HomeMy WebLinkAboutSR - AGR-6220 - KATELLA AVENUE & WANDA ROAD IMPROVEMENTSAGENDA ITEM
o ; �<
:a April 14, 2015
Cp�, G
TO: Honorable Mayor and
Members of the City Council
THRU: Rick Otto
Interim City Mana r
FROM: Joe DeFrancesco G
Public Works D' ector
Reviewed/Verified
City Manager
Finance Direct
l/
To Be Presented By:
Joe DeFrancesco
Cons Calendar
City Mgr Rpts
Council Reports
_
_ Legal Affairs
Boards /Crates
Public Hrgs
X Admin Reports
_
Plan/Environ
1. SUBJECT
Bid No. 145 -34; Award of Katella Avenue and Wanda Road Improvements Project (SP- 3762).
2. SUMMARY
The bids for the Katella Avenue and Wanda Road Improvements Project were received and
opened on March 26, 2015. Nine (9) bidders responded to the Notice Inviting Bids. The
apparent low bidder is All American Asphalt, of Corona, CA for $754,326.00. The Engineer's
original estimate was $760,000.00 including contingencies and staff cost. The revised estimated
total project cost is $830,000.00 including 10% contingencies and staff cost.
3. RECOMMENDED ACTION
1. Award the contract in the amount of $754,326.00 to All American Asphalt, and authorize the
Mayor and City Clerk to execute the necessary documents on behalf of the City.
2. Accept into the City's revenue budget a $583,680 grant from Orange County Transportation
Authority (OCTA) M2 funds into revenue account number 550.5011.45290.20073, Katella
Ave. /Wanda Rd. 2 nd Left Turn Addition
3. Accept into the City's revenue budget $99,000 for fair share funds from Villa Park, into
revenue account number 550.5011.45530.20073, Katella Ave. /Wanda Rd. 2 " Left Turn
Addition
4. Authorize the appropriation of $682,680 from Fund 550 into expenditure account number
550.5011.56330.20073, Katella Ave. /Wanda Rd. 2 "d Left Turn Addition
5. Authorize the appropriation of $35,000 from the Transportation Systems Improvement
Program (TSIP) Area C (Fund 285) unreserved fund balance into expenditure account
number 285.5011.56330.20073, Katella Ave. /Wanda Rd. 2 " Left Turn Addition
6. Transfer $84,000 from account number 285.5011.56330.13034, Meats Ave. and SR -55
Interchange Study into account number 285.5011.56330.20073, Katella Ave. /Wanda Rd. 2 "
Left Turn Addition
ITEM �. 1 1 4/14/15
Cf Printed on Recycled Paper
OCTA M2 grant and Villa Park's fair -share for construction is currently programmed for FY
2015 -16. OCTA Measure M2 funding guideline gives the City pre -award authority (award prior
to the funding program year). Staff is requesting appropriation to advance the FY 2015 -16 funds
to the FY 2014 -15 accounts.
4. FISCAL IMPACT
After appropriation, funds will be available in the following accounts.
285.5011.56330.20073 (TSIP Area "C" — Katella Ave. / Wanda Rd.) $ 132,597
550.5011.56330.20073 (Fair Share: Villa Park — Katella Ave. / Wanda Rd.) $ 99,000
550.5011.56330.20073 (OCTA M2 — Katella Ave. / Wanda Rd.) $ 631,824
Total
$ 863,421
5. STRATEGIC PLAN GOAL(S)
1 b. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the
safety of the public.
6. GENERAL PLAN IMPLEMENTATION
Circulation and Mobility Element Goal 1.0: Provide a safe, efficient, and comprehensive
circulation system that serves local needs, meets forecasted demands and sustains quality of life
in neighborhoods._
Policy 1.2: Identify key intersections and streets with historical or projected traffic congestion
problems and apply creative traffic management measures to improve overall circulation.
Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to
enhance public safety and improve circulation.
Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -
of -way.
1 7. DISCUSSION and BACKGROUND
This project is proposed in order to alleviate congestion and reduce delay at the intersection of
Katella Avenue and Wanda Road during peak traffic periods. The project consists of the
widening of the northwest and southwest quadrants of the intersection. This project will add one
additional left turn pocket on eastbound Katella Avenue onto northbound Wanda Road and one
right turn lane on westbound Katella Avenue onto northbound Wanda Road. Pavement
rehabilitation, sidewalks, curb and gutter, replacement of stamped concrete median, street trees,
signing and striping, street lighting, and signal modifications are proposed for the project. Signal
modifications include replacement of traffic signals, controller cabinet, loop detectors, and other
related items. Traffic signal includes replacement of poles, mast arm, and signal heads to
accommodate new lane configurations.
The current construction cost estimate is $830,000.00 including 10% contingencies and staff
cost. Funds including OCTA M2 grant and Villa Park's fair -share for construction are currently
programmed for the 2015 -16 Fiscal Year. The project is ahead of schedule. In order to take
advantage of completing the project during summer time to minimize traffic impacts to nearby
ITEM 2 4/14/15
schools, staff recommends awarding the construction contract in April. OCTA Measure M2
funding guideline gives the City pre -award authority. Therefore, staff is requesting appropriation
to advance the FY 2015 -16 funds to the current fiscal year.
The City Council previously approved advertisement for bids on February 10, 2015. The bid
solicitation was advertised on February 18, 2015 for a period of five weeks, and bids were
opened on March 26, 2015. The nine bids received are as follows:
1)
All American Asphalt, Corona ......... ...............................
$ 754,326.00
2)
Hardy and Harper, Inc., Santa Ana .. ...............................
$ 765,000.00
3)
Excel Paving Company, Long Beach ..............................
$ 779,220.00
4)
RJ Noble Company, Orange ............ ...............................
$ 779,600.00
5)
Hillcrest Contracting Inc. , Corona .. ...............................
$ 780,126.00
6)
Sully- Miller Contracting Co., Brea .. ...............................
$ 787,852.00
7)
Terra Pave Inc., Whittier .................. ...............................
$ 823,810.00
8)
Griffith Company, Santa Fe Springs ...............................
$ 837,482.00
9)
Aramexx Construction, Ontario ....... ...............................
$ 978,570.00
The revised estimated total project cost is $830,000.00, which includes the apparent low bid of
$754,326.00, and approximately 10% contingencies and staff cost.
The project is categorically exempt under CEQA Guidelines Section 15301, Existing Facilities.
This exemption applies to the operation, repair, maintenance and minor alteration to existing
public or private structures or facilities (including existing highways, streets, sidewalks, gutters,
trails, and similar facilities), involving negligible or no expansion of the existing use. The CEQA
Notice of Exemption was filed with the County Recorder's Office in August 2013.
Construction is scheduled to begin in June 2015 and is expected to be completed within one
hundred calendar days.