Loading...
HomeMy WebLinkAboutSR - AGR-6242 - POLICE HEADQUARTERS WALK IN EVIDENCE COOLER FREEZERAGENDA ITEM .. a July 14, 2015 c�O1YTY CP TO: Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Manager/ FROM: Joe DeFrancesco Public Works D' ector ReviewedNerified City Manager Finance Direc To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports _ Legal Affairs Boards /Cmtes Public Hrgs Admin Reports _ Plan/Environ 1. SUBJECT Award of contract for Bid No. 145 -59, SP -3883; Orange Police Headquarters Walk -in Evidence Cooler /Freezer Installation Project. 2. SUMMARY Bids for Orange Police Headquarters Walk -in Evidence Cooler /Freezer Installation Project were received and opened on June 25, 2015. Three (3) bidders responded to the Notice Inviting Bids. The apparent low bidder is Golden Sun Firm & Co., Inc. Northridge, CA for $117,450.00. The engineer's estimate including 10% for contingencies and construction engineering is $121,000. 3. RECOMMENDED ACTION Award the contract in the amount of $117,450.00 to Golden Sun Firm & Co., Inc. and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are available in the following account: 954.4021.56020.30031 (Orange Police Headquarters Remodel) $ 200,000 5. STRATEGIC PLAN GOAL(S) Provide for a safe community: b. Provide and maintain infrastructure necessary to ensure the safety of the public. 4. Provide outstanding public service: b. Provide facilities and services to meet customer expectations. ITEM � 1 7/14/15 LlvPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Public Safety Element Goal 6.0 Provide public safety services of the highest quality. Policy 6.1: Provide the Police Department with adequate personnel, equipment and state- of -the- art technology to effectively combat crime, meet existing and projected service demands, and provide crime prevention programs. These resources should be provided prior to anticipated needs. 1 7. DISCUSSION and BACKGROUND This project consists of removing an existing walk -in evidence cooler /freezer and furnishing and installing a new walk -in evidence cooler /freezer. The existing unit is over 15 years old and has been showing signs of heavy condensation on the walls' exterior. This indicates poor insulation and loss of energy. Replacing this unit before it fails is necessary to maintain the integrity of the stored evidence. With the low bid received and including 10% for contingencies and construction engineering the estimated project construction cost is $129,195.00. As part of redevelopment dissolution, funding for this project would be available through remaining redevelopment bonds proceeds that were approved by the State Department of Finance for transfer to the City through the ROPS 14 -15B process. Informal bids were advertised for three weeks, and bids were opened on June 25, 2015. Three bids were received as follows: 1) Golden Sun Firm, Inc., Northridge $ 117,450.00 2) Robert D Gosney Construction, Hesperia $ 121,586.00 3) Norse Corporation, Costa Mesa $ 154,673.00 Construction is scheduled to begin in mid - August 2015 and is expected to be completed within thirty (30) calendar days. 18. ATTACHMENTS • Bid Abstract JD;mfly N:\Public Works\ADMINTYoung \Council Items \COUNCILUuly 2015 \7- 14 -15 \SP -3883 Award OPD Walk -in Evidence Cooler /Freezer.docx ITEM 2 7/14/15 C oPrinted on Recycled Paper