation flow rate [veh/h] 0.180.090.030.170.180.19(v / s)_i Volume / Saturation Flow Rate 0.210.210.210.700.700.70g / C, Green / Cycle 191919636363g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-28 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 5.27 5.46 0.00 5.09 0.00 29.02 31.43 36.92 0.00 0.00 0.00 Movement LOS A A A C C D d_A, Approach Delay [s/veh]5.27 5.09 34.95 0.00 Approach LOS A A C A d_I, Intersection Delay [s/veh]11.34 Intersection LOS B Intersection V/C 0.406 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.443 1.616 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 2.100 2.048 2.772 4.132 Bicycle LOS B B C D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-29 0.724Volume to Capacity (v/c): BLevel Of Service: 18.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 0108824693812920100169760468Total Analysis Volume [veh/h] 02726223532303042190117Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0108824693812920100169760468Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0108824693812920100169760468Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-30 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 07016054000130027Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-31 113.7686.05261.15261.15216.626.7459.2945.86156.5295th-Percentile Queue Length [ft/ln] 4.553.4410.4510.458.660.272.371.836.2695th-Percentile Queue Length [veh/ln] 63.2047.81158.06158.06124.963.7532.9425.4886.9650th-Percentile Queue Length [ft/ln] 2.531.916.326.325.000.151.321.023.4850th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group ACCCBCCCCLane Group LOS 8.6430.6521.7821.7817.4028.3131.0123.9827.63d, Delay for Lane Group [s/veh] 0.390.660.770.770.660.070.560.260.74X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.091.993.773.770.390.221.660.481.75d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.200.200.110.110.110.110.11k, delay calibration 8.5528.6718.0118.0117.0128.0929.3523.5025.88d1, Uniform Delay [s] 28103736106101956138300290630c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.210.070.300.300.250.010.050.050.14(v / s)_i Volume / Saturation Flow Rate 0.550.110.380.380.380.090.090.180.18g / C, Green / Cycle 377262626661212g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 676767676767676767C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-32 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]27.63 0.00 23.98 31.01 0.00 28.31 0.00 17.40 21.78 30.65 8.64 0.00 Movement LOS C C C C B C C A d_A, Approach Delay [s/veh]27.12 30.86 19.24 12.70 Approach LOS C C B B d_I, Intersection Delay [s/veh]18.69 Intersection LOS B Intersection V/C 0.724 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.646 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 909 1200 d_b, Bicycle Delay [s]55.00 55.00 16.36 8.80 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.479 2.293 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-33 0.585Volume to Capacity (v/c): CLevel Of Service: 26.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 201636241605400370021063387Total Analysis Volume [veh/h] 541156401350900531697Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 201636241605400370021063387Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 201636241605400370021063387Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-34 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0392118180100041410Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-35 47.0048.77269.9559.97243.6942.1521.61158.88157.2295th-Percentile Queue Length [ft/ln] 1.881.9510.802.409.751.690.866.366.2995th-Percentile Queue Length [veh/ln] 26.1127.09164.7133.32144.9623.4212.0088.2687.3450th-Percentile Queue Length [ft/ln] 1.041.086.591.335.800.940.483.533.4950th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesNoNoYesCritical Lane Group BBDADDACCLane Group LOS 14.4514.4435.878.1137.7349.993.7721.3221.35d, Delay for Lane Group [s/veh] 0.110.110.820.170.820.570.100.330.33X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.060.062.340.372.537.570.101.321.34d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 14.3914.3833.537.7435.2042.423.6720.0120.01d1, Uniform Delay [s] 808840757965662652041680671c, Capacity [veh/h] 179918703459158935601589281318051781s, saturation flow rate [veh/h] 0.050.050.180.100.150.020.070.130.13(v / s)_i Volume / Saturation Flow Rate 0.450.450.220.610.190.040.730.380.38g / C, Green / Cycle 40402055174653434g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-36 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]21.34 21.32 3.77 0.00 0.00 49.99 0.00 37.73 8.11 35.87 14.44 14.45 Movement LOS C C A D D A D B B d_A, Approach Delay [s/veh]15.75 49.99 30.96 31.01 Approach LOS B D C C d_I, Intersection Delay [s/veh]26.74 Intersection LOS C Intersection V/C 0.585 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 34.67 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.773 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]822 0 311 778 d_b, Bicycle Delay [s]15.61 45.00 32.09 16.81 I_b,int, Bicycle LOS Score for Intersection 2.649 4.132 2.137 2.225 Bicycle LOS B D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-37 0.645Volume to Capacity (v/c): CLevel Of Service: 28.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 358319144243865189867833214Total Analysis Volume [veh/h] 92153611101632252220854Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 358319144243865189867833214Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 358319144243865189867833214Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-38 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 011003800361304825Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-39 43.94148.12171.67258.68258.60305.229.74136.68127.28261.0495th-Percentile Queue Length [ft/ln] 1.765.926.8710.3510.3412.210.395.475.0910.4495th-Percentile Queue Length [veh/ln] 24.4182.2995.37156.20156.14191.695.4175.9370.71157.9850th-Percentile Queue Length [ft/ln] 0.983.293.816.256.257.670.223.042.836.3250th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group DEDDDBEAAELane Group LOS 51.2466.5246.0551.3651.3619.3664.309.469.2255.38d, Delay for Lane Group [s/veh] 0.340.850.600.820.820.500.330.250.250.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.9615.522.406.076.081.0210.190.500.268.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 49.2751.0043.6545.2845.2818.3454.118.968.9646.43d1, Uniform Delay [s] 10211924026926917831811722240247c, Capacity [veh/h] 1589185315891782178135601781186235601781s, saturation flow rate [veh/h] 0.020.060.090.120.120.250.000.150.150.12(v / s)_i Volume / Saturation Flow Rate 0.060.060.150.150.150.500.010.630.630.14g / C, Green / Cycle 77171717551696915g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-40 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.38 9.30 9.46 64.30 19.36 0.00 51.36 51.36 46.05 66.52 66.52 51.24 Movement LOS E A A E B D D D E E D d_A, Approach Delay [s/veh]18.66 19.66 50.05 62.62 Approach LOS B B D E d_I, Intersection Delay [s/veh]28.09 Intersection LOS C Intersection V/C 0.645 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.806 0.000 2.355 1.999 Crosswalk LOS C F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]800 582 618 127 d_b, Bicycle Delay [s]19.80 27.65 26.25 48.22 I_b,int, Bicycle LOS Score for Intersection 2.139 2.305 2.523 1.786 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 10: 10 PM Existing - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-41 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX D-II EXISTING PLUS PROJECT TRAFFIC CONDITIONS D-42 0.383Volume to Capacity (v/c): BLevel Of Service: 13.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 320114970002113971519561443Total Analysis Volume [veh/h] 802924000534944915411Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 320114970002113971519561443Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 320114970002113971519561443Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-43 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 03600000441004410Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-44 158.259.9264.8063.285.45105.6917.6236.0821.5095th-Percentile Queue Length [ft/ln] 6.332.402.592.530.224.230.701.440.8695th-Percentile Queue Length [veh/ln] 87.9133.2936.0035.163.0358.729.7920.0511.9550th-Percentile Queue Length [ft/ln] 3.521.331.441.410.122.350.390.800.4850th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesCritical Lane Group DCCCAADADLane Group LOS 40.2034.7334.7034.734.856.1549.364.5642.52d, Delay for Lane Group [s/veh] 0.780.270.270.270.020.300.380.130.28X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.190.580.540.560.030.175.940.060.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.11k, delay calibration 37.0234.1534.1634.174.815.9843.424.5141.57d1, Uniform Delay [s] 41224926926110734586394742156c, Capacity [veh/h] 281317021837178115896792178167923459s, saturation flow rate [veh/h] 0.110.040.040.040.010.210.010.090.01(v / s)_i Volume / Saturation Flow Rate 0.150.150.150.150.680.680.020.700.04g / C, Green / Cycle 1313131361612634g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-45 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]42.52 4.56 0.00 49.36 6.15 4.85 0.00 0.00 0.00 34.73 34.72 40.20 Movement LOS D A D A A C C D d_A, Approach Delay [s/veh]7.05 6.58 0.00 38.02 Approach LOS A A A D d_I, Intersection Delay [s/veh]13.07 Intersection LOS B Intersection V/C 0.383 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.801 2.541 Crosswalk LOS F F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]889 889 0 711 d_b, Bicycle Delay [s]13.89 13.89 45.00 18.69 I_b,int, Bicycle LOS Score for Intersection 1.831 2.151 4.132 1.998 Bicycle LOS A B D A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-46 0.527Volume to Capacity (v/c): BLevel Of Service: 16.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 000868278392011164038080Total Analysis Volume [veh/h] 000217701050291012020Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 000868278392011164038080Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 000868278392011164038080Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-47 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-48 337.00195.9724.06132.0569.7067.3295th-Percentile Queue Length [ft/ln] 13.487.840.965.282.792.6995th-Percentile Queue Length [veh/ln] 216.38109.9713.3773.3638.7237.4050th-Percentile Queue Length [ft/ln] 8.664.400.532.931.551.5050th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoCritical Lane Group CCBBAALane Group LOS 29.6322.4319.2010.869.989.85d, Delay for Lane Group [s/veh] 0.870.420.060.310.160.17X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.530.420.040.210.320.10d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 27.1022.0119.1610.659.669.75d1, Uniform Delay [s] 996662631378210383782c, Capacity [veh/h] 281318701781679218646792s, saturation flow rate [veh/h] 0.310.150.020.170.090.10(v / s)_i Volume / Saturation Flow Rate 0.350.350.350.560.560.56g / C, Green / Cycle 323232505050g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-49 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 9.88 9.98 0.00 10.86 0.00 19.20 22.43 29.63 0.00 0.00 0.00 Movement LOS A A B B C C d_A, Approach Delay [s/veh]9.88 10.86 27.60 0.00 Approach LOS A B C A d_I, Intersection Delay [s/veh]16.88 Intersection LOS B Intersection V/C 0.527 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.530 1.697 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 1.827 2.040 3.515 4.132 Bicycle LOS A B D D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-50 0.697Volume to Capacity (v/c): BLevel Of Service: 19.