Loading...
HomeMy WebLinkAboutSR - AGR-6191 - FEATHER HILL SUBDRAIN & VILLA REAL STORM DRAINAGENDA ITEM January 13, 2015 TO: Honorable Mayor and Members of the City Council THRU: John W. Sibley, City Manager FROM: Joe DeFrancesco, Public Works Di ector ReviewedNeri By; City Manager Finance Direc r To Be Presente Joe DeFrancesco X Cons Calendar City Mgr Rpts Council Reports _ _ Legal Affairs Boards /Crates Public Hrgs Admin Reports _ Plan/Environ 1. SUBJECT Award of contract for bid No. 145 -23; Project D -166A; Feather Hill Drive Subdrain and Villa Real Drive Storm Drain Improvements. 2. SUMMARY Informal bids for Feather Hill Drive Subdrain and Villa Real Drive Storm Drain Improvements were received and opened on December 4, 2014. Six (6) bidders responded to the Notice Inviting Bids. The apparent low bidder is GRFCO, Inc. of Perris for $45,000. The Engineer's estimate was $45,000. 13. RECOMMENDED ACTION I Award the contract in the amount of $45,000 to GRFCO, Inc., and authorize the Mayor and City Clerk to execute the necessary documents on behalf of the City. 4. FISCAL IMPACT Funds are available in the following accounts: 263.5011.56330.13120 (Local Street Maintenance) $45,000 5. STRATEGIC PLAN GOAL(S) lb. Provide for a safe community - Provide and maintain infrastructure necessary to ensure the safety of the public. 4b. Provide outstanding public service - Provide facilities and services to meet customer expectations. 6. GENERAL PLAN IMPLEMENTATION Infrastructure Element Goal 1.0: Ensure water, sewer, and storm drain systems that meet the needs of residents and businesses. ITEM 3. 11 1 01/13/15 �1%Printed on Recycled Paper Policy 1.1: Provide sufficient levels of water, sewer, and storm drain service throughout the community. 17. DISCUSSION and BACKGROUND The bid solicitation was advertised as informal bid procedures on November 20, 2014 for a period of two (2) weeks. Bids were opened on December 4, 2014, and six (6) bidders submitted proposals as follows: TOTAL BID 1) GRFCO, Inc., Perris $ 45,000.00 2) SND Construction, Inc., Arcadia $ 49,768.00 3) Atlas Allied, Inc., Anaheim $ 66.055.00 4) Vaslj, Inc., Irwindale $ 71,450.00 6) Ramona, Inc., Arcadia $ 76,750.00 7) Paulus Engineering, Inc., Anaheim $ 120,500.00 The project improvements will extend the existing subdrain system at Feather Hill Ave. which includes the installation of approximately 70 linear feet of 8" PVC perforated subdrain piping for interception of subsurface water seepage within public right -of -way. As part of this project, it will also replace existing corrugated metal storm drain pipe with reinforced concrete pipe at Villa Real Drive which is completely corroded. The total estimated construction cost including 15% for contingencies and construction engineering is $52,000. Construction is scheduled to begin in February 2015 and is expected to be completed within 2 weeks. 18. ATTACHMENTS I • Bid Abstract JD;m;ly N:\ADMIN\ADMIN\LYoung \LYoung \Council Items \COUNCIL\Jan - 2015 \Featherhill and Villa Real bid rejection.docx ITEM 2 01/13/15 .y �F Printed on Recycled Paper