Loading...
HomeMy WebLinkAboutSR - AGR-6241 - ASPHALT REPLACEMENT VARIOUS LOCATIONSAGENDA ITEM ,o July 14, 2015 ro T y C TO: Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Managers, / FROM: Joe DeFrancesco t Public Works Di ctor L SUBJECT Reviewed/Verified City Manager Finance Direct r To Be Presente oe DeFrancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Crates Public Hrgs Admin Rpts Plan /Environ Award of Contract - Bid No. 145-50; Asphalt Replacement at Various Locations FY 15 -16. 2. SUMMARY Three bids for the Asphalt Replacement at Various Locations FY 15 -16 were received and opened on June 4, 2015. The apparent low bidder is All American Asphalt for $673,000.00. 3. RECOMMENDED ACTION Award a contract for $673,000.00 to All American Asphalt and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and are available in the following account: 600.8041.53830.00000 Asphalt Products $700,000.00 15. STRATEGIC PLAN GOAL(S) lb) Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 2d) Be a fiscally healthy community - Effectively manage and develop City assets. 4b) Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. ITEM 3.� p 7/14/15 1 Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 7. DISCUSSION and BACKGROUND The City Council previously approved the advertisement for bids on May 12, 2015. Three bids were received and opened on June 4, 2015. The results are as follows: CONTRACTOR AMOUNT All American Asphalt $673,000.00 Hardy & Harper $710,500.00 R.J. Noble Company $1,334,000.00 All American Asphalt is the low bidder. As a result, staff conducted reference checks with other agencies that have done business with All American Asphalt including the Cities of Fullerton, Santa Ana, and Beverly Hills. All agencies contacted gave good reviews on the performance of All American Asphalt. Therefore, staff recommends that All American Asphalt be awarded the contract for $673,000.00 for the Asphalt Replacement at Various Locations FY 15 -16. Work items will include traffic control, removal of temporary asphalt concrete, saw cutting and grinding, paving and overlay, slurry seal, and adjustment of utility valves and covers to grade. The scope of work includes all labor, equipment, and materials necessary to repair the asphalt concrete patches on an "as needed" basis. The term of the contract is for one year. The contract can be renewed annually with approval of City Council for four more years if the City is satisfied with the performance and level of service from the contractor. The cost for the initial year is $673,000.00. Each subsequent year is subject to a formula -based consumer price index (CPI) with the adjustment cap of no greater than 2 %. 18. ATTACHMENTS Bid Results N:Tublic Works \ADMIN\Corina Perez\DPW Council Agendas\2015\July \Staff Report for AC Replacement FYI S-16 - Award.doc ITEM 7/14/15