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 07721285641467050251960564Total Analysis Volume [veh/h] 01933214136701063240141Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 07721285641467050251960564Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 07721285641467050251960564Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-51 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 06612054000180036Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 120Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-52 87.8943.70225.45225.45212.823.1886.4655.00182.7895th-Percentile Queue Length [ft/ln] 3.521.759.029.028.510.133.462.207.3195th-Percentile Queue Length [veh/ln] 48.8324.28131.44131.44122.181.7648.0430.56101.5550th-Percentile Queue Length [ft/ln] 1.950.975.265.264.890.071.921.224.0650th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group BCCCBCCCCLane Group LOS 10.0430.0820.8920.8918.7526.3730.2022.2426.13d, Delay for Lane Group [s/veh] 0.310.450.730.730.680.030.660.280.76X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.071.112.202.200.460.061.930.451.66d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.130.130.110.110.110.110.11k, delay calibration 9.9728.9718.6918.6918.2926.3028.2721.7924.47d1, Uniform Delay [s] 25202855595591793175382340740c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.150.040.260.260.240.000.070.060.16(v / s)_i Volume / Saturation Flow Rate 0.490.080.350.350.350.110.110.210.21g / C, Green / Cycle 335232323771414g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 666666666666666666C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-53 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]26.13 0.00 22.24 30.20 0.00 26.37 0.00 18.75 20.89 30.08 10.04 0.00 Movement LOS C C C C B C C B d_A, Approach Delay [s/veh]25.56 30.13 19.61 12.89 Approach LOS C C B B d_I, Intersection Delay [s/veh]19.76 Intersection LOS B Intersection V/C 0.697 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]49.50 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.577 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 833 1033 d_b, Bicycle Delay [s]60.00 60.00 20.42 14.02 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.397 2.055 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-54 0.492Volume to Capacity (v/c): BLevel Of Service: 19.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 219925551477090063375561Total Analysis Volume [veh/h] 5256413119020015819140Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 219925551477090063375561Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 219925551477090063375561Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-55 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0351916160100045450Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-56 38.1939.62120.7910.43223.1911.9968.19171.17171.7695th-Percentile Queue Length [ft/ln] 1.531.584.830.428.930.482.736.856.8795th-Percentile Queue Length [veh/ln] 21.2222.0167.115.79129.786.6637.8995.0995.4250th-Percentile Queue Length [ft/ln] 0.850.882.680.235.190.271.523.803.8250th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesYesNoNoCritical Lane Group CCDADEABBLane Group LOS 20.6120.5838.253.5839.1155.134.1013.7913.85d, Delay for Lane Group [s/veh] 0.100.100.580.040.810.400.300.340.35X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.070.071.210.072.8111.100.371.001.03d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 20.5320.5237.043.5136.3044.033.7312.7912.82d1, Uniform Delay [s] 5926294401153586222100930920c, Capacity [veh/h] 175918703459158935601589281318011781s, saturation flow rate [veh/h] 0.030.030.070.030.130.010.220.180.18(v / s)_i Volume / Saturation Flow Rate 0.340.340.130.730.160.010.750.520.52g / C, Green / Cycle 30301165151674747g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-57 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]13.83 13.79 4.10 0.00 0.00 55.13 0.00 39.11 3.58 38.25 20.59 20.61 Movement LOS B B A E D A D C C d_A, Approach Delay [s/veh]8.97 55.13 35.68 32.60 Approach LOS A E D C d_I, Intersection Delay [s/veh]19.69 Intersection LOS B Intersection V/C 0.492 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 34.67 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.766 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]911 0 267 689 d_b, Bicycle Delay [s]13.34 45.00 33.80 19.34 I_b,int, Bicycle LOS Score for Intersection 3.653 4.132 1.995 1.869 Bicycle LOS D D A A ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-58 0.611Volume to Capacity (v/c): CLevel Of Service: 26.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 3515519418741102410211640194Total Analysis Volume [veh/h] 11014510518525626316049Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515519418741102410211640194Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515519418741102410211640194Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-59 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 010003800363302926Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-60 4.438.8060.87258.95258.15307.06139.50105.1298.28241.6195th-Percentile Queue Length [ft/ln] 0.180.352.4310.3610.3312.285.584.203.939.6695th-Percentile Queue Length [veh/ln] 2.464.8933.82156.40155.80193.1177.5058.4054.60143.4150th-Percentile Queue Length [ft/ln] 0.100.201.356.266.237.723.102.342.185.7450th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group EEDDDBEAAELane Group LOS 56.2357.9941.8952.0052.0315.5659.649.479.2955.83d, Delay for Lane Group [s/veh] 0.130.230.230.830.830.510.780.190.190.85X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.634.310.506.476.500.929.520.380.208.81d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 53.6053.6741.3945.5345.5314.6450.129.099.0947.02d1, Uniform Delay [s] 2326235265264201113111472203227c, Capacity [veh/h] 1589185515891788178135601781185435601781s, saturation flow rate [veh/h] 0.000.000.030.120.120.290.060.120.120.11(v / s)_i Volume / Saturation Flow Rate 0.010.010.150.150.150.570.070.620.620.13g / C, Green / Cycle 22161616628686814g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-61 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.83 9.35 9.47 59.64 15.56 0.00 52.01 52.00 41.89 57.99 57.99 56.23 Movement LOS E A A E B D D D E E E d_A, Approach Delay [s/veh]20.02 19.55 50.88 57.40 Approach LOS C B D E d_I, Intersection Delay [s/veh]26.09 Intersection LOS C Intersection V/C 0.611 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.775 0.000 2.309 1.996 Crosswalk LOS C F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]455 582 618 109 d_b, Bicycle Delay [s]32.84 27.65 26.25 49.16 I_b,int, Bicycle LOS Score for Intersection 2.024 2.489 2.371 1.574 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 11: 11 AM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-62 0.700Volume to Capacity (v/c): CLevel Of Service: 26.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 25496457000211506173891089205Total Analysis Volume [veh/h] 6424114000537749727251Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 25496457000211506173891089205Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 25496457000211506173891089205Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-63 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 05600000421004412Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-64 103.1271.5627.443.6314.15280.9624.19185.24134.1995th-Percentile Queue Length [ft/ln] 4.1310.8625.101.750.5711.240.977.415.3795th-Percentile Queue Length [veh/ln] 57.30165.9452.924.247.86173.0813.44102.9174.5550th-Percentile Queue Length [ft/ln] 2.296.6418.120.970.316.920.544.122.9850th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesNoNoYesCritical Lane Group CCDCBCEBELane Group LOS 23.9527.4244.6722.4517.2322.3359.5216.9156.15d, Delay for Lane Group [s/veh] 0.240.510.920.090.030.500.410.320.81X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.120.6411.720.060.080.596.530.265.97d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.260.110.500.500.110.500.11k, delay calibration 23.8326.7732.9522.3917.1521.7452.9816.6550.17d1, Uniform Delay [s] 10476336966637083024413367254c, Capacity [veh/h] 281317021870178115896792178167923459s, saturation flow rate [veh/h] 0.090.190.340.030.010.220.010.160.06(v / s)_i Volume / Saturation Flow Rate 0.370.370.370.370.450.450.020.500.07g / C, Green / Cycle 4141414149492558g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-65 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]56.15 16.91 0.00 59.52 22.33 17.23 0.00 0.00 0.00 22.45 38.87 23.95 Movement LOS E B E C B C D C d_A, Approach Delay [s/veh]23.13 22.67 0.00 35.16 Approach LOS C C A D d_I, Intersection Delay [s/veh]26.69 Intersection LOS C Intersection V/C 0.700 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.305 2.672 Crosswalk LOS F F B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]727 691 0 945 d_b, Bicycle Delay [s]22.27 23.56 55.00 15.29 I_b,int, Bicycle LOS Score for Intersection 2.093 2.197 4.132 2.611 Bicycle LOS B B D B ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-66 0.411Volume to Capacity (v/c): BLevel Of Service: 11.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00050817462380118502416200Total Analysis Volume [veh/h] 000127441695296064050Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00050817462380118502416200Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00050817462380118502416200Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-67 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-68 231.32147.6349.1478.6493.3189.3995th-Percentile Queue Length [ft/ln] 9.255.911.973.153.733.5895th-Percentile Queue Length [veh/ln] 135.7782.0227.3043.6951.8449.6650th-Percentile Queue Length [ft/ln] 5.433.281.091.752.071.9950th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesCritical Lane Group DCCAAALane Group LOS 36.7631.1428.775.205.585.34d, Delay for Lane Group [s/veh] 0.830.430.160.250.260.28X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.100.720.190.130.480.15d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 33.6630.4128.585.075.105.20d1, Uniform Delay [s] 609405385471712824717c, Capacity [veh/h] 281318701781679218466792s, saturation flow rate [veh/h] 0.180.090.030.170.180.19(v / s)_i Volume / Saturation Flow Rate 0.220.220.220.690.690.69g / C, Green / Cycle 191919626262g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-69 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 5.39 5.58 0.00 5.20 0.00 28.77 31.14 36.76 0.00 0.00 0.00 Movement LOS A A A C C D d_A, Approach Delay [s/veh]5.39 5.20 34.78 0.00 Approach LOS A A C A d_I, Intersection Delay [s/veh]11.45 Intersection LOS B Intersection V/C 0.411 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.444 1.616 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 2.102 2.048 2.787 4.132 Bicycle LOS B B C D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-70 0.728Volume to Capacity (v/c): BLevel Of Service: 18.