Loading...
HomeMy WebLinkAboutSR - - WELL NO 27 EQUIPPING PROJECTG� °°c� AGENDA ITEM March 10, 2015 CpU GP TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley City Manager FROM: Joe DeFrancesco Public Works Di ector 1. SUBJECT ReviewedNeri B City Manager Finance Direct r To Be Presente Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Rpts Legal Affairs Boards /Crates Public Hrgs Admin Rpts Plan /Environ Bid No.145 -39; Well No. 27 Equipping Project (W -659); Approval of plans and specifications and authorization to advertise for bids. 2. SUMMARY Plans and specifications have been completed for the Well No. 27 Equipping Project. This project is ready to be advertised for bids. The preliminary cost estimate is $1,300,000.00. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the Well No. 27 Equipping Project (W -659) 4. FISCAL IMPACT Funds are budgeted and are available in the following accounts: 600.8011.56411.18119 Well 27 Construction $1,301,404.00 5. STRATEGIC PLAN GOAL(S) lb) Provide for a safe community — Provide and maintain infrastructure necessary to ensure the safety of the public. 2d) Be a fiscally healthy community - Effectively manage and develop City assets. 4b) Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATIO Infrastructure Element Goal 6.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the ITEM �J.1 3/10/15 1 community. Economic Development Element Goal 6.0: Provide sufficient infrastructure to support anticipated economic development and growth. Policy 6.1: Provide public improvements to support commercial, industrial and institutional uses. 17. DISCUSSION and BACKGROUND Well No. 27 is located at 140 S. Jameson Street, adjacent to the Water Division headquarters parking lot. Well 27 will replace existing wells 4, 5 and 14 which have exceeded their useful life and are failing. The first phase of the Well 27 construction consisted of drilling and test pumping to determine actual well performance and capacity. This work was completed in October 2014 and it was concluded that the well could produce approximately 3000 gallons per minute of potable water. With this determination, the second phase of the project, the equipping phase, could be designed and the project moved forward for final construction. The scope of work for the equipping phase of Well 27 construction includes the installation of pump and motor, discharge piping, electrical and chlorine buildings, emergency power generator, fencing, and landscaping. The preliminary engineering cost estimate for this project is $1,300,000.00. Construction is anticipated to begin in May 2015 and to be completed within 270 calendar days. The Well No. 27 project was previously approved by the City Council on February 9, 2010, as part of the larger "Water Warehouse Renovation and Well 27 Construction" project. At that same time, Mitigated Negative Declaration (MND) 1816 -09 was approved in compliance with the California Environmental Quality Act (CEQA). The proposed Well 27 Equipping Project was adequately described and analyzed in the previously approved MND. As such, nothing further is warranted for CEQA compliance. Mitigation measures identified in previously - approved MND 1816 -09 have been incorporated into project plans and specifications and will be implemented during construction. 18. ATTACHMENTS I . Location Map ITEM 7 -11-(6/14