1. SUBJECT
Award of Consultant Services Agreement for design and construction services required for the
construction of a new tower antenna at the Water Plant Headquarters site.
2. SUMMARY
The City requested proposals from qualified consultants for design and construction services for
the construction of a new tower antenna at the Water Division Headquarters site. One qualified
response was received from Applied Technology Group, Inc. Applied Technology Group, Inc.
will be working with the Water Division's Engineering Section and Community Development's
Planning Division on the design and construction of the new tower antenna. The Water Division
is recommending award the consultant services agreement to Applied Technology Group, Inc., of
Bakersfield, CA in the amount of $38,100.00.
3. RECOMMENDED ACTION
Approve a Consultant Service Agreement with Applied Technology Group, Inc., in the amount
of $38,100.00 for design and construction services required to construct a new tower antenna at
the Water Division Headquarters site and authorize the Mayor and City Clerk to execute the
contract on behalf of the City.
4. FISCAL IMPACT
Funds are budgeted and are available in the following account:
600.8011.51620.00000 Engineering Services $ 190,000.00
5. STRATEGIC PLAN GOAL(S)
lb) Provide for a safe community — Provide and maintain infrastructure necessary to ensure
the safety of the public.
2d) Be a fiscally healthy community - Effectively manage and develop City assets.
ITEM 11/10/15
4b) Provide outstanding public service - Provide facilities and services to meet customer
expectations.
6. GENERAL PLAN IMPLEMENTATION
Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the
needs of residents and businesses.
Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the
community.
Economic Development Element Goal 6.0: Provide sufficient infrastructure to support
anticipated economic development and growth.
Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses.
E DISCUSSION and BACKGROUND
The Water Division has contracted with a video management and surveillance camera consultant
(Leverage Information Systems, Inc.) to upgrade the Water Division camera surveillance system.
This camera system allows for monitoring of the Water Plant Headquarters as well as critical
water facilities scattered throughout the City. As part of the camera upgrade, it was determined
that a first order requirement for the new system is the construction of a new higher antenna
tower capable of holding the required receiver equipment for both the new camera surveillance
system along with existing SCADA components that allow for remote water facility operations.
This antenna will be located at the Water Plant Headquarters and will replace the existing
antenna. The existing antenna will be relocated to a yet to be determined location to act as a
future backup antenna for the SCADA control system.
To facilitate the design and construction of the required antenna tower, a request for proposal
(RFP) was developed and sent to three qualified antenna consultants. The RFP requested
consultant proposals for the design and construction services required to successfully construct
and integrate the required antenna. Only one consultant, Applied Technology Group, Inc., of
Bakersfield, CA responded. Two other consultants declined to submit a proposal as it was out of
their work plan or they just declined to respond. Upon staff review, Applied Technology Group,
Inc. was found to be qualified and staff is recommending award of the contract to Applied
Technology Group, Inc. Applied Technology Group, Inc. will be working with the Water
Division's Engineering Section and Community Development's Planning Division on the design
and construction of the new tower antenna.
The total estimated cost for the consultant's work, which will include design, construction
oversight services, and integration, is $38,100.00.
8. ATTACHMENTS — 7�1
• Proposal
• Consultant Service Agreement