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 0109524694412960100169760477Total Analysis Volume [veh/h] 02746223632403042190119Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0109524694412960100169760477Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0109524694412960100169760477Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-71 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 07417057000130028Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 115Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-72 116.2386.86265.96265.96219.006.8159.8946.07160.8795th-Percentile Queue Length [ft/ln] 4.653.4710.6410.648.760.272.401.846.4395th-Percentile Queue Length [veh/ln] 64.5748.25161.69161.69126.703.7833.2725.6089.3750th-Percentile Queue Length [ft/ln] 2.581.936.476.475.070.151.331.023.5750th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group ACCCBCCCCLane Group LOS 8.7430.9122.1822.1817.5428.5631.3024.0027.76d, Delay for Lane Group [s/veh] 0.390.660.770.770.660.070.570.260.75X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.092.003.993.990.390.221.700.461.77d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.210.210.110.110.110.110.11k, delay calibration 8.6528.9018.1918.1917.1528.3429.6123.5325.99d1, Uniform Delay [s] 28083726116111957137298294639c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.210.070.300.300.250.010.050.050.14(v / s)_i Volume / Saturation Flow Rate 0.550.110.380.380.380.090.090.180.18g / C, Green / Cycle 377262626661212g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 676767676767676767C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-73 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]27.76 0.00 24.00 31.30 0.00 28.56 0.00 17.54 22.18 30.91 8.74 0.00 Movement LOS C C C C B C C A d_A, Approach Delay [s/veh]27.24 31.15 19.50 12.81 Approach LOS C C B B d_I, Intersection Delay [s/veh]18.89 Intersection LOS B Intersection V/C 0.728 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]47.03 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.651 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 922 1217 d_b, Bicycle Delay [s]57.50 57.50 16.71 8.80 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.484 2.297 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-74 0.586Volume to Capacity (v/c): CLevel Of Service: 26.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 201656241625410370021063389Total Analysis Volume [veh/h] 541156411350900531697Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 201656241625410370021063389Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 201656241625410370021063389Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-75 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0392118180100041410Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-76 47.5149.28269.9560.81244.0042.1521.65159.81158.1695th-Percentile Queue Length [ft/ln] 1.901.9710.802.439.761.690.876.396.3395th-Percentile Queue Length [veh/ln] 26.4027.38164.7133.78145.2023.4212.0388.7887.8750th-Percentile Queue Length [ft/ln] 1.061.106.591.355.810.940.483.553.5150th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesNoNoYesCritical Lane Group BBDADDACCLane Group LOS 14.4414.4335.878.1337.7049.993.7821.3721.40d, Delay for Lane Group [s/veh] 0.110.110.820.170.820.570.100.330.34X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.060.062.340.382.537.570.101.331.35d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 14.3814.3833.537.7535.1842.423.6820.0420.05d1, Uniform Delay [s] 809841757965663652040679670c, Capacity [veh/h] 180018703459158935601589281318051781s, saturation flow rate [veh/h] 0.050.050.180.100.150.020.070.130.13(v / s)_i Volume / Saturation Flow Rate 0.450.450.220.610.190.040.730.380.38g / C, Green / Cycle 40402055174653434g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-77 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]21.39 21.37 3.78 0.00 0.00 49.99 0.00 37.70 8.13 35.87 14.43 14.44 Movement LOS C C A D D A D B B d_A, Approach Delay [s/veh]15.80 49.99 30.89 30.97 Approach LOS B D C C d_I, Intersection Delay [s/veh]26.72 Intersection LOS C Intersection V/C 0.586 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 34.67 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.773 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]822 0 311 778 d_b, Bicycle Delay [s]15.61 45.00 32.09 16.81 I_b,int, Bicycle LOS Score for Intersection 2.652 4.132 2.140 2.227 Bicycle LOS B D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-78 0.647Volume to Capacity (v/c): CLevel Of Service: 28.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 358319144244265390067835214Total Analysis Volume [veh/h] 92153611111632252220954Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 358319144244265390067835214Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 358319144244265390067835214Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-79 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 011003800361304825Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-80 43.94148.12171.28260.49260.41306.709.74137.63128.17261.0495th-Percentile Queue Length [ft/ln] 1.765.926.8510.4210.4212.270.395.515.1310.4495th-Percentile Queue Length [veh/ln] 24.4182.2995.16157.56157.50192.835.4176.4671.20157.9850th-Percentile Queue Length [ft/ln] 0.983.293.816.306.307.710.223.062.856.3250th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group DEDDDBEAAELane Group LOS 51.2466.5245.8751.2951.2919.4764.309.529.2855.38d, Delay for Lane Group [s/veh] 0.340.850.600.820.820.510.330.250.250.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.9615.522.346.076.071.0310.190.500.268.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 49.2751.0043.5345.2245.2218.4454.119.029.0246.43d1, Uniform Delay [s] 10211924227127117791811692236247c, Capacity [veh/h] 1589185315891782178135601781186235601781s, saturation flow rate [veh/h] 0.020.060.090.120.120.250.000.160.160.12(v / s)_i Volume / Saturation Flow Rate 0.060.060.150.150.150.500.010.630.630.14g / C, Green / Cycle 77171717551696915g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-81 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.38 9.36 9.52 64.30 19.47 0.00 51.29 51.29 45.87 66.52 66.52 51.24 Movement LOS E A A E B D D D E E D d_A, Approach Delay [s/veh]18.69 19.77 49.96 62.62 Approach LOS B B D E d_I, Intersection Delay [s/veh]28.14 Intersection LOS C Intersection V/C 0.647 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.807 0.000 2.356 1.999 Crosswalk LOS C F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]800 582 618 127 d_b, Bicycle Delay [s]19.80 27.65 26.25 48.22 I_b,int, Bicycle LOS Score for Intersection 2.140 2.307 2.530 1.786 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 12: 12 PM Existing + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-82 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX D-III YEAR 2021 CUMULATIVE TRAFFIC CONDITIONS D-83 0.564Volume to Capacity (v/c): BLevel Of Service: 14.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 4801191120002220741632188545Total Analysis Volume [veh/h] 1203028000651948022111Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 4801191120002220741632188545Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4801191120002220741632188545Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-84 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 03600000441004410Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-85 222.460.3264.8963.307.27221.5518.6671.8422.4795th-Percentile Queue Length [ft/ln] 8.902.412.602.530.298.860.752.870.9095th-Percentile Queue Length [veh/ln] 129.233.5136.0535.174.04128.5710.3739.9112.4950th-Percentile Queue Length [ft/ln] 5.171.341.441.410.165.140.411.600.5050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesCritical Lane Group DCCCABDADLane Group LOS 37.4230.0029.9930.006.8110.0349.146.8942.45d, Delay for Lane Group [s/veh] 0.830.210.210.210.020.500.390.200.28X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.160.300.280.290.040.425.790.110.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.11k, delay calibration 34.2629.7129.7129.716.779.6143.346.7941.50d1, Uniform Delay [s] 5783503763669784177414333160c, Capacity [veh/h] 281317021830178115896792178167923459s, saturation flow rate [veh/h] 0.170.040.040.040.010.310.010.130.01(v / s)_i Volume / Saturation Flow Rate 0.210.210.210.210.620.620.020.640.05g / C, Green / Cycle 1818181855552584g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-86 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]42.45 6.89 0.00 49.14 10.03 6.81 0.00 0.00 0.00 30.00 30.00 37.42 Movement LOS D A D B A C C D d_A, Approach Delay [s/veh]8.61 10.29 0.00 35.01 Approach LOS A B A D d_I, Intersection Delay [s/veh]14.56 Intersection LOS B Intersection V/C 0.564 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.805 2.571 Crosswalk LOS F F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]889 889 0 711 d_b, Bicycle Delay [s]13.89 13.89 45.00 18.69 I_b,int, Bicycle LOS Score for Intersection 1.943 2.431 4.132 2.146 Bicycle LOS A B D B ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-87 0.622Volume to Capacity (v/c): BLevel Of Service: 17.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0009493374149715550312060Total Analysis Volume [veh/h] 0002378410124389013020Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0009493374149715550312060Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0009493374149715550312060Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-88 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-89 355.96223.5323.77204.25119.97116.3895th-Percentile Queue Length [ft/ln] 14.248.940.958.174.804.6695th-Percentile Queue Length [veh/ln] 231.26130.0213.20115.9566.6564.6550th-Percentile Queue Length [ft/ln] 9.255.200.534.642.672.5950th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoCritical Lane Group CCBBBBLane Group LOS 27.8621.0917.3413.5712.2812.04d, Delay for Lane Group [s/veh] 0.870.470.060.440.250.27X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.350.470.040.390.600.19d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 25.5020.6217.3013.1811.6711.85d1, Uniform Delay [s] 108872368835619783561c, Capacity [veh/h] 281318701781679218666792s, saturation flow rate [veh/h] 0.340.180.020.230.130.14(v / s)_i Volume / Saturation Flow Rate 0.390.390.390.520.520.52g / C, Green / Cycle 353535474747g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-90 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 12.08 12.28 0.00 13.57 0.00 17.34 21.09 27.86 0.00 0.00 0.00 Movement LOS B B B B C C d_A, Approach Delay [s/veh]12.08 13.57 25.81 0.00 Approach LOS B B C A d_I, Intersection Delay [s/veh]17.10 Intersection LOS B Intersection V/C 0.622 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.558 1.754 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 1.959 2.201 3.749 4.132 Bicycle LOS A B D D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-91 0.773Volume to Capacity (v/c): CLevel Of Service: 23.