Loading...
HomeMy WebLinkAboutSR - AGR-6240 - CALSENSE CENTRAL IRRIGATION EQUIPMENT VARIOUS PARKSApproval of a contract with Imperial Sprinkler Supply to purchase Calsense central irrigation system controllers and related equipment for Eisenhower, Olive, Handy, Pitcher, and Hart Parks for $91,719.86. 2. SUMMARY This contract with Imperial Sprinkler Supply will supply the parts necessary to complete the upgrades of the existing irrigation systems to centralized irrigation systems that utilize weather data, allowing for better management through remote access and the potential for significant water savings. 3. RECOMMENDED ACTION 1.) Approve the contract with Imperial Sprinkler Supply to purchase Calsense irrigation system controllers and related equipment; and 2.) Authorize the Mayor and the City Clerk to execute the contract on behalf of the City. 4. FISCAL IMPACT Funds are available to cover the cost of the Calsense installation as follows: 510.7021.56031.30047 ( Calsense Installation) $91,719.86 5. STRATEGIC PLAN GOAL(S) GOAL 3. Enhance and Promote Quality of Life in the Community A. Refurbish, maintain, develop and/or expand public use places and spaces. ITEM 3 1 - 1 07/14/15 6. GENERAL PLAN IMPLEMENTATION Natural Resources Element Goal 2.0: Protect our water and energy resources from pollution and overuse. Policy 2.3: Reduce the amount of water used for landscaping through the use of native and drought - tolerant plants, proper soil preparation, and efficient irrigation systems as parks are built or renovated. 7. DISCUSSION and BACKGROUND Background Eisenhower, Olive, Handy, Pitcher, and Hart Parks comprise over 74 acres of landscape, lighting, and other infrastructure maintained by the City under service agreements. The cost for all maintenance in the parks, including irrigation water, has steadily increased in recent years and the aging infrastructure is demanding more resources to maintain it. The irrigation system is extensive, providing water to turf, shrubs and trees throughout the parks. Governor Brown's recent Executive Order B -29 -15 has dictated that the City show a 28% decrease in water usage. A significant reduction in irrigation water use through improved efficiency in its delivery is imperative to meet the mandate. Other efforts are being planned and implemented as part of an overall, comprehensive plan to reduce water consumption in City landscapes. These include future removal of turf in parks and other City facilities, replacing it with drought- tolerant plant designs as funds are available; retrofitting irrigation systems to low flow, sub - surface type designs; mulching planters; and providing continuing education to staff on water management and irrigation technology. Discussion In an effort to accomplish ongoing reductions in water consumption for public landscape, the Community Services Department is proposing to replace irrigation controllers throughout the five parks with Calsense centralized irrigation control systems. Calsense irrigation control systems have already been introduced at other City parks and are proving to accomplish significant savings as well as maximizing staff's ability to more effectively manage the systems throughout the City. The Community Services Department advertised Bid 145 -56 and received bids from four (4) companies. The lowest responsible bid was received from Imperial Sprinkler Supply for $91,719.86. In a separate agenda item for Council consideration is an award of contract for installation of this equipment. The work is scheduled to begin in July of this year and be completed within 90 days. Additional parks will be retrofitted with Calsense irrigation control systems in the FY 15/16 CIP cycle. Efforts will continue over the next 5 -6 years with the eventual retrofit of all parks to weather -based irrigation control systems. Other City facilities will be addressed as funds are made available. 2 ITEM 07/14/15 8. ATTACHMENTS Bid Abstract Imperial Sprinkler Supply Proposal ITEM 07/14/15