Loading...
HomeMy WebLinkAboutSR - - REJECTION OF BIDS DROUGHT RESISTANT LANDSCAPE RENOVATION WATER PLANT HEADQUARTERS & SOUTH YARD1. SUBJECT Rejection of all bids for Bid No.145 -57; Drought Resistant Landscape Renovation for Water Plant Headquarters and South Yard. 2. SUMMARY Four (4) bids for the Drought Resistant Landscape Renovation for Water Plant Headquarters and South Yard project were received and opened on July 16, 2015. The apparent low bidder, STL Landscape, Inc., for $103,000.00, claimed that a clerical mistake was made which resulted in its submitted bid being lower than it should have been. Since the second lowest bid received is substantially higher than the lowest bid, staff recommends rejection of all bids. 3. RECOMMENDED ACTION Reject all bids received. 4. FISCAL IMPACT Funds are budgeted and are available in the following account: 600.8011.51401.00000 Repair Buildings and Fix Equipment $176,996.29 5. STRATEGIC PLAN GOAL(S) lb) Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 2d) Be a fiscally healthy community - Effectively manage and develop City assets. 4b) Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 9/8/15 1 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND On June 9, 2015, the City Council approved the advertisement for the Drought Resistant Landscape Renovation for Water Plant Headquarters and South Yard project. Four (4) bids were received and opened on July 16, 2015. The results are as follows: CONTRACTOR AMOUNT STL Landscape, Inc. $103,000.00 KASA Construction, Inc. $159,425.00 Mariposa Landscape, Inc. $200,103.00 Clean Cut Landscape $265,343.00 STL Landscape, Inc., the apparent low bidder at the bid opening, requested to be relieved of the project claiming that a clerical error was made while filing out its bid. Upon reviewing the evidence provided by STL Landscape, Inc., staff confirmed that the error was made and would accept the request for withdrawal. Since the second lowest bid, submitted by KASA Construction, Inc., was $159,425.00 which is $56,425.00 or 54.8% higher than the lowest bidder, staff is recommending rejection of all bids. 8. ATTACHMENTS Bid Results ITEM 9/8/15 2