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 095716865817140503091410599Total Analysis Volume [veh/h] 02394216542901077350150Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 095716865817140503091410599Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 095716865817140503091410599Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-92 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 06610056000100014Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-93 136.2669.51319.46319.46281.993.63124.4497.46220.0595th-Percentile Queue Length [ft/ln] 5.452.7812.7812.7811.280.154.983.908.8095th-Percentile Queue Length [veh/ln] 75.7038.62202.71202.71173.872.0169.1354.14127.4750th-Percentile Queue Length [ft/ln] 3.031.548.118.116.950.082.772.175.1050th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group BDCCCCCCCLane Group LOS 11.8536.2828.2728.2721.6929.2034.1626.1329.86d, Delay for Lane Group [s/veh] 0.380.630.810.810.760.030.720.400.79X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.092.386.666.660.650.052.250.761.90d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.270.270.110.110.110.110.11k, delay calibration 11.7633.9021.6121.6121.0429.1531.9125.3727.96d1, Uniform Delay [s] 25372695845841873198431348758c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.190.050.300.300.280.000.090.090.17(v / s)_i Volume / Saturation Flow Rate 0.500.080.370.370.370.120.120.220.22g / C, Green / Cycle 386282828991717g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 767676767676767676C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-94 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]29.86 0.00 26.13 34.16 0.00 29.20 0.00 21.69 28.27 36.28 11.85 0.00 Movement LOS C C C C C C D B d_A, Approach Delay [s/veh]29.15 34.08 24.32 15.50 Approach LOS C C C B d_I, Intersection Delay [s/veh]23.60 Intersection LOS C Intersection V/C 0.773 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]34.67 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.605 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 1156 1378 d_b, Bicycle Delay [s]45.00 45.00 8.02 4.36 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.538 2.178 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-95 0.558Volume to Capacity (v/c): CLevel Of Service: 21.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 2214729983605090066778611Total Analysis Volume [veh/h] 6377521151020016720153Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2214729983605090066778611Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2214729983605090066778611Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-96 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0371918180100043430Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-97 48.8250.42139.3719.39266.6311.9992.24212.87213.5095th-Percentile Queue Length [ft/ln] 1.952.025.570.7810.670.483.698.518.5495th-Percentile Queue Length [veh/ln] 27.1228.0177.4310.77162.206.6651.25122.22122.6750th-Percentile Queue Length [ft/ln] 1.081.123.100.436.490.272.054.894.9150th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesYesNoNoCritical Lane Group BBDADEABBLane Group LOS 17.3917.3836.924.2637.1855.135.4717.9118.00d, Delay for Lane Group [s/veh] 0.120.120.590.070.840.400.330.420.42X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.070.071.080.132.6911.100.451.561.60d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 17.3217.3135.844.1334.4944.035.0216.3616.40d1, Uniform Delay [s] 7057385101121722221993825816c, Capacity [veh/h] 178618703459158935601589281318001781s, saturation flow rate [veh/h] 0.050.050.090.050.170.010.240.190.19(v / s)_i Volume / Saturation Flow Rate 0.390.390.150.710.200.010.710.460.46g / C, Green / Cycle 35351364181644141g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-98 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]17.96 17.91 5.47 0.00 0.00 55.13 0.00 37.18 4.26 36.92 17.38 17.39 Movement LOS B B A E D A D B B d_A, Approach Delay [s/veh]11.82 55.13 33.20 29.87 Approach LOS B E C C d_I, Intersection Delay [s/veh]21.16 Intersection LOS C Intersection V/C 0.558 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 34.67 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.768 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 0 311 733 d_b, Bicycle Delay [s]14.45 45.00 32.09 18.05 I_b,int, Bicycle LOS Score for Intersection 3.797 4.132 2.127 1.946 Bicycle LOS D D B A ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-99 0.706Volume to Capacity (v/c): CLevel Of Service: 27.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 3515820474837119810611754223Total Analysis Volume [veh/h] 11015511920930027318956Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515820474837119810611754223Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515820474837119810611754223Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-100 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 010003800363302926Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-101 4.438.8062.75284.44283.63401.95144.58135.06126.24269.3995th-Percentile Queue Length [ft/ln] 0.180.352.5111.3811.3516.085.785.405.0510.7895th-Percentile Queue Length [veh/ln] 2.464.8934.86175.73175.12267.7780.3275.0370.13164.2950th-Percentile Queue Length [ft/ln] 0.100.201.397.037.0010.713.213.002.816.5750th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group EEDDDBEBBELane Group LOS 56.2357.9940.2850.9650.9819.7959.3510.7710.5355.02d, Delay for Lane Group [s/veh] 0.130.230.220.840.840.630.780.240.240.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.634.310.426.386.401.629.390.500.268.89d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 53.6053.6739.8644.5844.5818.1749.9610.2810.2846.14d1, Uniform Delay [s] 2326262295293189413611132135256c, Capacity [veh/h] 1589185515891788178135601781185635601781s, saturation flow rate [veh/h] 0.000.000.040.140.140.340.060.140.140.13(v / s)_i Volume / Saturation Flow Rate 0.010.010.160.160.160.530.080.600.600.14g / C, Green / Cycle 22181818598666616g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-102 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.02 10.61 10.77 59.35 19.79 0.00 50.97 50.96 40.28 57.99 57.99 56.23 Movement LOS E B B E B D D D E E E d_A, Approach Delay [s/veh]20.64 23.01 49.85 57.40 Approach LOS C C D E d_I, Intersection Delay [s/veh]27.49 Intersection LOS C Intersection V/C 0.706 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.827 0.000 2.331 1.997 Crosswalk LOS C F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]455 582 618 109 d_b, Bicycle Delay [s]32.84 27.65 26.25 49.16 I_b,int, Bicycle LOS Score for Intersection 2.103 2.635 2.470 1.574 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 13: 13 AM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-103 0.834Volume to Capacity (v/c): CLevel Of Service: 29.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 644100380000222249184861552213Total Analysis Volume [veh/h] 161251200006562512238853Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 644100380000222249184861552213Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 644100380000222249184861552213Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-104 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 06100000421004412Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 115Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-105 282.6288.6650.362.9116.02478.5926.69283.97151.5795th-Percentile Queue Length [ft/ln] 11.3111.5526.012.520.6419.141.0711.366.0695th-Percentile Queue Length [veh/ln] 174.3178.9472.134.958.90329.7014.83175.3884.2150th-Percentile Queue Length [ft/ln] 6.977.1618.891.400.3613.190.597.023.3750th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesNoNoYesCritical Lane Group CCDCBCECELane Group LOS 28.0327.1642.4622.3018.8229.5762.0220.6762.54d, Delay for Lane Group [s/veh] 0.580.510.900.110.030.760.430.480.88X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.490.619.590.070.091.956.680.509.61d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.260.110.500.500.110.500.11k, delay calibration 27.5326.5532.8722.2318.7327.6255.3420.1752.93d1, Uniform Delay [s] 11036677336996882941423258243c, Capacity [veh/h] 281317021870178115896792178167923459s, saturation flow rate [veh/h] 0.230.200.350.040.010.330.010.230.06(v / s)_i Volume / Saturation Flow Rate 0.390.390.390.390.430.430.020.480.07g / C, Green / Cycle 4545454550503558g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 115115115115115115115115115C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-106 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]62.54 20.67 0.00 62.02 29.57 18.82 0.00 0.00 0.00 22.30 37.26 28.03 Movement LOS E C E C B C D C d_A, Approach Delay [s/veh]25.72 29.72 0.00 33.12 Approach LOS C C A C d_I, Intersection Delay [s/veh]29.52 Intersection LOS C Intersection V/C 0.834 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 47.03 47.03 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.330 2.748 Crosswalk LOS F F B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]696 661 0 991 d_b, Bicycle Delay [s]24.46 25.78 57.50 14.63 I_b,int, Bicycle LOS Score for Intersection 2.288 2.504 4.132 2.984 Bicycle LOS B B D C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-107 0.536Volume to Capacity (v/c): BLevel Of Service: 12.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00064122064691164102521850Total Analysis Volume [veh/h] 0001605516173410065460Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00064122064691164102521850Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00064122064691164102521850Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-108 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-109 273.37176.6346.77150.11170.71165.9095th-Percentile Queue Length [ft/ln] 10.937.071.876.006.836.6495th-Percentile Queue Length [veh/ln] 167.3198.1325.9883.3994.8492.1750th-Percentile Queue Length [ft/ln] 6.693.931.043.343.793.6950th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesCritical Lane Group CCCAAALane Group LOS 34.0927.9425.147.778.387.99d, Delay for Lane Group [s/veh] 0.850.440.130.380.370.40X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.870.610.130.250.890.28d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 31.2327.3325.017.527.497.71d1, Uniform Delay [s] 752500476437211924372c, Capacity [veh/h] 281318701781679218516792s, saturation flow rate [veh/h] 0.230.120.040.240.240.26(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.640.640.64g / C, Green / Cycle 242424585858g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-110 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 8.06 8.38 0.00 7.77 0.00 25.14 27.94 34.09 0.00 0.00 0.00 Movement LOS A A A C C C d_A, Approach Delay [s/veh]8.07 7.77 32.01 0.00 Approach LOS A A C A d_I, Intersection Delay [s/veh]12.60 Intersection LOS B Intersection V/C 0.536 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.480 1.662 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 2.289 2.237 3.086 4.132 Bicycle LOS B B C D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-111 0.790Volume to Capacity (v/c): CLevel Of Service: 23.3Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 013512871026154201002151120541Total Analysis Volume [veh/h] 03387225738603054280135Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 013512871026154201002151120541Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 013512871026154201002151120541Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-112 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 06910059000100011Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-113 185.78117.44360.96360.96306.397.7588.9379.07206.7295th-Percentile Queue Length [ft/ln] 7.434.7014.4414.4412.260.313.563.168.2795th-Percentile Queue Length [veh/ln] 103.2165.25235.20235.20192.604.3049.4143.93117.7450th-Percentile Queue Length [ft/ln] 4.132.619.419.417.700.171.981.764.7150th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group BCCCCCDCCLane Group LOS 10.7434.8531.4131.4121.9231.8135.7927.0331.02d, Delay for Lane Group [s/veh] 0.480.710.850.850.800.070.660.350.