Loading...
HomeMy WebLinkAboutSR - - REJECT ALL BIDS & READVERTISE SEWER LINE CLEANING & VIDEO INSPECTIONAGENDA ITEM .. 4 June 9, 2015 O� •, emp 6 �. P1� TO: Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Manag FROM: Joe DeFrancesco Public Works D' ector Reviewed/Verified B City Manager Finance Director To Be Presented By- DeFrancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Crates Public Hrgs Admin Rpts Plan /Environ 1. SUBJECT Bid No. 145 -37; S -236: Sewer Line Cleaning and Video Inspection, rejection of all bids. 2. SUMMARY Public Works received four bids for Sewer Line Cleaning and Video Inspection as a result of the Notice Inviting Bids. Bids were opened on April 30, 2015 and all bids received were higher than the available project funding. Staff recommends rejection of all bids and seeks the authorization to re- advertise the project with a reduced scope of work. 3. RECOMMENDED ACTION 1. Reject all bids received. 2. Authorize staff to re- advertise this project with a reduced scope of work. 4. FISCAL IMPACT Upon approval of the Fiscal Year 2015/16 budget, Capital Improvement Program funds will be available in the following account: 220.5022.56510.15509 (Sewer Cleaning and Video) $ 200,000 5. STRATEGIC PLAN GOAL(S) 1 b. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 1 06/09/15 6. GENERAL PLAN IMPLEMENTATION Infrastructure Goal 1.0 Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. Policy 1.5: Investigate and carry out cost - effective methods to reduce storm water infiltration into the sewer system. Implementation Plan: Program II -6 — Correct Sewer System Deficiencies. 7. DISCUSSION and BACKGROUND The City Council previously approved the advertisement for bids at the March 10, 2015 meeting. The bid solicitation advertised on March 11, 2015 for a period of 50 calendar days with bids opened on April 30, 2015. Four bidders submitted proposals as follows: 1) Innerline Engineering $351,400.00 2) Hoffman Southwest Corp, DBA PPS $361,900.00 3) Houston & Harris PCS, Inc. $401,531.66 4) Nor -Cal Pipeline Systems $453,250.29 Upon review of bids received, staff determined that the total cost for the contract based on the original scope of work provided for this bid would exceed the total available funding. A comparison of the current bid unit pricing with the previous contract unit pricing shows there has been an increase of over 100 %. For example, the existing contract pricing for "routine sewer line cleaning" is $0.266/LF; the pricing received for the same scope of work is now bid at $0.61/LF. The engineer's estimate for this project was originally based on existing unit pricing. Staff is recommending rejection of all bids and requesting authorization to re- advertise the project with a reduced scope of work. Staff will provide a new scope of work that focuses on only the essential aspects of the project such as sewer line cleaning. This work is required in order to mitigate sewer spills and to stay in compliance with the State Water Resources Control Board (SWQCB) Order No. 2006 -0003- DWQ entitled Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. In addition, the data gathered during video inspection of the sewer lines is used to identify infrastructure deficiencies and plan for CIP projects. 8. ATTACHMENTS Bid Abstract N: \Public Works\ADMIN\ADMIN\WITIIAM\AGENDA REPORTS\2015UUNE 9\13I1) 145 -37 SEWER LINE CLEANING REJECTION OF ALL BIDS.doc 0)