Loading...
HomeMy WebLinkAboutSR - AGR-6218 - 2014-15 ADA WHEELCHAIR ACCESS RAMPS VARIOUS LOCATIONSa vxnc TO: AGENDA ITEM April 14, 2015 Honorable Mayor and Members of the City Council THRU: Rick Otto Interim City Mana FROM: Joe DeFrancesco ' It /__ Public Works D' ector Anna Pehoushek A" Acting Assistant Community Development Director 1. SUBJECT Award of Contract - Bid No. 145 -43; SP- 3906; FY 2014 -15 Community Development Block Grant (CDBG) Project — Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations. 2. SUMMARY Bids for ADA Wheelchair Access Ramps at Various Locations, Fiscal Year 2014 -15 were received and opened on April 2, 2015. Three (3) bidders responded to the Notice Inviting Bids. The apparent low bidder is Vido Samarzich, Inc. in the amount of $78,780.00 3. RECOMMENDED ACTION — _7�1 Award a contract in the amount of $78,780 to Vido Samarzich, Inc., Alta Loma, CA 91701 and authorize the Mayor and the City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are budgeted and available in the Capital Improvement Program in the following account: 310.9645.56330.11328 (CDBG — ADA Improvements) $ 94,854 5. STRATEGIC PLAN GOAL(S) 1 b. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. Reviewed/Verified By: City Manager Finance Director To Be Presented By: Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports Legal Affairs Boards /Crates Public Hrgs Admin Reports Plan /Environ ITEM ? J- 19 1 4/14/2015 OPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND The City Council previously approved advertisement for bids at its March 10, 2015 meeting. The bid solicitation was advertised on March 18, 2015 for a period of two (2) weeks, and bids were opened on April 2, 2015. Three (3) bidders submitted proposals as follows: 1) Vido Samarzich, Inc. $78,780.00 2) EBS General Engineering, Inc. $79,900.00 3) C.J. Concrete Construction, Inc. $91,750.00 This project will provide for construction of approximately fourteen (14) ADA wheelchair access ramps at various locations, City -wide. As part of this project, detectable warning surfaces (truncated domes) will be installed per the American with Disabilities Act Accessibility Guidelines (ADAAG) requirements. The City receives CDBG funding from the U.S. Department of Housing and Urban Development for activities that primarily benefit Low and Moderate Income residents. Construction of ADA compliant access ramps City -wide qualifies for CDBG funding because the ramps benefit disabled residents that are considered to be Low Income. The estimated total cost for this project is $90,597 including 15% contingency and construction engineering. Construction is scheduled to begin in mid May 2015, and is expected to be completed within a month. 8. ATTACHMENTS • Bid Abstract • Location Map JD;at;ly N:\Public Works\ADMIN\ADMIN \LYoung \LYoung \Council Items \C0UNCIL\April - 2015 \SP 3906 Award- ADA Ramps FY 14- 15.docx ITEM 2 4/14/2015 C oPrinted on Recycled Paper