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.132.299.639.630.780.192.280.661.97d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.320.320.110.110.110.110.11k, delay calibration 10.6132.5621.7821.7821.1431.6333.5126.3729.05d1, Uniform Delay [s] 27964056036031934150326318692c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.270.080.320.320.300.010.060.070.16(v / s)_i Volume / Saturation Flow Rate 0.550.120.380.380.380.090.090.200.20g / C, Green / Cycle 429292929771515g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 767676767676767676C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-114 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]31.02 0.00 27.03 35.79 0.00 31.81 0.00 21.92 31.41 34.85 10.74 0.00 Movement LOS C C D C C C C B d_A, Approach Delay [s/veh]30.34 35.61 25.72 14.96 Approach LOS C D C B d_I, Intersection Delay [s/veh]23.28 Intersection LOS C Intersection V/C 0.790 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]34.67 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.683 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 1222 1444 d_b, Bicycle Delay [s]45.00 45.00 6.81 3.47 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.619 2.461 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-115 0.652Volume to Capacity (v/c): CLevel Of Service: 29.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 212566751866420380024666465Total Analysis Volume [veh/h] 56416947161010006217116Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 212566751866420380024666465Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 212566751866420380024666465Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-116 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0643331310100026260Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-117 77.8079.89318.5180.19307.9948.7133.17216.69215.6695th-Percentile Queue Length [ft/ln] 3.113.2012.743.2112.321.951.338.678.6395th-Percentile Queue Length [veh/ln] 43.2244.38201.9744.55193.8327.0618.43125.01124.2650th-Percentile Queue Length [ft/ln] 1.731.788.081.787.751.080.745.004.9750th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesNoNoYesCritical Lane Group BBDADEACCLane Group LOS 14.6914.6939.708.9940.8256.144.7825.9726.02d, Delay for Lane Group [s/veh] 0.160.160.850.190.850.600.120.410.41X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.080.082.730.442.868.870.131.921.96d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 14.6114.6136.978.5537.9547.274.6624.0524.07d1, Uniform Delay [s] 875898792972753631993649641c, Capacity [veh/h] 182118703459158935601589281318021781s, saturation flow rate [veh/h] 0.080.080.200.120.180.020.090.150.15(v / s)_i Volume / Saturation Flow Rate 0.480.480.230.610.210.040.710.360.36g / C, Green / Cycle 48482361214713636g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 100100100100100100100100100C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-118 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]26.00 25.97 4.78 0.00 0.00 56.14 0.00 40.82 8.99 39.70 14.69 14.69 Movement LOS C C A E D A D B B d_A, Approach Delay [s/veh]19.28 56.14 33.67 32.42 Approach LOS B E C C d_I, Intersection Delay [s/veh]29.23 Intersection LOS C Intersection V/C 0.652 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 39.61 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.781 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]440 0 540 1200 d_b, Bicycle Delay [s]30.42 50.00 26.65 8.00 I_b,int, Bicycle LOS Score for Intersection 2.842 4.132 2.243 2.345 Bicycle LOS C D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-119 0.751Volume to Capacity (v/c): CLevel Of Service: 29.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 36862015125197201088671025237Total Analysis Volume [veh/h] 92253811301802722225659Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 36862015125197201088671025237Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 36862015125197201088671025237Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-120 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 012003800361104924Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-121 44.34144.46173.66294.65294.59418.789.74194.48182.48283.4095th-Percentile Queue Length [ft/ln] 1.775.786.9511.7911.7816.750.397.787.3011.3495th-Percentile Queue Length [veh/ln] 24.6480.2696.48183.56183.51281.265.41108.91101.38174.9550th-Percentile Queue Length [ft/ln] 0.993.213.867.347.3411.250.224.364.067.0050th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group DEDDDCEBBDLane Group LOS 49.8459.3643.1349.9649.9625.6864.3011.8211.4654.99d, Delay for Lane Group [s/veh] 0.310.780.540.840.840.670.330.320.320.88X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.489.231.676.016.012.2210.190.760.409.21d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 48.3650.1341.4643.9543.9523.4654.1111.0611.0645.78d1, Uniform Delay [s] 11713627731131116231811122124269c, Capacity [veh/h] 1589185315891782178135601781186335601781s, saturation flow rate [veh/h] 0.020.060.090.150.150.310.000.190.190.13(v / s)_i Volume / Saturation Flow Rate 0.070.070.170.170.170.460.010.600.600.15g / C, Green / Cycle 88191919501666617g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-122 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]54.99 11.58 11.82 64.30 25.68 0.00 49.96 49.96 43.13 59.36 59.36 49.84 Movement LOS D B B E C D D D E E D d_A, Approach Delay [s/veh]19.69 25.90 48.43 56.94 Approach LOS B C D E d_I, Intersection Delay [s/veh]29.57 Intersection LOS C Intersection V/C 0.751 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.873 0.000 2.383 2.001 Crosswalk LOS C F B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]818 582 618 145 d_b, Bicycle Delay [s]19.20 27.65 26.25 47.29 I_b,int, Bicycle LOS Score for Intersection 2.258 2.462 2.668 1.794 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 14: 14 PM 2021 Cumulative - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-123 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX D-IV YEAR 2021 CUMULATIVE PLUS PROJECT TRAFFIC CONDITIONS D-124 0.564Volume to Capacity (v/c): BLevel Of Service: 14.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 4801191120002220741633188645Total Analysis Volume [veh/h] 1203028000651948322211Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 4801191120002220741633188645Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 4801191120002220741633188645Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-125 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 03600000441004410Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-126 222.460.3264.8963.307.27221.5518.6671.9422.4795th-Percentile Queue Length [ft/ln] 8.902.412.602.530.298.860.752.880.9095th-Percentile Queue Length [veh/ln] 129.233.5136.0535.174.04128.5710.3739.9712.4950th-Percentile Queue Length [ft/ln] 5.171.341.441.410.165.140.411.600.5050th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesNoNoYesCritical Lane Group DCCCABDADLane Group LOS 37.4230.0029.9930.006.8110.0349.146.8942.45d, Delay for Lane Group [s/veh] 0.830.210.210.210.020.500.390.200.28X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 3.160.300.280.290.040.425.790.110.95d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.500.500.110.500.11k, delay calibration 34.2629.7129.7129.716.779.6143.346.7941.50d1, Uniform Delay [s] 5783503763669784177414333160c, Capacity [veh/h] 281317021830178115896792178167923459s, saturation flow rate [veh/h] 0.170.040.040.040.010.310.010.130.01(v / s)_i Volume / Saturation Flow Rate 0.210.210.210.210.620.620.020.640.05g / C, Green / Cycle 1818181855552584g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-127 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]42.45 6.89 0.00 49.14 10.03 6.81 0.00 0.00 0.00 30.00 30.00 37.42 Movement LOS D A D B A C C D d_A, Approach Delay [s/veh]8.61 10.29 0.00 35.01 Approach LOS A B A D d_I, Intersection Delay [s/veh]14.56 Intersection LOS B Intersection V/C 0.564 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 1.805 2.571 Crosswalk LOS F F A B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]889 889 0 711 d_b, Bicycle Delay [s]13.89 13.89 45.00 18.69 I_b,int, Bicycle LOS Score for Intersection 1.944 2.431 4.132 2.146 Bicycle LOS A B D B ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-128 0.623Volume to Capacity (v/c): BLevel Of Service: 17.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 0009533374149715550312160Total Analysis Volume [veh/h] 0002388410124389013040Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 0009533374149715550312160Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 0009533374149715550312160Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-129 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-130 356.91222.9723.69204.93121.63118.0095th-Percentile Queue Length [ft/ln] 14.288.920.958.204.874.7295th-Percentile Queue Length [veh/ln] 232.01129.6113.16116.4467.5765.5650th-Percentile Queue Length [ft/ln] 9.285.180.534.662.702.6250th-Percentile Queue Length [veh/ln] YesNoNoYesNoNoCritical Lane Group CCBBBBLane Group LOS 27.7820.9817.2513.6612.3812.13d, Delay for Lane Group [s/veh] 0.870.460.060.440.250.27X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.350.460.040.390.610.19d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 25.4320.5117.2113.2611.7611.94d1, Uniform Delay [s] 109272669135519763551c, Capacity [veh/h] 281318701781679218666792s, saturation flow rate [veh/h] 0.340.180.020.230.130.14(v / s)_i Volume / Saturation Flow Rate 0.390.390.390.520.520.52g / C, Green / Cycle 353535474747g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-131 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 12.18 12.38 0.00 13.66 0.00 17.25 20.98 27.78 0.00 0.00 0.00 Movement LOS B B B B C C d_A, Approach Delay [s/veh]12.18 13.66 25.73 0.00 Approach LOS B B C A d_I, Intersection Delay [s/veh]17.13 Intersection LOS B Intersection V/C 0.623 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.559 1.754 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 1.962 2.201 3.756 4.132 Bicycle LOS A B D D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-132 0.776Volume to Capacity (v/c): CLevel Of Service: 23.8Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 095916866817210503091410603Total Analysis Volume [veh/h] 02404216743001077350151Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 095916866817210503091410603Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 095916866817210503091410603Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-133 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 06510055000100015Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-134 137.5469.92324.88324.88285.573.65125.2097.86222.2395th-Percentile Queue Length [ft/ln] 5.502.8013.0013.0011.420.155.013.918.8995th-Percentile Queue Length [veh/ln] 76.4138.85206.92206.92176.602.0369.5654.37129.0750th-Percentile Queue Length [ft/ln] 3.061.558.288.287.060.082.782.175.1650th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group BDCCCCCCCLane Group LOS 11.9136.4728.7628.7621.8429.3534.3426.1829.98d, Delay for Lane Group [s/veh] 0.380.630.820.820.760.030.720.400.79X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.092.407.007.000.670.052.270.751.91d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.280.280.110.110.110.110.11k, delay calibration 11.8234.0721.7521.7521.1729.3032.0825.4328.07d1, Uniform Delay [s] 25372685855851875198430350761c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.190.050.300.300.280.000.090.090.17(v / s)_i Volume / Saturation Flow Rate 0.500.080.370.370.370.120.120.220.22g / C, Green / Cycle 386282828991717g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 767676767676767676C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-135 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]29.98 0.00 26.18 34.34 0.00 29.35 0.00 21.84 28.76 36.47 11.91 0.00 Movement LOS C C C C C C D B d_A, Approach Delay [s/veh]29.26 34.26 24.61 15.58 Approach LOS C C C B d_I, Intersection Delay [s/veh]23.80 Intersection LOS C Intersection V/C 0.776 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]34.67 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.607 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 1133 1356 d_b, Bicycle Delay [s]45.00 45.00 8.45 4.67 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.545 2.179 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-136 0.559Volume to Capacity (v/c): CLevel Of Service: 21.