Loading...
HomeMy WebLinkAboutSR - - ADVERTISE BIDS FY 2015-16 ANNUAL CONCRETE REPLACEMENT VARIOUS LOCATIONS1. SUBJECT Bid No. 156 -21; SP -3937; Annual Concrete Replacement at Various Locations, Fiscal Year 2015 -16 (FYI 6). Approval of plans and specifications and authorization to advertise for bids. 2. SUMMARY Plans and specifications have been completed for the Annual Concrete Replacement at Various Locations, FY16 Project. The project is ready to be advertised for bids. The estimated construction cost is $500,000 with 10% contingency. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the Annual Concrete Replacement at Various Locations, FYI Project. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 263.5021.51700.00000 (Measure M — Contractual Services) $ 170,000 263.5011.56330.13120 (Local Street Maintenance) $ 330,000 Total: $ 500,000 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 3. 11 1 11/10/15 C oPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND This project is part of the annual street maintenance activities for curb and gutter, sidewalk, driveway, and cross gutter replacement at various locations. Utilizing the City's Pavement Management Survey ranking of the streets, the City has prepared a list of streets requiring pavement rehabilitation for FY16. This project will complete all concrete replacement needs within these street rehabilitation locations before street overlay and slurry seal work starts, and other high maintenance areas. Street rehabilitation overlay and slurry seal will bid out as a separate project later this fiscal year. The estimated total quantities of concrete replacement at various locations, FYI is as follows: 1. 4,000 linear feet of curb and gutter 2. 41,000 square feet of sidewalk 3. 3,000 square feet of driveway apron 4. 4,000 square feet cross gutter and spandrel The total estimated construction cost for the annual concrete replacement project is $500,000 with 10% contingency. Construction is estimated to begin in February 2015 and be completed by June 2015. S. ATTACHMENTS • Plans, specifications, and cost estimates are available for review in the Public Works Department JD;ml;ly N: \Public Works\Active Construction Project \SP -3937 Annual Concrete, 15 -16 \SP -3937 Auth to Adv Aannual Concrete FYI 5-16 - DRAFT.docx ITEM 2 11/10/15 Printed on Recycled Paper