HomeMy WebLinkAboutSR - - ADVERTISE BIDS 2014-15 WHEELCHAIR ACCESS RAMPS VARIOUS LOCATIONSor o..
S CP ti
TO:
AGENDA ITEM
February 10, 2015
Honorable Mayor and
Members of the City Council
Reviewed/Veri ied By:
City Manager
Finance Direct
To Be Presente B .
Joe DeFrancesco
X Cons Calendar
_ City Mgr Rpts
Council Reports
_ Legal Affairs
Boards /Cmtes
_ Public Hrgs
Admin Reports
Plan/Environ
THRU: John W. Sibley
City Manager
FROM: Joe DeFrancesco
Public Works D' ector
Rick Otto
Interim Community Development Director
L SUBJECT
Bid No. 145 -33; SP- 3906; FY 2014 -15 Community Development Block Grant (CDBG) Project
— Americans with Disabilities Act (ADA) Wheelchair Access Ramps at Various Locations.
Approval of plans and specifications and request for authorization to advertise for bids.
2. SUMMARY
Plans and specifications have been completed for the CDBG- funded FY 2014 -15 ADA
Wheelchair Access Ramps at Various Locations Project and the Project is ready to be advertised
for bids. The total estimated construction cost including contingencies and construction
engineering (15 %) is $92,000.
3. RECOMMENDED ACTION
Approve plans and specifications and authorize advertising for bids for the FY 2014 -15 CDBG
ADA Wheelchair Access Ramps at Various Locations.
4. FISCAL IMPACT
Funds are budgeted and available in the Capital Improvement Program in the following account:
310.9645.56330.11328 CDBG — ADA Improvements $ 96,482
5. STRATEGIC PLAN GOAL(S)
lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the
safety of the public.
4b. Provide outstanding public service - Provide facilities and services to meet customer
expectations.
ITEM 3.4a 1 02/10/2015
O Printed on Recycled Paper
6. GENERAL PLAN IMPLEMENTATION I
Infrastructure Element Goal 3.0 Ensure adequate maintenance of public rights -of -way to
enhance public safety and improve circulation.
Policy 3.1: Continue to maintain and repair sidewalks and pavement surfaces on public rights -
of -way.
17. DISCUSSION and BACKGROUND
This project will provide for construction of approximately twenty (20) ADA wheelchair access
ramps at various locations, City -wide. As part of this project, detectable warning surfaces
(truncated domes) will be installed per the American with Disabilities Act Accessibility
Guidelines (ADAAG) requirements.
The City receives CDBG funding from the U.S. Department of Housing and Urban Development
for activities that primarily benefit Low and Moderate Income residents. Construction of ADA
compliant access ramps City -wide qualifies for CDBG funding because the ramps benefit
disabled residents that are presumed to be Low Income.
The proposed project is categorically exempt from the provisions of the California
Environmental Quality Act (CEQA) under CEQA guidelines Section 15301 "Existing Facilities"
Class I (c). The Notice of Exemption has been filed with the County Recorder's Office. The
proposed project is also categorically excluded from the provisions of the National
Environmental Policy Act (NEPA) under CFR 24 Section 58.35. Documentation of this
determination is on file.
The estimated total cost for this project is $92,000 including 15% contingency and construction
engineering.
Construction is scheduled to begin in April 2015, and is expected to be completed within a
month.
8. ATTACHMENTS
• Location List
• Plans, specifications, and cost estimate are available for review in the Public Works
Department.
JD:at:ly
N:\Public Works\ADMIN\ADMIN \LYoung \Council Items \COUNCIL\March - 20140-1 I\A A Ramp 13 -14 Auth to Advertise.docx
ITEM 2 02/10/2015
0 Printed on Recycled Paper