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 2214829987607090066778611Total Analysis Volume [veh/h] 6377522152020016720153Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 2214829987607090066778611Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2214829987607090066778611Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-137 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0371918180100043430Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-138 49.0350.64139.3220.40267.2511.9992.58213.23213.8695th-Percentile Queue Length [ft/ln] 1.962.035.570.8210.690.483.708.538.5595th-Percentile Queue Length [veh/ln] 27.2428.1377.4011.33162.676.6651.44122.48122.9450th-Percentile Queue Length [ft/ln] 1.091.133.100.456.510.272.064.904.9250th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesYesNoNoCritical Lane Group BBDADEABBLane Group LOS 17.3517.3336.904.2837.1355.135.5017.9818.06d, Delay for Lane Group [s/veh] 0.120.120.590.080.840.400.330.420.42X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.070.071.070.142.6811.100.451.561.61d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 17.2717.2635.834.1434.4544.035.0416.4116.45d1, Uniform Delay [s] 7077395101121724221991823814c, Capacity [veh/h] 178718703459158935601589281318001781s, saturation flow rate [veh/h] 0.050.050.090.050.170.010.240.190.19(v / s)_i Volume / Saturation Flow Rate 0.390.390.150.710.200.010.710.460.46g / C, Green / Cycle 36361364181644141g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090909090C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-139 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]18.03 17.98 5.50 0.00 0.00 55.13 0.00 37.13 4.28 36.90 17.34 17.35 Movement LOS B B A E D A D B B d_A, Approach Delay [s/veh]11.86 55.13 33.01 29.81 Approach LOS B E C C d_I, Intersection Delay [s/veh]21.15 Intersection LOS C Intersection V/C 0.559 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 34.67 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.768 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]867 0 311 733 d_b, Bicycle Delay [s]14.45 45.00 32.09 18.05 I_b,int, Bicycle LOS Score for Intersection 3.797 4.132 2.132 1.947 Bicycle LOS D D B A ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-140 0.707Volume to Capacity (v/c): CLevel Of Service: 27.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 3515820476839120010611754223Total Analysis Volume [veh/h] 11015511921030027318956Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 3515820476839120010611754223Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 3515820476839120010611754223Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-141 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 010003800362204026Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-142 4.438.8062.70285.32284.52403.37145.10135.08126.26269.3995th-Percentile Queue Length [ft/ln] 0.180.352.5111.4111.3816.135.805.405.0510.7895th-Percentile Queue Length [veh/ln] 2.464.8934.83176.41175.80268.9080.6175.0470.14164.2950th-Percentile Queue Length [ft/ln] 0.100.201.397.067.0310.763.223.002.816.5750th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group EEDDDBEBBELane Group LOS 56.2357.9940.2250.9250.9519.8759.7310.7810.5455.02d, Delay for Lane Group [s/veh] 0.130.230.220.840.840.630.790.240.240.87X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.634.310.426.386.401.639.710.500.268.89d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 53.6053.6739.8144.5444.5418.2350.0210.2810.2846.14d1, Uniform Delay [s] 2326263296294189213511132135256c, Capacity [veh/h] 1589185515891788178135601781185635601781s, saturation flow rate [veh/h] 0.000.000.040.140.140.340.060.140.140.13(v / s)_i Volume / Saturation Flow Rate 0.010.010.170.170.170.530.080.600.600.14g / C, Green / Cycle 22181818598666616g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-143 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]55.02 10.62 10.78 59.73 19.87 0.00 50.93 50.92 40.22 57.99 57.99 56.23 Movement LOS E B B E B D D D E E E d_A, Approach Delay [s/veh]20.64 23.10 49.81 57.40 Approach LOS C C D E d_I, Intersection Delay [s/veh]27.54 Intersection LOS C Intersection V/C 0.707 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.828 0.000 2.331 1.997 Crosswalk LOS C F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]655 582 618 109 d_b, Bicycle Delay [s]24.89 27.65 26.25 49.16 I_b,int, Bicycle LOS Score for Intersection 2.103 2.637 2.474 1.574 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 15: 15 AM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-144 0.834Volume to Capacity (v/c): CLevel Of Service: 29.5Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 1: State College Boulevard at Anaheim Way/I-5 NB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 644100380000222250184921552213Total Analysis Volume [veh/h] 161251200006563512338853Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 644100380000222250184921552213Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 644100380000222250184921552213Base Volume Input [veh/h] I-5 NB RampsAnaheim WayState College BoulevardState College BoulevardName Volumes Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-145 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.00.00.00.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.00.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001600330Pedestrian Clearance [s] 000000070070Walk [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Vehicle Extension [s] 06100000421004412Split [s] 0.01.00.00.00.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.00.00.00.03.03.00.03.03.0Amber [s] 03000000303003030Maximum Green [s] 060000066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040000061025Signal group SplitSplitSplitPermissPermissPermissPermissPermissProtecteUnsignaPermissProtecteControl Type Phasing & Timing 12.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 115Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-146 282.6288.6650.362.9116.02478.8726.69283.97151.5795th-Percentile Queue Length [ft/ln] 11.3111.5526.012.520.6419.151.0711.366.0695th-Percentile Queue Length [veh/ln] 174.3178.9472.134.958.90329.9314.83175.3884.2150th-Percentile Queue Length [ft/ln] 6.977.1618.891.400.3613.200.597.023.3750th-Percentile Queue Length [veh/ln] NoNoYesNoNoYesNoNoYesCritical Lane Group CCDCBCECELane Group LOS 28.0327.1642.4622.3018.8229.5862.0220.6762.54d, Delay for Lane Group [s/veh] 0.580.510.900.110.030.760.430.480.88X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.490.619.590.070.091.966.680.509.61d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.260.110.500.500.110.500.11k, delay calibration 27.5326.5532.8722.2318.7327.6355.3420.1752.93d1, Uniform Delay [s] 11036677336996882941423258243c, Capacity [veh/h] 281317021870178115896792178167923459s, saturation flow rate [veh/h] 0.230.200.350.040.010.330.010.230.06(v / s)_i Volume / Saturation Flow Rate 0.390.390.390.390.430.430.020.480.07g / C, Green / Cycle 4545454550503558g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 115115115115115115115115115C, Cycle Length [s] RCCLRCLCLLane Group Lane Group Calculations Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-147 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]62.54 20.67 0.00 62.02 29.58 18.82 0.00 0.00 0.00 22.30 37.26 28.03 Movement LOS E C E C B C D C d_A, Approach Delay [s/veh]25.72 29.73 0.00 33.12 Approach LOS C C A C d_I, Intersection Delay [s/veh]29.52 Intersection LOS C Intersection V/C 0.834 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 47.03 47.03 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.330 2.748 Crosswalk LOS F F B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]696 661 0 991 d_b, Bicycle Delay [s]24.46 25.78 57.50 14.63 I_b,int, Bicycle LOS Score for Intersection 2.288 2.504 4.132 2.984 Bicycle LOS B B D C ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 -------------421Ring 1 Sequence Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-148 0.540Volume to Capacity (v/c): BLevel Of Service: 12.7Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 2: State College Boulevard at I-5 SB Ramps Intersection Level Of Service Report YesYesNoNoCrosswalk NoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoPresence of On-Street Parking 00065022064691164202521920Total Analysis Volume [veh/h] 0001635516173411065480Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 00065022064691164202521920Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 00065022064691164202521920Base Volume Input [veh/h] I-5 SB RampsI-5 SB RampsState College BoulevardState College BoulevardName Volumes Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-149 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoPedestrian Recall NoNoNoMaximum Recall NoNoNoMinimum Recall 0.00.00.00.02.00.00.02.00.00.02.00.0l2, Clearance Lost Time [s] 0.00.00.00.02.00.00.02.00.00.02.00.0l1, Start-Up Lost Time [s] NoNoNoRest In Walk 00000001800130Pedestrian Clearance [s] 000000070070Walk [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Vehicle Extension [s] 000061002900290Split [s] 0.00.00.00.01.00.00.01.00.00.01.00.0All red [s] 0.00.00.00.03.00.00.03.00.00.03.00.0Amber [s] 000030003000300Maximum Green [s] 000060060060Minimum Green [s] ------------Lead / Lag Auxiliary Signal Groups 000080060020Signal group PermissPermissPermissSplitSplitSplitUnsignaPermissPermissPermissPermissPermissControl Type Phasing & Timing 8.