Loading...
HomeMy WebLinkAboutSR - - ADVERTISE BIDS ANNUAL CONCRETE STREET REHABILITATION VARIOUS LOCATIONSAGENDA ITEM February 10, 2015 t/NTY TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley, City Manager FROM: Joe DeFrancesco Public Works Wrector ReviewedNer' >t d By: City Manager Finance Dire or To Be Presente y: Joe DeFrancesco X Cons Calendar _ City Mgr Rpts Council Reports _ Legal Affairs Boards /Cmtes Public Hrgs Admin Reports _ Plan /Environ 1. SUBJECT Bid No. 145 -32; SP -3905; Concrete Street Rehabilitation at Various Locations, Fiscal Year 2014 -15. Approval of plans and specifications and authorization to advertise for bids. 2. SUMMARY Plans and specifications have been completed for the Concrete Street Rehabilitation at Various Locations, Fiscal Year 2014 -15. The project is ready to be advertised for bids. The estimated construction cost is $ 550,000. 3. RECOMMENDED ACTION Approve plans and specifications and authorize advertising for bids for the Concrete Street Rehabilitation at Various Locations, Fiscal Year 2014 -15 Project. 4. FISCAL IMPACT Funds are budgeted in the Capital Improvement Program and are available in the following accounts: 340.5011.56330.13120 (Local Street Maintenance) $ 600,000 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. ITEM 3 � H 1 02/10/15 C oPrinted on Recycled Paper 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to enhance public safety and improve circulation. Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights - of -way. 17. DISCUSSION and BACKGROUND This project is part of the Annual Street Maintenance activities, and is designed to prolong pavement life of city streets. This project will rehabilitate concrete pavement streets at various locations and will include reconstruction of damaged sidewalk, curb, and gutter. The rehabilitated pavement will have a longer service life and will provide a safe and smooth ride for the traveling public. Most of the concrete streets are located in the Old Towne area. Damaged concrete pavement will be replaced in sections. The streets selected for maintenance in accordance with our Pavement Management Plan, generally fall into the "poor to fair" category and require work at this time to prevent total pavement failure and more costly reconstruction in the future. The available budget is $600,000 including 10% contingency. Staff will rehabilitate as many locations as budget allows. The proposed project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities" Class 1 (c). The CEQA Notice of Exemption will be filed with the County Recorder's Office upon Council's approval of the plans and specifications. Construction is estimated to begin in April 2015 and be completed by June 2015. 8. ATTACHMENTS • Plans, specifications, and cost estimates are available for review in the Public Works Department JD;at;ly NAPublic Works\Active Construction Project \SP -3905 concrete Street Rehab. 14 -15 \SP -3905 Auth to Adv Concrete Street Rehab. FY14 -15 - DRAFT.docx ITEM 2 02/10/15 ()Printed on Recycled Paper