Loading...
HomeMy WebLinkAboutSR - AGR-6211 - 2014-15 CONCRETE REHABILITATION VARIOUS LOCATIONSa AGENDA ITEM March 10, 2015 TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley City Manager FROM: Joe DeFrancesco Public Works rector Reviewed/Ver' ied By: City Manager Finance Direc or To Be Presente : Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports Legal Affairs Boards /Crates Public Hrgs Admin Reports Plan /Environ 1. SUBJECT Award of Contract - Bid No. 145 -32; SP -3905; Concrete Street Rehabilitation at Various Locations, Fiscal Year 2014 -15 2. SUMMARY Bids for Concrete Street Rehabilitation at Various Locations were opened on February 26, 2015. Nine (9) bidders responded to the Notice Inviting Bids. The apparent low bidder is CLS Constructors, Inc. of Grand Terrace, CA for $576,500. 3. RECOMMENDED ACTION Award a contract in the amount of $576,500 to CLS Constructors, Inc., Grand Terrace, CA and authorize the Mayor and the City Clerk to execute on behalf of the City. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 340.5011.56330.13120 (Local Street Maintenance) $ 650,000 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 3, 9 1 3/10/2015 CoPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 7. DISCUSSION and BACKGROUND This project is part of the Annual Street Maintenance activities, and is designed to prolong pavement life of city streets. This project will rehabilitate concrete pavement streets at various locations and will include reconstruction of damaged sidewalk, curb, and gutter. The rehabilitated pavement will have a longer service life and will provide a safe and smooth ride for the traveling public. Most of the concrete streets are located in the Old Towne area. Damaged concrete pavement will be replaced in sections. The streets selected for maintenance in accordance with our Pavement Management Plan, generally fall into the "poor to fair" category and require work at this time to prevent total pavement failure and more costly reconstruction in the future. The City Council previously approved advertisement for bids on February 10, 2015. The project was publicly advertised for two weeks. The bids were opened on February 26, 2015. Eleven (11) bid proposals were sold and nine (9) bidders responded as follow: 1. CLS Constructors, Inc. $576,500 2. Vido Samazich, Inc. $602,700 3. Unique Performance Construction, Inc. $619,440 4. Horizons Construction Co. $624,520 5. C.J. Concrete Construction, Inc. $651,650 6. EBS General Engineering, Inc. $654,600 7. All American Asphalt Corp. $726,726 8. Nobest, Inc. $764,100 9. Kalban, Inc. $1,074,400 The Engineer's Construction Cost Estimate is $600,000, which includes approximately 10% construction contingency. Upon bid opening, the estimated project cost is $634,150, which includes the apparent low bid of $576,500, approximately 10% contingency. Construction is scheduled to begin in late April 2015 and be completed by July 2015. 18. ATTACHMENTS Bid Abstract NAPublic Works \ADMIN\ADMIN\LYoung \LYoung \Council Items \COUNCIL\March - 2015\3- 10 -15 \SP 3905 Award- Concrete St Rehab FY 14- 15.docx ITEM 2 3/10/2015 C oPrinted on Recycled Paper