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-150 276.12175.5946.50152.32173.76168.9495th-Percentile Queue Length [ft/ln] 11.047.021.866.096.956.7695th-Percentile Queue Length [veh/ln] 169.4097.5525.8484.6296.5493.8550th-Percentile Queue Length [ft/ln] 6.783.901.033.383.863.7550th-Percentile Queue Length [veh/ln] YesNoNoNoNoYesCritical Lane Group CCCAAALane Group LOS 33.9327.6724.917.928.558.15d, Delay for Lane Group [s/veh] 0.850.430.130.380.370.41X, volume / capacity Lane Group Results 1.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.00d3, Initial Queue Delay [s] 2.850.590.120.250.900.28d2, Incremental Delay [s] 1.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.500.50k, delay calibration 31.0727.0824.787.667.647.87d1, Uniform Delay [s] 761506482434911864349c, Capacity [veh/h] 281318701781679218526792s, saturation flow rate [veh/h] 0.230.120.040.240.240.26(v / s)_i Volume / Saturation Flow Rate 0.270.270.270.640.640.64g / C, Green / Cycle 242424585858g_i, Effective Green Time [s] 2.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 909090909090C, Cycle Length [s] RCLCCCLane Group Lane Group Calculations Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-151 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]0.00 8.23 8.55 0.00 7.92 0.00 24.91 27.67 33.93 0.00 0.00 0.00 Movement LOS A A A C C C d_A, Approach Delay [s/veh]8.23 7.92 31.83 0.00 Approach LOS A A C A d_I, Intersection Delay [s/veh]12.72 Intersection LOS B Intersection V/C 0.540 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 0.00 34.67 34.67 I_p,int, Pedestrian LOS Score for Intersection 0.000 0.000 2.481 1.662 Crosswalk LOS F F B A s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]556 556 1267 0 d_b, Bicycle Delay [s]23.47 23.47 6.05 45.00 I_b,int, Bicycle LOS Score for Intersection 2.291 2.237 3.101 4.132 Bicycle LOS B B C D ----------------Ring 4 ----------------Ring 3 --------------86Ring 2 ---------------2Ring 1 Sequence Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-152 0.794Volume to Capacity (v/c): CLevel Of Service: 23.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 6: I-5 Ramps at Chapman Avenue Intersection Level Of Service Report NoNoNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 013582871032154601002151120550Total Analysis Volume [veh/h] 03407225838703054280138Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 013582871032154601002151120550Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 013582871032154601002151120550Base Volume Input [veh/h] Chapman AvenueChapman AvenueI-5 RampsI-5 RampsName Volumes Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-153 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoPedestrian Recall NoNoNoNoNoMaximum Recall NoNoNoNoNoMinimum Recall 0.02.02.00.02.00.00.00.02.00.00.02.0l2, Clearance Lost Time [s] 0.02.02.00.02.00.00.00.02.00.00.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0000410000000Pedestrian Clearance [s] 000070000000Walk [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Vehicle Extension [s] 06610056000100014Split [s] 0.01.01.00.01.00.00.00.01.00.00.01.0All red [s] 0.03.03.00.03.00.00.00.03.00.00.03.0Amber [s] 03030030000300030Maximum Green [s] 066060006006Minimum Green [s] --Lead-----Lead--LeadLead / Lag Auxiliary Signal Groups 047080001005Signal group PermissPermissProtectePermissPermissPermissSplitPermissSplitSplitPermissSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 90Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-154 189.44118.29367.98367.98310.077.8089.5779.28210.4695th-Percentile Queue Length [ft/ln] 7.584.7314.7214.7212.400.313.583.178.4295th-Percentile Queue Length [veh/ln] 105.3065.72240.75240.75195.444.3349.7644.05120.4650th-Percentile Queue Length [ft/ln] 4.212.639.639.637.820.171.991.764.8250th-Percentile Queue Length [veh/ln] NoYesNoYesNoNoYesNoYesCritical Lane Group BDCCCCDCCLane Group LOS 10.8935.0732.2432.2422.1732.0236.0227.0031.12d, Delay for Lane Group [s/veh] 0.490.710.860.860.800.070.660.350.78X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.132.3010.2110.210.810.192.290.641.98d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.330.330.110.110.110.110.11k, delay calibration 10.7632.7722.0322.0321.3631.8333.7326.3629.13d1, Uniform Delay [s] 27894056026021929150325322701c, Capacity [veh/h] 509434591589158950941589345915893459s, saturation flow rate [veh/h] 0.270.080.320.320.300.010.060.070.16(v / s)_i Volume / Saturation Flow Rate 0.550.120.380.380.380.090.090.200.20g / C, Green / Cycle 429292929771616g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 777777777777777777C, Cycle Length [s] CLRCCRLRLLane Group Lane Group Calculations Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-155 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]31.12 0.00 27.00 36.02 0.00 32.02 0.00 22.17 32.24 35.07 10.89 0.00 Movement LOS C C D C C C D B d_A, Approach Delay [s/veh]30.42 35.84 26.20 15.11 Approach LOS C D C B d_I, Intersection Delay [s/veh]23.60 Intersection LOS C Intersection V/C 0.794 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]34.67 0.00 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 2.686 0.000 0.000 0.000 Crosswalk LOS B F F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]0 0 1156 1378 d_b, Bicycle Delay [s]45.00 45.00 8.02 4.36 I_b,int, Bicycle LOS Score for Intersection 4.132 4.132 2.623 2.464 Bicycle LOS D D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-15Ring 1 Sequence Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-156 0.653Volume to Capacity (v/c): CLevel Of Service: 29.2Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 15: Designer Dirve/SR-22 WB Ramps at Metropolitan Drive Intersection Level Of Service Report NoNoYesNoCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 212586751886430380024666467Total Analysis Volume [veh/h] 56516947161010006217117Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 212586751886430380024666467Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 212586751886430380024666467Base Volume Input [veh/h] Metropolitan DriveMetropolitan DriveDesigner DriveSR-22 WB RampsName Volumes Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-157 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoNoMinimum Recall 0.02.02.02.02.00.02.00.00.02.02.00.0l2, Clearance Lost Time [s] 0.02.02.02.02.00.02.00.00.02.02.00.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 0220000000000Pedestrian Clearance [s] 070000000000Walk [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Vehicle Extension [s] 0643331310100026260Split [s] 0.01.01.01.01.00.01.00.00.01.01.00.0All red [s] 0.03.03.03.03.00.03.00.00.03.03.00.0Amber [s] 0303030300300030300Maximum Green [s] 066660600660Minimum Green [s] --Lead---------Lead / Lag 2,82,7Auxiliary Signal Groups 047880600220Signal group PermissPermissProtecteOverlapPermissPermissSplitPermissSplitOverlapSplitSplitControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 100Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-158 78.3680.44318.5181.18308.3348.7133.23217.58216.5695th-Percentile Queue Length [ft/ln] 3.133.2212.743.2512.331.951.338.708.6695th-Percentile Queue Length [veh/ln] 43.5344.69201.9745.10194.0927.0618.46125.66124.9150th-Percentile Queue Length [ft/ln] 1.741.798.081.807.761.080.745.035.0050th-Percentile Queue Length [veh/ln] NoNoYesNoYesYesNoNoYesCritical Lane Group BBDADEACCLane Group LOS 14.6814.6839.709.0140.7956.144.7926.0326.08d, Delay for Lane Group [s/veh] 0.160.160.850.190.850.600.120.410.41X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 0.080.082.730.442.868.870.131.941.97d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.500.110.110.500.500.50k, delay calibration 14.6014.6036.978.5737.9347.274.6724.0924.11d1, Uniform Delay [s] 875899792972754631993648641c, Capacity [veh/h] 182118703459158935601589281318021781s, saturation flow rate [veh/h] 0.080.080.200.120.180.020.090.150.15(v / s)_i Volume / Saturation Flow Rate 0.480.480.230.610.210.040.710.360.36g / C, Green / Cycle 48482361214713636g_i, Effective Green Time [s] 2.002.002.000.002.002.000.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 100100100100100100100100100C, Cycle Length [s] CCLRCRRCLLane Group Lane Group Calculations Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-159 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]26.06 26.03 4.79 0.00 0.00 56.14 0.00 40.79 9.01 39.70 14.68 14.68 Movement LOS C C A E D A D B B d_A, Approach Delay [s/veh]19.34 56.14 33.60 32.38 Approach LOS B E C C d_I, Intersection Delay [s/veh]29.21 Intersection LOS C Intersection V/C 0.653 Other Modes g_Walk,mi, Effective Walk Time [s]0.0 11.0 0.0 0.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]0.00 39.61 0.00 0.00 I_p,int, Pedestrian LOS Score for Intersection 0.000 1.781 0.000 0.000 Crosswalk LOS F A F F s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]440 0 540 1200 d_b, Bicycle Delay [s]30.42 50.00 26.65 8.00 I_b,int, Bicycle LOS Score for Intersection 2.845 4.132 2.245 2.347 Bicycle LOS C D B B ----------------Ring 4 ----------------Ring 3 ------------87--Ring 2 ------------4-62Ring 1 Sequence Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-160 0.753Volume to Capacity (v/c): CLevel Of Service: 29.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: SignalizedControl Type: Intersection 17: The City Drive at SR-22 EB Ramps Intersection Level Of Service Report YesYesNoYesCrosswalk NoNoNoNoCurb Present 0.000.000.000.00Grade [%] 30.0030.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.0012.00Lane Width [ft] RightThruLeftRightThruLeftRightThruLeftRightThruLeftTurning Movement Lane Configuration WestboundEastboundSouthboundNorthboundApproach SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Intersection Setup 0000Bicycle Volume [bicycles/h] 0000v_ab, Corner Pedestrian Volume [ped/h] 0000v_ci, Inbound Pedestrian Volume crossing mi 0000v_co, Outbound Pedestrian Volume crossing 0000v_di, Inbound Pedestrian Volume crossing m 0000v_do, Outbound Pedestrian Volume crossing 000000000000Local Bus Stopping Rate [/h] 000000000000On-Street Parking Maneuver Rate [/h] NoNoNoNoNoNoNoNoPresence of On-Street Parking 36862015125237221090671027237Total Analysis Volume [veh/h] 92253811311812732225759Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Peak Hour Factor 36862015125237221090671027237Total Hourly Volume [veh/h] 000000000000Right-Turn on Red Volume [veh/h] 000000000000Other Volume [veh/h] 000000000000Existing Site Adjustment Volume [veh/h] 000000000000Pass-by Trips [veh/h] 000000000000Diverted Trips [veh/h] 000000000000Site-Generated Trips [veh/h] 000000000000In-Process Volume [veh/h] 1.001.001.001.001.001.001.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.002.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 36862015125237221090671027237Base Volume Input [veh/h] SR-22 EB RampsSR-22 EB RampsThe City DriveThe City DriveName Volumes Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-161 0Pedestrian Clearance [s] 0Pedestrian Walk [s] 0Pedestrian Signal Group Exclusive Pedestrian Phase 1.001.001.