Loading...
HomeMy WebLinkAboutSR - - ADVERTISE BIDS 2014-14 STREET SEWER IMPROVEMENT PROJECTS VARIOUS LOCATIONSAGENDA ITEM �. a July 14, 2015 •Z'•, , NOUN C TO: Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Mana e FROM: Joe DeFrancesco Public Works D e William R. Crouch Community Development Director 1. SUBJECT ReviewedNerified (First Street Rehabilitation: Chapman Ave. to North End) $78,847.00 City Manager (Kelly Avenue Rehabilitation: Lemon St. to West End) 78,715.00 Finance Direc r (Pixley Street Rehabilitation: Culver Ave. to La Veta Ave.) 74,407.00 To Be Presented By: Joe DeFrancesco X Cons Calendar _ City Mgr Rpts Council Reports _ Legal Affairs Boards /Crates Public Hrgs Admin Reports _ Plan/Environ Bid No. 156 -03; Approval of plans and specifications, and authorization to advertise for bids for construction of FY 2014 -15 Community Development Block Grant (CDBG) Street /Sewer Improvement Projects: First Street, Kelly Avenue, Pixley Street, Center Street, Culver Avenue, Parker Street and Clark Street (SP- 3922). 2. SUMMARY _771 Plans and specifications have been completed for the rehabilitation of First Street, Kelly Avenue, Pixley Street, Center Street and Culver Avenue, and the sewer improvements on First Street, Parker Street and Clark Street under the FY 2014 -15 CDBG Program. The project is ready to be advertised for bids. The Engineer's construction estimate is $600,000.00 including contingencies and staff cost. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the CDBG FY 14 -15 Street Improvement Projects. 14. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 310.9645.56330.30033 (First Street Rehabilitation: Chapman Ave. to North End) $78,847.00 310.9645.56330.30034 (Kelly Avenue Rehabilitation: Lemon St. to West End) 78,715.00 310.9645.56330.30035 (Pixley Street Rehabilitation: Culver Ave. to La Veta Ave.) 74,407.00 310.9645.56330.30036 (First St. Sewer Replacement: Chapman Ave. to North End) 97,711.00 310.9645.56330.30037 (Center Street Rehabilitation: First St. to West End) 38,702.00 ITEM .� 1 7/14/15 O Printed on Recycled Paper 310.9645.56330.30038 (Culver Avenue Rehab.: Montgomery Way to Clark St.) 164,276.00 310.9645.56330.30040 (Parker St. & Clark St. Sewer Relining: On property easement) 62,300.00 Total $ 594,958.00 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 17. DISCUSSION and BACKGROUND The Federal CDBG Program provides grant funds to enable eligible localities to upgrade Low and Moderate Income Areas within their jurisdictions. Based on 2010 Census data, designated areas within the City of Orange qualify for CDBG funds. Eligible activities include infrastructure upgrades such as street improvements. The following streets qualify for CDBG funds and have been selected for rehabilitation and sewer improvements. 1) First Street Rehabilitation: Chapman Ave. to North End 2) Kelly Avenue Rehabilitation: Lemon St. to West End 3) Pixley Street Rehabilitation: Culver Ave. to La Veta Ave. 4) First St. Sewer Replacement: Chapman Ave. to North End 5) Center Street Rehabilitation: First St. to West End 6) Culver Avenue Rehabilitation: Montgomery Way to Clark St. 7) Parker St. & Clark St. Sewer Relining: On property easement These streets were rated in the Citywide Pavement Management Program with a Pavement Condition Index (PCI) ranging from 31 -55 (out of a maximum score of 100) indicating the need for street rehabilitation. The scope of rehabilitation, in general consists of, but is not limited to ADA compliant access ramps, localized removal and replacement of the existing pavement, asphalt concrete overlay, removal and replacement of failed sections of curb and gutter, driveways, sidewalks, cross gutters, spandrels, and adjustment of manholes and water valve covers to grade. Also included are sewer improvements on First Street, and along a property easement between Parker Street and Clark Street. The seven projects will be bid together for economies of scale and ease of construction coordination. The current total project cost estimate is $600,000 including 10% contingencies and staff cost, while the available unencumbered balance is $594,958. At the time bids are ITEM 2 7/14/15 O .z Printed on Recycled Paper received and actual bid prices are known, staff may request an additional appropriation, if necessary, to award the contract. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The CEQA Notice of Exemption will be filed with the County Recorder's Office upon Council's approval of the plans and specifications. The proposed project is also categorically excluded from the provisions of the National Environmental Policy Act (NEPA) under 24 CFR Section 58.35. Documentation of this determination is on file. Construction is scheduled to begin in September 2015 and is expected to be completed within forty -five calendar days. 18. ATTACHMENTS • Location Maps • Plans, Specifications and cost estimates are available for review in the Public Works Department JD;pt;ly NAPublic Works \ADMIN\ADMIN\LYoung \Council Items \COUNCILUuly - 2015 \7 -14 \SP -3922 Auth to Adverl4_15 CDBG.doc ITEM 3 7/14/15 C Printed on Recycled Paper