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Length [ft] 0.00.00.00.00.00.00.00.00.00.00.00.0Detector Location [ft] NoNoNoNoNoNoPedestrian Recall NoNoNoNoNoNoMaximum Recall NoNoNoNoNoNoMinimum Recall 0.02.00.00.02.00.00.02.02.00.02.02.0l2, Clearance Lost Time [s] 0.02.00.00.02.00.00.02.02.00.02.02.0l1, Start-Up Lost Time [s] NoNoNoNoRest In Walk 000027002500180Pedestrian Clearance [s] 000070070070Walk [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Vehicle Extension [s] 012003800361104924Split [s] 0.01.00.00.01.00.00.01.01.00.01.01.0All red [s] 0.03.00.00.03.00.00.03.03.00.03.03.0Amber [s] 030003000303003030Maximum Green [s] 060060066066Minimum Green [s] --------Lead--LeadLead / Lag Auxiliary Signal Groups 040080061025Signal group SplitSplitSplitSplitSplitSplitUnsignaPermissProtectePermissPermissProtecteControl Type Phasing & Timing 16.00Lost time [s] SingleBandPermissive Mode LeadGreenOffset Reference 0.0Offset [s] Fully actuatedActuation Type Time of Day Pattern CoordinatedCoordination Type 110Cycle Length [s] -Signal Coordination Group NoLocated in CBD Intersection Settings Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-162 44.34144.46173.32296.41296.35420.739.74195.41183.60283.4095th-Percentile Queue Length [ft/ln] 1.775.786.9311.8611.8516.830.397.827.3411.3495th-Percentile Queue Length [veh/ln] 24.6480.2696.29184.91184.86282.835.41109.57102.00174.9550th-Percentile Queue Length [ft/ln] 0.993.213.857.407.3911.310.224.384.087.0050th-Percentile Queue Length [veh/ln] NoYesNoNoYesYesNoNoNoYesCritical Lane Group DEDDDCEBBDLane Group LOS 49.8459.3642.9849.8949.9025.8464.3011.8911.5354.99d, Delay for Lane Group [s/veh] 0.310.780.540.840.840.670.330.320.320.88X, volume / capacity Lane Group Results 1.001.001.001.001.001.001.001.001.001.00PF, progression factor 1.001.001.001.001.001.001.001.001.001.00Rp, platoon ratio 0.000.000.000.000.000.000.000.000.000.00d3, Initial Queue Delay [s] 1.489.231.636.016.012.2510.190.760.409.21d2, Incremental Delay [s] 1.001.001.001.001.001.001.001.001.001.00I, Upstream Filtering Factor 0.110.110.110.110.110.500.110.500.500.11k, delay calibration 48.3650.1341.3543.8943.8923.5854.1111.1311.1345.78d1, Uniform Delay [s] 11713627931331316191811102120269c, Capacity [veh/h] 1589185315891782178135601781186435601781s, saturation flow rate [veh/h] 0.020.060.090.150.150.310.000.190.190.13(v / s)_i Volume / Saturation Flow Rate 0.070.070.180.180.180.460.010.600.600.15g / C, Green / Cycle 88191919501666617g_i, Effective Green Time [s] 2.002.002.002.002.002.002.002.002.002.00l2, Clearance Lost Time [s] 0.000.000.000.000.000.000.000.000.000.00l1_p, Permitted Start-Up Lost Time [s] 4.004.004.004.004.004.004.004.004.004.00L, Total Lost Time per Cycle [s] 110110110110110110110110110110C, Cycle Length [s] RCRCLCLCCLLane Group Lane Group Calculations Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-163 Movement, Approach, & Intersection Results d_M, Delay for Movement [s/veh]54.99 11.65 11.89 64.30 25.84 0.00 49.90 49.89 42.98 59.36 59.36 49.84 Movement LOS D B B E C D D D E E D d_A, Approach Delay [s/veh]19.73 26.05 48.35 56.94 Approach LOS B C D E d_I, Intersection Delay [s/veh]29.64 Intersection LOS C Intersection V/C 0.753 Other Modes g_Walk,mi, Effective Walk Time [s]11.0 0.0 11.0 11.0 M_corner, Corner Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 M_CW, Crosswalk Circulation Area [ft²/ped]0.00 0.00 0.00 0.00 d_p, Pedestrian Delay [s]44.55 0.00 44.55 44.55 I_p,int, Pedestrian LOS Score for Intersection 2.874 0.000 2.384 2.001 Crosswalk LOS C F B B s_b, Saturation Flow Rate of the bicycle lane 2000 2000 2000 2000 c_b, Capacity of the bicycle lane [bicycles/h]818 582 618 145 d_b, Bicycle Delay [s]19.20 27.65 26.25 47.29 I_b,int, Bicycle LOS Score for Intersection 2.259 2.464 2.675 1.794 Bicycle LOS B B B A ----------------Ring 4 ----------------Ring 3 --------------65Ring 2 ------------8421Ring 1 Sequence Scenario 16: 16 PM 2021 Cum. + Project - Caltrans The Terrace Apartments, Orange Version 6.00-01 Generated with D-164 LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-17-3882-1 The Terrace Apartments, Orange N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Dividers.doc APPENDIX E PROJECT DRIVEWAY LEVEL OF SERVICE CALCULATION WORKSHEETS LINSCOTT, LAW & GREENSPAN, engineers LLG Ref. 2-16-3695-1 Kendall-Palm Commercial, San Bernardino N:\3800\2173882 - The Terrace Apartments, Orange\Report\3882 Sub-Dividers.doc APPENDIX E-I YEAR 2021 CUMULATIVE PLUS PROJECT TRAFFIC CONDITIONS E-1 0.027Volume to Capacity (v/c): CLevel Of Service: 16.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 19: Lewis Street at Project Driveway No. 1 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 2Lewis StreetLewis StreetName Intersection Setup 000Pedestrian Volume [ped/h] 119107600781Total Analysis Volume [veh/h] 3226900195Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 119107600781Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 119107600781Base Volume Input [veh/h] Project Driveway No. 2Lewis StreetLewis StreetName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-2 CIntersection LOS 0.14d_I, Intersection Delay [s/veh] BAAApproach LOS 13.400.000.00d_A, Approach Delay [s/veh] 3.493.490.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.140.140.000.000.000.0095th-Percentile Queue Length [veh/ln] BCAAAAMovement LOS 11.2915.980.009.330.000.00d_M, Delay for Movement [s/veh] 0.020.030.010.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-3 0.018Volume to Capacity (v/c): CLevel Of Service: 16.0Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 20: Lewis Street at Project Driveway No. 2 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 3Lewis StreetLewis StreetName Intersection Setup 000Pedestrian Volume [ped/h] 1561084116763Total Analysis Volume [veh/h] 4227132191Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 1561084116763Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 1561084116763Base Volume Input [veh/h] Project Driveway No. 3Lewis StreetLewis StreetName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-4 CIntersection LOS 0.19d_I, Intersection Delay [s/veh] BAAApproach LOS 12.560.090.00d_A, Approach Delay [s/veh] 3.303.300.000.990.000.0095th-Percentile Queue Length [ft/ln] 0.130.130.000.040.000.0095th-Percentile Queue Length [veh/ln] BCAAAAMovement LOS 11.1815.990.009.340.000.00d_M, Delay for Movement [s/veh] 0.020.020.010.010.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-5 0.113Volume to Capacity (v/c): BLevel Of Service: 10.6Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 21: City Boulevard at Project Driveway No. 3 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project Driveway No. 4City BoulevardCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 5286331066722Total Analysis Volume [veh/h] 1322827176Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 5286331066722Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 5286331066722Base Volume Input [veh/h] Project Driveway No. 4City BoulevardCity BoulevardName Volumes Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-6 BIntersection LOS 4.30d_I, Intersection Delay [s/veh] BAAApproach LOS 10.210.001.86d_A, Approach Delay [s/veh] 14.8814.880.000.000.001.1695th-Percentile Queue Length [ft/ln] 0.600.600.000.000.000.0595th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.5410.610.000.000.007.53d_M, Delay for Movement [s/veh] 0.050.110.000.000.000.02V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 7: 7 AM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-7 0.012Volume to Capacity (v/c): CLevel Of Service: 20.1Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 19: Lewis Street at Project Driveway No. 1 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 2Lewis StreetLewis StreetName Intersection Setup 000Pedestrian Volume [ped/h] 53883001140Total Analysis Volume [veh/h] 1122100285Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 53883001140Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 53883001140Base Volume Input [veh/h] Project Driveway No. 2Lewis StreetLewis StreetName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-8 CIntersection LOS 0.06d_I, Intersection Delay [s/veh] CAAApproach LOS 15.680.000.00d_A, Approach Delay [s/veh] 1.781.780.000.000.000.0095th-Percentile Queue Length [ft/ln] 0.070.070.000.000.000.0095th-Percentile Queue Length [veh/ln] BCABAAMovement LOS 13.0020.150.0010.920.000.00d_M, Delay for Movement [s/veh] 0.010.010.010.000.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-9 0.008Volume to Capacity (v/c): CLevel Of Service: 20.4Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 20: Lewis Street at Project Driveway No. 2 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftThruLeftRightThruTurning Movement Lane Configuration WestboundSouthboundNorthboundApproach Project Driveway No. 3Lewis StreetLewis StreetName Intersection Setup 000Pedestrian Volume [ped/h] 9286919151137Total Analysis Volume [veh/h] 2121754284Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 9286919151137Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 9286919151137Base Volume Input [veh/h] Project Driveway No. 3Lewis StreetLewis StreetName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-10 CIntersection LOS 0.18d_I, Intersection Delay [s/veh] BAAApproach LOS 14.420.240.00d_A, Approach Delay [s/veh] 2.152.150.002.440.000.0095th-Percentile Queue Length [ft/ln] 0.090.090.000.100.000.0095th-Percentile Queue Length [veh/ln] BCABAAMovement LOS 13.0820.420.0011.170.000.00d_M, Delay for Movement [s/veh] 0.020.010.010.030.000.01V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 200Number of Storage Spaces in Median YesTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-11 0.059Volume to Capacity (v/c): BLevel Of Service: 10.9Delay (sec / veh): 15 minutesAnalysis Period: HCM 6th EditionAnalysis Method: Two-way stopControl Type: Intersection 21: City Boulevard at Project Driveway No. 3 Intersection Level Of Service Report YesNoNoCrosswalk 0.000.000.00Grade [%] 30.0030.0030.00Speed [mph] 100.00100.00100.00100.00100.00100.00Pocket Length [ft] 000000No. of Lanes in Pocket 12.0012.0012.0012.0012.0012.00Lane Width [ft] RightLeftRightThruThruLeftTurning Movement Lane Configuration EastboundSouthboundNorthboundApproach Project Driveway No. 4City BoulevardCity BoulevardName Intersection Setup 000Pedestrian Volume [ped/h] 2039851288438Total Analysis Volume [veh/h] 51021322110Total 15-Minute Volume [veh/h] 1.00001.00001.00001.00001.00001.0000Other Adjustment Factor 1.00001.00001.00001.00001.00001.0000Peak Hour Factor 2039851288438Total Hourly Volume [veh/h] 000000Other Volume [veh/h] 000000Existing Site Adjustment Volume [veh/h] 000000Pass-by Trips [veh/h] 000000Diverted Trips [veh/h] 000000Site-Generated Trips [veh/h] 000000In-Process Volume [veh/h] 1.001.001.001.001.001.00Growth Rate 2.002.002.002.002.002.00Heavy Vehicles Percentage [%] 1.00001.00001.00001.00001.00001.0000Base Volume Adjustment Factor 2039851288438Base Volume Input [veh/h] Project Driveway No. 4City BoulevardCity BoulevardName Volumes Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-12 BIntersection LOS 2.30d_I, Intersection Delay [s/veh] BAAApproach LOS 10.360.002.41d_A, Approach Delay [s/veh] 6.566.560.000.000.002.1695th-Percentile Queue Length [ft/ln] 0.260.260.000.000.000.0995th-Percentile Queue Length [veh/ln] ABAAAAMovement LOS 9.3110.890.000.000.007.73d_M, Delay for Movement [s/veh] 0.020.060.000.000.000.03V/C, Movement V/C Ratio Movement, Approach, & Intersection Results 000Number of Storage Spaces in Median NoTwo-Stage Gap Acceptance 000Storage Area [veh] NoFlared Lane StopFreeFreePriority Scheme Intersection Settings Scenario 8: 8 PM 2021 Cum. + Project The Terrace Apartments, Orange Version 6.00-01 Generated with E-13 THIS PAGE INTENTIONALLY LEFT BLANK